HomeMy WebLinkAbout2010-10-06 PACKET 04.K.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 10/06/2010 PREPARED BY Engineering Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR COUNCIL ACTION REQUEST Consider awarding the contract for the Grey Cloud Island Bridge No. L8159 to High Five Erectors Inc. in the amount of $16,100.00. STAFF RECOMMENDATION Adopt the resolution awarding the contract for the Grey Cloud Island Bridge No. L8159 to High Five Erectors Inc. in the amount of $16,100.00. BUDGET IMPLICATION $ $ BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE SUPPORTING DOCUMENTS ® MEMO /LETTER: Jennifer Levitt, September 30, 2010. ® RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ❑ OTHER: Bridge L8159 Critical Finding Documentation, September 8, 2010. ADMINISTRATORS COMMENTS I/ City Administrator Date COUNCIL ACTION TAKEN: /APPROVED ❑ DENIED ❑ OTHER CITY OF COTTAGE GROVE MINNESOTA To: Honorable Mayor and City Council Ryan Schroeder, City Administrator From: Jennifer M. Levitt, P.E., City Engineer Date: September 30, 2010 Re: Grey Cloud Island Bridge Repairs Background /Discussion On September 8, 2010 the Minnesota Department of Transportation bridge unit performed an inspection on the Grey Cloud Island Bridge as part of routine inspection of fracture critical bridges. There was a critical finding in the inspection. Please see the enclosed L8159 Bridge Critical Finding Documentation by the DOT. The critical finding of 25% loss of steel in an interior and external channel and gusset plate has resulted in the need for the bridge to have < load rating reduction to 22 ton for a single axle and 28 ton for a semi. These load ratings will not allow Aggregate Industries' trucks to haul loaded over the bridge. This will impact the export of material from their facility. It is critical for this repair to occur quickly. SRF was contracted to prepare plans for the repair, since they had completed the load rating analysis in 2009 for the bridge. They completed the plans and had DOT approval on September 22, 2010. The plans were packaged and distributed to four companies to provide quotes for the work. The engineers estimate for the work is $20,000 and has a completion date of December 6, 2010. This is an urgent non - budget item. The following are the results of the quotes received: Company Quote Amount Low High Five Erectors $16,100 #2 Danny's Construction Company $18,900 It is recommended the Council adopt a resolution awarding the quote for the Grey Cloud Island Bridge repairs to High Five Erectors in the value of $16,100. RESOLUTION NO. 2010- RESOLUTION AWARDING QUOTE FOR GREY CLOUD ISLAND BRIDGE NO. L8159 TO HIGH FIVE ERECTORS, INC. IN THE AMOUNT OF $16,100.00 WHEREAS, Plans and specifications were completed according to city standards, and WHEREAS, quotes were requested to provide the necessary work; 09 WHEREAS, two firms submitted quotes; and WHEREAS, it appears that High Five Erectors, Inc. is the lowest responsible quoter; and WHEREAS, it is the recommendation of the City Engineer that the contract be awarded to High Five Erectors, Inc. NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Cottage Grove, County of Washington, State of Minnesota, that the quote for the Grey Cloud Island Bridge No. L8159 to High Five Erectors, Inc. in the amount of $16,100.00. Passed this 6th day of October, 2010. Myron Bailey, Mayor Attest: Caron M. Stransky, City Clerk a s x w O�dn00 _ 000 79 ff 9w .m wy 6 ego jig G i =8 °. Buff om m `8 L 9< d M u I D a s G <� M.i 4 X =s a s x w F n d� Sao O�0 O_ N � N m m ° z 0 u Z Z F �"y a 1 0 K U V � i a g3� � e . 000 w O�dn00 _ 000 G i w F n d� Sao O�0 O_ N � N m m ° z 0 u Z Z F �"y a 1 0 K U V � i a g3� � e . 000 Bridge L8159 Critical Finding Documentation September 8, 2010 Inspection Location: Grey Cloud Trail over Channel Owner: City of Cottage Grove, MN in Washington County Team Lead Inspectors Present: Jennifer Zink and Ken Rand Assistant Inspectors & Others: Ryan Rohne During the fracture critical and routine inspection on September 8, 2010 at Bridge L8159, the following finding initiated a critical finding per Mn /DOT Technical Memorandum 08- 02 -B -02: Truss Span — LO -Ul Diagonal Member Web Compression Member — (2) C8 x 11.5 x 1 /4 "PL • East Truss (Photos 1 -2): Web through corrosion on interior channel near interface with gusset LO East. Photo taken during the 2009 routine inspection shows no through corrosion at that time. • West Truss (Photo 3): The web on both the interior and exterior channels near the interface with gusset LO West have 25% loss overall. There is also 12% loss at the bottom chord exterior angels at the LOW gusset plate and 25% loss along the horizontal shear zone of the exterior gusset plate for a length of 6 inches (Photos 4 -5). The gusset plate is 3/8" thick. 33% loss was accounted for in the gusset horizontal shear area however in the 2009 SRF load rating. LO' -Ul' Member does exhibit developing corrosion in same area, but not to this extent yet (Photos 6 -7). Tom Styrbicki - Mn /DOT Bridge Inspection Program Manager, Yihong Gao — Mn /DOT Load Ratings, and Todd Niemann — Mn /DOT Bridge Inspection Engineer were contacted by Jennifer Zink onsite with the finding via e-mail with photo. It was determined that the finding be forwarded to the City Engineer, the consultant routine inspector, SRF Consultants — who performed the last load rating in 2009, and Dave Conkel — Mn /DOT Bridge State Aid Engineer. SRF completed a preliminary load rating on September 9, 2010: OPERATING RATING = 0.79 (HS15.8) SINGLE UNIT TRUCK = 0.95 (22.8T) SEMI (3S2 -40) = 0.79 (31.6T) DBL (3S3) = 0.74 (29.6T) Indicated posting: 22T/28T/28T As a result of the load rating analysis, the City retained SRF to prepare repair plans. The City intends to temporarily post the bridge until repairs are made. The Mn /DOT Bridge Office updated the Pontis inventory and inspection report to reflect the following: NBI Superstructure: 2 Critical Finding Smart Flag #964: 2 Fracture Critical Smart Flag #966: 3 The critical finding will resolve to condition state 1 once verification of the load posting signs are in place. The NBI Superstructure rating will also be upgraded to 4 and the Fracture Critical Smart Flag to 2 — please reference the Mn /DOT Bridge Inspection Manual Version 1.8 for details on condition states. Further condition state changes are anticipated once repairs are made. 1IPage 21Page 31Page sets 4 1 P a g e 51 P a g e