HomeMy WebLinkAbout2012-08-08 PACKET 08.E.City of
Cotta Grove
J Minnesota
To: Parks, Recreation and Natural Resources Commission
From: Zac Dockter, Parks and Recreation Director
CC:
Date: July 30, 2012
Subject: Pine Tree Pond Trail
2012 grant funding for the Pine Tree Pond Trailway project was not awarded by the MN DNR. Without
those dollars, the east side of the trail and the paving of the west portion will not take place. The west
trail will be graded and a gravel base applied. The gravel trail will connect 80 Street, the archery
range and Isleton Court (near playground). Paving of the west trail and expansion to the east will only
occur as funding becomes available.
tF PINE TREE
G t r
o `-
PARK
'
i r� _ S
TRAILHEAD
—
80th S
EXISTING PARK
1lERLOOK
Cotfte G—
�Officg
f`
�
1, M�
Al
�J PROMSED TRAIL .- (4,
} ...j
ARCfiERY
6
hp
Sj
1
A
.J
t,
1
'/
✓y� 1
�: •�; t� �f� �;..f 7 � EXISTING PLAYGROUND
»
/y ' , aoa7lyNVTE
i s — N 1
Iwo IQ*
PROPOSED TRAIL LAYOUT
2/
<
ESIGN C
2.5" TYPE SP 9.5 WEARING COURSE MIXTURE
6" CLASS 5 AGGREGATE BASE
t
A
Fl t _
�r
COTTAGE GROVE, MINNESOTA
PINETREE POND PARK TRAIL
DATE: 2fi 12
FIGURE 1
shollac