Consider authorizing the purchase of a new heating system for the Public Works truck bays
and shops from Doody Mechanical.
F-�_, _. e k A i = I
Authorize the purchase of a new heating system for the Public Works truck bays and shops
from Doody Mechanical.
BUDGET IMPLICATION: $
BUDGETED AMOUNT
ADVISORY COMMISSION ACTION:
SUPPORTING DOCUMENTS:
ACTUAL AMOUNT FUNDING SOURCE
REVIEWED
APPROVED
DENIED
❑
❑
❑
F
El
El
❑
E]
❑
MEMO/LETTER: Memo from Bob LaBrosse and Harry Taylor dated 12/1/10
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
❑ OTHER: Bids
City Administrator Date
COUNCIL ACTION TAKEN: M El DENIED E10THER
-ANEW
CITY OF COTTAGE GROVE
MINNESOTA
To: Honorable Mayor and City Council
Ryan Schroeder, City Administrator
From: Bob LaBrosse, Building Official
Harry Taylor, Public Works Supervisor
late: December 1, 2010
a =0
The City Council is requested to authorize the purchase of a new heating system for the Public
Works truck bays.
Due to the outdated, inefficient gas hanging unit heaters within the Public Works truck bays
and shop areas, we solicited proposals from four heating contractors to remove the existing
hanging units and install a gas radiant tube heating system within three truck storage bays
along with a new furnace to replace the three horizontal furnaces currently used to heat the
sign and street light shop.
Installing a radiant tube system will cost about 15 percent more than merely replacing the
existing units. The new system will, however, result in energy savings of over 60 percent.
111 • M,
Based on the three proposals received, we believe the proposal by Doody Mechanical would
iie the most beneficial heating system for the Public Works truck bays and shops. Doody
Honorable Mayor, City Council, and Ryan Schroeder
Public Works Truck Bay Heating Upgrade
December 1, 2010
Page 2
Currently, $32,000 is budgeted for this project and the remainder is proposed to come from the
sustainability grant the City received from the State of Minnesota.
Authorize the purchase of a new heating system for the Public Works truck bays and shops
from Doody Mechanical.
1
41__�
N ovi
N ASSEFF MECHANICAL • c •.' ple to provide •o • propos
Furnish and install Co- Ray -Vac infrared tube heaters to serve the Woodshop, Parks Garage, Water Dept Garage, and Streets
Dept Garage.
Work to Include:
• Remove and dispose of existing unit heaters. Secure gas, electrical, and roof vent openings.
• Furnish and install Co- Ray -Vac infrared tube heating system as per attached schematic.
• Includes nine (9) B -8 and two (2) B -6 burners, hot rolled 4" heat exchanger tubing, aluminized steel tail pipes, polished
deep reflectors, reflector supports and hangers, three (3) cast iron HP vac pumps, three (3) control panels, six (6)
thermostats w/ locking covers.
• Gas piping from existing unit heater locations to new IR heater burners with new gas regulators, shut off valves, and
flexible gas connectors. Hanger materials for heaters, piping, and vac pumps. Hole cutting and flashing for side wall venting
of systems.
• Power and control wiring.
• Start up and test operation. Associated labor, materials, and permit. Note: Pricing does not reflect potential
rebates. Application for rebates will be
• 1 year full labor and 3 year equipment warranty. submitted to Xcel for pre- approval.
Cost base job as described above is ......................................................................... ............................... .....................$76,260.00
Deduct Alternate 1— Furnish and install one (1) 250 mbh gas unit heater in lieu of 50 feet of IR tube heater and burner serving
the Wood Shop Area. Deduct $2,810.00 from base job.
Deduct Alternate 2- Use materials on hand previously removed Garage A. Value and condition of materials will be determined
and deducted from base job.
Exclusions:
. Overtime
'terms: This quote is good for 30 days from the date of this proposal. Payment terms are Net 20 Days.
Proposed by: I Accepted by:
Stevz ScAunidt
Date
Steve Schmidt
Service Manager
Company
Title:
Name
uate
49:
� d
"redefinii mechanical service"
To: Bob LaBrosse Phone: 651 -458 -2828
Company: City of Cottage Grove Fax: 651 - 458 -2881
Address: 7516 Both St So Date: October 28, 2010
City /State /Zip: Cottage Grove, MN 55016 Subject: Public Works Duct Furnaces -
PROPOS 1 -1150
Replace existing duct furnaces serving the Sign Shop, Street Lights Shop, and Mezzanine with one (1) Duct furnace.
Work to Include:
• Remove and dispose of three (3) existing duct heaters and one (1) unit heater. Secure gas, electrical, and roof vent
openings.
• Furnish and install one horizontal Goodman 115 mbh 80% 2 -stage furnace to serve all three areas.
• Connect gas piping and venting.
• Modify supply air, return air, and outside air ducts to connect to new furnace. Fabricate and install new filter box in return
duct. Install manual balancing dampers in supply ducts.
• Furnish and install new supply registers in existing ducts to serve Storage Room and Break Area in Mezzanine.
• Power and control wiring. Reuse existing thermostat in Sign Shop.
• Start up and test operation. Associated labor, materials, and permit.
• 1 year full labor and 5 year equipment warranty.
Terms: This quote is good for 30 day f rom the da of this proposal. Payment terms are Net 10 Days.
Proposed by: Accepted by:
► ��[[ 1: r����1�a1 :T!�Ir,����T�7�1�:��Li�1��7:i
Stem S �v 2s 2V
Date
Steve Schmidt
Service Manager
Company
Title:
Name Date
11/17/2010 11:10
PAGE 0110AD
Attu:
Bob Labrosse
City of Cottage Grove
Job Site
Public Works Building
8635 West Point Douglas Road
Cottage Grove
SCOPE OF WORK:
Phase I Maintenance and Wash Area: Install one (1) CoRayVac infrared tube beater. I t draft induced burners and one side wall
vented vacuum pump. Infrared tubing layout per plan. Remove existing unit heaters and cap vent openings. Reconfigure and add gas
piping to new Wmer assemblies, $20,940.00
Pla ce '? Vehicle Siorage Area. Install one (1) CQRayVac infrared tube 'heater. Install four draft induced burners and one side wall vented
i ...... g _
vacuum pump. Infrared tubing layout per plan. Remove existing unit heaters and cap vent openings. Reconfigure and add gas piping to
C)
new burster assemblies. $22,680.00
Please 3 arau Addition Area: Instal I one (1) CoRayVac infrar d tube beater, Install four draft induced burners and one side wall Vented
.1
vacuum pump, Infrared tubing layout per plan. Remove existing unit heaters and cap vent openings, Reconfigure and add gas piping to
new burner assemblies, $12,680-00
Shop / Mez7anine Area: Replace two existing duct furnaces, Reconnect to existing ductwork, vent, and gas piping. Install return air
transfer grills to groong level shop room. $4,370.00
Gas Piping material will be provided by Weract Services, Inc,
Controls needed to complete this project will be provided by Wenol Services, Inc,
Electrical Semites will NOT be provided by Wencl Services, Inc.
Concrete Coring Smites will be provided by Wencl Services, Inc.
Mechanical Engineered Plans will NOT be provided by Wencl Services, Inc,
Structural Engineered Plans or structural supports will NOT be provided by Weacl Services, Inc,
System Start Up needed upon completion of this project will be perfomed by Wencl Services, Inc,
All work will be conducted between the business hours of 9:00 a-m- through 5:00 p,rn., Monday through Friday.
All equipment provided by Wencl Services, Inc., w1il be covered under a workmanship warranty for a period of One year,
The cost orsecuring all permits accessary to perform the work as stated above, is included in this pToposaL
Downpayment of 30% required prior to .start of work, with balance d" on completion.
PROPOSED AND SUBMITTED M
e
Michael K. Wertel November 17, 2010
This proposal is revoked if not accepted within 30 days ftorn the above date.
Wencl Services, Inc,, requires acceptance of any proposal in writing'
In the event that we must take legal action to recover past due amounts under the terms as stated in this contract, it is agreed that you will
also be liable for all costs and disbursements and reasonable attorneys fees incurred in collections.
Wencl Services, Inc, will provide Hen waivers upon request after full payment,
ACCEPTAN CE:
I have read the above proposal and I as in full undcrstanding and agreement of the terms and conditions as written therein,
X
Siwiature of Acceptance
J=J7Nfl
tZinow 1!01 E i I 11 III =11 111 Jill I I II: 11111 1 11 11 11 I�
WIN=
0-11" 1 MO-Mm"111
� -0. -
L4 a MIWIR
City of Cottage Grove Public Works Building-8635 W. Point Douglas Road
Mechanical Proposal
Doody Mechanical is pleased to submit our scope for the mechanical work for the referenced
project. This proposal is complete in accordance to the following scope, clarifications, and
exclusions.
RIOM
1301 L'Oiient Street i St, Paid, Mh 55117 1 p: 651-287-2746 1 f 651-489-0141 1 www,doodymechanical.com
Exclusions
The following items are specifically excluded from our proposal:
I. Fire Protection
2. FrostAArinter conditions. Snow removal.
3. Site survey and building layouts.
4. Roofing
I . VITIM-I's-
Sixty Seven Thousand Five Hundred Dollars
$67,500.00
Thank you for the opportunity to offer this proposal. If you have any questions, please contact
me at (651) 287-2746
1301 UOnent Street ! at Pud, Mn 55117 1 p: 651-287-21746 1 f 651-489-0141
\Cti,n P C'Ppomuni!� Flnfpl',' "r
0 _0
Z
MZ
LD
z w
LLI
w
iM
5
i Riz F -I 9A
E tag
H 19 ff sh
s ad 16 P al ? g
I la
11
q w
0 ir
CD
;i
Z I
In
I I. fl R i ON
cn
� T�
fy
0
w (D
> a- z
0 :):�;
111 IN lull
>
w w
U . 0
1� (!) LU
U Z;q
o [9 rj IX r �, F
=Ulu q
z
c
4��b 0 8
(; <
z
LU <
w
nit