HomeMy WebLinkAbout2012-09-10 PACKET 09.B.City of
Cotta Grove
J Minnesota
To: Parks, Recreation and Natural Resources Commission
From: Zac Dockter, Parks and Recreation Director
CC:
Date: September 5, 2012
Subject: Pine Tree Pond Trail Pad Update
The Pine Tree Pond Trail construction is a work in progress. As of September 1, most tree and brush
clearing of the trailway has been completed. Relocation and maintenance of the utility access points is
under construction. Upon completion of that work, the trailway will be excavated and replaced with 8"
of gravel. Due to the City's inability to secure grant funding from the MN DNR, only the western portion
of the trailway will be completed which will connect 80` Street with the archery range and playground
area at Isleton Court South. The trail will not be paved until future funding becomes available.
n
m Z O
d X D
m m
•o M
0 20
O
rn
D
3
T. Z
— Z
D �
r OO
D
- A .
f `
✓ ✓ ✓��� m x
D v - 1 T.
L�l
z O O� ..
'r c _ V m
,� Flr,a . I • i Isleton CT
Isfe A s 1 t ; fit• `, z �'tr r
TA
Z
v
O
a
O
In
m
--I
r
O
C
i'
I
L1
C
A
m
m