HomeMy WebLinkAbout2011-07-20 PACKET 04.D.REQUEST OF CITY COUNCIL ACT COUNCIL AGENDA MEETING ITEM # DATE 07/20/2011 a PREPARED BY Engineering Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR COUNCIL ACTION REQUEST Consider awarding the contract for the ED -P8 & ED -P9 Pond Improvements to Hydrocon, Inc. in the amount of $74,255.50. STAFF RECOMMENDATION Adopt the resolution awarding the contract for the ED -P8 & ED -P9 Pond Improvements to Hydrocon, Inc. in the amount of $74,255.50. BUDGET IMPLICATION $ BUDGETED AMOUNT SUPPORTING DOCUMENTS ® MEMO /LETTER: Mike Boex, July 13, 2011. ® RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ❑ OTHER: Bid Tabs ADMINISTRATORS COMMENTS ACTUAL AMOUNT FUNDING SOURCE i City Administrator Date COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER RESOLUTION NO. 2011- RESOLUTION AWARDING QUOTE FOR THE ED -P8 & ED -P9 POND IMPROVEMENTS TO HYDROCON, INC. IN THE AMOUNT OF $74,255.50 WHEREAS, Plans and specifications were completed according to city standards, and WHEREAS, quotes were requested to provide the necessary work; and WHEREAS, two firms sent quotes; and WHEREAS, it appears that Hydrocon, Inc. is the lowest responsible quoter; and WHEREAS, it is the recommendation of the City Engineer that the contract be awarded to Hydrocon, Inc. NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Cottage Grove, County of Washington, State of Minnesota, that the quote for the ED -P8 & ED -P9 Pond Improvements to be awarded to Hydrocon, Inc. in the amount of $74,255.50. Passed this 20th day of July, 2011 Myron Bailey, Mayor Attest: Caron M. Stransky, City Clerk 2335 Highway 36 W St, Paul, MN 551L3 Tel 651 -636 -1600 Fax 651-636 -1311 www.bonestroo.com July 13, 2011 Jennifer Levitt City of Cottage Grove 8635 West Point Douglas Road South Cottage Grove, MN 55016 Re: ED -P8 & ED -P9 Pond Improvements Project No. 000048- 11000 -0 Quote Results Dear Jennifer: Quotes were received for the Project stated above on Tuesday, July 12. Transmitted is a copy of the Bid Tabulation for your information and file. Four contractors were sent invitations to quote the project, and of those two submitted quotes. The following summarizes the results of the quotes received: Contractor Total Base Bid Low Hydrocon,Inc. $74,255.50 #2 Nodland Construction, Inc. $89,987.00 The low Bidder on the Project was Hydrocon, Inc. with a Total Quote Amount of $74,255.50. This is approximately 25% under the Engineers Estimate of $99,000. Earlier this year the City received a grant for this project from the South Washington Watershed District (SWWD) and their Coordinated Capital Improvements Program (CCIP). The SWWD allocated $23,750 to the City to complete this project. Should you have any questions, please feel free to contact me at (651) 604 -4917. Sincerely, BONESTROO, INC. Mike Boex, PE 651.604.4917 0 i a O E Z Z � - V i i 1t C N O O 2 a a a � m y 9 z V H n 2 C V 9 � 9 m F F 0 m m 0 ° 0 0 d 0 6 S 6 W D D � O F W J W N u Vt N LL LL Y V1 LL J Q Q Y Y U VI Q Q t/i LL} {{III� LL W Q W W} W W w p z w O u Z O z o p O 00 0 0o m o d m °oM m a °o M az'^ z4' zri w tt0 �O�^ Z O N O tis O S ° ° o ° z w p S £ 3 .�.. O u G _ N o 0 0 0 o a o o £ oo ^ N m a N o ^ o o Q N o� o M m ° ° ll � rl� Ina d wO ww z F-Wi w 0 0 N W z r w0 W w� �M °zG £ 0 zw z o m d 0 6 S 6 W D D � O F O J J O J O Vt N LL LL Y V1 LL J Q Q Y Y U VI Q Q t/i LL} {{III� LL W Q W W} W W w p z w m d 0 6 S 6 W D D � O F O J J O J O Q Q C Q w p z w O u Z O z o p O w p Gua Z ZK az'^ z4' zri w tt0 �O�^ Z O N O tis O S ¢ z w p S £ 3 .�.. O u G O F G O F 4 £ G j �O�z Z w K £ F z £ a £ Q r o �v1 O w Ina d wO ww z F-Wi w O �- K v� w W z r w0 W �z O °zG £ 0 zw a z o o u w a ¢ = a u p y o> G z o " m> x z u u a G<<£ z o o� o >' u z 3 O O s° O a c° o a O Z 0 1n K m ££ U O 0 0 ¢ K p a o O p z C £ o -- z LL O �tYiNN z s Q O o a z W ££ w a V www JO O OtYiw 4 w 0 w£F £l w .0 w s-u 1-� w1n i��tr wvi E dZ Q F Z � � m i- � w 0 0 0 0 G Q 4 ° N � j O H m in n w F N E In n .. Z o N N C o O � 2 2 9 Q 9 y C � G U a vo.b A 6 O � Z Q F Z � � m i- � w 0 0 0 0 G Q 4 ° N � j O H m in n w F N E In n .. Z N C O � 2 2 9 Q 9 y C � Q F Z � � m i- � w 0 0 0 0 G Q 4 ° N � j O H m in n w F N E In n .. Z NORTH Ei f FAX TRANSMITTAL DATE: TO: -...&(IKE- COMPANY: '�' FAX NO: 6-3Q l FROM: REFERENCE: Cwiz Q NUMBER OF PAGES, INCLUDING COVER PAGE: Due Date: 7/12/2011 4 P -M. CDT THIS QUOTE IS SUBMITTED TO'. Cary olCounge C'mw 7516 Sath StS Cottage Grove, MN, 55016 -3161 No. Item � I f QUOTE FRONT 1y _ drocon, Lnc. Bo 1 AGO 1. DOCUMENT 004 H) ED -P8 QUO'rC' FOR61 FOND ED -1`8 - ED -1`9 RAVLNE IMPROVEMENTS I ' - BONESTROO FILE NO. 45 -10 -000 L5 COTTAGE GROVE, MN _ (� � 5-00, — 00 S 6, 500. --- — --- 2011 Due Date: 7/12/2011 4 P -M. CDT THIS QUOTE IS SUBMITTED TO'. Cary olCounge C'mw 7516 Sath StS Cottage Grove, MN, 55016 -3161 No. Item thlit. Qt} L nit P' T l ED -P8 I ' - MOBILIZATION TEMPORARY CONSTRUCTION ENTRANCE L5 1 g _ (� � 5-00, — 00 S 6, 500. --- — --- 3 REMOVE EXISTING BRIDGE EA I S - --- 500 QQ g 500. MAIN CHANNEL EROSION CORRECTION LS LF 1$ — - b �O- - QQ S 5 SECONDARY CHANNEL EROSION CORRECTION LF 115 $ _ —__- - -3'�0 S _ - - __977. 50 6 EROSION CORRECTION AT FLARED END EA 160S _ 6_. aQ s _ 1., Il4Q._00 RIP RAP 2 $ 2 aQ0_0 s _ 41..040... QO 8 TURF REINFORCEMENT MAT 10 S 145. 1 , 450. SUBTOTAL ED-PS sv ss $ — 8_. -50 s 6 247._50 s22,,365_.00 ED-P9.1 11 REMOVE EXISTING FES EA l4 CRUSH EXISTING RETAINING WALL 2 S 350. QO $ 70 0 . QQ IS SECONDARY CHANNEL EROSION CORRECTION LS 13 400 $ 4�Q_QO 1 6 12" RCP STORM SEINER, CLASS 5 LF LF 405$ 6.-50 S 2.,,,632 - 50 17 12 " RCP FES 84S 32.0 s_ 8.OQ 1 S 48" DIAM. STORM SEWER MANHOLE EA Is _ . Z Q . -QO $ __L,.2QQ_.Q0 19 CONNECTTO EXISTING STORM SEWER EA 1 $— Z ODD —QO $ 00 2.0 O 20 RIP RAP 2 > __ 450.00s 1 TURF REINFORCEMENT MAT Cy I _2 00 ` 00 1 22 CHANNEL SEED AND FERTILIZER Sy 72S $ _$�-- 3 fi I fi 2 ...5,0 ' - EROSION CONTROL AS 0,06 s 4. 50 {�,QQ S V J Q _QQ 1$_750, 00 s 750, 00 SUBTOTAL ED -P9.1 $ _ _ 8 - 1 9, 153.00 — ..........�__ ED -P9.2 2 5 ' TEMPORARY CONSTRUCTION ENTRANCE EA 1 $ 500.00 jQO, O - 6 27 REMOVE TREE REMOVE TIMBERS EA - -- 3 S ,g_ _- __2 5_. S _ 2S MAIN CHANNEL EROSION CORRECTION LS LF 1$ __75_. 500.00 500.0 29 30 CULVERT LF LF 210S 90 S _ 8.50 s 1 785 , 00 24. QO 5 2 16 0 31 TURF TURF REINFORCEMENT MAT ROCK VdIER .2 �_ 2�,_� jSQ LS 1 s 5�0 aQ 00 $ 5 , 000. OQ SUBTOTAL ED -P9.2 $ s 111. 110 u1.IFn.'i elcur C7111, 94101 �I[� FGRM ED -P9.3 �.. SECONDARY CHANNEL EROSION CORRECTION LF t72 $ $ I 1 _8. _ Q Q 33 EROSION CORRECTION AT FLARED END EA I $ _ _6,_5 — 2 O . QU $ _ _ _2 34 CLEAN CULVERT LF 9D s 24.00 $_ 2, 160.0 3F RIP RAP CY SO $ S -0-Q0 36 TURF REINFORCEMENT MAT SY 380 3 _.__I4 _,_00 , S� S _..1� _ 3 2N._00 SUBTOTAL ED -P9.4 S _ S 9 ED -P9.4 37 SECONDARY CHANNEL EROSION CORRECTION LF 230 $_, 6. 50 $ 1. , 4 .0 0 3fi EROSION CORRECTION AT FLARED END EA 1 $ $.__2 QO 39 RIP RAP CY 10 $ _2sQ4Q_94 145 .00 $ 1,45 Q - 00 40 TURF REINFORCEMENT MAT SY 572 S ,...._ 8. 50 $ 4 , 862 . 00 SUBTOTALED -P9.4 $ S._._ 980 7.,_Q0 SUMMARY n:va;u nmr�,m Eck c_?1 0(N11-2 iyocaUi TOTALQUOTE s 74,255.50 Nodiand Construction, Inc. Contract Proposal For 7/12/2011 Pond ED -P8 - ED - P9 Ravine Improvements Cottage Grove, Minnesota Est. Qty Bid Total Description Unit Total Price Price ED -P8 1 Mobilization LS 1.00 $ 3,500.00 S 3,500.00 2 Temporary Construction Entrance EACH 1.00 $ 1,750.00 $ 1,750.00 3 Remove Existing Brige LS 1.00 $ 500.00 $ 500.00 4 Main Channel Erosion Correction LF 115.00 $ 25.00 S 2,875.00 5 Secondary Channel Erosion Correction LF 160.00 $ 25.00 $ 4,000.00 6 Erosion Correction at Flared End EACH 2.00 $ 1,500.00 $ 3,000.00 7 Rip Rap CY 10.00 $ I50m $ 1,500.00 8 Turf Reinforcement Mat SY 735.00 $ 6.00 $ 4,410.00 20 Rip Rap Total ED-P8 10.00 $ 150.00 $ $ 21,535.00 ED -P9.1 11 Remove Existing FES EACH 2.00 S 500.00 $ 1,000.00 14 Crash Existing Retaining Wall LS 1.00 $ 2,500.00 S 2,500.00 15 Secondary Channel Erosion Correction LF 405.00 $ 25.00 $ 10,125.00 16 12" RCP Cl. 5 LF 84.00 $ 35.00 $ 2,940.00 17 12" RCP FES EACH 1.00 S 850.00 $ 850.00 18 48" Storm Sewer Manhole EACH 1.00 - T2 6.00 S 2,500.00 19 Connect to Existing Storm Sewer EACH 2.00 $ 1,500.00 S 3,000.00 20 Rip Rap CY 10.00 $ 150.00 $ 1,500.00 21 Turf Reinforcement Mat SY 725.00 $ 6.00 S 4,350.00 22 Channel Seed and Fertilizer AC 0.06 $ 9,750.00 S 585.00 23 Erosion Control LS 1.00 $ 500.00 S 500.00 Total ED -P9.1 Ell -P9.2 $ 29,850.00 25 Temporary Construction Entrance EACH 1.00 $ 1.750.00 S 1,750.00 26 Remove Tree EACH 3.00 $ 250.00 $ 750.00 27 Remove Timbers LS 1.00 S 500.00 $ 500.00 28 Main Channel Erosion Correction LF 210.00 $ 25.00 $ 5,250.00 29 Clean Culvert LF 90.00 $ 35.00 $ 3,150.00 30 Turf Reinforcement Mat SY 465.00 $ 6.00 $ 2,790.00 31 Rock Weir LS 1.00 S 2.500.00 S 2,500.00 Total ED -P9.2 S 16,690.00 Page 1 Nodland Construction, inc. $21,535.00 Total ED -P9.1 $29,850.00 Total ED -P9.2 $16,690.00 7/12/2011 $11,230.00 ED -P9.3 $10,682.00 32 Secondary Channel Erosion Correction LF 172.00 $ 25.00 $ 4,300.00 33 Erosion Correction at Flared End EA 1.00 $ 1,500.00 $ 1,500.00 34 Clean Culvert LF 90.00 $ 35.00 S 3,150.00 35 Turf Reinforcement Mat SY 380.00 $ 6.00 $ 2,280.00 Total ED -P9.3 $ 11.230.00 ED -P9.4 32 Secondary Channel Erosion Correction LF 230.00 $ 25.00 $ 5,750.00 33 Erosion Correction at Flared End EA 1.00 $ 1,500.00 $ 1,900.00 35 Turf Reinforcement Mat SY 572.00 $ 6.00 S 3,43100 Total ED -P9.4 $ 10,682.00 SUMMARY Total ED -P8 $21,535.00 Total ED -P9.1 $29,850.00 Total ED -P9.2 $16,690.00 Total Ell -P9.3 $11,230.00 Total ED -P9.4 $10,682.00 Base Bid $89,987.00 Date: Page 2 4 8 �_ ° t Y x EROSION CONTROL LEGEND MAIN CHANNEL EROSION CORRECTION (SEE SHEET CROI) SECONDARY CHANNEL EROSION CORRECTION ..................... .d (SEE SHEET 00.01) MnDOT 240 SEED MIX CONSTRUCTION ENTRANCE /EXIT'. RIP RAP NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND - MAINTAINING A STABILIZED CONSTRUCTION ENTRANCE/EXIT - PER DETAIL DRAWING OR APPROVED EQUIVALENT, PAYMENT SHALL BE BY THE UNIT PRICE AND INCLUDE INSTALLATION, MAINTENANCE, AND REMOVAL. 2. THE CITY, OR AUTHORIZED REPRESENTATIVE, NRLL BE CONDUCTING THE REQUIRED EROSION AND SEDIMENT CONTROL INSPECTIONSWEEKLYANDAFTEREACH V, "RAINEVENT. 3. ALL EXPOSED AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO ❑MIT SOIL EROSION BUT IN NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OFTHE SUE HAS TEMPORARtLY OR PERMANENTLY CEASED. 4. RESTORATION OF THE CONSTRUCTION ACCESS SHALL BE INCIDENTAL TO THE PROJECT. S. SALVAGING AND REINSTALLING TOPSOIL WILL BE PAID FOR UNDER THE BID ITEM FOR MAIN CHANNEL EROSION CORRECTION AND SECONDARY CHANNEL EROSION CORRECTION. 6. THE BID ITEM FOR TURF REINFORCEMENT MAT INCLUDES PREPARATION OF TOPSOIL, PREPARATION OF THE SEEDBED, ' FERTRIZER, SEED MIX AND THE TURF REINFORCEMENT MAT. Z. ALL RIP RAP SHALL BE GROUTED ACCORDING TO THE DETAIL ON SHEET 8.01. � [G z � a z p� o a a O o m � a 0 z 0 a INO.IR 10N LATE I W Lu ttt I 1 1 '"x" www.bonestrao,com mBONESTF� 2011 \ S I® LU Q v C� wo:. rvo. aocca cer I C2.O1 EROSION CONTROL LEGEND MAIN CHANNEL EROSION CORRECTION (SEE SHEET C8.01) SECONDARY CHANNEL EROSION CORRECTION is (SEE SHEET CSBI) MIDOT 240 BED MIX CONSTRUCTION ENTRANCE / EXIT RIP RAP 1- 14 . V _/- NOTES: I. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING A STABILIZED CONSTRUCTION ENTRANCE/EXR PER DETAIL DRAWING OR APPROVED EQUIVALENT. PAYMENT SHALL BE BY THE UNIT PRICE AND INCLUDE INSTALLATION, MAINTENANCE, AND REMOVAL 2. THE CITY, OR AUTHORIZED REPRESENTATIVE, WIL BE CONDUCTING THE REQUIRED EROSION AND SEDIMENT CONTROL INSPECTIONS WEEKLY AND AFTER EACH '/z "RAIN EVENT. 3. ALL EXPOSED AREAS MUST BE STABIIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT IN NO CASE LATER THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SUE HAS TEMPORARILY OR PERMANENTLY CEASED. 4. RESTORATION OF THE CONSTRUCTION ACCESS SHALL BE INCIDENTAL TO THE PROTECT. S SALVAGING AND REINSTALLING TOPSOIL WILL BE PAID FOR UNDER THE BID ITEM FOR MAIN CHANNEL EROSION CORRECTION AND SECONDARY CHANNELEROSION CORRECTION. 6. THE BID ITEM FOR ]TIRE REINFORCEMENT MAT INCLUDES PREPARATION OF TOPSOI4 PREPARATION OF THE SEED BED, FERTILIZER, SEED MIX AND THE TURF REINFORCEMENT MAT. 7. ALL RIP RAP SHALL BE GROUTED ACCORDING TO THE DETAIL ON SHEET 8.01. l � 1 11 f www.bonestraosom W BON6lRW 2011 `z - A s 91 0 W o 0 o� i U p 1 �c)� NO, RMSMN VATE cz.os RAVINE STABILIZATION LEGEND 1 , 1 CH NCORRECTION SECONDARY CHANNEL ® EROSION CORRECTION ® EROSION CORRECTION AT FLARED END NOTE: 1. CLEAR AND GRUB WILL BE PERFORMED BY OTHERS. 2, THE CONTRACTOR IS TO PROTECT AS MANY TREES AND SHRUBS AS POSSIBLE. 3. EXCAVATION IS REQUIRED TO OBTAIN THE CROSS SECTIONS SHOWN ON SHEET 08.81. CONTRACTOR SHALL REGRADE AND SHAPE CHANNEL, AND ANY WASTED MATERIAL WILL BE GRADED INTO THE EXISTNG CHANNEL NO MATERIAL IS TO BE HAULED OFFSITE. 3. THE BID ITEM FOR MAIN CHANN EL AND SECON DARY CHANNEL EROSION CORRECTION WILL INCLUDE: SALVAGING AND TEMPORARILY STOCKPILING TOPSOIL, EXCAVATION REQUIRED TO MEET THE REQUIRED CROSS SECTION, GRADING EXCESS MATERIAL INTO EXISTING CHANNEL, AND RESPREADING TOPSOIL, 4. ACCESS TO THE SITE WILL BE LIMITEDTO THE PROVIDED CONSTRUCTION ACCESS SHOWN ON THE DRAWINGS. 5. EROSION CORRECTION AT FLARED END INDUCES: SALVAGING EXISTING RIP RAP, REGRADING AND RESHAPING THE BOWL, P[AOMG SUPPLEMENTAL RIP RAP AND GROUTING. 6. ANY ADDITIONAL RIP RAP PLACED AT RAKED END SECTIONS MUST BE GROUTED. / / s www.bone5troo.mm B BONESiROp 3013 Tv d a qq kk� INVERT a SEE 9 L W W d W pi O a O E W w z m > a q� w r IND.IRev OM DATE 40 BO n I 63, v® _ �. - -- -- WASTED MATERIAL WILL BE GRADED INTO THE EXISTING CHANNEL NO x 8C 4 pp \� MATERIAL IS TO BE HAULED OFFSETS. 3. THE BID ITEM FOR MAIN CHANNEL AND SECONDARY CHANNEL EROSION .E$ CORRECTION WILL INCLUDE: SALVAGING AND TEMPORARILY STOCKPILING TOPSOIL, EXCAVATION REQUIRED TO MEET THE REQUIRED CROSS SECTION, g R W E / GRADING EXCESS MATERIAL INTO EXISTING CHANNEL, AND RESPREADING a �. TOPSOIL.? 4. ACCESS TO THE SITE MILL BE LIMITED TO THE PROVIDED CONSTRUCTION 0 ACCESS SHOWN ON THE DRAWINGS.4 m / 5. EROSION CORRECTION AT FLARED END INCUDE4 SALVAGING EXISTING RIP a RAP, REGRADING AND RESHAPING THE BOWL, PLACING SUPPLEMENTAL RIP `>.B RAP AND GROUTING. 6. ANY ADDITIONAL RIP RAP PLACED AT FLARED END SECTIONS MUST BE GROUTED. , C„T RCP RAVINE STABILIZATION LEGEND MAIN CHANNEL EROSION CORRECTION SECONDARY CHANNEL ® EROSION CORRECTION EROSION CORRECTION J AT FLARED END ^� ww.bonestrW.Mm NOTE: 9BONPST800 ]f111 1. CLEAR AND GRUB WILL BE PERFORMED SPOTTERS. '.• 2. THE CONTRACTOR IS TO PROTECT AS MANY TREES AND SHRUBS AS N `V POSSIBLE. P v J 3. EXCAVATION IS REQUIRED TO OBTAIN THE CROSS SECTIONS SHOWN ON 8 = SHEET C8.0 CONTRACTOR SHALL DEGRADE AND SHAPE CHANNEi AND ANY Ya Z LL cr C7 W F D k- O U i i � O a F m � a a D w w z O w Z O a JWOJAE MION DAIS I E EWEL AVE. Sp APPRo -- - - _ D 110, N� >^ / onbl Scale In CS,0Z V SEE S I X \ A7 'SO RAVINE STABILIZATION LEGEND MAIN CHANNEL EROSION CORRECTION SECONDARY CHANNEL ® EROSION CORRECTION ® EROSION CORRECTION AT FLARED END www.bonutrao.cam NOTE: meorvFSTaoo 1oi1 1, CLEAR AND GRUB WILL BE PERFORMED BY OTHERS. 2. THE CONTRACTOR IS TO PROTECT AS MANY TREES AND SHRUBS AS gg POSSIBLE. §'E 3. EXCAVATION IS REQUIRED TO OBTAIN THE CROSS SECTIONS SHOWN S 9 ON SHEET 0.01. CONTRACTOR SHALL REGRADE AND SHAPE is CHANNEL, AND ANY WASTED MATERIAL WILL BE GRADED INTO THE 6- EXSTING CHANNEL. NO MATERIAL IS TO BE HAULED OFFSITE. a E N 3. THE BID ITEM FOR MAIN CHANNEL AND SECONDARY CHANNEL EROSION CORRECTION WILL INCLUDE: SALVAGING AND g TEMPORARILY STOCKPILING TOPSOIL, EXCAVATION REQUIRED TO € MEET THE REQUIRED CROSS SECTION, GRADING EXCESS MATERIAL a! : a INTO EXISTING CHANNEL, AND RESPREADING TOPSOIL r 8 A 4. ACCESS TO THE SITE WILL BE QMITED TO THE PROVIDED CONSTRUCTION ACCESS SHOWN ON THE DRAWINGS. SALVAGING �- m E _ 5. EROSION CORRECTION AT FLARED END INCUDES: Qg EXISTING RIP RAP, REGRADING AND RESHAPING THE BOWL, PLACING m SUPPLEMENTAL RIP RAP AND GROUTING.�R' a b. ANY ADDITIONAL RIP RAP PLACED AT FLARED END SECTIONS MUST BEGROUTED. -_ _- - - - - ULU SCNDARV CHA NEII,ERO55� A[L I PL W - 2 —� O o z — _ � LLi 1� , Qo i f L9 P b / " B 5o HDrizonmI Scale In Feet / INO.IREVISION DATE 1 �m m. r0000wcw C5.03 1 vTJl�t]FL -CdY �QW E�3 M 3 YM1VYMIMAMLNX� r � 505 FzrU� DROP Va Sn DUaAaAN AM1eeNS .Ul 'U a vnnrrs v„aAa� —(rrP ROCK WEIR DETAIL � ge .rE,,E 9onesfroD 0 CpOPO O n r,0 r x ROCK -6" MINIMUM DEPTH WOODCHIPS-18" MINIMUM DEPTH WASHED ROCKOR WOODCHIPS PER SPECIFICATIONS 18" MINIMUM CUT OFF BERM TO MINIMIZE RUNOFF FROM SITE NOTES. FILTER FABRIC SHALL BE PLACED UNDER ROCK TO STOP MUD MIGRATION THROUGH ROCK. FILTER FABRIC IS NOT REQUIRED UNDER WOODCHIPS. ENTRANCE MUST BE MAINTAINED REGULARLY TO PREVENT SEDIMENTATION ON PUBLIC ROADWAYS. r W NtM�M car "r STAND RDD E(AILE wT aevtaoN. Ica GSVg ��+� C " °A rove STANDARD DETAILS - CONSTRUCTION CTION ENTRANCE nNE 2oas 7BOnestroo f ROCK AND WOODCHIP I COTTAGE GROVE, MINNESOTA ERO^7 pvva All.E SUtt:wD¢ CHANNEL CORRECTION DETAIL Bonestroo ww.banestrw,cwn p BONE5lR002031 E z MANHOLE STEPS, NEENAH R19SU OR EQUAL, 16" ON CENTER. ALUMINUM STEPS APPROVED. PIPE SHALL BE CUT OUT F WSH WITH INSIDE FACE OF WALL NOTE: KOR -N -SEAL MANHOLE OR EQUAL CONSIDERED ACCEPTABLE ALTERNATE. MINIMUM SLAB THICHN ESS IS b" FOR 14' DEPTH. INCREASE THICK NESS I "FOR EVERY uPn 1EQVrx - DETERMINED BY PIPE SIZE REINFORCE WITH 6" X 6" 10/10 MESH. ��+� C " °A rove STANDARD DETAILS PLAN �+f�w¢V�a STORM SEWER JUNCTION JUNE ZOOS Bonestroo MANHOLE COTTAGE GROVE, MINNESOTA PADre�. STO -2 SO THAT OFFSET VERTICAL PORTION 3 OiB 3x030 tt OF CONE 15 FACING DOWNSTREAM. NO BLOCK STRUCTURES ARE ALLOWED. 'Grl w 431 na A.s Ter Zm]t05J uw ��f \ f�� LETTERED, "STORM SEWER", WITH 2 IIwOmSAN WF, 31 _,(�/ / MINIMUM OF 2 ", MAXIMUM OF 12" OF HOPE ADJUSTMENT RINGS nxo e �CMJ S o 4 FITAm _ . m eurni HP ... ®A.zD> 111 MDUrvner fNN�9 SECTION A -A Dr °, cvT.0 rnr- nnremp r � Ga0 C� PIWPP UT X' .. .. el (muWT+AN IDI SECTION B -B reorexr�ze rAAren,vcem ilgP...., = ove FLARED EN DTCAIORRECITON � <'o�lc o e drove 11 6U D E z MANHOLE STEPS, NEENAH R19SU OR EQUAL, 16" ON CENTER. ALUMINUM STEPS APPROVED. PIPE SHALL BE CUT OUT F WSH WITH INSIDE FACE OF WALL NOTE: KOR -N -SEAL MANHOLE OR EQUAL CONSIDERED ACCEPTABLE ALTERNATE. MINIMUM SLAB THICHN ESS IS b" FOR 14' DEPTH. INCREASE THICK NESS I "FOR EVERY SECTION AGE DEPTH GREATER THAN 14', AND - DETERMINED BY PIPE SIZE REINFORCE WITH 6" X 6" 10/10 MESH. ��+� C " °A rove STANDARD DETAILS us HUJRUN: �+f�w¢V�a STORM SEWER JUNCTION JUNE ZOOS Bonestroo MANHOLE COTTAGE GROVE, MINNESOTA PADre�. STO -2 SO THAT OFFSET VERTICAL PORTION OF CONE 15 FACING DOWNSTREAM. z w W U 0 m a GL w a z Z D- a rNOJREISION DATE r APPxovm w . woe+ D C8.01 GROUT BOTTOM OF MANHOLE TO 1/2 DIAMETER AT PIPE AND SLOPE GROUT 2" TOWARD INVERT. �ASTING A B `K RI 692B A ZZ" I J�' MANHOLE STEPS SHALL BE PLACED SO THAT OFFSET VERTICAL PORTION OF CONE 15 FACING DOWNSTREAM. NO BLOCK STRUCTURES ARE ALLOWED. PLAN NEENAH FRAME AND COVER OR EQUAL, LETTERED, "STORM SEWER", WITH 2 CONCEALED PICK HOLES. _,(�/ / MINIMUM OF 2 ", MAXIMUM OF 12" OF HOPE ADJUSTMENT RINGS