HomeMy WebLinkAbout2011-08-10 PACKET 08.A.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 08/10/11
PREPARED BY Engineering Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
W W W W W W * * * * * * W W W W * W * * * * * * W W W W W * W * * * * * W W W Yr W * W * * *
COUNCIL ACTION REQUEST
It is recommended to proceed with the renovation of the Highlands Park Building with an
award for a total construction cost of $132,017.
STAFF RECOMMENDATION
It is recommended to proceed with the renovation of the Highlands Park Building with an
award for a total construction cost of $132,017.
BUDGET IMPLICATION
BUDGETED AMOUNT ACTUAL AMOUNT
ADVISORY COMMISSION ACTION
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES /RIGHTS
❑ ECONOMIC DEV. AUTHORITY
SUPPORTING DOCUMENTS
DATE REVIEWED
APPROVED
DENIED
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
® MEMO /LETTER: Jennifer Levitt - August 5, 2011
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
® OTHER: Bid Tab
ADMINISTRATORS COMMENTS
4 ity "dministrator Date
W W k * * * * * * & * W * W fY W * W * * * * W W * W * W * * k * * * * W * W * W W * * * * * * *
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
RTORMS \Council Action Form.doc
CITY OF COTTAGE GROVE
MINNESOTA
To: Honorable Mayor and City Council
Ryan Schroeder, City Administrator
From: Jennifer Levitt, P.E., City Engineer
Date: August 5, 2011
Subject: Project Award Highlands Park Building Renovation
The City Council on July 20, 2011 approved the plans and specifications for the Highlands
Park Building Renovation. The City Council also approved construction management as the
project delivery method. The results of the quotes are as follows:
oa ` • Z + * I* • • ` •
2 — Excavations
• Excavation of footings
• Provide all required fill material
• BackfilUcompaction
• Rough grade
• Poly vapor barrier
Larson Contracting $6,200.00
4A — Concrete /Masonry Johnny Masonry
• Reinforced steel
• Footings
• Concrete slabs and control joints
Foundation concrete masonry
• Foundation /under slab insulation
• Provide and set anchor bolts
• Interior masonry demolition
Concrete masonry wainscot, sill and finishes
6A — Building Mat'Is
• Sill seal
• Framing materials
• Blocking and bracing
• Wall sheathing
• Air barrier
• Roof sheathing
• Soffit and fascia material
Lamperts
•;a r1
6D — Carpentry Labor Maroushek Custom Building $22,750.00
• All wood framing demolitions
• Shoring of existing porch roof
• Install all materials in package No. 6A
• Install listed toilet accessories and corner guards
7A — Roofing Timmers Roofing & Siding
• Provide and install all roof felt, ice and water shield
• Metal shingle edge, ridge vent and shingles
7B — Insulation Insulation Services
Provide and install all wall and attic insulation
Vapor barriers at wood frame areas
• Insulate baffles, window and doors
• Ridge foam insulation at room 103
8A — Hollow Metal Twin City Hardware
• Provide and install all hollow metal frames
• Provide and install hollow metal doors and hardware
8B — Alum Doors & Wdws Indianhead Glass
6 Provide and install all aluminum windows, doors, and hardware
9A — Drywall Maroushek Custom Building
• Provide and install all gypsum drywall, trim and accessories
9B — Ceramic Tile Eric Almendinger
Provide and install all ceramic tile (wall, base, trim)
• Includes all floor preparation
9C — Flooring Becker Arena Products
• Remove all existing rubber flooring
• Provide and install rubber flooring
• Include floor preparation
9D — Painting & Staining Ken L.orge Quality Painting
• Exterior siding and trim
. Existing exterior concrete masonry
. Soffits and fascia
• Hollow metal frames and doors
. Gypsum drywall
• Plywood interior ceilings
• Existing interior concrete masonry at room 104
10A — Toilet Accessories Twin City Hardware
• Material only — grab bars, mirrors and corner guards.
$2,506.00
$2,372.00
$7,150.00
�
•, r a
11013 — Toilet Partitions Twin City Hardware $ 2,800.00
• Provide and install 1" solid plastic toilet partitions, urinal screens and all related
hardware — partitions to be with continuous support brackets.
15A — HVAC Binder Heating & A/C $6,200.00
• Furnace and all required supply and exhaust piping
• Demo existing furnace
• Modify air distribution system
• Any required gas piping
• Toilet room ventilation
16B—Plumbing Bruce Nelson Plumbing $13,000.00
• High /low drink fountain
• Urinal with automatic flush
• Wall mount water closets with automatic flush
• Wall mount lavatories with motion sensors
• All required faucets and trim
• Floor drains
• Frost proof sillcock at east and south exterior
• Stub piping out for future drink fountain at splash pad area
• Demo existing toilet fixtures and required piping and mounting hardware
• Demo existing exterior and interior drink fountains
• Concrete cutting and patching
16A — Electrical Keller Electric $7,570.00
• (2) hand dryers with motion sensors
• (2) bath fans
• Wire furnace
• Interior gfi outlets
• Exterior gfi outlets
• Exterior porch lighting with occupancy sensors
• Toilet room surface mount fluorescent lighting with occupancy sensors and switched
override
• Surface mount fluorescent fixtures at rooms 101 and 104 on 3 -way switching
• Convenience outlets
• Demo existing electrical as required
The engineers estimate for the construction cost was $147,900. The total project cost with
construction and design services is $149,517.00 as shown in the attached bid tab.
Recommendation:
It is recommended to proceed with the renovation of the Highlands Park Building with an
award of the project to the above listed quoters for a total construction cost of $132,017.
HIGHLANDS PARK ACTIVITIES BUILDING
CITY OF COTTAGE GROVE, MINNESOTA
STATEMENT OF CONSTRUCTION COSTS
RVK ARCHITECTS
AUGUST 03, 2011
DESCRIPTION
CONTRACTOR
SCHEDULED VALUE
General Conditions
$ 1,500.00
Architectural Fees
RVKArchitects
8,500.00
Const'n Management Fees
RVK Architects
9,000.00
Excavations
Larson Contracting
5,200.00
Concrete & Masonry
Johnny Masonry
26,920.00
Building Materials
Lamperts
16,464.00
Carpentry Labor
Maroushek Custom Building
22,750.00
Roofing
Timmers Roofing & Siding
2,506.00
Insulation
Insulation Services
2,372.00
Hollow Metal
Twin City Hardware
6,420.00
Aluminum Doors & Windows
Indianhead Glass
7,150.00
Drywall
Maroushek Custom Building
800.00
Ceramic Tile
Eric Almendmger
2,370.00
Flooring
Becker Arena Products
4,995.00
Painting and Staining
Ken Lorge Quality Painting
2,560.00
Toilet Accessories
Twin City Hardware
440.00
Toilet Partitions
Twin City Hardware
- 2,800.00
HVAC
Binder Heating & A/C
6,200.00
Plumbing
Bruce Nelson Plumb'g & Heat'g
13,000.00
Electrical
Keller Electric
7,570.00
TOTAL
$ 149,517:00