Loading...
HomeMy WebLinkAbout2010-11-03 PACKET 04.G.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 11/03/10 14 G 11214,111 ".11 ZIA Engineering ORIGINATING DEPARTMENT Jennifer Levitt STAFF AUTHOR COUNCIL ACTION REQUEST: Adopt the attached resolution approving the feasibility report and establishing a December 1, 201 public improvement hearing date for the 201 Pavement Management Project, Pine Coulee and Countrywood (District 1) and Howard's Addition (District A). STAFF RECOMMENDATIO It is recommended the Council adopt the attached resolution approving the feasibility report and establishing a December 1, 201 public improvement hearing date for the 201 Pavement Management Project, Pine Coulee and Countrywood (District 1) and Howard's Addition (District A). ADVISORY COMMISSION ACTION: DATE REVIEWED ❑ PLANNING F F PUBLIC SAFETY ❑ PUBLIC WORKS ❑ ❑ PARKS AND RECREATION ❑ ❑ HUMAN SERVICES/RIGHTS ❑ ❑ ECONOMIC DEV. AUTHORITY ❑ ❑ ❑ SUPPORTING DOCUMENTS: MEMO/LETTER: Jennifer Levitt, October 28, 201 RESOLUTION: ❑ ORDINANCE: F ENGINEERING RECOMMENDATION. F LEGAL RECOMMENDATION: M OTHER: 2011 Pavement Management Project Report. 3��� lid Date COUNCIL ACTION TAKEN: /APPROVED ❑ DENIED ❑ OTHER APPROVED DENIED F F F F F F F F F F F F ❑ ❑ • . 0 . 0 as I WHEREAS, pursuant to resolution the council adopted September 1, 2010, a report was authorized to be prepared by Bonestroo for the 2011 Pavement Management Area; and WHEREAS, the feasibility report has been prepared and does find the construction of said improvements to be necessary, cost - effective, and feasible; and WHEREAS, the City desires to assess the cost of said improvements to all benefited properties; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF COTTAGE GROVE, MINNESOTA: The feasibility report which was prepared pursuant to Resolution No. 2010 -125 for the 2011 Pavement Management Area finds the improvements to be necessary, cost effective and feasible and is hereby approved. 2. The council will consider the improvement of such streets, storm sewer, and park improvements in accordance with the feasibility report and the assessment of benefitting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvement of $1,639,000.00. 3. A public hearing shall be held on such proposed improvement on the 1 st day of December, 2010, in the council chambers of the city hall at 7:30 p.m. and the clerk shall give mailed and published notice of such hearing and improvement as required by law. CITY • COTTAGE GROVE MINNESOTA To: Honorable Mayor and City Council Ryan Schroeder, City Administrator From: Jennifer M. Levitt, P.E., City Engineer Date: October 28, 2010 Re: 2011 Pavement Management Approve Feasibility Report Call for Public Improvement Hearing On September 1, 2010 the City Council authorized that a feasibility report be prepared for the 2011 Pavement Management Area. The 2011 Pavement Management Area is for Pine Coulee and Countrywood (District 1) and Howard's Addition (District A) as established by the 1994 Pavement Management Program. The City Council held a workshop session on October 20, 2010 to discuss the various elements of the proposed improvements. The workshop session provided the necessary guidance to define the scope of the improvements. A neighborhood meeting is scheduled to be held on November 9, 2010 at 7:00 p.m. at City Hall in the Council Chambers. Notices were mailed to residents on October 25, 2010. Feasibility Report: On the basis of the Council's previous action, a feasibility report has been prepared. Upon this analysis, the project is felt to be physically and financially feasible. The feasibility report is enclosed for the Council's review. Call for Public Improvement Hearing: The public improvements associated with the 2011 Pavement Management Area will benefit properties in the immediate area. Therefore, for the costs to be assessed to all benefited properties, it will be necessary to hold a public hearing for the project. A hearing date of December 1, 2010 will afford the necessary time to publish legal notices and send out letters to affected property owners. • Project Fundinq Analysis The total project cost for the road work, storm sewer, and park improvements is $1,639,000. According to the City's policy, 45% of the total project is assessed against the benefiting properties. The total project value that is assessed is $669,150 for the two districts. The Cosl Estimate Summary can be viewed in Appendix B of the Feasibility Report. A benefit appraisal was ordered for eight properties within the project area. The benefit appraisals are scheduled to be submitted to the City on November 14, 2010, prior to the public hearing. The proposed assessments are as follows for street and stormwater improvements: Howard's Addition (12 units) = $6,150/unit Pine Coulee/Countrywood (87 units) = $6,843/unit a - 0 11 11 It is recommended the Council adopt the attached resolution approving the feasibility report and establishing a December 1, 2010 public improvement hearing date for the 2011 Pavement Management Project, Pine Coulee and Countrywood (District 1) and Howard's Addition (District A). 0 o Cottaq� Grt" L= I 0 0=10, 2335 Highway 36 W St. Paul, MN 55113 Tel 651- 636 -4600 Fax 651- 636 -1311 www.bonestroo.com November 3, 2010 `. Bonestroo Honorable Mayor and City Council City of Cottage Grove 7516 80th Street South Cottage Grove, MN 55016 Re: West Point Douglas Frontage Road Extension & 2011 Pavement Management Project Client Project No.: 10 -284 & 10 -289 Bonestroo File No.: 000048 - 10284 -0 & 000048 -10 -289 -0 Honorable Mayor and City Council Members: Enclosed for your review is the 2011 Pavement Management project Feasibility Report. The project scope includes street rehabilitation and storm sewer improvements in the Pine Coulee /Countrywood (District I) and Howard's Addition (District A) neighborhoods, as identified in this report. This report describes the improvements necessary to improve the streets and storm sewer within the project area. Cost estimates for the proposed improvements are presented in the appendices of the Report. We would be happy to discuss this report at your convenience. Please contact me at 651- 604 -4917 if you have any questions or concerns. Sincerely, BONESTROO Mike :•- I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Al a & t vo Michael 1. Boex Date: November 3, 2010 Registration No.: 44576 SECTION TITLE Tableof Contents ................................................................................ ............................... I Introduction....................................................................................... ............................... 2 Existing Conditions - Pine Coulee /Countrywood ....................................... ..............................2 Streets............................................................................................ ............................... 2 Sanitary Sewer and Water Main .......................................................... ..............................3 StormSewer ................................................................................... ............................... 3 Existing Conditions - Howard's Addition ................................................. ............................... 3 Streets............................................................................................ ............................... 3 Sanitary Sewer and Water Main .......................................................... ..............................4 StormSewer ................................................................................... ............................... 4 Proposed Improvements - Pine Coulee/ Countrywood ................................ ..............................4 Streets............................................................................................ ............................... 4 Sanitary Sewer and Water Main ......................................................... ............................... 5 StormSewer.. . ............................................................................................................... 5 StormWater Quality ......................................................................... ............................... 5 Proposed Improvements - Howard's Addition ......................................... ............................... 6 Streets............................................................................................ ............................... 6 Sanitary Sewer and Water Main .......................................................... ..............................6 StormSewer ................................................................................... ............................... 6 StormWater Quality .......................................................................... ..............................6 Proposed Improvements - Pine Coulee Park ............................................ ..............................6 Permits and Easements ......................................................................... ..............................7 EstimatedCosts .................................................................................. ............................... 7 CostSummary .................................................................................. ..............................7 CostAllocation ................................................................................. ............................... 7 Financing........................................................................................ ............................... 8 PublicHearing ..................................................................................... ..............................8 ProjectSchedule ................................................................................. ............................... 8 Conclusions and Recommendations.. . ............ ........ ... -----9 Appendices +rr- • . Figures Appendix B - Cost Estimate Summary Appendix C - Preliminary Assessment Rol" City of Cottage Grove, MN Page 1 2011 Pavement Management Project Bonestroo 000048 - 10289 -0 2011 PAVEMENT MANAGEMENT PROJECT The Pine Coulee, Countrywood, and Howard's Addition residential neighborhoods have been identified as candidates for rehabilitation during the 2011 construction season as a part of the City of Cottage Grove's ongoing roadway rehabilitation program. The City Council authorized preparation of this Report to determine the feasibility of rehabilitating those streets as a part of the 2011 Pavement Management Project. Pine Coulee and Countrywood are located in the Southeast corner of the City and are part of Pavement Management District I, as shown on Figure 1 located in Appendix A. There are seven residential streets within these neighborhoods totaling approximately 11,860 lineal feet. The Countrywood neighborhood consists of Lofton Avenue and Lockridge Avenue, with Pine Coulee being the remainder. Howard's Addition is located South of 70th Street and East of the Acorn Ridge development. It's part of Pavement Management District A as shown on Figure 1 located in Appendix A. There are two residential streets within Howard's Addition totaling approximately 1,600 lineal feet. The purpose of this report is to further evaluate the work actually required for this street rehabilitation project, to provide an estimate of cost, and to establish a method of cost allocation or assessment in order to determine the physical and economic feasibility. STREETS The streets within Pine Coulee and Countrywood are rural residential and were originally constructed in the early 1970's. Generally, the streets are 21 -24 feet wide with no concrete curb and gutter. Gravel shoulders, although once present, have been either overlayed with new bituminous or have been covered with vegetation over the years. The Pavement Condition Index (PCI) of these streets range from 22 -40 as identified in the 1994 Pavement Management Plan. Per that plan, PCI's in those range are classified as "Poor" and "Very Poor" and are beyond the point of performing seal coats or overlays to maintain the streets. Figure 5 depicts the age of the streets within the neighborhood. Test pits were performed to determine the thickness of the existing street section. This information will be used to design a recommended pavement section. City of Cottage Grove, MN Page 2 2011 Pavement Management Project Bonestroo 000048 - 10289 -0 ♦ •, No. Location Materials 1 11880 Lofton Ave 3" Bituminous, 3.5" Gravel, 10" Lean Clay, Sand 2 11821 Lockridge Ave 4" Bituminous, 6" Gravel, 6" Sand with Silt 3 11701 Lockridge Ave 3" Bituminous, 3" Gravel, 4.5" Sand 4 11600 Lockridge Ave 3" Bituminous, 4" Gravel, 2" Sand, 6" Sand with Silt 5 11566 Leeward Ave 2.5" Bituminous, 3" Gravel, 5.5" Sand, Mixed Soils & Organics 6 11660 Lehigh Ave 2.5" Bituminous, 7" Mixed Soils, Clean Sand 7 11700 Lehigh Ave 3" Bituminous, 2" Gravel, Mixed Soils 8 11827 Leeward Ct 3" Bituminous, 3" Gravel, 3" Sand, Clay & Organics 9 11680 Leeward Ave 1.5" Bituminous, 1" Gravel, 5" Mixed Soils, Clay & Organics 10 11760 Layton Ave 4" Bituminous, 3" Gravel, Clean Sand 11 11680 Layton Ave 4" Bituminous, 2" Gravel, 7" Sand with Silt 12 11570 Layton Ave 3.5" Bituminous, 3" Gravel, 4" Mixed Soils, 7" Sand with Silt From the existing test pits, it can be seen that the average section consists of 3 inches of bituminous over 2.75 inches of gravel. SANITARY SEWER AND WATER MAIN Currently, there is no public sanitary sewer or watermain within these neighborhoods. STORM SEWER There's a very small amount of existing storm sewer within Pine Coulee and Countrywood. The storm sewer appears to be pieced together over time to address specific drainage needs. Product materials and construction methods do not follow typical City standards. Generally speaking, Lofton Avenue is the only street that consistently has driveway culverts. Other streets in the neighborhood have little to no ditch definition and yards are typically graded out to the edge of the street. Existing drainage follows the street and must cross over the driveways. Leeward Avenue currently has three parallel 60" CMP culverts that convey runoff through a major drainage way. Adjacent to the cross culverts is a street section with bituminous curb and gutter. The streets within Howard's Addition were originally constructed in 1974. The streets are approximately 34 feet wide from back of curb to back of curb. The Pavement Condition Index (PCI) of these streets range from 35 -63 as identified in the 1994 Pavement Management Plan. A PCI of 35 is identified as "Poor" and is beyond the point of performing seal coats or overlays to maintain the streets. There are sections of existing B618 curb and gutter that have settled, cracked, or have other defects that will require replacement. Figure 6 depicts the age of the streets within the neighborhood. • - •- • ^• • - - - ^ • - ^ • - -, 11 01 a I ire 14 LVINAT111 •- • E VIRM • • - • - r. - o City of Cottage Grove, MN Page 3 2011 Pavement Management Project Bonestroo 000048- 10289 -0 No. Location Materials 1 6588 71st Street 3" Bituminous, 11" Gravel, Clay /Sand 2 7123 Granada Ave 2.75" Bituminous, 4.5" Gravel, Dirty Gravel and Sand 3 7128 Granada Ave 2.75" Bituminous, 6" Gravel, 12" Sand Currently, there is no public sanitary sewer or watermain within the Howard's Addition neighborhood. •.0 There is virtually no existing storm sewer within Howard's Addition. Drainage generally flows from 70th Street to the South along the existing curb and gutter. No catch basins and street storm pipe are present within the project area. There is one cross culvert at the very south end of the project limits that drains towards the Acorn Ridge development. Pill 74 Due to the thin and highly variable pavement sections and materials present, reclamation of the existing section could contaminate the reclaimed base if additional gravel (add -rock) is not placed prior to the reclamation process. For the majority of the neighborhood, it's proposed to add 2 -4 inches of add -rock over the existing pavement. Then the add -rock, pavement, and existing gravel base would be reclaimed to a depth of approximately 8 inches. The resultant reclaimed material would then be shaped and graded to allow for placement of 3.5 inches of new bituminous pavement. The resulting street section would be much more consistent, comprising of 3.5 inches of bituminous over 7 -8 inches of reclaimed aggregate base. This method would raise the road 5 -8 inches, which would help improve the depth of adjacent shallow ditches and bring a uniformity to the pavement section not currently present. Due to the existing pavement section, the portion of Leeward Avenue between the Layton Avenue loop will require a different method of rehabilitation. In this area, subgrade excavation would be performed, followed by placement of an aggregate backfill, construction of aggregate base, and paving. Figure 2 depicts the improvements in these two neighborhoods. It is proposed that all street widths remain the same as the existing condition. The single exception to this is the cul -de -sac at Leeward Court. The existing pavement at the turnaround is 13 feet in width. Minimum access width per Fire Code is 20 feet so it is proposed that the turnaround be widened meet that requirement. It is also proposed that the existing Lockridge Avenue cul -de -sac be reduced in size to the City standard 47 -foot radius. Adjacent driveways would need to be extended to accommodate this change. An alternative to this would be to incorporate a vegetative island in the existing cul -de -sac, also reducing bituminous surfacing. SANITARY SEWER AND WATER MAIN No public improvements are proposed as a part of this project. It's proposed that the existing storm sewer systems be replaced with materials conforming to City standards. In doing so, the longevity and reliability of the system will be increased and maintenance should be reduced. The existing bituminous curb along the culverts at Leeward Avenue will be replaced with concrete curb and gutter. A catch basin and short section of storm sewer is proposed to collect street drainage near the culverts and direct runoff into the drainage way. Generally speaking, the intent of this project is to rehabilitate the streets and not change existing drainage patterns. Therefore, in areas where driveway culverts do not currently exist none are proposed. The intent is to maintain drainage patterns which appear to follow the street and pass over the driveways. Raising the road by the placement of add -rock and new pavement will better define the ditches and may push drainage away approximately 10 feet from the edge of street. STORM WATER QUALITY Approximately 4 proposed infiltration features will be located along the project corridor to provide water quality treatment and runoff volume reduction within the project area. These small scale surface infiltration features will be located adjacent to the street and within the City owned right - of -way. While the standard restoration option for these features will be a wet - tolerant turf grass, the City offers residents the option to substitute the turf grass with native rain garden plantings within the context of the project. It should be noted however that the turf grass option provides a more economical upfront materials costs and reduces long term maintenance costs. Figure 2 identifies the most suitable locations for infiltration features. This preliminary assessment of suitable locations is based on a field inspection that identified locations where no conflicts with significant trees or steep slopes were present, available right -of -way appeared to be sufficient, and the relative elevation of the location was suitable. The infiltration feature locations identified on the Figure should be considered preliminary at this time. It will be necessary to perform soil borings in some of the proposed infiltration feature locations to confirm that the existing soils are conducive to infiltration. If the borings indicate that infiltration is not a feasible option, alternative methods such as biofiltration basins or filtration swales will be evaluated to provide water quality treatment within the project area. In the past, the City has partnered with the SWWD to fund storm water quality improvements within the context of their Pavement Management Program. It is anticipated that the South Washington Watershed District (SWWD) will have cost share funds available for the infiltration features and associated storm water improvements included in the 2011 Pavement Management Project. This cost -share opportunity as well as other funding opportunities will be investigated as a part of the final design. Although these funding opportunities vary year to year, the City will continue to monitor solicitations as they become available. City of Cottage Grove, MN Page 5 2011 Pavement Management Project Bonestroo 000048- 10289 -0 Proposed Improvements - Howard's Addition STREETS At Howard's Addition, it's proposed to reclaim the existing pavement and gravel base to a depth of 6 -9 inches. Because Howard's Addition is an urban section with concrete curb and gutter, the top 3.5 inches of reclaimed material would need to be hauled off -site to allow for 3.5 inches of new bituminous pavement. Figure 3 depicts the improvements in this neighborhood. The existing B618 concrete curb and gutter will be evaluated prior to construction. Based on a preliminary evaluation, it is estimated that approximately 15% is in poor condition and would need to be replaced. SANITARY SEWER AND WATER MAIN No public improvements are proposed as a part of this project. STORM SEWER As a part of this project the existing cross culvert at the south end of the project will be evaluated for replacement. STORM WATER QUALITY Storm water quality improvements are not required in this neighborhood due to no increase of impervious surfacing. Proposed Improvements - Pine Coulee Park To be consistent with past City pavement management projects, parks within the pavement management district typically receive upgrades. Therefore, several new improvements are proposed for the existing park along Lofton Avenue. A bituminous parking lot with concrete curb and gutter will be provided and will accommodate twenty (20) stalls and a rain garden will be added to handle the increase in impervious surfacing. A landscape -type concrete curb will also be placed along the perimeter of the existing play area. Other amenities include: • 30' x 30' basketball court • Gazebo structure (with picnic table) • Swing set • Bituminous trails • Trash receptacles • Benches • Planting of trees • Concrete pad under existing benches and maintenance strip under existing fence • Regrade ball field City of Cottage Grove, MN Page 6 2011 Pavement Management Project Bonestroo 000048 - 10289 -0 This project will require the following permits: ■ Phase II General Storm Water Permit from the MPCA No easements are anticipated in the Howard's Addition. In the Pine Coulee and Countrywood neighborhoods, the proposed rain gardens may require additional drainage and utility easements if they cannot be contained within the existing right -of- way. This will be evaluated during the final design phase of the project. =-- 0•" • Cost estimates for the improvements have been prepared and are included in the Appendix of this report. All costs for items to be constructed are based on anticipated unit prices for the 2011 construction season. All costs include a thirty (30) percent allowance for indirect costs associated with the project (engineering, administrative, financing, and legal) as well as a ten (10) percent contingency. No costs are included for capitalized interest during the construction period or before assessments are levied. An overall summary of the estimated cost is shown below: Estimated Cost Summary Location Estimated Project Cost Pine Coulee /Countrywood $1,323,000 Howard's Addition $164,000 Pine Coulee Park Improvements $152,000 Total Estimated Project Cost: $1,639,000 Assessments for this project will be based upon the "Infrastructure Maintenance Task Force Special Assessment Policy For Public Improvements," dated September 30, 2005. All adjacent benefiting properties are proposed to be assessed. Per the Rural Residential policy, 45% of the project cost would be assigned to each individual residential lot on a unit basis. The intent of the City's policy is to treat all properties within a residential development as similar individual units regardless of lot frontage. City funds would pick up the remaining 55% of the project costs. In the Pine Coulee neighborhood, it should be noted that two (2) "sliver" parcels were not included in the total unit count. It is assumed that one will be turned over to the City as right -of- way and one will be combined into an existing lot prior to the commencement of the project. The large parcel north of Leeder Avenue that's zoned agricultural was counted as one unit in this report. In addition, the City Park was counted as 2 equivalent units for the purposes of calculati assessments. i RITTV409-rciff1w, =0 01 fell City of Cottage Grove, MN Page 7 2011 Pavement Management Project Bonestroo 000048- 10289 -0 Location City Funds (55% of Total) Assessed Amount (45% of Total) Estimated Project Cost Pine Coulee /Countrywood $727,650 $595,350 $1,323,000 Howard's Addition $90,200 $73,800 $164,000 Subtotal $817,850 $669,150 $1,487,000 Howard's Addition 12 $73,800 $6,150 City Funds (100% of Total) Pine Coulee Park $152,000 - $152,000 Totals: $969,850 $669,150 $1,639,000 Estimated Cost Per Unit FINANCING Assessments are proposed to be levied based on the City's current assessment policy. The remainder of the project would be financed through a combination of City funds such as the General Tax Levy and Enterprise funds for items such as storm sewer improvements. General Levy funds will be utilized for the proposed park improvements. Because the properties within the Pavement Management project benefit from the proposed improvements, and the project will be partially funded through assessment, it will be necessary for the City to hold a public improvement hearing to receive comment on the proposed project and to determine the further action to be taken. Below is the proposed schedule assuming a 2011 construction season; ■ 09/01/2010 ■ 11/03/2010 I1 I i 1 Council Orders Feasibility Report Council Receives and Approves Feasibility Report Council Sets a Public Improvement Hearing Date Hold Neighborhood Meeting Council Holds Public Improvement Hearing Council Orders the preparation of the Plans and Specifications Council approves the Plans and Specifications and sets Bid Date Project Bid Date Contract Award Begin Construction Complete Construction Council sets Assessment Hearing date Council holds Assessment Hearing City of Cottage Grove, MN Page 8 2011 Pavement Management Project Bonestroo 000048 - 10289 -0 Assessable Assessed Amount Location Assessed Cost Per Unit Units (45% of Total) Pine Coulee /Countrywood 87 $595,350 $6,843 Howard's Addition 12 $73,800 $6,150 FINANCING Assessments are proposed to be levied based on the City's current assessment policy. The remainder of the project would be financed through a combination of City funds such as the General Tax Levy and Enterprise funds for items such as storm sewer improvements. General Levy funds will be utilized for the proposed park improvements. Because the properties within the Pavement Management project benefit from the proposed improvements, and the project will be partially funded through assessment, it will be necessary for the City to hold a public improvement hearing to receive comment on the proposed project and to determine the further action to be taken. Below is the proposed schedule assuming a 2011 construction season; ■ 09/01/2010 ■ 11/03/2010 I1 I i 1 Council Orders Feasibility Report Council Receives and Approves Feasibility Report Council Sets a Public Improvement Hearing Date Hold Neighborhood Meeting Council Holds Public Improvement Hearing Council Orders the preparation of the Plans and Specifications Council approves the Plans and Specifications and sets Bid Date Project Bid Date Contract Award Begin Construction Complete Construction Council sets Assessment Hearing date Council holds Assessment Hearing City of Cottage Grove, MN Page 8 2011 Pavement Management Project Bonestroo 000048 - 10289 -0 It is recommended that this report be used as a guide for the layout, design, and cost allocation for the public improvements. It is further recommended that the owners of properties within the project limits be notified of the proposed improvements in order to provide comment. To determine project feasibility, a comparison was made between the costs estimated herein and the costs experienced for other similar projects within the City. These comparisons, on a per linear foot basis, are shown below: Estimated Cost Per Unit Project Cost Per Linear Foot 2011 Pavement Management Project (Estimated) Pine Coulee /Countrywood $77.97 Howard's Addition $71.47 2010 Pavement Management Project - River Acres (Bid Results) 1 $69.14 From the tabulation above, it can be seen that the cost to rehabilitate the Pine Coulee /Countrywood neighborhood is slightly higher than the costs from the 2010 Pavement Management Project. This is primarily due to the fact that a simple reclamation of the existing pavement section is not feasible considering the potential risk for contaminating the reclaimed base. The gravel "add- rock" for this project accounts for approximately $4 per linear foot of rehabilitation costs. Howard's Addition, on the other hand, is estimated to be very similar in cost to the 2010 project. The project is financially feasible, with funding sources identified from the City as well as the benefited properties adjacent to the project. Financial responsibilities have been determined based on estimated project costs as well as adopted City policy. From an engineering standpoint, this project is feasible, necessary, and cost effective. City of Cottage Grove, MN Page 9 2011 Pavement Management Project Bonestroo 000048- 10289 -0 0 1500 30W Horaontal Scale In Feet CITY OF COTTAGE GROVE, MN FIGURE 1 Colt Grove 2011 PAVEMENT MANAGEMENT PROJECT = C IAI� y "—, 1:\48\48102890\CAD\DWG\4810289ZFDOI.DWG DATE: 10-22-10 COMM: 000048-10289-0 5 19 11 .99 wig � z 19 -:z- Lu LL 0 0 Lu Lu Ld LU < C) u uj 6J Q F- z LU LU -j 2: :D or w 0 u u I 0 C) u r1i O + o z LU � I mi 6 � M LU LL O 6i b uj LU us 2: LU F- LU ( D < z W �n 9 z p a U W U_ < 0 < a- 0 u I O ILAWS O O 0 LU 0� D (D p--q U- > F- z U-1 2: LU Uj > (D < < uj 0- (D uj < Z uj Uj 0 V > 0 ui z P-4 C:) C) O 00 rq 2 Ob , T C) S O O O O Ln O LU tE cl U- 00 O 00 C) C� 00 O 00 — 0, U z m 0 < u 0 < 0 z LU uj I O ILAWS O O 0 LU 0� D (D p--q U- > F- z U-1 2: LU Uj > (D < < uj 0- (D uj < Z uj Uj 0 V > 0 ui z P-4 C:) C) O 00 rq 2 Ob , T C) S O O O O Ln O LU tE cl U- 00 O 00 C) C� 00 O 00 — 0, i 200 400 Scale In Feet YEAR CONSTRUCTED COTTAGE GROVE, MINNESOTA FIGURE: 5 City of (m e 2011 PAVEMENT MANAGEMENT PROJECT Minnesota resojo Coltag Grove !:\48\48102890\CAD\DWG\4810289ZFDOS.DWG DATE: 10/25/10 COMM: 48-10289H 2011 PAVEMENT MANAGEMENT PROJECT AREA CONSTRUCTED 1971 CONSTRUCTED 1974 OUTSIDE PROPOSED PROJECT AREA CONSTRUCTED 1971 Ln Lu i 200 400 Scale In Feet YEAR CONSTRUCTED COTTAGE GROVE, MINNESOTA FIGURE: 5 City of (m e 2011 PAVEMENT MANAGEMENT PROJECT Minnesota resojo Coltag Grove !:\48\48102890\CAD\DWG\4810289ZFDOS.DWG DATE: 10/25/10 COMM: 48-10289H YEAR CONSTRUCTED ul) ui 70TH ST. d d z (D 71ST ST. S N 2011 PAVEMENT MANAGEMENT PROJECT AREA In CONSTRUCTED 1980 CONSTRUCTED 1990 o iso soo CONSTRUCTED 1992 Horizontal scale In Feet cn CONSTRUCTED 1993 uw CONSTRUCTED 1996 d_ d d z (D v 2 ,4TN ®Q z YEAR CONSTRUCTED (D 0 All (DI 0 '0 U:i LLJ 0 C) u r1l 7µ W LU LL� UJ Ilp jr. iffill City Of Cottage Grove Minnesota :L oq C� m U Ln c� Lq oc� Ili moo ^ m n T rl 41 Ln g, c ir, 0 0 0 t9 m CL 14 io* O o {/} LL —'L c E m a m . 0 N u in lc C Ci ( rl�. 0, L6 R ' m � N ll� r-.� E Z' 0 = - L Ln o Go LL N N a 0 L LM Ln LM 0 O Lq r", 'I "I LQ L'I m Ln E N N I kn Ln VI O u� 0 0 N cyi rl� T ci T li O Itt v ON Fn N 0 0 > S u C 0 MN - mmt)� R 0tz� tD - zo m r 0 r ui d Q Z U, JA > < Q "22 'E . Preliminary Assessment Roll Pine Coulee & Count Mood Parcel ID Owner Address Units $ /Unit Total /Unit 3602721240001 MICHAEL J & MARY L OLSON 11344 LEEDER AVE 1 $6,843.10 $6 0 3602721310001 WILLIAM G & ELIZABETH C BERG 11599 LEEWARD AVE S 1 $6,843.10 $6 3602721310002 ROSS A & CECILIA M PETERSON 11611 LEEWARD AVE S 1 6,843.101 $6,843.10 3602721310003 JAMES L SEEGER 11566 LEEWARD AVE S 11 6,843.10 6 843.10 3602721310004 JAMES L & PATRICIA A SEEGER 11566 LEEWARD AVE S 1 $6,843.10 $6,843.10 3602721310005 LEO W & DONNA J SPYCHALLA 11560 LAYTON AVE 1 $6,843.10 $6 3602721310006 LARRY W SMITH 11660 LEHIGH AVE S 1 $6,843.10 $6,843.10 3602721310007 MICHAEL A & ROSEMARY KVAMME 11625 LEEWARD AVE S 1 $6,843.10 $6,843.10 3602721310008 JAMES P NOREEN 11671 LEEWARD AVE S 1 $6 $6,843.10 3602721310009 DANIEL B & MICHELE M TATRO 11701 LEEWARD AVE 1 $6,843.10, $6,843.10 3602721310010 WAYNE M & PATRICIA THOMPSON 11733 LEEWARD AVE 1 $6,843.10 $6,843.101 3602721310011 BRANDON L & JOY G HERDT 11600 LEEWARD AVE S 1 $6 $6,843.101 3602721310012 RICHARD B & DOLORES I KOCH 11620 LEEWARD AVE S 1 $6,843.10 $6,843.10 3602721310013 ANDREW J & DONNAMARIE C KRAUSE 11640 LEEWARD AVE S 1 $6,843.10 $6 3602721310014 THOMAS A & ANDREA M KULJU 11660 LEEWARD AVE 1 $6,843.10 $6 3602721310015 LEIGHTON J & REBECCA L SWANSON 11680 LEEWARD AVE S 1 $6,843.10 $6,843.10 3602721310016 GREGG A & PATRICIA DONATELL 11700 LEEWARD AVE S 1 $6,843.10 $6,843.10 3602721310017 SHARON A LEWIS 11735 LAYTON AVE 1 $6,843.10 $6,843.10 3602721310018 PAUL A & CHARLOTTE SCHOEN 11600 LAYTON AVE S 1 $6 $6,843.10 3602721310019 TIMOTHY W & DIANE D MASLOSKI 11570 LAYTON AVE SO 1 $6,843.10 $6,843.10 3602721310020 NEIL JOHN MCKENZIE 11580 LAYTON AVE 1 $6,843.10 $6 3602721310021 ARTHUR F & KATHLEEN LUEDTKE 11590 LAYTON AVE 1 $6,843.10 $6,843.10 3602721310022 NICHOLAS J & CRYSTAL LARDANI 11673 LEHIGH AVE 1 $6,843.10 $6,843.10 3602721310023 LESLIE W MILVERSTEDT 11681 LEHIGH AVE S 1 $6 $6,843.10 3602721310024 SAMUEL C & JAN M TRIPP 11775 LEHIGH AVE S 1 $6 $6,843.10 3602721310026 SCOTT G & EILERS SMALLIDGE 11680 S LAYTON AVE 1 $6,843.10 $6 3602721310027 ROBERT C JR HADLICH 11650 LAYTON AVE 1 $6,843.10 $6 3602721310028 RICHARD R HEDLUND 11620 LAYTON AVE S 1 6,843.101 $6,843.10 3602721310029 DAVID J & GWENDOLYN FUCHS 11575 S LAYTON AVE 1 $6,843.10 $6 3602721310030 MATTHEW J & KAREN A OHMANN 11599 LAYTON AVE S 1 $6 6,843.10. 3602721310031 KENT R & GAIL R GRIFFITH 11633 LAYTON AVE 1 $6,843.10 $6,843.10 3602721310032 HILARIO & VICKIE L MURO 11655 LAYTON AVE S 1 $6,843.10 $6 3602721310033 TIMOTHY R MURPHY 1156 HASTINGS AVE 1 $6,843.10 $6,843.10 3602721310034 TROY M & TINA M F FREIERMUTH 11700 LEHIGH AVE 1 $6,843.10 $6,843.10 3602721340001 SAMMY AMBROSE & MARY J SMITH 11760 LOCKRIDGE AVE 1 6,843.101 $6,843.10 3602721340002 THOMAS W RADABAUGH 11780 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721340003 ALBERT CHARLES & CYNTHIA KERR 11800 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721340004 GREGORY B & TAMMY J JOHN 11820 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721340005 JEROME L & NONIE L KISCH 11840 LOCKRIDGE AVE S 1 $6 $6,843.10 3602721340006 THOMAS R MCNIFF 11860 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721340007 JAMES J & MARGARET A CATURIA 616 W 3RD ST 11 6,843.10. $6,843.10 3602721340008 JOHN & WALTON MAUREEN SMETANA 11821 LOCKRIDGE AVE 1 $6,843.10 $6,843.10 3602721340009 DELANO R & AMY L NELSON 11801 LOCKRIDGE AVE 1 $6 $6,843.10 3602721340010 JOHN & PAMELA MALLUEGE 11740 LEEWARD AVE S 1 $6 843.10 $6,843.10 3602721340011 PHILLIP J & ELIZA THORKELSON 11795 LEHIGH AVE 1 $6 $6,843.10 3602721340013 PHILLIP J & ELIZA THORKELSON 11795 LEHIGH AVE 0 $6,843.10 $0.00 3602721340015 ROGER L & MARY C TOKHEIM 11825 LEEWARD CT S 1 $6,843.10 $6,843.10 3602721340016 SUSAN G DONOVAN 11823 LEEWARD Cr 1 $6,843.10 $6,843.10 3602721340017 JAMES E & BETTE M CLEMENT 11827 LEEWARD Cr 1 $6 3602721340018 LESTER W & MARY A WILLIAMS 11760 LAYTON AVE S 1 $6,843.10 _____ L6 , 843.10 $6 3602721340019 EMMA P SEEGER 3514 DOUGLAS DR 0 $6,843.10 $0.00 3602721340020 ROBERT J & JUDITH BALDERSON 11793 LEHIGH AVE 1 $6,843.10 $6,843.10 3602721340021 MARK E & MARY I SCHABERT 11821 LEEWARD CT S 1 $6,843.101 $6,843.10 FORREST L & KARRI L BOE 11620 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721420002 JEAN A TRS STOKER 11640 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 1 3602721420001 3602721420003 JOHN J & JUDITH G MELBO 11660 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721420004 ROBERT K & SUE A MONJEAU 11680 LOCKRIDGE AVE S 1 $6,843.10 1§ 3602721420005 EDWARD D & GLORIA DEUTSCHMANN 11621 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721420006 PATTY A & SCOTT C WARDELL 11661 LOCKRIDGE AVE 1 $6,843.10 $6,843.10 3602721420007 JAMES W & DIANE T NAATZ 11681 LOCKRIDGE AVE S 1 $6,843.10 $6,843.10 3602721420008 PATRICK R & BARBARA E PINC 11627 POINT DOUGLAS DR S 1 $6,843.10 $6,843.10 3602721420009 ANTHONY L & MELANIE TISCHLER 11667 POINT DOUGLAS DR S 1 $6,843.10 $6,84110 3602721420010 ROBIN R & AMBER R HANSON 11645 POINT DOUGLAS DR S 1 $6,843.10, $6,843.10 3602721420011 RICHARD C & REBBECCA A DANA 11600 LOCKRIDGE AVE 1 $6,843.10 6,843.10 3602721420012 JAMES I& HAINES 11599 W POINT DOUGLAS RD S 1 $6 $6,84110 3602721420013 BRUCE A & BRENDA L ARNDTSON 11569 POINT DOUGLAS DR S 1 $6,843.10 $6 3602721420014 JOHN MCCAULEY 11549 POINT DOUGLAS DR S 1 $6,843.10 $6,843.10 3602721430001 CITY OF COTTAGE GROVE 7516 80TH ST S 2 $6,843.10 $13,686.20 3602721430002 HARVEY D & CAROL A MITCHELL 11700 LOCKRIDGE AVE 11 6,843.10 $6 3602721430003 JACK P & ELIZABETH A BRANDT 11706 LOCKRIDGE AVE 1 $6,843.10 $6,843.10 3602721430004 THOMAS C & GAYLE M SCHOMMER 11710 LOCKRIDGE AVE 1 $6,843.10 $6,843.10 3602721430005 GEORGE PAUL & NANCY KERESTES 11941 LOFTON AVE 1 $6,843.10 $6 3602721430006 PAUL C & PAULA J RUNZE 11931 LOFTON AVE S 1 $6,84110 $6,843.10 3602721430007 GARRIT & MARY L MEMELINK 11921 LOFTON AVE 1 $6,843.10 $6,843.10 3602721430008 RENEE MARZITELLI 11911 LOFTON AVE SO 1 $6 843.10 $6,843.10 3602721430009 JAMES R III & KATHERINE SNYDER 11901 LOFTON AVE S 1 $6 843.10 $6,843.10 3602721430010 NORBERT & PROVANCE J STRANGLER 11891 LOFTON AVE 1 $6,843.10 $6,843.101 3602721430011 LUVERNE JOEL & MICHELE BENNETT 11881 LOFTON AVE 1 $6 $6,843.10 3602721430012 DENNIS A & PAMELA KIEFFER 11861 LOFTON AVE S 1 $6,843.10 $6,843.10 3602721430016 PAUL A & LISA K SCHOONOVER 11741 LOCKRIDGE AVE 1 $6,843.10 $6,843.10 3602721430017 RICHARD J & VIRGINI COUGHLIN 11781 LOCKRIDGE AVE 1 $6,843.10 $6,843.10 3602721430018 JEANNE M CHAPDELAINE 11920 LOFTON AVE S 11 6,843.10 $6,843.10 3602721430019 NANCY IRENE OLSON 11900 LOFTON AVE S 1 6,843.101 $6,843.10 3602721430020 KENNETH W & LAVONNE T FOLCH 11880 LOFTON AVE 1 $6,843.10 $6,843.10 3602721430021 STEVEN M & ROCHELLE R NIELSEN 11860 LOFTON AVE 1 6 843.10 6843.10 3602721430022 JOHN J & DIANE C RANDALL 11840 LOFTON AVE S 1 $6,843.10 $6 3602721430023 CARMEN MARIE BROWN 11820 LOFTON AVE 1 $6 $6,843.10 3602721430024 MICHAEL T & CAROLYN M WILLIAMS 11701 LOCKRIDGE AVE i $6,843.10 $6,843.10 Totals 1 87 $595,349.70 Preliminary Assessment Roll Howard's Addition Parcel ID Owner Address Units $ /Unit Total /Unit 702721120001 QUINN P & RENAE Y VILLARI 6588 71ST ST S 1 $6,150.00 $6,150.00 702721120002 MARK STEVEN MCCOLLEY 7110 GRANADA AVE S 1 $6,150.00 6150.00 702721120003 BRUCE D & CHARLENE M BESTEL 7114 GRANADA AVE S 1 $6,150.00 $6,150.00 702721120004 MICHAEL A & DIANE L SCHULTZ 7118 GRANADA AVE S 1 $6,150.00 $6 702721120005 ROBERT G & DAWNA D NEWBY 7124 GRANADA AVE S 1 $6,150.00 $6,150.00 702721120006 CLAYTON G & MARY A GROVUM 7128 GRANADA AVE S 1 $6,150.00 $6,150.00 702721120007 RONALD A & DONNA M SATHER 7115 GRANADA AVE S 1 $6,150.00 $6,150.00 702721120008 JAMES P & SUSAN C L CANNON 7119 GRANADA AVE S 1 $6,150.00 $6,150.00 702721120009 DAVID L & MARY C SCHUCK 7123 GRANADA AVE S 1 $6 $6,150.00 702721120010 HERBERT D & JANICE L JAPS 7127 GRANADA AVE S 1 $6,150.00 $6,150.00 702721120011 DANIEL J & DEANNA L ROTHBAUER 7131 GRANADA AVE S 1 $6,150.00 $Q,150.00 702721120012 FRANK R KIRCHNER 7001 GRANADA AVE S 1 $6,150.00 $6,150.00 Totals 1 12 $73,800.00