2011-10-05 PACKET 04.G.
REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 10/05/11 6. PREPARED BY Engineering Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR COUNCIL ACTION REQUEST Consider awarding the contract for soil correction work at Highlands Park Splash Pad site to Eureka Construction, Inc. in the amount of $23,272.50. STAFF RECOMMENDATION Adopt the resolution awarding the contract for soil correction work at Highlands Park Splash Pad site to Eureka Construction, Inc. in the amount of $23,272.50. BUDGET IMPLICATION BUDGETED AMOUNT ADVISORY COMMISSION ACTION DATE REVIEWED ❑ PLANNING ❑ ❑ PUBLIC SAFETY ❑ ❑ PUBLIC WORKS ❑ ❑ PARKS AND RECREATION ❑ ❑ HUMAN SERVICES /RIGHTS ❑ ❑ ECONOMIC DEV. AUTHORITY ❑ ❑ ❑ SUPPORTING DOCUMENTS FAILSJILI AIWAIJV APPROVED DENIED ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ® MEMO /LETTER: Jennifer Levitt, September 29, 2011 ® RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ® OTHER: Quote Eureka Construction Inc. Quote Hydrocon, Inc. ADMINISTRATORS COMMENTS Administrator Date COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER H: \mkock \COUNCIL FORMS \Council Action Form splash pad soil correction.doc CITY OF COTTAGE GROVE MINNESOTA To: Honorable Mayor and City Council Ryan Schroeder, City Administrator From: Jennifer M. Levitt, P.E., City Engineer Date: September 29, 2011 Re: Highlands Park Splash Pad Soils Correction - Quote Background /Discussion: The City Council on September 21, 2011 approved the plans and specifications for the construction of a splash pad at Highlands Park. As a cost savings measure a quote package was assembled to utilize excess granular material from the Ravine Parkway site for the necessary soil corrective work for the splash pad. The excess granular material provides an estimated savings of $11,000 for the soil correction work and the overall project cost. The proposed soil correction work would take place this fall and would be prepared in a manner to minimize frost impacts to the area and to enable the contractor of the splash pad to begin construction in early spring. This will help in achieving a July 4, 2012 opening. There were a total of 2 quotes. The following summarizes the results of the quotes received: Contractor Quoted Amount Low Eureka Construction, Inc. $ 23,272.50 #2 Hydrocon, Inc. $ 36,942.50 The lowest accepted quote on the project will be Eureka Construction, Inc. at $23,272.50. Recommendation: It is recommended to award the project to the lowest accepted quote, supplied by Eureka Construction, Inc. at $23,272.50. RESOLUTION NO. 2011- RESOLUTION AWARDING QUOTE FOR THE SOIL CORRECTION WORK AT HIGHLANDS PARK SPLASH PAD TO EUREKA CONSTRUCTION, INC. IN THE AMOUNT OF $23,272.50 WHEREAS, Quotes were requested to begin soil correction work at Highlands Park Splash Pad site; and WHEREAS, two firms submitted quotes; and WHEREAS, it appears that Eureka Construction, Inc. is the lowest responsible quoter; and WHEREAS, it is the recommendation of the City Engineer that the contract be awarded to Eureka Construction, Inc. NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Cottage Grove, County of Washington, State of Minnesota, that the contract for soil correction at Highlands Park Splash Pad site be awarded to Eureka Construction Inc. in the amount of $23,272.50. Passed this 5 day of October, 2011. Myron Bailey, Mayor Attest: Caron M. Stransky, City Clerk QUOTE FROM: E Q DOCUMENT 00 41 10 QUOTEFORM HIGHLANDS PARK SPLASH PAD SOIL CORRECTIONS BONESTROO FILE NO. 000048-11297-0 COTTAGE GROVE, MN 2011 Due Date: 9/23/11 THIS QUOTE IS SUBMITTED TO: City of Cottage Grove 7516 80th St S Cottage Grove, MN, 55016 -3161 No. Item Units Qty Unit Price Total Price QUOTE - SOIL CORRECTIONS 1 MOBILIZATION LS 1 $ + Q7PL7� $ 4, 000 — 2 TEMPORARY ROCK CONSTRUCTION EA 1 $ .- $ /, `Oo ENTRANCE rY 3 SILT FENCE, TYPE MACHINE SLICED LF 850 $ d -- $ 4 SEED AND MULCH AC 0.7 $ if °,QO _ $ /t C)...5•: Ci ~ 5 INLET PROTECTION EA 3$ Z Ca - $ boo a so 6 COMMON EXCAVATION AND HAUL TO CY 1550$ 6 . $ 1 0. 0 DISPOSAL SITE i4" 7 PLACE AND COMPACT SELECT GRANULAR CY 2200 $ 4 $ / 1, [3 MATERIAL AND GENERAL BACKFILL ,597 TOTAL QUOTE - SOIL CORRECTIONS $ + Z z 000098 -1129M © 2011 acngwo 00 41 10 -1 Quore mm � F ■ QUOTE FROM: Bonestroo Hydrocon, Inc. DOCUMENT 00 4110 QUOTEFORM HIGHLANDS PARK SPLASH PAD SOIL CORRECTIONS BONESTROO FILE NO. 000048 - 11297-0 COTTAGE GROVE, MN 2011 Due Date: THIS QUOTE IS SUBMITTED TO: City of Cottage Grove 7516 80th St S Cottage Grove, MN, 55016 -3161 No. Item Units Qty Unit Price Total Price QUOTE - SOIL CORRECTIONS 1 MOBILIZATION 2 TEMPORARY ROCK CONSTRUCTION ENTRANCE 3 SILT FENCE, TYPE MACHINE SLICED 4 SEED AND MULCH S INLET PROTECTION 6 COMMON EXCAVATION AND HAUL TO DISPOSAL SITE 7 PLACE AND COMPACT SELECT GRANULAR MATERIAL AND GENERAL BACKFILL TOTAL QUOTE- SOIL CORRECTIONS L5 1 $ 5,500.00 5,500.00 EA 1$ 1,000.0 $ 1,000.00 IF 850 $ 1.7 $ 1,487 AC 0.7$ 1,900.00 $ 1,330.0 EA 3 $ 150.00 $ 450.00 CY 1550 $ 11.50 $ 17,825.00 CY 2200 $ 4.25 $ 9,350.00 $ 36.942.50 WGA8�'X291.0 10 2oU 9.ss . 004110-1 QUOTE roan