Pursuant to due call and notice thereof, a regular meeting of the Planning Commission was duly
held at City Hall, 7516 — 80th Street South, Cottage Grove, Minnesota on the 24th day of July,
2006, in the Council Chambers and telecast on local Government Cabie Channel 16.
Call to Order
Chairperson Brittain called the meeting to order at 7:00 p.m.
Roll Call
Members Present: Shane Bauer, Ken Brittain, Jason Cavallo, Tina Folch-Freiermuth,
Rebecca Kronlund, Tracy Poncin, David Thiede
Members Absent: Rod Hale, Chris Reese
Staff Present: Howard Blin, Community Development Director
John M. Burbank, Senior Planner
David Boguslawski, Planning Intern
Ben Pierson, Planning Intern
Mark Grossklaus, City Councii Liaison
•... • ► �+- ,.
Brittain announced that the applications for Everwood and driveway setbacks will be contin-
ued to the August meeting.
Mofion by Bauer, second by Thiede, to approve the agenda. Motion approved unani-
mousiy (7-0 vote).
Open Forum
Chairperson Brittain asked if anyone wished to address the Planning Commission on any non-
agenda item. No one appeared to address the Commission.
Chair's Explanation of the Public Hearing Process
Chairperson Brittain explained the purpose of the Planning Commission, which serves in an
advisory capacity to the City Council, and the City Council makes aIl final decisions. In addi-
tion, he explained the process of conducting a public hearing and requested that any person
wishing to speak should come to the microphone and state their full name and address for the
public record.
Public Hearings and Application Reviews
Planning Commission Minutes
Juiy 24, 2006
Page 2 of 18
6.1 Stewart Dog Kennel — Case CUP06-028 (continued from 6/26/06)
Allen and Christine Stewart have applied for a conditional use permit to allow a dog
�oardirg kenrei at 9435 Kimbro Avenue �outh.
Boguslawski summarized the staff report and recommended approval subject to the condi-
tions stipulated in the staff report.
Cavallo asked if the building would air conditioned. Boguslawski responded that there would
be air conditioning. Cavallo asked if the unit would be shielded from view.
Chris Stewart, 6750 Jamaica Avenue, stated that the air conditioner would be a ground unit
located at the back of the building.
Cavallo asked if the applicants would need approval for any future signage. Blin responded
that a permit is required for any signs.
Bauer asked about the size of the building and where the office and bathroom would be lo-
cated. Stewart responded that the office and bathroom are located in the drop-off/pick-up
area. The reason for the two different sizes noted in the staff report is that one is just for the
building and the other includes the overhangs. Bauer about the state subdivision exemption
statutes. Blin responded that state Iaw allows any parcel 20 acres in size or greater to be sub-
divided without city approval for agricultural uses.
Poncin asked if the farm fields on the north and south of the parcel would remain as farm
fields and is the area going to remain agricultural in the master plan. Blin responded that in
the 2020 Comp Plan, the area is guided for agriculture. As we move into the next comp plan
update we will look at that area, but he believes that it will for the foreseeable future it will re-
main agriculture.
Brittain opened the public hearing.
Richard Borner, 9017 Lamar Avenue South, speaking on behalf of his mother Violet Borner,
stated that he sent a letter of concern to the Commission. He is not satisfied with the noise
that could occur from the kennel. He stated that it would take awhile for the landscaping that is
being added to help mitigate the noise to grow enough to help. He stated that it is quiet out
there and he can hear dogs barking now, so if there are going to be 20 additional dogs, there
will be more noise.
No one e/se spoke. Brittain c/osed the public hearing.
Thiede asked Stewart about the noise issue. Stewart responded that they will be living on the
property and don't want to listen to dogs bark either. The dogs won't always be permitted to
be outside. She explained that she has watched dogs at her current residence and they get
used to being there and don't bark much. Thiede asked if there was any way to monitor the
noise levels or establish decibel limits, as a condition. Blin responded that the city could re-
quest periodic monitoring as a condition. He stated that sometimes what meets noise stan-
dards in terms of decibel levels is still audible.
Planning Commission Minutes
July 24, 2006
Page 3 of 18
Folch asked if there was recourse the neighbors would have through the city if the noise from
too much barking. Blin responded there was.
�auer made a r►sotion t� approve the application subjecf to the conditions lPSted be{�w
with an added condition regarding monitoring decibel levels. Thiede seconded.
1. The facility plans shall be modified to reflect the requested changes identified in the
statf report prior to issuance of a building permit.
2. Afi appticable permits (i.e., building, electrical, grading, mechanical) and a commercial
plan review packet shall be completed, submitted, and approved by the City prior to
commencement of any construction activities. Detai/ed construction plans sha/i be
reviewed and approved by the Building O�cia/ and Fire Marshall.
3. Final exterior construction materia(s and colors shall be reviewed and approved by
the Planning Department prior to the issuance of a buiiding permit.
4. Feed must be properly stored in a manner that does not promote rodent problems.
5. If the property is ever subdivided or reaoned to a non-agricultural zoning classifica-
tion, the use must be discontinued and the huilding sizes reduced to be in com�sli-
ance with the accessory structure sfandards applicable at the time of the change of
status of the properEy.
6. The appiicant provide fhe City with an as-built survey of the property.
7. The designated vehicle/trailer parking area on the site must be screened with land-
scaping. The landscaping plan must address the items identified in the staff report.
Said plan will be reviewed and approved hy the Planning Division prior to tne issu-
ance of a building permit. A bona fide cast estimate of the (andscaping improve-
ments must be submitted in conjunction with a/etter of credit approved by the City
in the amount of 150 percent of such estimate. Upon compleYion of the landscaping
requirements, the applicant must in writing inform the City that said improverrtents
have been completed. The City will retain the financial guarantee for a period of one
year from the date of notice to insure the survival of the plantings. No building per-
mit will be issued until the required financial guarantee has been received and
accepted by fhe City.
8. A surface water management depression be creafed on the site to manage the sur-
face water guality and quantity changes created by the addifional hard surface areas
on the site. The depression design must meet current city development standards
and be approved by the City Engineer.
9. The signage on the site is limited to a monument sign that does not exceed 32
square feef. Prior to the issuance of a building permit, the applicant must submit a
comprehensive sign package to the City for review and approval.
90. The designated parking area and drive aisle be installed as a dry dustless surface.
Planning Commission Minutes
July 24, 2006
Page 4 of 18
11.A11 outdoor lighting shall be directed downward and away from residential property
and public streets and shall not exceed .5 footcandle at the property lines.
12.If �xcessiv� od�rs, rodent infestations, traffic accidents or other operafi�ral issues
are brought to the attention of the city, it wi!! be probable cause for City Council re-
view and modification of the conditions for operation of the conditional use permit.
This review may result in amendment or revocation of the conditional use permit.
Motion passed unanimously (7-to-0 vote).
6.2 Oak Cove — Cases CP06-038, ZA06-039, PP06-040
Summit Ridge Two Company has applied for a comprehensive plan aanendment to expand
the Metropolitan Urban Services Area (MUSA) boundary and to change the land use des-
ignation of 8.63 acres of land from Rural Residential to Low Density Residential; a zoning
amendment to change the zoning from R-2, Residential Estate, to R-2.5, Residential; and a
preliminary plat for Oak Cove, which creates 12 single family lots and one outlot on land
located south of Timber Ridge 5th Addition on Burr Oak Cove.
Burbank summarized the staff report and recommended approval subject to the conditions
listed in the staff report.
Brad Gonyea, Summit Ridge Two Company, 211 River Ridge Circle South, Burnsville, stated
that one of the things discussed at the open house was the Bocation of the house pad on the
first lot on the east of the road. He stated that they would move that lot to preserve more of the
higher value significant trees and improve drainage.
Cavallo asked if the name of the proposed project could be changed to something like
Camel's Hump Ridge to keep with the traditions of our city. Gonyea stated that Oak Cove Ad-
dition is more marketable than Camel's Hump.
Brittain asked if there would be a gutter inlet with the extension of curb and gutter, to help with
standing water. Burbank stated that there would be a catch basin about 20 feet south of the
property line that would pick up drainage occurring in the street, and some of the other drain-
age would go into the drainage swale along the back of one of the lots, which could be ex-
tended around some of the trees that are proposed to be saved.
Thiede asked if Outlot A was intended to be a water catch basin. Burbank responded that was
the surface water management pond.
Kronlund asked about traffic concerns. Burbank responded that based on the existing subdivi-
sion with Iocally designed street, the additional trips in the neighborhood would probably not
be noticed. Another issue that was raised during the neighborhood meeting was the access to
the entire neighborhood, which is off 73rd Street and off Meadow Grass Avenue by West
Draw Park. There was also a question if an additional access could be found for the neighbor-
hood. Burbank explained that when the Timber Ridge neighborhood to the north was platted,
public right-of-way was proposed into the Hidden Oaks neighborhood; however, it was finally
approved as an emergency access/trailway. Kronlund asked if that would ever become a
roadway access, noting that there is another proposed development that would bring a signifi-
Planning Commission Minutes
July 24, 2006
Page 5 of 18
cant increase in traffic. She also asked if it was decided that another access point was
needed, where it could be located. Burbank responded that the trailway is platted as right-of-
way, but it was constructed as a trailway. He stated that no other access points could be cre-
ated because of t�e steep bluffs to tt�e south and east of the property.
Thiede expressed concern about the location of the park at the end of a residential area. Blin
responded that staff have talked with Public Safety about that, and there will be patrols at
night to check the park.
Brittain opened the public hearing.
Patricia Brick, 6803 — 74th Street South, stated that she would not be in favor of changing the
land use from rural residential to low density residential. They would prefer having the five lots
allowed under the current zoning than the 12 houses proposed. She thanked the developer for
moving the house pad.
BiII Schumal, 7420 Burr Oak Cove, stated that he is against the proposal. He stated that when
they moved in they were aware that the area could be developed with five or six acreage lots,
like the Hidden Oaks subdivision. He is concerned about tree preservation. He believes that it
was a good choice to relocate the house pad, which would save some 80 year old oak trees.
He asked how the developer is planning to prevent the spread of oak wilt disease. He then
expressed concern about the roadway into the park, asking that it not be a straight shot from
Timber Ridge to the park; crime in the area; mosquito control by the pond; and the four-foot
fence on the 10-foot retaining wall around the pond.
Cavalio asked about the proposed Iot sizes. Burbank responded that the smallest lot size was
13,000 square feet with the Iargest 53,000 square feet. He stated that the lots in the Timber
Ridge development were in the 13,000 to 16,000 square foot range. The proposed lots would
be similarly sized but slightly bigger than what is in the neighborhood to the north.
No one e/se spoke. Brittain closed the public hearing.
Cavallo asked if this application was denied would the developer be interested in doing a de-
velopment with five lots that wouid meet the current zoning standards. Gonyea responded that
they have looked at that option in the past but they would not develop that type of subdivision
at this time.
Gonyea stated that the 10-foot retaining wall by the pond was brought up at the neighborhood
meeting, noting that they will continue to work with staff on the pond. He explained that the
fencing that they are required to put on top wouid be a black coated chain fence. He explained
that they have explored other options for the pond, but those would require the removal of
more trees. Burbank explained that the city's surface water management plan follows the
state guidelines.
Thiede asked about the possibility of creating a creek to take that water away and pool it fur-
ther downhill. Gonyea stated that erosion is great concern with creeks and the maintenance
costs can be high.
Planning Commission Minutes
July 24, 2006
Page 6 of 18
Brittain asked about mosquito control policies. Burbank responded that mosquito control is
done at the state level. He stated that the design of the pond is still being worked on, but
maybe it could be designed to hold water sooner. Blin stated that the Metropolitan Mosquito
Control �istrict typically treats these ponds.
Molly Schumal, 7420 Burr Oak Cove, stated that they did not move near a pond on purpose
and she is concerned about chiidren's safety near the pond, particuiarly how kids would get
out of the pond if they fell in with the ten-foot retaining wall. Burbank stated that ponds are de-
signed with maintenance and vegetative benches so there is not a sheer drop off into the
water.
Brittain asked about the grades on the other sides of the pond. Cody Ilertson, Boland Survey-
ing and Engineering, stated that he is one of the engineers working on this project. He
explained the grades in the area of the pond. Brittain would like to see if there is some way to
minimize the 10-foot wall.
Folch asked why this area was originaliy designated as an R-2 zoning district. Burbank re-
sponded that in the comprehensive plan compieted in the 1970s and early 1980s, the whole
West Draw area was slated for development. As the City was updating the comprehensive
plan in the late 1980s and were looking to stage development into the West Draw, there was
neighborhood opposition to the proposed plans. As a result of the opposition, compromises
were made and the areas identified for urban growtn were smaller than what was in the origi-
nal comprehensive plan. Since that planning process was complete, there have been several
decisions made by the City to provide urban services to this area and utility projects com-
pleted. Blin stated that at that time there were concerns about whether the sewer would be
deep enough to serve these properties, but it was constructed deep enough. Folch asked if
the developer purchased the land knowing what the zoning was with the intention of rezoning
it so there would be a higher volume of homes. Gonyea stated that the when they purchased
the property, the parcel to the north, which they also owned at that time, had not yet devel-
oped and they did not know whether or not it could be served by utilities. Once it was deter-
mined that the sanitary sewer was deep enough to serve the property, they proposed to hook
onto city utilities.
Poncin asked if their company developed Timber Ridge. Gonyea responded tnat they worked
with Pulte Homes on the design of the subdivision, but Pulte bought the entire parcel and de-
veloped it themselves. Poncin asked if the home styles for the development would be consis-
tent with the existing neighborhood. Gonyea responded that they have not yet talked with any
builders, but they intend the lots to be custom lots with custom house designs that would be at
least the value of the existing neighborhood.
Brittain asked if they intend to have a monument sign. Gonyea responded that with only 12
lots and the extension of a street with a park at the other end, it was not important for them to
identify the development as separate from the existing neighborhood. Brittain asked the re-
sponsibiiities the arborist that the applicant must retain would have regarding tree removal.
Burbank responded that as part of the tree removal process prior to grading, the developer's
representatives, engineers, staff, the deveioper-paid arborist, the tree grading contractor, and
the grading contractor meet on site to waik the perimeter and the areas that are to be saved.
In the case of the Timber Ridge 4th subdivision, they saved additional through this process.
Planning Commission Minutes
July 24, 2006
Page 7 of 18
Kronlund asked if there were concerns voiced by the homeowners at the public meeting about
tree preservation and if the developer feels that they have adequately addressed those con-
cerns, particularly on the east side where there are not as many trees. Burbank explained cri-
teria in the city's tr�� preservation ordinance. He believes that the tleveloper is maRi�r� a�cc�
effort preserving as many trees as possible.
Brittain made a motion to approve the applications subject to the conditions listed be-
low, adding that the staff and applicant work to reduce the height of the retaining wall.
Poncin seconded.
1. The revised preliminary plat must conform to the preliminary plat dated June 20,
2006 with the addition of an outlot for trailway corridor purposes in the southeast
corner of the plat and any ponding outlot modifications, as coordinated with
P(anning staff.
2, The developer must petition the City for public improvements and enter into a
subdivision agreement with the City for the installation of and payment for all public
improvements in the subdivision and adjacent pubtic roadways, pursuant to Title 10
of the City Code.
3, The applicant receive appropriate building permits from the City, and permits or ap-
provals from other regulatory agencies including, but not limited to, the South
Washington Watershed District, DNR, and the Minnesota Pollution Control Agency.
4. The revesed grading and utility plan must be submitted to Cify staff for review and
approval prior to the submission of the fina! plat plan applications to the City. All
emergency overflow swales must be identified on the grading and erosion control
plan. Drainage calculations must be submitted prior to City Council review of the
preliminary plat.
5. The applicant must submit a final construction management plan that includes ero-
sion control measures, projecf phasing for grading work, areas designated for pres-
ervation, a crushed-rock construction entrance, and construction-re/ated vehicle
parking for staff review and approval prior to issuance of a grading permit.
6. A pre-construction meeting with City staff and the contractor must be held before
site work begins. The contractor shall provide the City with a project schedule for
the various phases of construction.
7. Erosion control devices must be installed prior to commencement of any grading
activity. Erosion controt shall be performed in accordance with the recommended
practices of the "Minnesota Construction Site Erosion and Sediment Control Ptan-
ning Handbook" and the conditions sfipulated in Title 10-5-8, Erosion Control
During Construction, of the City's Subdivision Ordinance.
8. The developer must pay for required public improvements, all trailway improvement
costs, stop signs, area charges, park dedication fees, and the required off site cul-
de-sac roadway installation costs.
Planning Commission Minutes
July 24, 2006
Page 8 of 18
9. Outlot A and the required trailway corridor outlot must be conveyed to the City of
Cottage Grove at the time of recording the final plat.
;O.�ark d��ication requireen�rrt� �ri{! be rnet t.hr�vgh a cash �ayrr,er�t, vrjti; t.`,e fcta6
amount based on fees in effect at the time the fina! plat is approved.
11. The developer must install sidewalks conforming to City sfandards atong the east
side of the public streets as identified in the staff report, and eight-foot wide bitumi-
nous pathways as determined on the final grading plan. Damage to sidewalks
during the home construction process sha!! be the responsibility of the developer.
The applicant will pay 1 DO percenf of the cost for development of recreation trails on
all publicly dedicated land.
12. Tree mitigation is required in accordance with ordinance criteria.
13.An additional four yard tre2s and ten shrubs must be planted on each residential lot.
14. The applicant must hire a city-approved arborist to assisf with al! facets of tree
preservation on the site. The arborist will supervise installation and maintenance of
tree preservation fencing and the tree and brush removal process. Mitigative meas-
ures to aid in preservation of trees slated to remain widl occur based upon the rec-
ommendations of the arborist Should trees designated for preservation be
removed, the applicant will replace the trees in accordance with the ordinance crite-
ria. Trees designated for preservation which are found to be harmed, diseased, or
dying, or are not suited for location into the project may be removed based upon the
recommendation of the arborist in agreement with the City and the applicant Trees
removed will be replaced as required by ordinance. The developer must install snow
Pencing or similar fencing material around ali trees or groups of trees that are to be
preserved prior to any grading activity on the site,
15. The applicant must submit appropriafe engineering information for retaining walls.
Any fencing on retaining walts must be decorative and subject to staff review and
approval.
16.A stop sign must be instalied at any /ocations deemed appropriate by the city engi-
neer based on the sign installation requirements adopted by the city.
17. The final street name identified on the final plat must be consistent with the prelimi-
nary ptat.
18, Al1 monumenf signs
on private property.
nance of a!I signs.
must comply with the City's Sign Ordinance and only be placed
The Homeowners Association is responsible for the mainte-
19. The applicant must submit private covenants which details the following:
The homeowners association is responsible for ali ownership and mainfenance
of landscaping improvements, fencing, and autlots as depicted on the final plat.
Monument signs wi!! be maintained by the homeowners association.
Planning Commission Minutes
July 24, 2006
Page 9 of 18
• Any fencing provided on the site will be constructed of materials that are uniform
in design and color.
• AI! signs, mailboxes, and accessory lighting will be uniform in materials and de-
sic�r� antf f�e �pproved as part of the fandscape pian.
20. The developer must advise homebuyers that they are responsible fo maintain the
boulevard area that abuts their property ali the way to the curb of the street.
29. The developer is responsible for street sweeping responsibilities or the costs for the
entire designated construction haul route to 70th Street during the development of
the subdivision.
22. The final plat will incorporate all comments inc/uded in the July 19, 2006 memoran-
dum from the City's consulting engineer.
Motion passed on a 6-to-1 vote (Cavatto).
Cavallo stated that his objection to the application is that he is opposed to rezoning property
when citizens are opposed to it. He believes that the city is making a promise and agreement
to its citizens with zoning and guiding of a property.
6.3 Gaalswyk Stable — Case CUP06-037
Richard Gaalswyk has applied for a conditional use permit to allow construction of a 42-
foot by 60-foot stable that is 22 feet high at 7160 Lamar Avenue South.
Burbank summarized the staff report and recommended approval subject to the conditions
stipulated in the staff report.
Richard Gaalswyk, 7160 Lamar Avenue South, expiained the reasons for his request for a
conditional use permit and variance based on the zoning and the use of the property. He de-
scribed the proposal and displayed photos and drawings of his property and the surrounding
area. He stated that the existing building, which he would be replacing, was used as a garage
and he received variances that allowed him to add two lean-tos to the structure. He noted that
the structure now has a ramshackle appearance and the aesthetics of the new building is one
of the reasons why he wants to buiid the proposed stable. He stated that the structure would
be shielded from the road by trees and shrubs. He described the stable noting that it would
have wood siding that was painted a dark brown with a dark green roof, which wili help it
blend in to the surrounding area. He wili also re-paint his remaining structure with similar col-
ors. The new building would be used for his horses and to store equipment.
Brittain opened the public hearing. No one spoke. Brittain closed the public hearing.
Thiede made a motion to approve the conditional use permit suBject to the conditions
listed below. Cavallo seconded.
9. The vegetative screening on the site from adjacent properties and the public right-of
way must be maintained to at least 50 percent opacity at all times.
Planning Commission Minutes
July 24, 2006
Page 10 of 18
2. The proposed building height of fhe new sfructure must not exceed 22 feet.
3. The maximum square footage for the site for the two detached accessory buitdings
is l:mited to 3,454 square feet.
4. ln accordance with the ordinance criteria, a garden or tool shed of up to 160 square
feet will be allowed in addition to the detached accessory structures.
5. lf future site development renders the structure nonconforming, the buitding must
be brought into compliance or removed as a condition of the development approval.
Motion passed unanimously (7-to-0 vote).
6.4 American Motor Sports Bar & Grill — Cases CUP06-046 and V06-047
American Motor Sports Bar & Grill, 7240 East Point Douglas Road, has applied for a condi-
tional use permit to expand the restaurant with liquor by 55 seats and a variance for mini-
mum parking requirements.
Blin summarized the staff report and recommended approval subject to the conditions stipu-
lated in the staff report.
Tom Shannon, 6240 Ideal Avenue South, asked if the Commission had any questions. Bauer
asked about the capacity of the restaurant. Shannon responded that they are currently al-
lowed 151, but have only 130 seats; they are hoping to get 40 to 50 in the banquet room and
about 12 more in the lounge area.
Brittain opened the public hearing.
Dan Pendar, 7473 — 96th Street South, stated that he frequents the restaurant and is in favor
of this proposal. He expressed concern about the maintenance and appearance of strip malls
in the city.
No one else spoke. 8rittain closed the public hearing.
Thiede asked if there would be any changes to the front elevation. Shannon responded there
would not be any changes to the elevation and the door to the nail salon will be kept for emer-
gency exit only.
Brittain asked if the fascia has a color transition between the two spaces. Shannon responded
yes, but they are not pianning to change that. Brittain asked if it would be evident from outside
that this additional space is part of the restaurant. Shannon responded that they may put
some screening on the windows as they have on the original space and add some signage.
Brittain asked who is responsibie for the front face aesthetics. Shannon responded the prop-
erty owner.
Bauer made a motion to approve the application subject to the conditions listed below.
Cavallo seconded.
Planning Commission Minutes
July 24, 2006
Page 11 of 18
1. The restaurant must not exceed a capacity of 210 seats.
2. Afl other conditions of CUPO4-009 must continue to be met.
Motion passed unanimously (7-to-0 vote).
6.5 Ichor Creative Stone — Case SP06-042
Vanguard Construction, on behalf of Ichor Creative Stone, has applied for a site plan re-
view of a 42,336 square foot building to be located in the Industrial Park on the west side
of Hemingway Avenue north of 100th Street and south of 97th Street.
Blin summarized the staff report and recommended approvai subject to the conditions stipu-
lated in the staff report.
Craig Moss, Vanguard Construction, 2350 Wycliff, St. Paul, stated that he is representing
Ichor Creative Stone. He stated that the owners incorporated granite into the fa�ade of the
building. The front of the building would be pre-cast, EFIS material, with granite slabs
mounted on pilasters to accent the entry way. He stated that there would be a customer show-
room consisting of 4,500 square feet. He explained that they currently occupy about 20,000
square feet of space in Mendota Heights and are looking at occupying 32,000 square feet of
this facility with a potential tenant taking the rest.
Bauer asked about noise control and what hours the manufacturing would be done. Moss
stated that all manufacturing and fabricating is done within the building and their hours of op-
eration begin at 7:00 a.m. Depending on the time of year and their workload they could work
inside until 8:00 or 9:00 p.m. The majority of their work in the fabricating shop would be cutting
and polishing the stone, which is then loaded into trucks that are staged at the docks over
night and taken out to the job sites in the morning.
Cavallo stated that he was disappointed that the owners of the business were not present to
answer questions regarding the hours of operation, traffic, growth, pay of the jobs, and noise,
because this lot is right next to a residential area. He is also concerned about the commercial
aspect of the business, which will add weekend hours and retail traffic, and the increase in
semi-truck traffic on 95th Street and Hadley Avenue. Blin stated that Vanguard is developing
the project and the tenant is Ichor Creative Stone. In terms of truck traffic, most of the trucks
use the Jamaica interchange with Highway 61 and travel south on Jamaica to 100th Street to
Hemingway. Cavallo stated that he is still concerned that some trucks will utilize Hadley Ave-
nue to get to 100th Street. He is also worried about the number of employees at the business.
Moss stated that they plan to employ 20 people and possibly increase that to 30 to 40 em-
ployees. He explained that currently the business gets one to two semi-trucks a month that
bring in bundles of granite slabs. The install trucks are simiiar in size to a UPS truck.
Burbank stated that several years ago he toured a granite facility similar to this in St. Cloud
and the noise from the machinery is nothing that would be unexpected in an industrial park.
Cavallo is still concerned about the noise. Brittain noted that the potential tenant or storage
space would create additional buffering between the manufacturing area and the residential
neighborhood.
Planning Commission Minutes
July 24, 2006
Page 12 of 18
Srittain opened the public hearing.
Dan Pendar, 7473 — 96th Street South, stated that he Iives in the development behind the
pro�osed �uildin�. �iis co�cerrs i�clu�e roise, waste, hours of operatior, ^and ii ti�is busi��ess
is appropriate for the area. He stated that he was not aware that there would be commercial
uses in the area and thought it would be all industrial. He stated that any business locating in
the industrial park should have good wages and provide tax benefits to the city. He asked
what happens to the building if the business fails.
Moss responded that there is an area in the facility that is designated for remnants, which are
used for smaller installations. They will also have a dumpster in a trash enclosure right outside
one of the loading docks on the north side of the building. He then explained that the owner of
the company plans on providing a decent wage for the employees; they instali granite counter
tops in residential homes so wages would be consistent with that market. He stated that if the
company no longer exists in five or ten years, the building would be marketable to another
company.
Cavallo asked who is responsible for maintaining the current tree Iine. Blin responded that
most of those trees are on the industrial property, so the maintenance is the responsibility of
the owners of the industrial properties. Cavalio asked about the penalties if a tree dies, and do
they need to have a plan in place for tree maintenance before the project is approved. He ex-
pressed concern about the buffering between the residential and industrial uses, noting that it
could be at least 10 years before the new trees would be of sufficient size. Blin explained that
it is a rough windrow of trees and there isn't any plan to cull out any dead trees. The idea is to
deepen it out with new plantings and let it grow naturally.
No one else spoke. Brittain closed the public hearing.
Bauer asked if that was just one row of trees. Blin responded that there are about 40 to 50
feet of trees.
Brittain stated that if you walk the site, you can see the majority of the houses on the other
side of the tree line. He also noted that there will be a berm constructed between the buildings
and the trees.
Cavallo asked if there was an average e�erior decibel level for this kind of manufacturing. Blin
responded that the city does have decibel standards. Cavallo asked if the industrial park has
hours of operation or could businesses manufacture 24 hours a day. Blin responded that there
are no set hours of operation for the industrial park. He stated that if noise Ievels outside the
building become a problem, the city would deal with that. Moss stated that currently they are
open a coUple days a week untii 8:00 p.m. and noon to 6:00 p.m. on Saturdays.
Thiede made a motion to approve the application subject to the conditions listed below.
Folch seconded.
Bauer asked if a condition could be added regarding additional tree plantings or landscaping
on the south side of the building. Thiede agreed to amend his motion to add a review of the
plantings on the south side of the building.
Planning Commission Minutes
July 24, 2006
Page 13 of 18
Motion passed on a 6-to-1 vote (Cavallo).
Cavallo stated that he has a hard time approving the application with the owners of Ichor not
in attendar�ce as he has a lat af questions about their operatior. He waul� not be so cor-
cerned about this project if it was being built in the center of the industrial but because it is so
close to the residential area, he wants to have an understanding of its impact on the residents
in the area.
6.6 United Church of Christ
Cottage Grove United Church of Christ has applied for an amendment to their conditional
use permit to allow additions to their building and parking lot at 7008 Lamar Avenue
South.
Blin summarized the staff report and recommended approval subject to the conditions stipu-
lated in the staff report.
Ron Bonnevier, 6301 Oakwood Road, Woodbury, stated that he is the project coordinator for
the church. He explained that they are adding 5,700 square feet over two levels to increase
the narthex, move the offices into the church building, and make the current part of the build-
ing more handicapped accessible. The size of the sanctuary is not planned to be increased.
Blin stated that staff based the required number of parking spaces on the size of the sanc-
tuary.
Brittain asked if anyone wanted to speak regarding this application, noting that the public
hearing will be held by the City Council at their meeting on August 9, 2006.
Richard Gaalswyk, 7160 Lamar Avenue South, spoke in favor of the project and urged the
Planning Commission and City Council to approve it.
John Perkins, 10723 �ehigh Road, explained the process the church used to come up with
their proposed improvements. He stated that they had planned to start construction in May of
this year but were delayed by banking issues. They would like to get going on the project as
soon as possible.
Reverend Obid Hofland, 11130 — 70th Street South, stated that he has been the pastor of the
Church for almost 16 years. It has been his dream to remodel and add to this churcn.
Thiede asked why the east driveway was being moved to the south. Blin responded that it
moves the driveway further from 70th Street.
Cavallo made a mofion to approve the application subject to the conditions listed be-
low. Thiede seconded.
1. All site and building improvement� must coniorm to ptans dated June 26, 2006.
2. All applicable permits (i.e., building, elecfrical, etc.) musf be applied for and issued
by the City prior to any work or construction taking p/ace.
Planning Commission Minutes
July 24, 2006
Page 14 of 18
3. A right-of-way permit must be obtained from the Washington County Public Works
Department and Cottage Grove Public Works Department for relocating the existing
driveways and construction of new driveways.
4. A combination of trees and bushes/shrubs be ptanted along the south side of the
Church's parking lot to mitigate the public view of the parking lot. A landscape plan
showing this landscaping must be approved by City staff prior to issuance of a cer-
tificate of occupancy for the addifion.
5. Construction equipment, construction trailer, trailers, or construction materials are
prohibited from parking or being stored on 70th Street or Lamar Avenue.
6. Att outdoor lighting must be directed downward with cut-offs and away from abufting
property owners, Reflected giare of spiH light must not exceed five-tenths (0.5) foot-
candle as measured on the proper(y line.
7. The grading and erosion control ptan for the site must comply with NPDES Il Permit
requirements. Erosion control devices must be installed prior to commencemenf of
any grading activity. Erosion control must be performed in accordance with the rec-
ommended practices of the "Minnesota Construction Site Erosion and Sediment
Control Planning Handbook" and the conditions stipulated in Tet/e 10-5-�, Erosion
Control During Construction, of the City's Subdivision Ordinance.
8. A final grading plan, stormwater calculations, and stormwater quality ca/cu/afions
must be submitted to the City Engineer and South Washington Watershed District
for review and approvai before a building permit will be issued.
9. Al1 curbing for the project must be 6618 concrete design and the concrete drive
aprons compliant with city standards.
10.A!l ground-mounted mechanical equipment accessory to the principal structure over
30 +nches or greater fhan 12 cubic feet shaU he screened from pub/ic views with land-
scaping, berming, or a screen wall/fence. Screening materials must be similar to or
compatible in design and color with those used on the principal structure. Screening
material may include property maintaened wood, vinyl, or metal screens or fencing as
required in Title 11-6-4(3) of the City Codes.
91. The applicant must comply with all city ordinances and policies.
12. The Church is responsible for the cost of installing a"STOP" sign at each of the two
access drives that connect to public roadways. TNe "STOP" sign ►nust be 10 feet
from the roadway edge and 2 feet from the driveway edge. The bottom of the sign
must be 6 feet from the ground. The "STOP" sigrr must be a 30-inch sized sign
having a high intensity reflective face. Said sign should be mounted on a six-foot
No. 3 and eight-foot No. 2 stee/ post. The applicant may request the City's Pubfic
Works Department to install this sign, but must reimburse the City for actual costs
incurred by the City.
Planning Commission Minutes
July 24, 2006
Page 15 of 18
13.A demolition permit must be filed with the Building Inspections Division and issued
by the City before the residential structure is razed.
?4. TL�e sanitary �e��ic system must be sized and design�d acc�,rdi�e� ges 'v'f<�shir���an
County Departmenf of Heaith requirements.
15. The stormwater pre-development and post-development calcuiations and storage
capacity of the proposed sformwater basin must be provided to the city for review
and approval before the city issues the Building permit.
16. The applicant must pay the stormwater area charge fee to the city at the time the
city issues the building permit. The amount of the stormwater area charge will be
determined once the city completes their review of fhe stormwater drainage calc-
ulations.
Mofion passed unanimously (7-to-0 vote).
6.7 Gateway Center Sign — Case V06-048
The City of Cottage Grove has applied for a variance to the City's sign ordinance to allow
an off-site sign for Gateway Center (Title 9-8-8, Off-Premises Advertising Signs, and Title
9-8-5F, Prohibited Signs). The sign would be located on the northwest corner of 80th
Street and Hardwood Avenae.
Burbank summarized the staff report and recommended approval based on the findings of fact
in the staff report.
Brittain asked if the wall that is going to be reconstructed would look similar to the wall on the
east side of 80th Street. Burbank responded yes.
Thiede asked how much the monument sign would cost. Burbank responded the masonry unit
would be $23,000 for the masonry and sign caps, the bank signage is around $4,000, and the
letters for Gateway North is $1,500 to $2,OOOs. Thiede asked how much the Coldwell Banker
sign was and who paid for it. Burbank responded that it was the same price and the EDA paid
for the sign through the TIF District. Thiede asked about the Walgreen's and Hollywood Video
signs. Burbank responded that Walgreen's sign was paid for by Walgreen's and the Home
Depot sign on the Hollywood Video site was paid by Home Depot. Thiede asked about the
usefulness of the sign for the money being spent and wondered if some of the businesses be-
hind the Bank would want to pay for part of the signage. Burbank responded that as part of
the land sales for the city-owned property that was formerly part of Oakwood Park, there were
$10,000 contributions from each of those that goes directly towards these monument signs.
Identifying all four quadrants in the Gateway North area has been the direction of the City
Council and EDA, and they have worked out financing either through TIF or land sale negotia-
tions. Thiede asked why two signs were needed for both Coldwell Bank and US Bank and
asked if Ruby Tuesday was considered for of the signs at Coldwell Banker. Burbank re-
sponded that in the initial discussions for that, another user was included but decided not to.
Thiede thought allowing other businesses in the area to be on the sign could cover some of
the $23,000 cost.
Pianning Commission Minutes
July 24, 2006
Page 16 of 18
Brittain stated that he was concerned about having too many signs up. He asked if Coldwell
Banker Burnet had a sign on the corner before the area was redeveloped. Burbank responded
that they had a pylon sign behind the pine trees. Brittain asked if tne US Bank pylon sign
wouid oe removed. 8urbank responded thafi has no4 ye4 been de4errnined. Bri�f�in s�ated Th�4
he believes the pylon sign should be removed.
Cavallo asked if building the retaining wall is triggering the construction of the monument sign.
Burbank responded no, he was informing the Commission of the activities occurring in that
area. The City has been talking to the property owner about repairing the retaining wail long
before the Gateway redevelopment process started. He then explained the history of the sign-
age as part of the Gateway redevelopment project. Cavallo understood that it is the intent of
the City Council to spend that much money on a monument sign to bring development and
interest to the area but it seems that $23,000 is a little high. He believes that other options
could have been looked at to defray the costs.
Brittain asked if anyone had any comments on the applications, noting that the public hearing
would be held by the City Council at their meeting on August 9, 2006. No one spoke.
Bauer asked who maintains the signs. Blin responded that the City is responsible for mainte-
nance of the Gateway North portions of the signs; tne masonry units and the lighting are the
responsibility of the property owner.
Bauer made a motion to approve the application. Kronlund seconded. Motion passed
unanimously.
6.6 Core Development Concept Plan — South Point Ridge
Biin described the proposed mixed-use deve�opment, noting that the public hearing wili be
held next month. Matt Frisbie, Frisbie Architects in River Falls, Wisconsin, stated that he is
representing Core Development, the developer, and Comforts of Home, who will be running
the senior housing portion. He also introduced Nick and Frank Frattalone, South Point Ridge,
LLC. He displayed the proposed site plan and described the uses on the site, which inciude
two senior housing buildings, two class A office buildings, and office condominiums. He stated
that they will be working with the grades on the site and are in the process of completing the
tree inventory. He noted the locations of retention ponds and the proposed trail through the
site. He expiained that they have presented this information to the City Council and then
showed some building elevations based on comments they received. He stated that there will
be underground parking to minimize the amount of paved areas on the site.
Cavallo asked if the memory care portion is a clinic or a living facility. Frisbie stated that it
would be a living facility for residents who require more care. Cavallo asked if this facility
would compete with the proposed Presbyterian Homes project. Blin responded that both
Comforts of Care and Presbyterian Homes serve a little different market, particularly in the as-
sisted living areas. The Presbyterian Homes units tend to be a little larger witn a little less ser-
vice provision.
Thiede asked if this proposai is consistent with the intended use in the Gateway North area.
Blin responded that there had been discussions about retail use on that site in the past but it is
not a good retail site because of its location and access. The City has looked at the site as
Planning Commission Minutes
July 24, 2006
Page 17 of 18
more of an office and multi-family residential development and this plan combines both op-
tions. The key for this development is to minimize tree loss. Thiede asked if the residents in
the two proposed single-family developments wouid see the roof lines. Blin responded that
they wauld ha3e ro views af the buil�i��gs because of the ��ur�ber trees betwee� the twa
areas and the housing developments are at a lower elevation.
Brittain asked if there would be any traiis for the lower building that are more level. Frisbie re-
sponded that there would be connections throughout the site and into the City's street system.
Brittain asked if there would be access to Camel's Hump from this area. Blin responded that
the city is talking with the developers about a foot path going up the hill with some parking
spaces at the end of the road.
Folch noted that this facility would be on top of the highway and expressed concern about the
noise and the fact that it is such a visible site. Frisbie stated that was why the residential
buiidings are set back further than the office buildings, but there is pienty of bufFering between
the site and the highway. He explained that the buildings would be masonry at the base and
hardiplank above, which would help mitigate any traffic noise.
Application and Requests
Bauer asked if there was any update on the lights across the city Iooked at last winter. Blin
stated that he would look into that.
Approval of Planning Commission Minutes of June 26, 2006
Blin reported that the minutes were not completed due to the new digital recorder and the lack
of equipment to transcribe the minutes. They will be presented at next month's meeting.
Reports
9.1 Recap of July City Council MeeBings
Blin reviewed the items discussed by the City Council at their meetings in July 2006.
9.2 Committee Reports
None.
9.3 Response to Planning Commission Inquiries
Blin reported that the staff looked into the trees that were planted along Hinton and believe
those trees would not encroach on the trail for at least 20 years.
9.4 Planning Commission Requests
Thiede asked for an update on the Red Rock corridor. Blin responded that the project is going
through a process called Alternative Analysis, which the federal government requires. He be-
lieves that tne corridor is at least five to six years out from funding construction of the line.
Planning Commission Minutes
July 24, 20�6
Page 18 of 18
Cavallo stated that he attended a meeting on transportation issues and reported that light rail
service between St. Paul and Minneapolis may commence by 2013 and the funding is now
starting; it is an arduous process to receive funding from the federal government. They said
Red Rock could be done by 2025 to 2030. Thiede asked if 4here nas been any plar�nir�g an
development around tne train station. Blin responded not a lot, noting that the tentative loca-
tions for the station would be the park and ride lot or at Belden Boulevard. He stated that
based on the ridership numbers, Red Rock would have around 700 boardings a day in
Cottage Grove, which is probably not enough to drive a lot of development around that station.
Adjournment
Motion by Bauer, seconded by Thiede, to adjourn. Motion carried unanimously (9-to-O).
The meeting adjourned at 9:23 p.m.