HomeMy WebLinkAbout2008-02-06 PACKET 08.B.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM
DATE 02/06/08
PREPARED BY: Engineerin� Jennifer Levitt
ORIGINATiNG DEPARTNfENT BTAFF AUTHOR
�����<��..��������.���.�.�«�������.����.�������.
COUNCIL ACTION REQUEST:
Authorize the site improvement work at the Pine Tree Valley Park to be included in the 2008
Pavement Management Project.
STAFF RECOMMENDATION:
Recommend the Council authorize the site improvement work at the Pine Tree Valley Park to
be included in the 2008 Pavement Management Project.
ADVISORY COMMISSION ACTfON:
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES/RIGHTS
❑ ECONOMIC DEV. AUTHORITY
❑
SUPPORTING DOCUMENTS:
i.�_�ra
APPROVED
❑
❑
❑
❑
❑
❑
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
REVIEWED
❑
❑
❑
❑
❑
❑
❑
� MEMO/LETTER: Jennifer Levitt, January 28, 2008.
❑ RESO�UTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: Pine Tree Valley Park Building Plan Layout.
ADMINISTRATORS COMMENTS:
��
City Administrator ate
�����������,,�������.���������,����,.�..�����������
COUNCIL ACTION TAKEN: U APPROVED ❑ DENIED ❑ OTHER
CITY OF COTTAGE GROVE
MINNESOTA
To: Honorable Mayor and City Council
Ryan Schroeder, City Administrator
From: Jennifer Levitt, P.E., City Engineer
Date: January 28, 2008
Subject: Pine Tree Valley Park Building
At the January 16, 2008 City Council meeting staff was directed to review the existing
condition of the Pine Tree Valley Park Building and report back on the immediate repairs that
are necessary to keep the building in service for a few additional years. Also the Council
requested information pertaining to the amount of site work that can be completed as part of
the 2008 Pavement Management Project.
Current Repairs
The following is a list of necessary repairs that need to take place to the buiiding:
Job Detail Cost
Electrical Move exterior lights $1000
Flooring Replace rotten boards $300
Exterior Work Paint, soffits, siding $800
Restrooms Replace sinks $500
Duct Cleanina Complete duct and reaister cleaninq $500
TOTAL $3100
The electrical work noted wiil be done by a hired electrician and aIl remaining work will be done
by in-house Public Works staff. The Building Official did review the building and noted that the
building does have a humidity problem due to the inadequate ventilation system of the
building. This inadequacy can lead to mold probiems. In the past, trace moid did occur on the
ceiling and it was cleaned, disinfected and sealed. It is important that inspections occur
regularly to ensure that mold growth does not exist. The costs noted above do not include any
roof repairs; to date no leaking has been identified.
Site Work
The site work that can be completed as part of the 2008 Pavement Management Program as
shown on the attached drawing includes:
1. Adding two additional parking stalls to the existing parking area.
2. Adding ten additional parking stalls to relieve the parking issue at the site.
3. Relocating the existing hydrant to work for the ultimate site and future building
location.
4. Replace the deteriorated and hazardous pavement near the building.
5. Extend a bituminous trail to the existing playground area and install a concrete pad
for benches to be installed.
6. Construct a bituminous trail from the building and new parking area to the existing
trail system.
Of the work outlined above, only a smali portion would be removed when actual building
construction takes piace. The small portion is the bituminous around the building, valued at
$1000. All other work that would be completed would most likely not be damaged during
construction of a future building.
Staff is stiii reviewing the sanitary sewer service for condition and depth. It is important to
ensure that it does not need to be replaced to accommodate a different building's finished floor
elevation. If a new sanitary sewer service is needed, it can be added during construction. At
this time it is not expected that a new service would be required.
The cost of the site work outlined above is valued at $24,100. The key thing to note is if this
work were to be completed at a later date, the cost would most likely be higher because of the
small quantities. If these items are included in the 2008 Pavement Management Project, there
are efficiencies gained with a larger scale project, which reduces the overail price.
Demo and Trailer Option
The cost estimate to demolition the existing building is $3,000. The following outlines the cost
of a temporary trailer (12' x50') that could be set up on site:
Monthly Rent = $450 per month
Set-up & Deliver Fees = $400
Take down & Deliver Fees = $400
Power hook up (for lights) _ $500
8' x 30' Building
Monthly Rent = $400
All other costs are equivalent to the larger building referenced above.
So, based on a three month season, it would cost approximately $2,650 per year. Based upon
these costs, it would not be cost effective to proceed with this option and would limit rental
opportunities and other use beyond the 3 month rental time frame.
Recommendation
Recommendation is to authorize the site improvement work at the Pine Tree Valley Park to be
included in the 2008 Pavement Management Project.
I e4fU ^'�W qEPA[P GATE MX 2-3390 2 STAL� PAflN XL EXPANSSON.
NOTES: � TNf3 ��� � NAiCH INiO BACN U E% VALVE 80X � BUIlO - GRApES TO CH dOJACENT
1. CIXRPdCiM TO VENlFY 4L UT[LITT ELEYATlONS AN� PIPE SIZES I 9 9 PAIMING l20/ �EEP [ 20' pl�E1.
94f0 pry�qETE CUP9 6GIiITEP 3 LF
V. SEE PPOJECi SPECL(T�ES NM SGECIFIEU FUfl flEWVAL , __ - � . 1 V - - _
MIEH CMNECiMC T� E%ISTING FAC41T[E5. _ _
2. PPOiELT AL1. FACI � Y` ♦ _
]. SPO� PEKKIV4 6 PEPLACEA£M aF Cd4 SHALL BE AS �[PECTEO BU1t0 - Y � \ � h \
BT iHE ENG[NEEP IN THE FIEL➢. q P31 - _ � 1 -.� .� \� - fy �.
[F[CATIONS FOR 50[L BOflING LOCS PNO LOC4TWN XAP. - � � > --+��- 1 ° � P � � �-
i __ i _ �'�} -\ � l : Y \ r l� � �• >
�� _ - _ \ h � \', � ` _ . 4 - � P — _ �� _ .' _ . .. •� ' "�.��' `� \
� '" _ , > F\ i i�, d� : � "� "� �.. � < \ ` " _ __ _ .. � ` ' •
� �
v�+ -� + • - v - � -r^: ,� � t � - _ _ / - . _ suxuouxr>a�F .'•�
. . - \ a � i \ I �> �S _ �PEHOVE 20 LF
� � \ � T � � �� � : Y t q � .,, ° `a ;. '� ...�"� _ _ - CONCflEiE CUflB WP8 6 GUREP `�
� x �
� . i . �.' � �� �a. �� � � .�.. 6 GIIREP �� �
t . . .�. h
. . . .. n � _ . .
y� �\ Y 1 . . . \' ` _ � i ___ __ , \ � SPNITAPY SEIcP RECWSiPIICT \
S Z
�✓ ; j F..• J� v �""��_ • ClqiB Wi UPNWXTABLE � SPOi PEPA[P (10 W Cf 8" PYLI $�ITAPY M{
�
N .' ` n \ - ��--�' -- - _ �URB 6 GIIiTEfl I 8` % 6' PVC WYE 9.6 LF �
W�C ]5 LF-6" PVC SEPV[CE P[PE N �
W ��r r : - - f0 STLLI PAflMIN4 E%VANSIDH _
N —� �t PEA9VF CWiC. gytf (XEMI 20' x 100' WI�E C 8' BtT. , Nliql E%.
- --- } VALLEY GVREP
iflA[L .' T. TflA1L
�` 9901 PEtUVE/flEPLAGE
4 V 61T. PRVENEHi
q� F'. } 1 CONCPER VN.LEY -
�� GIITiEP (30 SY1 CONXECT TO
��„' � E%. 6' MN
O I MATLH E%. ��
Q \ �.�� ABANOON6' 81TUWHWS �pE�OCdiESdLVA4E�
� VI � . O1P MM HYOPANi
Q� ���.'�. �I 6' GV b BOX !�
Z 7 �~ I 6' W[�E �- / -
Q i BIT.TRAI�
I I 1 �
� 54VAGE b �NSTp�L
I_ � — �- — - _ '^'`� � HT�MNT �:
\ I
I -- � ,���: ' � fAXGiEtE PtAxGPOUXD NME: '
_ — P➢ANIXG SjALLS TO 0E SiPIPE� 10� MIOE
seE snEer ss INDIAN BOULEVARD S0. P � "� `� �"�" `°'�` ""`"
i � \ A�JUST XYOPONT \ I / N
�� 0.5 LF � _ I � �
059fi 8612 � _ _ __ B'/2
� ` � � .
� \ �\ .. y Y` _" F ` . "i': ., - �
3548 \ 8846 ti.'�' / � R 4i t ��""i-� t : _�
ti �•`� ` • • • �� r � /' : l `���� , • Y - /
; ( �i f. %.�. \ • r:, \ � F Y F '� - � La� . �
8580 : • l• • 2 � ' ��M j F \
` :\< .. � , ,\ _ � � - 1
_ { l . � ,-- -1 - \ f `*/� / % ` �i
/ - R � . 0G20 � + ' � •� �
'-��\� ( f f_ X . � � M12-3382 } � �'� �..r �` / .� � ^ �
./ < „ f BVI1.� F �' .'� ,•' Y 0601 \�^__ l
\'( OEPTN 9 9- .'� � \ g59] I � N
�/'\ �_. Y ' V t �/ t R � `� Y Sl :� �\ W 2-3}83 / W
�`� I 1 /' r F y�'� �' '. Bullo
%. ��.� ' -e � 1 i �'—'�"'� ,� \., pEPiH e �0.0' / � N
V � y '� . I -h l`- . --- - 1 - : Y l ���,. \
x � f • � �: �:. �s / eTs
,+, . � �-� � � LE�END
:` '-. ';;X...,x,�; -, cM1...:x,'T", y sF' '.i, � 4
� . _^ � � �y '� GATON BP$(N
�`l ��'y —%�-y. y�-f F � STqEET PEHPBIIITAi1WJ ■ PELONSTPIILTIdIi/flEPLACE1ENi
- / ' '%, f F ! .�$ s. �. 9129
/ o '� ` � y • �?� � �. � NANXd.E flECONSiflJCTIIXi ❑ AOJUSTMENTN CRST[NG
5 ITARY SEWEP
�" 8`+� 2' � ' SP T PEPAIP (10 LF OF B' PVCI \ Qx
Q � �— -- B 6' PVG WYE �.y NAtiHPo.E CASTING AOJUSTNENi � GATE VALVE <�JIISTNENT
'v V 1 � 33 L 6" PVC SE0.VICE VIPE }
_ / = J / %�:! / 1 Q633 SONN _ y �. WAiEfl MA[N IIPPMEAENTS ���� SiWiN SEWEft IMPOVEMEHTS /
m SEE SHEE( 55 INDIAN BOULEVARD S0. _ s �„ r �„ sE s p m �,,,,�
• � ; ' I � �� �, � �r , � : �r �rs.so �x �� CONStAUCitUN PLAN 53
o: � i °°f "'" `�" °"�,`�""" °" �.�/� iss' on. COTTAGE GROVE, iNOw+ a�w S. ��,�/
� (� �� E �� µ SEH si. Pna. ew ssiio MINNESOTA �g pAVEMEM MANAGEMEM PROJECT �'3�
_ xeeneo. �` I�:lar I oAtc 'cv�sears I �., � ���. '�°B a�F++r aaa.no. oebaf