Consider the following Public Safety/City Hall Project approvals: 1. Approval of Site Master
Plan. 2. Approval of the Phase One Solution on the Site. 3. Approval of the Conceptual
Building Plans. 4. Approval of the Building Size. 5. Approval of the Budget and Schedule.
STAFF RECOMMENDATION:
Approve the five items and direct the Project Team and consultants to enter the design and
development phase of the project.
SUPPORTING DOCUMENTS:
❑ MEMO/LETTER: Memo from Ryan Schroeder.
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
F LEGAL RECOMMENDATION:
[] OTHER: Attachments.
ADMINISTRATORS COMMENTS:
!
ity Administ or Date
COUNCIL ACTION TAKEN: APPROVED F1 DENIED FIOTHER
WINUff"M
s
City of
�` .r • " , ,
Minnes
As Council is aware it has been scheduled that on December 15, 2010 a decision point on the
proposed Public Safety / City Hall (PSCH) project exists. That decision is to move the project
forward as presented by the Project Team or to amend the project scope, scale and budget
prior to moving the project forward. At this time the Project Team is recommending a project
scope and budget.
Enclosed, please find concept drawings fora 66,500 square foot building. This building size is
somewhat larger than the 2005/6 Space needs study; however, with two exceptions it is also
substantially similar in scope to the initial study. The two areas which constitute almost the
entire growth in scope are in the parking lot and an interior mechanical room instead of a roof
top mezzanine. Both of these building enlargements allow us to take advantage of the
conceptual building footprint and as such it is anticipated that the mechanical room, while a
square footage upgrade is likely not a cost upgrade. In the case of the parking facility we are
still planning for a 40 car parking garage. The square footage allocated for this garage within
the space needs study was found to not be sufficient to provide this amount of parking.
Further, as in the mechanical room example the garage sidewalls would be coterminous with
the conceptual building envelope footprint. In spite of the growth in the building size we
believe we can build this project within the previously established budget and to provide for
some cost savings from that initial budget. As is shown within the Wald Engineering initial cost
estimating (attached) the project, including the building construction ($11,925,800), site work
($1,200,000), construction contingency ($634,200) project fees, professional services, moving,
etc. ($1,355,000) and furniture, fixtures and equipment ($880,000) totals $15,995,000.
A community meeting is set on December 14, 2010 to review the concept plans and budget
numbers. Any observations / ideas generated from that meeting will be brought forward to the
City Council for consideration.
Recently I have heard talk within the community that a gun range facility should be considered
for this project. The project team has not included that in this recommendation as we have not
had the time availability to completely review the topic. However, according to Wold the
project budget for a four -lane gun range would be about $750,000.
Wold will be coming to your meeting with additional material which will be helpful in walking
through the project. What Council will be asked at the conclusion of that
presentation /discussion is as follows:
1. Approval of the Site faster Plan
2. Approval of the Phase One Solution on the site (construction of the PSCH)
3. Approval of the Conceptual Building Plans
4. Approval of the Building size (66,500 square feet)
5. Approval of the Budget and Schedule (enclosed)
If Council is comfortable with all of the above we would ask for direction to enter the
design/development phase on this project.
Council Action: By motion approve the five items noted above for the PSCH project and direct
the Project Team and consultants to enter the design and development phase of the project.
December 14: Community Meeting @ City Hall
Open House:
Presentation:
December 15: City Council Meeting on Concept Design: 730 PM
Presentation by Wold Architects including project estimating
Council action to approve concept and order design/development
January through March
Design Development
Refine project estimates/value engineering
April 3: City Council Meeting; Design Development Presentation
Presentation by Wold Architects
Finalize project financing
Council action to approve design and enter Contract Document Phase
August 3, 2011: Presentation to City Council on Construction documents
Council action to approve construction documents to go to bid
September 15, 2011: Bids Received
September 21, 2001: Presentation to Council
Council action to award construction contract
City of
Cottage Grove
7516 80th Street South / Cottage Grove, Minnesqj?j55Q)10-6la5T A G E G a o %l E
www.cottage-grove.org
MEETING TRAINING' EOC
ROOMS
COMMUN
ROOM
COMMUNITY
DEVELOPMENT
STORAGE EOUII
E MEN'S TLT
N'S TILT I=
N B TLT
LOBBY
O
COUNCIL
CHAMBERS
651-458-2800 Fax 651-458-2897
TDD 651-458-2880
MEN'S LOCKER' FIRE CONE' SLOWER, TRAINING
TOILETS
CASE
MGMT
WOMEN'S INVESTIGATIONS
LOCKER,
SHO.EfIl
J
E LEV.
ROLL C ALL Om—E
ITY HALT
LOCKER OU STAIRS
'IT
j
SHOWER ROOM
J
TOILETS
R.LLCALL
RESERVES STATE
STOR� ROOPE
BREAK F I ITNESS
ROOM
PATROL
SHARED
STAFF
SPACES
WAIN -EVEL FLOOR PLAN DIA GRAM
12 / 1 3/ 1 ()
EQUAL OPPOR UNITY EMPLOYER
MAIN ENTRY/
LOBBY
CONE. SUB -CORBY
u O
CENTRAL
MAIL , . �_
CONF.
PUBLIC
LIM,
SAFETY
W M JAN. M w
n
PS DMIN/ FIRE
FILES
ADMIN.
651-458-2800 Fax 651-458-2897
TDD 651-458-2880
MEN'S LOCKER' FIRE CONE' SLOWER, TRAINING
TOILETS
CASE
MGMT
WOMEN'S INVESTIGATIONS
LOCKER,
SHO.EfIl
J
E LEV.
ROLL C ALL Om—E
ITY HALT
LOCKER OU STAIRS
'IT
j
SHOWER ROOM
J
TOILETS
R.LLCALL
RESERVES STATE
STOR� ROOPE
BREAK F I ITNESS
ROOM
PATROL
SHARED
STAFF
SPACES
WAIN -EVEL FLOOR PLAN DIA GRAM
12 / 1 3/ 1 ()
EQUAL OPPOR UNITY EMPLOYER
City •
Cotta e Grove
7516 80th Street South / Cottage Grove, Minnes(pt@155Q)10-al25T A (, iz G ii o %l f:l
www.cottage-grove.org
651-458-2800 Fax 651-458-2897
TDD 651-458-2880
NO sm
i2 /13 /10
LOWER L EVEL FLOOR FLAN DIAGRAM
EQUAL OPPORTUNITY EMPLOYER
New Public Safety/ City Hall W !d Architects and Engi
City of Cottage Grove December 13, 201
Construction Costs
Area
737
Cost/ SF
CostrUction
Cost
Base Structure &Enclosure
86.500
SF
$
95.00
$
6.317,500
Police Office Area
12.800
SF
$
90.00
$
1,152
City Hall Office Area
9,100
SF
$
88.00
$
819,000
Public Area/ Meeting/ Council Chambers
8,100
SF
$
140.00
$
1
Shared Areas
6,800
SF
$
71.00
$
482,800
Police Detention/ Booking/ Ci[c.
4
5F
$
225.00
$
900
Evidence Processing
4.700
SF
$
165.00
$
775,500
Police Garage
18.000
SF
$
15.00
$
270
Mechanical Spaces
3
SF
$
25.00
$
75
Subtotal ConstruUonCost
86,500
SF
$
179.34
$
11,925.800
Site Construction Costs
Earthwork/ Site Preparation
$
130
Site Utilities
$
165
Roads/ Sidewalks/ Parking
$
350,000
Landscaping
$
475,000
SiteAmmenides
$
80,000
Subtotal Site Costs
$
1
Construction Contingency
$
634,200
Total Construction Cost
$
13,760,000
Project Costs
ArchiteoundFaeo
$
737
Expenses
Reimbursable Ex
�
480O8
'
Legal/ Bond Issuance
$
60
GeotenhnicaKEnvironmentad
$
50
Surveying
$
40.000
Metropolitan Council/ City SAC Fees
$
15,000
Trunk Fees
$
25,000
City Engineering/ Inspections
$
30,000
Water Access Fees
$
20
Plumbing Plan Review Fee
$
10.000
City Roads and Service Fees
$
25.VOO
Utility Transformer/ Inspection Fees
$
40,800
Construction Testing/ Special Inspections
$
50.000
Commissioning/ Testing and Balancing
$
60.008
Quality Review/ Value Engineering
$
30.000
Bid Set Printing/ Advertising
$
15.000
Staff Time/ Moving Costs
$
26.000
Contingency
$
75.000
Total Project Costs
$
1,355,080
Furniture d Equipment
Furniture Allowance
$
550.000
Equipment Allowance
$
125,000
Technology Allowance
$
125
Consultant Fees
$
38
Contingency
$
50.000
Subtotal Furniture and Equipment 880,000
TOTAL PROJECT COST $ 15,995,004,'