HomeMy WebLinkAbout2012-11-21 PACKET 08.A.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING IT!!11w
DATE 11/21/12
•
PREPARED BY
Finance
Robin Roland
DEPARTMENT HEAD
ORIGINATING DEPARTMENT
COUNCIL ACTION REQUEST
Adopt the attached resolution approving the feasibility report and establishing a December 19,
2012 public improvement hearing for the East Point Douglas Road Street and Utility
Improvements project.
STAFF RECOMMENDATION
Adopt the attached resolution approving the feasibility report and establishing a December 19,
2012 public improvement hearing for the East Point Douglas Road Street and Utility
Improvements project.
BUDGET IMPLICATION N/A N/A
BUDGETED AMOUNT ACTUAL AMOUNT
ADVISORY COMMISSION ACTION
DATE
REVIEWED
APPROVED
DENIED
❑ PLANNING
❑
❑
❑
❑ PUBLIC SAFETY
❑
❑
❑
❑ PUBLIC WORKS
❑
❑
❑
❑ PARKS AND RECREATION
❑
❑
❑
❑ HUMAN SERVICES /RIGHTS
❑
❑
❑
❑ ECONOMIC DEV. AUTHORITY
❑
❑
❑
❑
❑
❑
❑
SUPPORTING DOCUMENTS
® MEMO /LETTER: Roland, November 16, 2012
® RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
® OTHER: East Point Douglas Road Street and Utility Improvements Project Feasibility
Report -
ADMINISTRATORS COMMENTS
_ I
City Administrator Date
H: \Council items \City Council Action Form.doc
RESOLUTION NO. 12
RESOLUTION APPROVING THE FEASIBILITY REPORT AND CALLING FOR A
PUBLIC HEARING BY THE CITY COUNCIL ON THE EAST POINT DOUGLAS
ROAD STREET AND UTILITY IMPROVEMENTS PROJECT (Phase 1)
WHEREAS, a feasibility report was authorized to be prepared by Bolton & Menk for the East
Point Douglas Road Street and Utility Improvements; and
WHEREAS, the feasibility report has been prepared and does find the construction of said
improvements to be necessary, cost - effective and feasible; and
WHEREAS, the City desires to assess the cost of said improvements to the benefiting
properties.
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Cottage Grove,
County of Washington, and State of Minnesota:
1. The feasibility report for the East Point Douglas Road Street and Utility Improvements finds
these Phase I improvements to be necessary, cost effective and feasible and is hereby
approved.
2. The City Council will consider the Phase I improvements to the street and utilities in
accordance with the feasibility report and will further consider the assessment of benefitting
property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes,
Chapter 429 at an estimated total improvement cost of $2,974,665.41.
3. A public hearing shall be held on the proposed Phase I improvements on the 19 day of
December, 2012 in the Council Chambers of City Hall at 7:30 p.m. and the clerk shall give
mailed and published notice of such hearing and improvement as is required by law.
Adopted by the City Council of the City of Cottage Grove this 21S day of November, 2012.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
(M City of Cottage Grove Memo
TO
FROM
DATE
Honorable Mayor and City Council
Ryan Schroeder, City Administrator
Robin Roland, Finance Director
Jennifer Levitt, City Engineer /Community Development Director
November 16, 2012
RE: Adopt Resolution approving the East Point Douglas Road Street and
Utility Improvements Feasibility Report and establishing a December 19,
2012 Public Improvement Hearing
Introduction
The City Council called for the East Point Douglas Road Street and Utility
Improvements Feasibility Report on April 18, 2012. This feasibility study was to
consider improvements to the roadway from its current location at the VFW to CSAH 19.
These improvements would be necessary to serve potential retail development in that
area.
Discussion
The completed feasibility study is included with this item. The analysis was separated
into phases, with Phase I to be considered currently in conjunction with the Wal -Mart
development which was approved by the City Council on September 5, 2012. The
project is considered physically and financially feasible.
The public improvements identified by the feasibility study will benefit properties in the
immediate area. Costs for Phase I of the project may be assessed to the properties
benefiting from the improvements. Under state statute, a public hearing is necessary
for such assessment to occur. A public hearing date of December 19, 2012 will afford
the necessary time for publishing and mailing legal notices to the affected property
owners.
A schedule of the affected properties and the proposed assessment amounts is
included in the feasibility report, Appendix C (page 35 and 36). Negotiations with
property owners and developers are currently underway and may lead to agreements
regarding the proposed assessment amounts which would ultimately eliminate the need
to complete the full Statute 429 process. Staff will notify council at the time of the public
hearing whether those agreements have been secured.
City Council
East Point Douglas Road Street and Utility Improvements
Page 2
Action Requested
Adopt the resolution approving the East Point Douglas Road Street and Utility
Improvements Feasibility Report and establishing a December 19, 2012 Public
Improvement Hearing.
......... ......... ...
Consuttin En Surveyors
Arm
Cotta
Grove
,ph ete Pride and PrpSperity Meet
Feasibility Report
for
East Point Douglas Road
Street and Utility Improvements
City of Cottage G Minnesota
November 2012
Project Number N15.104975
C:> ETON &,.&. M I N K , i r%%j C:4
0 Consulting Engineers &Surveyors
It 2035 County Road D East • Suite Be Maplewood, MN 55109 -5314
Phone (651) 704 -9970 •Fax (651) 704 -9971
www.bolton- menk.com
November 21, 2012
Honorable Mayor and City Council
City of Cottage Grove
7516 80' Street South
Cottage Grove, MN 55016
RE: East Point Douglas Road Street and Utility Improvements
BMI Project No. N15.104975
Honorable Mayor and City Council Members,
Enclosed for your review is the East Point Douglas Street and Utility Improvement project Feasibility Report. The
project scope includes street construction and utility improvements from approximately East Point Douglas Lane to
Innovation Road (CSAH 19), as identified in this report.
This report describes the improvements necessary within the project area. The work outlined is anticipated to be
performed in phases; the first phase to handle an immediate development request from Wal -Mart and another to
provide for development of the remaining Cottage View site. Cost estimates for the proposed improvements are
presented in the Report.
We would be happy to discuss this report at your convenience. Please contact me at 651- 968 -7674 if you have any
questions.
Sincerely,
BOLTON & MENK, INC.
Ata gt��
Mike Boex, PE
DESIGNING FOR A BETTER TOMORROW
Bolton & Menk is an equal opportunity employer
EAST POINT DOUGLAS ROAD
FEASIBILITY REPORT
TABLE OF CONTENTS
Tableof Contents ......................................................................................................
............................... i
Certification.............................................................................................................
............................... ii
Introduction..............................................................................................................
............................... 1
ExistingConditions ..................................................................................................
............................... 1
SanitarySewer ...................................................................................................
............................... 1
WaterMain ........................................................................................................
............................... 1
Services.............................................................................................................
............................... 2
StormSewer ......................................................................................................
............................... 2
Streets................................................................................................................
............................... 2
PrivateUtilities ..................................................................................................
............................... 3
ProposedImprovements ...........................................................................................
............................... 3
SanitarySewer ...................................................................................................
............................... 3
WaterMain ........................................................................................................
............................... 4
Services.............................................................................................................
............................... 4
StormSewer ......................................................................................................
............................... 4
Streets................................................................................................................
............................... 6
Streetscape .........................................................................................................
............................... 8
Grading..............................................................................................................
............................... 9
Permitsand Easements .............................................................................................
............................... 9
EstimatedCosts ......................................................................................................
............................... 10
CostAllocation ......................................................................................................
............................... 10
Financing...............................................................................................................
............................... 11
AreaCharges ...................................................................................................
............................... 11
TrunkFunds .....................................................................................................
............................... 12
Non -City Contract Improvements .....................................................................
............................... 13
Major Roadway Special Assessment ................................................................
............................... 13
PublicHearing ........................................................................................................
............................... 13
ProjectSchedule .....................................................................................................
............................... 14
Conclusion And Recommendations ........................................................................
............................... 14
City of Cottage Grove, Minnesota Table of Contents
East Point Douglas Road Street & Utility Improvements Page i
EAST POINT DOUGLAS ROAD
APPENDIX
Appendix A
Figure 9 —
Figure 1 —
Location Plan
Figure 2 —
Ownership Map
Figure 3 —
Existing Conditions
Figure 4 —
Pavement Cores
Figure 5 —Phase
1 Improvements
Figure 6 — Phase 2 Improvements
Figure 7 — Phase 1 & 2 Improvements
Figure 8 —
Proposed Utility Plan
Figure 9 —
2030 Projected Traffic Volumes
Figure 10
— Typical Sections
Figure 11
— Phase 1 Improvements — Public /Private
Figure 12
— Jasmine & Jeffery Turnarounds
Appendix B — Cost Estimate Summary
Appendix C — Assessment Calculations
Appendix D — Area Charges
CERTIFICATION
I hereby certify that this plan, specification, or report was
prepared by me or under my direct supervision, and that I
am a duly Licensed Professional Engineer under the laws
of the State of Minnesota.
By_ 4 400 1 P &>g::;)
Michael J. Boex, P.E.
License No. 44576
Bolton & Menk, Inc.
Date: November 21, 2012
City of Cottage Grove, Minnesota Certification
East Point Douglas Road Street & Utility Improvements Page ii
EAST POINT DOUGLAS ROAD
INTRODUCTION
Proposed development within the Cottage View site has spurred the need for construction of water,
sanitary sewer, storm sewer, and street improvements to serve the area between East Point Douglas Lane
and Innovation Road (CSAH 19). The City Council authorized the preparation of this Report on April
18", 2012 to determine the feasibility of the proposed street and utility improvements.
The Cottage View site is generally described as the area between East Point Douglas Lane, Highway 61,
CSAH 19, and both the Ridgewood and Knollwood Additions. A location plan is shown on Figure 1 and
the Cottage View area and parcel ownership is shown on Figure 2 in Appendix A
This report will include a discussion of the improvements required to serve the proposed development,
estimated costs of said improvements, and a method of cost allocation to determine project feasibility.
This feasibility report examines the following street segments:
1. East Point Douglas Road & Ravine Parkway from East Point Douglas Lane to CSAH 19.
Construction for Phase 1 improvements is planned for early 2013. Construction for Phase 2 improvements
is anticipated to be completed when additional development occurs within the Cottage View site.
EXISTING CONDITIONS
SANITARY SEWER
The Metropolitan Council Environmental Services (MCES) completed construction of the 54 -inch
diameter South Washington County interceptor in 2005. The interceptor conveys wastewater from
Woodbury and Cottage Grove to the Eagles Point treatment plant. The interceptor follows County Road
19 to the south from the Woodbury border. At 90' Street, the interceptor turns west for one -half mile and
then proceeds south along the eastern and southern edge of the Ridgewood developments. Avertical drop
structure is located near Jeffery Avenue due to the steep change in elevation within the Cottage View site.
The interceptor then heads south and crosses East Point Douglas Road and Highway 61 adjacent to the
VFW and Groveland Cottages development.
A lateral 12 -inch stub has been provided at MCES MM-19 and a 30 -inch stub at M14-17. Both were
provided to serve future development areas, including the Cottage View site. From previous studies, the
12 -inch stub was provided to serve sewer district ED -6 (the Cottage View site) and the 30 -inch stub was
provided to serve the entire Southeast (SE) district and the portion of the Cottage Grove Ravine (CRG)
district south of 90" Street. The 30 -inch stub was most recently extended in 2007 to a new manhole as a
part of the VFW Utility Improvement project.
The 15 -inch trunk sanitary sewer installed in 1996 as a part of the Groveland Cottages Utility
Improvement project will no longer be extended to the Cottage View site. The MCES interceptor negated
the need for extension of this pipe and therefore was not completed during the interceptor project.
Service has since been proposed from the interceptor.
WATER MAIN
A 24 -inch diameter ductile iron pipe (DIP) trunk water main currently extends southeast along East Point
Douglas Road and terminates at the VFW property. The main was installed m1996 and was extended
beyond the MCES interceptor in 2005, and extended once again to the VFW property in 2007.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 1
EAST POINT DOUGLAS ROAD
6 -inch lateral water main pipes currently terminate on Jareau Avenue, Jasmine Avenue, and Jergen
Avenue. An 8 -inch water main exists on Jeffery Avenue and was extended beyond the MCES interceptor
as a part of the interceptor project. Jergen Avenue currently operates on the City's High Pressure Zone
and the others on the Intermediate Zone.
SERVICES
No individual service pipes exist to the majority of the Cottage View site since it is currently
undeveloped. Services have been provided to the VFW building in 2007 when trunk utilities were
extended to that property.
STORM SEWER
The majority of the Cottage View site is located within drainage area ER -A9, consisting of 125 acres.
No regional pond currently exists in this drainage area. A portion of the northeast corner of the Cottage
View site is in drainage area ER -A5.4 which is proposed to drain to the east of CSAH 19. Generally
speaking, the existing topography of the site naturally drains from the northeast to the southwest There is
an existing 24 -inch diameter reinforced concrete pipe (RCP) culvert under East Point Douglas just west of
the entrance to the drive -in theatre. Where the urban street section begins near the Groveland Cottages
development two flared ends pick up ditch drainage from the east. Drainage is then conveyed up East
Point Douglas to Islay Avenue, then heads south and crosses Highway 61 and discharges to pond L -P3.
STREETS
East Point Douglas Road is a designated MSA (Municipal State Aid) street from 80t Street to Innovation
Road (CSAH 19). State Aid funds can be used on the designated MSA streets for construction and
maintenance purposes.
The segment of East Point Douglas Road adjacent to the Drive -In Theater site was originally part of
Highway 61 from approximately 1927 -1958. Concrete paving from old Highway 61 is present under the
existing roadway just east of the drive -in theater.
East Point Douglas Road was last reconstructed in 1996. It's a 3 -lane urban section 40 feet wide, from
face of curb to face of curb, from Jamaica Avenue to the south plat line of the Groveland Cottages
development. The three lane section includes two eastbound through lanes and one westbound through
lane. From the VFW to CSAH 19, East Point Douglas Road is a rural section two lane roadway 24 feet
wide with 3 -foot gravel shoulders. An 8 foot bituminous pathway is within the south boulevard the entire
length of the street. A 6 foot concrete sidewalk is within the north boulevard from Jamaica Avenue to the
east property line of Menards. Street lighting currently exists along the urban street section from Jamaica
Avenue to East Point Douglas Lane.
Innovation Road (CSAH 19) is under the jurisdiction of Washington County and it serves as the main
arterial for the developing East Ravine area. Traffic volumes between 90` Street and Highway 61 are
currently around 7,700 daily trips. Traffic volumes are expected to grow considerably by 2030, requiring
expanded capacity of the roadway. CSAH 19 includes two northbound through lanes and two
southbound through lanes in this area. One of the southbound through lanes transitions to a right turn lane
at the T.H. 61 interchange ramps.
Coring of the pavement on East Point Douglas Road was performed to determine the thickness of the
existing street section. This was used to design a recommended pavement section and anticipate
necessary removals. See Figure 4 for the core locations.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 2
EAST POINT DOUGLAS ROAD 1
Existing Street Section — East Point Douglas
No.
Location
Bituminous (in)
Concrete (in)
Aggregate Base (in)
1
475 if West of CSAH 19
6 -3/4" *
9 -1/2"
2A
1075 if West of CSAH 19
6"
12"
2
1275 if West of CSAH 19
3 -3/4"
7 -3/8"
9 -1/4"
2B
1475 If West of CSAH 19
3 -1/2"
7 -1/2"
11 -1/2"
3
1825 if West of CSAH 19
5 -3/4"
21 -1/2"
4
2225 if West of CSAH 19
7"
17 -3/4"
5
3260 if West of CSAH 19
4 -5/8"
2 -1/4" to Refusal
* Low - severity asphalt stripping was present
On the north side of the Cottage View site, temporary turnarounds exist on Jasmine Avenue and Jeffery
Avenue. The 2030 comprehensive plan allows for the extension of these streets in the future. Jasmine
and Jeffery both have temporary cul -de -sacs the width of the existing right -of -way. The temporary sacs
do not have curb and gutter.
PRIVATE UTILITIES
There is a 50 foot natural gas transmission pipeline easement that runs east -west along the southern
boundary of the Ridgewood development, approximately from Menards to CSAH 19. Overhead power
extends down East Point Douglas Road in the north boulevard. Also present along East Point Douglas
are underground gas and communication lines.
PROPOSED IMPROVEMENTS
SANITARY SEWER
The Wal -Mart parcel will be served with sewer by connecting to the 12 -inch diameter ductile iron pipe
(DIP) stubbed out of MCES Manhole (MIT) -19. In the future, a lateral sewer pipe could also be extended
from the 12 -inch stub to serve a future parcel east of Wal -Mart.
The existing 30 -inch diameter polyvinyl chloride (PVC) sewer on the west side of the VFW would be
extended to serve future development to the east of CSAH 19. This 30 -inch trunk pipe will ultimately
serve approximately 2,800 acres east of CSAH 19 and south of 90th Street. This trunk sewer pipe would
be installed along the east -west portion of East Point Douglas Road and would be stubbed out for a future
connection where the proposed roadway curves to the north. The 30 -inch pipe will ultimately be
extended in the existing road right -of -way to CSAH 19, or along a future property line as development
between East Point Douglas Road and CSAH 19 occurs.
The 30 -inch pipe has been evaluated for capacity based on the anticipated 2030 land use plan. It appears
the 30 -inch trunk sewer has enough capacity to serve the remaining portion of the Cottage View site,
eliminating the need for a parallel 12 -inch trunk pipe originating from MCES MH -19. Where East Point
Douglas Road curves to the north, a lateral 8 -inch sewer pipe would be extended from the 30 -inch trunk
to serve the remaining portion of the Cottage View site. It should be noted, however, that this lateral
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 3
EAST POINT DOUGLAS ROAD
sanitary sewer cannot be extended beyond the Cottage View site to serve areas to the north. Future sewer
service north of the Cottage View site will be from MCES MH -21.
WATER MAIN
The Cottage View site is planned to operate in two separate pressure zones, the High Zone (HGL 1093)
and the Intermediate Zone (HGL 990). Water main pressure in this area of the City is anticipated to be as
high as 85 pounds per square inch (psi) and as low as 40 psi. As development in this area occurs, it
should be noted that low static pressures (less than 40 psi) occur in the Intermediate Zone when ground
elevations are higher than 898 and high static pressure (greater than 100 psi) occur in the High Zone
when ground elevations are lower than 862.
Trunk water main service would be provided by extending the 24 -inch diameter ductile iron pipe (DIP)
water main from the existing stub adjacent to the VFW along East Point Douglas Road. Asa part of the
Phase 1 improvements, an 8 -inch water main will be looped from the easterly Wal -Mart driveway to
Jeffery Avenue. All of the Phase 1 improvements would operate in the Intermediate Zone.
The Phase 2 improvements would extend the 24 -inch water main to the curve in East Point Douglas
Road. At that location, an 18 -inch trunk would be stubbed out towards CSAH 19 to provide additional
capacity for a future water tower located east of CSAH 19. The remainder of East Point Douglas Road to
the north can be reduced to an 18 -inch water main.
A pressure reducing valve (PRV) is proposed between the two pressure zones at an elevation between 865
and 870. A connection to the High Zone will be provided by extending the existing 6 -inch water main
from Jergen Avenue. The proposed PRV will also provide a redundant connection to the Intermediate
Zone and should be designed for two -way flow to provide adequate fire -flow during emergencies. A 12-
inch stub in the High Zone will be provided at the roadway connection to CSAH 19.
12 -inch diameter DIP water mains would be installed throughout the remainder of the site at appropriate
locations to serve any future development. The entire system would be equipped with the necessary
valves and hydrants for operation, control, and fire protection. Water main should be looped where
possible to eliminate dead ends, to provide adequate fire protection and circulation for improved water
quality.
SERVICES
Individual sewer and water services would be installed to anticipated locations of commercial property
within the Phase 2 development The individual water services would be 12 -inch diameter ductile iron
pipe for fire flow. The sanitary sewer services would be 8 -inch diameter PVC pipe. As per City code,
sewer services are considered private from the building to the sewer main and water services are private
from the building to the curb stop. Ownership and maintenance is therefore responsibility of the property
owner where the service is considered private.
STORM SEWER
The storm water runoff from the construction of the new street would be conveyed by the proposed
concrete curb and gutter and collected at low points and at street intersections. The lateral storm sewer
system will then be designed to a 5 -year return frequency in accordance with City policy. A 100 -year,
6.3 -inch 24 -hour event is used for overland drainage and pond storage design.
Wal-Mart is proposing an on -site ponding system that meets current City rate control and water quality
requirements. The onsite ponds are proposed to be private as they will only serve the Wal -Mart site. The
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 4
EAST POINT DOUGLAS ROAD
private pond on the southeast corner of the Wal -Mart site will discharge to a pipe crossing the proposed
frontage road into a regional pond to the east
The VFW parcel will require an onsite pond when it redevelops and will be restricted to the 100 -year rate
control requirements of district ER -A9 as currently planned in the 2008 Surface Water Management Plan
(0.06 cfs /acre). However, due to elevation constraints, the VFW site and a portion of the street drainage
are proposed to be routed to the existing storm sewer system heading northwest along East Point Douglas
Road.
Under Phase 1, no portion of the ultimate trunk storm sewer outlet from ER -A9 is proposed to be
constructed. The regional pond will instead discharge into a temporary 18" outlet which will run
northwest along East Point Douglas Road approximately 800 feet, then cross East Point Douglas Road
and discharge to an existing cross - culvert under Highway 61.
When additional development in the area is proposed (Phase 2), construction of the ultimate outlet should
be evaluated at that time. Costs for the ultimate outlet have not been included in the Phase 2 costs for this
report; rather it is recommended that the City incorporate the ultimate trunk storm sewer outlet into the
City's Capital Improvement Plan (CIP) in the next few years. It is anticipated that the ultimate outlet will
be triggered by either:
1. Additional development within the Cottage View Site (or drainage district ER -A9)
2. Incorporation of the drainage area into the City's Wellhead Protection Area
The regional pond on the east side of the frontage road has been proposed to be constructed without a clay
liner as an interim measure to provide some mitigation for the runoff volume and flow duration increases
due to the Wal -Mart site, as addressed in the Walmart Regional Stormwater Analysis memo (dated
August 21, 2012) prepared by Stantec. Infiltration at this location should be considered a temporary
solution for mitigating some of the increase in runoff volume and flow duration, until such time as the
ultimate trunk outlet is constructed. It is anticipated that when the ultimate outlet is constructed the pond
will be lined with an impermeable liner to prevent infiltration.
The City's volume control requirement of infiltrating 1 -inch of runoff from the new impervious areas will
need to be provided for review with each incoming Phase 2 development plan. Due to the groundwater
protection concerns, the use of filtration or biofiltration BMPS's should be used in lieu of infiltration.
A concept grading plan dated 06/18/2012 was developed byHerringer Companies for the remaining
undeveloped property. Due to extreme topography changes across the site, this concept depicts two
primary ponds within drainage district ER -A9. This concept was used as a basis for estimating future
pond and storm sewer costs for potential Phase 2 improvements. When actual development plans come
in, this development concept and therefore estimated costs will be subject to change.
It was assumed that further pond construction would occur in phases as development occurs. The portion
of pond required for the roadway would be constructed initially, and ponds would be expanded and added
in the future as development occurs. Pond costs presented in this report are for street drainage only and
additional expansion of the ponds due to future development would be a developer's cost.
Construction of the proposed roadway improvements will account for a portion of the ponding needs of
the site. It is estimated that approximately 4.5 acre -feet of storage will be required for the construction of
street improvements within the right -of -way. This volume is proposed to be incorporated into the regional
ponds adjacent to the roadway.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 5
EAST POINT DOUGLAS ROAD
STREETS
Previous studies such as the Southwest Cottage Grove Transportation Study (2008) and the Cottage
Grove East Ravine AUAR (2006) were referenced during the preparation of this report. This report
evaluated traffic impacts to the proposed public roadways due to development within the Cottage View
site. Specifically, the following was studied:
1. Location of the new East Point Douglas Rd/CSAH 19 intersection
2. Location of East Point Douglas Rd/Ravine Parkwaylntersection (proximity to CSAH 19)
3. Determination of through road status (East Point Douglas Rd vs. Ravine Parkway)
4. CSAH 19 improvements at East Point Douglas Rd intersection
Both East Point Douglas Road and Ravine Parkway have a proposed a functional classification of Major
Collector per the City's 2030 comprehensive plan.
The Phase 1 improvements will be completed to serve the Wal -Mart development, while the Phase 2
improvements will serve the entire Cottage View area. The improvements will be implemented as
development pressures dictate. The streets will be designed to a 30 -mph design standard and a maximum
5% centerline grade will be established.
TRAFFIC VOLUMES
East Point Douglas Road currently has an Average Annual Daily Traffic (AADT) of 2,800 vehicles per
day in the Wal -Mart area. After construction, the AADT west of Wal -Mart is expected to increase to
3,100 vehicles per day and the AADT east of Wal -Mart is expected to increase to 10,100 vehicles per
day.
CSAH 19 currently has an AADT of 6,700 vehicles per day north of the East Point Douglas Road
intersection and 8,200 vehicles per day south of the intersection. The AADTs are expected to increase to
8,000 vehicles per day to the north and 14,700 vehicles per day to the south after the Wal -Mart
construction.
The complete development of the Cottage View area in accordance with the 2030 land use plan is
expected to cause traffic volumes to increase to 33,700 vehicles per day on East Point Douglas Road near
CSAH 19. Volumes between the East Point Douglas Road and Ravine Parkway intersection and the Wal-
Mart site are projected at 20,600 vehicles per day, while traffic volumes to the Wal -Mart site are
anticipated to increase to 11,200 vehicles per day. Traffic volumes west of the Wal -Mart site are
anticipated to be 4,800 vehicles per day. Traffic volumes along CSAH 19 are expected to increase to
13,800 vehicles per day north of the East Ravine Parkway intersection and 38,500 south of the
intersection.
PHASE 1 IMPROVEMENTS (2013)
The Phase 1 improvements consist of extending the existing three lane section of East Point Douglas
Road from East Point Douglas Lane to the east, past the Wal -Mart site. This will include approximately
2,000 feet of urban section roadway, with a face -to -face dimension of 40 feet to meet MnDOT State Aid
standards. The roadway will then taper back to the existing two lane section east of the Wal -Mart
property. Approximately 380 feet of taper section will be required to connect the different roadway
sections. A short right turn lane will be constructed for westbound traffic into the easterly Wal -Mart
entrance. This will be constructed in anticipation of the Phase 2 improvements in this area.
The existing boulevard and trail will remain in -place along the south edge of the roadway. An 8 -foot wide
boulevard and a 6 -foot wide concrete walk will be constructed along the north side of the roadway.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 6
EAST POINT DOUGLAS ROAD
The roadway alignment has been established by the full- section roadway constructed to the west of the
Wal -Mart site and the existing alignment to the east of the Wal -Mart site. Additionally, the Phase 2 layout
helps define future roadway extensions and establishes a continuous alignment through the Cottage View
area. The southerly Right -of -Way through this area is a common line with Trunk Highway 61.
Based analyses completed to date, no improvements will be required on CSAH 19 for the interim
condition. The existing two -way stop condition appears to be adequate to control the additional traffic
generated from the Wal -Mart development However, Washington County will require a right turn lane
on East Point Douglas as it approaches CSAH 19 in order to preserve acceptable traffic operations.
With the addition of the Wal -Mart site, the temporary turnarounds at Jasmine and Jeffery Avenues will be
reconstructed to a permanent cul -de -sac. They will include concrete curb and gutter, modification of
storm sewer, and extension of street lighting if necessary. The widths of the cul -de -sacs will remain
approximately the same as they exist today, constrained by the width of the right -of -way. Jareau Avenue
and Jergen Avenue will be addressed in the future when redevelopment occurs adjacent to those streets.
INTERMEDIATE IMPROVEMENTS
Analyses completed to date indicate that the intersection of East Point Douglas Road and CSAH 19 will
function marginally after the Wal -Mart construction. There is the potential that additional improvements
will be required at the intersection, depending upon developing traffic patterns. There is the potential for
an all -way stop to be implemented, and potentially the need for a traffic signal at this location. The
intersection will be monitored after construction to determine the need for any additional improvements.
PHASE 2 IMPROVEMENTS
The Phase 2 improvements assume additional development within the Cottage View area. Further
development will create the need to extend East Point Douglas to the north to a new intersection with
CSAH 19. The new intersection location with CSAH 19 has been coordinated with the County and is
approximately 1550 feet north of the westbound Highway 61 ramp. This location is consistent with the
Southwest Transportation Study. The existing intersection of East Point Douglas will be severed to allow
for better intersection spacing along CSAH 19.
The East Point Douglas Road alignment will curve to the north and maintain a parallel alignment with
CSAH 19, leaving approximately 500 feet of developable property between the Rights -of -Way. A new 4-
legged intersection will be created to allow for a connection to CSAH 19 to the east, a connection to a
future Ravine Parkway to the north and a connection to future development to the west. The roadway will
be widened through the curve to allow for a 4 -lane divided roadway section with left and right turn lanes
at each intersection. Two median openings and associated curb openings will be created to allow for
property access along the roadway. The median openings will be created to allow for access to properties
to the east Access to properties on the west side of the roadway will be provided by a future internal
roadway system. Should the internal roadway system be a public road, the City will coordinate with the
property owner determine the locations of future commercial development during the final design of the
Phase 2 improvements. Measures to protect the concrete curb will include the construction of gravel
driveway aprons at each curb opening location designated by the developer.
Intersection control will be required at each of the new intersections created. Based on traffic analyses,
interconnected traffic signal systems will provide the best means of control. The traffic signals will most
likely not be installed initially. Traffic signal warrants will need to be met prior to installing the systems.
As development continues in the Cottage View area, traffic will increase, most likely driving the need for
the signal systems at a later date, therefore no costs for a signal at East Point Douglas & Ravine Parkway
are presented in this report.
t
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 7
EAST POINT DOUGLAS ROAD
CSAH 19 IMPROVEMENTS
CSAH 19 is a four -lane, urban - section roadway through this area, tapering to a two -lane section roadway
north of the proposed future intersection. Intersection control required for the Phase 1 improvements is
anticipated to consist of stop conditions for East Point Douglas Road. There is the potential for this
intersection to become a four -way stop or for a temporary signal to be installed to control traffic. Traffic
will be monitored after Phase 1 construction to analyze traffic patterns top determine if a revised traffic
control system will be required.
The Phase 2 improvements will sever the existing East Point Douglas Road access and create a new
intersection approximately 1550 feet north of the T.H. 61 ramps. Initially, the new intersection will most
likely be controlled with a stop condition on East Point Douglas Road, As traffic increases due to
continued development in the Cottage View area, a signalized intersection will most likely be required.
There is also the potential for southbound right turn lane at the new intersection. Signing and striping
improvements will be required as the method of intersection control is revised along CSAH 19.
While traffic volumes will continue to increase with development, the volume of traffic that can safely
access CSAH 19 will be limited by the T.H. 61 interchange. Interchange concepts have been developed
that will include an expansion of CSAH 19 past the future East Point Douglas Road intersection. Costs
associated with these improvements are anticipated to be shared by MnDOT, Washington County and the
City of Cottage Grove. The City's portion of the costs would most likely be in the form of State Aid,
Cooperative Agreement and future assessments. No costs are included in this report for those
improvements. We anticipate that benefit to the Cottage View area would be determined as a portion of
that project and assessments levied accordingly.
STREET SECTION
The Phase 1 and Phase 2 street sections were assumed to consist of 4- inches of bituminous wear course,
2- inches bituminous non -wear course, 10- inches of class 5 aggregate base, and 12- inches of select
granular borrow (if necessary). Typical street sections can be seen on Figure 10.
Soil borings previously taken in this area have generally consisted of topsoil (6 -18 inches) over poorly
graded sand (SP). Prior to final design, additional borings should be taken over the design street
alignment to confirm soil conditions and assumed R- value. Due to the findings of the previous borings, it
is not anticipated that select granular borrow will be needed for the proposed street section.
TRAIL AND SIDEWALK
A 6 -foot wide concrete sidewalk would be constructed within the north and west boulevards of East Point
Douglas Road, extending from the existing sidewalk at Menards to CSAH 19. The sidewalk would be
publicly owned.
The existing trail on the south side of East Point Douglas Road will be extended along the new alignment
to County Road 19. The trail will be eight feet wide and separated from, and parallel to, each side of East
Point Douglas Road. The proposed trail will provide a link to the City of Cottage Grove's trail system and
will ultimately link to Washington County's Cottage Grove Ravine Regional Park
STREETSCAPE
East Point Douglas Road & Ravine Parkway will both incorporate landscaping, lighting, and urban
streetscaping features utilized in prior phases of Ravine Parkway near the County Government Center and
future City Hall site. This will provide a consistent experience for users of the roadway and trail system.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 8
EAST POINT DOUGLAS ROAD
Decorative lighting is proposed to illuminate the roadway and trails. The standard luminaire types for use
on Ravine Parkway are depicted on City standard detail plates STR -41 and STR -42, respectively.
Medians, where present, will be planted with shrubs, ornamental grasses, and perennials. The inside edge
of medians will contain a 2 -foot wide band of colored concrete. Decorative stamped colored- concrete
will be utilized in narrow areas of the median where sufficient room for planting beds is not present.
Consistent with past projects, a mix of tree types will be used in varying locations along the boulevard.
An irrigation system will be provided for the boulevards and plantings along East Point Douglas Road
and Ravine Parkway.
GRADING
There is considerable grading required for the construction the street and pond improvements due to the
topography of the site. Additionally, as sites develop there will be additional grading and possible
retaining walls to create buildable pads. The earthwork estimates in this report assume two phases of
construction with development driving the need for expedient grading operations. Earthwork costs can be
greatly impacted by factors such as: will the material have to be exported offsite, is there a buyer or need
for the exported excavated material, how many phases of grading will occur, and length of time allowed
to complete the grading.
There is currently a grading operation occurring on the Anderson and Apache parcels adjacent to CSAH
19. As grading continues to occur there it should reduce the necessary earthwork and associated costs for
future pond and street construction.
PERMITS AND EASEMENTS
A construction permit from the Minnesota Department of Health (MDH) and the Minnesota Pollution
Control Agency (MPCA) would be required for the water main and sanitary sewer construction. Because
this project disturbs more than one acre of land, a Phase II General Storm Water Permit for Construction
Activities from the MPCA would also be required.
A MaDOT Utility Permit on Trunk Highway Right Of Way will be needed for utility construction
parallel to the trunk highway. A Drainage Permit will be required due to changing drainage patterns as
development and pond construction occurs. A Limited Use Permit may also be required for street and
trail construction within parcels controlled by the State.
It is anticipated that Washington County will require a Right Of Way Permit. An access permit will be
required for the new Phase 2 connection to CSAH 19. An Obstruction Permit for temporary traffic
control on the County Road during construction either phase would also be required.
Permits from both the MCES and Northern Natural Gas are anticipated for proposed utility crossings of
their facilities.
A permanent drainage and utility easement for public utility extensions will need to be obtained across the
VFW property to the proposed development.
All necessary easements and right -of -way within the proposed development would be acquired through
the platting process. Temporary grading easements for the proposed street construction would need to be
obtained from the property owners.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 9
EAST POINT DOUGLAS ROAD
ESTIMATED COSTS
Detailed cost estimates for both phases of the East Point Douglas Road street and utility construction have
been prepared and are itemized in Appendix B. All costs are based on anticipated unit prices for the 2013
construction season. All costs include a ten (10) percent contingency and a thirty (30) percent allowance
for indirect costs associated with the project (engineering, administrative, financing, and legal). No costs
are included for capitalized interest during the construction period or before assessments are levied.
Following is an overall summary of the estimated costs:
Item
City Contract:
Sanitary Sewer
$404,761.50
$262,934.10
Water Main
$377,488.50
$661,246.30
Services
$7,817.81
$26,969.80
Storm Sewer*
$140,772.06
$582,127.26
Storm Water Regional Pond*
$173,499.04
$186,972.50
Streets
$626,281.37
$3,385,560.75
Sidewalks & Trails
$133,190.20
$250,744.78
Landscaping
$159,695.25
$549,692.00
Street Lighting
$160,338.75
$379,879.50
Subtotal
$2
$6,286,126.99
CSAH 19 Improvements
$286,000.00
$500,500.00
Frontage Road - Street
$256,399.00
Frontage Road - Utilities
$103,461.93
Jasmine & Jeffery Turnarounds
$145,000.00
Total Estimated Project Costs
$2,974,665.41
$6,786,626.99
'Assumed Regional Ponds. Actual costs for drainage may vary as Phase development plans
come in.
COST ALLOCATION
Assessments for this project will be based upon the "Infrastructure Maintenance TaskForce Special
Assessment Policy For Public Improvements," dated September 30, 2005. All adjacent benefiting
properties are proposed to be assessed. Guidelines related to Commerciai/Industrial Land Use were
utilized in determining the assessment amounts for the commercial properties. The project costs were
apportioned based on both footage abutting the project and area of the properties.
Assessments were estimated for both phases of improvements. Due to the fact that approximately 90% of
the Cottage View site is anticipated to be comprised of Commercial use per the 2030 plan, the
commercial assessment policy was applied to the entire Cottage View site. Per the CommerciaFIndustrial
policy, 100% of the project costs for both surface and subsurface improvements would be assigned to
each benefited commercial/industrial lot.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 10
EAST POINT DOUGLAS ROAD
The total estimated project assessments, assuming each phase of construction will occur independently,
are shown in Appendix C. Trunk funds, presented in more detail later in this report, are credited to the
project cost to determine an assessable project amount.
Assessed Costs
Phase Construction Total Project Cost
Assess to Entire Site:
Phase 1
$1,527,136.00
$2,183,804.48
Phase 1 TrunkFunds
$ (352,788.00)
$ (504,486.84)
Phase 1 CSAH 19
$200,000.00
$286,000.00
Phase I Suhtotal
$1,374,348.00
$1,965,317.64
Phase
$4,395,893.00
$6,286,126.99
Phase 2 Trunk Funds
$ (275,790.00)
$ (394,379.70)
Phase 2 CSAH 19
$350,000.00
$500,500.00
Phase 2 Subtotal
$4,470,103.00
$6,392,247.29
Total
$5,844,451.00
$8,357,564.93
Assess to Wal -Mart & Apache
Chief Theatre Co LLP:
Frontage Road - Street
$179,300.00
$256,399.00
Frontage Road - Utilities
$72,351.00
$103,461.93
Trunk Funds
$ (8,480.00)
$ (12,126.40)
Total
$243,171.00
$347,734.53
Totals
$6,087,622.00
$8,705,299.46
FINANCING
Assessments are proposed to be levied based on the City's current assessment policy. MSA funds will be
utilized on all actual participating construction costs. If construction for Phase 1 is done privately and is
not publicly bid, MSA funds cannot be used on the Phase 1 improvements. For the purposes of this
report, it is assumed that both Phase 1 and Phase 2 would be publicly bid and therefore MSA funds could
be utilized. The remainder of the project would be financed through a combination of City funds such as
the General Tax Levy and Enterprise funds for items such as sanitary, storm, water main, and street light
improvements.
AREA CHARGES
All properties in the City of Cottage Grove are assigned area charges as improvements are installed. The
area charges are used to fund the construction of trunk utilities throughout the City. Area charges are to be
assigned to the net area. The area charges are based on 2012 rates and could change depending on when
development occurs. For the Wal -Mart site, the net area is determined as follows:
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 11
EAST POINT DOUGLAS ROAD
Gross to Net Area Calculations
7Fund
y Fund
Acres
Gross Area
23.89
Less Pond HWL, Outlots
(4.53)
Net Area
19.36
Deduction Summary
7Fund
y Fund
Acres
Outlot A
1.39
Outlot B
0.49
North Pond HWL
0.47
South Pond HWL
1.48
Frontage Road
0.70
Subtotal
4.53
A summary of Area Charges for both the proposed Wal -Mart site and remaining future development of
the Cottage View site can be seen in a table in Appendix D. The areas presented in the Appendix were
based on the approved 2030 Land Use plan and excluded existing and proposed major road right -of -way.
No pond credit was applied to parcels other than Wal -Mart because no other developments plans have
been provided. Once a development plan is submitted and ponding is addressed, the appropriate area
would be credited.
The area charges applied are based on the rates that are in effect for various land uses as of January 1,
2012 per the City of Cottage Grove fee ordinance.
TRUNKFUNDS
This development will be assessed for a portion of the trunk utilities through the site based on minimum
development standards. The portion of the funds necessary for increased main capacity will be provided
through the City Trunk Utility Funds.
Trunk Fund Summary
Phase 1 Phase 2
7Fund
y Fund
$271,449.7 5
$83,054.40
und
$238,013.49
$311,325.30
Trunk Storm Fund
$7,150.00
$0.00
Trunk Fund Total
$516,613.24
$394,379.70
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 12
EAST POINT DOUGLAS ROAD
NON -CITY CONTRACT IMPROVEMENTS
Certain improvements are required to be completed and financed by the developer. Costs for these
improvements will be deposited in an escrow account with the City. The anticipated costs for the
proposed Wal -Mart development are estimated below and do not include the 150% increase as is required
for the escrow account. Sidewalk repair and lot pin replacement do not require the 150% increase.
04 Non -City Contract Improvements
Item
Total
Street Grading
$0.00
Street Signs
$2,550.00
Erosion Control
$43,200.00
Pond Cleaning
$10,000.00
Boulevard Trees
$0.00
Boulevard Seed
$0.00
Swale Sod
$0.00
Street Sweeping
$0.00
Total Requiring 150% Increase
$55,750.00
Grading Certificate & Lot Pin Replacement
$6,500.00
Sidewalk Repair
$3,000.00
Grand Total
$65,250.00
The developer will be required to deposit an escrow for the development in the amount of $150% of
$55,750.00, plus the cost of the Sidewalk Repair and Grading Certificate & Lot Pin Replacement charges
of $9,500.00, plus area charges.
MAJOR ROADWAY SPECIAL ASSESSMENT
The major roadway special assessment does not apply to the East Ravine Neighborhood 1- South,
therefore no charges are presented in this report.
PUBLIC HEARING
Because the properties within the project area benefit from the proposed improvements, and the project
will be partially funded through assessment, it will be necessary for the City to hold a public
improvement hearing to receive comment on the proposed project and to determine further action to be
taken.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 13
EAST POINT DOUGLAS ROAD
PROJECT SCHEDULE
Below is the proposed schedule assuming starting construction in 2013
• 04/18/2012
Council Orders Feasibility Report
• 05/31/2012
Meeting with Property Owners
• 06/20/2012
Meeting with Property Owners
• 07/23/2012
Planning Commission Reviews Wal -Mart Plat
• 08/27/2012
• 09/05/2012
• 11/21/2012
• 12/19/2012
• 02/20/2013
• 03/28/2013
• 04/03/2013
• Spring 2013
• Summer 2013
• July 2013
•
August 2013
• TBD
Planning Commission Approves Wal -Mart Plat
Council Approves Wal -Mart Plat
Council Receives and Approves Feasibility Report
Council Sets a Public Improvement Hearing Date
Council Holds a Public Improvement Hearing
Council Orders the Preparation of the Plans and Specifications — Phase 1
Council Approves the Plans and Specifications
Project Bid Date —Phase 1
Contract Award — Phase 1
Begin Construction —Phase 1
Complete Construction —Phase 1
Council sets Assessment Hearing Date
Council holds Assessment Hearing
Phase 2 Construction
CONCLUSION AND RECOMMENDATIONS
The following table compares the costs estimated in this report to the costs in other preliminary reports
for recent developments in the area. These comparisons, on a per unit basis, are shown as follows:
Cost per Unit Comparison
Ravine Parkway & 85 Street South*
$827/LF
*Bridge costs not included in comparison
East Point Douglas —Phase 1
$955/LF
East Point Douglas —Phase 2
$1,418 /LF
The table above shows that the estimated costs to provide public utilities and streets within the Cottage
View site are comparable to the previous Ravine Parkway project, considering the proposed road sections
and therefore feasible. The prior Ravine Parkway project was predominantly a two -lane roadway. This
project consists of a three -lane roadway (Phase 1) and four -lane roadway (Phase 2). In addition, there are
larger trunk utilities required in this particular site. The proposed improvements are necessary to allow
development in accordance with the City Comprehensive Plan. This project is cost effective based on
existing conditions and acceptable standards proposed to construct the improvements.
It is recommended that this report be approved and used as a guide for the layout, design, and cost
allocation for the improvements to serve the Cottage View site. It is further recommended that copies of
this report be forwarded to the developer to determine the further action to be taken.
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements Page 14
EAST POINT DOUGLAS ROAD
Appendix A
Figures
M m Cottage
Grave
h ere Pride ana prp5 gerity Meet
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements
z
All
AREA
EAST POINT
I
I
o woo
SCALE FEET
Cliyof A�, BOLTON 8L MEN K, INC.I CITY OF COTTAGE GROVE, MINNESOTA
ConwlMnp Enpinrn a s,rv.yo,. EAST POINT DOUGLAS ROAD
Cotta Grove ,�11 Ml MIN FARMONT, MN SLEEW EYE, MN LOCATION PLAN
Minnesota BURNSMLLE, MN WILLMAR, MN CHASI
i0e.�n ,,
i x M.. x,.. 201 . All Ri.hf. R.—d RAMSE . MN MAPLEW000, MN BRAINERD. MN AMES. IA JUNE 2012 FIGURE NO. 1
§ Z.
w -
I �
�§ �§
&
//»
� §
or
0
wOW/ §
� � u
�
0
- -
i
WR H.
% Wa Ldz
� �k k �•Z
/ § ZM
/ f z - !\
k 0{
�ltm
0
as __ _rte �� \ «�#
§ & q
iid § $l (
iidkb ^ §
zi
)§ k zo
kd� %
�u
■
� < �
s ! 3 3N risvr
d
&
I log ,
ma _» mm \, 08 W & §
% &£_ L
o w
� !2
q
a \ / \
§
zz
+ !
1� n > 0
z I
/ 7§
% z
/
z � !
z � � �
x ;
z ;
\° s z
0
W 4
Z
\ � Q
Z LLI \ � E
m O z
\ X08
rz
z
IN
a
U
\ o o
N
mv
� U w
,
ti
b
0
v
z b
m e� Z � z
/ C
� W�� w
(1 Zwa
\ o c Egj
m
jai
m�
1 m
H n s n n 3 a3
- o -
a
w
� f v
w
z cr-
z w
LU
a
�s 0
It
fV
w m �5
H 3 1 �'! 3
W n o ��
I c
II
n MNn n3`d Wa
o
U) � EL
ii z�
T W
i! U)
®E „ a
LU
_ N
c w Z cm
L
�j
�� U Vn
a
Q o
H z
O
N
W
Z
Z S
�O
W q
S W OHO
(Eno
o �O
w ��
8 Q$a
°z �aa
J
O
N
\ � K
W
U m
o
Z g
CD
Y =
Z
WA
v ==
B� Z W LL�2a
SJ
yb S�
�\ az
I
I
I 'I
I
�I
\' I
Z N
W
,E
I
I I
H nos rI I
I
I
I �
III >
�I M
EEI EP
MID
- -- - - - - - - -t z
Z \\y
W � -
� i
i o
N
z
in
I°
� O K
mo o=
m w
z
/ U z
w N a � I %!
� Z
orc•�so I Z
} U U Y B B w
0 0 Z p p i° II Y C m$<
w w C d d Li
N N inn I
W&& I1 LU
_ z�Z
ON
Z W az
o 3
4
1 @ __
Hl OS JFlNdAV Naudar I I 0 8 gym"
I
� Z W
LU
by
---------------- - - - - -- - --
! o 0
- - - - - --
Pv ENU
RED •F
f
a
II �
3f1N3AV 3NIV f 1
-- --------------- - --
P
HinOS 3nN3AV nv
I •zx T%.
�S v tJ z
o
cr
�� Q'
° z
\ N p
I \ w 4
~ ® \\ K
\ o o
\ 5�
OO C�
^�O ,0 < � \ \\ O �a
\ �
a JO \ \ 61 O a
O N
o
0 am •s� �.
Z
�,W W
3
a z .� w
w a iS a s � Y e L �<
z z
1111 I I ��pv� 1 e z M
Oz3d
--I ZWaz2
I o I zA m
r �zm
Hl 3 N3Ad Naud3f I I o gym"
W :41
>
- - - - -- - - --
I;
--------------
-
PVE
EV
R
w
LL �
3nN3Ad Al f I /"
�.o
5
c�
H1nOS 3nN3AV nym I 5�
I /^ J
1ID a,
/
� vL)z
Q O
U3
a \ 4z
LU
m
m
z
U J
m CL
y W g��a
W zw I O
Z
z w .J x K
> $ ° ° ° w ° w
y y h> f o o
° x �a �a in m w a a
11111
\ Q z
F
\ O
\ W c
\\ z ��nn
\ \ z
\ Ld
\ �ja
OQ �
W a
c \ \\\ haw
O \ B[ U m
O tib V .
O
_ N
S�
O4 /o w
4--j
I
I
I
i
I
I
I
LU
LU
0
i
II w�
1}, D a i
I' o�
0&
o
111 111
11111
i 4'
LU
\ Jas
\ \,,
Z g
w
Y e m
Z Lit
LU
� -V zz
_z�
_d
p � 3 8
z
m
LOL�F 3
z
�¢S
o
m �
h F 0
O
LLI
z
CL
zo
Irma
z
�
Q �ry� LLI
� ao
w �ao
r z
0 /
m
W p O
U) N
EL
LU
CL 0
o s�
K W
a cn / Z
�l
5
II
3NOZ Y e �
giu =
/ 3mnSS3Hd 1• W E g�'
HEM
a
;�
;
-- a i
W 7wa
O C
ry s
LU
3NOZ 3unSS3Nd Cl) O . m
31d1a3W2131N1 o
0
EL
O p Q
d O� 1
aW
OQ
a3
m
1 �
�.,. ✓/
•S 3nN3AV f1VMW
iL P
} 6
a
- ----- — /
;
GO
� s
1
Li I
c1�
\
I�
�0z
°
--]1t,
z w
> a W
w
Q
7 �
LL
Eli] EF
7
a
�0& 6
&E-
l x
Q
0 °
J� D
m W
Z
U J
y CL
D O
in z
LU
z O
0 0: z
w K
p > ° w ° w
y En O O
cr rn w a a
111 I
e1 H
b
0
0
0
M
c t
S
F
m
z
Z
O �
3
O
N
W
�
Z
W � w
Z
Q`
z
e ZWm
�Z.
MO B
p�3
a
>g°
A RL
0
m
X o�
LLI
� o L L I
a
O�a
U fi
L, N
O
°
N
c t
0
Z
O �
3
w
Y e m
Z
W � w
Q`
z
e ZWm
�Z.
p�3
; d
Z
A RL
0
m
00s`s
NOUVAONNI
§
Zi
\
F. §
¥§2
2 \\
cr �
§2
- - §a
S§ <
<
0
LU LU LU LU
0 0 �
\\ z �� z �\ z z
2:
z �
- !:m
y .! |§
z !
w \
- |_
\ \ | Z.!§
\ ` _ \_/ z\
0 a Z !!
v \ - \� R9
� ! m ||
- ° I / m 2 |:
\ ` § E
L \
§ w m § w % z
§ Cl) , k D
-� $ ƒ -* g ƒ .\ /
E e
§
~ \|
-
\\ .
(
� ®
L
§ |
./ U) z
/ � §
` I LL
LU
^ � � :\
j}
(A
J
J �
t
<
- -- r — — — • - - - - - - - - - --
WITHIN BoUlam
VFW
o syc
�q ys'0
4 B�
IEM=
PUBLIC SANITARY SEWER
PUBIC STORM SEWER
PUBIC WATERMAN
PRIVATE SANITARY SEWER
PRIVATE STORM SEWER
PRIVATE WATERMAN
PRIVATE CONSTRUCTION
1
\;
INQ
` 'TAI DRIVE IN
THEATER
0 80 120
F �
C.ilY at LAIT OF (:UIIAUL UKUVt, MINNLtUTA
Cottage Grove EAST POINT DOUGLAS ROAD
emm a uex, m. z n, ui canes reeserve Minne /// ��� coigne s sota m scaouioae;s- ricn.a.o 11/16/12 iaiiz eai m NO VEMB E R, / PRI VATE UTILITY OWNERSHIP AND CONSTRUCTION'
- - - - -_
F-
Fit-
--
_ —_�,, �11���,v.
������)�
—
W
J�/
, �/�
/
Z W
h
EXISTING
BUILDING )
l�
�/
/
1
`�����VA� �A �T.
I �FE, �� \ \Vy.�AV��A
y
o Yn
�E,
>O
LLIW
r
1
W W
Y
�N
<
/ v
gg
— —
—1 -.
<Q
G< <G
L 11
- I Imo`
O U
<
I.L
1 I —r
�(J V ?JJ 3d 3
OL
If
EXISTINC
FENCE /�
_ �-
z'
BUILD
✓
- �I / /�I
/ /�� - —
, _ -- ��
��_�
°_
44 z <
L
w
/ ~
_
e'CH� INK FENCE
'W'k'
S. OF
zw a
/
c a
I
I
/
E F —
-
J
JJi
y a
-
<— _
m
Y
- EXISTINhi
BUSINC
G 3f1N 3AV 3NIWSVf o
��m
pp
C�
n \ EXISTING
BUILDING
T
V /�� /r /
I
/� A
m
_ o
��
I
I
T O
m
/
V - I
- - - --
a
L
�
EAST POINT DOUGLAS ROAD
Appendix B
Cost Estimate Summary
Cottage
Grove
41/lere Pride andP,,sperity Meet
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements
O
O
O
O
O
O
O
O
O
O
O
O
op
O
O
O
O
O
O
R
�
�7
M
O
n
�
q
q
�
v,
L ,
O
O
O
O
O
O
O
sbG O
O
O
O
O
O
O
O
�
�l W
O
Y
y
V�i
o
9
G
9
O
O
O
O
O
O
O
O
Y
O
O
O
O
O
O
O
O
O
v
`o •-
1
ti
N
N
N
H
H
O
O
M
M
D O
�
06
-6'
ti
ti
a
R
3
o
o
a
o
6
R
O
N
Vl
O�
O
O
O
P
N
O
O
M
O
O
O
O
O
O
O
M
O
O
O
O
O�
O
O
O
U\
O
O
O
CT
P
0
0
o
fn
o
o
n
o
o
O
o
O
o
O
fn
o
0
Yyn:
o
rn
�
i+ _
EA
EA
EA
ti
EA
ti
fA
EA
V
r
Vl
�D
O
W
Vl
Vl
y
O
fn
M
O
O
O
O
O
O
O
b
O
�O
W
O
O
O
O
O
O
O
P
O
W
O
O
O
O
N
P
n
o
b
In
o
o
p
ryj
1!J
W
O�
171
0 0
V3
p
N
M
N
V3
rn
Y3
vl
W
N
vl
to
M
t+i
y
�
N
N
r
y
U
N
0
0
�D
`S
l�
O
Vl
Vl
O
fn
M
O
O
O
O
ti
O
O
O
�D
O
Vl
W
O
O
q
O
O
O
CT
O
vl
vl
W
o
o
to
N
N
P
try,
o
Dv
q
o
O
o
O
y
to
W
N
vl
P
P
o
v'i
q
o
O
p
q
e4
T
NE�
vl
l
vl
N
3
�
N
Dv
,-.
On
b
W
.y
o
e
O
F
C
c»
sr>
0
U
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
o
p
p
o
n
�
fn
fn
Vl
W
.--�
P
fri
.--�
N
�'
O�
N
ti
•--�
O
O
O'
O
fn
N
W
l�
O
l
�
�
Vl
h
O
O
O'
Ve
lD
Y
63
63
63
63
63
63
63
Eg
63
63
Eg
63
63
63
63
63
63
v3
63
63
Eg
�
�
�
r j
�
�
O
G
O
�
U
�
O
78
b
N
b
F
P.
a
P.
CZ
u
P
v
EAST POINT DOUGLAS ROAD
Appendix C
Assessment Calculations
Cottage
Grove
%ere Pride and p,,SPerlty Meet
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements
Phase 1: East Point Douglas Rd Assessment Calculations
Abutting Property
Anla sis- Phase]
T(6gF[;
Abr6Nrg
-ra Asassam[
ToW
Parcel
P arsed
a )
%dTUtll
Pryert AmooN
Coutributi®
As e ®[
Contribofim
As�.momt
2202721320003
V,Lr.s Of FOraMWars&
202
$0671
2202721320003
Veterans Of POVaWWars&
Cottage Grove Post 0752
Veterans Of Po-, Wars&
Cottage Grove Post 0752
403
0:13
Cottage Grove Post 0752
$0627702
2202721320005
$95191
$20$85631
2202721320005
Qwest & Tax Left
50
0:02
W0Mat
Qwest & Tax Dept
$10,70434
N/A
$1,00,44482
2202721310005
$95191
N/A
W O Mart
1,037
034
$0.00
W0Mar[
$222000.10
2202721310005
$70543672
2202721310005
Metropolitan Coined &Metro
Apache CALefaeat, Co LLP
0
0.00
ver sed CALefaeatre Co LLP
$0.00
2202721310004
$12,173.30
$0.00
2202/21310004
Metropolitan Coined &Metro
Apache ClLefTh ®treCoLOP
$000
Metropolitan Counel &Metro
Transit Finance Div
0
0.00
Transit Finance Div
$0.00
2202721420001
$000
$0.00
$1217330
2202721420001
2202721430001
Ap ache Clnef9heaore Co LLP
0
0.00
1
$0.00
2202721340002
$0.00
2202721340002
$0:00
Ross Mathal &L-esk
0
0.00
Ross Mathal &L-esR
$0.00
2202721430001
Wacltington County*
$000
$0.00
2202721430001
$0.00
Mderson Ron est M Md Linda
syn derson Pon est M send Linda
MvDOT IlighPOf -Way*
Macky-Mdersov
0
0.00
$641,90994
Macky-Mdersov
$0.00
2202721340003
$0.00
2202721340003
ashinglon County
0
0.00
WanungLn County
$0.00
/A
$0.00
/A
MvDOTRht of Way
1,50
051
MnDGTR t -off *
$33411642
Totals
3,050
1.00
$1,M5$17.61
TOWS
1 81Il
Area Anlaysis - Phase 1
-Phase
T(6gF[;
Abr6Nrg
-ra Asassam[
ToW
Parcel
% of TOtll
Projert AmooN
Asmsvo ®[
Pare
Contribofim
As�.momt
V,Lr.s Of FOraMWars&
202
$0671
2202721320003
$292,133.92
Cottage Grove Post 0752
Veterans Of Po-, Wars&
2202721320005
Cottage Grove Post 0752
264226
0.16
$95191
$20$85631
2202721320005
W0Mat
Qwest & Tax Dept
1, 22 2
0.00
$1,00,44482
2202721310005
$95191
N/A
Apache ClLefTh ®treCoLLP
$000
$0.00
W0Mar[
1,00$144
0 6
$70543672
2202721310005
Metropolitan Coined &Metro
ver sed CALefaeatre Co LLP
0
0:00
$12,173.30
$0.00
2202/21310004
Apache ClLefTh ®treCoLOP
$000
Metropolitan Counel &Metro
$0.00
2202721340002
Transit Finance Div
15
0:01
$000
$0.00
$1217330
2202721420001
2202721430001
Ap ache CALefae tre Co LLP
0
0.00
$0.00
2202721340002
$0:00
$0.00
2202721340003
Ross Mathal &L-esR
0
0.00
Wacltington County*
$000
$0.00
2202721430001
$0.00
N/A
syn derson Pon est M send Linda
MvDOT IlighPOf -Way*
$33411642
$30$79353
$641,90994
Macky-Mdersov
0
0:00
$0.00
2202721340003
WanungLn County
0
0:00
$0.00
/A
MnDGTR t -off *
392,500
023
$305,79353
TOWS
1 81Il
l.m
$119 ll.61
$13]0 ll. i6
$1 ID211.M
'Loans rig6bLway was ewloded tam par ®I area
"Assumed unoorm q hwa y easement width ot250 t1
Total Assessment
-Phase
1
Abr6Nrg
-ra Asassam[
ToW
Parcel
Ass-art
Asmsvo ®[
2202721320003
V,Lr.s Of FOraMWars&
202
$0671
$20$85631
$292,133.92
Cottage Grove Post 0752
2202721320005
fewest & Tax Dept*
$10,70434
$95191
$11,65625
N/A
W0Mat
$222000.10
$10543672
$1,00,44482
2202721310005
Apache ClLefTh ®treCoLLP
$000
$0.00
$080
2202721310004
Metropolitan Coined &Metro
Transit Finance Div*
$000
$1217330
$12,173.30
2202721420001
Apache ClLefTh ®treCoLOP
$000
$0:00
$0.00
2202721340002
Ross Mai J & Lenses R
$000
$0.00
$0.00
2202721430001
syn derson Ron est M send Linda
Mackey- Mdersoo
$000
$0:00
$0.00
2202721340003
Wacltington County*
$000
$0:00
$0.00
N/A
MvDOT IlighPOf -Way*
$33411642
$30$79353
$641,90994
Touts
$655,ll58
$1$1g211.M
Phase 1: Drontage Road (Stub Street) Assessment Calculations
Abutting Property
Anla sis- Phased
T(6gF[;
Abooting
Total
Parcel
Parcel
e'
%ofTodd
"ec[Ammuat
Contribution
Ass uftiog
Contribution
Is.-.
2202721320003
Vetauns Of Foreign Wars&
2202721320003
Vetaanc Of POVaWWarc&
Cottage Grove Post 0752
$000
$0.00
Veterans Of Forage Wars&
$0.00
Cottage Grove Post 0752
0
0:00
Cottage Grove Post 0752
$0.00
2202721320005
$0.00
$0.00
2202721320005
Qwest & Tax Left
0
0:00
Weil -Mat
Qwest & Tax Dept
$0.00
N/A
$1630T).55
2202721310005
$0.00
N/A
al -Mat
206
046
$12256153
Wad -Mat
$5301606
2202721310005
$109,26149
2202721310005
Metropolitan Coined &Metro
Apache Cltiefaeat, Co LLP
330
054
ver sed Cltiefaeatre Co LLP
$6209545
2202721310004
$0.00
$12256153
2202/21310004
Metropolitan Coined &Metro
Apache CltiefTh ®treCoLOT
$000
Metropolitan Counel &Metro
Transit Finance Div
0
0.00
Transit Finance Div
$0.00
2202721420001
$000
$0.00
$0.00
2202721420001
2202721430001
Ap ache Cltiefaeat, Co LLP
0
0.00
Ap ache Cltiefae tre Co LLP
$0.00
2202721340002
$0.00
2202721340002
$0:00
Ross Mathal &L-esk
0
0.00
Ross Mathal &L-esR
$0.00
2202721430001
Washington County*
$000
$0.00
2202721430001
$0.00
Mderson Rosiest M Md Linda
syn derson Rosiest M send Linda
MvDOT Right of Way*
Mack,- Mdersov
0
0.00
$0.00
Mack,- Mdersov
$0.00
2202721340003
$319,731X3
$0.00
2202721340003
anurZon County
0
0.00
WahingLn County
$0.00
/A
$0.00
/A
MvDOTRht of Way
0
0.00
MnDOT Ili CofW *
0
Touts
616
1.00
$31],]3153
$1]5911.51
$1]5,911.51
Area Anlay$is - Phase 1
- Phased
T(6gF[;
Abr6tisrg
Total
Parcel
%ofTotll
Pr ojectAmouut
Asmsun ®t
Parcel
Contribution
Is.-.
Vetauns Of Foreign Wars&
2202721320003
Cottage Grove Post 0752
$000
$0.00
Veterans Of Forage Wars&
$0.00
2202721320005
Cottage Grove Post 0752
0
0.00
$0.00
$0.00
2202721320005
Weil -Mat
Qwest & Tax Dept
0
0.00
$1630T).55
2202721310005
$0.00
N/A
Apache CALefTh ®treCoLLP
$6209545
$12256153
Wad -Mat
1,00$144
047
$109,26149
2202721310005
Metropolitan Coined &Metro
ver sed Cltiefaeatre Co LLP
1,130062
053
$0.00
$12256153
2202/21310004
Apache CltiefTh ®treCoLOT
$000
Metropolitan Counel &Metro
$0.00
2202721340002
Transit Finance Div
0
0:00
$000
$0.00
$0.00
2202721420001
2202721430001
Ap ache Cltiefae tre Co LLP
0
0.00
$0.00
2202721340002
$0:00
$0.00
2202721340003
Ross Mathal &L-esR
0
0.00
Washington County*
$000
$0.00
2202721430001
$0.00
N/A
syn derson Rosiest M send Linda
MvDOT Right of Way*
$000
$0.00
$0.00
Mack,- Mdersov
0
0:00
$319,731X3
$0.00
2202721340003
WahingLn County
0
0:00
$0.00
/A
MnDOT Ili CofW *
0
0:00
$0.00
Totals
2
lID
$3194.N.53
$231 33.1tt
MI.M31C
'Loans rig6bLway was ewloded tmm parcel area
"Assumed unoorm honwa easement width ot25O t1
Total Assessment
- Phased
_
Abr6tisrg
Total
Parcel
Assemnvrt
�. ®Asas -.
Asmsun ®t
2202721320003
Vetauns Of Foreign Wars&
Cottage Grove Post 0752
$000
$0.00
$0.00
2202721320005
fewest &Tax Dept*
$000
$0.00
$0.00
N/A
Weil -Mat
$5301606
$109,26149
$1630T).55
2202721310005
Apache CALefTh ®treCoLLP
$6209545
$12256153
$104,65698
2202721310004
Metropolitan Coined &Metro
Transit Finance Div*
$000
$0:00
$0.00
2202721420001
Apache CltiefTh ®treCoLOT
$000
$0:00
$0.00
2202721340002
Ross Mai J &]amesR
$000
$0.00
$0.00
2202721430001
syn derson Ron estM send Linda
Mack,- Mderson
$000
$0:00
$0.00
2202721340003
Washington County*
$000
$0:00
$0.00
N/A
MvDOT Right of Way*
$000
$0.00
$0.00
To_s
$11591151
$231$23.03
$319,731X3
0
Phase 2: East Point Douglas Rd Assessment Calculations
Abutting Property Anlaysis - Phase 2
Abutting
1 /3rd
Abutting
Assessment
Area Assessment
o /o of Total
Project Amount
2202721320003
Parcel
(Lin. Ft.)
Contribution
Assessment
2202721320003
$0.00
$0.00
Veterans Of Foreign Wars &
Cottage Grove Post 8752
2202721320005
0
0.00
$0.00
Cottage Grove Post 8752
$0.00
$0.00
N/A
2202721320005
Wal -Mart
$0.00
$0.00
Qwest & Tax Dept
0
0.00
$0.00
N/A
Apache Chief Theatre Co LLP
$96,989.05
$1,645,093.45
$1,742,082.50
Wal -Mart
0
0.00
$0.00
2202721310005
$0.00
Apache Chief Theatre Co LLP
290
0.05
Transit Finance Div*
$96,989.05
2202721310004
2202721420001
Metropolitan Council & Metro
Apache Chief Theatre Co LLP
$1,322,395.53
$1,911,076.86
$3,233,472.39
2202721340002
0
0.00
$0.00
Transit Finance Div
$133,636.88
$339,989.44
2202721430001
2202721420001
Anderson Forrest M And Linda
Apache Chief Theatre Co LLP
3,954
0.62
$201,335.89
$359,392.77
$1,322,395.53
2202721340002
Mackey - Anderson
Ross Martha J & James R
6171
0.10
$206,352.57
2202721430001
$64,643.62
$232,535.01
N/A
Anderson Forrest M And Linda
MnDOT Right-of- -Way*
$135,784.67
$147,654.61
602
0.09
$2,130,749.10
$4,261,498.19
$201,335.89
Mackey - Anderson
*To be covered by City Funds
2202721340003
Washington County
502
0.08
$167,891.39
N/A
MnDOT Right -of -Way
406
0.06
$135,784.67
Totals
6,371
1.001
$6, 392, 247.29
$2,130,749.10
$2,130,749.10
Area Anlaysis - Phase 2
Total Area
2 /3rd
Area
Assessment
Area Assessment
%of Total
Project Amount
2202721320003
Parcel
(Sq. Ft.)
Contribution
Assessment
2202721320003
$0.00
$0.00
Veterans Of Foreign Wars &
Cottage Grove Post 8752
2202721320005
0
0.00
$0.00
Cottage Grove Post 8752
$0.00
$0.00
N/A
2202721320005
Wal -Mart
$0.00
$0.00
Qwest & Tax Dept
0
0.00
$0.00
N/A
Apache Chief Theatre Co LLP
$96,989.05
$1,645,093.45
$1,742,082.50
Wal -Mart
0
0.00
.$0.00
2202721310005
$0.00
Apache Chief Theatre Co LLP
1,130,862
0.39
Transit Finance Div*
$1,645,093.45
2202721310004
2202721420001
Metropolitan Council & Metro
Apache Chief Theatre Co LLP
$1,322,395.53
$1,911,076.86
$3,233,472.39
2202721340002
0
0.00
$0.00
Transit Finance Div
$133,636.88
$339,989.44
2202721430001
2202721420001
Anderson Forrest M And Linda
Apache Chief Theatre Co LLP
1,313,703
0.45
$201,335.89
$359,392.77
$1,911,076.86
2202721340002.
Mackey - Anderson
Ross Martha J & James R
91,8641
0.03
$133,636.88
2202721430001
$64,643.62
$232,535.01
N/A
Anderson Forrest M And Linda
MnDOT Right-of- -Way*
$135,784.67
$147,654.61
247,052
0.08
$2,130,749.10
$4,261,498.19
$359,392.77
Mackey - Anderson
*To be covered by City Funds
2202721340003
Washington County
44,437
0.02
$64,643.62
N/A
MnDOT Right -of -Way **
101,500
0.03
$147,654.61
Totals
2,929,418
1.001
$6,392,247.29
$4,261,498.19
$4,261,498.19
*Existing right -of -way was excluded from parcel area
**Assumed uniform highway easement width of 250 ft
Total Assessment - Phase 2
Abutting
Total
Parcel
Assessment
Area Assessment
Assessment
2202721320003
Veterans Of Foreign Wars &
$0.00
$0.00
$0.00
Cottage Grove Post 8752
2202721320005
Qwest & Tax Dept*
$0.00
$0.00
$0.00
N/A
Wal -Mart
$0.00
$0.00
$0.00
2202721310005
Apache Chief Theatre Co LLP
$96,989.05
$1,645,093.45
$1,742,082.50
2202721310004
Metropolitan Council & Metro
$0.00
$0.00
$0.00
Transit Finance Div*
2202721420001
Apache Chief Theatre Co LLP
$1,322,395.53
$1,911,076.86
$3,233,472.39
2202721340002
Ross Martha J & James R
$206,352.571
$133,636.88
$339,989.44
2202721430001
Anderson Forrest M And Linda
$201,335.89
$359,392.77
$560,728.66
Mackey - Anderson
2202721340003
Washington County*
$167,891.39
$64,643.62
$232,535.01
N/A
MnDOT Right-of- -Way*
$135,784.67
$147,654.61
$283,439.28
Totals
$2,130,749.10
$4,261,498.19
$6,392,247.29
*To be covered by City Funds
EAST POINT DOUGLAS ROAD
Appendix D
Area Charges
Cottage
Grove
41/lere Pride and?(Os perity Meet
City of Cottage Grove, Minnesota
East Point Douglas Road Street & Utility Improvements
Cottage View Site - Total Area Charges Summary by Parcel
Item
Area Charge
Canna aal
Medisnn Density
Residential
HighDeraty
Residential
Mixed Use
Total
2202721320003
Saitary Sewer
$11,264.18
Residential Residential
$11,264.18
Veterans Of Foreign Wars&
Cottage Grove Post 8752
Water MVv
$17,71212
2202721320003
$17,712.12
Stonn Sewer
$54,05229
Veterans Of Foreign Wars&
$54,05229
Subtotal
1 $83,028.591
$0.00
$0.001
$0.001
$0.001
$83,028.59
Sardtary Sewer
$35,951.52
2202721320005
$35,951 52
War Marc
Wa terMvn
$56,53120
1,221.81
$56,53120
Sto. Sewer
$172,51696
$172,51696
Subtotal
Apache Chief Theatre Co LLP
$264,999.681
so.001
$0.001
$0.001
$0.00
$264,999.68
2202721310004
2202721320005
Sardtary Sewer
Metropolitan Council &Metro
$000
Qwest &Tax Dept
Water Main
15,624.99
$000
Storm Sewer
15,624.99
Transit Finance Div
$000
Subtotal
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Apache Chief Theatre Co LLP
1,673,638.18
2202721310005
Sautary Sewer
$55,83758
$25178
$5856
2202721340002
$5614702
Apache Chief Theatre Co LLP
WaterMvn
$87800.62
$44283
$10299
155,675.78
91,864.78
$88,34643
StonrSewer
$26794222
1 $1,424.10
$397.11
$26976343
SubLO[al
$411,580.421
$2,118.71
$558.651
$0.001
$0.00
$414,25778
Mackey- Anderson
2202721310004
Sardtary Sewer
48,467.00
Totals
$000
Metropolitan Council &Metro
Transit Finance Div
WaterMvn
249,599.42
238$39.35
517,439.80
*Existing right or way was excluded from parcel area
* *Based on 2030 comprehensive plan boundaries. Actual areas may vary as parcels develop
$000
Stonn Sewer
$000
Subtotal
$0.00
$0.001
$0.001
$0.001
$0.001
$0.00
2202721420001
Sardtary Sewer
$32,73479
$1,89006
$7,409]5
$3,594]6
$5,08026
$50,71051
Apache Chief Theatre Co LLP
WaterMvn
$51,473.12
$3,32572
$13,03101
$6,32229
$7,98835
$8214139
Sto. Sewer
$157,081.16
$10,69527
$50,249.82
$24,378.15
$24,378.15
$266,78254
Subtotal
$241,289.07
$15,911.94
1 $70,691.48
$34,295.19
$37,44676
$399,634.44
2202721340002
Sardtary Sewer
$3,91627
$391627
Ross Martha J &JarnesR
WaterMvn
$615806
$615806
Storm Sewer
$18792.63
$18792.63
Subtotal
$28,866.97
$0.001
$0.001
$0.001
$0.00
1 $28,866.9]
2202721430001
Sardtary Sewer
$10,53154
$10,531 54
Anderson Forrest M And Linda
Mackey - Anderson
WaterMvn
,5.09
$1660
$16,560.09
Stonn Sewer
$50,536.65
$50,536.65
Subtotal
1
1 $77,628.281
$0.001
$0.001
$0.001
$0.001
$]],628.28
Grand Total $1,107,393.01 $18,030.65 $71,250.13 $34,295.19 $3],446.]6 $1,268,415.]4
Parcel Summary for Area Charges
Total Area
2030 Land Use Breakmt 8
.Ft.)**
CanalMixed
Medisnn Density High Density
Use
Undevelopable,
(Sq. Ft)*
p ared
Residential Residential
2202721320003
Veterans Of Foreign Wars&
Cottage Grove Post 8752
264,126.01
264,126.01
2202721320005
Qwest & Tae Dept
1,221.81
1,221.81
2202721310005
Apache Chief Theatre Co LLP
2,192,607.37
2,153,114.35
8 ,346.83
1941.19
1 29,145.00
2202721310004
Metropolitan Council &Metro
15,624.99
15,624.99
Transit Finance Div
2202721420001
Apache Chief Theatre Co LLP
1,673,638.18
767,866.15
62,686.46
245,638.23
238 ,337.35
359,110.00
2202721340002
Ross Martha J &JarnesR
155,675.78
91,864.78
63,811.00
2202721430001
Anderson Fonest M And Linda
Mackey- Anderson
295 ,507.32
247,040.32
48,467.00
Totals
4,598 ,501.46
3 ,524,111.61
71,033.29
249,599.42
238$39.35
517,439.80
*Existing right or way was excluded from parcel area
* *Based on 2030 comprehensive plan boundaries. Actual areas may vary as parcels develop
— Future major road right of way excluded from parcel gross acreage