HomeMy WebLinkAbout2010-05-19 PACKET 04.K.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 5/19/2010 PREPARED BY Administration Ryan Schroeder ORIGINATING DEPARTMENT DEPARTMENT HEAD COUNCIL ACTION REQUEST Receive space needs study. STAFF RECOMMENDATION Receive report. SUPPORTING DOCUMENTS ® MEMO /LETTER: Memo from Ryan Schroeder. ❑ RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ® OTHER: Attachments. ADMINISTRATORS COMMENTS r f fr'f aityAdministrator Date Document1 Subject: Space Needs Study Update At the January 23, 2010 Strategic Planning session Council directed that staff update the 2006 Public Safety /General Government space needs study by May 2010. The departments of Finance, Community Development, and Public Safety each submitted independent reviews of the 2006 document. These reviews are enclosed for your edification. Staff has not yet had the opportunity to reconcile variances between the initial document and these reviews. However, the largest open question (beyond site options) is whether or not the building includes apparatus space for fire vehicles. The answer to that issue is site dependent but in 2006 the Council direction was that any apparatus space would likely be limited. At this point (absent the apparatus question) it is believed that we can proceed under the 2006 study parameters from a conceptual building size perspective. That building is projected at 42,531 square feet with 15,309 square feet of enclosed squad parking (26,650 SF Public Safety, 14,881 SF General Government and 1,000 SF flex space; this is project option #4 from the 2006 Space Needs). That project size is very similar in scope and scale to more recent projects in cities that have a planning horizon similar to Cottage Grove. In our case the project is estimated to readily meet the needs of the community to a population of 66,000 (2040 estimate) and beyond. We have provided project cost estimates for budget/financing purposes to complete this project. However, it should be noted that, as directed, staff is currently working with potential project partners (St. Paul YMCA, Washington County Library system and Presbyterian Homes). Inclusion of any of these partners in a project will have timing, scope, scale and cost implications. It is expected that in most, but not all, possible scenario's partnered projects would have an opportunity for scale and project efficiencies. Budget estimates for the project concept are as follows: 1. Construction @ $197.18/SF 2. Site Improvements @ $7.71/SF (6 acres) 3. FIFE estimated at $515,000 based upon the work station schedule 4. Professional Services @ 9% of construction 5. Land acquisition @ $5 /SF 6. Contingency @ 6.4% of construction Each of these costs should be within reasonable parameters of reality with the possible exception of land which could vary dramatically in this market; so a middle of the road number is being used here. Included in your packet is a memorandum that discusses the need for a new building. It should be noted that the need is not due to deficiencies of the current structure other than those that would normally exist in a 42 year old building as property maintenance has been an ongoing activity within the current City Hall. More important is that we have outgrown this building which housed 47 staff 20 years after it was built, about 70 staff currently with projections for between 125 and 142 staff by 2040. The building just cannot hold that staffing complement, which, as Council is aware has been and continues to be at staffing levels significantly below most of its peer communities. Mean staffing levels for our peer communities within public safety and general government are at 2.54 staff / thousand. The 15 most efficiently staffed communities from within that peer group are staffed at a mean level of 2.1 staff /thousand. For our 2040 staffing projections for this project we are targeting 2.152 staff /thousand which is slightly greater than our current staffing levels (at about 2.05). Within the 2006 study there was space allocated toward an engineering function in City Hall, which, with circulation space totaled 440 SF. It is assumed at this point that the engineering function would continue to operate out of Public Works. Alternatively, the construction and ffe cost associated with that space in this project would approximate $145,000 plus soft costs. Next Steps Council has directed that we identify and work with potential partners on a joint project. That process has begun but at this point we are uncertain of what path that will follow. Absent that directive we would be prepared to enter the schematic design phase which is directed to be complete by year's end. While we believe we would not be using resources efficiently on that portion of the project should we begin that today we will begin meeting with architectural firms in an attempt to develop a short list of firms that may meet our needs. At the point where Council determines if we are following a joint project or not we then would be prepared to enter that next stage expeditiously. Stages: Given that we are working to put together joint project options our potential schedule could be impacted dramatically. As a solo project we believe the following completion dates are possible. An expanded scope to include partners would need to consider partner funding opportunities and timelines. A desire to pursue third party funding would also impact the schedule. A. Preliminary Programming Determination: July B. Project Path Decisions (CM, GC, et al): July C. Professional Services Decisions: August D. Project Scope /Partner Decisions: September E. Site Decisions: October to December F. Programming /Schematic Design: December G. Final Design: March 2011 H. Bid Award: May 2011 I. Occupancy: June 2012 to October 2012 (depending on winter construction schedule) Council Action: Receive Report 2006 Space Needs Estimates 42,531 SF Office 15,309 SF Garage (approx. 35 spaces up from 15) 57,840 SF Total Construction: (blended construction est of $197.18/SF) Site Improvements /FFE: Professional Services: Land @ 6 acres /$5 /SF: Contingency: Total: $11,405,000 $ 2,530,000 $ 1,026,500 $ 1,306,800 $ 731,700 $17,000,000 2006 Space Needs Study Current and Projected square footage needs by year Current 2010 2020 2040 General Government 9,292 14,881 14,881 14,881 Police 8,376 17,988 16,973 20,671 Fire ( #2) 7,239 3,155 3,155 3,155 PS Shared Space NA 4,055 4,055 3,824 Subtotal PS 15,615 25,198 24,183 26,650 Police Garage 6,480 9,525 14,731 15,309 Fire Bay 6,768 20,663 20,663 20,663 Subtotal garage 13,248 30,188 35,394 35,972 Total Office 24,907 40,079 39,064 41,531 Total w/ garage /by 38,155 70,267 74,458 78,503 Note: current City Hall is 24,148 square feet including the garage Costs For 2040 Project General Government @ $165/SF = $2,455,365 + 20% cont. = $2,946,438 Police @ $198/SF = $4,092,858 + 20% cont. = $4,911,430 Fire @ $185/SF = $ 583,675 + 20% cont. = $ 700,410 PS Shared @ $192/SF = $ 734,208 + 20% cont. = $ 881,050 PD Garage @ $198/SF = $3,031,182 + 20% cont. = $3,637,418 Fire Garage @ $185/SF = $3,822,655 + 20% cont. = $4,587,186 SUBTOTAL $17,663,932 Additional Costs Parking: $3,520 /space (range of $390,000 to $620,000) FFE: $20 /square foot of office space (range of $555,000 to $850,000) Site Work: $250,000 per acre of site ($1,250,000 for 5 acres) Extras: environmental and architectural (7% to 9% of project costs), tech systems, signage, moving Space Needs Project Options: 1. 27,650 SF Public Safety minus garage :$ 5,674,000+ 2. 34,130 SF Public Safety w/ 6,480 SF garage :$ 7,004,000+ 3. 49,011 SF PS /City Hall w/ 6,480 SF garage :$ 9,593,000+ 4. 57,840 SF PS /City Hall w/ 15,309 SF garage :$11,405,000+ 5. 64,077 SF PS /City Hall w/ 15,309 SF garage + 6,768 SF Bay :$12,716,000+ 6. 78,502 SF PS /City Hall w/ 15,309 SF garage + 20,663 SF Bay:$15,409,000+ Note: " +" includes site, ffe, parking etc. plus professional services Project 1. Extras = $1,805,000 plus professional services and land acquisition Project 2. Extras = $1,735,000 plus professional services and land acquisition Project 3. Extras = $2,620,000 plus professional services and land acquisition Project 4. Extras = $2,530,000 plus professional services and land acquisition Project 5 or 6. Extras = $2,710,000 plus professional services and land acquisition City Hall and Police Square Footage Space Comparisons (from 2005 IGH Space Needs Study) General Government/City Hall Police Golden Valley 1958 25,500 SF Blaine 2001 30,000 SF Shakopee 1993 20,000 SF Edina 2003 42,500 SF Ramsey 2006 25,000 SF Plymouth 2005 43,000 SF Lakeville 1991 25,000 SF Minnetonka 1989 23,000 SF St. Louis Park 1963 30,000 SF Ramsey 2006 38,000 SF Woodbury* 1990 28,370 SF Burnsville 1989 26,500 SF Burnsville 1989 34,748 SF Eagan 1995 28,000 SF Plymouth 1979 30,000 SF Brooklyn Cntr 1999 31,000 SF Shakopee 2003 32,000 SF *Expanded since St. Louis Park 1993 26,000 SF Ave. 27,327 SF Ave. 32,000 SF Proposed IGH Project: 20,936 SF 29,146 SF (plus 7,971 SF of shared and circulation space for total project of 58,052 SF) Cottage Grove 1968 9,292 SF Cottage Grove 1968 14,856 SF Proposed 15,000 SF 35,000 SF Depending on site there could be a Fire component at 24,000 SF CITY OF COTTAGE GROVE MINNESOTA TO: Ryan Schroeder FROM: Howard Blin DATE: May 12, 2010 RE: Space Need Study The following are comments on the March26, 2006 Space Needs analysis prepared by Hay Dobbs. These comments build upon a previous review of the study by Community Development staff. General Lobby - 1800 sf. appears too large. There should be a relationship between the size of the Council Chambers and the size and location of the lobby, with the lobby serving as overflow from the Chambers. It is assumed that Community Development staff will continue to perform most receptionist duties. The entrance area and how building users interact with staff should be carefully considered during preliminary design. Filing /Storage - With the transition to the Laserfiche imaging system, the amount of space allocated for document storage may be reduced. Conference Rooms. The number and location of conference rooms requires more work. They should be located in front of the building for ease of public access. There should also be a range of sizes, with one room large enough to accommodate 20 -30 people. Some cities have also set up this large room as an emergency operations center. Also affecting the amount of space needed for conference rooms are the number of small informal meeting areas and whether office spaces for managers are sized to accommodate small meeting areas. ® Bathrooms —Whether separate public and employee bathrooms are provided should be considered. Page 2 of 2 Community Development Space The space needs listed below are independent of needs for the engineering function. The only items discussed are proposed changes to the Hay Dobbs report. All other items in that report appear correct. • Counter Space —A dedicated CD counter is necessary, a minimum of 15 feet wide. While this specific detail may be accounted for in general space, it is an important item which should not be lost in the process. • Conference Room — A 160 sf. room should be located adjacent to the front counter. • Director's Office— The 198 sf. indicated by Hay Dobbs can be reduced to 143 sf. as previously proposed. • Building inspectors Offices— Inspectors need space for plan review which is adjacent to a computer and a telephone. Space for the code enforcement position should be increased to 64 sf. • Flex Space — 120 sf. will be needed for interns and other temporary uses. This space will need telephone and computer connections and should be configured to be used for other purposes. • Plotter /Scanner— 80 sf. is needed. This space would be shared with Engineering. It should also be combined with other space for records storage. To minimize noise, this should be enclosed space. • Copier/Printer /Fax — 30 sf. • Hanging files — 32 sf. • Planning /Building Files —120 sf. • Off Site Dead Storage — If we continue to store plans and records off site, and do not move to scanned digital storage, we will need 140 sf of new space in addition to the existing 160 sf., for a total of 300 sf. Date: April 6, 2010 Subject: Space Needs Study My staff and I have had the chance to review and discuss the 2006 Space Needs Study which was done by Hay Dobbs P.A. The following comments reflect our thoughts on the Finance area, common areas and technology requirements pertinent to a "new" City Hall facility. • The staffing level proposed and the spaces allotted for private offices (140 sq ft and 100 sq ft) and workstations (64 sq ft each) seem appropriate. The conference room space identified for Finance /Administration would be wonderful for our auditor's once a year. • Under our current set up, confidential matters are sometimes discussed with the payroll clerk and in consideration of that (assuming that clerk retains the same responsibilities) a more private workstation would be desirable. • Also, having the payroll clerk in closer proximity to HR staff would be helpful. • "It would be nice to keep the Finance Department together rather than having staff in two separate rooms." • There is significant appeal in having a "decent" size lunchroom with kitchen facilities so that employees could "get away" from their desks for a period of time to eat lunch and /or take a break. The study identifies roughly 685 sq ft for these two spaces combined with an additional 85 sq ft for vending. This would seem adequate. • A central "one stop" reception desk would be efficient for utility billing questions and /or payment receipting along with (perhaps) building permit issuance and /or dog license sales. A work/mail room adjacent to this desk could increase its efficiency. • Space outlined in the study for technology (IT) should be reconsidered. Although the study has a 200 sq ft computer work room /storage area identified, the 90 sq ft identified is not adequate space for the City's servers (currently at 13 counting police, phones & voicemail). Roughly 180 sq ft of 'server' room would suffice; enough to set up the servers and switching equipment so both the fronts and backs of the devices are accessible. Such a 'server room' would need to be adjacent to the phone company's demarcation point (usually on an exterior wall). Other special requirements of a server room would include: • Physical security (locking door and /or card reader access which keeps entry/exit records) • Fire suppression system (NOT water based) • Windowless and carpet -less. With a raised floor or over head cable management system. o Significantly increased power requirements (from 'average' office space) —with dedicated circuits o Dedicated air cooling /dehumidification system for that space. • Use of Laserfiche technology should significantly reduce the amount of file storage space necessary, not just for the finance department but for all departments. • Although we can try to imagine what differences the future might bring (outsourcing, working from home etc.) we do not want to plan for a reduction in functionality from what our current needs are. This memo probably contains more detail than necessary at this time (regarding IT) however it is best to err on the side of planning rather than not. Like it or not, technology drives an incredible amount of our operations in all departments today and we do not see that decreasing into the future. Please let me know if you have any questions. City of Cottage Grove Public Safety Memo To: City Administrator Ryan Schroeder Director of Public Safety Craig Woolery From: Deputy Director of Public Safety Peter Koerner Date: March 22, 2010 Subject: PUBLIC SAFETY COMMENT ON FACILITY NEEDS First, I would like to thank you for the opportunity to provide feedback on the space needs study. During this process, I revisited the comments made in 2005. 1 solicited the input from many of the staff that provided input in 2005 and much of those comments remain the same today. I asked them to review the facility needs comments that were provided at that time and asked them to revisit those comments. I also expanded the groups to additional sergeants and their crews for additional comments. Many of the issues and comments remain the same so much of the information is being regurgitated. I will attempt to summarize comments received from various work groups in Public Safety on future facility needs estimated on projected staffing levels in the year 2040. Office needs were presented to the work groups based in the City of Bloomington's city hall office templates. Administration- Director — 1 Private Office A (11'x18) Should have secure file storage for private personnel documents. 2 -4 lateral drawers. Overhead storage cabinets, or book shelves needed Deputy Directors — 3 Panel Office L (10'x12') - Deputy Directors deal frequently with private, confidential personnel matters and need a secure office, not panel dividers. - Plan calls for one lateral 36" file; we currently have a mix of 2 -4 lateral files, 2 -4 drawer files that are full. This is considerably less storage. - Overhead storage cabinets or book shelves needed Fire Chief, Deputy Chief and EMS Coordinator Panel Office L (10'12') Need for securable office with walls for work with private personnel data. Overhead storage cabinets or bookshelves needed. Fire Captains — 4 -8 Panel Office G (7'x8') - Need room for computer, file storage and phones for their performance of assigned duties and programs Sergeants — 11 Panel Office G (7'x8') - Need secured file storage. Deal with private and confidential personnel matters. - This office space is smaller than what they are currently operating in. A sergeant supervises around 6 -9 officers and must secure paperwork in lockable areas. Sergeants have many additional duties such as firearms, training, and over site of many programs that require space to store materials. Investigations — 5 Panel Office G (7'x8') - Investigative sergeant should have a larger enclosed office area, not panel. Private personnel matters should ensure confidentiality. Office area should be lockable for the same reason. - Investigators frequently interview, speak with citizens on a formal and informal basis. Two chairs needed. File storage again is a concern. - Panel office does not allow for privacy in performance of their duties that may be of confidential nature. We have spoken with investigative units (such as Woodbury) that use a panel office and they have many of the same concerns. Investigative Aide Panel Office G (7'x8') - The FTE projections do not include the investigative aide. - The Investigative Aide needs additional secure storage for forfeiture files. - Need additional secure storage room for squad camera media and server. Needs to be treated as evidence and there is limited access to only a few. "Soft" interview room - Locate in non - secure, non - threatening environment for victims of child abuse to be interviewed. - With new technology, need to be able to wire cameras and audio recording equipment to squad camera server. Clerical — Investigations Open Office E (6'x7') - There is a need for a clerical staff assigned to this division Clerical Staff — 8 Open Office E (6'x7') Clerical staff is very concerned with the limited space in this proposal and believe that 64 BSF is completely inadequate. Clerical staff felt office space H (7'x9') was more practical. Concerns over space for computers, printers, scanner etc. Concerns over privacy, side panels recommended Support Staff supervisor needs secure office for many of the reasons listed above with police sergeants. Support Staff supervisor to be near clerical staff. Need for shared workspace and document storage, which should be lockable, retention periods of 7 -10 years are a factor. Large counter spaces needed. Personnel records need to be in a secure area. Shared use areas - - Restrooms in the clerical area. Closets for coats. Currently do not have a locker or place to store coats. Supply room for office supplies, department forms and equipment Small sink, counter and cabinet for coffee pot etc. Media area to include copier, fax, paper shredder and large counter tops for work Central area for employee mailboxes Access to conference room (6 -8 chairs for meetings) Records — 2 - Open office area E (6'x7') - Records uses scanner for documents that is S wide and would not fit - Needs close proximately to copier, shredder, fax (or have a separate unit) - Security of documents in a lockable room (i.e. ambulance runs sheets) Patrol Officers — 62 Squad Room - Patrol Officers should be provided a mailbox and a lockable file drawer for storage and security. - Platoon work stations, Shakopee PD has 4 large work stations in an open area that have approximately 10' of L shaped counter space along with computer, file storage etc. For reporting and workstations. - Officers now maintain their own training records which was previously done by the MN POST Board - Officers have many additional duties (multi - family officer, instructors, alcohol and tobacco compliance, reserve liaison) and need additional space. Roll Call /Training Room - There is currently 6 tables and 12 chairs in the roll call room - 12 tables, 28 chairs for shifts coming and going. Can also double as a training room. - Computers, LCD projector, dry erase boards, bulletin boards for postings - Large LCD monitor for electronic roll call and training presentations and videos Booking Room /Detention area - This area must be accessible from a secure sally port garage for prisoner handling. - Needs to follow DOC rules and guidelines - Receiving room for pat down, search with counter tops, computer work station, interview room, intoxilyzer testing room, blood draw area - Two recorded interview rooms in secure area - Evaluate the need for holding cells (currently 4 hour holds) and separate juvenile holding rooms - Shower for decontamination - Cameras for all areas in secured facility - Janitorial storage for jail supplies, mops, blankets, first aid, bibles etc. - Restroom for prisoner (large enough for officer and suspect for DWI urine collections and DNA samples) - Cabinets for prisoner scrubs, forms and paperwork and drug testing supplies. - Sink and countertop area. Garage - The current garage has 15 parking spaces for 21 department vehicles utilized by 39 sworn officers - The 2040 projection would make the fleet total around 45 vehicles. - The new garage should have 45 -50 parking spaces Areas to consider - Secure property area for large items or vehicle (needs to be secured in fenced in area) - Bicycle storage (typically 20 -50 being held prior to disposition) - Room for ATV's and trailer - Room for police bikes (8) - Armory room for ammunition, fire extinguishers, targets. - Storage shelves for paramedic gear and officers' duty gear bags. - Equipment room for radios, rifles, radars, Tasers, cameras and other issued equipment. - Workbenches for light repair of equipment. - Wash bay - Evidence processing bay, lighted, shelves and accessible to bring a vehicle in with a two truck - SRT bay for 14' trailer and lockers for 10 people Sally Port - Need two sally ports - Difficult to give a percentage of how often there are multiple arrests (records system and multiple agencies) - At least four agencies use our booking facility on a regular basis (Cottage Grove, MN State Patrol, Newport, St. Paul Park) When there is two or more people in custody between all agencies, officers need to walk prisoners through common areas and unsecured areas. Even with one person in custody, we frequently have one officer making an arrest and another officer or CSO transporting. It is more efficient to have a two space sally port where the transporting officer can also pull in. When we need to make detox placement we do have to move squads to allow the detox transport into the sally port. Fire Department Garage needs - - 8 bays with drive through capability for fire, ambulance and command vehicle. - Separate from police garage. - Storage areas for EMS supplies, fire supplies, extra hose and foam as well as cleaning and maintenance areas. Laundry area. 2 -3 breakout rooms for training scenarios in EMS and Fire to handle smaller groups of 10 people. Property and Evidence Room - The current property room (30'x18') is grossly undersized. It is completely full and overflowing, offsite storage at fire halls has been added and rental space has been utilized. - The property room itself should be twice the existing size, it should have a large processing area to package, weigh, photograph and enter property. The processing room needs evidence lockers, outlets, computer station and supplies cabinet. - Area for hanging and drying evidence. - Look at sliding shelf units on tracks that can compress together to save space. - Processing room to have vented hood for fuming. - Proper ventilation. - The lockers currently used are 12" wide, very small. Locker availability is at near capacity. - Lockers should be 24 " -30" wide and have an interior electrical outlet for charging of equipment (radios, flashlights). - For police sworn and civilian personnel, it would be estimated the need of 30 female lockers and 70 male lockers. - Separate restroom and shower areas for each gender that are attached to the locker rooms. Fire Department lockers - Fire department estimates the need for 15+ lockers, not specified how many male or female. Report Writing Room - There are currently five workstations for 26 officers in the existing report room which is Tx16'. - There may not be a specific need for a separate report writing room if a shared workstation system could be employed. - If a report room is needed, there needs to be at least 8 -10 workstations. Support Services - Community Service Officers and Reserve Officers - One shared office space such as open space C (5'x6') - Community Affairs Officer /Neighborhood Watch Coordinator - There should be 2 -3 open office areas such as open space C (5'x6') that could be utilized for volunteer services. Recently implemented the Volunteers in Policing program, which will use citizen volunteers. Community Room /Training Room /Emergency Operations Center - Located outside of public safety and city hall administration - Should be an area that can be utilized by the public after hours or during business hours without interfering with daily operations. - Should accommodate 80+ people with a small kitchen facility off to side as well as storage for AV equipment. - The room needs floor plates and table outlets for phone, computer and electrical for EOC use. - LCD Projector and LCD monitors - Public Restrooms in main entrance nearby. Exercise room- - Should be large enough to accommodate personnel from all city departments - Free weights, universal equipment, stationary bicycles. Treadmills and room for aerobics and defensive tactics training with mats. - Near locker rooms and showers, access from employee entrance and not main entrance. - Consider room for police simulator training (i.e. laser shot) Other areas- - Consider installation of a water softener for the building, saves on hard water in this area that causes liming of utilities, appliances as well as shower facilities. - Zoned controlled heating - Use of natural lighting to conserve energy usage - Placement of smaller conference rooms in work group areas - Share space work areas, large counter tops - K9 Kennel - Temporary holding area for impounded cats and dogs Shared lunchroom facilitates with refrigerator, stove, dishwasher and vending machines Adjacent outdoor patio, lunch area for employees Make use of views and access to Ravine Park trails Facilitate public use community rooms for meetings, elections and other groups to use Small public rooms with furniture from main lobby t have families to wait in crisis events, reports to officers from citizens who walk in (currently have to walk and though unsecured areas) Wall space and glass cabinets to display awards, elected officials, honors and awards of merit and memorials. In conclusion, you can see that a majority of the information remains the same from when the work group first looked at the study five years ago. Each person that presented their ideas was given the opportunity to look at their past input and offer new ideas. s 1.0 Pre-design Summary Statement 1.1 Introduction 1.2 Executive Summary 2.0 Findings and Analysis 2.1 Background 2.2 Project Approach 2.3 Summary of Needs Analysis 2.4 Demographics 2.5 Benchmarking 3.0 Financial Capital Expenditures 3.1 Project Costs 3.2 Construction Costs Breakdown 3.3 Budget and Schedule Considerations 4.0 Program Description 4.1 Program Summary 4.1 .1 Definitions 4.1.2 Space Standards 4.1.3 Space Summary 4.1.4 Recommendations 4.1.5 Revised Space Summary 4.1.6.1 Adjacency Diagram Option A 4.1.6.2 Adjacency Diagram Option B 4.1.6.3 Adjacency Diagram Option C 4.2 Design Intent 4.2.1 Site Considerations and Building Placement 4.2.2 Building Design 5.0 Appendices 5.1 Department Summaries 5.2 Existing Floor Plans 5.3 Space Standards Drawings City of Cottage Grove Space Needs "bidy Page 2 3/23/06 HD 06006.001 Fier¢ 514/06 1.0 Pre- design Summary Statement 1.1 Introduction This document is the Municipal Center Space Needs Study Report. It compiles and summarizes information that identifies and responds to the overall project needs. This report is a summary of architectural and programmatic issues that have been investigated, evaluated through various methods to explore alternatives, and are being recommended for implementation. These recommendations will be a guideline for concepts of building and systems sizing, arrangement, performance and relationships for architects and engineers during schematic design, design development, detailed design and subsequent contract documentation. Actual final sizes and configuration of rooms, equipment and furnishings may change with continued development of more detailed architectural layout, building envelope design, site specific context response and more specific engineering. However, overall concepts should remain consistent with these recommendations. 1.2 Executive Summary The City of Cottage Grove Space Needs Study has determined that the existing City Hall, which currently houses City Administration, Finance, Community Development, Council Chambers and the Police Department, is inadequate to serve the City's growing population. Cottage Grove is the second largest city in Washington County behind Woodbury. According to the Metropolitan Council, the current population of approximately 31,800 is anticipated to grow to 43,700 by 2020 and 53,000 by 2030. This growth of approximately 160% will require the city to expand its capacity to provide municipal administration, police and fire department services. Other similar municipalities and public facilities have been investigated. These cities are similar in location, culture, and sized to the projected benchmarks in population of the City of Cottage Grove. 1.3 Issues and Considerations that affect the City of Cottage Grove Facilities • Increasing population demands expanded services. • Decreasing budgets demand more of current staff and more efficient operations. • Disconnections in department floor plans, adjacencies and locations have diminished staff efficiencies as well as public use. • The existing building and site offer very little strategic expansion possibilities. • The City Council of Cottage Grove has voted to migrate dispatch to Washington County. Only two dispatchers will remain and be re- titled "Office Manager' and Records and Information Systems Coordinator ". • Given the physical limitations of the current building, it becomes impossible to consolidate, centralize and share common spaces such as showers, fitness center, lunchrooms, copy /work rooms and storage areas. City of Cottage Grove Space Needs Study Page 3 3/23/06 HD 06006.001 Rev 5/4106 • Changes in technology offer opportunities to consolidate and increase efficiencies but will demand a more progressive plan. • Changes in technology also impact methods of contact between staff, departments and public. 1.0 Pre- design Summary Statement • Lack of security, especially in the detention area of the police department has potential judicial ramifications. • The rapid increase in illegal methamphetamine use has created a heavy burden on the police staff and detention facilities. • Parking, both secure for police, fire, and city hall staff and public parking needs to be addressed. • Community use of the municipal facilities indicates the need for multi -use and multi - functional friendly citizen spaces. • Impact of a safe and healthy work place on staff and public. • Emergency management and preparedness and the need for enhance security and safety has more burdens on staff and facilities. 1.4 Goals The goal of this Space Needs Study is to provide the necessary information to plan for future facilities for the City of Cottage Grove. These facilities should support the functions and programs required to service their public and staff, accommodating known space needs, projected space needs and flexible and adaptable space for the next 35 years. City of Cottage Grove Space Needs Study Page 4 3/23/06 FID 06006.001 Rev 514/06 2.0 Findings and Analysis 2.1 Background The City Municipal Center Space Needs Study seeks to establish the feasibility, size and cost of developing a new facility to house future municipal administration, public safety (police) and emergency services (fire and ambulance) needs. The study makes a determination of the projected space requirements needed to meet a 35 year projection for municipal office, council, police, fire and community support facilities to service this growing community. This includes current department needs, additional department and space needs required, and unforeseen future programs that will be supported by this new facility. The site currently under consideration and accepted as the preferred future site is at the intersection of 85` Street where it connects to County Road 19. This is a site indicated in the Washington County Space Planning exercise conducted by Washington County. This location would have immediate access to County Road 19 for Public Safety to rapidly access areas south of Highway 61 along with the northern reaches of the community in the east half of town. The site is approximately 5 acres and the city expects the site to be used to consolidate the Police Department, Fire Station #2 and the City Hall. 2.2 Project Approach The City Municipal Center Space Needs Study reflects a shared vision for an efficient and comprehensive public facility for the City of Cottage Grove, Minnesota. Critical to achieving "The Vision" for a future facility is the process for attaining consensus, setting direction and gaining approvals for the study and its recommendations. This was achieved by listening to staff ideas, researching trends and legislative directives, gathering data and transforming this information into realistic spatial, functional and aesthetic requirements. These requirements will set the groundwork for the site and building design and project implementation. It is the intent of this study to create an indispensable tool which, when used properly, will result in an enduring addition to the City of Cottage Grove. The study process was undertaken with an understanding of the goals and aspirations of those involved in the project along with a strong sense of fiscal responsibility. Research, dialog, analysis and professional synthesis have all informed the recommendations contained herein. 2.3 Summary of Needs Analysis The facility utilization study and future staffing projections have identified a need for additional square footage to accommodate additional staffing and support needs. In general the project provides needed consolidated and expanded space for: Governance City Council Council Chambers City of Cottage Grove Space Needs Study HD 06006.001 Administration, Finance, Human Resources, Community Development Page 5 3/23/06 Rev 5/4/06 2.0 Findings and Analysis Public Spaces Community Rooms Access to the city Government Public Safety (Police Department) Administrative and Investigative Offices Communications, Records, Evidence Roll Call Duty Room Detention and Booking Interview Rooms Holding Cells Sally Ports Juvenile Area Proprietary Toilets Storage and Supplies Kennel Squad Car Garage Shared Spaces Meeting Rooms Training Rooms Central Mail, Storage Lunch Room Kitchen Locker Rooms Toilet Rooms Fitness /Exercise Room Mechanical, Support and Circulation Emergency Services (Fire Department) Apparatus Bays (including ambulance) Maintenance Area (including SCBA) Gear Lockers Dispatch and Administrative Offices Day Room, Kitchen / Break Decontamination Area, Proprietary Toilets Hazardous Material Storage Hose Storage /Drying General Storage 2.4 Demographics The League of Minnesota Cities currently lists the population of Cottage Grove at 31,774. Cottage Grove is the second largest city in Washington County behind Woodbury, population 50,050. According to the Metropolitan Council, the current population of approximately 31,800 is anticipated to grow to 43,700 by 2020 and 53,000 by 2030. This is growth of approximately 160 %. If we reasonably extrapolate even further then we can assume that the city will exceed a population of 60,000 by 2040. Washington County's current population of approximately 218,000 is predicted to blossom to 342,620 by 2030. This is growth of about 157 %. Employment forecasts for the county also indicate strong growth from the current number of approximately 72,000 jobs to over 128,000 jobs in 2030. This is a 178% rate of growth. Clearly, this anticipated growth of approximately 160% over the next 24 years will require the city to expand its capacity to provide municipal administration, police and fire department staffing, services and space to support these services. City of Cottage Grove Space Needs Study Page 6 3/23/06 HD 06006.001 Rev 5/4106 2.0 Findings and Analysis 2.5 Benchmarking In addition to proprietary operational needs specific to the city of Cottage Grove, it is important to understand perceived needs and space in comparison to other municipalities. This benchmarking activity provides sound data for a comparative analysis and subsequent recommendations for actions. All statistics are derived from the Metropolitan Council and League of Minnesota Cities research and statistics. Fire Departments: City 2004 Size Fire Total Apparatus Apparatus Approx. Approx. Annual Patrol Population (sq. mi.) Stations Apparatus Bays per Bays per Annual Call Call Volume per Patrol Staff per Cars per Parking Bays 1000 pop. sq. mi. Volume 1000 pop. NNEENEWNEW :Lakeville 46,285 36.2 4 10 0.216 0.276 600 13 Maple Grove 54,000 32.9. 5 12 0.222 0.365 900 17 Maplewood 35,600 17.3 5 15 0.421 0.867 2900 81 Plymouth 67,824 33.0 3 9 0.133 0.273 1300 19 St. Louis Park 44,744 10.7 2 6 0.134 0,561 3600 80 Woodbury 49,170 35.0 4 14 0.285 0.400 2400 49 " " 30 - , 4 "' "" "` , A.0235 �, =x -0457,x,. Plymouth 4_3 Cottage Grove 31,600 37.9 4 14 0.443 0.369 2000 63 Projections by 66,000 37.9 4 19 0.288 0.501 4000 61 Cottage Grove for 8.000 Woodbury 49,170 35.0 $62,088,463 $678 68 15 2040 1.383 0.305 0.000 Average 27 5, . $fit 316 099 Cottage Grove 66,000 37.9 4 19 0.288 0.501 4000 61 Projections determined by city Cottage Grove 31,600 37.9 $24,938;008 $605 58 22 averages for 2040 1.835 0.443 16.000 Projections by 66,000 37.9 Police Departments: City 2004 Size 2005 Tax Household Total Total Marked Police Patrol Indoor Population (sq. Base Per Capita Police Police Patrol Staff per Cars per Parking mi.) Tax Base Staff Vehicles Cars 1000 1000 Stalls p opulation population `Lakeville 46,285 36.2 $48,222,710 $669 75 25 16 1.620 0.346 4.000 Maple Grove 54,000 32.9 $70,737,637 $945 85 19 19 1.574 0.352 35.000 Maplewood 35,600 17.3 $39,527,271 $962 67 30 17 1.882 0.478 6.000 Plymouth 67,824 33.0 $95,548,005 $852 84 40 18 1.238 0.265 53.000 St. Louis Park '- 44,744 107 $51,772,509 $779 70 10 10 1.564 0.223 8.000 Woodbury 49,170 35.0 $62,088,463 $678 68 15 15 1.383 0.305 0.000 Average 27 5, . $fit 316 099 0 328 17 667 .�.. E - Cottage Grove 31,600 37.9 $24,938;008 $605 58 22 14 1.835 0.443 16.000 Projections by 66,000 37.9 107 44 28 1.621 0.424 32.000 Cottage Grove for 2040 Cottage Grove 66,000 37.9 101 44 22 1.530 0.333 32.000 Projections determined by city averages for 2040 L__ City of Cottage Grove Space Needs Study Page 7 3/23/06 HD 06006.001 Rev 5/4/06 3.1 3.0 3.2 Financial Capital Expenditures Total Project Costs Include the Following: Construction Costs Professional Services: Architectural, Engineering, Surveys, Soils and Environmental Reports Site Acquisition and Improvements, Public Access Amenities Furnishings and Equipment Technology Moving and Relocation Legal, Accounting, Testing Site Utilities, Additional Site Construction and Professional Fee Estimate of Probable Costs Breakdown GSF Low Medium Hi h 2040 Build Out rate $ rate $ rate $ 14,881 gsf $94 /gsf $1,398,814 $103 /gsf $1,532,743 $124 /gsf $ 1,845,244 Contractor O &P 25% $349,704 25% $383,186 25% $ 461,311 Basic Arch Fees 7.97% $111,485 7.96% $122,006 7.97% $ 147,066 Sub Total $125 /gsf $1,860,003 $137 J sf $2,037,935 $165 /gsf $ 2,453,621 35,728 gsf $109 /gsf $3,894,352 $121 /gsf $4,323,088 $150 /gsf $ 5,359,200 Contractor O &P 25% $973,588 25% $1,080,772 25% $ 1,339,800 Basic Arch Fees 7.34% $285,84.5 7.34% $317,315 7.33% $ 392,829 Sub Total $144 /gsf $5.153,785 $160 /gsf $5,721,175 $198 / sf $ 7,091,829 23,818 gsf $104 /gsf $2,477,072 $111 /gsf $ 2,643,798 $139 /gsf $ .3,310,702 Contractor O &P 25% $619,268 25% $660,950 25% $ 827,676 Basic Arch Fees 7.74% $191,725 7.74% $204,630 7.78% $ 257,573 Sub Total $138 /gsf $3,288,065 $147 /gsf $3,509,377 $185 $4,395,950 .. 74,427 2sf $136 f sf $10,301,854 $148 / sf $11.268,487 $183 /g sf $13,941,400 r « 20% $2,060,371 $2.253,697 $ 2,788,280 $12,362,225 $13,522,185 $16,729,681 City Hall Police Fire Total Contingency Total Fees include Architectural and Engineering professional services. This estimate does not include site acquisition and improvements; surveys, soils and environmental reports; furniture, fixtures and equipment; technology systems, wayfinding, signage, artwork, moving and relocation. City of Cottage Grove Space Needs Study Page 8 HD 06006.001 3/23/06 Rev 5/4/06 3.0 Financial Capital Expenditures 3.3 Budget and Schedule Considerations • Estimated construction costs are based on current (2006) rates. The inflation rate overall is projected to be 2.2 to 3.5 % per year for 30 years* baring any natural or otherwise disaster. However, construction cost have risen at a much faster rate have surpassed this. • Inflation rate per year estimate for construction: 10 %. • `This is an inflation calculator for adjusting costs from one year to another using the Gross Domestic Product (GDP) Deflator inflation index. This inflation calculator is based on the inflation rate during the US Government Fiscal Year. • Schedule, start date and end date will affect the estimate of probable costs cited. 3.4 Phasing Opportunities The full project to consolidate and build to the 2040 year projected capacity at current estimated costs is approximately $12, 300,000.00 to $16,700,000.00. This plan would provide the desired consolidation taking advantage of volume pricing and today's cost values. Any redundancies in program space would be avoided completely. Because this project is made up of 3 separate city government functions, it is feasible to build this facility in phases. Building the Police and the Fire department allows the advantage of building the shared use spaces for them and avoids redundancy. Building for the Police and Fire Departments and the core to year 2040 capacity is approximately 63,300 square feet at approximately $10,128,000.00 to $13,800,000.00. A third option for the city to consider is to build the Public Safety Building to year 2025 capacity. This would be approximately 57,500 square feet and a cost of $9,468,000.00 to $12,694,000. The large training and EOC Rooms would remain at the current location until a future time and 6 apparatus bays would be constructed, the remaining bays to be added at a future date. To 2040 Capacity. Police Station and Fire Station with all 10 apparatus bays and the core: Approximate SF Total 63,300 SF Low $10,128,000.00 Medium $11,076,000.00 High $13,800,000_00 To 2030 Capacity. Police Station and Fire Station with 6 apparatus bays and the core minus the large training center: Approximate SF Total 57,500 SF Low $9,468,000.00 Medium $10,243,200.00 High $12,694,000.00 These estimates do include 20% contingency. They do not include site acquisition and Improvements; surveys, soils and environmental reports; furniture, fixtures and equipment; technology systems, wayfinding, signage, artwork, moving and relocation. City of Cottage Grove Space Needs Study Page 9 3/23/06 HD 06006.001 Rev 5/4/06 4.0 Program Description, Recommendations and Summary 4.1.1 Definitions of Programmed Space Base Area is the individual space allocated for an office, workstation or equipment needs. It is measured from the centerline of normal office partitions and the interior surface of exterior walls. Workstations are measured as interior clear space. Net Area is the result of the multiplying base area by an appropriate factor for internal circulation within the department areas. Net Square Footage is designated as "NSF ". Gross Area is the total area of a building including exterior walls, circulation between departments, mechanical and electrical spaces, and vertical circulation (if any). Gross Square Footage is designated as "GSF ". The Net -to -Gross Factor includes: Mechanical/ Electrical and Communications at 12% of the net area; the structure (columns) and thickness of exterior walls at 9% of the net area; and general circulation at 6% of the net area. 4.1.2 Space Standards City of Cottage Grove Space Standards include standards for private offices and workstations. During the information gathering process, special accommodations were identified, responded to and incorporated as deemed necessary. The following is a list of the office space standards. The coding used is the Cottage Grove coding: Private Offices: Current Standard Proposed Standard Private Office Typical A: 198 SF 144 SF Community Development Director Director of Public Safety City Administrator Director of Finance Private Office Typical B: 143 SF 120 SF Deputy Public Safety Director Deputy Chief Engineer Chief Bldg Official Fire Marshall Private Office Typical C: 120 SF 100 SF Fire EMC Coordinator Emergency Operations Coordinator Human Resource Manager Finance Manager City Clerk/Risk Manager Comm Dev Planner Private Office Typical C1 100 SF 80 SF Police Investigators City of Cottage Grove Space Needs Study Page 10 3/23/06 HD 06006.001 Rene 614/06 4.0 Program Description, Recommendations and Summary Open Offices Workstation Typical D: 36 SF 36 SF Interns, Temporary, Part Time CSO Workstations Code Enforcement Suited for positions that require a touch down space, much of the time is spent out of the building. Workstation Typical E: 42 SF 48 SF Visitor Work Station Fire Dept Captain Fire Fighters Coordinator Patrol Sergeants Suited for positions that require a touch down space, much of the time is spent out of the building. Workstation Typical H: 63 SF 64 SF This size station is most commonly suited for majority of positions. By providing options in work surface sizes, filing, storage and other amenities, this size station can be "customized" to the job description. Workstation Typical L: 120 SF 64 SF Workstation Typical N: 88 SF 64 SF See Appendix 5.3 for suggested private office, workstation, other floor plans and options. 4.1.3 Space Summary The following Summary is based on traditional space standards and dedicated spaces Population Projections 32,500 42,700 47,800 66,000 Subtotal Summaries EAstm - 2006 Needs 2010 Needs 2020 Needs 2040 Needs Public Safety Police 27% 27% 27% 27% NSF: 8,376' NSF: 13,503 NSF: 14,427 NSF: 14,686 NSF: 16,671 Gross Factor SF: 'Inch SF: 3,646 SF: 3,896 SF: 3,965 SF: ' 4,501 Public Safety Police Gara :NSF: 6,480. NSF: 13,699 'NSF: 14,390 NSF: 21,410 -NSF: 26,753 Gross Factor SF:' GSF Ind: 14,856 SF: GSF 3,699 34,546 SF: GSF' 3,885 36,597 1 SF: GSF 5,781 45,841 -SF: GSF 7 55,148 Public Safety Fire Department NSF: 7,239 NSF: 2,010 NSF: 2,010 NSF: 1 2,010 NSF: 2,010 Gross Factor GSF: Incl. SF 543 SF: 543': SF: 543 SF: 543 Public Safety Fire Apparatus NSF: 6,768 NSF: 16,270 'NSF: 16,270': NSF: 16,270 NSF: 16,270 Gross Factor SF: Ind - ' SF: 4,393 SF: 4,393 SF: 4,393 SF: 4,393 aG .... ,.. GSF 14,007 i GSF 23,216 GSF .23,216 GSF 23,216 GSF 23,218` Police /Fire Shared (Including Gross Factor ) GSF 4,827 4,827 4,827 "4,609 -GSF 28;863 -'. GSF 57,762 'GSF 59;813 GSF 89,057 -GSF 82;973 27% ✓ :. City Hall ':NSF: 9,292.. NSF: 14,745 :NSF: 15,138 NSF: 15,302 ! NSF: .15,383 Gross Factor Q1aI CF9tGSF .1'ota <C. ll'/,F1re/P4ftCe GS $F: GSF: GSF: inclu 9,292 - 38,155 SF: GSF: GSF: 3 18,726 76,488 SF: GSF: GSF: 4,087' 19,225 79,038 SF: GSF: GSF: 4,131 19,433 88,490 'SF:" GSF: GSF: 4,154 19,537 102;510 City of Cottage Grove Space Needs Study Page 11 3/23/06 HD 06006.001 Rev 5/4/06 4.0 Program Description, Recommendations and Summary 4.1.4 Space Program Recommendations The following recommendations seek to provide overall cost saving opportunities by increasing efficiencies long and short term: Reduced Individual Work Spaces: Reduce amount of storage and equipment in personal workspaces: • Pull out all items stored and equipment in the individual workspace that needs to be shared with others. The concept of reducing sizes of individual workspaces does not reduce program space. Its goal is provide access to shared materials and equipment, reducing redundancy. Job Needs: • Size workstations and private offices to the job description, including time spent in the office, duties performed and amount of dedicated storage needed. Staff Amenities: • Provide space for staff amenities, specifically small varied break out and casual meeting /working areas that will relieve the rigidity of the workstation. Studies have shown these areas are important for muscle and eyestrain relief. • Provide small beverage stations, places for personal phone conversations, and more interaction with each other. • Further individual amenities include use of day - lighting, quality indoor lighting, quality air, some personal control of environment, color, and textures. Studies have indicated fewer insurance claims initiated, less turn over and fewer sick days. Shared Usage and Multiuse Spaces: In order to use the most of space without eliminating program space, it is determined that the following spaces can be shared by the City Administration, the Police Department and the Fire Department: Lunch Rooms and Kitchens: • Provide one common eating area for City Hall staff, Police and Fire Departments: Large enough to seat 32. Locate 2 spaces of 250 square feet of Conference /Case Management adjacent with moveable partitions to be able to expand to 985 square feet of meeting and or dining space. • Provide one shared kitchen with oven, cook top, microwave ovens, full refrigerator, dishwasher, storage, and counter top adjacent to lunchroom. • Provide a common vending area of 4 to 5 vending machines adjacent to the lunch room • This area is to be available all hours and days for the police and fire departments and secured from public use. Conference, Training, and Meeting Spaces: • Provide one large training room 1,200 square feet divisible into 3 smaller training rooms /conference rooms to be shared by the police and fire departments. Provide a secure storage area adjacent to this room for EOC equipment. This room will also double as the EOC Room seating up to 80 people if needed. • Provide Council Chambers to accommodate 54 audience members. This room is to be able to be divided up into 3 sections with 2 sections to allow for meeting of 24 to 25 people each. • Provide one conference room each, seating 10 to 12 people, in the city administration area, the police administration and the fire administration. City of Cottage Grove Space Needs Study Page 12 3/23/06 HD 06006.001 Rev 5/4/06 4.0 Program Description, Recommendations and Summary ® This concept will provide: 2 conference rooms of 250 SF, 3 meeting rooms of 400 SF, 2 sections of 480 SF, 3 conference rooms of 240 SF OR 1 conference room of 500 SF, 1 conference room of 1,200 SF, council chambers of 850 SF, 3 conference rooms of 240 SF Total seating in both cases is 190 to 200 people at one time. Showers and Toilets: • Provide two staff ADA compliant toilet room for staff only use in each city administration area, the police administration and the fire administration. • Provide Men's and Women's Toilets /Shower suite to be shared by the Police and the Fire Department.. Decontamination showers are additional to these. Records Management: • Develop a strategic plan for both on -site and off site storage needs. Investigate electronic and traditional storage, space requirements, impact on staff and legal requirements. Central Mail, Work and General Office Storage • Consolidate all incoming and outgoing mail process, general office supplies storage and workrooms. In this area consolidate large copying projects and mailings. Provide small copy /fax/printer satellites in strategic areas for immediate use by staff. 41.5 Revised Space Summary: The following Space Needs Summary is based on the recommendations sited above: Population Projections 32,500 c- 42,700 47,800 - 66,000 - Subtotal Summaries E)d tinq 2006 Needs 2010 Needs < 2020 Needs 2040 Needs Public Safety Police NSF: i' 8,376 NSF: 12,284 NSF: 14 NSF: 13,295 NSF: :16,206 Gross Factor 27% SF: Incl :- SF: 3,317 SF: '3,606 SF: 3,590 SF: 4,376 Public Safe Police Garage NSF: 6,480 NSF: 7,684 NSF: 17,372 ` NSF: 11,470 NSF: 11,926 Gross Factor 27% SF: Ind - SF: 2,075 SF: 1,990 SF: 3,097 SR 3,220 G$ GSF 14,856 GSF 25,359 GSF 27,262 GSF 31,452 GSF 35,728 Public Safety Fire Department NSF: 7,239 NSF: 1 2,484 NSF: 1 2,484 NSF: 2,484 NSF: 2,484 Gross Factor 27% SF: [nc] SF: 671 SF: i 671 i SF: 671 SF: 671 Public Safety Fire Apparatus NSF: 6,768:.: NSF: 16,270 NSF: ::16,270: NSF: 16,270 NSF: 16,270. Gross Factor 27% SF - Incl SF: 4,393 SF: X4,393 SF: 4,393 SF: 4,393 eta a GSF 74,007 GSF 23,818 GSF 23,818 GSF 23,818 GSF 23,818 Police /Fire Shared (including Gross Factor ) GSF 4,005 4,005 4,005 3,824- Off GSF < 28,663 GSF 53,182 GSF 55,085 - GSF 59,275 GSF 63,370 City Hall NSF. 9,292 `. NSF: 10,947 NSF: 11,549 NSF: 11,549 NSF: 11,549` Factor 27% SF: " inclu SF: 2,956 SF: =3,118 - SF: 3,118 SF: >3,118' { G�ross �,gc6�.,C GSF: 9,292 GSF: 73,902 GSF: 14,668 ! GSF: 14,668 GSF: .74,668 r 1 to '. 8 r -ice GS�. . GSF 38,155 GSF: 67,085 GSF: 69,753 GSF: 73,942 GSF: 78,037 Further options for consideration include • Reduce the number of Patrol Car indoor parking stalls to 20 8,000 GSF • Reduce Holding time of prisoners and eliminate one sallyport 420 GSF • Eliminate Fitness Center 550 GSF Eliminate Hose Drying Tower in deference for hose dryer City of Cottage Grove Space Needs Study Page 13 3/23/06 HD 06006.001 Rev 514106 4.0 Program Description, Recommendations and Summary 4.1.6.1 Adjacency Diagram Option A This diagram illustrates the adjacencies required, public control, staff access, special access of police and fire, placement of shared areas and directions of expansion. This is not a building plan, nor does it relate to a selected site. City of Cottage Grove Space Needs Study Page 14 3/23106 HD 06006.001 Rev 5/4/06 4.0 Program Description and Summary �y 4.1.6.2 Adjacency Diagram Option B Option B shows possible phasing p The City Offices, 2 apparatus bays and part cf the core isk later construction project. Staff would bu impacted bv the inconvenience Uf two sites, some redundancy would occur in the core and costs of the second phase of construction would be City of Cottage Grove Space Needs Study Page 15 2/23/06 HD 06006.001 Rev 514/06 This diagram illustrates possible phasing scenarios. 4.0 Program Description and Summary 4.1.6.3 Adjacency Diagram Option C This diagram illustrates the adjacencies required, public control, staff access, special access of police and fire, placement of shared areas and directions of expansion. This is not a building plan, nor does it relate to a selected site. City of Cottage Grove Space Needs Study Page 16 3/23/06 HD 06006.001 Rev 514106 4.2 Design Intent 4.2.1 Site Considerations and Building Placement During the process of Design the size of the site should be more thoroughly investigated. The size of the facility, the type of occupancy and the possibilities of a one to two story building will all affect the proper sizing of the site. Access and from to the building is critical and of different functions: • Public access needs to be controlled, ideally with one main access point, visible recognizable, with convenient parking and access from the street. It should also be inviting. • Assess by general city office staff can be at several locations if a security system is in place. This also allows for parking to be divided up. • Emergency Apparatus: Quick and safe existing from the facility is key. Placement with regards to the surrounding area needs to be considered as well as traffic and pedestrian control needs at the times of existing and entering. Drive- through bays are required. • Police Officer access to their vehicles, exiting and entering should be separate from public. • Police bringing detainees in: Separate, secure, safe access to the salleyport, separate from all other entrances and exists. • Site upgrading should consider the waste water run off, snow removal and heat contributors. Provide for pedestrian traffic, bicycle and motorized vehicles. • Design needs to take into consideration of the cost of up -keep of vegetation, pervious and impervious materials used. • Building should be orientated to take advantage of prevailing winds and natural sunlight. • Parking and Green Space are important considerations. 4.2.2 Building Design Current public facilities that are being constructed and completed are built to last and sensitive to operated costs. Completed in 2006, buildings for the Minnesota Department of Agriculture /Health and the Minnesota Department of Human Services have been built to last 100 years and building systems to last 25 years. The design is flexible, adaptable and sensitive to changing use, technology and energy consumption. Public and private facilities are being constructed to avoid the pitfalls of poor air quality, expensive operating costs and trendiness. Responsibly designed environments prove to increase staff productivity and public acceptance. By planning early, these concepts will reduce initial and long -term costs and benefit the staff and the city. The interior spaces of the city facilities provide numerous opportunities for flexibility. Design and materials are at the heart of these opportunities, but only in the context of anticipating and meeting staff and public needs. The facility needs to be sophisticated in an effort to accommodate numerous pressures including public support, image, optimum facility utilization, various levels of security, accessibility, changes in legislation, changes in equipment, changes in technology, initial and operating costs, record management, and partnering with the Washington County and the state. City of Cottage Grove Space Needs Study Page 17 3/23/06 HD 06006.001 Rev 514/06 4.2 Design Intent 4.2.2 Building Design, continued Flexibility and Adaptability The city facilities must have flexible spaces. This implies that the building should be designed to meet the demands of new technology and external forces. That systems and constructs should be flexible and adaptable to avoid obsolescence. The facility should be programmed to meet multiuse requirements and adapt to accommodate changing staff and public needs, technology and legislative directives. Non - dedicated areas within the building should invite staff and local residents to use the facility as part of a partnering effort that builds a strong sense of community. Smart Working Environment and Design Office, meeting and training and support venues should be enabled to plug into the digital communications infrastructure and talk to each other. These spaces should become electronically mediated places that are simultaneously imbedded in and sustained by systems of physical, visual and acoustic communication, and remote interconnection. The best designed of these spaces should contain qualities that are typically expected in a physical work place together with startling new opportunities provided by widely available, inexpensive electronic intelligence and telecommunications. The cost of building a new municipal facility is minor in comparison with the staffing. Through smart design, creating critical site lines and adjacencies as well as shortening travel distances, efficiencies re gained and the necessity of hiring more staff can be avoided. This is especially affective in the design of the processing and detention area of the police department and the support areas of the fire department. Technology Telecommunications services, virtual meeting places, on -line data bases, research and search engines and services, along with a host of other digital and telecom systems are all changing the way we disperse information, catalog data and interact. Council meetings are being televised to the citizens in their own home. Much of public access is on -line. Documents that used to be required by law to be kept in paper form can be scanned and electronically stored. Dispatch services and access to county and state help are more and more efficient allowing less time for response. Patrol officers are equipped to do searches and follow -up reports in their own vehicles. Staff is able to connect to the workplace from remote locations by cell phone and on -line. Much training can be done on -line individually, remotely and /or as a group. All of this and more has a direct impact on space and equipment needs. Effort should be invested into wiring up the facility to create a "smart place" where information flows abundantly, both in the physical and digital worlds. ® Building Materials Consider initial and long term costs when selecting materials. This includes replacement and general maintenance. Consider use of materials found locally, including the locations of manufacturers of brick, windows, roofing materials, etc. This will not only support the local economy, but also save on shipping expenses. Consider materials that will support heat and cold reflectivity. City of Cottage Grove Space Needs Study Page 18 3/23/06 HD 06006.001 Rev 514/06 4.2 Design Intent 4.2.2 Building Design, continued Support Systems Lighting: Provide indirect lighting supplemented by task lighting where required to reduce eyestrain and glare on computers. Provide appropriate lighting levels in multi- activity spaces. This will also reduce energy costs. Power. Power supplies should be designed to enable users to plug in multiple locations. Power to recharge equipment used by officers and fire fighters needs to be convenient, in their designated lockers. Data: Data jack and /or wireless solutions should be provided to enable users to connect to supporting networks, intranets, extranets, the Internet, and other sources and systems. Presentation Systems: Information delivery systems should be enhanced and supplemented beyond the white board to more capable systems of conveyance and retention. Records management with roll call needyto be integrated. The interconnection of data systems and pre - wire for 800 MHz needs to be initiated. Building Control Systems: Building Control Systems that control power, heating, cooling, security and communications should be incorporated to increase comfort, safety, reliability and reduce energy consumption costs. Areas to consider are motion and temperature sensors to reduce energy consumption in spaces not in use. Commissioning of building systems will provide optimized energy efficiency, indoor air quality and occupant comfort by verifying the delivery of the building systems incorporated. Furniture Systems: Furniture for open office and private offices that are ergonomically sound, adjustable and efficient for the individual, provide options, support technology, economical, non - obsolescent, interchangeable, and easily managed are required. The design should allow required site lines and allow day - lighting to penetrate deep into the workspaces. Waytinding: Wayfinding systems are those systems that enable users to better understand access, circulation and arrival. These systems should work together to provide direct and indirect cues to create a legible exterior and interior holistic facility and grounds wayfinding system. Building Signage, Ground Plane Surfaces, Wall Plane Surfaces, Orientation Points and Naming or Mnemonic Devices should be coordinated for the municipal facility. This system should take into account the users' ability to extract the needed information. City of Cottage Grove Space Needs Study Page 19 3/23/06 HD 06006.001 Rev 5/4/06 5.0 Appendices 5.1 Department Summaries 5.2 Existing Floor Plans 5.3 Space Standards Drawings City of Cottage Grove Space Needs Study Page 20 3/23/06 H6 06006.001 Rev 5/4/06 RECOMMENDED SPACE NEEDS SUMMARY . . ° TMEN 3' « ' ` '< 1.00 PS - Police Administration NSF Staff Spaces `Exist Space: "Staff I NSF I Spaces 2,525 2006 Needs Staff I NSF Space 2,663 2010 Needs Staff I NSF Space _ 3,313 2020 Needs Staff NSF Spaces 3,444 2040 Staff Spaces s" Needs NSF :'3,444 10, 121 19 19 2.00 PS - Police Patrol NSF Staff Spaces 1 2,169 2,232 2,295 `- 2,484 - 51 5 0 6 0 71 0 !' 10 3.00 PS - Police Investigations NSF Staff Spaces 763 865 969 969 1,284 4F 51 6 6 9 4.00 PS - Police Evidence NSF Staff Spaces 414 2,261 2,261 2,261 "2,261. 5.00 PS - Police Evidence Garage NSF Staff Spaces '840 1,688 .1.,688 1,668 :: 2,102 6.00 PS - Police Detention /Booking NSF Staff Spaces 1.. 1,894 1.,894 1,894 3,309 7.00 PS - Police Vehicle Detention NSF Staff Spaces '.467 497 994 994 '. 994 '. 8.00 PS - Police Armory NSF Staff Spaces'i 261 403 403 I 403 403 - 9.00 PS -Police Garage NSF Staff Spaces 4,872 5,499 5,683 8,768 -. ..9,823 10.00 PS - Police Support NSF Staff Spaces ' .906 1,923 1;923 1,923 " .1.,923 _ 11.00 PS - Police Dog Kennels NSF Staff Spaces 0 106 106 706 ` 106 12.00 PS - Police Communications Ctr NSF Staff Spaces - 488 0 `, 0 0 0 0 _ 0 _ 0 13.00 PS - Fire Dept Administration NSF Staff Spaces 1,524 1,524 1,524 ' 1,524 18 '. 19 20 20 14.00 PS - Fire Department Garage NSF Staff Spaces 0 16,270 ..16,270 16,270 - 16,270 0'� '- 0 0' 0 " 15.00 PS - Fire Department Support NSF Staff Spaces 960 960 960 960 0 "01 I 0 0 16.00 PS - Shared NSF Staff Spaces 3,011 3,011 : 3,071. _� 0' `0 07 �3 ,0011 0 17.00 CH - Finance/Administrative Srvs NSF Staff Spaces [E2,98�6 3,022 3,457 3,457 'I ".3,457 171 201 0 20 20 0. 18.00 CH- Community Development NSF Staff Spaces _ 19 2 0 :21 2,599 r0 _ 211 2, 599 0 21 2,599 19,00 CHI - Shared Space NSF Staff Spaces 3,216 5,661 5,661 5,661 : 5,661: 0 T_ 1 _" ,tQ At1 F S Exist Staff, 1. 36 NSF: SF GSF: Space'' NSF''. 23,737 6,409 30,146 2006 Staff 77 NSF: SF: GSF: Needs NSF 52,848 14,269 67,117 "2010 Staff 91 NSF: SF: GSF: Needs ;: NSF 54,949 14,836 69,785 2020 Staff 94 NSF: SF: GSF: Needs NSF 58,248 15,727 73,975 ;. 2040. Staff 100 NSF: SR GSF: Needs.° ' NSF '61,614 16,636 78,250 BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department - - -- "Gross Factor" is the square footage allowance for circulation between departments, vertical circulation (if any), mechanical and electrical GSF includes to the square footage between departments, vertical circulation (if any), mechanical and electrical rooms, thickness of exterior Net -to- Gross: Mech/Elec /Comm: 12 %; Structure /Walls: 9 %; General Circulation: 6 "Total amount of the existing space is located in this Space Summary Sheet City of Cottage Grove Space Needs Study 3/23/06 Rev 5/4/06 RECOMMENDED SPACE NEEDS SUMMARY Population Projections 32,500 .:42,700 47,800 66,000 Subtotal Summaries Existing 2006 Needs 2010 Needs 2020 Needs " 2040 Needs Eliminating separate report writing /watch office in the Fire Department Public Safety Police 27% 27% 27% 27% Factor) 27% ' NSF: 8,376 NSF: 12,284 NSF; 14;095 NSF: 13,295 NSF: 16,206 Gross Factor SFi. Incli SF: 3,317 SF:, 3,806 SF: 3,590 SR "' 4,376. Public Safety Police Garage NSF: 6,480. NSF: 7,684 NSF: 7,372 NSF: 11,470 NSF: '11,926 Gross Factor SF: GSF Mcl 14;855 SF: GSF 2,075 25,359 SR <. GSF- ` 1,990 27,262 SF: GSF 3,097 31,452 SR GSF ` 3,220 35,728 Public Safety Fire Department NSF: 7,239. NSF: 2,484 NSF:':' 2,484 NSF: 2,484 NSF: ' -2,464 Gross Factor SF.: Inch`:'. SF: 671 SF: i. 671 SF: 671 SF: - 671 Public Safety Fire Apparatus NSF: 6,768 NSF: 16,270 NSF: 16,270 NSF: 16,270 .NSF: 516,270 Gross Factor =�Ii wdv� „ r1 r ' " SF GSF Incl 74;007. SF: GSF 4,393 23,818 SR - GSF:, 4,393 23,818 SF: GSF 4,393 23,878 SF: GSF 04,393 23,818 Police /Fire Shared (including Gross p _4 __ :: $.,; _ GSF ' -. 28,863 GSF GSF 4,005: 53,762 GSF- 4,005 55,085 GSF 4,005 59,275 "'•. GSF '3,824 63,370 City Hall NSF: 9,292 NSF: 11,114 NSF- 11,717 NSF: 11,717 NSF: 11,717 Gross Factor u ` •, a, SR , GSF: .inclu i 9;292 38,155 SF: GSF: GSF: 3 001 10.,115 67,298 SF: : G$FP GSF.! 3,164 74,857 69,966 SF: GSF: GSF: 3,164 14,881 74,155 SF. � GSF: GSF: ..3,164 "14,687 78,250 Options include: Smaller Private Offices and Workstation. Combining mail /fax/copier /workroom /storage into one shared. Provide satillite copy /storage areas Provide one story Lobby at City Hall. Engineering Archive Storage to be off site Police Archive Storage to be off site. Further Options Reduce number of Patrol Car Indoor Parking stalls to 20 4,140 Eliminating separate report writing /watch office in the Fire Department 420 Dispatch4G- ge- te- Gsunty-Sacvis . Reduce Holding time of prisoners, eliminate one sallyport 420 Eliminate Fitness Center 460 Eliminate Drying Tower Subtotal 4,980 Total City Hall /Fire /Police GSF GSF: 73,270 City of Cottage Grove Space Needs Study 3/23/06 Rev 5/4/06 DEPARTMENT SUMMARY 1.00 Public Safety - Police Administration Be 1.01 1.02 iRfB gdSl N 11 NET f' PR IVATE OFFICE Existing Space Unit Qty of Extend BSF Spaces Unit BSF Pfopo , 2006 Needs 2010 Needs 2020 Needs 2040 Needs Umt F Qty of Exend Qty of Extend Qty of Extend Qty of Extend 4 '. Spaces Unit BSF Spaces Unit BSF Spaces Unit BSF Spaces Unit BSF Director of Public Safety 216 1 216 14 4 1 '1 144 7 144 1 144 1 _ 144 Captain 145 2 290 100 2 " 200 21 200 3" ;. 300 3: 300 Command Staff Position 0 '`'0 100 0 '0 1 100 ' ' 1 100 1 100 WORKSTATION Records Manager' 143 " 1 143 64 2 128 2 128 2 128 2 128 Admin Assistant 118 2 ; i237 _ 64 21 128 2 128 2 r 128 2 128 Clerical 90 ; 4 :360 64 , 41 256 7' 448 7 448 7 448 Reception - Records 0 : -0 140 01 0 1 140 1 .' 140 1 140 Management Analyst 0 'F '0 64 ' o - - ':0 11 64 1 "64 _ 1 64_ Office Manage 64 1 "64: — 1 64 1 ` 64 1 64 i TOTAL STAFF SPA ! 10 12 19 -: 19 DEPT SHARED SP ACE Files & Records 11 1 144 300 1 4 '300 1 3 00 1 .300 1 300 Soft Interview 0 0 1+:`0 120 1 120 1 120 1 120 1, 120 Hard Interview 154 1 ' 154 80 1 80 1. 80 1= '80 1� 80 Copy /Fax/Ptr Satellite 72 :' 1 :. 72 48 1 48 1 48 1 : - 48 1 48 IT S taff & work Bench Staff Toilet Women 332 1 2 332 .169 64 1 - 64 _ 1! _- 64 1 64 1 64 Staff Toilet Men 64 1 - -64 1 64 1 ; 64 _ 1 64 Janitor 170 -. 1 > 170 50 1 ' '50 1 50 1 -: `. 50 1 _ 50 Bev Station Satelli 01 0 25 1 is `25 _ 11 25 1 ' 25 1 25 Coats 0 :.0 6 1 6 1. __ 6 1: '6 _ 1I } 6 Special Duty WkSt 0 : '0 36 3 'i .106. 31 108 3 z 106 3j 108 Neighborhood Watch Cant Room for 10 to 12 01 !' 0 48 200 1f 1 48 200 1 1 48 200 1 1 ? 48 200 11 1 48 200 ._ ft SfiEB£{Qi� BSF: 2,287 SF: - NSF 2,525. ,,�'x .L ._ `NSF: BSF: 'r 2,033 SF: 630. 2,663 BSF: 2,529 SF: 784 NSF: 3,313 BSF: : 2,629 SF: 815: NSF: 3,444 BSF: 2,629 SF: 815 NSF: 3,444 BSF: Base Square Feet is the individual space square feet "Net Factor' is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Close to rest of the department. Soft and hard interview rooms to be close to entrance. SPECIAL REQUIREMENTS Soft interview is for child/wife abuse victims. Provide lounge type furniture enough for family. Central Mail: See City Hall Section 20 CH Shared Space This positions are as a result of the dispatch responsibilies being transferred to Washington County, Existing Men and Women Toilets Square footage is combined, City of Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 DEPARTMENT SUMMARY 2.00 Public Safey - Police Patrol 2010 Needs 1 ,. 2020 Needs 2040 d Qty of Extend Qty of Extend Qty of Ex 3F Spaces Unit BSF Spaces Unit BSF Spaces Unit 2.01 PRIVATE OFFICE 4 Patrol Officers 48 BA5 S l+REA SfJ6I ' A BSF. 1,208 BSF. :1,656 BSF: 1 704 BSF:'. t1 ,752 BSF: NE7}if= _; SF:SF: i:: :.513 SF: 528 SF: 543 SF: 6, NE TA NSF: 1,008 ; NSF, f 2,169 NSF: 2,232 NSF; '' 2,295 NSF: BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Needs Direct access to exit and patrol car SPECIAL REQUIREMENTS Report W ritiing Stations area shared. Number not expected to go up because much more is being done in the patrol car. Roll Call to be dedicatd use and at police staff entrance. This will also serve as a conference room for the Police staff. Reserves Storage and Animal control storage can be combined. The Sergeants need to be located next to the department conference room City of Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 514/06 i TOTAL STAFF SPACES 5 " ' 5 6, " 7 10 DEPT SHARED SPACE Report Writing (24 patrol) '12 . 12 . 144 48 5 240. 5 240 5, 240 Reserves /Reserves Stor 150 1 150 :: 1, 150 1� 150 CSO Animal Control Stor `_0 15 0 i 1 .150 1 150 1 150 CSO Workstations _ _ 36 ? 2 72 2 72 2' 72 Visitor W orkstation 131'. 48 " '= 2'- :96 , - -- 2`96 _ 2 96 Rotl Cail for 30` '418 600 1 600 r2721 1 600 1 600 File Storage Special D uty WkSt 0 4 0 36 " 3 108 3 708 _ 3 108 BA5 S l+REA SfJ6I ' A BSF. 1,208 BSF. :1,656 BSF: 1 704 BSF:'. t1 ,752 BSF: NE7}if= _; SF:SF: i:: :.513 SF: 528 SF: 543 SF: 6, NE TA NSF: 1,008 ; NSF, f 2,169 NSF: 2,232 NSF; '' 2,295 NSF: BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Needs Direct access to exit and patrol car SPECIAL REQUIREMENTS Report W ritiing Stations area shared. Number not expected to go up because much more is being done in the patrol car. Roll Call to be dedicatd use and at police staff entrance. This will also serve as a conference room for the Police staff. Reserves Storage and Animal control storage can be combined. The Sergeants need to be located next to the department conference room City of Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 514/06 DEPARTMENT SUMMARY 3.00 Public Safety - Police Investigations " .'Existing Space; Pwpbso 2006 Needs 2010 Needs 2020 Needs 1 2040 Needs r" Existing t; Qty of Extend Unit BSF Qtyof Extend Qty of Ex[end Qty of Extend ` Qty of Exter Unit BSF Spaces Unit BSF ?; '> Spaces Unit BS Spaces Unit BSF Space's Unit BSF Spaces Unit B 3.01 PR IVATEOFFIC E Investigative Sergeant 140 1 140 100 1 100 1 _100 1 10o 1 1 Investigators 130 2 261 80 3 240 3 240 4 320 5 4 Investigative Aid 21. 1 21! 80 `. 1 BO 2 160 '1 80 3 e 3.02 WORKSTATION TO STAFF SPACES 4 - 5 61 6 9 3.03 DEPT SHARED SPACE I Case Management Rm 0 0 0'. 0 0 0 0 0 Forensic Computer Lab 1 _70 120 ' 1 � 120 1 120 - !1 120 11 1 Invest Stor /Electr Equip 120 fi 120 1 1201, 1 120 11 1 _ ti/{SN�Sf'!a}7�P�..bUC}V:i ". nar: 2tl4 a oar.: oou 5 oar. SF: < 153 ,, SF_ ' 20 SF: 229 S F; ? 229 SF: iJEiLS�# t�B NSF' 763 NSF:' >865NSF: 9691NSR 969 NSf BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Next to Patrol SPECIAL REQUIREMENTS Forensic Computer Lab needs to be secure and clean, environmentiy controlled Invesigation Storage /electronic equipment needs to be highly secure and not easily accessable by others, Case Management . room is included in Section 20 City Hall - Shared Spaces. This space needs to be acousticall, °— 1 Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 DEPARTMENT SUMMARY 4.00 Public Safety - Police Evidence ids 2010 Needs 2620 Needs 2040 Needs Rend Qt of Extend Q of Extend City of I Eder it BSFJ Spaces I Unit BSFj Spaces'. Unit BSF, Spaces Unit B PRIVATE OFFICE I WORKSTATION TOTAL STAFF SPA 4.03 DEPT SHARED SPACE Evidenc Entry/Proc Evidence Prep room Physical Evidence Lab Evidenc Tech Rm _ Hazard Ma terial Storage Evidence Storage Vault Stor (weapo Workstation for Invest Ai 3601 1 i 1 7 1 7 1 11_ 7� BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Next to Garage Sallyport SPECIAL REQUIREMENTS Evidense Prep Room requires lockers, stainless steel table, vents for chemicals. Evidense Process, Prep Room, Lab Tech Room, and all storage rooms are to have limited access. Cottage Grove Space Needs Study HD 06006.001 11 1 �I l 1 7 I 1� 3/23/06 DEPARTMENT SUMMARY 5.00 Public Safety - Police Evidence Garage 6 2006 Needs 2010 Needs 1 2020 Needs 2040 Nee( aty of Spaces Unit Q of I BSF; Spaces Unit BSF pa es unit BSF Spaces Unit 5.01 TE OFFICE ATION TOTAL STAFF SPACES DEPT SHARED SPACE 0 0 Fenced Stall 17'x 30' 420 496 1 496 _ 1 496: 1' 496 1 496 Fenced Stall 10' w x 18 long 180 2 360 2, 360 2 360 2 720 Special Response Vehicle Stall W I V Q 420 '1 420 1 420 '1 420 1 420 dA F kF#EAmi413 01AL" B9 840', ,' BSF, I 1;468 BSF: I 1,468 BSF: 1;468 BSF: 1,828 )/B "'y SF:�34 SF: 220 SF: 220 SF: 220 SF: 274 �YES�a?IJ89 NSF: 840 „ r NSF:' 1;688 NSF: 1,688 NSF 1;688 NSF: 2,102 BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS SPECIAL REQUIREMENTS Fenced stalls are for impounded vehicles, clearance of 5' all around. Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 DEPARTMENT SUMMARY 6.00 Public Safety - Police Dentention /Booking a k `. y o f Needs 2010 Needs f Ne _ 2040 Qty of Extentl '. Qty of 1 Extend Qt Y of Extend I Qty of Spaces Unit BSF Spaces 1 Unit BSF Spaces Unit BSFj Spaces PRIVATE OFFICE 11 1001 Detenti Room - nP } ?f$IOn RYYI -.l 1 Repor Report - writing - 0 42 l; 0 42 1l 0 1 42 0 42 - Jail Supply 0 50 1 '- 50 „ i L, 50 1 50 1 50 Jani Supply 83 so i 50 1 50 1 5 1 5 WORKSTATION FQRFP4U13'a;OfiA :a BSF: 746 - 0 :, BSF:i'. 1 ^ 0 0 0 O TOTAL STAFF SPACES 0 -. `ll 0 0 i. 0 - 0 i DEPT SHARED SPACE Pre- Booking/Suspect 0 100 ' 1 ' 10 C 1. 100 1 100 1 100 Waiting Rnnkinn Intoxvlizer ;327 300 ? Ir 300 1j 3001 11 11 300 11 1001 Detenti Room - nP } ?f$IOn RYYI -.l 1 Repor Report - writing - 42 1 42 1l 42 1 42 1 42 - Jail Supply 50 1 '- 50 „ i L, 50 1 50 1 50 Jani Supply 83 so i 50 1 50 1 5 1 5 FQRFP4U13'a;OfiA :a BSF: 746 - ' BSF:dV 1,446 BSF. 1 446 BSF:i'. 1 BSF: 2,526 ,5 [i�A�i3ftfff. T}i I- _ , I NSF: 1,189 .. KW,. 1,8941NSF: 1,8941NSF: 1,1 BSF: Base Square Feet is the individual space square feet 'Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Next to garage, garage sally port SPECIAL REQUIREMENTS Dentention maintains 16 hour holding. Not staffed full time, observed at Communications Center. Locate Report Writing close to intoxylizer. Interview Rooms must be sound proofed. Provide one -way mirrof into Prisoner Viewing. Provide shelving in Jail and Janitorial Supply Rooms. Provide gun lockers at entrances. Cottage Grove Space Needs Study HD 06006.001 3/23/06 DEPARTMENT SUMMARY 7.00 Public Safety - Police Vehicle Detention Existing Space o 2005 Needs 2010 Needs r 2020 Needs 2040 Needs Existing "Oily of Extend Qty df Extend Qty of Extend Qty of Extend Qty of Extei Unit BSF Spaces Unit BSF Spaces Unit BSF Spaces Unit BSF Spaces Unit BSF Spaces Unit B 7.01 PRIVATE OFFICE _ 1 —_ 7.02 WORKSTATION _ TOTAL STAFF SPACES 01 1 1 0 1 1 01 1 0 7.03 DEPT SHARED SPACE i Sallyport stall 1 .467 432 1 . 432 2 864 21 8 'BSF: "467'�''� `° BSF: '.. 1432 BSF: 864 BSF: .. E (JV?j<Tl3 SF:` SF.' 65 SF: 30 SF: S W NSF: `.467 -, m. r NSF: 497 NSF: 994 NSF: BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Next to perpetrators' entrance SPECIAL REQUIREMENTS Locate in garage at entrance to Detention /Booking. Sallyport Stall to be 16' wide x 27' long Cottage Grove Space Needs Study HD 06006.001 BSF: SF: NSF: 3/23/06 DEPARTMENT SUMMARY 8.00 Public Safety - Police Armory WE NOW .2005 Needs 2010 Needs 2020 Needs 2040 Needs Extend Qty of S; Extend Qty of Extend Qty of Extend - Qty of Extend Unit BSFSpaces Unit BSF Spaces I Unit BSF Spaces Unit BSF Spaces Unit BSF BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Next to entrance, secure from prisoners and public. SPECIAL REQUIREMENTS Armor's work area to have bench, storage and be vented. Room to be secure with limited access. Storage to be secure with limited access and special reatment for hazardous material. Provide lockers for amo and targets in armor work area. Cottage Grove Space Needs Study HD 06006.001 3/23/06 DEPARTMENT SUMMARY 9.00 Public Safety - Police Garage 2005 9.011 PRIVATE OFFICE WORKSTATION 1 1' I : ' : I I `,I 2010 Needs 1 2020 Needs 2040 Nee( ty of Extend Qty of Extend Qty of EX aces I Unit BSF Spaces Unit BSF Spaces I Unit TOTAL STAFF SPACES 0 `.0 0 0 0 DEPT SHARED SPACE Police car parking stall 377,: 15 15,656 180 20 3,600 20 3,600 35 6,300 40 7,200 Wash bay 1 i 345 2721 272 1 272 1 272 1 272 Patrol storage !. 750 750 1 750 1 750 '1 750 1 750 Storage for gear bags 160 160 . ,1. 160 320 .2 320 2 320 — r ! N"+4,fy',`(�.. ` SF:5 %: SF: : 717 SF: 741 SL 11 IiIE]'uk„`£AFI; NSF: 4,872 NSF: 5,499 NSF: 5,683 NSF: 8,7 BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Next to patrol entrance, away for public SPECIAL REQUIREMENTS Police car parking stall to be 10'x 18' Wash bay to be 16'x 17' for wash and squad decontamination. This can be used by others. Patrol storage to be 25' x 30' Storage for gear bags is 20" x 20" x 20 ", open, 5 high. BSF: Cottage Grove Space Needs Study HD 06006.001 3/23/06 I OFFICE TION 10.03 DEPT SHARED SPACE Mens Locker/foilet/Shw Women Locker/TolleU: Men's Locker Rm (70) Men's Vestibule Women's Locker Rm (31 W omen's Vestibule _ Archive Storage Supply /g eneral Storage Staff Quiet Room Break/Lunch Room Existing Space" !sting Qty of I - Extend'. tit BSF Spaces Unit BSF 0 DEPARTMENTAL SUMMARY 10.00 Public Safety - Police Support Bads 2010 Needs 2020 Needs '1 2040 Neer Extend Qty of I xtend I Qty of I Extend Qty of Ext Jnit BSF'. Spaces Unit BSF Spaces Unit BSF; Spaces I Unit 0 i i ^ a J 0 ^ J u 8401 i I BSF: 870 _ BSF: 1;658 BSF: 1,658 BSF: 1,658 BSF: 7,658 SF: s 98 ;G�%s� SF: ( '265 SF: 265 SF: S 265 SF: 266 NEx 'SF f`t , NSF: 906 , . NSF: -] ".1,923 NSF: 1,923 NSR '- 1.,923 NSF: 1,923 BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Central, easy access SPECIAL REQUIREMENTS Mens and Womens Lockers/Tollets /Showers: See Section 16 PS Shared Spaces. Police to have own locker Rooms. Toilets and showers can be shared with Fire Department. Archive storage will not increase due to electronic filing. Staff Quiet Room and Lunch /Break Room can be shared with Building staff, not, however with public. See Section 16 PS Shared Spaces. Move Archive Storage off site. City of Cottage Grove Space Needs Study 3/23106 12 70 - 44 1 , 12 30 44 1 i i ^ a J 0 ^ J u 8401 i I BSF: 870 _ BSF: 1;658 BSF: 1,658 BSF: 1,658 BSF: 7,658 SF: s 98 ;G�%s� SF: ( '265 SF: 265 SF: S 265 SF: 266 NEx 'SF f`t , NSF: 906 , . NSF: -] ".1,923 NSF: 1,923 NSR '- 1.,923 NSF: 1,923 BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Central, easy access SPECIAL REQUIREMENTS Mens and Womens Lockers/Tollets /Showers: See Section 16 PS Shared Spaces. Police to have own locker Rooms. Toilets and showers can be shared with Fire Department. Archive storage will not increase due to electronic filing. Staff Quiet Room and Lunch /Break Room can be shared with Building staff, not, however with public. See Section 16 PS Shared Spaces. Move Archive Storage off site. City of Cottage Grove Space Needs Study 3/23106 11.01 [PRIVATE OFFICE DEPARTMENT SUMMARY 11.00 Public Safety - Police Dog Kennels )05 Needs 2070 Needs 2020 nEend 2040 Needs of - Extend Qty of I Extend Qty of Qty of Extend :es Unit BSF. Spaces Unit BSF Spaces Spaces Unit BS F BASY+RAU;EO3i.: OF: 0 BSF. 96 BSF: 96 BSF: 96 BSF: E�FCOt3 _,.v SF: � � G%6 SF: 10 SF: 10 SF: �10 SF: N�-8M . U%4T T. + NSF: T WINSF: 106 NSF: 106 NSF: 1 106 NSF: 1 BSF: Base Square Feet is the individual space square feet 'Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Close to patrol parking and patrol entrance. SPECIAL REQUIREMENTS This dog kennel is to handle officers' dogs while officer is in training, maximum 4 hours. Space should be protected and somewhat heated and cooled. Cottage Grove Space Needs Study HD 06006.001 3/23/06 DEPARTMENT SUMMARY 12.00 Public Safety - Police Communications Center -:Existing, 2005: Needs 2010 Needs 2020 Needs r 2040. Needs . Existing ;Qty of Extend Qty of Extend -:: Qty of Extend Qty of Extend " Qty of Extend Unit BSF .Spaces Unit BSF Spaces. Unit BSF Spaces Unit BSF Spaces. I Unit BSF Spaces I Unit BSF 12.01 PRIVATE OFFICE �. Communications Sup'vr 1 156 100 0' 0 0_ 0 0 0: 0 0 i 12.02 W ORKSTATIO N Dispatcher 7 0' 0 0 _ 0 0 0 0 0 TOTAL STAFF SPACES 8 0 0 0 0 12.03 DEPT SHARED SPACE Com munications Center 390 1 390 440 0 0 01 0 0 0 0 0 Kitchen 50 0 0 01 0 0 0. 0 0 Lockers - 12 B@ 24" 9 ,:0 01 Oj ___ 0 0 0 O ; B'A &ESARE'atlk`�DA BSR i 390 ,BSF. ,0 BSF: 0 BSF. 0 BS( % `rp„ % SF: ;.6', SF.. 0 SF: 0 SF: ° >0 SF: NSF: = 488 I ' NSF: 0 NSF: 0 NSF: ' '0 NSI BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Away from public acess SPECIAL REQUIREMENTS Redundant power and communications This function is being transferred to Washington County Cottage Grove Space Needs Study HD 06006.001 3/23/06 Rev 5/4/06 Existing Existing Qty of Unit BSF Spaces 13.01 P RIVATE OFFICE DEPARTMENT SUMMARY 13.00 Public Safety - Fire Department Administration o"o ' °' &d 2005 Needs 2010 Needs 2020 Needs , 2040 Needs Extend 'Extend ,_ Ory of Extend Qty of Extend j Qty of Extend Unit. BSF` .h Spaces Unit BSF Spaces Unit BSF Spaces: Unit BSF Spaces Unit BSF _ Deputy Public Safety Director. 1 120 ` 1 120 1 120 1 "120 1 120 Deputy Chief 3 120 2 is 240. 2 240 3 360 _ 3 360 EMC Cordinato 1 100 1 "- 100 1 100 1. ". 100 1 100 Fire Marshall 1 100 1 100 1 1" 100 1 100 Emergency Ops Coord 1 100 1 ! 100. 1 _1001 1 00F 1 ". 100 1 100 13.02 WORKSTATION Captain 4 48 4. ". 192 51 240 5'' 240 5 240 Secretary 1 64 1 64 1' 64 1.. 64 1 64 Fire Fighters' Coord 1 48 1.; 48 1 48 1 11 48 Fire Fighters 36 5 -. 180 5 180 5.' 5 180 Lieutenant 48 1,? 48 1 48 1I. !'48 1 48 TOTAL STAFF SPACES 13 18 `, 19 20: x . 201 -- 13.03 DEPT SHARED SPACE It Files 326 1 '326 15 201 300 20 300 20! 300 20 300 Copier /Ptr /Fax Satellite 42 142 48 148 1 48 1i 48 1l 48 Cent Room for 10 to 12 - .'`228 200 1 'I - 200 1 200 ' 1 ". 200 1 200 Work a rea for Fighters 5 36 5T 7.80 5 1 180 5'. .180 5 180 Beverage Station Satellite 0 D 25 1 " 25 IF 25 1 ' x :25. 1 25 Janitorial 50 1 "' 50 1 50 1' - 50 i" _ 50 St aff Toilet Women 64 1 64 1 64 1 64 1 64 Staff Toi Men 1 - 64 1`: 64 1 _ 64 1" 64 11 64 Dining Room ` .215 Kitchen :180 Lounge 305 Bunk 645 _ _ Toilet - -_ Reception ' : -175 Watch '232 232 1 232 1 232 1; 232 1 232 M en's Locker /Sh/Toi X300 Women's Locker /Sh/Toi "220 _ _ Storage :.i T raining 7,138 F itness BSF: BSF. 1,153 BSF: r 1,163 BSF: ,' 1,163 BSF: SF: i°,,6, SF: 361 SF: 361 SF: 361 SF: NE'{.SFib' W NSF: „, NSF:. ;' 1,524 NSF: 1,524 NSF: 1,524 NSF: BSF: Base Square Feet is the individual space square feet ” "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Next to publice entrance with service counter. Fire Fighters work area closer to fire department support spaces. SPECIAL REQUIREMENTS Files include training files, records /file maintainence, supply orders, burning permits Secreatry provides admin duties for chief, deputy chiefs, Emergency Management, and assists public. Also provide accounting for the department. Emergency Opserations Coordinator Office to house 3 people. `Total amount of the existing space is located in the Space Summary Sheet Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 1,163 361 1.524 DEPARTMENT SUMMARY 14.00 Public Safety - Fire Department Garage 14.01 � - .'Existing Existing Oty of Unit BSF ;Spaces PRIVATE OFFICE Extend Unit BSF .. • 2005 Spices Q f , Needs f Extend Unit BSF; 2010 Qty of Spaces Needs Extend Unit BS= 2020 Qtv of ,Spaces I Needs. Extend'. Unit BSF 2040 Qty of Spaces Needs Exter Unit B 0 0 0 14.02 WORKSTATION TOTAL STAFF SPACES 0 0 1 00 0 14.03 DEPT SHARED SPACE SCBA Storage /Fill Stati _ 233 1 233 1 233. 1 233 1 Maintenance, repair, 1 cle aning supply 288 600 1 600 11 600 1 600 1 f Hose washer, dryer, storage 120 f 120: 1 120 ` ; 1 120 1 1 I Medical Supplies 1 600 JT 600 1 600 1 f _600 Emergency Operations .. 1_ Center /CPR S torage 204 200 '1 , 200 11 200 _. 1 200. 1 `< Ham Radio Room 128 1 ' 12 6 1 128 11 128 1 I? Fire Apparatus Bays 51 6,380 1,050 10 10,500 10' 10,500 10 10,500 10 10,: Mezzanine Storage - 11 384 _ R rnunrl Stnrana 2.000 1 2,000 1' 2 000 ":1 2,000 1 2,( Ambulance _ <i I Bp�E,g A tAT t F BSF: , BSF. i 14,148 BSF: 14,148 BSF ( 14,748 BSF: 14,14- _. ., .. v� 1yT#dt�7 ", SF: SF: :2,122 SF: 2,122 SF: ii 2;122 SF: 2,72 °S� _ NSF: :7,256 NSF: 16,270 NSF: 16,270 NSF: 16,270 NSF: 16,27 BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS SPECIAL REQUIREMENTS SCBA Storage /Fill Station: Workspace, compressor, fill station, spare bottle storage, O two bottles, outside wall, fresh air Maintenance, repair, cleaning supplies: Washer /dryer Qumpsuits and towel), washer (bunker gear), cleaning supplies, flammable liquid storage, oil Hose Drying Storage: Drying tower, winch method Medical Supplies: Locker part for drugs, sink, water, mass casualty equipment storage, spare back board storage Emergency Operations Center/ CPR Storage: CPR training materials and equipment, EMS education and training material Ham Radio: Secondary Backup to Communications Center Fire Bays : Ten total, 5 on each side; 50' wide x 106' long x 30' high each, drive through. Includes handling /quality management (OSHA), ability to be on top of fire apparatus, vehicle maintenance, ceiling lights /fans, fixture spacing, light dispersion Ground Storage could be mezzanine Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 DEPARTMENT SUMMARY 15.00 Public Safety - Fire Department Support I �L " ' Exsting ,g 2005 Needs 2010 Needs 2020 Needs 2040 Needs „` µ .. ; Existing Qty of Extend_ .; Qty of - Extend Qty of Extend Qty of Extend ' Qty of Extend 4 _,:, Unit BSF' Spaces Ur3it 8SF x 'Spaces Unit _BSF Spaces Unit BSF Spaces Unit BSF Spaces Unit BSF 15.01 PRIVATE OFFICE 0 0 0 -- 0 _.. - 0: -- 0 0 0 15.02 WORKSTATION _ i TOTAL STAFF SPACES 0 ` 0' 0 D 0 15.03 DEPT SHARED SPACE _ Mans Loc ker/Toilet/Shw 11% 's 250 Womens Lockedfoilet/Shw ' 1 '' 200' 9ayreem Procurement Storage 200 1 200 11 200 1 200 11 200 Men's Locker Rm (25) 12 : 25 300 25 300 2S 300 25 j 300 Men's Vestibule 44 1 44 1 44 ;:1 44 1 44 Women's Looker Rm (15) "' 12 " " =18 180 15 180 15 180 15 - so Wo men's Vestibule 44 '''.1 44 t 44 "1 ''44 1 44 Decontamination Shower 30 -2 60. 2 60 ,2 ':60: 21 60 I B7\S S(9A, iE SLjJ3, Q',1'::: x BSF: ` BSF: +628 BSF: 828 BSF: -828 BSF: E 1A137Q' SF: -S ' SF: 132 SF: 32 SF: 132 SF: NE SF'AAE 'S b C3Tft NSF PPWW., INSF: 960 NSF' 960 NSF: r' - ' 96 0 NSF: f BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Mens and Womens Lockers/Toilets /Showers: See Section 16 PS Shared Spaces. Fire Department to have own locker Rooms. Toilets and showers can be shared with Police Department. Qayfeem -we be4esat bay SPECIAL REQUIREMENTS Flay eea;- te- se�ae�;s rasa., dad= tra;:.ing- reem,�iopa' ' �et-t4o"i ,4QPG4- wtitFR9: Kitchen: See Section 16 Public Safety Shared Spaces. 'Total amount of the existing space is located in the Space Summary Sheet Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 DEPARTMENT SUMMARY 16.00 Public Safety - Shared 2006 Needs 2010 Needs Qty of Extend I Qty of EMei ;paces Unit BSF Spaces Unit E 16.011PRIVATE OFFICE _STAF SPACES SHARED SPACE /_Pt /Fax/Mail Rm Toilet/Shower n's Toilet/Shower- 5 Center rg Rm /EOC e Rm 0 01 — �0- 0 0 ;paces Unit BSF Spaces Unit BSF 0 0 0 0. 0 0. 0 488 11 4881 11 48BI 11 4 88 11 38B 1 388 1� 388 '1 368 i' 400 1 400 11 400 -1 400 1 1,200 1 1,2001 1,200 '1 1,200 1, 1 120 1 12bl 1 120 1 120 t '; SF: ,�u SF. 01 415. SFS: : 415 S NSF F: 0 41 1 5 SF: 415 `; NSF: ' NSF: 8,1 NF 3,011 : > 8,1 NSF: 3,011 BSF: Base Square Feet is the individual space square feet 'Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Locker rooms for police and fire department to be located with shared men's and women's shared toilet/shower faciity. SPECIAL REQUIREMENTS Provide benches in locker rooms. Lockers to be 24" w x 15" d. Lockers to have outlets for charging equipment. Men's Toilet/Shower to have 9 showers, 1 HC Shower, 5 water closets, 2 urinals, 6 lays. Women's Toilet/Shower to have 5 showers, 1 HC Shower, 5 water closets, 5 lays. Fitness Center to have two universal gyms, bike, treadmil, lifts, eliptical machine, open space for jump rope, etc. Fitness center available to all. Kitchenette can be located between the Fire Dayroom and the Police breakroom to serve both. Kitchen to have cabinets, of unsecured rehab needs, used for meals, special occasions, serving window to dayroom and shared with Police. Copier /Ptr /Fax/Mail Rm to be centralized. See Section 20, City Hall Shared Spaces Training Room needs to be 1,200 sf for training up to 50 to 60 people. This is to have the ability to divide up into 3 separate rooms for small training sessions of 20 people each or meeting rooms of 20 pople each. This area will also serve as the EOC Room when needed. "Total amount of the existing space is located in the Space Summary Sheet Cottage Grove Space Needs Study HD 06006.001 3/23/06 DEPARTMENT SUMMARY 17.00 City Hall - Finance and Administrative Services 17.01 PRIVATE OFFICE City Administrator Finance /A.S. Direc HR Manager Finance Manger City Clerk/Risk M( 17.02 WORKSTATION HR Coordinator Deputy City Clerk Accountant Accounting Clerk ;pacesjI Unit BSFI Spaces I Unit BSFj Spaces I Unit BSFi Spaces Unit BSF 1 144 1 144 1 ` 144 1 144 1 144 1 -_— 144 1 14411 1 144 1 100 1 100. 1 100 1 100 1 100 11 1001 1 100' f i 100 1 100 7 T 1 ooF 00. 11 100 1 1 0 Temp PT's 73 21 146 '; 64 11 64 0 1: 0 1 TOTAL STAFF SPACES'[ 17 : 64 17.03 DEPT SHARED SPACE 1i ! 64. 1 64 Conf Rm f 10 to 12 -- 64 1 , 64 3 Interview Rm (2 -3) 4 _ 256 4 S. 256. Staff Toilet Women 256 2 '. 128. 3 Staff Toilet Men -. -.. 192 3 192 Financial Files - Secure 60 1 200 1 HR Files Secure 1 64 11 25 City Clerk Files 25 1 '. 64. 1 Copy /Ptr /Fax Satellite 142 .342 Office Stor Cabinets "64 1' 64 Records W 12ai '79E 72 _ Scanner 72 Server Rm EK Computer Work/storage 11 20 Hospitality Station Satellite 0 f ;pacesjI Unit BSFI Spaces I Unit BSFj Spaces I Unit BSFi Spaces Unit BSF 1 144 1 144 1 ` 144 1 144 1 144 1 -_— 144 1 14411 1 144 1 100 1 100. 1 100 1 100 1 100 11 1001 1 100' f i 100 1 100 7 T 1 ooF 00. 11 100 1 1 0 -: - -0 1 64 1 '; 64 11 64 0 1: 0 1 64 1 : 64 1 64 1i ! 64. 1 64 r ill 64 1 , 64 3 I: 192 4 _ 256 4 S. 256. 4 256 2 '. 128. 3 192 3 -.. 192 3 192 1 60 1 200 1 64 1 64 11 25 1 25 1 '. 64. 1 64 1 "64 1' 64 W 12ai 2.1 72 2 72 20 20 1 200 11 200 1 .200 _1 200 {.. .80 _ 1 60 1 S 80 1 _ 60 1 f. 64 1 64 1 ' -64 1 64 1 ,:" 64 11 64 1 '64 11 64 t 1 1 48 1' 48 _ 1 ' 48 1 2 ' 26 2 26 2 i 26 2, 1: ` 120 1 120 1 ,' 120 1 1 1 48 - -- 11 48 1 48 1 90 11 90 1 `90 1 60 1 200 11 200 — 1' 11 25 1 25 1 25 1� BSF. 2,835 - E - BSF: I: ^2,309 BSF: 2,639 65F: 2;639 BSF: 2,E Nt`FJgit',','3,}'•i , _,#:;F,kv'. E SF: o SF: 715 SF: 818 SF: 818 SR E NSF: '3;802 _ NSF: 3 022 NSF: 3,457 NSF: 3,457 NSF: 3 BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS SPECIAL REQUIREMENTS Interview Room is to be located close to the front entrance for use by HR and small meetings Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 ' Existing Sp Existing ( Qty of Extend Unit BSF Spaces Unit BSF. 18.01 PRIVATE OFFICE DEPARTMENT SUMMARY 18.00 City Hall - Community Development Option B 2006,Needs 2010 Needs 2020 Needs 1 2040 Needs Qty of- Extend'. Qty of Extend Qty of Extend Qty of Extend Spaces Unit BSF.. Spaces Unit BSF Spaces Unit BSF Spaces Unit BSF Comm Develop Dir 210 ' 1 210 144 .1 144 1 144 1 144 1 144 Planner 225 -: 3' 675 ___ 120 3 360 3 360 ' <3 36031 360 Engineer 240 ` 1 240 120 9 720 1 120 !1 120 1 120 Chief Building Official 210- 1 210 120 1 120 1 120 1 120: 1 120 Fire Marshal _ 120 1 120 1 120 `:' 1 120 _ 1 120 18.02 WORKSTATION Asst. Engineer 89.! 1 . 89 64 1 64. 1 64 ' 1 64 1 64 Engineer Tech 89 1. 89. 64 2 128 4 256. 41 256 4 256 GIS Technician 89 1 89 64 1 , 64 1 64 1 64. 1 64 Building Inspector 89'. 3 267 64 3 192 _ 3 192 -. 3 192 3 192 Code Enforcement 89` 1 89 36 °2 72 2 721 '2 72 2 72 Secretary 89 1 89 64 3 '192 3 792 3 192 3 192 TOTAL STAFF SPACES 14 19 21 '21 21 18.03 DEPT SHARED SPACE Copier /Ptr /Fax Satelite 30 '1 30 1 30 1 1 30 1 30 Files 1 150 1 150 1 150 (:1 150 1 150 Lay Out Space 100 1 " 100 11 100 1 100 1 1 100 Break / Goof 196 1 '. -'196 _ — — BAS a AI E 54.18Tfl1' BSF: , 2,268 „BSF. i 1,856 BSF: 1,984 BSF ' 1,984 BSF: nly` . ¢,'Q(j '., g SF: _ SF: " 575 SF: 615 SF: '.. 615 SF: NSF: '2,986 NSF: 2,431 NSF: 2,699 NSFs. 2;599 NSF: BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS SPECIAL REQUIREMENTS The spaces for the staff in the existing "W orkStation" column are an average. 1,984 615 2,599 Cottage Grove Space Needs Study 3/23/06 HD 06006.001 Rev 5/4/06 DEPARTMENT SUMMARY 19.00 City Hall - Shared Space 19.01 19.02 PRIVATE OFFICE WORKSTATION Existing Space Existing Unit BSF Qty of Spaces ! Extend Unit BSF Proposed Unit BSF ' 2005 Qty of Spaces Needs - Extend. Unit BSF. 2010 Qty of Spaces Needs Extend Unit BSF ' 2020.Needs Qty of I Spaces . :' Extend Unit BSF 2040 Qty of Spaces Needs Extend Unit BSF TOTAL STAFF SPACES 0 "'0 0 0 0 19.03 DEPT SHARED_ SPACE i Lobby 11, 701 900 1 " 900 1 900 `:1 900 1 900 Public Toilets 4 , i 36B 200 2 400 2 400 2 400 21 400 Council Chambers Seati 908 11, ' 908 850 1' 850 1 850 1 850 1 850 Council Members' Table 405 11 405 200 1 200 1' 200 ":. 1 200 1 i 200 Council Work Area 120 ::1 120 1 120 1 120 _ 1 120 Coats 100 1 100 1 100 1 100 1 100 Central Work/Mail Rm 240 !:1 240 1 240 1 240 1 240 Vending 17 5J' 85' 5 85 ` 5 -85 5 85 Kitchen 200 1 "" 200 1 200 1 .200 1 200 Lunch Room - 484 485 1 485 1 485 :: 1 2 1 485 Community /Case Mgt 350. 500... _ 1 " ... " 500' 1 500 ,; 1 500 _ 1 500 Conf Storage Room 150 ,1 150 1.--- 150 '' 1 150 1 150 Custodian ;. 50 -1 50 1 50 1 50 1! 50 Receiving /Dock 300. 1 :300 11 300 . 1 300--- 1 300 Storage 300 "1 300 1 300 1 `. 30011 300 3dS'S,Aft,,;?`Sf-1BT0T'X,C .` BSF: -° 3,216 SF: ,= . 6.46` BSF: :4;880 SF: . 781 BSF: 4,880 SF: 781 BSF:- 4 SF: r: + 781 BSF: 4,880 SF: 781 NEI`S 1R_ 0 TQA 1NSF: INSF: 5661 NSF' 5661 NSF: 5661(N6I-: Sbtit BSF: Base Square Feet is the individual space square feet "Net Factor" is the square footage allowance for circulation, wall thicknesses and panel thicknesses within the department. NSF: Net Square Feet includes the Net Factor Allowance within the department ADJACENCY REQUIREMENTS Centrally located, accessible by public without going through city offices. Accessible by staff. SPECIAL REQUIREMENTS Service Windows to be visible to public from lobby. Provide kiosk for announcements. Public toilets to be off public lobby. Council Chambers to accommodate 54 audience members. Room to be able to be divided up into 3 sections with 2 sections to allow for meeting of 24 to 25 people each. Council table to accommodate 4 council members, mayor, city administrator, secretary, City Attorney, one extra. Provide monitors in table. Provide technology for closed circuit TV, satellite connections, Plasma TV, Overhead projector, lecture with connections for lap top, presentation. Kitchenette to serve council chambers and community rooms. Conf. Storage room to store folding tables, chairs, mats. - Dock to accommodate mail truck, FedEx, delivery of supplies, etc., staging area. Storage room off dock to be secure. Central Work/Mail room to accommodate all incoming and out going mail, large copy projects, office supplies, and counters. Provide storage (closets) in conference rooms. Provide extra outlets for power, phones and data in room to sure as EOC. Provide redundant power, communications. Lobby to be one story and provide over flow for Council Chambers. Locate Community /Case Management as part of the lunch room and provide acoustic floor to ceiling movable partition to divide up Community /Case Management into tow meeting rooms at 12 to 13 people each and allow this space to be able to combine with the Lunchroom allowing for a room to hold meetings of 45 to 55 people. *Total amount of the existing space is located in the Space Summary Sheet Cottage Grove Space Needs Study HD 06006.001 3/23/06 Projected General Government and Public Safety Staffing to 2030 and 2040 (preliminary; April 12, 2005, updated 5/2010) 58,000 66,000 /1,000 Dept. /position 2030 FTE's 2040 FTE's Office Style Target Public Safety Director 1 1 A Deputy Director 4 4 L Sergeant 11 11 H Investigator 4 5 H Paramedic /Patrol 36 42 Squad Rm. Patrol 16 20 Squad Rm. Subtotal 72 (67) 83(76) 14 Fire Marshall I 1 H Firefighter 4 5 E Subtotal 5(5) 6 (6) H Mgmt Analyst 2 2 H Clerical 7 8 H Records 2 2 lI Investigative Aid 2 2 H Subtotal 13 (12) 14 (13) Subtotal 90 (84) 103 (95) Part-Time Fire Fighters 80 (79) 91(90) Clerical 2 2 E CSO 5 6 E Subtotal 7 (7) 8 (8) Finance and Administrative Services City Administrator 1 1 A Fin. Dir. 1 1 B HR Manager 1 1 L AFD 1 1 L HR Coordinator 1 1 H City Clerk/ Risk Mgr 1 1 L Dep. City Clerk I 1 14 Accountant 1 1 H Acct. Clerk 4 4 H MIS 2 2 H Mgmt. Analyst 3 4 H Secretary 1 2 H 1.15/ .09/ .20/ 1.37/ .122 Receptionist 1 1 H Subtotal 19 22 Community Development CD Director 1 1 B Planner 3 3 L GIS Technician 1 1 H Engineer NA NA L Asst. Engineer NA NA N Eng. Tech NA NA M Chief Bldg Official 1 1 J Bldg Inspection 3 3 M Code Enforcement 1 1 E Secretary 3 3 H Subtotal 14 1.7 Subtotal GG 33 (34) 39 (39) Total* 130 (125) +POC 150 (142) +PQC Room Sizes CONFIRM A: 198 SF. Enclosed w/ 4 person table B: 1.43 SF. Enclosed w/ 2 person table C: 30 SF. Open D: 36 SF. Open E: 42 SF. Open G: 56 SF. Open w/ 2 guest chairs H: 63 SF. Open J: 140 SF. Open w/ plan storage/ 2 guest chairs K: 100 SF. Open w/ drafting table / 1 guest chair L: 120 SF. Enclosed or Open w/ 2 guest chairs M: 81 SF. Open with plan storage / drafting table N: 88 SF. Open with plan storage / drafting table Plus squad room Total Design and set up services/ mist. .59/ a 2 total $ 20,OOC 2 total $ 1O,00C 0($3,500/) 0 total ($3,800/) 12 total $ 54,000 0 total ($5,0001) 47 total $235,000 1 total $ 9,000 0($8,500/) 10 total $ 90,000 3 total $ 9,000 0 total ($3,500/) 76 total $427,000 18 $ 54,000 $481,000 $ 34,000 Total Budget: $515,000 12' -0" 0 F 17 I 'A' PRIVATE OFFICE 144 SF 20' of Worksurface 20" x 60" Table 6 Chairs 12' of Shelving 12' of Shelving 10' -0 0 17 J 'C' PRIVATE OFFICE 100 SF 13' — "6" of Worksurface 36" dia Table 4 Chairs 13' -6" of Shelving 13' -6" of Shelving !A DOBBS CITY OF COTTAGE GROVE MINNESOTA 2 2 . . . a 220 S. Sixty St, Suite 165 65 SPACE NEEDS STUDY Ml ones Pe tts MN SPACE STANDARDS 5 5 4 0 2 - 2 9 2 9 Tet.612.338.4590 www „,.ones, 9� Gan Pia 4042 'B' PRIVATE OFFICE 120 SF 20' of Worksurface 48" dia Table 5 Chairs 10' of Shelving 1.0' of Shelving 10' -0" i_. I. 'C' PRIVATE OFFICE 100 SF 18' of Worksurface 36" dia ?able 4 Chairs 10' of Shelving 10' of Shelvina R - -n Cl' PRIVA OFFICE 80 SF 16' of Worksurface D I I I I I — I 10 of Cl' PRIVA OFFICE 80 SF 16' of Worksurface 36" dia Table 2 Chairs, Pad Ped 10 of Shelving 10' of Shelving I I 'H1'WORK STATION 64 SF 16' of Worksurface 6' @ 30" deep File, Dian Storage 1 Chair, Pad Ped 8' of Shelving 'E' WORK STATION 48 SF 14' of Worksurface File 1 Chair, Pad Ped 8' of Shelving D' WORK STATION 36 SF 10' of Worksurface FI Ie. Chair 6' of Shelving S CITY OF COTTAGE GROVE Date: 23 MARCH 200 MiNNesorn Proj No: 06006.001 1 / U. S. SIZth Sk, SUlte165 SPACE NEEDS STUDY Scale: 1/4" = 1' -0" Minne xpolls, MN SPACE STANDARDS 55402 -2929 TH 12.33 ®.4590 Fex. 61 2 .3 3 T. 8042 'H ''L ' N' WORK STATiON 64 SF 14 of Worksurface 2 Files 1 Chair, Pad Ped 8' of Shelving HARD INTERVIEW 80 SF -0" 0 0 I� CD SOFT ! NTERVIEW 120 SF T Seating Presenter L C OUNCIL MEMBERS' BOARD TABLE AREA i COUNCIL MEMBERS' Seating WORK AREA t)-X' A i H A D ou � `� CIIY OF COTTAGE GROVE MINNESOTA Date: MARCH 200 U i HARD INTERVIEW 80 SF -0" 0 0 I� CD SOFT ! NTERVIEW 120 SF T Seating Presenter L C OUNCIL MEMBERS' BOARD TABLE AREA i COUNCIL MEMBERS' Seating WORK AREA t)-X' A i H A D ou � `� CIIY OF COTTAGE GROVE MINNESOTA Date: MARCH 200 Proj No: o: 06006.001 1 " " "' " " ° ° ° ° ' "` ° " 220sai:msi,,,irsi6 ° s SPACE NEEDS STUDY Scale: 1/4" = 1 ° -0" Mi°°eep 011 x, MN SPACE STANDARDS 55402 -2929 Tel. 612. 338. 4590 F._612.33T.4042 To: Mayor and City Council From: Ryan R. Schroeder CC: Department Directors Date: _ D, Re: Future Facility Cost Scenarios / Project Options On May 17, 2006 the Hay -Dobbs Architectural firm presented a Preliminary Space Needs study which projected a 2040 need to increase our current general government, police and fire space allocations of 38,155 square feet at City Hall and Fire Station #2 to 78,502 square feet at a consolidated facility proposed fore the City controlled site at W , Street and County Road 19. The purpose of this workshop is to review the project options and to attempt to narrow the project scope choices for further analysis. There are various project options available for City Council consideration. We have identified seven (7) construction options plus five (5) subset options that suggest sale of either the current City Hall or Fire Station #2 or both. The attached spreadsheet identifies subset (sale) options as 3A, 4A, 5A, 6A, and 6B. Each of these subsets would include sale of the City Hall and assume a market value of $1,951,440 for this property (this is based upon a square foot value estimate not an actual appraisal). The project cost for option 6B assumes sale of Fire Station #2 at $1,009,302 (based on similar square foot values to City Hall). Option 5A would provide the opportunity to also consider sale or reuse of Fire Station #2 but the resulting proceeds from such a sale is not assumed in the project cost numbers (which, again would be reduced by the $1,009,302 estimated market value). In December, 2005 we projected a project cost range up to $14,732,500 for a 70,991 square foot project. The Hay -Dobbs space needs study estimates a project cost range from $12,405,846 to $16,789,705 for a 74,679 square foot project (plus site, FFE and other costs which staff projects at $2,705,000 for the largest of the project options). Our staff estimates for purposes of this workshop include a maximum projected project cost of $18,113,971 for a 78,502 square foot project (including site and FFE). The variance in project size between Hay -Dobbs and this staff estimate results from shared public safety (police and fire) space being dropped from the project estimating in error in the Hay -Dobbs report (but included in the programmed space). The difference in pricing results from the staff inclusion of site and FFE costs outside of the Hay -Dobbs study scope. (The net is that there is very little difference in project scope and pricing between staff and Hay -Dobbs after adjusting for site and similar considerations). We are not proposing that Council pursue the largest of the project scenarios at this time. In fact, the scenario choices identified to date range from $3,962,771 up to the larger project at $18,113,971. Further, at this point in time we have not attempted to pursue any changes in projected space square footages within the office area of the potential projects and certainly there is opportunity for that to occur. However, at this point we are suggesting that Council review the project scenario options pointed toward the year 2040 space needs for the most part (we are suggesting that garage and apparatus space can easily be exceptions to that statement as readily expandable space in the future, which is not the case for actual office areas). We have included the following exhibits: 1. Spreadsheet entitled "City Facilities Sample Project Scenarios" which identifies potential projects noted above ranging from a 14,881 square foot general government building up to a 78,502 square foot multi - departmental building. 2. Narrative entitled "June 2006 City Facilities Sample Project Scenarios" which provides the assumptions used in project estimating and also provides short descriptions of each of the primary project options. 3. Memo from Director of Public Safety Zurbey dated May 25, 2006 entitled "Space Needs Study — Input on Phasing" which recommends design to a phasing plan, construction of shell space which is not built out within an initial phase, and elimination of the Fire apparatus bays in favor of a northern tier Fire station at some point in the future (while at the same time allowing for Fire administrative personnel to be included in the Public Safety portion of this project in the initial phase). 4. A memo from Finance and Administrative Services Director Ron Hedberg regarding funding options and fiscal ability of the City to conduct various sized construction projects 5. A copy of the May 12, 2006 Hay -Dobbs Space Needs Analysis Report. While there are seven base options identified for your consideration at this time we are suggesting that you refine the choices to some smaller number. Staff would take that direction to further refine project scope choices and financing projections. We would suggest that project scenarios 7, 1, 2, and 3A could reasonably be pursued at this stage (from a fiscal perspective). While we do not believe the other options are within a comfortable funding range we would request any direction you may suggest on those larger projects from a long term planning perspective (i.e. should we continue to provide for site and phasing to allow those projects to occur at some point in the future but discard them from a near term construction perspective ?). A final option, of course, would be to delay consideration of the project until such time as we are able to provide additional funding capacity. Council Action: Based upon discussion. Space Needs Options JUne2006 0 Page 2 J� 'a I To: Mayor and City Council From:Ryan R. Schroeder Date: May 6, 2005 Re: City Facilities At an April 20, 2005 workshop the City Council reviewed various materials relating to potential City facilities including a general government building including City Hall, police, and fire uses, an ice arena expansion, and a community center to include, perhaps an aquatic center /pool. At the workshop consensus appeared to be to strive toward construction of a general government building with any future projects contingent upon voter referendum approval. Staff reads the direction therefore to concentrate on the general government project. We would not anticipate concentrated efforts on any of the other noted projects absent additional council action /direction or a change in events /circumstances such as an opportunity for a collaborative project with a third party (i.e. school district, private sector). The current City Hall was built in 1968. At that time the population of the community was approximately 12,200. There was an addition put on the building in 1973. In that year the population of the community was approximately 15,300. The police garage was added in 1985 (population of 20,800). Our current population projections are: 2008: 37,000 2020: 51,000 2030: 58,000 2040: 66,000 Our staffing within general government and public safety is projected to rise with the population as follows: Department 2005 2030 2040 Finance /Administration 13.83 19 22 Community Development 8.5 17* 20* Public Safety 56.48 107 122 Total Full Time Equivalents 78.81 143 164 * includes an allocation for engineering staff Paid On Call Fire 55 80 91 When the present day City Hall was constructed Cottage Grove was a relatively young and small City (and organization) probably with limited ability to provide for the growth of staff and facilities needs of the next three decades on the front end (which resulted in a building addition just five years after initial construction). Just eight years prior to taking on the City Hall construction project in 1968 the population of the community had been at 4,851 (1960 census). Today Cottage Grove is the 19 largest metro area suburb and the 24 largest City in the state with a population at about 33,000 to 34,000. In 1969 the total market value of the community was $8.6 million. In today's dollars that is an equivalent of about $70 million (@ 6% annual appreciation). In 2005 the community's market value is roughly $2 billion. We are currently able to retrieve staffing records back to 1988 at which time there were 14 general government and 33 police department personnel (sworn and non - sworn) operating out of this building. Projecting backwards there were likely 25 City employees within this building at the time of construction (up to 75 currently without the addition of fire personnel). We know that the community will continue its historical growth pattern. We know, therefore, that there will be necessitated staffing growth to support this population base. As noted above, that staffing growth is projected to settle in 2040 at just over twice the present day staffing complement. This staffing growth is projected to be at a somewhat lesser rate than has occurred over the past 30 years due to efficiencies gained within the operation. Nonetheless, as Council has appropriately identified it should not be expected that the present City Hall facility can provide for that level of staffing. The current City Hall /Public Safety building is approximately 28,000 square feet of which 6,480 square feet is dedicated to garage space (leaving about 21,500 square feet to office uses, common space, and Council chambers (8400 of which is allocated to the police department)). Staff has begun the process of needs analysis for future building space. However, as reported on April 20 initial projections to house this operation adequately for a 2030/40 population are: 0 Page 2 General Government: Public Safety: Garage and Apparatus Bays 16,000 to 20,000 square feet 19,000 to 25,000 square feet* 15,000 square feet ** ** includes relocation of Fire Department Station Two personnel to the public safety portion of this building Washington County will begin construction of its 60,000 square foot South Service Center at 90 Street and County Road 19 within the 2005/2006 timeframe. In order to effectively provide for that project we anticipate construction of a leg of the East Ravine Parkway beginning at a realignment of 90 Street at the intersection with County Road 19 and thence east and north through the South Service Center site with a termination near the northern portion of the 22 -acre site controlled by the City. The City, in agreements with Washington County and the Metropolitan Council, has until 2015 to utilize this site, presently Ravine Park property, for government center uses. In turn, that 22 acres will be replaced by attachment of additional property to the Ravine Park which land has a character and amenity value more in keeping with the balance of the Ravine Park than does this 22 -acre parcel. However, it is expected that the South Service Center site and the City site will jointly serve as a Park entrance and Trail Hub for the Ravine Park. We are currently working on a project scope for design /engineering /construction of the portion of the East Ravine Parkway relevant to these facilities projects. From the Council workshop discussion we believe the project schedule would reasonably expected to be: 2005 2006 2007 2008 2009 1. In -house space needs analysis x 2. Master planning 22 -acre site x 3. Architectural preprogramming x 4. Schematic Design x 5. Final Design x 7. Occupancy x x x x x e Page 3 If the above is a reasonable schedule we would need to allocate resources within this budget year. Those resources would be an expenditure of staff time along with $20,000 from the Building Replacement Fund for outside consulting architectural assistance. Additionally, within the 2006 budget year we would need to identify a source for $90,000 for schematic design along with some portion of the cost of final design (total cost of final design estimated at $490,000). Our project management team would include: A. City Administrator B. Director of Finance and Administrative Services C. Public Safety Director D. Community Development Director E. Chief Building Official F. City Engineer This team would be charged with insuring that the project parameters are followed, the project remains on schedule and on budget, and that staff buy -in of the vision and parameters occurs. Within each department there would be additional committee structure to review various project aspects such as technology needs. These departmental committees would be most important on the front end of this process. We would propose an oversight committee of the City Council and perhaps City Commissioners. That committee would ensure that the project management team understands and addresses the project vision and to parlay that vision to the community. This project is proposed to meet the needs of this community for the next thirty years or longer. A portion of the individuals working on this project may not ever be housed within the resulting building(s). It is important to remind the public of this fact and that this project is being proposed to meet the needs of the community (not existing City staff) over the long term. We would request direction on oversight committee membership and size. The project as noted above is estimated to include 45,000 square feet of office and 15,000 square feet of apparatus and police garage space. Construction cost for that project size is estimated at $8 million with a total project cost of $12 million (including architectural, site work, furniture fixtures and equipment, and the like). Project funding is proposed from resale of existing land and facilities and use of the building replacement fund and other fund reserves. As noted in the April workshop sale of existing City parcels could substantially contribute toward the capital cost of the project; this land sale and use of reserves, however, would not be expected to cover project costs in total. Therefore, in addition to the above sources a bond issue and resulting debt levy would be required. The exact size of that issue and resulting levy 0 Page 4 would be dependant upon year of construction, final project cost, and extent of use of reserves and other funds. As part of the review of the Capital Improvements Plan for 2006 we will need to revisit the above noted project timeline within our expected available resources. Within the 2005 -2009 Capital Improvements program the City Hall /Police Station is noted as a $9 million levy / referendum project in 2009. That same year notes a $12 million Community Center and $1.2 million athletic facility land purchase. In order to move this project up to 2007/8 it would be expected that those projects would be delayed further. At the Council budget workshop of May 4, 2005 staff was directed to provide an analysis of potential debt levy capacity. A preliminary analysis is attached for your review. At this point it is requested that Council confirm the above conceptual project scope and timeline. We also are requesting that Council allocate $20,000 from the Building Replacement Fund to provide for consulting services to more accurately define the project scope /scale and therefore to confirm or alter our understanding of potential project costs. Council Action: By motion direct staff to provide additional analysis of a projected 2007 -2008 police /fire /general government allocating $20,000 from the Building Replacement Fund for that purpose. 0 Page 5