Loading...
HomeMy WebLinkAbout2011-04-06 PACKET 08.A.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 4/6/2011 0. A. PREPARED BY Administration Ryan Schroeder ORIGINATING DEPARTMENT DEPARTMENT HEAD COUNCIL ACTION REQUEST Consider authorizing Wold Architects to begin the construction document phase of the PSCH project. STAFF RECOMMENDATION Authorize Wold Architects to begin the construction document phase of the PSCH project. SUPPORTING DOCUMENTS ® MEMO /LETTER: Memo from Ryan Schroeder. ❑ RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ® OTHER: Attachments. COUNCIL ACTION TAKEN: [ ❑ DENIED ❑ OTHER Document2 To: Honorable Mayor and City Council Members From: Ryan R. Schroeder, City Administrator Date: March 31, 2011 Subject: PSCH Construction Document Authorization The City Council received an update on the status of the Public Safety /City Hall (PSCH) design /development at the March 16, 2011 regular meeting. This was followed by a Council tour of City Hall lobby areas on March 19 and an all commission meeting during which the PSCH update was presented on March 26 (attendance of about 50). The City hosted an Open House and Community meeting on March 29, 2011. About 40 persons from the public were in attendance during the presentation portion of the March 29 event (37 persons signed in). The City has also offered the opportunity to serve on two design committees. Included is the Veterans Memorial and Lobby Displays committee for which we received two volunteers each at the Open House. According to the project plan Wold Architects will be present at the April 6, 2011 regular meeting to update Council on the final design development and to request authorization to enter the construction documents phase (plans and specs in our typical vernacular). This would be followed by Site plan review in May, a funding and financing workshop on June 1 and an authorization request to enter the bid stage on June 15. Enclosed is a copy of the Wold presentation to the Community Open House. The building layout had achieved substantial completion at the time of the Open House although we are currently conducting a final review of the front desk reception area and Council Chambers. We have been working with the Weidt Group as a contractor to Xcel Energy to assist the City with review of energy efficiency opportunities. We anticipate receiving initial recommendations from this group on April 7 which will be reviewed by the Environmental Commission on April 13. We are tentatively scheduled to present recommendations to Council on April 20. Any direction received will be integrated during this construction document phase of the project. As has been repeated since receipt of Council direction on the project statement and vision on June 2, 2010 and in virtually every presentation since, the PSCH project will not include an effort to receive any sort of LEED certification. However, there has been a desire throughout to build in operational and energy efficiency to the extent that we can identify a responsible return on investment. It has been opined from time to time throughout the process to date that work plan steps should not proceed absent a final decision on project funding and financing. Of note is that Council received the financing plan for this project on July 7, 2010 which allows that the project is feasible at or below a $17 million budget. We will receive improved estimates on April 6 and we currently anticipate the project will continue to be estimated below that project parameter. Council Action: By motion authorize Wold Architects to begin the construction document phase of the PSCH project work plan. City of Cottage Grove Wold Architects and Engineers New Public Safety/ City Hall March 6, 2011 Construction Costs Schematic Design Design Development 12/15/2010 4/5/2011 General Conditions and Contractor Overhead Concrete/ Steel/ Masonry Wood/ Finish Carpentry Moisture Protection Doors, Windows and Hardware Interior Wall/ Finishes / Specialties Elevator Fire Protection Mechanical and Plumbing Electrical Landscaping and Site Amenities Site, Civl and Utilities Incl. Incl. Incl. Incl. Incl. Incl. Incl. Incl. Incl. Incl. Incl. Incl. $ 1,339,789 $ 2,760,272 $ 188,951 $ 595,705 $ 697,165 $ 1,068,670 $ 52,140 $ 149,600 $ 2,393,600 $ 1,786,971 $ 673,443 $ 1,333,914 Subtotal Construction Contingency Total Construction Cost Project Costs (Fees, Testing, Contingencies) Furniture and Equipment $ 13,125,800 $ 634,200 $ 13,040,220 $ 719,780 $ 13,760,000 $ 13,760,000 $ 1,355,000 $ 1,355,000 $ 880,000 $ 880,000 TOTAL PROJECT COST $ 15,995,000 $ 15,995,000 Page 17 Commission No. 102189 RAVfNE PARKWAY 11 U� a� 42 Vu� < Z Z Z 0 U� a� 42 Vu� U� a� 0 0 U cma WD 0 0 rl cd aA b C) � U v a� CAS a� a e WN U � o ct H a� U H Ind � �� \� � ��� � � DO CIO Z.j ct, el l C', a C O N O { U G a c 0 N H � h � � 1-/ w c � G O p Z N O W O U � U N a G I m s ua a ro .--14 CIL) (L 0 ul uj a -j 2 � < 3: r—lo W Lu U) uj uj < -i Ul :D > CL U) Q = CL 0) z UD Li r) r7l 0 z UD Li r) r7l Qq az N W UD Li r) C) 4-j r-I Yf Va ct bQ 4-J Op.* V >.. 411 4, ct C) rx� CIO _ 1 Q W Y < ` Q U Q � Y MO U) ..n. t Ic 4-b I - r ;711 Cl) Pk; z 0 uj m 0 \� }�) � \ ^� / I