Loading...
HomeMy WebLinkAbout2012-08-08 PACKET 08.E.City of Cotta Grove J Minnesota To: Parks, Recreation and Natural Resources Commission From: Zac Dockter, Parks and Recreation Director CC: Date: July 30, 2012 Subject: Pine Tree Pond Trail 2012 grant funding for the Pine Tree Pond Trailway project was not awarded by the MN DNR. Without those dollars, the east side of the trail and the paving of the west portion will not take place. The west trail will be graded and a gravel base applied. The gravel trail will connect 80 Street, the archery range and Isleton Court (near playground). Paving of the west trail and expansion to the east will only occur as funding becomes available. tF PINE TREE G t r o `- PARK ' i r� _ S TRAILHEAD — 80th S EXISTING PARK 1lERLOOK Cotfte G— �Officg f` � 1, M� Al �J PROMSED TRAIL .- (4, } ...j ARCfiERY 6 hp Sj 1 A .J t, 1 '/ ✓y� 1 �: •�; t� �f� �;..f 7 � EXISTING PLAYGROUND » /y ' , aoa7lyNVTE i s — N 1 Iwo IQ* PROPOSED TRAIL LAYOUT 2/ < ESIGN C 2.5" TYPE SP 9.5 WEARING COURSE MIXTURE 6" CLASS 5 AGGREGATE BASE t A Fl t _ �r COTTAGE GROVE, MINNESOTA PINETREE POND PARK TRAIL DATE: 2fi 12 FIGURE 1 shollac