HomeMy WebLinkAbout2011-04-20 PACKET 08.B.REQUEST OF CITY COUNCIL ACTIO
PREPARED BY Public Works il:
ORIGINATING DEPARTMENT STAFF AUTHOR
COUNCIL ACTION REQUEST
1. Consider accepting Splash Pad Planning Study Report
2. Consider authorizing staff to prepare plans and specifications for a splash pad to be located
at Highlands Park with a total project expense estimated at $500,000.
3. Consider authorizing staff to hire architectural services and prepare plans and specification
for remodeling the existing Highlands Park building with a total project expense estimated at
$150,000.
STAFF RECOMMENDATION
COUNCIL AGENDA
MEETING ITEM #
DATE 4/20/11
1. Accept Splash Pad Planning Study Report
2. Authorize staff to prepare plans and specifications for a splash pad to be located at
Highlands Park with a total project expense estimated at $500,000.
3. Authorize staff to hire architectural services and prepare plans and specification for
remodeling the existing Highlands Park building with a total project expense estimated at
$150,000.
BUDGET IMPLICATION $0.00
BUDGETED AMOUNT
$650,000
ACTUAL AMOUNT
Park Maintenance
ADVISORY COMMISSION ACTION
DATE REVIEWED
❑ PLANNING ❑
❑ PUBLIC SAFETY ❑
❑ PUBLIC WORKS ❑
❑ PARKS AND RECREATION ❑
❑ HUMAN SERVICES /RIGHTS ❑
❑ ECONOMIC DEV. AUTHORITY ❑
El F
Y� l J l� T i i (I • [e 7 Z� Z� J 1�[ �C
® MEMO /LETTER:
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
❑ OTHER:
11 � 1►� I H I► [c Z.Y�D l z y n
APPROVED DENIED
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
❑ ❑
'S
City of
Cotta Grove
Minnesota
To:
Honorable Mayor and City Council
From:
Zac Dockter, Parks and Recreation Manager
Date:
4/13/11
Subject:
Splash Pad Study
Introduction
In August of 2010 city council directed staff to pursue closure of the outdoor municipal pool in
consideration of building a splash pad in a community park. The council further directed staff
to commission a Splash Pad Planning Study to fully understand the aquatic recreational needs
of the community as well as to master plan for splash pad amenities as recommended in such
a report.
Background
Staff hired Bonestroo to study the aquatic facility needs of Cottage Grove. The deliverable of
that project is the Splash Pad Planning Study previously presented to you. The study took into
account the following data to create a recommendation to the council:
1. National and regional recreational trends
2. Primary and secondary service area identification
3. Demographic characteristics of the community
4. Alternative aquatic service providers in the community
5. Bather load demand
6. Detailed site analysis
7. Splash pad development plan
8. Capital and operational financial impacts
After determining market areas and bather load figures for the city of Cottage Grove, the study
delves deeply into site analysis. Initially, the six site options considered were Hamlet Park,
Oakwood Park, Highlands Park, Kingston Park, Woodridge Park and the Municipal Pool. A
thorough matrix report was completed to analyze opportunities and deficiencies of each site.
The matrix took into consideration subject categories of size, location, land use, topography,
natural features, utilities, security, recreation programming and market benefits. The matrix
report is included as Appendix A to this memorandum. This matrix report yielded four
preferred community park site locations which are Highlands Park, Woodridge Park, Kingston
Park and Hamlet Park.
Cost estimates were devised for each of the preferred sites based on the construction of a
community sized splash pad. Council suggested at the August workshop that a community
sized splash pad be planned for in consideration of closing the community's only outdoor
aquatic recreational facility, the Municipal Pool. As such, the study deemed it desirable for the
first splash pad constructed to be designed large enough to fill the void in aquatic recreational
opportunities for the residents resulting from the closure of the pool. A community sized splash
pad is typically 1,500 to 4,000 square feet in size and is intended to facilitate a bather load of
100 to 266 patrons. This compares to an approximate bather load of 325 at the Municipal
Pool. A community sized splash pad design intends to entirely serve the primary service
market area as well as portions of the secondary service market area. Appendix B of this
document is a conceptual design of a community sized splash pad at Highlands Park.
Whereas the municipal pool typically reaches a broad range of demographics with its intended
usage, a splash pad is depicted as a more youth oriented amenity. However, building a
community sized splash pad broadens that target market by offering multiple zoned activity
areas such as family (all ages), toddler (1 -5 year olds), and active (5 -12 year olds) zones.
Active zones differ from family and toddler zones in that they offer an interactive experience for
the users through such equipment as water guns, water cannons, and spray noodles. This
community sized splash pad is proposed to be built as a family amenity with the intent to
maximize resident usage regardless of demographics. It is expected that a far superior
Cottage Grove residential usage rate will be experienced through the community sized splash
pad as compared to the Municipal Pool. This is believed to be true based on location of the
proposed splash pad as well as the improved aquatic features being offered as an attractant.
As directed by both the City Council and the Parks Commission, staff also requested that this
study take into account the effect this project may have on a future community center aquatic
facility in Cottage Grove. The study did so by incorporating the expectation of a splash pad
located at the community center in determining its final recommendation in the report. The
study suggests there is no concern of competition between a community park splash pad and
the community center aquatic facility.
Using the aforementioned data, the studies final recommendation is as follows:
Bonestroo recommends the city plan for a no -fee flow -thru splash pad at Highlands Park in
phase one and a second, third and fourth at Woodridge, Kingston, and Hamlet Parks in future
phases. Although circulation systems provide a more sustainable solution because it requires
lower water usage, the operating and maintenance budget for the city does not currently allow
for such a system. The flow -thru systems can be designed such that a future desire to provide
a recirculation system to a splash pad can be accommodated with minimal impacts. Cost
estimates in this report are general in nature and further refinements of design will result in
estimates to achieve the city's fiscal and operational requirements.
Based on the recommendation of the study, the next phase of this project would be to
authorize staff to begin preparing plans and specifications. Prior to doing so, there are several
directives the council must provide to staff.
1. Approval of the study and its recommendation of:
a. Site: Highlands Park
b. Size: Community
c. System: Flow -thru
2. Approval of a project budget.
3. Authorize staff to hire consultant services for preparing plans and specifications.
4. Authorize staff to hire architectural services for remodeling Highlands Park recreational
building.
A proposed splash pad project budget is submitted for your review in Appendix C. As noted,
costs include site demolition, site preparation, site improvements, utilities and splash pad
construction. The budget also offers a return on investment figure which is results from the
general fund savings realized by closing the outdoor Municipal Pool. Project funds will be
derived from the Park Trust Fund which holds a current balance of $750,000.
As the report suggests, it is vitally important that the entire park facility and design works
complimentary to a splash pad to maximize usage and recreational experiences of the project.
A splash pad alone will not be nearly as successful as a splash pad with positive supporting
elements. The investment into improving the surrounding areas for such things as benches,
shade, trash, landscaping and accessible restrooms are seen is integral in providing a positive
experience to all users of the splash pad. Intended users should also include the parents or
adults who may not be actively using the water features themselves but monitoring or enjoying
other park activities while their children are playing in the splash pad. One such item that
needs thoughtful consideration at Highlands Park is the review of restroom options. One
option would be to drop in a new, modular and handicap accessible restroom on the site.
However, this cost would be estimated at nearly $50,000. Staff is suggesting that a more
desirable option would be to invest up to $150,000 (total project budget) in remodeling the
current park facility. Approximately $10,000 would be used to hire architectural services to
remodel the building to include the following:
1. Enlarged, handicap accessible restrooms with access doors from the outside.
2. Enlarged mechanical room to house splash pad mechanical and control systems
a. Alternative option to this is to construct a below ground vault which is an
additional expense and not as desirable of a working environment.
3. Altering of awning to improve shade opportunities
4. Exterior improvements such as siding, window, painting and door replacement to
improve aesthetic appearance of the facility.
Funds for this building improvement would be taken from the Parks Building and Equipment
Replacement Fund which holds an estimated balance of $391,000.
Staff Recommendation
1. Accept Splash Pad Planning Study report
2. Authorize staff to prepare plans and specifications for a splash pad to be located at
Highlands Park with a total project expense estimated at $500,000.
3. Authorize staff to hire architectural services and prepare plans and specification for
remodeling the existing Highlands Park building with a total project expense estimated
at $150,000.
J
�
ao
a V
a
N
S
0
4 m
Illll��llllllll�llmllllllllllllllll�1111
191198899919199
■191191111111111191961111
Il��lllll�ll�ll��ll����inllll�lllll��ll
IE1dd1t�111�1�91�
■d�
Jdd41d116�i11�1��1��Nil
I
ell��llnllllllll��llllllllllllllllll�lll�
151111116111661
■�Itl€l11611116611161166Nil
1
III�IIIIIIII�II�IIIIIIIIIIIIIIIIII�IIII
I
191699999619919
.199919119999991991699111
l
�Il�nllllllll��l��ll����llllllllllllllll
,���������
.651666616565661651665...
'll��llllllllllllll�lllllll
�IIIIII�IIIII�
I
11115161111661
.666111116116661611616111
�I�IIIIIIIIIIVII�I�IIIIIIIIIIII11111�111I
161166661616611
■166116111191111611111111
'II��I�IIIIIIIIIIIIIIIIIIII
I
�IIIII�IIIII�I
.
196116199
■6111
■666619911111111991116111
1111111111111
�IIIIIIIIIIIIIII�IIIIIIII��
166166616116111
■161696■
111
■11195111
IIIIIIIIIIIII
�I111111111111�IIII111111
11119�81�116�91
■�1�1��9�11991991111191111
�1111�1111111�11���1��111111111111111111I
•
191661111116191
■1616611
■199911111161111
�111111�11�1��1��1111�11111111111111�1111
111111699616616
■111166119119661911169111
�IIII11111111111�I11111111111111111111111
199669119611116
■191991916696111611111111
II11111111111�1�111111111111111111111111
199999191919199
■661666119199661161111111
191199111111111
■
111111111111911191119111
�IIIIIIIIIIIIIII�IIIIIIIIIIIIIIIII1111111
161199169916966
■166619119111111611696111
�111111111111111�II1111111111111111111111
111999999919118
■199919911999991911969111
�
i rirati�y����°
Tennis Courts
L—
t
"LL
Post -K
Pre -K.
Future
Plavaround
i
Design Design kypical User
Concept Cate go ne Grou
1. Community Sized Discovery -4 years
2. Age Group Distribution Range Adventure 5 -12 years
Action 8 -12 years
Action _
Adventure
7
Shade
Structure
NORTH
0 30'
Appendix C
Highlands Park Splash Pad Concept Plan Cost Estimate
Collage Grove. MN
Community Sized Flow -Thru
April 2011
File No OWNS- 11291 -0
Bonestroo
item
Ueft
anlN
E WINOa
P. 81Y Bembution
I wi nmwllnon
nmpaum
1
b,aro
Omen
Crenrmnl8nr
mid,
1
alwv
$BOpB
B. Step Pnpuallm
ale, Weir end Bnewmr 3,auemer
m
1
E25m
Cen tel
alm Weir end em Emblem breast
f3
MOW
Iavnel
a2,5w
111
note
s sine or
m 0
4ao
ffls
Wanat
rc0
Q,aro
$]B.fiW
C. Bllo Improvement
$1(i
$1per
,are Wei It m 5 won
o ft
t
19
$1B,4eB
• BOd
on 0
2,000
fr
3eAm
In(i
"yet
18c0
a,ot
• Pri Tedv
$1,(1
f3,0.tl
necent
$1
52.100
MCmNngency
2
$10000
.120,000
arIry ritedne
11
1
In"
0(Xv
a Drum barn
I,mrpanm
1
Nro2
1`1 ON)
"more
o1N ENmtleE Pmlecf Cost
$8fi.80B
D. s P.a
MO M0
S ystem
I smnen pad plan Eawm > m.mou,end cnmmn
Imrmanm
1
s117$12
a Sent
• Si red suppyplpne
0n.
1.0
m $2e
$12
sm.om
asplann red omin Plana
It
114000)
mrespn.,Pndwmre�mm
ft
4
$14
mow
• Amen umlriaonivm, bitter, bitter, pae eonpnam
wmeanm
$1000
a0o0
• Bplaen bid pwpe
• Spliter,bid event
Wmpaum
1
$1 000
f1,0.tl
ae epaN pW supply tieNWtion 1111 owes new mwi .
Art return; pliunt m! is vwIM
n planing l m W by Cry in a Imure peps
Bike rat are mllnludedm
lo M e be
aouebon and 110 be hmallM by Cry In a imum area
=03AN
E WINOa
00
Vi
Crenrmnl8nr
mid,
1
alwv
$1 un
ale, Weir end Bnewmr 3,auemer
m
1
E25m
Vyet
alm Weir end em Emblem breast
lurbaum
1
E25m
a2,5w
seer, obine
U, I,
unt
W
38100
rc0
Q,aro
$1(i
$1per
on
nump",
1
$a uv
S un
9 permit eerie,
Wmpaum
1
In(i
"yet
pli
BuMWon
$881.p00
MCmNngency
$99000
Eo11m bid COnetrucllm CM
$880.000
10%Tesinu Pe,mils Pnnling,Oeslpn Constru On Aeminls Wn
"more
o1N ENmtleE Pmlecf Cost
MO M0
ae epaN pW supply tieNWtion 1111 owes new mwi .
Art return; pliunt m! is vwIM
n planing l m W by Cry in a Imure peps
Bike rat are mllnludedm
lo M e be
aouebon and 110 be hmallM by Cry In a imum area
Cost Comparison of Splash Pad to Municipal Pool Budget
Expense
Splash Pad
Pool
Personnel
$3,000
$18,700
Commodities
$10,000
$9,200
Services
$13,500
$15,900
YMCA Subsidy
$0
$42,500
TOTAL
$26,500
$86,300
* *Municipal pool budget uses actual 2009 numbers but does not include increased wages for routine overtime pay that is incurred
for such items as weekend start -ups, testing and after -hours call -ins. Pool budget also does not include emergency or large scale
repairs considered an "anomaly' such as pumps, filters, leaking pipes, boiler, and more.
Annual savings of splash pad vs pool operational expenses = $59,800
Return on $500,000 investment into splash pad project = 8.5 years