Loading...
HomeMy WebLinkAbout2012-01-18 PACKET 04.G.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # 1 1 „/' DATE 1/18/12 , (fit PREPARED BY Engineering Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR COUNCIL ACTION REQUEST Consider approval of Change Order #1 for the West Point Douglas Road Extension Project which increases the Original Contract Amount from $941,784.40 to the Revised Contract Amount of $951,277.41. STAFF RECOMMENDATION Approve Change Order # 1 for the West Point Douglas Road Extension Project which increases the Original Contract Amount from $941,784.40 to the Revised Contract Amount of $951,277.41. BUDGET IMPLICATION $941,784.40 BUDGETED AMOUNT ADVISORY COMMISSION ACTION ❑ PLANNING ❑ PUBLIC SAFETY ❑ PUBLIC WORKS ❑ PARKS AND RECREATION ❑ HUMAN SERVICES /RIGHTS ❑ ECONOMIC DEV. AUTHORITY - 7 REVIEWED El El El El El El $941,784.40 ACTUAL AMOUNT APPROVED DENIED ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ SUPPORTING DOCUMENTS ® MEMO /LETTER: Dave Sanocki, PE, January 5, 2012 ❑ RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ® OTHER: Change Order #1, December 9, 2011 ADMINISTRATORS COMMENTS City Administrator D COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER HACOUNCIL FORMS \Council 1 -18 -12 \Council Action Form Change Order West Point Douglas Road Extension.doc January 5, 2012 Stantec Consulting Services Inc. 2335 Highway 36 West St. Paul MN 55113 TeC (651) 636 -4600 Fax: (651) 636 -1311 Banestroa Ms. Jennifer Levitt City of Cottage Grove 8635 West Point Douglas Road South Cottage Grove, MN 55016 -3318 Re: City of Cottage Grove, Minnesota West Point Douglas Road Extension City Project No.: 10284 Bonestroo Project No.: 000048 - 10284 -0 Dear Jennifer: Enclosed is a copy of Change Order No. 1 for the West Point Douglas Road Extension Project. We have received approval and authorization from Mn/DOT to encumber additional State Aid funds to cover the cost of this change order. This change order addresses additional conduit costs that were necessary because the existing conduit was covered by the right turn lane concrete overlay that was installed as part of the 2010 Mn/DOT TH 61 concrete overlay project. This change order also addresses additional traffic control requested by Mn /DOT to protect the existing signal poles from traffic during construction. We recommend approving Change Order No. 1 for $9,493.01 which increases the Original Contract Amount from $941,784.40 to the Revised Contract Amount of $951,277.41: Sincerely, Dave Sanocki, P.E. Enclosure Cc: Chad Davison, Stantec Craig Larson, Stantec 1yfi f Bonestroo CHANGE ORDER NO. 1 WEST POINT DOUGLAS ROAD EXTENSION CLIENT PROJECT NO, 10284 BONESTROO FILE NO. 000048 - 102840 Descri Mon of Work Part A The following described Change Order Is necessary because the Lump Sum signal modification plans designed to have hand hole 116 connect to the existing conduit. The existing conduit was covered by the concrete overlay right turn lane installed wifh the 2010 Mn/Dot TH61 concrete overlay project, The Contractor shall provide all equipment, material and labor to extend a 2° conduit and all necessary cables from the new hand hole 116 to existing hand hole 12, and connection to hand hole 12. All work shall be in accordance with all the applicable specifications. Part B The following described Change Order is necessary because the Lump Sum traffic control plans do not account for the additional traffic control needed to protect the existing traffic signal poles. The existing poles were protected by an existing traffic barrier. This barrier had to be removed prior to the signal modification to allow for the bituminous pavement Installation before the seasonal shutdown of the bituminous plants. All work shall be in accordance with all the applicable specifications. Contract Unit Total Na. Item Unit Quantity Price Amount CHANGE ORDER NO. 1 Part A 2595.523 2" NON - METALLIC CONDUIT LIN FT 200 $9.10 $1,820.00 LIN FT 203.2 $17.19 $3,493.01 EACH 19 $220.00 $4,180.00 $9,493.01 Part B 2 2533.507 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 3 2554.602 IMPACT AT TENUATORBARRELS TOTAL CHANGE ORDER NO, 1: 4910184M)1.xWn Original Contract Amount Previous Change Orders This Change Order Revised Contract Amount (including this change order) CHANGE IN CONTRACT TIMES Original Contract Times: Substantial Completion (days or date): Ready for final Payment (days or date): Increase of this Change Order: Substantial Completion (days or date): Ready for final Payment (days or date): Contract Time with all approved Change Orders: Substantial Completion (days or date): Ready for final Payment (days or date): Recommended for Approval by: BONESTROO 6 ✓J . ( - �..... . Approved by Contractor: EUREKA CONSTRUCTION 1Z /J4 /2,5 1 1 Date cc: Owner Contractor Bonding Company Bonestroo $941,784.40 $0.00 $9,493.01 $951,277.41 Date: i2/'r� / 2 or c Approved by Owner: CITY OF COTTAGE GROVE Date Recommended for Approval CITY OF COTTAGE GROVE Date: DSAE portion: The State of Minnesota Is not participant in this contract. Signature by the District State Aid Engineer is for FUNDING PURPOSES ONLY and for comp Ila nce with State and Federal Aid Rules /Policy. Eligibility does not guarantee funds will be available. This work Is eligible for: , Federal Funding 4 State Aid Funding X Local funds n �i�S District State Aid Engineer� „,�.._. i i 4810284 CHOI.xism