HomeMy WebLinkAbout2011-10-05 PACKET 04.B.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 10/5/11
PREPARED BY Engineering Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
COUNCIL ACTION REQUEST
Consider adoption of a resolution approving final payment in the amount of $16,413.07 to Ace
Blacktop Inc. for 2010 Pavement Management Project.
STAFF RECOMMENDATION
Adopt resolution and final payment. The contractor, Ace Blacktop Inc. in accordance with the
contract plans and specifications, has satisfactorily completed the work.
ADVISORY COMMISSION ACTION
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES /RIGHTS
❑ ECONOMIC DEV. AUTHORITY
��1� ;Z�I:YIrP►CH�ZiZK11��i1�P11�`?
DATE REVIEWED
APPROVED
DENIED
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
® MEMO /LETTER: Chad E. Setterholm, September 15, 2011
® RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
® OTHER: Request for payment
ADMINISTRATORS COMMENTS
r
` C ity Administrator Date
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
HACOUNCIL FORMSXP.ce Blacktop Final Payment meeting 10- 5- 11.docx
RESOLUTION NO. 2011-
RESOLUTION APPROVING FINAL PAYMENT IN THE AMOUNT OF
$16,413.07 TO ACE BLACKTOP INC. FOR THE 2010 PAVEMENT
MANAGEMENT PROJECT
WHEREAS, the City Engineer has certified that work has been
satisfactorily completed, and found acceptable.
WHEREAS, the total contract amount is $872,324.63 compared to the
original contract amount of $922,952.75.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Cottage Grove, County of Washington, State of Minnesota, that $16,413.07 be
paid to Ace Blacktop Inc. for 2010 Pavement Management Project.
Passed this 5th day of October, 2011.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
September 15, 2011
Ms. Jennifer Levitt
City Engineer
City of Cottage Grove Public Works
8635 West Point Douglas Road
Cottage Grove, MN 55016 -3161
Dear Ms. Levitt:
RE: Cottage Grove, Minnesota
2010 Pavement Management Project
SEH No. COTTG 110505
Enclosed are four copies of the final application for payment from Ace Blacktop, Inc. for the above
reference project. Also enclosed are IC -134 forms, lien waivers, and Consent of Surety to Final Payment.
The final construction cost of the project is $872,324.63 which is $50,628.12 under the original contract
amount of $922,952.75. SEH was able to work with Ace Blacktop during construction of this project to
minimize the overall area of boulevard disturbance which reduced the restoration costs for this project.
We have reviewed worked performed on this project on site with public works staff, and have found it to
be acceptable. We therefore recommend approval of this final application for payment to Ace Blacktop,
Inc. in the amount of $16,413.07.
Please call me if you have any questions regarding this submittal for final payment.
Sincerely, p
Chad E. Setterholm, PE
Project Manager
ces
Enclosure
sAaekkatgV I0505\c.Amniou \paym uppliwi.osVoi ]p.yoat lette, m a it,d.o
r ECEIVE
"�IitC
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110 -5196
SEH is an equal opportunity employer I www.sehinc.com 1 651.490.2000 1 800.325.2055 1 651.490.2150 fax
APPLICATION FOR PAYMENT NO.4
• '(SI I
- SEH No. A- COTTG110505
Contract for
2010 Pavement Management Project
River Acres, District H
City Project No. 2010 -001
Location:
Cottage Grove, Minnesota
Contractor: A c e Blacktop, I nc. _
Owner:
City of Cottage Grove
7280 Dickman Trail
7516 80th Street South
Inver Grove Heights, MN 55076
Cottage Grove, MN 55016
For Period: 11/15 to 8/1 /2011
Date:
8/1 /2011
SUMMARY:
-
1 Original Contract Amount
$
922,952.75
2 Change Order - ADDITION
3 Change Order - DEDUCTION
4 Revised Contract Amount
5 Value Completed to Date
$
872,324.63
6 Material on Hand
7 Amount Earned
$
872,324.63
8 Less Retainage
$
-
9 Subtotal
$
872,324.63
10 Less Amount Paid Previously
$
(855,911.56)
11 Liquidated damages -
12 AMOUNT DUE THIS REQUEST FOR PAYMENT NO 4
$
16,413 -07
Contractor's Affidavit
The undersigned Contractor hereby swears under penalty ofpepury that 1) all previous progress paymems received from the O\a'ner on account ofu'ork performed
under the Contract referred heretofore have been applied by the undersigned to discharge in full all obligations of the undersigned incurred in connection with wort:
covered by prior .Applications for Pa)meut under said contract and 2) all material and equipment incorporated in said Project or otherwise listed in or covered by
this Application for Payment are free and clear ofall liens, claims, security interests and encumbrances.
C.menuor ACE BLACKTOP, "VC.
Q & " '2 0? C Azex a .l�cC� cZr2��M r �- 23 If
(signature) name. M e) i (d ate)
COUNTYOP
) SS
STATE OF
1366remeouthis 2 , 34 — doyol 20 !/. personally appeared sl'o� [/JPZ known to be, who being duly
swom did depose and say that he /she is the _ of the Contractor above mentioned, that he/she executed this Application for Payment
and Affidavit on behalf ofsaid Co!n'tragcAt✓o�jryj} and that all o { the slate ants contx ti d therein are true, correct. an complete -
Myc n . IVEv U °d SON � (�
(Vomry ubliq
' [31IFM[ ne,OtH
hpIt dhe dJ' n¢14rsM?3'
The undersigned has checked the Contractor's Application for Payment shown above. A part ofthis Application is the Contractor's
Affidavit stafing that all previous payments to him/her under this contract have been applied by him/her to discharge in foil all ofhis/her
obligations in connection with the work by all prior Applications for Payment. Recommended lot approval by:
SHOT ELLIOTT HENDRICKSON INC._
tsrgnamre)�J
Approved by Owner CITY OF COTTAGE GROVE
`J ( azure)
(signature)
Specified Contract Completion Date: September 30, 2010
Chad E. Setterholm, PE, Project Manager j "° /I
tname m ttt e pow)
(names title d �— (date)
tname & title)
A 3535 Vadnais Center Drive
SEH St. Paul, MN 55110 Covrepq
Item
Contract Unit Current Quantity Amount
Unit Quantity Price Quantity to Date to Date
1 Mobilization
L.S.
1
$12,250.00
1 $12.250.00
2 Field Office
L.S.
1
$4,500.00
3 Clearing and Grubbing
Acre
2.25
$1,500.00
1.15 $1,725.00
4 Remove CMP & RCP Pipe (Storm)
L.F.
155
$8.00
86 $688.00
32866 $19,719.60
5 Pulverize Bituminous Pavement( P)
S.Y.
32866
$0.60
6 Remove Bituminous Driveway Pavement
S.V.
996
$4.50
821 $3,694.50
7 Remove Concrete Driveway Pavement
S.Y.
309
$8.50
256 $2,176.00
8 Remove Catch Basin or Manhole (Storm)
Each
2
$350.00
1 $350.00
9 Sawing Concrete Pavement (Full Depth)
L.F.
268
$515
161 $845.25
10 Sawing Bituminous Pavement (Full Depth)
L.F.
1092
. $150
952 $3.332.00
11 Salvage Casting (Storm)
Each
2
$75.00
1 $75.00
12 Salvage Sign Type C
Each
2
$35.00
2 3 $10500
13 Salvage & Install Irrigation System
L.F.
363
$4.75
84 $399.00
3790 $40,174.00
14 Common Excavation (EV) (P)
C.Y.
3790
$70.60
15 Subgrade Excavation (EV)
C.Y.
303
$12.00
20 $240.00
16 Select Topsoil Borrow (CV)
C.Y.
1361
$16.80
1279 $20479.20
17 Street Sweeper (With Pickup Broom)
Hour
40
$90.00
17 $1;530.00
18 Common Laborers
Hour
20
$60.00
19 3 C.Y. Front End Loader
Hour
20
$90.00
?0 3 C.Y. Backhoe
Hour
20
$150.00
?1 Water for Dust Control
Mgal
160
$25.00
10 $250.00
>2 Aggregate Shouldering CI. 3
Ton
1902
$1150
1290 $17,475.00
?3 gate Base CI. 5
Ton
2992
$9.75
3364.32 $32,802.12
'4 ar Borrow (CV)
C.Y.
2538
$8.90
2706 $24,08340
15 Granular Borrow (Mod. 5 %)(CV)
C.Y.
350
$11.35
80 $908.00
'.6 h Crushed Rock (CV)
C.Y.
22
$40.00
66 $2,640.00
!7 g Soil (CV) (Seeding)
rType
C.Y.
66
$46.50
60 $2,79000
'8 g Soil (CV) (Perennials)
C.Y.
235
$46.50
127 $5,905.50
'9 de Preparation
Road Sta.
136
$170.00
136 $23,12000
'.0 Seal Bituminous Joint
LT.
11343
$1.55
8218 $12,737.90
1 P 12.5 Wearng Course Mixture (2,B)
Ton
3191
$57.50
3579,58 $205,825.85
2 Type SP 12.5 Non - Wearing Course Mixture (2,B)
Ton
4263
$52.50
3728.27 $195,734.18
3'fype SP 12.5 Wearing Course Mixture (2,B) (Trail)
Ton
150
$72.00
181.00 "9 $13,08168
Type 12.5 Wearing Course Mixture (2,B)
4 3.5 -Inch Thick (Driveways)
S.V.
1590
$20.00
1631 $32.620.00
5 Bituminous Material For Tack Coat
Gal
1866
$2.90
1950 $5.655.00
6 12 -Inch CS Pipe Culvert
L.F.
25
$20.00
36 $720.00
7 124nch CS Apron wf Trash Guard
Each
2
$300.00
8 12 -Inch RC Apron w/ Trash Guard
Each
1
$8007
1 $800.00
9 Energy Dissipater
Each
1
$900.00
1 $900.00
0 4 -Inch Pert PE Pipe Drain
L.F.
240
$17.00
240 $4,080.00
1 8 -Inch PVC Pipe Drain
L.F.
45
$20.00
45 $900.00
2 12 -Inch PVC Pipe Drain
L.F,
260
$24.00
340 $8,160.00
3 Daylight & Clean Culvert
Each
5
$200.00
11 $2,200.00
4 Casting Assembly (Storm CB)
Each
13
$570.00
13 $7,410.00
5 Casting Assembly (Storm MI)
Each
2
$450.00
2 $900.00
5 Const Drainage Structure Des. Yard Drain
Each
2
$900.00
2
Const Drainage Structure Des. 2'x3
(w/ Sump)
LP.
36
$185.00
-- $ - 1,800,00
36 $6,66000
i Const Drainage Structure Des. G
L.F.
8.45
$175.00
8.45 $1,478.75
Const Drainage Structure Des. 48 -4020
(w/ Sump)
L.F.
63
$192:00
63 $12,096.00
12 -Inch RC Pipe Sewer, Class V
L.F.
563
$24.00
563 $13,512.00
15 -Inch RC Pipe Sewer, Class V
L.F.
158
$2720
158 $4,297.60
! 18 -Inch RC Pipe Sewer, Class V
L.F.
150
$29.00
150 $4,350.00
24 -Inch RC Pipe Sewer, Class IV
lGeotextile
L.F.
24
$50.00
16 $800.00
Geotextile Filter Fabric, Type 1
S.Y.
116
$2.60
264 $686.40
Fabric, Type IV
S.Y.
58
$5.00
140 $700.00
Random Rip Rap
C.Y.
31
$50.00
737 $6,85000
Concrete Curb & Gutter Design B612
L.F.
374
$9.50
342 $3,249.00
Concrete Curb & Gutter Design 8618
L.F. f
2692
$8.95
2575 $23,04625
Concrete Driveway Pavement
(6 -Inch Thick)
S.Y.
276
$39.75
256 $10,176.00
Median Nose
EACH
4
$275.$3.25 00
4 $1,100.00
3 -Inch Concrete Walk
S.F.
460
462 $1,501.50
Pedestrian Ramp
EACH
2
$800.00
1 $800.00
Traffic Control
L.S.
1
$2,50000
1 $2,500.00
Railroad Protective Services (flagging)
L.S.
1
$9,500,00
1 $9,500.00
-A 3535 Vadnais Center Drive
SEE{ St, Paul, MN 55110 Detail
Contract Unit Current Quantity Amount
Ir... Item Unit Quantity Price Quantity to Date to Date
i F &I Sign Panels, Type C
S.F.
83.5
$38.00
2.75 86.25 $3,277.50
{ Silt Fence, Preassemble,
L.F.
6120
$1.50
5828 $8,742.00
Biorolls
L.F.
600
$2.70
1160 $3,132.00
Storm Drain Inlet Protection
EACH
19
$75.00
13 $975.00
Hydro Seeding (Type 270)
S.Y.
22396
$0.75
10124 20149 $15,111.75
Plantings Storm Basin 1
L.S.
1
$3,345.00
Plantings Storm Basin 2
L.S.
1
$7,150.00
1 $7,150.00
Plantings Storm Basin 3
L.S.
1
$6,690.00
1 $6,690.00
Plantings Storm Basin 4
L.S.
1
64,375.00
Tree Protection Fencing
L.F.
208
$1.40
Erosion Control Blanket Category 3
S.V.
7440
$1.00
6232 $6.232.00
4 -Inch Solid Line White - Epoxy
L.F.
12551
$0.30
10544 $3,178.20
4 -Inch Broken Line Yellow - Epoxy
L.F.
1183
$030
975 $274.50
4 -Inch Double Solid Line Yellow - Epoxy
L.F.
2426
$0.60
2425 $1 455.00
22 $132.00
12dnch Solid White - Epoxy
L.F.
22
$6.00
Pavement Message (RR X -ing) Epoxy
Each
2
$725.00
2 $1,450.00
TOTAL WORK COMPLETED TO DATE
$872,324.63
A 3535 Vadnais Center Drive
$EH St. Paul, MN 55110 Detail
PROJECT PAYMENT STATUS
OWNER: CITY OF COTTAGE GROVE
City Project No. 2010 -001
SEH No. A- COTTG110505
CHANGE ORDERS
No. Date Description Amount
Total Change Orders
f•7_\7ky, 1:1,i II&01 T111 7/
No. From To Completed Retainage Payment
1
7/6/10
8/6/10
$ 201,220.58
$ (10,061.03)
$ 191,159.55
2
816/10
9/10/10
$ 313,534.48
$ (15,676.72)
$ 297,857.76
3
9/11/10
11/15/10
$ 349,802.07
$ 17,09218
$ 366,894.25
4
11/15/10
8/1/11
$ 7,767.50
$ 8,645.57
$ 16,413.07
$ 872,324.63
$ -
$ 872,324.63
Material on Hand
Total Amount Earned
$ 872,324.63
Original Contract
$ 922,952.75
Retainage Pay No. 4
$ -
Change Orders
Total Payment to Date
$ 872,324.63
Revised Contract
$ 922,952.75
-A 3535 Vadnais Center Drive