HomeMy WebLinkAbout2011-01-05 PACKET 04.F.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 01/05/2011
PREPARED BY
Engineering
ORIGINATING DEPARTMENT
Jennifer Levitt
STAFF AUTHOR
COUNCIL ACTION REQUEST
Consider adoption of a resolution approving final payment in the amount of $115,437.37 to
Valley Paving, Inc. for 2009 Final Street Construction,
STAFF RECOMMENDATION
Adopt resolution and final payment. The contractor, Valley Paving, Inc. in accordance with the
contract plans and specifications, has satisfactorily completed the work.
ADVISORY COMMISSION ACTION
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES /RIGHTS
❑ ECONOMIC DEV, AUTHORITY
El
SUPPORTING DOCUMENTS
DATE REVIEWED
APPROVED DENIED
❑ ❑
❑
❑ ❑
❑
❑ ❑
❑
❑ ❑
❑
❑ ❑
❑
❑ ❑
❑
❑ MEMO /LETTER: Jeffrey P. Toutant, December 17, 2010
Z RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
❑ OTHER: Request for payment
ADMINISTRATORS COMMENTS
City A inistrator Date
COUNCIL ACTION TAKEN: APPROVED ❑ DENIED
FE •
RESOLUTION NO. 2011-
RESOLUTION APPROVING FINAL PAYMENT IN THE AMOUNT OF
$115,437.37 TO VALLEY PAVING, INC. FOR 2009 FINAL STREET
CONSTRUCTION
WHEREAS, the City Engineer has certified that work has been
satisfactorily completed, and
WHEREAS, the total contract amount is $1,059,333.37 compared to the
original contract amount of $1,068,906.50.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of
Cottage Grove, County of Washington, State of Minnesota, that $115,437.37 be
paid to Valley Paving, Inc., for 2009 Final Street Construction.
Passed this 5th day of January, 2011.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
2335 Highway 36 W
St. Paul, MN 55113
Tel 651- 636 -4600
Fax 651- 636 -1311
www,bonestrw.com
December 17, 2010
r Bonestroo
Attn: Jennifer Levitt
City of Cottage Grove
7516 80 Street S
Cottage Grove, MN 55016
Subject: 2009 Final Street Construction
Bonestroo File Number 48 -08278
City Project Number 08278 v u
Request for Payment Number 4 and Final
r _ro
Dear Ms. Levitt,
Enclosed please find Three (3) copies of the 4` and Final Request for Payment for the 2009 Final
Street Construction Project. The Contractor for this project is Valley Paving, Inc. In addition to
the Request for Payment the Contractor has submitted their IC -134 forms.
PROJECT REVIEW
This project consists of the construction of final streets in the Mississippi Dunes Addition Phase 2,
Timber Ridge 6 Addition, and Silverwood Addition. The project began in the summer of 2009
and was substantially completed in the summer of 2009. Final punch list activities were
completed in the fall of 2009.
CONSTRUCTION COST OVERVIEW
The following is a summary of the projected and final construction costs for the 2009 Final Street
Construction Project.
RM-7 --
TOTAL PART 1 — Mississippi Dunes
Phase 2
TOTAL PART 2 — Timber Ridge 6
Addition
TOTAL PART 3 — Silverwood Addition
G��;31sJ
Original Contract Final Construction
Amount Amount
$ 304,010.83 $ 312,303,10
$ 417,506,70 $ 401,766.54
$ 347,288.97 S 345,263.74
$ 1,068,906;50 $ 1,059,333,37
The Final Construction Amount for this project was $9,573.13 less than the Original Contract
Amount. The quantity differences from the Original Contract Amount are summarized below.
rota/ Part — Mississippi Dunes Phase 2— Due to an increase in the number of constructed"
homes at the time of construction from the original anticipated quantity of homes the driveway
apron quantity had a significant over run amounting to $7,504.26. There was also a large
increase in the topsoil and restoration items due to the existing lots being left lower than
anticipated. This included over runs in topsoil borrow of $5,695.90, sodding of $4,636.80, and
seed and blanket of $4,831.20. These discrepancies when combined with other minor quantity
differences resulted in a total over run of $8,292.27 for Part 1.
Total Part 2—Timber Ridge e Addition — Part 2 had an under run of $15,840.16. This was
due to an under run in bituminous non -wear course, and other minor quantity differences.
TotaiPart3— SiiverwoodAdditioo— The total under run amount for Part 3 is $2,025.23
This was due to minor quantity differences.
The Contractor, Valley Paving, Inc. has satisfactorily completed the Work in accordance with the
contract plans and specifications. Therefore, it is recommended that final payment of
$115,437.37 be made to the Contractor and the project be accepted by the City of Cottage
Grove.
After acceptance, please distribute all copies of the Request for Payment as appropriate. If you
have any questions about this project or require further information please contact me 651 -746-
4046.
Sincerely,
BONESTROO `
J
Jeffre P. Toutant
Enclosures
Cc: Mike Boex
File
FOR YOUR FILE
Orr
Bonestroo
Owner: City of Cottage Grove, 7516 80th St. S., Cottage Grove MN 55016 Date: December 7 2010
For Period: 7/22/2009 to 12/7/2010 Request 4 AND FINAL
Contractor: Valley Paving Inc., 8800 13th Ave. E., Shakopee MN 55379
CONTRACTOR'S REQUEST FOR PAYMENT
2009 FINAL STREET CONSTRUCTION
BONESTROO FILE NO. 000048 - 08278 -0
SUMMARY
1
Original Contract Amount
2
Change Order - Addition
3
Change Order - Deduction
4
Revised Contract Amount
5
Value Completed to Date
6
Material on Hand
7
Amount Earned
8
Less Retainage 0%
9
Subtotal
10
Less Amount Paid Previously
11 Liquidated damages -
12 AMOUNT DUE THIS REQUEST FOR PAYMENT NO.
Recommended for Approval by:
BONESTROO
$ 1,068,906.50
4 AND FINAL
$ 0.00
$ 0.00
$ 1,068
$ 1,059,333.37
$ 0.00
$ 1,059,333.37
$ 0.00
$ 1,059,333.37
$ 943,896.00
$ 0.00
$ 115,437.37
Approved by Owner:
CITY OF COTTAGE GROVE
Date:
Recommended for Approval
CITY OF COTTAGE GROVE
Specified Contract Completion Date:
06fjngineer
Date:
k 2 � "Zcs (ib
4808278RE04FINAL. A.m
4808278RE04 FINAL xIsm
Contract
Unit
Current
Quantity
Amount
No.
Item
Unit
Quantity
Price
Quantity
to Date
to Date
PART 1 - MISSISSIPPI DUNES PHASE 2:
1
TRAFFIC CONTROL
LS
1
716.76
1
$716.76
2
MOBILIZATION
LS
1
4500.00
1
$4,500.00
3
SALVAGE AND REINSTALL MAILBOX ASSEMBLY
EA
13
40.95
13
$532.35
4
TEMPORARY MAILBOXES
EA
18
15.36
18
$276.48
5
RECLAIM BITUMINOUS PAVEMENT
BY
15600
0.60
14502
$8,701.20
6
REMOVE BITUMINOUS PAVEMENT
SY
180
6.00
184
$1,104.00
7
REMOVE CONCRETE PAVEMENT
BY
60
15.00
64
$960.00
8
REMOVE AND REPLACE 6" CONCRETE SIDEWALK
SF
300
5.70
31
$176.70
9
SAWING BITUMINOUS PAVEMENT
LF
440
2.00
206
515
$1,030.00
10
SAWING CONCRETE PAVEMENT
LF
100
3.26
118
$384.68
11
SUBGRADE PREPARATION
SY
12300
0.54
12116
$6,542.64
12
HAUL EXCESS RECLAIM MATERIAL OFFSITE
CY
810
6.00
1485
$8,910.00
13
AGGREGATE BASE, CLASS 5
TN
500
5.00
$0.00
14
B618 CONCRETE CURB AND GUTTER
LF
6980
9.21
95
6974
$64,230.54
15
CONCRETE HYDRANT ACCESS PAD
EA
7
102.90
7
$720.30
16
CONCRETE PEDESTRIAN CURB RAMP
SF
410
4.61
466
$2,148.26
17
TRUNCATED DOME PANEL
SF
60
35.32
80
$2,825.60
18
6" CONCRETE DRIVEWAY APRON
SY
230
41.46
124
411
$17,040.06
19
TYPE LV NON - WEARING COURSE MIXTURE
TN
1820
51.24
1623.62
$83,194.29
20
TYPE LV WEARING COURSE MIXTURE
TN
1240
51.24
349.5
1165.2
$59,704,85
21
BITUMINOUS MATERIAL FOR TACK COAT
GAL
610
2.72
200
$544.00
22
SAW AND SEAL TRANSVERSE JOINTS IN
BITUMINOUS WEAR COURSE
LF
2210
1.44
3565
$5,133.60
23
ADJUST VALVE BOX
EA
6
190.45
6
$1,142.70
24
ADJUST CATCH BASIN CASTING
EA
14
102.39
14
$1,433.46
25
ADJUST MANHOLE CASTING
EA
23
370.02
24
$8,880.48
26
PROTECTION OF CATCH BASIN IN STREET
EA
14
136.04
12
12
$1,632.48
27
EXTEND HYDRANT BARREL
LF
1
550.00
$0.00
28
SALVAGE AND REINSTALL PERMANENT BARRICADE
EA
2
51.19
$0.00
29
PERMANENT BARRICADE
EA
1
296.92
1
$296.92
30
BOULEVARD STRIPPING
HR
28
111.07
38
$4,220.66
31
BOULEVARD GRADING
HR
28
89.32
22
$1,965.04
32
TOPSOIL BORROW
CY
400
14.42
795
$11,463.90
33
SIGN PANELS, TYPE C, HIGH INTENSITY
SF
25
27.65
25
$691.25
34
SODDING, LAWN TYPE
SY
230
4.48
1265
$5,667.20
35
APPLICATION OF WATER FOR TURF ESTABLISHMENT
MG
5
12.73
$0.00
36
SEEDING, INCL SEED, FERTILIZER, AND WOOD
FIBER BLANKET, CATEGORY 1
BY
230
3.05
1814
$5,532.70
37
SKIDSTEER(BOBCAT) WITH OPERATOR
HR
8
89.32
$0.00
38
STREET SWEEPER WITH PICK UP BROOM WITH
OPERATOR
HR
8
127.41
$0.00
TOTAL PART 1 - MISSISSIPPI DUNES PHASE 2:
$312,303.10
PART 2 - TIMBER RIDGE 6TH ADDITION:
39
TRAFFIC CONTROL
LS
1
716.76
1
$716.76
40
MOBILIZATION
LS
1
4500.00
1
$4,500.00
41
SALVAGE AND REINSTALL MAILBOX ASSEMBLY
EA
11
40.95
11
$450.45
42
TEMPORARY MAILBOXES
EA
47
15.36
49
$752.64
43
RECLAIM BITUMINOUS PAVEMENT
SY
16700
0,63
15636
$9,850.68
44
REMOVE BITUMINOUS WEDGE
SY
350
4.53
711
$3,220.83
45
REMOVE BITUMINOUS PAVEMENT
SY
680
5.00
609
$3,045.00
46
REMOVE CONCRETE PAVEMENT
BY
58
15,00 _.
$0.00
47
REMOVE AND REPLACE CONCRETE CURB AND
GUTTER
LF
40
23.82
41
$976,62
48
REMOVE AND REPLACE 6" CONCRETE SIDEWALK
SF
420
5.70
1740
$9,918.00
49
TRANSPLANTTREE
EA
1
409.56
1
$409.56
50
SAWING BITUMINOUS PAVEMENT
LF
1370
1.75
942
$1,648.50
51
SUBGRADE PREPARATION
SY
14650
0.45
13071
$5,881.95
52
HAUL EXCESS RECLAIM MATERIAL OFFSITE
CY
920
7.00
981
$6,867.00
53
AGGREGATE BASE, CLASS 5
TN
500
0.01
$0.00
54
8618 CONCRETE CURB AND GUTTER
LF
8050
9.21
117
8066
$74,287.86
55
CONCRETE HYDRANT ACCESS PAD
EA
13
102.90
13
$1,337.70
56
CONCRETE PEDESTRIAN CURB RAMP
SF
660
4.61
484
$2,231.24
57
TRUNCATED DOME PANEL
SF
100
35.33
92
$3,250.36
58
COMMON EXCAVATION - TRAIL OR SIDEWALK (EV)
CY
20
9.04
53
$479.12
59
6" CONCRETE SIDEWALK
SF
1380
4.61
1551
$7,150.11
4808278RE04 FINAL xIsm
4808275RE04FINAL. L
Contract
Unit
Current
Quantity
Amount
No.
Item
Unit
Quantity
Price
Quantity
to Date
to Date
60
AGGREGATE BASE, CLASS 5, 100% CRUSHED - TRAIL
OR SIDEWALK
TN
50
19.27
20
$385.40
61
6" CONCRETE DRIVEWAY APRON
SY
680
41.46
269
753
$31,219.38
62
TYPE LV NON- WEARING COURSE MIXTURE
TN
2170
51.24
1635.01
$83,777.91
63
TYPE LV WEARING COURSE MIXTURE
TN
1650
51.24
33.85
1612.48
$82,623.48
64
BITUMINOUS MATERIAL FOR TACK COAT
GAL
780
2.72
100
400
$1,088.00
65
SAW AND SEAL TRANSVERSE JOINTS IN
BITUMINOUS WEAR COURSE
LF
2453
1.44
4169
$6,003.36
66
ADJUST VALVE BOX
EA
7
190.45
8
$1,523.60
67
ADJUST CATCH BASIN CASTING
EA
18
102.39
19
$1,945.41
68
ADJUST MANHOLE CASTING
EA
48
370.02
2
50
$18,501.00
69
EXTEND HYDRANT BARREL
LF
1
550.00
$0.00
70
PROTECTION OF CATCH BASIN IN STREET
EA
18
136.04
20
20
$2,720.80
71
BOULEVARD STRIPPING
HR
32
111.07
6
54
$5,997.78
72
BOULEVARD GRADING
HR
32
89.32
37
$3,304.84
73
TOPSOIL BORROW
CY
680
14.42
768
$11,074.56
74
PERMANENT BARRICADE
EA
1
296.92
1
$296.92
75
SIGN PANELS, TYPE C, HIGH INTENSITY
SF
24
27.65
24
$663.60
76
SODDING, LAWN TYPE
SY
5340
2.51
4543
$11,402.93
77
APPLICATION OF WATER FORTURF ESTABLISHMENT
MG
20
12.73
$0.00
78
SKIDSTEER (BOBCAT) WITH OPERATOR
HR
8
89.32
12.5
12.5
$1,116.50
79
STREET SWEEPER WITH PICK UP BROOM WITH
OPERATOR
HR
8
127.41
9
$1,146.69
TOTAL PART 2 - TIMBER RIDGE 6TH ADDITION:
$401,766.54
PART 3 - SILVERWOOD ADDITION:
80
TRAFFIC CONTROL
LS
1
716.76
1
$716.76
81
MOBILIZATION
LS
1
4500.00
1
$4,500.00
82
SALVAGE AND REINSTALL MAILBOX ASSEMBLY
EA
17
40.95
17
$696.15
83
TEMPORARY MAILBOXES
EA
64
15.36
64
$983.04
84
RECLAIM BITUMINOUS PAVEMENT
SY
15560
0.60
14188
$8,512.80
85
REMOVE BITUMINOUS PAVEMENT
SY
390
6.00
381
$2,286.00
86
REMOVE CONCRETE PAVEMENT
SY
350
10.00
393
$3,930,00
87
REMOVE AND REPLACE CONCRETE CURB AND
GUTTER
LF
20
23.82
19
$452.58
88
REMOVE AND REPLACE 6" CONCRETE SIDEWALK
SF
600
5.70
822
$4,685.40
89
SAWING BITUMINOUS PAVEMENT
LF
790
1.52
98
412
$626.24
90
SAWING CONCRETE PAVEMENT
LF
620
3.26
20
360
$1,173.60
91
SUBGRADE PREPARATION
SY
12330
0.50
11768
$5,884.00
92
HAUL EXCESS RECLAIM MATERIAL OFFSITE
CY
760
6.50
1295
$8,417.50
93
AGGREGATE BASE, CLASS 5
TN
500
0.01
$0.00
94
B618 CONCRETE CURB AND GUTTER
LF
7330
9.21
152
7334
$67,546.14
95
CONCRETE HYDRANT ACCESS PAD
EA
10
102.90
11
$1,131.90
96
CONCRETE PEDESTRIAN CURB RAMP
SF
660
4.61
579
$2,669.19
97
TRUNCATED DOME PANEL
SF
100
35.33
104
$3,67432
98
6" CONCRETE SIDEWALK
SF
120
4.61
120
$553.20
99
AGGREGATE BASE, CLASS 5, 100% CRUSHED -TRAIL
OR SIDEWALK
TN
20
19.27
$0.00
100
6" CONCRETE DRIVEWAY APRON
SY
740
41.46
1006
$41,708.76
101
TYPE LV NON - WEARING COURSE MIXTURE
TN
1650
51.24
1413.54
$72,429.79
102
TYPE LV WEARING COURSE MIXTURE
TN
1240
51.24
351.58
1171.92
$60,049.18
103
BITUMINOUS MATERIAL FOR TACK COAT
GAL
620
2.72
300
$816.00
104
SAW AND SEAL TRANSVERSE JOINTS IN
BITUMINOUS WEAR COURSE
IF
2050
1.44
3326
$4,789.44
105
ADJUST VALVE BOX
EA
7
190.45
8
$1,523.60
106
ADJUST CATCH BASIN CASTING
EA
12
102.39
17
$1,740.63
107
ADJUST MANHOLE CASTING
EA
40
370.02
39
$14,430.78
108
PROTECTION OF CATCH BASIN IN STREET
EA
12
136.04
5
5
$680.20
109
EXTEND HYDRANT BARREL
LF
1
550.00
$0.00
110
SALVAGE AND REINSTALL PERMANENT BARRICADE
EA
4
51.19
$0.00
111
BOULEVARD STRIPPING
HR
29
111.07
36
$3,998.52
112
BOULEVARD GRADING
HR
29
8932
50
$4,466.00
113
TOPSOIL BORROW
CY
520
14.42
710
$10,238.20
114
SODDING, LAWN TYPE
SY
4710
2.51
3549
$8,907.99
115
APPLICATION OF WATER FOR TURF ESTABLISHMENT
MG
20
12.73
$0.00
116
SIGN PANELS, TYPE C, HIGH INTENSITY
SF
24
27.65
24
$663.60
117
SKIDSTEER (BOBCAT) WITH OPERATOR
HR
8
89.32
$0.00
4808275RE04FINAL. L
PROJECT PAYMENT STATUS
OWNER CITY OF COTTAGE GROVE
BONESTROO FILE NO. 000048 - 08278 -0
CONTRACTOR VALLEY PAVING INC.
CHANGE ORDERS
No. Date Description Amount
Total Change Orders
PAYMENT SUMMARY
No. From To Pavment Retainaqe ComDleted
1
04/01/2009
1 06/01/09
224,179.61
11,798.93
235,978.54
2
06/02/2009
06/25/09
412 945.25
33,532.89
670,657.75
3
06/26/2009
07/21/09
306,771.14
49,678.74
993,574.74
4 AND FINAL
07/22/2009
12/07/10
115,437.37
1,059,333.37
Material on Hand
Total Payment to Date
$1,059,333.37
Ori inal Contract
$1
Retains e Pa No. 4 AND FINAL
Chan e Orders
Total Amount Earned
$1,059,333.37
1 Revised Contract
1 068 906.50
480827 8REQ4FINAL XISm