Loading...
HomeMy WebLinkAbout19 Engineering2011 Goal & Accomplishments ENGINEERING 2011 Joint City Wide Seal Coat Program — 536,181 SY Total Cottage Grove = 382,374 St. Paul Park = 36,872 Newport = 68,575 Afton = 15,067 Denmark Township = 33,294 2011 Crack Sealing Program = 40,000 Pounds Total 2011 Micro Resurfacing Program — City Bituminous Trails = 2.13 Miles Total LOCATION DESCRIPTION DISTANCE Pinetree Valley Park Indian Blvd. to Irish Ave. cul -de -sac 0.85 Miles Pinetree Valley Pond 80` Street to Pinetree Valley Park 0.46 Miles Mississippi Dunes Mississippi Dunes to West plat line 0.40 Miles (Phase -1 Manley South /West End) Mississippi Dunes Mississippi Dunes to West plat line 0.18 Miles (Phase -2 NorthlWest End) Mississippi Dunes Mississippi Dunes Blvd. to Hadley Ave. 0.24 Miles (Phase -2; 95" Street) City Parks- Parking Lots (Agprox. 3,429 SY) Pinetree Valley Park (80 Street) Highlands Park (6975 Idsen Ave.) 2011 Joint- Paint Striping — 784,870 LF Total Cottage Grove = 642,716 St. Paul Park = 88,700 Newport = 53,454 2011 Joint- Street Sweeping — 490 Hours Total Cottage Grove = 450 Newport = 40 2011 Public Works/Fire Station #2 - Lighting Upgrades x (17 7 P_ nnrl MaintPna_nrr. Ponds ED -P8, ED -P9.1, ED -P9.2, ED -P9.3, ED -P9.4 Partnered with AmeriCorp to complete the project S9 Grantforproject = $23,750 2011 North Jamaica Ave. — Waterway Rehab 2011 Emergency Generator Upgrade - Fire Station #I 2011 Emergency Generator Replacement - Fire Station 44 2011 Pavement Management • Pine Coulee Park improvements • W. Point Douglas Rd. Expansion Development Retro- Reflectivity Program & Policy Revised Street Light Policy Bridge Painting L8159 — Pact Rust Removal .Right of Way Permits — Reviewed & Processed (89) Subdivision Developments • Everwood • Pineeliff 3rd & 4rh • Michael's Point • Preserve's of Cottage Grove Minnesota Department of Health Grants (2) - $20,000 • Spill Response Plan • Educational/Survey for well and septic residents • Tank removal and replacement at Fire Station #2 South Washington Watershed District Grants for 2011 = $305,095 • PSCH = $71,750 • C -P6 Regional Pond= $125,510 • East Draw = $23,750 • Ravine Parkway = $84,085 Cottage Grove was awarded the Blue Star Award for excellence in stormwater management.