Loading...
HomeMy WebLinkAbout2010-04-07 PACKET 04.D.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 04/07/201 PREPARED BY Engineering Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * COUNCIL ACTION REQUEST Consider approval of Change Order #6 for Division 5, for SpeckTacular Companies, Inc. STAFF RECOMMENDATION Approve the change order for additional demolition of curb, bituminous patching, class 5 material, grading and seeding, erosion control and removal of rock from staging area. ADVISORY COMMISSION ACTION DATE REVIEWED ❑ PLANNING ❑ ❑ PUBLIC SAFETY ❑ ❑ PUBLIC WORKS ❑ ❑ PARKS AND RECREATION ❑ ❑ HUMAN SERVICES /RIGHTS ❑ ❑ ECONOMIC DEV. AUTHORITY ❑ SUPPORTING DOCUMENTS ❑ MEMO /LETTER: Jennifer Levitt, March 18, 2010 ❑ RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ❑ OTHER: Change Order #6 ADMINISTRATORS COMMENTS APPROVED DENIED ❑ ❑ ❑ ❑ ❑ ❑ o ah ty Administrator Date ***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** COUNCIL ACTION TAKEN: APPROVED ❑ DENIED ❑ OTHER Ryan Schroeder, City Administrator From: Jennifer M. Levitt, P.E., City Engineer Date: March 18, 2010 Re: Ice Arena Expansion: Change Order #6 Background /Discussion: Change Order #6 is for a total contract addition of 10,888.05 for Division 5, for SpeckTacular Companies, Inc. This is the third change order for this contract. The contract addition was accounted for in the previous Council update on the Ice Arena budget. The additions are for demolition of curb to accommodate a new curb location, bituminous patching adjacent to curb line, additional class 5 material for grading at the front entrance, grading and seeding of temporary egress ramp, erosion control and removal of rock from staging area. The change order also provides for a $4,332.00 deduct for a credit related to the wear course paving at the front entrance to the facility and also a $281.00 deduct for damaging a sanitary sewer pipe in the existing rink while digging footings. Recommendation: It is recommended to approve Change Order #6 for the total addition of $10,888.05. Change Order (CM) Cottage Grove Ice Arena Addition Project # 90226 8020 80th Street South Cottage Grove, MN 55016 Date: 11/17/2009 Change Order Number: 003 To: SpeckTacular Companies, Inc. Contract Date: 3/5/2008 5595 270th Street East Elko, MN 55020 Contract Number: BP31Div05 The Contract is hereby revised by the following items: PCO 80, 94, and 108 PCO Item # Description Amount 080 001 Demolition of curb and gutter to accommodate new curb location, $1,780.90 080 002 Patching along north and south bus lane to ramp up to existing pavement. $642.28 080 003 Additional Class 5 required to meet new curb elevations at bituminous path and patching along $3,293.52 curb and gutter. 094 010 BACKCHARGE: Repair sanitary drain in existing rink. Specktacular hit pipe while digging new $(281.00) footing. 108 001 Grading and seeding of temporary egress ramp. $2,015.75 108 002 Erosion control pricing revision. $2,741.60 108 003 Removal of rock staging area at north and west sides of arena addition. $5,027.00 108 004 Credit for wear course paving at entrance. $(4,332.00) TOTAL AMOUNT THIS CHANGE ORDER: $10,888.05 Not valid until signed by Owner, Construction Manager, Architect, and Contractor. The original Contract Value was ...... ... ............................ .............................................. ............... -- ............... . $235,000.00 Sum of changes by prior Subcontract Change Orders.. .... ........ — ....... -- --.................. ............................... $(70,172.70) The Contract Value prior to this Subcontract Change Order was .................................... ............................... $164,827.30 The Contract Value will be changed by this Subcontract Change Order in the amount of ......................... -- $10,888.05 The new Contract Value including this Subcontract Change Order will be ...................... ............................... $175,715.35 The Contract duration will be changed by ........................................................................ ............................... 0 Days The revised Substantial Completion date as of this Subcontract Change Order is .......... ............................... 9/26/2008 Kraus - Anderson Construction Company CONSTRUCTION MANAGER 8625 Rendova Street NE /PO Box 158 Circle Pines, MN 55014 Address By Brian Hook SIGNATURE DATE / i / /® City of Cottage Grove OWNER 8635 West Point Douglas Road South Cottage Grove, MN 55016 BY Jennifer Levitt SIGNATURE ,L{ DATE SpeckTacular Companies, Inc. CONTRACTOR 5595 270th Street East Elko, MN 55020 Address By SIGNATURE A< u DATE " / d RSP Architects, Ltd ARCHITECT 1220 Marshall Street Minneapolis, MN 5 54 1 3 13 Address BY Charles Freiberg SIGNATURE 197. 11 490 Kraus- Anderson(D Construction Company 8625 Rendova Street NEIPO Box 158, Circle Pines, MIN 55014 Kraus - Anderson® Construction Company 8625 Rendova Street NE/PO Box 158 Circle Pines, MN 55014 PROJECT: Cottage Grove Ice Arena Addition ADDRESS: 8020 80th Street South Cottage Grove, MN 55016 TO: Charlie Speckman Fax: 952 -461 -5256 SpeekTacular Companies, Inc. 5595 270th Street East Elko, MN 55020 REQUEST FOR PROPOSAL PCO No. 080 Page I of I DATE: 9/24/2008 PROJECT NO.: 90226 CC: Jennifer Levitt Charles Freiberg Brian L. Hook Mike Dahlberg Please provide a cost breakdown in accordance with the Contract Documents and a Summary for the change described herein and on the attachments (if any) listed. This is not an authorization to proceed with the work described herein unless and until approved by the Owner. On approval, this change will be included in a Change Order, which will provide the formal Contract Change. DESCRIPTION OF PROPOSAL: Demolition of curb and gutter to accommodate new curb location. Patching along north and south bus lane to reamp up to existing pavement. Additional Class 5 required to meet new curb elevations at bituminous path and patching along curb and gutter. This Proposal is a "No Change" item for Type/Print Contractor's Name Attachments: None Requested By: Architect/Engineer ALL RESPONSES ARE REQUIRED WITHIN SEVEN (7) DAYS. Sep 23 08 01:31p Specktacular Companies 9524615256 p.2 °a CUvaatdaaaa o Graadhig o Da=aaam,ioat®a it 0 E"viraaa mentaai September 23, 2008 Brian Hook Kraus Anderson Construction 8625 Rendova Street ME P.O. Box 158 Circle Pines, MN 55014 RE: Cottage Grove lee Arena— Cottage Grove, MN Change order request for the demolition of curb and gutter to accommodate new curb location. This work was directed and authorized by the project superintendent and was completed on 915108: • 225 excavator 2hrs $180.00 $360.00 • T -250 Bobcat 2hrs $130.00 $260.00 • Tri -axle Dump Truck 31irs $95.00 $285.00 • Laborer 3hrs. $61.00 $183.00 • Saw 3hrs $67.00 $201.00 • Demolition Debris 33CY $10.00 $330.00 Subtotal: 10 %0&P: TOTAL: SpeckTacrdar Companies, Pna Blake Beilby Project Manager Cell# (651) 755 - 4570 $1,619.00 $161.90 $1,780.90 5595 270th Streef East a Elko, MN 55020 o Phone: 957-467-5Z ® fax. 052- specktacufur@infograonline.com Sep 23 08 01:31p Specktacular Companies 9524615256 p.3 ® Demolition is Environmental ® Additional Work Authorization H Contractor /Owner: /S /�k .. !' /.;,'/, ` �„ �;,,_. Contractor Job # or P.O. ! � q ,fob Name: C.,. � {..<. Lr� r 2 TAIc - II Date: Labor, (Equipment and Materials for. Machine[Labor 2 T-?SU ,'r Hours ( Rate / 136 Am / am ount ZE0`" !� i• L �. Ioci'r r �� �, b 6 7 - -- 2 es 2-01 Materials Quantity Price Amount X3 0� Subtotal: U - -- �� % Overhead & Profit: �6 // 7 CU Total for above work: � On behalf of the Contractortowrter, i do hereby agree with this additional work authorization. Authorized signature Date 4201 Miller View Road a Elko, A 55020 ® Phone: 952 - 461 -5255 a For 952- 461 -5256 speckiacular@integroonline.com Sep 23 08 12:54p Specktacular Companies September 23, 2008 Brian Hook Kraus Anderson Construction 8625 Rendova Street NE P.O. Box 158 Circle Pines, MN 55014 RE: Cottage Grove lee Arena — Cottage Grove, MN 9524615256 p.2 Change order request for patching along north and south bus Zane to ramp up to existing pavement This work was directed and authorized by the project superintendent and was completed on 8127108: Labor 4hrs $82.80 $331.20 • Tri -axle dump track .5hrs $104.65 $52.33 Bobcat .5hrs $124.20 $62.10 • Plate Compactor 25hrs $87.40 $21.85 ' • Blacktop 2TON $87.40 $174.80 TOTAL: $642.28 Change order request for additional class 5 required to meet new curb elevations at bitumincus path and patching along curb and gutter. This work was directed and authorized by the project superiniendant and was completed on 9116108: • Labor 19hrs • Tri -axle dump truck 2.51ss • Bobcat 4hrs • Plate Compactor I firs. • Class -5 limestone 21.05Ton • Blacktop 5.02Ton Feel Free to call with any questions regarding this request Sincerely, SpeckTacutar Companies, Inc. Blake Beilby Project Manager Cell* (651) 755 - 4570 $82.80 $1573.20 $104.65 $261.63 $124.20 $496.80 $87.40 $87.40 $20.70 $435.74 $87.40 $438.75 TOTAL: ' $3,293.52 5595 270th Street East a Elko, IAN 55020 a Phone: 952-46 1-5255 0 Fax: 1 1 , 52-46 1-5256 specktacular@infegra ®aline. cola xc avation Gr ading (` Demolition .< Environmental Kraus- Anderson® Construction Company 8625 Rendova Street NE/PO Box 158 Circle Pines, MN 55014 PROJECT: Cottage Grove Ice Arena Addition ADDRESS: 8020 80th Street South Cottage Grove, MN 55016 TO: Dave Thomas Fax: 651- 452 -0367 Wenzel - Plymouth Plumbing, LLC 1710 Alexander Road' Eagan, MN 55121 REQUEST FOR PROPOSAL PCO No. 094 Page I of I DATE: 11/17/2008 PROJECT NO.: 90226 CC: Jennifer Levitt Charles Freiberg Brian L. Hook Mike Dahlberg Please provide a cost breakdown in accordance with the Contract Documents and a Summary for the change described herein and on the attachments (if any) listed. This is not an authorization to proceed with the work described herein unless and until approved by the Owner. On approval, this change will be included in a Change Order, which will provide the formal Contract Change. DESCRIPTION OF PROPOSAL: Additional Work Authorization This Proposal is a "No Change" item for Type/Print Contractor's Name Attachments: None Requested By: Architect/Engineer ALL RESPONSES ARE REQUIRED WITHIN SEVEN (7) DAYS. Oct. 27. 2008 2:47PM Wenzel- Plymouth No, 7394 P, 12' W�NZI 1710 Alex anderRoad ' IL /t OU1 11 Phona ;MN55121 ! Phone: (651) 452 -1565 = Fax: (651) 452 -0367 PROJECT. Cottage Grove Ice Arena Wenzo /JOB s: 120- 08.064 Chenpa Order# Add1(fonal Work AUihorizat/on DATE: 22- 00-DB DESCRIPTION: Repair 4' Sanitary drain In existing rink. Specklacular hit pipe while digging new foo(in Past Labor Casts LABOR! STRAIGHT TIME Joumeymen 2 MRS@ $70.41 $740.02 Foreman 0 HRS@ S72e6 - TD 0 G. Foreman MRS@ 573.00 Subtotals 2 SUBTOTAL Ovothoad &Front 10% $14.00 0% 0.00 SUBTOTAL OF STRAIGHT TIME - $156.00 LABOR: OVERTIME (TIME AND ONE HALF) - Journeymen a HRS® $94.27 $0,00 Foreman 0 NRS@ sge.e6 $0.00 G. Foreman 0 HRS® $100.57 50,00 Subtotale 0 SUBTOTAL OH&P @ 6% o. 00 SUBTOTAL OF OVERTIME $0.00 RQUIPMENT, MATERIALS SUPPLIES: Material $41A2 stesma IJR $500.00 $D.6D Skid Steer Rental $53.00 $0,00 Barxhoa Rental S63.DD $oDD - Mial Trackhoe $45.00 OAO Pack*rRWal $20.00 $0,00 Tax @ 7.0% $2.00 SUBTOTAL 544,32 Orahead &Pro9l 10% $4.43 0% 0.00 SUBTOTAL OF MATERIAL $40.75 MISCELLANEOUS AND RENTAL COSTS Permilc Fuel costs EqulpmentlTooURenlate Total Diroct Labor Field Costs Total indirect Labor Field Cmts Total Change order Assembly Costs SpeClal TmunwCOmmicsloning SUBTOTAL Ovorhoad 10% Prom a% $0.00 $0.00 0.00 See equipment Rental Page $0.00 Sea lndimct Pago $0.00 See indirect Page '$70.00 Soo!ndirccf Paga W.00 $7.00 $0.00 SUBTOTAL MISC AND RENTAL COSTS 577.00 SUBCONTRACTOR COSTS. Ineulabon $0.00 SUBTOTAL $0.00 CONTRACTOR'S COMMISSION 5% OF NET SUBCONTRACTORS 50.00 SUBTOTAL OF SU TOTAL QUOTATION AMOUNT SUBTOTAL Bond & Insurontt @ 0.0% SUBTOTAL QUOTATION TOTAL QUOTATION AMOUNT 3200.03 $0,00 $204 $D.oO 7c t: 27: 2008 2:47PM Wenzel— Plymouth No. 7394 P. 13 r eew s v UI 1 IVI \L IS ®V! ®� 6�i Fri B 9baH S11ZO 110/ltl /'i LA d"b WENZ PLUMBING 8 HERTINU, INC. OWNER'S NAMERdENE CONTRACTOR A,J D PHONE DATE I TVILi 2409 STRPET - JOB NAME / �� G OB NUZaR O®^ MY srnre STREET 0 rH 5 cc o 60116- STATE 1 n/ You are authorized to perform the following specifically described additional work; RsfA(P_ rr of TAR fJ /N 140 Dkoal ,*J Com P v IN NIW oa J r pvc R PE q r. L 600ftl o UK ecK T ul ADDITIONAL CHARGE FOR ABOVE YVORK IS: $ Payment will be made as follows: Above additional work to bs performed under same condltlons as specified In original contract unless otherwise stipulated. Date Signature (OWNER SIGNS HERE) i hereby agree to furnlsh labor and materials - complete in accordance with the above specifications, at above stated price. Authorized Signature pate (CONTRACTOR SIGNS HERR) NOTE: This recisio bocomes Part o(, and in conlornrence with. the exisli wamrac Kraus- Anderson® Construction Company 8625 Rendova Street NE /PO Box 158 Circle Pines, MN 55014 Tel: 763 - 786 -7711 Fax: 763- 786 -2650 MOCK PCO No. 108 Page 1 of 1 DATE: 11/17/2009 PROJECT: Cottage Grove Ice Arena Addition 8020 80th Street South Cottage Grove, MN 55016 PROJECT NO.: 90226 TO: Charlie Speckman, SpeckTacular Companies, Inc. CC: Brian Hook, Kraus - Anderson Construction Company Mike Dahlberg, Kraus - Anderson Construction Company Jennifer Levitt, City of Cottage Grove Charles Freiberg, RSP Architects, Ltd. ATTACHMENTS: None REQUESTED BY: Architect/Engineer Please provide a cost breakdown in accordance with the Contract Documents and a Summary for the change described herein and on the attachments (if any) listed. This is not an authorization to proceed with the work described herein unless and until approved by the Owner. On approval this change will be included in a Change Order, which will provide the formal Contract Change DESCRIPTION OF PROPOSAL: 1. Temporary egress ramp grading and seeding at north west portion of existing arena. 2. Erosion Control pricing revision PCO #10 and onsite directive issued 9/30/08. 3. Removal of the rock staging area at the north and west sides of the ice arena addition. 4. Credit for wear coarse paving at entrance. ❑ This Proposal is a "No Change" item for Type /Print Contractor's Name ALL RESPONSES ARE REQUIRED WITHIN SEVEN (7) DAYS. VIN'02 09 07:10a Specktacular Companies 9524615256 P.1 I I IM M -- n- n t a I CULA A ........... Est. 200-9 Grading C� Demoliti o Sif I ro Brian Hook From. Blake Beilby Fax: 763186.2650 Pages. 6 Phone. Date, 9-1-09 Re: -Cottage Grove ice Arena- CC. Temp Egress Ramp Seeding 0 Urgent OForReidew DP[easeComma 0 Please Reply El Please Recycle Brian, The original area was measured in the field. I went to the site and checked the Sr of the a6ected area and will be reducing our claim by 165 SY, I originally turned in the quantity billed by my hydro seeder. I penciled in the new price on the original copy of the CO. New Price $2,015.75 Any questions, I can best be reached @ 651-755-4570. Thanks, B lake 5595270fh Streel fast a Elko, A 55020 * Axle. Fox. SP ecktacular(Pin tegraonflne . com Sep 02 09 07:11a Specktacular Companies 9524615256 p.2 To Brian Hook From: Blake Beilby Fax: 763.786.2650 Pages: 3 Phone: Date: 10/16/08 Re: - Cottage Grove Ice Arena - CC: Regrade spread black and hydro seed temporary egress ramp to building. ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle Brian, Change order request for the grading and seeding of the temporary egress ramp located at the North West portion of the existing arena see attached diagram. Any questions, I can best be reached @ 651 -755 -4570. Thanks, Blake 55452701h Street East ® Elko, MN5502D o Phone: 952 -961 -5255 a Fax. 952467 -5256 specklocular@integraonline.com Sep 02 09 07:11a Specktacular Companies 9524615256 p,3 Fxc avation cn Gr - ading c& Dem olition ee ): - - " 7 November 3, 2008 Brian Efook Kraus Anderson Construction 8625 Rendova Street NE P.O. Box 158 Circle Pines, MN 55014 RE: Cottage Grove Ice Arena —Cottage Grove, MN Change order requestfor the grading and seeding of the temporary egress ramp located at the North West portion of the existing arena: • T -250 Bobcat • Tri axle Dump Truck • Hydro seed affected area 5hrs $130.00 $520,00 31rrs $95.00 $285 -00 f,OGO -&Y $1.45 41;45&:00" g3SsY 1.K S (210.7 Subtotal: $2,255.00 10 %O &P: $225.50 NSW T�ti1 Z,o 1 s. 75 Sincerely, SpeckTacular Companies, Inc. Blake Beilby Project Manager Cell# (65I) 755 - 4570 5595 270th Street East a Elko, MN 55020 ® Phone: 952 - 461 -5255 a Fox. 452 - 461 -5256 specktacular@►ntegraonitne. com Sep 02 09 07:11a Specktacular Companies 9524615256 p.4 =Zi ------------------------ - - - - - - - - - - - - - - - - - - - - II 0 -------- L z II I 0 WR xw I Z Z MO MO F Sep 0209 07:11a Specktacular Companies 9 52461 52 56 p.5 HP Officejet Pro L7500 All-in -One series Last Transaction D ate Time Type Nov 3 3:02PM Fax Sent Fax Log for Specktacular Companies 9524615256 Nov 03 2008 3:03PM Statio ID Duration Pages Result 7637862650 0:50 3 OK 1 I i To Brian Hook From: Blake Beilby Fax: 763.786.2650 Pages: 2 Phone: Date: 9123108 Re: Erosion Control Pncino Revision CC: ❑ Urgent ❑ For Revlew ❑ Please Comment ❑ Please Reply ❑ Please Recycle M I have attached a summary of the erosion control pricing per our onsite meeting September 30. The City requested everything be hydro seeded and that erosion blanket be installed on critical areas. I have included a summary of all credits per submitted unit pricing and price difference for the directive issued verbally on site. I am hoping to get a directive in writing from KA before proceeding with the work to clear up any possibility of miscommunication or misinterpretation of the proposed work. Thank you for your quick response regarding this matter. Any questions, I can best be reached @ 651- 755 -470. Thanks, Blake 55952701h Street East* Elko, MM 55020 a Phone: 452467 -5255 a Fox: 952 - 461 -5251 speckfacular@integraonline.com t'd 99Z91.9bZ96 sapedwoo jelnoejvoadg Excavation wa, 4& Grading Q Demolition _ Environmental October 7, 2008 i Brian Hook Kraus Anderson Construction 8625 Rendova StreetN.E P.O. Box 158 Circle Pines, MN 55014 RE: Cottage Grove ice Arena –Cottage Grove, MN Change order request for erosion control pricing revision PCO# 10 and onsite directive issued September 30, 200,3: PCO #10 Erosion Controt Pricine: Hydro Seed 7,598SY Erosion Blanket 1,500SY Included in base bid: Sod Credit Hydro Seed Credit Erosion Blanket Credit Fence Removal Credit Landscape Rock Credit 1,473SY 2,000SY .- 1,300SY '- 30LF 12TON $1.45 $1.30 TOTAL: $3 -50 $1.45 $130 54.00 $30.00 TOTAL: Difference in pricing between Base Bid and PCO #10: ADD: We will wait for response before proceeding with work. Sincerely, SpeekTaeular Companies, Inc Blake Beilby Project Manager Cell# (651) 755 - 4570 S 1 I,017.10 $1,950.00 $12,967.10 $5,155.50 $2,900.00 $1,690.00 $120.00 $360 -00 — S10,225.50 $2,741.60 5595 270i Street East o Elko, AN 55020 ® Phone: 952 -461 -5255 ® Fax. 952461 -5256 specktacular @integraonline.com Z'd 99ZS69bZ96 sepedwoC as noe}voadS eZ5 L L 90 6Z PC Excavation 0 Grading Q� Demolition ® Environmental M3 08 05:12p V i M M ing cD Demolition - D EnvirozymentvA 1-: TO Brien Hook from. Blake Belby Fax: 763.7862650 Pages. 3 Phone: Date 9/23/08 Re: Cottage Grove Ice arena -Rock staging CC. area removal and disposal ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply 0 Please Recycle Brian, I have attached a change order request for the removal of the rock staging area at the north and west sides of the Ice arena addition. Mike said that he was not allowed to sign any change orders until you returned but that he was aware of the work that we had done. Let me know if you have any questions. I can best be, reached @ 651-7554570, Thanks, Blake 5595270th Street East Elko, MN 55020 a Axie. 952461-5255 • Fax. 952-461-5256 specktaculdr@integraonline.com Specktacular Companies 9524615256 PA Oct 23 08 05:12p Specktacular Companies 9524615256 p2 Grading October 23, 2008 Brian Hook Kraus Anderson Construction 8625 Rendova Street N.E P.O. Box 158 Circle Pines, MN 55014 Demolition Environmental RE: Cottage Grove Ise Arena — Cottage Grove, MN Change order requestfor the removal of the rock staging area located on the north and west side of the arena addition: • D -5 Dozer 5hrs : $184A0 $920.00 • 225 excavator 5hrs $180.00 $900.00 • Tri -axle Dump Truck Ilhrs $95A0 $1,045.00 • IT— 28 Front end loader Ilhrs $155.00 $1,705.00 Subtotal: 10 /u0 &P: TOTAL: ,SpeckYacalar Companies, Inc Blake BeiIby Project Manager Cell# (651) 755 - 4570 $4,570.00 $457.00 55,027.00 5595 270th Street Fast s Elko, MN 55020 a Phone: 052- 461 -5255 ® For 252- 461-5256 specktacular@integraontine.com Oct 23 Oa 05:12p Specktacular Companies 9524615256 P ' 4 P EPIv rOf7mc - nfol ® Additional Work Authorization ,ontractor]O ner: / k ✓a... �vs. (_,, f ,.. r, Contractor job # P.O. J ob Name: Date: J —r•r _abor, Equipment and Materials for: J Machine /Labor Hours 2z F S -z� VC.V_J Y /x•. IILI L Materials Quantity Rate Amount /✓� O oc '7 °-o Price Amount Subtotal: Ll S 70 G o % Overhead & Profit. qS 7 �o Total for above work: Q .2— 7 On behalf of the Contractor /Owner, l do hereby agree with this additional work authorisation. Authorized Signature 4201 Miller View Road a Elko, MH 55020 a Phone: 952- 461 -5255 a fax: 952- 461 -5156 specktacolar @iotegraonline.com Hook, Brian From: Blake Beilby [blakeb @integra.netj Sent: Friday, October 02, 2009 2:28 PM To: Nook, Brian Subject: Paving Credit Brian, The credit for the wear coarse paving at the entrance debacle is as follows: 6,0495E of 1.5" LVWE 35030B wearing Coarse = 57 Ton@ $76/Ton= $4,332.00 Talked to Charlie and we would like to get the landscaping bond and close out the project. Do I arrange this with Jeniffer at Boonestroo or through KA? Also, can we get the change orders ASAP so that we can bill this month? Thankyou RI OT Rild !"xrwsratPao . fA .aAYnp + Au�oditlau o �'n+YronmaRtw/ Blake Beilby - Project Manager Office: 952 -461 -5255 Fax: 952 - 461 -5256 Cell: 651 -755 -4570 Entail. blakeb(a)intezra.net