HomeMy WebLinkAbout19 Engineering2011 Goal & Accomplishments
ENGINEERING
2011 Joint City Wide Seal Coat Program — 536,181 SY Total
Cottage Grove = 382,374
St. Paul Park = 36,872
Newport = 68,575
Afton = 15,067
Denmark Township = 33,294
2011 Crack Sealing Program = 40,000 Pounds Total
2011 Micro Resurfacing Program — City Bituminous Trails = 2.13 Miles Total
LOCATION DESCRIPTION DISTANCE
Pinetree Valley Park Indian Blvd. to Irish Ave. cul -de -sac
0.85 Miles
Pinetree Valley Pond 80` Street to Pinetree Valley Park
0.46 Miles
Mississippi Dunes Mississippi Dunes to West plat line
0.40 Miles
(Phase -1 Manley South /West End)
Mississippi Dunes Mississippi Dunes to West plat line
0.18 Miles
(Phase -2 NorthlWest End)
Mississippi Dunes Mississippi Dunes Blvd. to Hadley Ave.
0.24 Miles
(Phase -2; 95" Street)
City Parks- Parking Lots (Agprox. 3,429 SY)
Pinetree Valley Park (80 Street)
Highlands Park (6975 Idsen Ave.)
2011 Joint- Paint Striping — 784,870 LF Total
Cottage Grove = 642,716
St. Paul Park = 88,700
Newport = 53,454
2011 Joint- Street Sweeping — 490 Hours Total
Cottage Grove = 450
Newport = 40
2011 Public Works/Fire Station #2 - Lighting Upgrades
x (17 7 P_ nnrl MaintPna_nrr.
Ponds ED -P8, ED -P9.1, ED -P9.2, ED -P9.3, ED -P9.4
Partnered with AmeriCorp to complete the project
S9 Grantforproject = $23,750
2011 North Jamaica Ave. — Waterway Rehab
2011 Emergency Generator Upgrade - Fire Station #I
2011 Emergency Generator Replacement - Fire Station 44
2011 Pavement Management
• Pine Coulee Park improvements
• W. Point Douglas Rd. Expansion
Development Retro- Reflectivity Program & Policy
Revised Street Light Policy
Bridge Painting L8159 — Pact Rust Removal
.Right of Way Permits — Reviewed & Processed (89)
Subdivision Developments
• Everwood
• Pineeliff 3rd & 4rh
• Michael's Point
• Preserve's of Cottage Grove
Minnesota Department of Health Grants (2) - $20,000
• Spill Response Plan
• Educational/Survey for well and septic residents
• Tank removal and replacement at Fire Station #2
South Washington Watershed District Grants for 2011 = $305,095
• PSCH = $71,750
• C -P6 Regional Pond= $125,510
• East Draw = $23,750
• Ravine Parkway = $84,085
Cottage Grove was awarded the Blue Star Award for excellence in stormwater
management.