HomeMy WebLinkAbout2013-01-02 PACKET 12.A.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 1/2/13 A z ® A0
PREPARED BY
Community Development
ORIGINATING DEPARTMENT
Jennifer Levitt
STAFF AUTHOR
***************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
COUNCIL ACTION REQUEST:
Workshop: 2013 Pavement Management
STAFF RECOMMENDATION
Workshop: 2013 Pavement Management
BUDGET IMPLICATION $N /A $N /A N/A
BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE
ADVISORY COMMISSION ACTION
DATE
REVIEWED
APPROVED
DENIED
❑ PLANNING
❑
❑
❑
❑ PUBLIC SAFETY
❑
❑
❑
❑ PUBLIC WORKS
❑
❑
❑
❑ PARKS AND RECREATION
❑
❑
❑
❑ HUMAN SERVICES /RIGHTS
❑
❑
❑
❑ ECONOMIC DEV. AUTHORITY
❑
❑
❑
❑
❑
❑
❑
SUPPORTING DOCUMENTS
® MEMO /LETTER: Memo from Jennifer Levitt dated 12/31112
❑ RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
® OTHER:
ADMINISTRATOR'S COMMENTS:
ity Administrator Dat
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
Cottage
Grove
h ere Pride and P , 05 perity Meet
To: Honorable Mayor and City Council
Ryan Schroeder, City Administrator
From: Jennifer M. Levitt, P.E., Community Development Director /City Engineer
Date: December 31, 2012
Re: Workshop: 2013 Pavement Management
Background
On June 1, 2011 the City Council authorized a feasibility report for the Pavement Management
Area as outlined in the Capital Improvement Plan for two areas: 1) Area bound by east of
Jamaica, north of 80th Street, west of Kingston (District C1); and 2) Area south of Kingston and
north of 80th Street [Jenner, Jocelyn, and 79th Street] (District C3). The City Council held a
workshop session on August 10, 2011 to discuss the various elements of the proposed im-
provements. At the workshop, staff presented the preliminary findings of soil boring results of
the area, which showed unfavorable results to include District C3 in the project for a mill and
overlay. The recommendation was not to proceed with District C3 and allow the roads to further
deteriorate to the point in which a reclamation of the roads would be warranted. Ultimately that
project was not ordered. Instead, a review of the City's IMTF policy was ordered. Approval was
provided on August 8, 2012 for the revisions to the IMTF Policy.
On August 8, 2012, the City Council authorized the preparation of a feasibility report for the
Pavement Management Districts C1 and C2.
As part of the feasibility report, improvements for trail expansion and improvements to Kingston
Park have been included; this is consistent with past Pavement Management Projects. The total
cost of the proposed park improvements is $496,685.
Discussion
Road Rehabilitation: Full Road Reconstruction
The rehabilitation method proposed for the streets in District C1 (green) and District C2 (purple)
is to remove the existing asphalt surface and replace with a new surface, which will consist of
two lifts of bituminous. All of the concrete curb and gutter will be replaced as part of the project.
Also proposed are some minor utility improvements for sanitary sewer, water, and stormwater.
The potential assessment for the improvements listed above is estimated at $4,100 per residen-
tial lot. The multi - family unit assessment has a potential assessment of $1,600 per unit.
Road Rehabilitation: Mill and Overla
In District C2 (dark blue) the street will be rehabilitated using a mill and overlay technique. This
is the milling off of the top surface of the asphalt and the new lift of asphalt being installed.
There will be spot curb replacement in as part of the mill and overlay. In addition, there will be
minor utility improvements made to the area. The potential assessment for the mill and overlay
area is $2,500 per residential lot.
Honorable Mayor, City Council, and Ryan Schroeder
Workshop: 2013 Pavement Management
December 31, 2012
Page 2
Road Rehabilitation and Utility Work
In District C2 (light blue) additional utility work will be done to facilitate stormwater drainage from
the South Washington Watershed District management area. Properties that are outlined in light
blue will experience more substantial utility work, with large excavation for installation of new
piping. This extensive utility work will result in the street being fully reconstructed. Properties
outlined in light blue will NOT pay for a full reconstruction, but the equivalent of a mill and over-
lay, which is the road rehabilitation method for which it was originally scheduled.
Project Funding Analysis
The total project cost for the road work, utility, storm sewer, and park improvements is
$7,566,610. According to the City's policy, 45 percent of the total project cost for road work and
utilities is assessed against the benefiting properties. The total project value that is assessed
residentially is $2,477,023 for the Districts C1 and C2. The School District's potential
assessment is $167,941. The South Washington Watershed District is responsible for $495,918.
The Cost Estimate Summary can be viewed in Appendix C of the Feasibility Report.
A benefit appraisal was ordered for properties within the C1 and C2 Districts. There was found
to be a special benefit of $5,000 per property for full pavement replacement, which is greater
than the proposed assessment for the residential lot. Benefit appraisals were ordered for the
multi - family units, and the benefit was found to be $1,600, which is less than the proposed
assessment. Special benefit appraisals were also conducted for the mill and overlay properties
and the benefit was found to be $2,500, which is greater than the proposed assessment. Benefit
appraisals were ordered for the two school district parcels. Results of those benefit appraisals
are anticipated to be complete by early January.
Recommendation
Review and comment on Draft Feasibility Report for the 2013 Pavement Management Project.
2
Consulting Engineers & Surveyors
Cottage
J Grove
h ere Pride and?r05Perity Meet
Feasibility Report
for
2013 Pavement Management Project
City of Cottage Grove, Minnesota
January 2013
Project Number N15.105420
• BQI_TON 8L M E K , I NC®
Consulting Engineers & Surveyors
it 2035 County Road D East • Suite B • Maplewood, MN 55109 -5314
Phone (651) 704 -9970 - Fax (651) 704 -9971
www.bolton - menk.com
January 16, 2013
Honorable Mayor and City Council
City of Cottage Grove
7516 80 Street South
Cottage Grove, MN 55016
RE: 2013 Pavement Management Project
BMI Project No. N15.105420
Honorable Mayor and City Council Members,
Enclosed for your review is the 2013 Pavement Management Project Feasibility Report. The project scope
includes street rehabilitation and utility repairs within pavement districts CI and C2, as identified in this
report.
This report describes the improvements necessaiy within the project area. Cost estimates for the proposed
improvements are presented in the Report.
We would be happy to discuss this report at your convenience. Please contact me at 651- 968 -7674 if you
have any questions.
Sincerely,
BOLTON & MENK, INC.
Mike Boex, PE
DESIGNING FOR A BETTER TOMORROW
Bolton & Menk is an equal opportunity employer
2013 PAVEMENT MANAGEMENT
FEASIBILITY REPORT
TABLE OF CONTENTS
Tableof Contents ...................................................................................................... ............................... i
Certification "
............................................................................................................ ............................... iii
Introduction.............................................................................................................. ............................... 1
Existing Conditions — Disctrict C 1 ............................................................................ ............................... 2
Streets................................................................................................................ ............................... 2
SanitarySewer ................................................................................................... ............................... 3
WaterMain ........................................................................................................ ............................... 3
StormSewer ...................................................................................................... ............................... 3
Existing Conditions — Disctrict C2 ............................................................................ ............................... 4
Streets................................................................................................................ ............................... 4
SanitarySewer .................................................................................................... ..............................5
WaterMain ........................................................................................................ ............................... 5
StormSewer ...................................................................................................... ............................... 5
ExistingConditions — Disctrict C3 ............................................................................ ............................... 5
Streets................................................................................................................ ............................... 5
SanitarySewer .................................................................................................... ..............................6
WaterMain ........................................................................................................ ............................... 6
StormSewer ...................................................................................................... ............................... 6
Proposed Improvements — District C 1 ....................................................................... ............................... 6
Streets................................................................................................................ ............................... 6
SanitarySewei ................................................................................................................................... 7
WaterMain ........................................................................................................ ............................... 7
StormSewer ...................................................................................................... ............................... 7
StormWater Quality .......................................................................................... ............................... 8
Proposed Improvements — District C2 ....................................................................... ............................... 8
Streets................................................................................................................ ............................... 8
SanitarySewer ................................................................................................... ............................... 9
WaterMain ........................................................................................................ ............................... 9
StormSewer ...................................................................................................... ............................... 9
City of Cottage Grove, Minnesota Table of Contents
2013 Pavement Management Project Page i
2013 PAVEMENT MANAGEMENT
StormWater Quality & S W WD ......................................................................... ............................... 9
Proposed Improvements — District C3 ..................................................................... ...............................
10
Streets.............................................................................................................. ...............................
10
SanitarySewer ................................................................................................. ...............................
10
WaterMain ...................................................................................................... ...............................
11
StormSewer .................................................................................................... ...............................
11
StormWater Quality ........................................................................................ ...............................
I 1
AlternateBid .......................................................................................................... ...............................
11
Streets.............................................................................................................. ...............................
I l
Proposed Improvements — Kingston Park ................................................................ ...............................
1 l
ParkingLots & Access Drive ........................................................................... ...............................
11
Trails............................................................................................................... ...............................
12
Trails............................................................................................................... ...............................
12
Park Improvement Cost Summary .................................................................... ...............................
12
Permits and Easements ........................................................................................... ...............................
13
EstimatedCosts ...................................................................................................... ...............................
13
CostAllocation ................................................................................................ ...............................
13
Financing......................................................................................................... ...............................
16
PublicHearing ........................................................................................................ ...............................
16
ProjectSchedule ..................................................................................................... ...............................
16
Conclusion And Recommendations ........................................................................ ...............................
16
City of Cottage Grove, Minnesota Table of Contents
2013 Pavement Management Project Page ii
2013 PAVEMENT MANAGEMENT
APPENDIX
Appendix A — Existing Pavement Condition Photos
Appendix B — Figures
Figure 1 — Location Map
Figure 2 — Pavement Condition Index (PCI)
Figure 3 — Streets - Year Constructed
Figure 4
— Proposed Improvements
Figure 5
— Utility Repairs (C1 & C3)
Figure 6
— Utility Repairs (C2)
Figure 7
— Assessable Parcels (C1)
Figure 8
— Assessable Parcels (C2)
Figure 9 —Pavement
Cores (C1 & C3)
Figure 10
—Pavement Cores (C2)
Figure 11
— Kingston Park Improvements
Figure 12
— SWWD CDSF Improvements
Figure 13
— Indian Boulevard Realignment
Appendix C
— Cost Estimate Summary
Appendix D
— Preliminary Assessment Roll
Appendix E
PCI Overview
CERTIFICATION
I hereby certify that this plan, specification, or report was
prepared by me or under my direct supervision, and that I
am a duly Licensed Professional Engineer under the laws
of the State of Minnesota.
am
Michael J. Boex, P.E.
License No. 44576
Bolton & Menk, Inc.
Date: January 16, 2013
City of Cottage Grove, Minnesota Certification
2013 Pavement Management Project Page iii
2013 PAVEMENT MANAGEMENT
INTRODUCTION
The Pinetree Pond East 2 Addition, Pinetree Pond East 3 6", 7 and 8''' Additions, East Parkview I"
and 2 Additions, Prestige Estates 1S & 2 Additions, and Prestige Estates on the Park residential
neighborhoods have been identified as candidates for rehabilitation during the 2013 construction season
as a part of the City of Cottage Grove's ongoing roadway rehabilitation program. The City Council
authorized preparation of this Report to determine the feasibility of rehabilitating those streets as a part of
the 2013 Pavement Management Project.
Pinetree Pond East 2nd Addition and a portion of Pinetree Pond East 3 rd Addition are located in the
Northeast corner of the 80''' Street & Jamaica Avenue intersection and are part of Pavement Management
District Cl, as shown on Figure 1 located in Appendix A. There are fourteen residential streets within
these neighborhoods totaling approximately 14,900 lineal feet.
Pavement Management District C2 is comprised of Pinetree Pond East 3 6' 7 and 8th Additions as
well as East Parkview 1 and 2 Additions. C2 is located immediately south of 70' Street between
Jamaica Avenue and Keats Avenue. There are twenty -four residential streets within these neighborhoods
totaling approximately 24,800 lineal feet.
The Prestige Estates 1S & 2nd Additions and Prestige Estates on the Park are located just east of the
Pinetree Pond East 2nd Addition north of 80' Street. It's part of Pavement Management District C3 as
shown on Figure 1 located in Appendix A. There are three residential streets within this area totaling
approximately 3,950 lineal feet.
The purpose of this report is to further evaluate the work actually required for this street rehabilitation
project, to provide an estimate of cost, and to establish a method of cost allocation or assessment in order
to determine the physical and economic feasibility.
This feasibility report examines the following street segments:
District Cl:
1. 75' Street So. from Jamaica Avenue So. to Indian Boulevard So.
2. Jeffery Avenue So. loop from 75 Street So. to 75 Street So.
3. Jasmine Avenue So. from 75 Street So. to 78 Street So.
4. Jasmine Avenue So. from Jasmine Avenue So. to cul -de -sac, south of 75 Street So.
5. Jasmine Avenue So. from Jasmine Avenue So. to cul -de -sac, north of Janero Avenue So.
6. Jeffery Avenue So. from 75 [11 Street So. to 80` Street So.
7. Jeffery Avenue So. from Jeffery Avenue So. to cul -de -sac, south of Jensen Avenue So.
8. Jeffery Court from Jeffery Avenue So. to cul -de -sac
9. Jensen Avenue So. loop from Jeffery Avenue So. to Jeffery Avenue So.
10. Janero Avenue So. from Jeffery Avenue So. to 79 Street So.
11. Janero Court from Janero Avenue So. to cul -de -sac.
12. 78' Street So. from Janero Avenue So. to Jeffery Avenue So.
13. 78' Street Court from 78 Street So. to cul -de -sac
14. 79 Street So. from Janero Avenue So. to Jeffery Avenue So.
District C2:
1. Indian Boulevard So. from Jamaica Avenue So. to Keats Avenue So.
2. Janero Avenue So. from Indian Boulevard So. to Jenner Lane So.
3. Jenner Lane So. loop from Janero Avenue So. to Janero Avenue So.
4. Jenner Alcove from Jenner Lane So. to cul -de -sac.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 1
2013 PAVEMENT MANAGEMENT
5. Jenner Bay from Jenner Lane So. to cul -de -sac.
6. Jenner Circle from Jenner Lane So. to cul -de -sac.
7. 73` Street So. from Janero Avenue So. to Jensen Avenue So.
8. Jensen Avenue So. from 70 Street So. to Indian Boulevard So.
9. 71" Street So. from Jenner Lane So. to Jewel Avenue So.
10. 71" Street Bay from 71" Street So. to cul -de -sac.
11. 72n Street So. from Jensen Avenue So. to Jocelyn Avenue So.
12. Indian Boulevard So. cul -de -sac (9100's) from Indian Boulevard So. to cul -de -sac.
13. Indian Boulevard Court from Indian Boulevard So. to cul -de -sac.
14. Jewel Avenue So. from Indian Boulevard So. to 71S Street So.
15. Jocelyn Avenue So. from Indian Boulevard So. to Joliet Avenue So.
16. Jocelyn Place So. from Jocelyn Avenue So. to cul -de -sac.
17. Jocelyn Bay from Jocelyn Avenue So. to cul -de -sac.
18. Jocelyn Alcove northwest from Jocelyn Avenue So. to cul -de -sac.
19. Jocelyn Alcove southeast fi•om Jocelyn Avenue So. to cul -de -sac.
20. 72 Street So. from Jocelyn Avenue So. to Joliet Avenue So.
21. Joliet Avenue So. from 70` Street So. to Indian Boulevard So.
22 72 Street So. from Joliet Avenue So. to Jonathan Avenue So.
23. Juliet Circle from Joliet Avenue So. to cul -de -sac.
24. Indian Boulevard So. cul -de -sac (9600's) from Indian Boulevard So. to cul -de -sac.
District C3:
1. Jocelyn Avenue So. from 80 Street So. to Jenner Avenue So.
2. 79 Street So. loop from Jocelyn Avenue So. to Jocelyn Avenue So.
3. Jenner Avenue So. from 80 Street So. to Jocelyn Avenue So.
EXISTING CONDITIONS - DISCTRICT C1
STREETS
The streets within District C1 are residential and were originally constructed in the early 1980's.
Generally, the streets are 32 feet wide (from face of curb to face of curb) with concrete curb and gutter.
Jeffery Avenue is classified as a collector roadway between 80 Street and 75 Street, as is 75 Street
from Jamaica Avenue to Indian Boulevard. Both of these collector streets are approximately 44 feet wide
(from face of curb to face of curb) with concrete curb and gutter. Each collector is marked with a double
yellow centerline and a white lane delineator on each side of the roadway for the purposes of pedestrians
and bikes.
A visual inspection was performed in 2012 to evaluate pavement surface conditions. The inspection
determined the Pavement Condition Index (PCI) of these streets generally range from 35 -45. Pavements
in the lower end of that range are considered poor and generally have major distress. In contrast, the 1994
Pavement Management Plan depicted PCI's in the range of 49 -80. Per that plan, PCI's in those ranges are
classified as "Fair" and "Good ". Since 1994, pavement condition has continued to deteriorate and much
of the pavements have major distress and are "Poor ". Figure 2 depicts the PCI rating at each street and
Figure 3 depicts the age of the streets within the neighborhood. In addition, there are sections of existing
curb and gutter that have settled, cracked, or have other defects that will require replacement. Appendix
A contains some representative photos of the existing pavement condition.
It should be noted that this District was originally proposed for rehabilitation in 1999 as a part of the 1999
Pavement Management Project. At that time, the streets were approximately 20 years old and the Public
Works Department had been providing the normal street patching and seal coat maintenance. It was
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 2
2013 PAVEMENT MANAGEMENT
proposed in the 1999 Pavement Management Feasibility Report that this area receive a Mill & Overlay,
meaning the existing pavement would be milled, patching and joint repair would occur, and a new
bituminous overlay would be placed. The total project cost was estimated to be approximately $495,000
and the proposed assessment was $1,639 per lot. In 1999, the assessment policy for this type of project
was I% of the assessed market value, or actual construction costs for the Mill/Overlay rehabilitation
method of construction. Ultimately, the residents in this area objected to the project and Council did not
proceed with ordering the plans & specifications for this area. Instead, it was decided that a pavement
management project be pushed off into the future with the possibility of increased pavement deterioration
and therefore increased future rehabilitation and assessment costs. In the meantime, these streets would
continue to receive normal maintenance from Public Works.
Coring of the pavement was performed to determine the thickness of the existing street section. This
information was used to design a recommended pavement section. From the cores, it can be seen that the
average section consists of 3 inches of bituminous over 4 -5 inches of gravel.
Existing Street Section — District C1
No.
Location
Bituminous (in)
Aggregate Base (in)
1
7789 Janero Avenue
Y
4"
2
7787 Jeffery Avenue
3 -1/2"
4
3
7555 Jeffery Avenue
3"
8"
4
9187 75 Street
4
3"
5
7420 Jeffery Avenue
3"
5"
SANITARY SEWER
The sanitary sewer system within the Pinetree Pond East Additions consists of 8 and 12 -inch VCP. The
only exception to this is a 12 -inch reinforced concrete pipe southeast of 75 Street through Kingston Park.
The existing sanitary sewer has been televised to evaluate pipe condition. The televising reports show
that the pipe is in good condition. However, some problems encountered in the existing sanitary sewer
were cracked pipe and sags.
WATER MAIN
The water mains within the Pinctree Pond East Additions consist of 6, 8, and 12 -inch diameter ductile
iron pipe. The mains were installed between 1979 and 1980. The water mains are believed to be in good
condition. However, there are two valves, a six -inch and twelve -inch, which are not operational and will
need to be addressed.
STORM SEWER
The existing storm sewer has been televised to determine pipe condition and necessary repairs. In
addition, storm structures were also inspected. Storm sewer mains are generally in good condition.
However, some problems encountered in the existing storm sewer were cracked or broken pipes and dirty
lines. Miscellaneous structure patching, lining, replacement of steps, and other repairs were noted during
the inspections.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 3
2013 PAVEMENT MANAGEMENT
EXISTING CONDITIONS - DISCTRICT C2
STREETS
The streets within District C1 are residential and were originally constructed over a twelve year period
between 1980 and 1992. The southwest coiner of C2 was constructed in 1980 and the next development
occurred eight years later.
Generally, the streets are 32 feet wide (from face of curb to face of curb) with concrete curb and gutter.
Jensen Avenue is classified as a collector roadway between 70 Street and Indian Boulevard, as is Indian
Boulevard from Jamaica Avenue to Keats Avenue (CSAH 19), and Joliet Avenue from 70 Street to
Indian Boulevard. All three of these collector streets are approximately 44 feet wide (from face of curb to
face of curb) with concrete curb and gutter. Indian Boulevard and Jensen Avenue are marked with a
double yellow centerline and a white lane delineator on each side of the roadway for the proposes of
parking and pedestrian/bike traffic. Indian Boulevard was also recently added to the City's Municipal
State Aid (MSA) street system.
A visual pavement condition inspection determined the Pavement Condition Index (PCI) of these streets
range from 40 -65. Pavements in the lower end of that range are considered "Poor" to "Fair" and
generally have major distress or a significant amount of load related distress. In contrast, the 1994
Pavement Management Plan depicted PCI's in the range of 71 -99. Since 1994, pavement condition has
continued to deteriorate to the current levels. Figure 2 depicts the PCI rating at each street and Figure 3
depicts the age of the streets within the neighborhood. In addition, there are sections of existing curb and
gutter that have settled, cracked, or have other defects that will require replacement. Appendix A
contains some representative photos of the existing pavement condition. It was observed that the older
developments typically have lower PCI ratings and greater amounts of damaged curb and gutter.
Coring of the pavement was performed to determine the thickness of the existing street section. This
information was used to design a recommended pavement section. From the cores, it can be seen that the
average section consists of 3 -4 inches of bituminous over 5 inches of gravel. Cores 2 -17 showed no signs
of stripping and were noted to be in good condition.
Existing Street Section — District C2
No.
Location
Bituminous (in)
Aggregate Base (in)
1
9056 Indian Boulevard
4" *
5"
2
7332 Janero Avenue
3"
4"
3
7141 Jenner Lane
4"
3"
4
7238 Janero Avenue
3"
3"
5
9226 73r Street
3"
4"
6
7056 Jensen Avenue
4"
5"
7
7379 Jensen Avenue
3 -1/4"
6"
8
9379 Indian Boulevard
3 -1/4"
5"
9
9410 Indian Boulevard Ct.
3 -1/4"
6"
10
946872 nd Sheet
4 -1/4"
3"
11
9484 71S Bay
3 -3/4"
4"
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 4
2013 PAVEMENT MANAGEMENT
12
7036 Jocelyn Alcove
3"
5 -1/2"
13
7163 Jocelyn Avenue
3 -3/4"
6
14
964572 nd Street
4-1/2"
6
15
7129 Joliet Avenue
4
6
16
9872 Indian Boulevard
4 -1/2"
5 -1/2"
17
7378 Jewel Avenue
3 -1/4"
5"
* Low - Severity Asphalt Stripping Observed
SANITARY SEWER
The sanitary sewer system within the Pinetree Pond East Additions consists of 8 and 12 -inch VCP. There
is also some 12 -inch RCP along Indian Boulevard between Jewel Avenue and Jocelyn Avenue. Sewer
within the East Parkview 2 " Addition consists of 8 PVC. The existing sanitary sewer has been televised
to evaluate pipe condition. The televising reports show that the pipe is in good condition. However,
some problems encountered in the existing sanitary sewer were cracked pipe and some root intrusion.
WATER MAIN
The water mains within the Pinetree Pond East Additions consist of 6, 8, 12, and 18 -inch diameter ductile
iron pipe. The mains were installed between 1980 and 1992. The water mains are believed to be in good
condition. However, there are some minor repairs required such as replacing the top sections of some
valves and extending hydrant barrels.
STORM SEWER
The existing storm sewer has been televised to determine pipe condition and necessary repairs. In
addition, storm structures were also inspected. Storm sewer mains are generally in good condition.
However, some problems encountered in the existing storm sewer were cracked or broken pipes and dirty
lines. Some pipe segments had been pierced by private utilities and need to be repaired. Miscellaneous
structure patching, lining, replacement of steps, and other repairs were noted during the inspections.
EXISTING CONDITIONS - DISCTRICT C3
STREETS
The streets within District C3 were originally constructed in the early to mid 1990's. The streets are
approximately 32 feet wide (from face of curb to face of curb) with concrete curb and gutter.
The Pavement Condition Index (PCI) of these streets range from 55 -75. In contrast, the 1994 Pavement
Management Plan depicted PCI's in the range of 99 -100 since they were new streets at the time. Current
PCI ranges are classified as "Good" and "Very Good" according to the City's pavement management
plan. Generally these pavements that have a significant level of both non -load related (Very Good) and
load related distress (Good). Since 1994, pavement condition has continued to deteriorate and much of
the pavements have significant distress. Figure 2 depicts the PCI rating for each street and Figure 3
depicts the age of the streets within the neighborhood. In addition, there are sections of existing curb and
gutter that have settled, cracked, or have other defects that will require replacement. Appendix A
contains some representative photos of the existing pavement condition.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 5
2013 PAVEMENT MANAGEMENT
Coring of the pavement was performed to determine the thickness of the existing street section. This
information was used to design a recommended pavement section.
Existing Street Section — District C3
No.
Location
Bituminous (in)
Aggregate Base (in)
1
7848 Jenner Avenue
3" *
5"
2
7901 Jocelyn Avenue
3 -1/2"
6
3
9501 79 Street
4 -1/4" *
5
* Asphalt Stripping Observed
From the cores, it can be seen that the average section consists of 3.5 inches of bituminous over 5 inches
of gravel. Two of the three cores displayed degradation due to stripping, which is generally described as
the separation of aggregate from the asphalt primarily due to moisture. The extent of the stripping found
degrades the strength and durability of the pavement.
SANITARY SEWER
The sanitary sewer system within the Prestige Estates Additions primarily consists of 8 -inch PVC. The
only exception to this is a section of 8 -inch ductile iron pipe off 80"' Street extended north into Jocelyn
Avenue. The existing sanitary sewer has been televised to evaluate pipe condition. The televising reports
show that the pipe is in good condition and no repairs are anticipated.
WATER MAIN
The water mains within the Prestige Estates Additions consist of 6 -inch diameter ductile iron pipe. The
mains were installed between 1990 and 1994. The water mains are believed to be in good condition, and
therefore, no improvements are proposed. There is, however, a valve that is not operational that should
be addressed.
STORM SEWER
The existing storm sewer has been televised to determine pipe condition and necessary repairs. In
addition, storm structures were also inspected. Storm sewer mains are generally in good condition.
However, some problems encountered in the existing storm sewer were cracked or broken pipes and dirty
lines. Miscellaneous structure patching, lining, replacement of steps, and other repairs were noted during
the inspections.
PROPOSED IMPROVEMENTS — DISTRICT cC
STREETS
Based on the deteriorated condition of the existing pavement and relatively good condition of the existing
subgrade, the proposed rehabilitation method for the majority of the streets in District C1 consists of full
pavement removal and replacement with 3.5 inches of new Ravement. The only exception would be the
collector streets, 75 Street and Jeffery Avenue south of 75 Street. In an effort to increase the pavement
section due to additional traffic associated with collector roadways, it is proposed to reclaim the existing
pavement and gravel base to a depth of approximately 8 inches. The reclaimed material would then be
salvaged, the subgrade would be excavated approximately 5.5 inches, and the salvaged reclaim material
would then be re- spread and placed. The resultant reclaimed material would then be shaped and graded to
allow for placement of 3.5 inches of non -wear and 1.5 inches of wearing course pavement. The wear
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 6
2013 PAVEMENT MANAGEMENT
course is proposed to be virgin mix, excluding the use of recycled asphalt pavement (RAP). Figure 4
depicts the improvements in this neighborhood.
The existing D412 concrete curb and gutter has been evaluated. It is proposed that 100% of the curb and
gutter be removed and replaced as a part of this project. Replacing all of the curb and gutter will:
1. Result in a more consistent product due to being machine laid versus hand poured
2. Produce a more uniform flow -line and improve drainage characteristics
3. Reduce the chance for differential settlement between panels
4. Restart the lifecycle of the curb, complimenting the adjacent new pavement
Since the concrete curb is proposed to be replaced, the existing direct -bury street light wire is also
proposed to be replaced within a PVC conduit. The City has recently experienced increased maintenance
due to deterioration of the existing direct -bury wire as well as damage due to rodents. The new wire and
conduit will require the installation of hand holes at every street light pole due to insufficient conduit size
within the existing light pole base. Feed points have been inspected by City staff and have been found to
need new cabinets and controllers.
When curb and gutter is removed and replaced each driveway would be patched with in -kind materials as
a part of the street rehabilitation process. Alternately, the homeowner could elect to receive a credit for
the City - constructed driveway patch. With the credit, the homeowner would then be able to hire a private
contractor and apply the credit towards a driveway repair of their choosing.
Traffic signs are proposed to be replaced as a part of this project to meet federal retroreflectivity
requirements. In addition, signs will be evaluated for conformance to the adopted City sign policy and
signs will be removed or supplemented as required.
SANITARY SEWER
Inline repairs are recommended to address cracks within the pipe. Where there are sags with a history of
back -ups, it is recommended that the pipe be removed and replaced. The sanitary sewer manhole castings
will be salvaged and reinstalled. The existing concrete adjusting rings will be replaced with new HDPE
adjusting rings to conform to current City standards.
WATER MAIN
It is proposed that the valves that are not operational be removed and replaced as a part of this project.
Also, there are ten hydrants that should be adjusted. It is proposed to extend the hydrant barrel on each of
these hydrants. Finally, concrete hydrant access pads are proposed to be installed at all hydrants in
accordance with current City standards.
STORM SEWER
Generally speaking, the intent of this project is to rehabilitate the streets and not change existing drainage
patterns. In -line repairs are recommended to address cracks, and leaking or offset joints. Structures in
poor condition and adjusting rings will be replaced to conform to current city standards. Existing castings
will be salvaged. Miscellaneous structure patching, lining, replacement of steps, and other repairs will be
performed as needed.
There have been some reports of localized ponding within the roadway at the corner of 79 Street and
Janero Avenue. Deposits of sediment that were found in the downstream pipe were believed to be
restricting flows and have recently been removed by Public Works. During some rain events
homeowners have reported a significant amount of overland flow coming down Janero Avenue from the
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 7
2013 PAVEMENT MANAGEMENT
north. During final design, the addition of additional catch basins in an effort to get water into the storm
pipes earlier will be evaluated.
STORM WATER QUALITY
Storm water quality improvements are not required in this neighborhood due to no increase of impervious
surfacing.
PROPOSED IMPROVEMENTS - DISTRICT C2
STREETS
Due to the range of pavement ages within District C2, two primary rehabilitation methods are proposed,
pavement replacement and mill - overlay.
The streets within C2 that were constructed in 1980 are proposed to undergo a full pavement replacement.
This is consistent with the proposed improvements in District C1 as both areas are of similar age,
pavement condition, and construction materials of the time. The only exception to this is Indian
Boulevard Court whose pavement and curb condition is better, presumably due to reduced traffic.
Indian Boulevard from Jamaica Avenue to Jewel Avenue is showing a greater level of pavement distress
due to additional traffic. It is therefore proposed to replace the full pavement section by reclaiming the
existing pavement and gravel base to a depth of approximately 12 inches. The excess reclaimed material
would then be hauled off -site. The resultant reclaimed material would then be shaped and graded to allow
for placement of 3.5 inches of non -wear and 1.5 inches of wearing course pavement. The wear course is
proposed to be virgin mix, excluding the use of recycled asphalt pavement (RAP).
In the areas of full pavement replacement it is proposed that 100% of the curb and gutter be removed and
replaced as a part of this project. Replacing all of the curb and gutter will:
1. Result in a more consistent product due to being machine laid versus hand poured
2. Produce a more uniform flow -line and improve drainage characteristics
3. Reduce the chance for differential settlement between panels
4. Restart the lifecycle of the curb, complimenting the adjacent new pavement
Similar to District C1, where the full concrete curb removal and replacement occurs, the existing direct -
bury street light wire is also proposed to be replaced within a PVC conduit as well as the installation of
hand holes at every street light pole. Feed points have been inspected by City staff and have been found
to need new cabinets and controllers.
The proposed rehabilitation method in the remainder of C2 is to mill 1.5 inches of the existing bituminous
pavement the entire width of the street, perform crack sealing and patching as needed on the remaining
pavement, then pave 1.75 inches of new bituminous pavement. This method typically results in reflection
of existing cracks in the new roadway surface within I to 2 years. Maintenance of the reflective cracks
through a route and seal will be required which reduces moisture penetration and prevents further
pavement breakup.
In the mill - overlay areas, the existing concrete curb and gutter will be evaluated prior to construction.
Based on a preliminary evaluation, it was estimated that approximately 18% is currently in poor condition
and would need to be replaced.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 8
2013 PAVEMENT MANAGEMENT
In locations where curb is replaced in front of driveways, curb will be removed and replaced and each
driveway would be patched with in -kind materials as a part of the street rehabilitation process.
Alternately, the homeowner could elect to receive a credit for the City - constructed driveway patch. With
the credit, the homeowner would then be able to hire a private contractor and apply the credit towards a
driveway repair of their choosing.
Traffic signs are proposed to be replaced as a part of this project to meet federal retroreflectivity
requirements. In addition, signs will be evaluated for conformance to the adopted City sign policy and
signs will be removed or supplemented as required.
Specific roadway improvements due to the work proposed by the South Washington Watershed District
(SWWD) is described in the section titled Storm Water Quality.
SANITARY SEWER
Inline repairs are recommended to address cracks within the pipe. Where there are sags with a history of
back -ups, it is recommended that the pipe be removed and replaced. The sanitary sewer manhole castings
will be salvaged and reinstalled. The existing concrete adjusting rings will be replaced with new HDPE
adjusting rings conform to current City standards.
WATER MAIN
It is proposed that broken valve top sections be removed and replaced as a part of this project. Also, there
are two hydrants that should be adjusted. It is proposed to extend the hydrant barrel on each of these
hydrants. Finally, concrete hydrant access pads are proposed to be installed at all hydrants in accordance
with current City standards.
STORM SEWER
Generally speaking, the intent of this project is to rehabilitate the streets and not change existing drainage
patterns. In -line repairs are recommended to address cracks, and leaking or offset joints. Structures in
poor condition will be replaced to conform to current city standards. Adjustment rings for manholes will
be replaced with HDPE rings. Catch basin rings will not be replaced unless the curb adjacent to them is
removed, or failure of the rings has occurred. The existing castings will be salvaged. Miscellaneous
structure patching, lining, replacement of steps, and other repairs will be performed as needed.
Public Works staff provided input on areas with historic drainage concerns. No major flooding or
drainage issues were noted; therefore only minor curb grade modifications and valley gutter installations
are proposed to facilitate drainage.
Since Indian Boulevard has been designated a MSA route, the storm sewer system must meet the
maximum allowable spread requirements set forth by MnDOT. These requirements will not apply to the
mill - overlay area portion of Indian since it is not viewed as a reconstruction. Therefore, it is anticipated
that a few additional catch basins will be required at two low points along Indian.
STORM WATER QUALITY & SWWD
The City initially proposed retrofit water quality improvements within pond ED -P5 in 2009 for a Clean
Water Fund grant submittal for water quality improvement projects. The retrofit improvements are
currently substantially completed and provide water quality treatment to a portion of the untreated
watershed of pond ED -P5 adjacent to Kingston Park.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 9
2013 PAVEMENT MANAGEMENT
Tied to those improvements are additional upstream improvements adjacent to 70 Street. Washington
County is currently proposing grading for the South Washington Watershed District's (SWWD) Central
Draw Storage Facility (CDSF) and construction of a piped outlet as a part of the proposed CSAH
22 /CSAH 19 (70' Street /Keats Avenue Improvement project). As a part of this project, a portion of the
ultimate 72" outlet will be constructed for the CDSF. Until the ultimate outlet is complete, storm water
from the CDSF will be routed down Joliet and Jocelyn Avenue to pond ED -P2.2. This will require the
removal and replacement of storm sewer pipe under those roadways.
In order to facilitate the installation of the new 30 -inch storm sewer pipe along Jocelyn, a new parallel
sanitary sewer lateral is needed to serve the residents on the south side of the street. Sewer and water
service pipes will be removed and replaced for these properties. Because of the utility work, it's proposed
that the full pavement section along with curb and gutter be removed and replaced. In addition, it's
anticipated that driveways and landscaping will be impacted to the right -of -way line. Figure 12 depicts
the proposed improvements.
The South Washington Watershed District (SWWD) is partnering financially with the City to implement
these water quality improvements and it's anticipated they will contribute a portion of the street and
utility construction for the installation of the proposed storm sewer.
Additional storm water quality improvements are not required in this neighborhood due to no increase of
impervious surfacing.
PROPOSED IMPROVEMENTS - DISTRICT C3
STREETS
Due to the age of the pavement in District C3, it would typically be proposed to mill 1.5 inches of the
existing bituminous pavement, perform crack sealing and patching as needed on the remaining pavement,
then pave 1.5 inches of new bituminous pavement. However, due to the observed depth and extent of the
existing pavement stripping, a mill and overlay is not recommended at this time.
Currently, Mn/DOT's Office of Materials is leading a study to evaluate "Stripping of Hot Mixed Asphalt
Pavements under Chip Seals." This study is scheduled to conclude in late 2012 and may provide some
insight as to why the stripping is occurring on certain roads. In the meantime, City staff met with
Mn/DOT to discuss the stripping in District C3. Numerous rehabilitation methods were discussed,
including various forms of full pavement replacement. Rather than pursue full replacement at this time,
the City has decided to monitor the deterioration until the pavement justifies a full replacement. District
C3 is now tentatively scheduled for rehabilitation in the post -2016 Capital Improvement Plan (CIP).
The existing concrete curb and gutter will be evaluated prior to the future rehabilitation. Based on a
preliminary evaluation, it was estimated that approximately 15% is currently in poor condition and would
need to be replaced. It should be anticipated that additional curb will need to be replaced in the future.
SANITARY SEWER
Since the televising has indicated the pipe is in good condition, no repairs were anticipated. The City may
choose to reevaluate necessary repairs when the project moves forward. The sanitary sewer manhole
castings will be salvaged and reinstalled. Any existing concrete adjusting rings will be replaced with new
HDPE adjusting rings to conform to current City standards.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 10
2013 PAVEMENT MANAGEMENT
WATER MAIN
The water mains are believed to be in good condition, and therefore, no improvements were proposed.
There is, however, a valve that is not operational. This repair can be handled as a general maintenance
item if desired. When the project moves forward, concrete hydrant access pads are proposed to be
installed at all hydrants in accordance with current City standards.
011107 :11T /&I :kT1T/ 4:1
In -line repairs are recommended to address cracks, and leaking or offset joints. Structures in poor
condition and adjusting rings will be replaced to conform to current city standards. Existing castings will
be salvaged. Miscellaneous structure patching, lining, replacement of steps, and other repairs will be
performed as needed.
STORM WATER QUALITY
Storm water quality improvements are not required in this neighborhood due to no increase of impervious
surfacing.
ALTERNATE BID
STREETS
The City could opt to obtain alternate bids to replace the traditional wearing course with an Ultra -Thin
Bounded Wearing Course ( UTBWC). Mn/DOT research document 2007 -18 states that nationwide
research has shown that UTBWC reduces deterioration caused by weathering, oxidation, traffic and
provides good skid resistance, reduced rolling noise, reduction of hydroplaning, and back spray from the
roadway.
UTBWC was introduced to Minnesota in 1999 and was first used on US -169 near Princeton. During the
first seven years after constructing the UTBWC overlay, Mn/DOT reported no further maintenance
activity with only some of the transverse cracks reflecting through; however, they were tight.
If this alternate is pursued, the UTBWC would replace the proposed wearing course on both the mill -
overlay and pavement replacement areas, with the exception of cul -de -sacs. At this time cul -de -sacs
cannot be paved with this product so it's proposed that the UTBWC be used up to the neck of the cul -de-
sac. The cul -de -sac bubble would then have the full pavement section replaced and would be
subsequently fog sealed. It is anticipated that this alternate would reduce the amount of reflective
cracking in the mill - overlay area and would last longer than the traditional wearing course.
PROPOSED IMPROVEMENTS - KINGSTON PARK
To be consistent with past City pavement management projects, parks within the pavement management
district typically receive upgrades. Therefore several new improvements are proposed for Kingston Park,
located east of 75 Street.
PARKING LOTS & ACCESS DRIVE
The proposed rehabilitation method for the main Kingston Park parking lot consists of full pavement
removal and replacement with 3.5 inches of new pavement. The addition of curb and gutter was
determined to be cost prohibitive due to the existing flat grades and the resulting grading and drainage
issues that would arise. Storm sewer improvements are also proposed adjacent to the existing parking lot.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 11
2013 PAVEMENT MANAGEMENT
Since the access drive appears to be in better condition, it's proposed to mill 1.5 inches of the existing
bituminous pavement, perform crack sealing as necessary on the remaining pavement, then pave 1.5
inches of new bituminous pavement. Figure 11 depicts the proposed park improvements.
TRAILS
Bituminous trails are also proposed to be constructed within Kingston Park. Costs for various options are
presented in the table below. Trail segments within Kingston Park are shown on Figure 11.
Trail Cost Summary — Kingston Park Segments
Location
Estimated Costs
Segment 1
$55,000
Segment 2
$26,000
Segment 3
$14,000
Segment 4
$31,000
Segment 5
$52,000
Segment 6
$12,000
Total:
$190,000.00
Costs presented include 10 % contingency + 30% indirect costs
TRAILS
The existing tennis and basketball courts currently display some cracking. Previous route and seal
maintenance has been met with limited success. Despite the cracking, the remaining portions of the
surface appear to be in good condition. Rather than pursue a full surface replacement at this time, a crack
repair is recommended that will not be included in this contract.
Other proposed amenities within the park include:
• Curb around existing play area
• Trash receptacles
• Benches
• Planting of trees
• Gazebo Structure (with picnic table)
PARK IMPROVEMENT COST SUMMARY
Estimated Park Improvements
Location
Estimated Costs
Trail Segments 1 -6
$190,202.87
Access Drive Rehabilitation
$29,465.15
Existing Parking Lot Rehabilitation
$213,882.96
Accessory Features
$63,134.50
Subtotal:
$496,685.48
Costs presented include 10% contingency + 30% indirect costs
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 12
2013 PAVEMENT MANAGEMENT
PERMITS AND EASEMENTS
Because the roadway construction is considered a maintenance project that would not create any new
impervious surfaces and would not change the existing grade, hydraulics, or purpose of the roadway, the
Phase II General Storm Water Permit from the MPCA would not be required for that portion of the work.
However, since the project is proposed to include extensive trail construction and new impervious areas,
the project will trigger the need for the Phase II Storm Water Permit.
This project will require the following permits:
• Phase II General Storm Water Permit from the MPCA
No additional drainage and utility easements are anticipated in the neighborhoods, however, this will be
evaluated during the final design phase of the project.
ESTIMATED COSTS
Cost estimates for the improvements have been prepared and are included in the Appendix of this report.
All costs for items to be constructed are based on anticipated unit prices for the 2013 construction season.
All costs include a thirty (30) percent allowance for indirect costs associated with the project
(engineering, administrative, financing, and legal) as well as a ten (10) percent contingency. No costs are
included for capitalized interest during the construction period or before assessments are levied.
Following is an overall summary of the estimated costs:
Estimated Cost Summary
Location
Estimated Project Cost
Pavement Replacement
District C-1-Pavement Replacement
$3,154,788.78
District C2- Pavement Replacement
$559,503.95
Indian Blvd- Pavement Replacement
$750,588.05
Mill Overlay.
District C2 -Mill Overlay
$2,226,918.02
Indian Blvd Mill Overlay
$444,895.24
District C3
-
Kingston Park Improvements
$496,685.48
Total Estimated Project Cost:
$7,633,379.52
Costs presented include 10% contingency + 30% indirect costs
Because District C3 is proposed for rehabilitation post -2016, no costs are presented above.
COST ALLOCATION
Assessments for this project will be based upon the "Infrastructure Maintenance Task Force Special
Assessment Policy For Public Improvements," dated September 30, 2005, Revised August 8, 2012. All
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 13
2013 PAVEMENT MANAGEMENT
adjacent benefiting properties are proposed to be assessed. Per the Urban Residential policy, 45% of the
project cost for both surface and subsurface improvements would be assigned to each individual
residential lot on a unit basis. The intent of the City's policy is to treat all properties within a residential
development as similar individual units regardless of lot frontage. The amount assessed is based on the
City standard street section even if the width is greater. City funds would be responsible for the
remaining 55% of the project costs.
The 80 multi - family properties in District C2 (pavement replacement area) were assigned a Residential
Buildable Lot Equivalent (RBLE) with the following calculation per the policy:
80 units x 0.6 = 48 RBLE
Per the policy, City -owned property was evaluated in the same manner as commercial/industrial lots
where 100% of the project costs adjacent to the property are assessed. School property followed the
Religious Institutions /School Land Use policy where 75% of the project costs are apportioned based on
the front footage of the street being improved.
In areas where residential property was on the opposite side of the street of either the City or school
property, half of the street width was assigned to the residential area and the other half to either the City
or the school property. The estimated project assessments are as follows:
CITY -OWNED PROPERTY:
Estimated Cost Allocation
Abutting
City Property
Total Street Cost
Estimated City
Location
Street
Adjusted
Adjacent to City
Property
Assessment
- =
Costs* ($ /It)
Footage ** (lf)
Property
(100 % of Total)
C2 —Mill & Overlay
$152.42
1473.5
$224,586.04
$168,439.53
C1— Pavement Replacement
$277.61
313
$86,890.65
$86,890.65
C2 — Pavement Replacement
$255.99
212
$54,270.05
$54,270.05
C2 — Mill & Overlay
$152.42
139.5
$21,262.13
$21,262.13
Totals:
I
$162
* Total Project Cost, includes Street & Utilities
* * Includes 50% reduction for property on one side of the street
SCHOOL PROPERTY:
Estimated Cost Allocation
Abutting
School Property
Total Street Cost
Estimated
School Property
Location = -_
Street
Adjusted
Adjacent to School
Assessment
- =
Costs* ($ /It)
Footage ** (10
Property
75% of Total
C2 —Mill & Overlay
$152.42
1473.5
$224,586.04
$168,439.53
Totals:
$168,439.53
* Total Project Cost, includes Street & Utilities
** Includes 50% reduction for property on one side of the street
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 14
2013 PAVEMENT MANAGEMENT
URBAN RESIDENTIAL LAND USE:
Estimated Cost Allocation
Location
Other Funds x
Assessed Amount
(45% of Total)
Estimated
Project Cost
C1& C2— Pavement Replacement
$2,896,526.28
$1,568,354.49
$4,464,880.78
C2 — Mill & Overlay
$1,886,040.32
$785,772.94
$2,671,813.27
Kingston Park
$496,685.48
-
$496,685.48
Totals:
$5,279,252.08
$2,354,127.44
$7,633,379.52
* See Appendix C for Fund Breakout. Includes City, School & SWWD fiords
Estimated Cost Per Unit
Location
Assessable
RBLE Units
Assessed Amount
45% of Total
Assessed Cost Per
RBLE Unit
C1& C2— Pavement Replacement
385*
$1,568,354.49
$4,073.65
C2 — Mill & Overlay
320
$785,772.94
$2,455.54
* Includes 48 equivalent units for multi- family housing
The 80 multi - family properties in the District C2 pavement replacement area would be assigned a cost of:
48 RBLE x $4,073.65 = $195,535.11
$195,535.11 / 80 units = $2,444.19
It's anticipated that the SWWD will participate in the additional costs for replacing the roadway surface
and curbing, installation of new storm and sanitary sewer, and additional restoration and landscaping
costs adjacent to the pipe work they're proposing in area C2. As seen in Appendix C, these additional
costs are deducted from the project prior to calculating the assessments above.
Estimated project costs for the UTBWC Alternate can also be seen in Appendix C. The costs identified in
the table below summarize the additional impact to each assessable property with the alternate.
UTBWC Alternate - Estimated Cost Impact
Location
Assessable
RBLE Units
Additional
Amount Assessed
Additional Cost
Per RBLE Unit
C1 &C2— Pavement Replacement
385*
$90,063.97
$233.93
C2 — Mill & Overlay
320
$53,686.84
$167.77
School Property
-
$5,271.33
-
* Includes 48 equivalent units for multi- family housing
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 15
2013 PAVEMENT MANAGEMENT
FINANCING
Assessments are proposed to be levied based on the City's current assessment policy. MSA funds will be
utilized on all actual participating construction costs on Indian Boulevard. The remainder of the project
would be financed through a combination of City funds such as the General Tax Levy and Enterprise
funds for items such as storm sewer improvements. General Levy funds will be utilized for the proposed
park improvements. Figures 7 & 8 depict the assessable parcels for the project.
PUBLIC HEARING
Because the properties within the project area benefit from the proposed improvements, and the project
will be partially funded through assessment, it will be necessary for the City to hold a public
improvement hearing to receive comment on the proposed project and to determine further action to be
taken.
PROJECT SCHEDULE
Below is the proposed schedule assuming starting construction in 2013:
• 08/08/2012
Council Orders Feasibility Report
• 01/02/2013
Council Workshop
a 01/08/2013
Hold Neighborhood Meeting
• 01/16/2013
Council Receives and Approves Feasibility Report
Council Sets a Public Improvement Hearing Date
• 02/20/2013
Council Holds Public Improvement Hearing
Council Orders the preparation of the Plans and Specifications
• 03/20/2013
Council Approves the Plans and Specifications
• 04/18/2013
Project Bid Date
• 05/01/2013
Contract Award
• Spring 2013
Begin Construction
• September 2013
Complete Construction
• September 2013
Council sets Assessment Hearing Date
• October 2013
Council holds Assessment Hearing
CONCLUSION AND RECOMMENDATIONS
It is recommended that this report be used as a guide for the layout, design, and cost allocation for the
public improvements. It is further recommended that the owners of properties within the project limits be
notified of the proposed improvements in order to provide comment.
To determine project feasibility, a comparison was made between the costs estimated herein and the costs
experienced for other similar projects within the City. These comparisons, on a per linear foot
construction cost basis (no indirect project costs), are shown in the following table:
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 16
2013 PAVEMENT MANAGEMENT
Cost per Unit Comparison
2013 Pavement Management Project (Estimated)
District C1 & District C2 —Pavement Replacement Area
$150.39
District C2 — Mill & Overlay Area
$99.65
2011 Pavement Management Project (Bid Results)
Pine Coulee/Countrywood
$68.49
Howard's Addition
$63.18
2010 Pavement Management Project - River Acres (Bid Results)
$69.14
2008 Pavement Management Project (Bid Results)
$96.00
From the tabulation above, it can be seen that the cost to rehabilitate in the pavement replacement areas
are higher than the costs from the 2011 Pavement Management Project. This is primarily due to the fact
that this project includes streets with concrete curb and gutter and public sanitary sewer, storm sewer, and
water main repairs. In addition, the street widths are generally wider than the rural residential streets
from 2010 and 2011. In 2008, the bid result listed above did not include sanitary and storm sewer repairs
or full curb replacement.
The remaining C2 area has costs typical with a mill - overlay rehabilitation project with spot curb
replacement.
The project is financially feasible, with funding sources identified from the City as well as the benefited
properties adjacent to the project. Financial responsibilities have been determined based on estimated
project costs as well as adopted City policy.
From an engineering standpoint, this project is feasible, necessary, and cost effective.
City of Cottage Grove, Minnesota
2013 Pavement Management Project Page 17
2013 PAVEMENT MANAGEMENT
Appendix A
Existing Pavement Condition Photos
Cottage
J Grove
h ere Pride an6V'l ,"e"ty Meet
City of Cottage Grove, Minnesota
2013 Pavement Management Project
2013 PAVEMENT MANAGEMENT
District C1
Approximate Location: Jeffery Ave. 200' north of Janero Ave.
Curb damage observed with cracked and chipped panels. Settlement and poor drainage also present.
District C1
Approximate Location: Jeffery Ave.. 200' north of Janero Ave.
Pavement has much distress and is beyond an overlay. Full pavement replacement is recommended.
City of Cottage Grove, Minnesota
2013 Pavement Management Project
2013 PAVEMENT MANAGEMENT
YC {.
District C1
Approximate Location: Jeffery Avenue and 75 Street intersection
Patching of the bituminous pavement has occurred. Load - related cracking in the wheelpath is visible.
City of Cottage Grove, Minnesota
2013 Pavement Management Project
District C1
Approximate Location: 75 St. near Jeffery Ave.
Curb damage is visible.
2011-3 PAVEMENT MANAGEMENT
District Cl
District Cl
Approximate Location: Janero Court
Extensive block cracking is present and the effect of pavement aging is evident.
City of Cottage Grove, Minnesota
2013 Pavement Management Project
Approximate Location: Janero Court
Alligator cracking due to pavement fatigue is present.
2013 PAVEMENT MANAGEMENT
District Cl
Approximate Location: 79 Street at Janero Avenue
Pavement fatigue is visible by severe block cracking and alligator cracking within the wheelpath.
City of Cottage Grove, Minnesota
2013 Pavement Management Project
District C1
Approximate Location: Jeffery Avenue at Janero Avenue
Small block cracking and alligator cracking in wheelpath.
2013 PAVEMENT MANAGEMENT
City of Cottage Grove, Minnesota
2013 Pavement Management Project
District C1
Approximate Location: 7401 Jeffery Lane
Intermediate -size block cracking is visible.
District C2
Approximate Location: 7375 Janero Avenue
Some longitudinal cracks are present, block cracking is beginning.
2013 PAVEMENT MANAGEMENT
District C2
Approximate Location: 9149 73` Avenue
Large block cracking is present, with more pavement distress adjacent to multi - family homes.
S__`�
City of Cottage Grove, Minnesota
2013 Pavement Management Project
District C2
Approximate Location: 7237 Janero Avenue
Irregular block cracking.
2013 PAVEMENT MANAGEMENT
City of Cottage Grove, Minnesota
2013 Pavement Management Project
District C2
Approximate Location: 7157 Jenner Lane
Transverse (thermal) cracking with subsequent block cracking present.
District C2
Approximate Location: 7251 Jensen Avenue
Minor rutting in wheelpath, transverse cracks have been sealed.
2013 PAVEMENT MANAGEMENT
District C2
Approximate Location: Joliet Avenue & Jocelyn Avenue facing South
Longitudinal cracking at paving joints are not load - related. Past crack filling was performed.
City of Cottage Grove, Minnesota
2013 Pavement Management Project
District C2
Approximate Location: 7363 Joliet Avenue
Block cracking with few open cracks.
2013 PAVEMENT MANAGEMENT
District C2
)n.
City of Cottage Grove, Minnesota
2013 Pavement Management Project
Approximate Location: Joliet Circle
2013 PAVEMENT MANAGEMENT
City of Cottage Grove, Minnesota
2013 Pavement Management Project
District C3
Approximate Location: 7848 Jenner Avenue
Stripping of the seal coat is evident in the surface pavement.
District C3
Approximate Location: 7721 Jocelyn Avenue
Patching of the bituminous pavement has occurred.
2013 PAVEMENT MANAGEMENT
Appendix 6
Figures
M J Cottage
Grove
h ere Pride aa6lQrp51)erlty Meet
City of Cottage Grove, Minnesota
2013 Pavement Management Project
�i : ::: ■ � ���IIIIIIIIIIIII� ■ /`j1► �i��?i ►�
O Sm
In M1
BEER
�111111111� 11� s� ��i• ■■ \ty �
►• ■111111111 11� ■/ ■11�:�■i► �S
HOU SE
♦ � ■11111111 ►��
�. • ■
am
1:11
■11!1111► ii
mill
WARIP i ii 1 ■ ■\ ■Its! ♦ �1® ie i C
INEE
min
�wJ` �� ' ■1111■ ■11■ I■ 1111■■■ ■I�i� �
�� �. � �� i � � ■
� �� � �.� /■ ■1111■ � � 1111��I��.�i�'�����
j \I■ ��I �11■�I i�����1 ■111■1
FEW
�lia . ,�►.�� �IIIIIIII�O��! !,. r
� :::: � � �� 1111111111111 n �`j� ®�i���r ►�
OR
mill
alum 0 oil
lip
� � . •`.'♦111. - ��� °' � ��
A /1111 � . ai��1,�'�' � �lnllilil�� �■� � �
INS
t MERE
'POPPY Igo
OR was
Mall AN
I 'I� ■ �n 1w own
Ron
. IC I le Ii�ll +am el ������11►
IN MEN MEMEmm ME
i NONE
.M
NONE �iiii�I�� i�iii ►�
ONE
INS
�� t1�. � � ♦��I lllllil� ►.� ♦ r
�� .... � ��� , IIIIIIIIIIIII� u /`j���rr;�i ►�
�■ ■111111111► ��11■ ,,�,� = ■���I��i �� �;
■ ����'
oil
mill
slim
Am
ME
MOM
�11r 1� - - rrr� rr ►+� `�
Ok
■111 ■11► � ♦� �'L�� ■. �
Mom
a In WHO
1 1 'r � � fI a' �� '■�I1�1 ■11�� ►� 1�'�1® u� i
��� ♦�� ��`l111111111111� �IIlIII1�jp mi111
in mill I IMLO-0-11 11510,
JOE -
■ �, ■ ■a as a. : � ��► '��
���� � ���1►� ♦� 11111111\ � �'�� •�� r
Z N
w
zo G ��
IN
_rc hW Na o
20
� Goy zo zu z� zw ou ow G
a c >¢v w iuN v �c tia hu �e �iiz Q
w V
N
u d F-
D
I EA o
'os' AV nor I Z s
LU
ZEE-
ti
y ti
1 I Lp
• � � '�� / \ � ]EI HER VE.�O. �
, I ■ I
/ S3 tlN SN3f \
'• 3A AN fi3f )� Nff 8
3A AN3 i3f N31 r
— — _ —
ifJ19G49f — — — — CD
O G
w
o _
IN
IN
<o
p
�w
o
o °
wm6m °0
a G
~
g H
H GOZw
to t s`
zc za z9 zW o
�o
02
°�
� d
�a
G=
_
z
�_—
z
__
- - --
z_ w
• • • •
• I I I
I -- - -_ -- — - -r
--
- --
w
� Q
[C }
C7 2 F
�
� r
Ell
K a
° n�
O o
'\
'OS
AV 3
1
7
G
i
ZEE—
,3 f
_ tl
o
'OS V 3M f
1 iL
3 T I -1
p
G
d3
A a3
O �
•Q
9 ^1
i
b
L
uj.
Am 33f
_a of c
—
�I du
o w ffi B
F 1315 H1NL n .
cc H 8 g
'n ON3 Ntlf n
ON3Ntlf H
F r F e e$ 83
'os 3nv 3Ap15Ml AVE.
.
MNOMAI OS 3AV
J /
F G
o
� d
w �
z z
a
> a
z �
l7 z
w �
n
O o
P
Z N
Ill y
`a
C E
z
0
0
m
�E
ym
3£
£f
�
3
a �
3
O
I Ln
V
(bi
CD
o
c
v U:2
8
a
s
QQQFI
Q G
o O
u, a
z r Z
z �
z
02
C7 z
L
0 i
00
/tt
g
'O53Atl131lOf
i
U
Z �n
Z„ �<
L U
Zap£
0 �E
.j u f
0
l0 E
MID
7
Q G
o O
u, a
z r Z
z �
z
02
C7 z
L
0 i
00
/tt
g
'O53Atl131lOf
i
U
Z �n
Z„ �<
L U
Zap£
0 �E
.j u f
0
l0 E
/ p A
S n A
6
& o p E
S
a 0�
^ D $
uV�
'OS 3Atl r 3NO1SAA1
I
7
/ p A
S n A
6
& o p E
S
a 0�
^ D $
uV�
'OS 3Atl r 3NO1SAA1
I
3Atl 3NOLSMI AW
NOUM
'M WMAl
F G
o°
N a
w f
2 Z
O �
U' z
l7 �
ka
0
U
Zn
L U
Z" Ef
0=
J v $a
0
to
8 �
8
s
N
O
L
a)l
0�
_al s
o�
�U�
��-
eeee
l o�
Z=
Z�
a
> a
l7 z
w �
k a
00
IN
Wl
CD
o�
ao�
U
Z �n
ZN
y$
C
o
p F E
i
0 = H
o
to 4
'M 3AV U3 r
}�
'll' A19 I I
/
/
/
'OS3AVN3SH
z
/ /
/
IN
Wl
CD
o�
ao�
W� °111111
w
J
n S f
I
\ t \ \ 1
i l\
II
II
FA - 1
I a I I
1 s�l II
i
i n j II
I I l
I I
I zz I I
L
° o
¢ o
w
U
U.
O �
N N
— 111 —i -1—
�i
y \.
F G
0 s
In 6
W F
Z �
. Z
C �
l7 2
I- 6
� N
U E
�E
W °
N ♦�O }'I' / � � � M � l
/ W
/
00 /
r 1
I 1 0 �d
z
'--- 35N3f I�
/ / � , ♦ ♦ ♦. ♦ 1 �V� / / 's -- — L-- J —L - -1 �L- -1 - -J— —fir � ♦ z
/ /j ♦ \♦ I A
- -�� ------ - - - - °-
J
o F-
- {�.. ;qT-� �_ i3f^' ,�., .r>:^ --•- _�-- 1 ��x .ry''+' f.. • r •.- • I::•.. ".__. o z
'o�
-- eJd H�eJ,80 :✓I30,6[Z " •' - - ' - U O
`^ '05'3AV 13HOf -
0
eA
E 4
7 •�- - � _�- �ti , - C 1- �; �•�. cam �
a
`�''_ .. '.rte' - tr ��•-T Q �. ��
� y �
1 �.• VR C
K
s
�• i tr 7,
?R; •�`S" r ..! '0.a a• + - - - - 9v - a
�• �t r � C0 � y �ti.a i en: u U Z5
. �.� _ ��, .,:.•_ �__ � �� fi ;�, . T -. : 1 :(�'�•� -.:- fig ,
r l7
M ,s
°a
Lu
MEE
3 ^b �b3'Vb f
l d
. � 2
4-1 s
} N
ebb' / "W / / •'•r ' uul�
2013 PAVEMENT MANAGEMENT
Appendix C
Cost Estimate Summary
Cottage
J Grove
1ph el - e Pride anaPtpSPerity Meet
City of Cottage Grove, Minnesota
2013 Pavement Management Project
Sm
1
21!
o
' 11 , 71
' 1
1
m l
m l
E Z
1
;888
8
8 8
o f
j
8888$
o o
a
888
165
N
8888$
CI
d
. .
.
N
a
N
9
»
1; O
ta
66.
6p
6
g
888m
088
888M
8 88
8$88
888
0
5
sA
g
p
c;
8 8
8
„
gi
88000
8888
8
9
13
8
8
8°88
8e88e
8888$
8888$
c5
88x8
00$
o
IR
I N
.6
.°1
mmee
- a 'o
NN
It
8
8 ti
'
r
4
6
cm
16
$ 8$88
0l
«
88 88
I
g d
O
G
8
0 E
x
tR
j
N
N
p
»
Q
h
N
G c5
zp
4 'r
— -o
6
6 cs
6
IR
o
jo
IN
12
R
Iz
T
o e
1z.
ol
Is
cO
s3
1
le
ia
i
=i
_
in:
Le
R
R
k R
d
'
g
8 N
888 8$
16 6
'i
N
P
5
g
le
t p
g
p
_
CL
1
15
1
cu
E
aj
bt
E
rw
is E
CU
E
E
M
I E
r
5oa 'o
05
Sm
2013 PAVEMENT MANAGEMENT
Appendix D
Preliminary Assessment Roll
(M Cottage
o Grove
%ere Pride a,aQtO5 peritY Meet
City of Cottage Grove, Minnesota
2013 Pavement Management Project
Preliminary Assessment Roll
District C1 & C2 Pavement Replacement
Parcel ID
District
Owner
Address
Units
$ /Unit
I Total /Unit
1002721230032
C1
LEANO ALFRED
9170 75TH ST S
1
$4,073.65
$4,073.65
1002721230033
C1
LARSON KENNETH C & PAQUIN
9140 75TH ST S
1
$4,073.65
$4,073.65
1002721230034
C1
MILLER DAVID ALLEN & SUSAN M
7481 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230035
C1
KRAMER CHARLIE M
7469 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230036
C1
GRUDLE EVERETTJ
7457 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230037
C1
RICHARD JAMES W & JENNINGS & KIMBERLY A JENNINGS
7449 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230038
C1
ELLIOTT AMY D
7443 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230039
C1
LACASSE KENNETH P 1R & AMELIA
7437 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230040
C1
NG CHUNG YIN & FLING YEE
7431 JEFFERY LN S
1
$4,073.65
$4,073.65
1002721230041
C1
GAUGHAN DAVID
7421 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230042
C1
DOHENY MICHAEL D & MARY T
7411 JEFFERY LN S
1
$4,073.65
$4,073.65
1002721230043
C1
THOMPSON SHARILYN G
7401 JEFFERY LN
1
$4,073.65
$4,073.65
10027212300441
C1
FINCH JULIE A
7400 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230045
C1
HALLETT CATHERINE A & LISLE P & P L LISLE
7410 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230046
C1
FISCHERJEROME B
7420 JEFFERY LN S
1
$4,073.65
$4,073.65
1002721230047
C1
DEMMATHOMASJ
7430 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230048
C1
HUNSBERGER MARTIN S & GLORIA M HUNSBERGER
7440 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230049
C1
NELSEN THERESA C
7452 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230050
C1
DAVIS ANN M
7462 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230051
C1
NESS BRUCE A & WENDY E
7474 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230052
C1
ODEN JOHN ERIK & TERHELL & KRISTINE LYNN TERHELL
7438 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230053
C1
GURROLA HARRY R & CRISTINA G
7444 JEFFERY LN S
1
$4,073.65
$4,073.65
1002721230054
C1
KAPSH WILLIAM D & ANITA L
7458 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721230055
C1
BERNARD SANDRA L
7466 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230056
C1
ERICKSON KEITH R & MICHELE A
7476 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230057
C1
TIBBITS JOSHUA & JOANN
7473 JEFFERY LN
1
$4,073.65
$4,073.65
10027212300581
C1
CHAPMAN LISA G
7461 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230059
C1
FLATTUM CYNTHIA C
7459 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230060
C1
GALLES MICHELLE L & MICHAEL MAXWELL
7441 JEFFERY LN
1
$4,073.65
$4,073.65
1002721230061
C1
DOHENY KURT M & LAURIE J
7429 JEFFERY LN
1
$4,073.65
$4,073.65
1002721310003
C1
LINDBLOM TIMOTHY A & SHERI J
7733 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320001
C1
BAR RIENTES JASON R & SHEILA M
7657 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320002
C1
KRITZKY DONALD R JR & LINDA C
7667 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320003
C1
SCHYMA HILARY W & CONNIE J SCHYMA
7677 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320004
C1
MATTHEWS DANIEL L & KRISTIN C
7729 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320005
C1
FLIGG TRACY L
900175TH ST S
1
$4,073.65
$4,073.65
1002721320006
C1
HARDECKE CLINTON & ANGELA C D
902175TH STS
1
$4,073.65
$4,073.65
1002721320007
C1
LEWANDOSKI KATHLEEN M
9043 75TH STS
1
$4,073.65
$4,073.65
1002721320008
C1
DOHERTY PATRICK J & ANGELA M
9067 75TH ST S
1
$4,073.65
$4,073.65
1002721320009
C1
TOWNSEND STEPHEN J & MARY B
7508 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320010
C1
FERGUSON COREY L & HEIDI A
7532 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320011
C1
VANG SHOUA
7564 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320012
C1
MOUA SEESOK & GE XIONG
7586 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320013
C1
LEVOIR CHARLES J
7594 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320014
C1
RUSSELLJEFFERYA & DEBBIE L
7602 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320015
C1
CHRISTIANSEN PHILLIP D
7610 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320016
C1
LUNDIN ERIKA
7618 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320017
C1
FARLEY BARBARA J
7626 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320018
C1
EILEKTHERESAANN
7634JASMINEAVES
1
$4,073.65
$4,073.65
1002721320019
C1
PRIDGEN DARRELL M & DEBRA A
7642 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320020
C1
LOWE TODD D & STEPHANIE A
7652 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320021
C1
RICHIE LAWRENCE J & LINDA A
7676 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320022
C1
SPEARS MELVIN J & SUSAN J
7680 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320023
C1
DELMORE BRIAN & ALDRICH B & BARBARA A ALDRICH
7684 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320024
C1
ETOLL REGINA M
7688 JASMINE AVE 5
1
$4,073.65
$4,073.65
1002721320025
C1
SWAIM RICHARD M & AMY
7692 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320026
C1
KIMLINGER DARLENE E
7696 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320027
C1
ZIEGELMANN THEODORE & CHRISTINE A ZIEGELMANN
7700 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320028
C1
FRANCIS JOSEPH RAYMOND
7704 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320029
C1
STROMBERG MICHELE M & ROGER D
7708 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320030
C1
MEYER KEVIN X & CYNTHIA C
7710 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320031
C1
KRIER JEFFREY M & KAREN M
7722 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320032
C1
MELSON JEFFREY T & LISA M
7734 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320033
C1
ROFFERS APRIL A
7748 JAN EROCTS
1
$4,073.65
$4,073.65
1002721320034
C1
HUEGEL KURT & TERRY
7750 JAN ERO CTS
1
$4,073.65
$4,073.65
1002721320035
C1
SCHWARTZ EDWARD & CHERYL
7752 JANEIRO CTS
1
$4,073.65
$4,073.65
1002721320036
C1
LEVESQUE DANIEL& DAWN
7754 JANEIRO CTS
1
$4,073.65
$4,073.65
1002721320037
C1
SIEVERS JAMES E & KIMBERLY A
7756 JANEIRO CT S
1
$4,073.65
$4,073.65
10027213200381
C1
PICKAR CHRISTOPHER M & ERIN E 17507
JASMINE AVE S
1
$4,073.65
$4,073.65
10027213200391
C1
RUSHFORD KATHLEEN 17533
JASMINE AVES
1
$4,073.65
$4,073.65
10027213200401
C1
KENDIG BRYAN A & JULIE A 17563
JASMINE AVE S
1
$4,073.65
$4,073.65
Preliminary Assessment Roll
District C1 & C2 Pavement Replacement
Parcel ID
District
Owner
Address
Units
$ /Unit
I Total /Unit
1002721320041
Cl
PEIFFER RICHARD DAVID
7593 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320042
Cl
SEDLACEK JEFFREY D & MANDE M S SEDLACEK
7603 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320043
Cl
KOMRO IRVIN T & MARY LOU
7629 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320044
C1
RICHARDSON PAUL W & JEAN A
7653 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320045
C1
EGGUM DANIEL M & CHRISTINA M
7679 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320046
C1
THOMPSON CHERYL D
7701 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320047
C1
ERICKSON STEVEN M
7705 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320048
C1
OLSON MARC A
7707 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320049
Cl
BIEBER JORDAN L & KRISTEN M
7723 JASMINE AVES
1
$4,073.65
$4,073.65
1002721320050
C1
SCHMIDT DANIEL E & YVONNE M
7735 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320051
C1
DAY JESS L & NANCY C
7741 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721320052
C1
RMS RESIDENTIAL PROPERTIES LLC
7722 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320053
C1
GUSTAFSON JOHN A & LORI
7714 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320054
C1
BAUMAN MICHAEL S & KELLY L
7706 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320055
C1
MADSEN JEFFREY Q & PAMELA J
7702 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320056
Cl
AKERVIK SUSAN ELIZABETH
7684 JEFFERY AVES
1
$4,073.65
$4,073.65
1002721320057
Cl
FREYBERGER 1R ALEXANDER F & AMY E FREYBERGER
7662 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320058
Cl
LYNCH JASON & MARCIA REYES
7636 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320059
Cl
NEUFFER GREGORY W
7604 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320060
Cl
KREINER GEORGE 1 & SHIRLEY M
7594 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320061
Cl
BOYD SCOTT A & PATRICIA J
7572 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320062
C1
KRAMER JOSEPH J & JULIE A
7550 JEFFERY AVES
1
$4,073.65
$4,073.65
1002721320063
C1
JACKOLA ROBERT D & DIANE E
7526 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320064
C1
RISTANI KRELANDOTRS
7506 JEFFERY AVES
1
$4,073.65
$4,073.65
1002721320065
C1
YOUNG JR TIMOTHY R & CYNTHIA
7555 JEFFERYAVE S
1
$4,073.65
$4,073.65
1002721320066
C1
HOFMANN RONALD F & CATHERINE
7573 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320067
C1
APITZ LYNNETTE MARIE
7597 JEFFERY AVES
1
$4,073.65
$4,073.65
1002721320068
C1
PROCAI RICHARD J & CYNTHIA P
7607 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320069
C1
BOLAND MICHAEL P & JUDY K
7637 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320070
Cl
LOPEZ-CERON WILTON A
7667 JEFFERY AVES
1
$4,073.65
$4,073.65
1002721320071
Cl
JOHNSON TERANCE PHILLI P & SUSAN K SENGER
7691 JEFFERY AVES
1
$4,073.65
$4,073.65
1002721320072
Cl
GRAVES MARK R & JUDY L
7703 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320073
Cl
ELLIOTT BRIAN W & NANCY D
7713 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721320074
Cl
LESTER MICHAEL T& MOLLY J
7717 JEFFERY AVES
1
$4,073.65
$4,073.65
1002721320075
Cl
PROKOP DANIEL) & BARBARA
7650 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320076
Cl
ZUBELL JON J & JANET K
7632 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320077
Cl
HARDER JASON T
7622 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320078
Cl
SEYMOUR ROBERT R & CHRISTINE
7612 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320079
C1
JONES SHAUN D
7602 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320080
C1
GRECZYNA FRANK N
7592 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320081
C1
PETERSON RICHARD W & BARBARA
7582 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320082
C1
MAGNUSON GREG & KARI
7572 JENSEN AVE S
1
$4,073.651
$4,073.65
1002721320083
Cl
MARX RICHARD J & LINDA L
7562 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320084
C1
LARSON DENNIS A & TRUDY 1
9187 75TH ST S
1
$4,073.65
$4,073.65
1002721320085
Cl
TINGO THOMAS J
7517 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320086
C1
WINK JOHN L
7527 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320087
C1
KEETLEY PETER F & KIM M
7537 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320088
C1
STORM DONALD A& DIANE C
7547 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320089
C1
MILLIGAN ELIZABETH S
7557 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320090
C1
BAST KERNON J & DONALDAJ SPEER -BAST
7567 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320091
C1
TROWBRIDGE LEE E & VICKI L
7577 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320092
Cl
KAMPS STEVEN M & JENNIFER
7587 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320093
C1
HARRINGTON DEBRA J
7597 JENSEN AVES
1
$4,073.65
$4,073.65
1002721320094
C1
QUASHNICK LARRY G & KELLEEN Y ROBINSON
7607 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320095
C1
BENJAMIN ROBERT M & MARGARET E
7617 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721320096
Cl
BERLING PETER M &JENNIFER A
7486 JEFFERY LN
1
$4,073.65
$4,073.65
1002721320097
Cl
PAT KEVIN J & GAIL T
7498 JEFFERY LN
1
$4,073.65
$4,073.65
1002721320098
Cl
OYE JOSHUA C & CHRISTINA A
7484 JEFFERY LN S
1
$4,073.65
$4,073.65
1002721320099
C1
MUNKELWITZTERESA
7496 JEFFERY LNS
1
$4,073.65
$4,073.65
1002721320100
C1
LINDQUIST NATHAN M
9100 75TH ST S
1
$4,073.65
$4,073.65
1002721320101
C1
WYLIE JODI L
9090 75TH ST S
1
$4,073.65
$4,073.65
1002721320102
C1
BENNETT JOHN M & NANCY A
908075TH STS
1
$4,073.65
$4,073.65
1002721320103
C1
SANTANA LESLIE
7497 JEFFERY LN
1
$4,073.65
$4,073.65
1002721320104
C1
TAUZELL ANTHONY M & AMY J
7485 JEFFERY LN
1
$4,073.65
$4,073.65
1002721320105
C1
KENNEDY HOLUE J
9193 75TH ST S
1
$4,073.65
$4,073.65
1002721330001
C1
SVEDIN ERIK A SR & ELIZABETH A & JOSEPH SVEDIN
7725 JEFFERY AVE S
1
$4,073.65
$4,073.65
10027213300021
C1
GREENWELLJOHN M & KAREN T RAUCH
7745 JEFFERY CIR S
1
$4,073.65
$4,073.65
1002721330003
Cl
FRANZ DANIEL M & MARY & MARY ODGEN -FRANZ
7747 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330004
Cl
BROWN JEFFREY B
7753 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330005
C1
PRIBYL PHILLIP J & DEBRA A
7755JASMINEAVES
1
$4,073.65
$4,073.65
1002721330006
C1
DIETRICH GARY! & LINNEA F 17765
JASMINE AVE S
1
$4,073.65
$4,073.65
Preliminary Assessment Roll
District C1 & C2 Pavement Replacement
ParcellD
District
Owner
Address
Units
$ /Unit
Total /Unit
1002721330007
Cl
JORGENSEN REGINA M & DENNIS J
7771 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330008
C1
PERLTJACQUELINEA
7777 JASMINE AVES
1
$4,073.65
$4,073.65
1002721330009
C1
MEYER JOEL M & NOBLE KRISTEN A
7783 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330010
C1
GRAY MICHAEL P & MINDY L COVER
7789 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330011
C1
REIMER MICHAEL K & COLLEEN A
7795 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330012
Cl
HUISENGA DENNIS F & JANICE R
7796 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721330013
Cl
GREEN JUNE M
7792 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721330014
Cl
CRIDER MICHAEL K & TRICIA M
7786 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721330015
C1
RYCHLY LISA M & LARRY R JR
7780 JEFFERY AVE 5
1
$4,073.65
$4,073.65
1002721330016
C1
ANDERSON BRIAN D
7776 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721330017
Cl
SWITS GLENN V & KATHLEEN C
7768 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721330018
Cl
BARES GREGG A & JOAN M
7760 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721330019
Cl
ANTHONSEN BRYAN J & CATHY R
7754 JEFFERY AVE S
1
$4,073.65
$4,073.65
10027213300201
Cl
MOE WILLIAM E & JODI A
7746 JEFFERY AVE 5
1
$4,073.651
$4,073.65
1002721330021
Cl
STAPLES SHAWN R
7740 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721330022
Cl
OLSON JERROLD D & GINA M
7799 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330023
Cl
MCCKERSON HENRY R & PAMELA K
7789 JANERO AVES
1
$4,073.65
$4,073.65
1002721330024
Cl
VANDER LAAN JOHN W & DARLA B
7775 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330025
Cl
COCCHIARELLA JOHN A & KRISTINE & KRISTINE E COCCHI
7769 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330026
Cl
KENNEDY GREGORY J
7751 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330027
Cl
OLSON GARRYJ
7741 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330028
C1
LUDWIG WILLIAM J & DEBORAH J
7731 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330029
C1
ANDERSON DAVID L & LINDA L
7721 JANERO AVES
1
$4,073.65
$4,073.65
1002721330030
C1
FICK JOSEPH J & JENNIFER J
7711 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330031
C1
CLEMEN KEVIN M & HEATHER K
7752 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330032
C1
LEWANDOWSKI STACI & PHYLLIS F DEAN
7758 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330033
C1
NEDRY WAYNE C & JENNIFER A
7764 JASMINE AVE 5
1
$4,073.65
$4,073.65
1002721330034
Cl
SOMMERJEREMY
7784 JASMINE AVES
1
$4,073.65
$4,073.65
1002721330035
Cl
BAILEY MYRON A & CINDY K
7788 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330036
Cl
HANSON STEVEN B
7794 JASMINE AVE S
1
$4,073.65
$4,073.65
1002721330037
Cl
SCHMIDT EUGENE G & MERIDEAN
9156 78TH STS
1
$4,073.65
$4,073.65
1002721330038
Cl
REED GREGORY A & PATRICIA A
9132 78TH STREET CT S
1
$4,073.65
$4,073.65
1002721330039
Cl
ROBERTS AYODELE & JERUSHA BANNAH
9128 78TH STREET CT S
1
$4,073.65
$4,073.65
1002721330040
Cl
MCELMURYIAMESD
912278TH STREET CTS
1
$4,073.65
$4,073.65
1002721330041
Cl
POPOWITZ BRIAN L & DAWN LEA
9116 78TH STREET CT 5
1
$4,073.65
$4,073.65
1002721330042
Cl
FRAMPTON OTIS T III & MARY L
9112 78TH STREET S
1
$4,073.65
$4,073.65
1002721330043
Cl
ROCHE TIMOTHY L & CINNAMON L
9108 78TH STREET CTS
1
$4,073.65
$4,073.65
1002721330044
Cl
EGAN WANDA M
9104 78TH STREET CT S
1
$4,073.65
$4,073.65
1002721330045
C1
DICKERSON CHARLES D & KRISTINE
9042 78TH ST S
1
$4,073.65
$4,073.65
1002721330046
C1
ASH JASON J & KRISTA L
9017 78TH ST S
1
$4,073.65
$4,073.65
1002721330047
C1
FEDERAL HOME LOAN MORTGAGE CORP
9033 78TH STS
1
$4,073.65
$4,073.65
1002721330048
Cl
MCCARTHY THOMAS P
905178TH STS
1
$4,073.65
$4,073.65
1002721330049
Cl
BRODERICK ROBERT L & TAMMY
9103 78TH ST S
1
$4,073.65
$4,07165
1002721330050
Cl
WILLIAMS MARK H &JENNIFER M
9117 78TH STS
1
$4,073.65
$4,073.65
1002721330051
Cl
REIMERS THOMAS & MICHELLE
9133 78TH ST S
1
$4,073.65
$4,073.65
1002721330052
Cl
HAMMERO RICHARD N & KAREN E
914778TH STS
1
$4,073.65
$4,073.65
1002721330053
Cl
MAUSOLF ROBERT J & DEBORAH E
9163 78TH ST S
1
$4,073.65
$4,073.65
1002721330054
Cl
ONKEN CORY
9177 78TH ST S
1
$4,073.65
$4,073.65
1002721330055
C1
FULLER CHERICE B
9193 78TH ST S
1
$4,073.65
$4,073.65
1002721330056
Cl
DOCKTER GLENN D & GAYLE 1
9207 78TH STS
1
$4,073.65
$4,073.65
1002721330057
C1
JOHNSON PATRICK M & KATHERINE
9225 78TH STS
1
$4,073.65
$4,073.65
1002721330058
Cl
STEINMETZ SHIRLEY
924178TH STS
1
$4,073.65
$4,073.65
1002721330059
Cl
CHRISTIANSON LORILEE S & ANDRE
9240 79TH ST S
1
$4,073.65
$4,073.65
1002721330060
C1
LAVALLE ROBERT WAYNE
9224 79TH ST S
1
$4,073.65
$4,073.65
1002721330061
C1
JONES DOUGLAS W & GAIL M
9208 79TH ST S
1
$4,073.65
$4,073.65
1002721330062
Cl
VAN KLOMPENBURG DONALD & KAREN
9196 79TH ST S
1
$4,073.65
$4,073.65
1002721330063
Cl
HUERTA FERNANDO & ERIKA
9180 79TH ST S
1
$4,073.65
$4,073.65
1002721330064
Cl
STEINER ROBERT &TRACY L
9166 79TH STS
1
$4,073.65
$4,073.65
1002721330065
Cl
CRUMB CHRISTOPHER & NICOLE L
915079TH STS
1
$4,073.65
$4,073.65
1002721330066
Cl
SWANSON RICHARD A & KARI L
9134 79TH ST S
1
$4,073.65
$4,073.65
1002721330067
Cl
JASO JOHN P & CHERIE M
9120 79TH ST S
1
$4,073.65
$4,073.65
1002721330068
C1
FISH WILLIAM R & SARA M
9106 79TH ST S
1
$4,073.65
$4,073.65
1002721330069
C1
SCHNEIDER PAMELA J
905679TH STS
1
$4,073.65
$4,073.65
1002721330070
C1
KNOWLES CHARLES A & KRISTA J
9032 79TH ST S
1
$4,073.65
$4,073.65
1002721330071
C1
SCHILLING RICHARD D & NANCY 1
9020 79TH STS
1
$4,073.65
$4,073.65
1002721330072
C1
GOODPASTER MACK R & HARLA J
7710 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330073
C1
PIERSON GORDON E & JANET L
7720 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330074
C1
DIGGS VALLARY M
7730 JANERO AVE S
1
$4,073.65
$4,073.65
10027213300751
C1
MEYER BLAKE A 17742JANERO
CTS
1
$4,073.65
$4,073.65
10027213300761
C1 I
KOONCELEEANN 17744JANERO
CTS
1
$4,073.65
$4,073.65
10027213300771
C1 I
MILLER JEFFREY J & TERESA J 17746
JAN EROCTS
1
$4,073.65
$4,073.65
Preliminary Assessment Roll
District C1 & C2 Pavement Replacement
Parcel ID
District
Owner
Address
Units
$ /Unit
Total /Unit
1002721330078
C1
HAGEN ERIKA & REBEKAH F
7758 JANERO CT S
1
$4,073.65
$4,073.65
1002721330079
C1
JACKSON KRISTINA J &JASON B
7760 JANERO CT S
1
$4,073.65
$4,073.65
1002721330080
C1
DREXEL JOSEPH T & MONA C
7762 JANERO CT S
1
$4,073.65
$4,073.65
1002721330081
C1
VAN GUILDER BARBARA A
7766 JANERO AVE S
1
$4,073.65
$4,0737
1002721330082
Cl
ALT JOHN L & NISSEN PATRICIA L
7774 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330083
Cl
PALMERSTEN JONATHAN M
7782 JANERO AVE S
1
$4,073.65
$4,073.65
10027213300841
Cl
TUOMINEN KENNETH F & CORINNE TUOMINEN
7790 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330085
Cl
SCHYMA DANIEL M
7798 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330086
Cl
HANSEN KURT A& SHARON M
7800 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330087
Cl
LOPEZ MATTHEW A & CARLA J AMAYA
7820 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330088
Cl
MICKELSON ALLEN L & DEBRA L
7840 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330089
Cl
LEAS JAMES A
7860 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330090
Cl
NELSON ROBERT W & MARYANN
7880 JANERO AVE S
1
$4,073.65
$4,073.65
1002721330091
Cl
RAGAN MICHAEL E
9005 79TH ST S
1
$4,073.65
$4,073.65
1002721330092
Cl
GERMAINE DANIEL FRANK & CONS
9019 79TH ST S
1
$4,073.65
$4,073.65
1002721330093
Cl
BORENZ CHAD & ALECIA
903179TH ST S
1
$4,073.65
$4,073.65
1002721330094
Cl
RUGEL LINDA LIZETTE & JUAN R
9055 79TH ST S
1
$4,073.65
$4,073.65
1002721330095
Cl
SMITH JEAN MARIE
9105 79TH STS
1
$4,073.65
$4,073.65
1002721330096
Cl
SERGENT ERNEST JR & CLAUDETT
9119 79TH ST S
1
$4,073.65
$4,073.65
1002721330097
Cl
BRANG LAURA J
9135 79TH ST S
1
$4,073.65
$4,07165
1002721330098
Cl
TWEETJEROME S & THERESA E
9149 79TH ST S
1
$4,073.65
$4,073.65
1002721330099
C1
CARLSON WADE M & JENNIFER L
9165 79TH ST S
1
$4,073.65
$4,073.65
1002721330100
Cl
STEIN ECK DAVID & LORETTA SCAN LAN
9179 79TH ST S
1
$4,073.65
$4,073.65
1002721330101
Cl
AUGE RACHEL J & GARY W WELDON JR
9195 79TH ST S
1
$4,073.65
$4,073.65
1002721330102
Cl
SUNDBERG KENNETH & KATHLEEN
921179TH STS
1
$4,073.65
$4,073.65
1002721330103
Cl
REID ROBERT & CAROLYN M
9227 79TH STS
1
$4,073.65
$4,073.65
1002721330104
Cl
SCHNEIDER DAVID E
9243 79TH STS
1
$4,073.65
$4,073.65
1002721340002
Cl
NIEMCZYK RITA M & JEROME F
7801 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340003
Cl
MROSZAK DENNIS F
7805 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340004
Cl
SWANSON GREGORY A& JEANNE M
7809 JEFFERY CT S
1
$4,073.65
$4,073.65
1002721340005
Cl
PEDERSON DANIEL R & LISA M
7813 JEFFERY AVE CT S
1
$4,073.65
$4,073.65
1002721340006
Cl
WILLIAMS CAROL & JONATHAN L
7827 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340007
Cl
LARSON SUZANNE E
7863 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340008
Cl
RISTANIKRELANDOTRS
7915 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340009
Cl
LEVINE KEITH M & LAURIE L
7959 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340010
Cl
WALLACE WILLIAM M & CHRISTINE
7737 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340011
Cl
BURSAW DAVID W & PATRICIA F
7741 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340012
Cl
BAILEY BRANDON L
7779 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340013
Cl
GORNICK RALPH A JR & JANET E
7781 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340014
Cl
SONNEE LEE E & ANDREA
7787 JEFFERY AVE S
1
$4,073.651
$4,073.65
1002721340015
Cl
WAGNER SCOTT R & KIMBERLY
7791 JEFFERY AVE S
1
$4,073.65
$4,073.65
1002721340016
Cl
PEDERSON ROBERT P & GLORIA F
7795 JEFFERY AVE S
1
$4,073.65
$4,07165
1002721340017
Cl
WOULFE MAURICE J
7799 JEFFERY CTS
1
$4,073.65
$4,073.65
1002721210076
C2
RAVEN DOUGLAS R & MARCIA 1
9356 73RD ST S
1
$4,073.65
$4,073.65
1002721210077
C2
DUTCHIN ALSTON N & PAMELA A
9324 73RD ST S
1
$4,073.65
$4,073.65
1002721210078
C2
CATALANO JOHN C
9288 73RD ST S
1
$4,073.65
$4,073.65
1002721210079
C2
HAWLEY STEPHEN R & MARY JO
9272 73RD ST S
1
$4,073.65
$4,073.65
1002721210080
C2
TVEITTALIA D
9258 73RD ST S
1
$4,073.65
$4,073.65
1002721210098
C2
FITZGERALD MICHAEL R & SANDRA & SANDRA M KASPRZAK
7307 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721210099
C2
KOATS LISA
7295 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721210100
C2
0LMSTEAD MICHAEL E
7273 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721220002
C2
HANSEN JAMES W JR & STACIA M
7366 JANERO AVE
1
$4,073.65
$4,073.65
1002721220003
C2
BRANT JOSEPH L & SUSAN R
7348 JANERO AVE S
1
$4,073.65
$4,073.65
1002721220004
C2
BULLIS KRISTIN L & JEFFREY 1
7332 JANERO AVE S
1
$4,073.65
$4,073.65
1002721220005
C2
RESSLER WILLIAM E & MARY
7316 JAN ERO AVE S
1
$4,073.65
$4,073.65
1002721220006
C2
SCHWARTZ JASON & KAMEHA
7300 JAN ERO AVE S
1
$4,073.65
$4,073.65
1002721220007
C2
WALTZ JEAN A& CHARLES M
7296 JANERO AVE S
1
$4,073.65
$4,073.65
1002721220053
C2
HALFEN DANIEL) & PAMELA
9244 73RD STS
1
$4,073.65
$4,073.65
1002721220054
C2
DONAHOE CHRISTOPHER M & DAWN M
9230 73RD ST S
1
$4,073.65
$4,073.65
1002721220055
C2
RUTSCH ARNO H
9226 73RD ST S
1
$4,073.65
$4,073.65
1002721220056
C2
PAUL GEORGE & MERCY
9214 73RD ST S
1
$4,073.65
$4,073.65
1002721220057
C2
ANDRUS SCOTT R & DAWN M
9192 73RD ST S
1
$4,073.65
$4,073.65
1002721220058
C2
SCHANK PAUL M & KARRI A
9158 73RD ST S
1
$4,073.65
$4,073.65
1002721220059
C2
DAHL RONALD C & CAROL J
9142 73RD ST S
1
$4,073.65
$4,073.65
1002721220060
C2
LEMIRE DOUGLAS B
9126 73RD ST S
1
$4,073.65
$4,073.65
1002721220061
C2
PAULSON BARBARA A & DAVID A KLEPAIDA
9104 73RD ST S
1
$4,073.65
$4,073.65
1002721220062
C2
KNUTSON IAN M & ANGELA L
7337 JANERO AVE S
1
$4,073.65
$4,073.65
1002721220063
C2
BURTH MICHAELI & MAUREEN
7319 JANERO AVE S
1
$4,073.65
$4,073.65
1002721220064
C2
HENNEN DANIEL W & ANNE M
9117 73R2 ST S
1
$4,073.65
$4,073.65
1002721220065
C2
KOENIG BARBARA R
9135 73RD ST S
1
$4,073.65
$4,073.65
1002721220066
C2
WILLENBRING MARTIN & KATHLEEN & KATHLEEN A WILLEN
9149 73RD STS
1
$4,073.65
$4,073.65
Preliminary Assessment Roll
District C1 & C2 Pavement Replacement
Parcel ID
District
Owner
Address
Units
$ /Unit
I Total /Unit
1002721220080
C2
HANSEN JAYNE L
7294 JANERO AVE S
1
$4,073.65
$4,073.65
1002721230002
C2
ZAHRADKA ROBERT F & BONNIE L ZAHRADKA
7384 JANERO AVE
1
$4,073.65
$4,073.65
1002721230003
C2
LARSON JULIE A
9176 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230004
C2
JANSEN JENNIFER J
9156 INDIAN BLVD
1
$4,073.65
$4,073.65
1002721230005
C2
RAWAY MARY P
9136 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230006
C2
FANGEL ROSEMARY & WILLIAM TRUS
9118 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230007
C2
GREGERSON MICHAEL C
9116 INDIAN BLVD
1
$4,073.65
$4,073.65
1002721230008
C2
BOLLMAN THOMAS & NANCY
9114 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230009
C2
MEISSNER DIANE KAY
9112 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230010
C2
OMAN TERRENCE P & BARBARA
9110 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230011
C2
STILLWELL JONATHAN D & MARY E ZAPPA STILLWELL
9108 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230012
C2
KUPER RICHARD J & KAREN J
9102 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230013
C2
CHAPMAN THOMAS A
9056 INDIAN BLVD S
1
$4,073.65
$4,073.65
10027212300141
C2
BLAIR MELISSA C & JOSHUA P
7375 JANERO AVE S
1
$4,073.65
$4,073.65
1002721230015
C2
SIMMA BAKER &JENNIFER R HIRTE
9167 73RD STS
1
$4,073.65
$4,073.65
1002721230016
C2
NELSON TAMMY M
9183 73RD ST S
1
$4,073.65
$4,073.65
1002721230017
C2
GALLAGHER JEROME T
9013 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230018
C2
TEGANTVOORT KURTIS A & JILL C
9055 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230019
C2
BEDARD MICHAEL D & MIKI K
9097 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230020
C2
WINTER JOHN P & DARLA M
9105 INDIAN BLVD S
1
$4,073.651
$4,073.65
10027212300211
C2
HANDELAND DANA P & WANDA M
9109 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230022
C2
DORN DARRELL E & CAROLYN A
9115 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230023
C2
HICKEY TIM &TAMMY
9133 INDIAN BLVD
1
$4,073.65
$4,073.65
1002721230024
C2
BUTINA JOHN M & CINDY H
9145 INDIAN BLVD
1
$4,073.65
$4,073.65
1002721230025
C2
SCHLAUCH JANET L
9163 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230026
C2
FARR PAUL M
9181 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230027
C2
B10RKMAN DAVID A & MARY M
9189 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230028
C2
ROSS WILLIAM P & SUZANNE C
9199 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230029
C2
UNDBACK TIMOTHY &TANYA E
9207 INDIAN BLVD
1
$4,073.65
$4,07165
1002721230030
C2
CALLAHAN MATTHEW P & REBECCAJ
9225 INDIAN BLVD
1
$4,073.65
$4,073.65
1002721230031
C2
STOCKBURGER JAMES P & BARBARA
9259 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721230065
C2
RYAN MATTHEW J
9184 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230066
C2
NELSON CINDY
9212 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230067
C2
LAUNDRY ANN M
9208 INDIAN BLVD S
0.6
$4,073.651
$2,444.19
1002721230068
C2
CARLSON GRETCHEN
9188 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230069
C2
TERRY JO -ANN M
9192 INDIAN BLVD
0.6
$4,073.65
$2,444.19
10027212300701
C2
HOLBROOK ROLLAND L & NANCY M
9204 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230071
C2
GOGALA MATTHEW A
9200 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230072
C2
FLORES FRANCES S
9196 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230073
C2
BIXBY JOANNE
9224 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230074
C2
NGUYEN THACH & TAI HUYNH
9228 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230075
C2
REHAK SARAH M
9216 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230076
C2
SCHLUETER DAVID H & SUSAN SCHREINER
9220 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721230080
C2
WATSON TOMMY A & AKESHA D
9227 73RD ST S
0.6
$4,073.65
$2,444.19
1002721230081
C2
CRESS BRIAN J & DORIS M
923173RD STS
0.6
$4,073.65
$2,444.19
1002721230082
C2
GUSTAVSSON KAREN M
9235 73RD ST S
0.6
$4,073.65
$2,444.19
1002721230083
C2
PETERSON NANCY C
9223 73RD STS
0.6
$4,073.65
$2,444.19
1002721230084
C2
MCCAULEYJULIE
921973RD STS
0.6
$4,073.65
$2,444.19
1002721230085
C2
HEVERN JOHN DJR
9239 73RD STS
0.6
$4,073.65
$2,444.19
1002721230086
C2
WEAVER CHARLES H & MARILYN R
9243 73RD STS
0.6
$4,073.65
$2,444.19
1002721230087
C2
LIEN DON A & MARK A & PAUL R & PAUL R LIEN
9215 73RD ST S
0.6
$4,073.65
$2,444.19
1002721230088
C2
SCHOTTMULLERJENNIFER
925173RD STS
0.6
$4,073.65
$2,444.19
1002721230089
C2
PAGEL GLENN T
927173RD ST S
0.6
$4,073.65
$2,444.19
1002721230090
C2
WILKOSKE REBECCA L
9275 73RD STS
0.6
$4,073.65
$2,444.19
1002721230091
C2
DYER JANET S & JAYE F
9247 73RD ST S
0.6
$4,073.65
$2,444.19
1002721230092
C2
MATTSON THOMAS
9259 73RD STS
0.6
$4,073.65
$2,444.19
1002721230093
C2
EARLEY THOMAS W & PEGGY M
9263 73RD ST S
0.6
$4,073.65
$2,444.19
1002721230094
C2
PAGEL GLENN T & MARY E & MARY E SOTANSKI - PAGEL
9267 73RD ST S
0.6
$4,073.65
$2,444.19
1002721230095
C2
BERG PAMELA
9255 73RD STS
0.6
$4,073.65
$2,444.19
1002721240026
C2
CLARK JODI R & KENT M COOK
7425 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721240027
C2
LUTZ JASON & RHONDA G
7415 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721240028
C2
HOLT GERALD J & PATRICIA L
7405 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721240029
C2
NELSEN DAVID M & THERESA M
7379 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721240030
72
AMORES ADOR NELSON O & JO ANGELA S AMORES
7357 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721240031
C2
RENELT BRIAN P & DEANNA L
7333 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721240032
C2
DONLEY THOMAS M & DAWN M
7317 JENSEN AVE S
1
$4,073.65
$4,073.65
1002721240033
C2
NELSON WILLIAM A G & MARY G
9273 INDIAN BLVD S
1
$4,073.65
$4,07165
1002721240034
C2
PALMER JOHN C & NANNINA A
9285 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721240035
C2
CHENEY JON E & SHELLY
92991NDIAN BLVDS
i
$4,073.65
$4,073.65
1002721240036
C2
O'MEARA GREG K & ANN M
9307 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721240037
C2
KARLSTRAND JAN R & TAMARA S
9321 INDIAN BLVD S
1
$4,073.65
$4,073.65
Preliminary Assessment Roll
District C1 & C2 Pavement Replacement
Parcel ID
District
Owner
Address
Units
I $ /Unit
Total /Unit
1002721240038
C2
METHNER SCOTTJ & VALOREE A
9335 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721240039
C2
SPICER JAMES H & TERESAJ
9349 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721240040
C2
FRECHETTE DONALD 1 & RUTH M
9363 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721240041
C2
HAMILTON JOHN J
9379 INDIAN BLVD S
1
$4,073.65
$4,073.65
1002721240043
C2
O'NEILL TIMOTHYJ & TERESE M
9419 INDIAN BLVD
1
$4,073.65
$4,073.65
1002721240044
C2
HUNSTAD JOHN M & LORI A
9431 INDIAN BLVD S
1
$4,073.651
$4,073.65
10027212400451
C2
NATHE JODY M & JULIE A 0
9445 INDIAN BLVD S
1
$4,073.65
$4,073.65
10027212400461
C2
GREGERSON MICHAEL C
9461 INDIAN BLVD S
1
$4,073.65
$4,073.65
10027212400471
C2
CRABTREE GREGORY M & SAMANTHA K
9477 INDIAN BLVD S
1
$4,073.65
$4,073.65
10027212400481
C2
BRYAN SHARON K
9493 INDIAN BLVD S
1
$4,073.65
$4,073.65
10027212400521
C2
HANSON SHERYL D
9236 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240053
C2
MISSERA ROBERT
9232 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240054
C2
BAILEY ALANA M
9244 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240055
C2
FLECK LISA
9240 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240056
C2
DRENCKHAHN SHIRLEE J
9248 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240057
C2
DOLNEY DENNIS M &JOANNE R
9276 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240058
C2
PETERSON VERNON H
9272 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240059
C2
DAHL STEVEN M & ANDREA L YOUNG
9252 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
10027212400601
C2
MEADE ASHLEY J
9256 INDIAN BLVD
0.6
$4,073.65
$2,444.19
1002721240061
C2
PETERSON WILLIAM C
9268 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240062
C2
FOX MICHAEL R
9264 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240063
C2
ROBENS JEREMY L
9260 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240064
C2
SCHUMACHER ERIC S
9288 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240065
C2
MONETTE DEBORAH D
9300 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240066
C2
BEARD ARTHUR G JR
9296 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240067
C2
WOODBECK DONNA
9292 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
10027212400681
C2
POLING DEANNA L
9280 INDIAN BLVD S
0.61
$4,073.65
$2,444.19
1002721240069
C2
HAUPERTMICHAELD
9308 INDIAN BLVD
0.6
$4,073.65
$2,444.19
1002721240070
C2
KIRBY JOHN F & REBECCA C
9304 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240071
C2
STARR DEBORAH L
9284 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240072
C2
NELSEN BRADLEY M
9312 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240073
C2
CONRAD ELIZABETH A
7380 JENSEN AVE S
0.6
$4,073.65
$2,444.19
1002721240074
C2
TURNER LAURA A
7390 JENSEN AVE S
0.6
$4,073.651
$2,444.19
1002721240075
C2
WILDENAUER CAROL L
9316 INDIAN BLVD S
0.6
$4,073.651
$2,444.19
10027212400761
C2
RAMIREZ MARTIN MAYEN & ROSALIO C POLVO LIRA
9320 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240077
C2
PFEIFER JUDITH K
7400 JENSEN AVE S
0.6
$4,073.65
$2,444.19
1002721240078
C2
ERIKSEN DAVID & ATTN E02 JENSEN LLC
7410 JENSEN AVE S
0.6
$4,073.65
$2,444.19
1002721240079
C2
BAUER CORA
9324 INDIAN BLVD S
0.6
$4,073.65
$2,444.19
1002721240080
C2
OTT - SWENSON RHONDA & SWENSON A
929173RD ST S
0.6
$4,073.65
$2,444.19
1002721240081
C2
KUNESH LYNN E
9295 73RD ST S
0.6
$4,073.65
$2,444.19
1002721240082
C2
WEIDLINGNICKLASJ
929973RD STS
0.6
$4,073.65
$2,444.19
1002721240083
C2
TRUHLER MARY L
9287 73RD ST S
0.61
$4,073.65
$2,444.19
1002721240084
C2
MONTORRIE JULIE E
9283 73RD ST S
0.6
$4,073.65
$2,444.19
1002721240085
C2
MAJOR CONNIE
9303 73RD STS
0.6
$4,073.65
$2,444.19
1002721240086
C2
LUHRS JUSTIN & JEANNETTE VANDENBERG
930773RD STS
0.6
$4,073.65
$2,444.19
1002721240087
C2
ROHWEDER ROBERTT
9279 73RD STS
0.6
$4,073.65
$2,444.19
1002721240088
C2
FLO SUSAN T
9315 73RD ST S
0.6
$4,073.65
$2,444.19
1002721240089
C2
PLASTER ROBIE A
9335 73RD ST S
0.6
$4,073.65
$2,444.19
1002721240090
C2
HENDRICKSON GERALD D
9339 73RD ST S
0.6
$4,073.65
$2,444.19
1002721240091
C2
KRAHN GEORGE TRS & KRAHN TRS
931173RD ST S
0.61
$4,073.65
$2,444.19
1002721240092
C2
BENDISKE BRADLEY R & JEFFREY A
9323 73RD ST S
0.61
$4,073.65
$2,444.19
1002721240093
C2
PINETREE POND EAST FIRST ASSOCIATION
932773RD STS
0.61
$4,073.65
$2,444.19
1002721240094
C2
MILLER JEANIE M
933173RD STS
0.61
$4,073.65
$2,444.19
1002721240095
C2
HAAPALA JAY W & REBECCA L
9319 73RD STS
0.61
$4,073.65
$2,444.19
1002721240096
C2
OTT - SWENSON RHONDA & SWENSON A
9355 73RD ST S
0.61
$4,073.65
$2,444.19
1002721240097
C2
PETERSON STEVE M
7310 JENSEN AVE S
0.61
$4,073.65
$2,444.19
1002721240098
C2
DENNIS STEPHANIE
7320 JENSEN AVE S
0.6
$4,073.65
$2,444.19
1002721240099
C2
BECKRICH BARBARA L
935173RD ST S
0.6
$4,073.65
$2,444.19
1002721240100
C2
SHEA SCOTT & SUSAN
9347 73RD ST S
0.6
$4,073.65
$2,444.19
1002721240101
C2
HILL GLEN E & BARBARA J
7330 JENSEN AVE S
0.6
$4,073.65
$2,444.19
1002721240102
C2
LINHOFF KATHRYN A TRS
7340 JENSEN AVE S
0.6
$4,073.65
$2,444.19
1002721240103
C2
VAN HORN BRIAN K
9343 73RD ST S
0.6
$4,073.65
$2,444.19
Totals
385
$1,568,355.25
Preliminary Assessment Roll
District C2 Mill Overlay
Parcel ID
District
Owner
Address
Units
$ /Unit
Total /Unit
1002721220128
C2
GUNDERSON STEVEN D & KELLY A
7141 JENNER LN
1
$2,455.54
$2,455.54
1002721220126
C2
KUPHALJOSEPH M & AMBER D
7157 JENNER LN
1
$2,455.54
$2,455.54
1002721220120
C2
THOMPSON BARRY LEE & CINTHIA M
7062 JENNER BAY S
1
$2,455.54
$2,455.54
1002721220101
C2
FITZGERALD SHAWN P
7254JENNER LN S
1
$2,455.54
$2,455.54
1002721220108
C2
JOHNSON DAVID L & SUSAN M
7210 JENNER ALCOVE S
1
$2,455.54
$2,455.54
1002721220102
C2
I SERRATO MARIO
7246 JENNER ALCOVE
1
$2,455.54
$2,455.54
1002721220107
C2
NORRIS DAN & MELINDA
7218 JENNER ALCOVE S
1
$2,455.54
$2,455.54
1002721220111
C2
THAD SHINAS PAUL& CHRISTIAN VAM
7188JENNER ALCOVE S
1
$2,455.54
$2,455.54
1002721220116
C2
ROSS MICHAELJ & ANGELA )
7098 JENNER BAY S
1
$2,455.54
$2,455.54
1002721220098
C2
LEMAYJAMES A & JOHNSON LISA
7225 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220110
C2
MCGREGOR -RICE JAMIE & GERALYN CARPENTER
7192 JENNER ALCOVE S
1
$2,455.54
$2,455.54
1002721220100
C2
MITTERHOLZER JAY N
7260JENNER LN
1
$2,455.541
$2,455.54
1002721220109
C2
DEMARRE JOHN B & KATHRYN L
7202 JENNER ALCOVE
1
$2,455.54
$2,455.54
1002721220103
C2
ISTUMP ANDREW P & JULIE A
7242 JENNER ALCOVES
1
$2,455.54
$2,455.54
1002721220112
C2
I BLAISDELL JEFFREY J & JESSICA R
7172 JENNER BAY
1
$2,455.54
$2,455.54
1002721220114
C2
ISMITH MICHAELJ & REBECCA )
7126 JENNER BAY S
1
$2,455.54
$2,455.54
1002721220124
C2
I HANSON ROBERTA
7173 JENNER LN
1
$2,455.54
$2,455.54
1002721220117
C2
MORRELL DEAN E
7086 JENNER BAY S
1
$2,455.54
$2,455.54
1002721220104
C2
HEIM MATTHEW C & TRINA 5
7236 JENNER ALCOVE
1
$2,455.54
$2,455.54
1002721220113
C2
GRAMER WILLIAM 0 & PAULA 1
7144JENNER BAY 5
1
$2,455.54
$2,455.54
1002721220121
C2
RIEGE DAVID & CHRISTINE
7050JENNER BAY
1
$2,455.54
$2,455.54
1002721220119
C2
BENSON JOHN D & BARBARAJ
7070JENNER BAY S
1
$2,455.54
$2,455.54
1002721220127
C2
JORISSEN MICHAELJ & MICHELLE
7147JENNER LN
1
$2,455.54
$2,455.54
1002721220130
C2
I WILLKOM CHASE A & CHRISTINA R
71171ENNER LN S
1
$2,455.54
$2,455.54
1002721220106
C2
WUANGFELIX
7224JENNERALCOVE S
1
$2,455.54
$2,455.54
1002721220115
C2
GARDNER LEE A & PATRICIA L
7100 JENNER BAY 5
1
$2,455.54
$2,455.54
1002721220105
C2
WEBB HENRY W JR & MARY C
7230JENNER ALCOVE
1
$2,455.54
$2,455.54
1002721220122
C2
ABDELAL AMRO & SAMIA M GABER
7048 JENNER CIR S
1
$2,455.54
$2,455.54
1002721220099
C2
FOURNIER KAREN M
7219 JANERO AVE
1
$2,455.54
$2,455.54
1002721220129
C2
ANDERSON TROY D
7135 JENNER LN
1
$2,455.54
$2,455.54
1002721220125
C2
LIBEL MARK E & DIANA M GATES
7165 JENNER LN S
1
$2,455.54
$2,455.54
1002721220118
C2
MALINSKI MICHAEL H
7078 JENNER BAY S
1
$2,455.54
$2,455.54
1002721220123
C2
DONALDSON GEORGE & PATRICIA
7181 JENNER LN S
1
$2,455.54
$2,455.54
1002721240018
C2
PUFF THERESA A
9408 INDIAN BLVD CTS
1
$2,455.54
$2,455.54
1002721240002
C2
BRANDVOLD ERIC &JAMIE M
7335 JEWEL AVE
1
$2,455.54
$2,455.54
1002721240004
C2
FRANKENBERG DAVID & BEVERLY
7381 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721240022
C2
NELSON ERIC P
9396 INDIAN BLVD CTS
1
$2,455.54
$2,455.54
1002721240023
C2
SCHULT THOMAS G & SHERRI M
9394 INDIAN BLVD CTS
1
$2,455.54
$2,455.54
1002721240005
C2
SCHROEER SHARON K
7399JEWELAVE
1
$2,455.54
$2,455.54
1002721240010
C2
PESEK TODD A & KRISTI K
7378 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721240003
C2
AMLAND PATRICIA E & RODNEY
7353 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721240025
C2
CLARKE KATHLEEN M
9390 INDIAN BLVD CTS
1
$2,455.54
$2,455.54
1002721240008
C2
LAUS ALFREDO & YVETTE
7338 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721240016
C2
HOFMANN TIMOTHY H
9412 INDIAN BLVD CT S
1
$2,455.541
$2,455.54
1002721240017
C2
NORTH CHRISTOPHER K
9410 INDIAN BLVD CT S
1
$2,455.54
$2,455.54
1002721240020
C2
MCGUIRE PAUL R & EILEEN F
9400 INDIAN BLVD CT S
1
$2,455.54
$2,455.54
1002721240014
C2
LANGER JAY A & REBEKAH S
9416 INDIAN BLVD CT S
1
$2,455.54
$2,455.54
1002721240009
C2
CHAPMAN STEPHEN J & JUDITH A
7354JEWELAVE S
1
$2,455.54
$2,455.54
1002721240011
C2
WEGELETERA
7398 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721240013
C2
WHITE CRAIG R & BRENDA 1
7418 JEWELAVE S
1
$2,455.54
$2,455.54
1002721240021
C2
LANGBEHN JONATHAN G
9398 INDIAN BLVD CT S
1
$2,455.54
$2,455.54
1002721240024
C2
AHERNS KRISTIN A & SHANE A
9392 INDIAN BLVD CT S
1
$2,455.54
$2,455.54
1002721120015
C2
CARLIER MARTIN & TRACY
7036 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120020
C2
OVERLAND ROBERT G & GRACE L
7072 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120005
C2
HALL BRAD & TARA
7015 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721240006
C2
BLANCK JEFFREY J & KATHLEEN A AUSTI N BLANCK
7409JEWELAVES
1
$2,455.54
$2,455.54
1002721240019
C2
POOLE JAMES D & ROSE M POOLE
9406 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721120047
C2
KROPP MICHAEL A & BARBARA H
7051 JOCELYN CT S
1
$2,455.54
$2,455.54
1002721120088
C2
CHLEBECK SARAH E & KEVIN B
9692 72ND ST S
1
$2,455.54
$2,455.54
1002721120094
C2
AGA JOHN B JR & PATRICIA M
7042 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120022
C2
CHATTERTON CHRISTOPHER & JAYNE
7086 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120027
C2
RAMSDEN BENJAMIN J & KIMBERLY L RAMSDEN
7130 JOCELYN BAY S
1
$2,455.54
$2,455.54
1002721120029
C2
STUEMPERT HILMONTJ & LINDA A
7146 JOCELYN BAY
1
$2,455.54
$2,455.54
1002721120036
C2
OXFORD JEFFREY A & RENEE J
9524 72ND ST
1
$2,455.54
$2,455.54
1002721120006
C2
DANIELSON ROY W
7002 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721120008
C2
BAILEY THOMAS G
7010 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120007
C2
SUMMERS JOEL BRENT 1 7008
JOCELYN AVE
1
$2,455.54
$2,455.54
1002721120031
C2
LEITHAUSER JAMES M & JULIE L 17160
JOCELYN BAY 1
1
$2,455.54
$2,455.54
1002721120042
C2
KAPING RANDALL A & AUDREY A 17019
JOCELYN AVE I
1
$2,455.54
$2,455.54
Preliminary Assessment Roll
District C2 Mill Overlay
Parcel ID
District
Owner
Address
Units
$ /Unit
Total /Unit
1002721120057
C2
PFROMM PAMELA J
7219 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120085
C2
LARSON TIMOTHY C & LINDA C
9634 72ND ST S
1
$2,455.54
$2,455.54
1002721120097
C2
ERICKSON JENNIFER & NATHAN LIND
7266 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120103
C2
HANG KONG PHENG & KHOU MOUA
960172ND ST S
1
$2,455.54
$2,455.54
1002721120051
C2
KIDDER JOSEPH A & ERIN L
7125 JOCELYN CTS
1
$2,455.54
$2,455.54
1002721120063
C2
I RYAN JAMES R & NANCY L
7329 JOCELYN PL
1
$2,455.54
$2,455.54
1002721120064
C2
DUSTIN GEORGE E & MARY J
7347 JOCELYN PL
1
$2,455.54
$2,455.54
1002721120077
C2
LEVANG MICHAEL & KRYSTAL & VIVIAN K PARTELLO
7217 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120003
C2
HEMAUER RONALD L & KATHRYN M
7001 JOLIET AVE 5
1
$2,455.54
$2,455.54
1002721120012
C2
BUSTAD ANGELA M & RANDY
7028 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120016
C2
JENNIGES MATHIAS M &THERESEA
7044 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120038
C2
KLUCK ROBERTJ & MARY P
9504 72ND STS
1
$2,455.54
$2,455.54
1002721120018
C2
CLARK KURT & SANDRA L FINHOLT
7054 JOCELYN ALCOVE S
1
$2,455.54
$2,455.54
1002721120062
C2
SAMLASKA GREGORY M & LAVONNE
7319 JOCELYN PL
1
$2,455.54
$2,455.54
1002721120089
C2
WAGENKNECHT RICHARD A& LISA
9700 72ND ST S
1
$2,455.54
$2,455.54
1002721120017
C2
HOULISTON DAVID A & DARLA J
7050 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120013
C2
WOOD ROBERT J & TAMMY J
7032 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120034
C2
PARKER MARK W & MARI ROSE
7180 JOCELYN BAY
1
$2,455.54
$2,455.54
1002721120043i
C2
GILES TIMOTHY S & BELINDA L
7023 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120021
C2
SCHMITJAMES E & LINDA L
7078 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120028
C2
MARTIN MICHAEL L & LORI J MARTIN
7138 JOCELYN BAY
1
$2,455.54
$2,455.54
1002721120030
C2
WIGANT CRAIG A & SARA E
7152 JOCELYN BAY
1
$2,455.54
$2,455.54
1002721120035
C2
LEFEBVRE DOUGLAS M & SANDRA L
7188 JOCELYN BAY
1
$2,455.54
$2,455.54
1002721120053
C2
JOHANNSEN LEROY H JR & MARY P
7163 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721120061
C2
BERG THOMAS C & COLLEEN K
7303 JOCELYN PL
1
$2,455.54
$2,455.54
1002721120087
C2
PADMANABHAN ELCY & SRI NIVAS
967072ND STS
1
$2,455.54
$2,455.54
1002721120004
C2
WILLIAMSJERRYW
7007 JOLIET AVE
1
$2,455.54
$2,455.54
1002721120010
C2
GLOWARTZ TIFFANY M
7020 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120067
C2
BLACKBURN JULIE A
7222 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120041
C2
SHERER ERICA
7009 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120073
C2
HOLTER CHARLES I & CATHERINE M CULLEN
7129 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120080
C2
DESMOND STEVE C & JOAN M
7253 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120083
C2
LEWIS GRETA L
9598 72ND ST S
1
$2,455.54
$2,455.54
1002721120095
C2
LAVERTY JULIA K
7290 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120105
C2
BOCHE CLIFFORD M JR &JEAN M
956172ND STS
1
$2,455.54
$2,455.54
1002721130017
C2
WILSON LAURIE
7460 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721130067
C2
HUDALLA CYNTHIA A
7429 JOLIET AVE S
1
$2,455.541
$2,455.54
1002721130076
C2
VERHOEVEN DARYL & TAMMY
9686 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721120024
C2
PEAL NADIA M
7102 JOCELYN ALCOVE S
1
$2,455.54
$2,455.54
1002721120025
C2
COTTON MARK & MARY BETH
7114 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120054
C2
SONDAG CRAIG D & HEIDI J
7179 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721120074
C2
DAHLY BRIAN J
7161 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120014
C2
GLIBBERY PETER J & LINDA K
7034 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120039
C2
TESSMAN THOMAS G & JODELLE L
7003 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120046
C2
MOST TERRENCE M & JULIE R
7043 JOCELYN CT
1
$2,455.54
$2,455.54
1002721120011
C2
GARDNER RICHARD D & HELEN M
7024 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120066
C2
PAUL - PHILLIPS FRANCIS & DENISE
9507 72ND STS
1
$2,455.54
$2,455.54
1002721120084
C2
SOMMERNESS ADAM & JENNIFER M
961672ND STS
1
$2,455.54
$2,455.54
1002721120098
C2
DRENTH DEBORAH J
972172ND STS
1
$2,455.54
$2,455.54
1002721120040
C2
DAVIS MARSHALL L & CHRISTINE
7005 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721120045
C2
UMBREIT GARY L & CHERYL M
7037 JOCELYN CT
1
$2,455.54
$2,455.54
1002721120052
C2
CAGLEJERRY W II &SHANNON S
7141 JOCELYN CT
1
$2,455.54
$2,455.54
1002721120058
C2
GOYTOM MANA & REDAZGI HABTEZGI
7231 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120060
C2
ANDERSON DAVID M & APRIL S
7281 JOCELYN PL S
1
$2,455.54
$2,455.54
1002721120071
C2
DULKATREVORS
7065 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120081
C2
DELANEY DANIEL J & SALLY A
7275 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120086
C2
CZAPLEWSKI BRADLEY & SHAUNA L ONEY
9652 72ND ST S
1
$2,455.54
$2,455.54
1002721120019
C2
THOMPSON TERRY DEAN
7064 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120026
C2
SLACK DAVID - W & DIANE M WEBB
7122 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120033
C2
DEFLORIN LEE & DONNA
7174 JOCELYN BAY
1
$2,455.54
$2,455.54
1002721120044
C2
COULTER KIMBERLY 1 & RONALD S
7033 JOCELYN CT
1
$2,455.54
$2,455.54
1002721120055
C2
HUELSMAN RICHARD J & BARBARA
7191 JOCELYN AVE 5
1
$2,455.54
$2,455.54
1002721120075
C2
REICHOW WILLIAM A & ARDELLE
7183 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120049
C2
AGUIRRE RIGOBERTO &JENNIFER
7095 JOCELYN CT
1
$2,455.54
$2,455.54
1002721120056
C2
KONSTANDINOU SANDRA J & JOHN
7203 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721120082
C2
GULDANTIMOTHY
957672ND STS
1
$2,455.54
$2,455.54
1002721120009
C2
DALLDORF TROY A & NAOMI 17016
JOCELYN AVE S
1
$2,455.541
$2,455.54
1002721120037
C2 I
KERPER MICHAEL J & ANITA M 19512
72ND ST S
1
$2,455.541
$2,455.54
Preliminary Assessment Roll
District C2 Mill Overlay
Parcel ID
District
Owner
Address
Units
$ /Unit
Total /Unit
1002721120048
C2
BECK SANDRA M & TINA MURPHY
7073 JOCELYN CT
1
$2,455.54
$2,455.54
1002721120050
C2
BANACH CHARLES N & SUSAN M
7111 JOCELYN CT
1
$2,455.54
$2,455.54
1002721120059
C2
LEROSS JEFFREY N & KAREN R
7253 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721120070
C2
LEMAY GARY A & JOANNA L BRAUN
7023 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120072
C2
DAVIS JERRY L
7107 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120079
C2
MYERS RANDALL J
7231 JOLIET AVE S
1
$2,455.541
$2,455.54
1002721120091
C2
KRAMER JASON C & AMY M
7178 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120101
C2
COATES RICHARD A & LISA C W
9645 72ND ST S
1
$2,455.54
$2,455.54
1002721130072
C2
ROBIDEAUX JOEL & CHERYL
9646 INDIAN BLVD
1
$2,455.54
$2,455.54
1002721130087
C2
TRAUTMAN DAVID W & HELEN R
7390 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120093
C2
GEHLING TRAVIS & MARISSA MCDONALD
7084 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721130002
C2
BHARTI VIVEK & MEENA
7355 JOCELYN PL
1
$2,455.54
$2,455.54
1002721130065
C2
ANDERSON JOHN R
9552 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130070
C2
SELLNER GARY M & CAROL A
9622 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721120076
C2
SCHWARTZ ALAN & SUSAN T
7205 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120090
C2
VASEY ALAN P & SUSAN C
7190 JOLIET AVE 5
1
$2,455.54
$2,455.54
1002721130009
C2
OLSON MICHAEL STEVEN
9540 INDIAN BLVD
1
$2,455.54
$2,455.54
1002721120096
C2
SWANSON THOMAS D &JENNIFER L MILLER
7288 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721130003
C2
DICKINSON TIMOTHY & VICTORIA
7365 JOCELYN PL
1
$2,455.54
$2,455.54
1002721120092
C2
KODLUBOY TRACY A
7146 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721120078
C2
IDEMBOUSKI JASON A & ALISA M
7229 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721130015
C2
LARKIN ROBERT G & ANNE MARIE T
7422 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721240007
C2
WEBB STEVEN W & JODI A
7419 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721240012
C2
VERBOUT JOSEPH A & SANDRA )
7408 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721240015
C2
KING JANE L & ROBERT A BONSACK
9414 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721120099
C2
EDISON MICHAEL & PAMELA TRS
9689 72ND ST S
1
$2,455.54
$2,455.54
1002721120068
C2
PETERSON GARY I & HALL MARGARE
7232 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721120102
C2
DUROSE TIMOTHY P & LAURINDA R
9623 72ND STS
1
$2,455.54
$2,455.54
1002721120104
C2
BRUNNETTE JAMES C
958572NDST5
1
$2,455.54
$2,455.54
1002721130014
C2
LARSEN PETER JON & JANELLE G
7404 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721130005
C2
DOREE JEFF & ANNA
7393 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721130073
C2
KRUMRIE JEFFREY J & JENNIFER A
9658 INDIAN BLVD
1
$2,455.54
$2,455.54
1002721130071
C2
LINDOW JON & ZIGNEGO ANGELA
9634 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130080
C2
TIMM GARRY L & SHEILA M
7323 JOLIET CIR S
1
$2,455.54
$2,455.54
1002721130069
C2
FLICK PAULINE M
9618 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130078
C2
MYERS RONALD K & ARLENE A
7317 JOLIET CIR S
1
$2,455.54
$2,455.54
1002721130083
C2
WEBER KEITH W & PAMELA
7339 JOLIET CIR S
1
$2,455.54
$2,455.54
1002721130013
C2
DUNCAN DAVID L & BARBARA A
7388 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721130089
C2
SCHMIDT PATRICK A & DENISE C
7356 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721140027
C2
NUTZMAN LARRY J & LYN M
9798 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130090
C2
COOK ALLIE LJR & THERESA M
7334JOLIETAVES
1
$2,455.54
$2,455.54
1002721130074
C2
LEVI JOSEPH H & CAMILLEJ
9662 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130085
C2
GATTI ANTHONY & MOLLY
7363 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721130091
C2
ALLEN RICHARD D & LISA M
7312 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721130004
C2
FRANK KENNETH W & LISA A
7385 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721130012
C2
ERLING A TUFTE LIV TRS 11/30/2010 ETAL
7366 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721130079
C2
SOLER PAUL & REBECCA
7319 JOLIET CIR S
1
$2,455.54
$2,455.54
1002721120100
C2
JOHNSON JOHN M & BECK[ JO
9667 72ND ST S
1
$2,455.54
$2,455.54
1002721130007
C2
MOGREN RICHARD M & PATRICIA A
7423 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721130010
C2
LEIKNES JEFFREY D & BARBARA
7246 JOCELYN AVE
1
$2,455.54
$2,455.54
1002721130082
C2
STORLIEN MARK A & PAMELA A
7337 JOLIET CIR
1
$2,455.54
$2,455.54
1002721130066
C2
ERICKSON FREDERICK
9574 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130008
C2
JUST RUBY E & NOVACK KEVIN
9532 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130086
C2
BOYER JAMES F & VON] J JACOBSON BOYER
7401 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721130088
C2
REIDT ERIK D & LINDSAY R
7378 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721140006
C2
WAGNER ROBERT A & TAMMY L
9752 INDIAN BLVD
1
$2,455.54
$2,455.54
1002721140029
C2
RECKINGER PATRICK M & TANYA
9774 INDIAN BLVDS
1
$2,455.54
$2,455.54
1002721130016
C2
O'BRIEN JUSTIN F
7442 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721130068
C2
MADISON SCOTT M & LAURIE A
9596 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721140025
C2
SCHULTZE TODD C & LAURA A M
9872 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721140028
C2
BASILIO RICO & MARLETTE BASILIO
9786 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721140026
C2
MCCAULEY RONALD W
9870 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721120023
C2
JENSEN CYNTHIA S
7096 JOCELYN ALCOVE
1
$2,455.54
$2,455.54
1002721120032
C2
STOFFEL TROY & JODI
7166 JOCELYN BAY 5
1
$2,455.54
$2,455.54
1002721120065
C2
WOZNIAK MICHAEL A & RUSH & CHRISTINE RUSH
9505 72ND STS 1
1
$2,455.54
$2,455.54
1002721130006
C2
HAERTL THOMAS W & ANN M
7407 JOCELYN AVE
1
$2,455.541
$2,455.54
1002721130011
C2
BRIA JEFFREY D & MICHELE D
7258 JOCELYN AVE S
1
$2,455.54
$2,455.54
1002721210124
C2
IHIEKWE AUSTIN A & AMAKA A 1 7221
JENSEN AVE
1
S2.455.541
$2,455.54
Preliminary Assessment Roll
District C2 Mill Overlay
Parcel ID
District
Owner
Address
Units
$ /Unit
Total /Unit
1002721210139
C2
BRETOI CRAIG A & JULIE A
7039 JENSEN AVE
1
$2,455.54
$2,455.54
1002721210119
C2
BRAUN STEPHEN R & JENNIFER L
936071ST STS
1
$2,455.54
$2,455.54
1002721210130
C2
CADALBERTYVONNE
7030JENNERCIRS
1
$2,455.54
$2,455.54
1002721210163
C2
BLEVENS BRENT R & LISA M
9494 71ST ST S
1
$2,455.54
$2,455.54
1002721130081
C2
BLASKOWSKI MATTHEW L & PAMELA
7325 JOLIET CIR S
1
$2,455.54
$2,455.54
1002721210094
C2
ICOHOON DONALD J & BERNADINE M COHOON
7304 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721210102
C2
I KLANN SOKHOM V & JESSICA M
7214 JANERO AVE
1
$2,455.54
$2,455.54
1002721210117
C2
ISIKE VINCENT I & EUCHARIA U
7248 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210096
C2
KADLEC THOMAS A & PAULETTE M
9404 INDIAN BLVD CT S
1
$2,455.54
$2,455.54
1002721210107
C2
STADT CHARLES G & LEANN M
7175 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210111
C2
OLSEN ROBERT R & LORI BARTON
7158 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210129
C2
LEIDECKER WILLIAM & DIANE M
7034 JENNER CIR S
1
$2,455.54
$2,455.54
1002721210138
C2
ANACKER PHILLIP L & MARY A
7013 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210143
C2
BRENNEKE JEFFREY M & TERESA A
938471ST BAY
1
$2,455.54
$2,455.54
1002721210115
C2
SELZ SUSAN M
7208 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210147
C2
JOTBLAD KEVIN M &JUSTINE E KIRCHNER
9410 71ST BAY S
1
$2,455.54
$2,455.54
1002721210095
C2
WELLINGTON DENNIS R & BECKY L
7320JEWELAVES
1
$2,455.541
$2,455.54
1002721210112
C2
PEDERSON SCOTT & BETSY L
7168 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210128
C2
MALONE DANIELJ & ANGELAA
7038 JENNER CIR S
1
$2,455.54
$2,455.54
1002721210105
C2
MCELVEEN CHARLES E & DONNA M MCELVEEN
7203 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210118
C2
HUSS JOSEPH RJR
9352 71ST ST S
1
$2,455.54
$2,455.54
1002721120106
C2
I SCHWIETZ STEPHEN M
955972ND STS
1
$2,455.54
$2,455.54
1002721130075
C2
WERNER DANIEL] & LUGENE A
9674 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721130084
C2
PALACIO STEVEN D & CHERIE A
7341 JOLIET AVE S
1
$2,455.54
$2,455.54
1002721210106
C2
BENSON BRUCE A
7191 JANERO AVE
1
$2,455.54
$2,455.54
1002721210083i
C2
TIX THOMAS R & JUDITH A
7307 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721210084
C2
BOUDREAU HENRY P & CHERYL
7321 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721210135
C2
BALINT MICHAEL K & DANIELLE K
7020 JENNER CIR S
1
$2,455.54
$2,455.54
1002721210104
C2
NELSON MARK W & JEANNE M
7211 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210114
C2
ADAMS ANTHONY & NICOLE
7182 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210126
C2
CARPENTER JEFFREY L & SHAWN
7046 JENNER CIR S
1
$2,455.54
$2,455.54
1002721210136
C2
LARSON MATTHEW J & ELIZABETH
7016 JENNER CIR S
1
$2,455.54
$2,455.54
1002721210144
C2
KRONSCHNABLE CHARLES & CORRINE
9386 71ST BAY S
1
$2,455.54
$2,455.54
1002721210146
C2
SEIDL JULIE B
9398 71ST BAY S
1
$2,455.54
$2,455.54
1002721210150
C2
WEIRENS KATHLEEN A
9426 71ST STREET BAY S
1
$2,455.54
$2,455.54
1002721210152
C2
ROY WILLIAM B & MICHELLE R
9436 71ST BAY S
1
$2,455.54
$2,455.54
1002721210097
C2
DORDAL DAVID D & SHARON M
9402 INDIAN BLVD S
1
$2,455.54
$2,455.54
1002721210108
C2
AGUIRRE JOSE B
7159 JANERO AVE S
1
$2,4SS.54
$2,455.54
1002721210131
C2
HURDT LEONARD FLOYD & SANDRA
7024 JENNER CIR S
1
$2,455.54
$2,455.54
1002721210121
C2
WAGNER RAYMOND H & ELIZABETH
7093 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210140
C2
PIERCE JAMES WILLIAM
7061 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210155
C2
RUDICH JOSEPH H & MARGARET A
9450 71ST BAY S
1
$2,455.54
$2,455.54
1002721210161
C2
AUGE JON P & JULIA A
9486 71ST BAY S
1
$2,455.54
$2,455.54
1002721210160
C2
ANDERSON BRUCE 1 & ANN E
9484 71ST BAY S
1
$2,455.54
$2,455.54
1002721210157
C2
BEESON JOSIE M & DAVID J
9474 71ST BAY S
1
$2,455.54
$2,455.54
1002721210174
C2
MCCOOL JOHN F & PATTI J
944171ST STS
1
$2,455.54
$2,455.54
1002721210142
C2
KENNEDY JENNIFER Y
7109 JENNER LN S
1
$2,455.54
$2,455.54
1002721210176
C2
HOLM JULIE A
949371ST STS
1
$2,455.54
$2,455.54
1002721220085
C2
BUI SONNY & LIEN K HUYNH
7266 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210103
C2
LINDJOHNP
7206 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210154
C2
DOHENY SEAN
9446 71ST BAY S
1
$2,455.541
$2,455.54
1002721210156
C2
JOHNSON I KEVIN & LINDA L
9460 71ST BAY S
1
$2,455.541
$2,455.54
1002721210110
C2
MCGOVERN ROBERTJ JR & ROBIN J
9349 71ST ST S
1
$2,455.54
$2,455.54
1002721210133
C2
CALLAWAY MICHAEL C & NICOLE M
7040 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210145
C2
MUENNICH H FRED & LINDA K
9394 71ST BAY ST
1
$2,455.54
$2,455.54
1002721210182
C2
SEIDELDARIN
937872ND STS
1
$2,455.54
$2,455.54
1002721210168
C2
CHILTON SCOTT D & LISA L
7199 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721210183
C2
MCMAKEN JON R & KEITH A BURGESS
9366 72ND ST
1
$2,455.54
$2,455.54
1002721210120
C2
GIBNEY ROGER H
9366 71ST ST S
1
$2,455.54
$2,455.54
1002721210125
C2
FREDINE DAN & COOMBES SUSAN & SUSAN COOMBES
7251 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210165
C2
RONEY BRYAN CHARLES
7177JEWELAVES
1
$2,455.54
$2,455.54
1002721210171
C2
LARTER CHRISTOPHER M & GRACE J
9375 71ST ST S
1
$2,455.54
$2,455.54
1002721210166
C2
MAURER TIMOTHY & HEIDI PEARSON
7183 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721210169
C2
HINZ LUCAS A & KATHRYN L WITMER
7261 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721220083
C2
DENNIS STEVEN J & KATHLEEN M
7264 JENNER LN S
1
$2,455.54
$2,455.54
1002721210109
C2
MELDAHL BARBARA 1
7143 JANERO AVE
1
$2,455.54
$2,455.54
1002721210113
C2
KNUTSON ROSS & JEANETTE K
7176 JENSEN AVE
1
$2,455.54
$2,455.54
1002721210127
C2
SNOOKAMBERI 17042
JENNER CIR S
1
$2,455.541
$2,455.54
Preliminary Assessment Roll
District C2 Mill Overlay
Parcel ID
District
Owner
Address
Units
$ /Unit
Total /Unit
1002721210148
C2
BEBEAU PAUL D & DOREEN M
9416 71ST BAY 5
1
$2,455.54
$2,455.54
1002721210158
C2
FULLER BRIAN P & MAUREEN D
9476 71ST BAY S
1
$2,455.54
$2,455.54
1002721210175
C2
SHATEK SCOTT R & KRYSTAL
9477 71ST ST S
1
$2,455.54
$2,455.54
1002721210184
C2
FLORES RAFAEL C
9373 72ND STS
1
$2,455.54
$2,455.54
1002721220088
C2
PETZOLD THOMAS R & KELLY L
7238 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220094
C2
I ELLEVOLD JUSTIN & RONDA
7249 JANERO AVE
1
$2,455.54
$2,455.54
1002721210177
C2
ISCHLICHTE MARGARET A
949672ND STS
1
$2,455.54
$2,455.54
1002721210186
C2
BEDNAREK ROBERT & MARLO
9409 72ND ST S
1
$2,455.54
$2,455.54
1002721210149
C2
SUNDELL RYAN & RANDI
9420 71ST BAY S
1
$2,455.54
$2,455.54
1002721210134
C2
BROWN MARK C & DIANA L & DUNNE -BROWN
7056 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210159
C2
MCCRADY SCOTT W & LORI J
9480 71ST BAY S
1
$2,455.54
$2,455.54
1002721210172
C2
KINNEY CHRISTOPHER E & JODY D
938171ST STS
1
$2,455.54
$2,455.54
1002721210187
C2
LANE GREGORY & PAMELA J
9443 72ND ST S
1
$2,455.54
$2,455.54
1002721210151
C2
O'NEIL ROBERT D & RITA M
9432 71ST BAY S
1
$2,455.54
$2,455.54
1002721210180
C2
PETERSON SARA
9438 72ND ST S
1
$2,455.54
$2,455.54
1002721210137
C2
VERTANEN SCOTT A & JENNIFER E
7004 JENNER CIR
1
$2,455.54
$2,455.54
1002721210162
C2
POLOS JONATHAN A& MEGAN C
9490 71ST ST S
1
$2,455.54
$2,455.54
1002721210164
C2
JAHNKE ROBERT H & DAWN P
9498 71ST ST 5
1
$2,455.54
$2,455.54
1002721220081
C2
SCHNEIDER KENT G & JEANINE M
7290 JANERO AVE S
1
$2,455.54
$2,455.54
100272121
C2
PEDERSON STEPHANIE M
9392 72ND STS
1
$2,455.54
$2,455.54
10027212293
C2
WALTERS TERRIE LYNN & ROBIN G
7255 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210132
C2
MORRELL RONALD JAMES
7012 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210141
C2
STEIN SARA M & DANIEL P
7073 JENSEN AVE S
1
$2,455.54
$2,455.54
1002721210153
C2
ROCHE DENNIS E
9440 71ST BAY S
1
$2,455.54
$2,455.54
1002721210179
C2
DULLUM JEFFERY A
9468 72ND ST S
1
$2,455.54
$2,455.54
1002721210188
C2
KEISER AMY J & STEVEN D
9479 72ND ST S
1
$2,455.54
$2,455.54
1002721210190
C2
NELSEN CHRISTOPHER & KATIE M
7292 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721220087
C2
SALVESON ERIN C &JOSEPH
7250 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220089
C2
MOHR MICHAEL P & DEUTSCH C R & CATHERINE R DEUTSCH
7232 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220095
C2
SHAFER DAVID ALLEN & SANDRA
7243 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220092
C2
FITZGERALD JAMES C JR
7269 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210178
C2
AMLAND PATRICIA E
9482 72ND ST S
1
$2,455.54
$2,455.54
1002721210185
C2
HUSSAIN ZAKIR & ZAREEN JAHAN
939172ND ST S
1
$2,455.54
$2,455.54
1002721210116
C2 IKOSTOHRYZ
ALLEN J & PAMELA !
7228 JENSEN AVE
1
$2,455.541
$2,455.54
1002721210122
C2 I
HUERTA JUANITO M & MARIANA
9367 71ST ST S
1
$2,455.54
$2,455.54
1002721210123
C2
MAYERS ALAN H & BOBBI JO P
9362 72ND ST S
1
$2,455.54
$2,455.54
1002721210167
C2
LONERGAN JOHN A
7187 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721210170
C2
SELVIG CHAD D & CHRISTINE M
7293 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721220082
C2
QUEVEDO GONZALO & TERESA
7280 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220090
C2
MCLAUGHLIN KATHY & STEVEN
7222 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220096
C2
PFENNING EMILY M
7237 JANERO AVE S
1
$2,455.54
$2,455.54
1002721210173
C2
ROSS LONNIE L & JACALYN K
9393 71ST ST S
1
$2,455.54
$2,455.54
1002721210189
C2
JONES TIMOTHY A & LISA G & LISA G HAKENJOS -JONES
7268 JEWEL AVE S
1
$2,455.54
$2,455.54
1002721220091
C2
HUBER JAMES L & LORI A
7291 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220084
C2
SUTTON NATHAN & SARA
7274 JANERO AVE
1
$2,455.54
$2,455.54
1002721220086
C2
HANCE JONATHAN K & KATHLEEN A
7256 JANERO AVE S
1
$2,455.54
$2,455.54
1002721220097
C2
BRINKMAN AMY S
7229 JANERO AVE S
1
$2,455.541
$2,455.54
Totals
320
$785,772.80
2013 PAVF FAT MANAGEMENT u
Appendix E
Pavement Condition Index (PCI) Overview
A visual inspection was performed in 2012 to evaluate pavement surface conditions by identifying
various pavement defects.
Pavements can deteriorate at different rates due to many factors, including: original construction
procedures, construction materials, traffic volume, drainage characteristics, and subsequent pavement
maintenance. Due to this, pavements constructed at the same time may not deteriorate at the same rate
and may have different useful lives.
It should be noted that not all pavements with the same or similar PCI will look exactly the same.
Various types and amounts of distress contribute to a particular PCI rating. Identifying the cause of the
distress (load related vs. non -load related) is important in understanding the current pavement condition
and potential rehabilitation methods. In addition, segments of the same street may in vary in condition
and a representative rating for the majority of the segment is determined.
Generally speaking, pavements deteriorate slowly over the first ten years and then tend to deteriorate
more quickly. As pavement ages and surface cracking occurs, additional moisture is able to enter the
pavement structure and accelerate deterioration. Early preventative maintenance can extend the life of
pavement by protecting the pavement structure from the effects of moisture and weathering. If a
pavement is left without maintenance, the pavement condition can deteriorate very rapidly towards the
end of the lifecycle. This deterioration is illustrated in the following figure from the City's 1994
Pavement Management Plan:
City of Cottage Grove, Minnesota
2013 Pavement Management Project
2013 PAVEMENT MANAGEMENT
Figure 1- PCI vs Age
I
NUMBER VERBAL CONDITION
RATI RATING GROUPING
Excellent
+•�
$0
Pavements that
have little or
no distress.
' ,aa ►'
1 1 7, 1 a -_: :;
•
Typical Strut Life
5so1 coat ( ;2.25 — $3.50)
Overlay
Roconstrw
20 Very Poor Pavements that have
significant amounts
00-S75.00)
of major distress,
0 Fa I I ad
3 95 1 (YEARS)
20 25
($10.00436.00)
City of Cottage Grove, Minnesota
2013 Pavement Management Project
0 °
`.4
Very Good
n
Z
Pavements that have
5
70
a significant level
of distress.
s
non —load related.
—60—
Good
pavements that have
4
a signtitcont level
V
of distress.
load related.
_50
z
Fair
teJ
Pavenw nts that have
I1
[40
Poor
major distress.
30 • -
Typical Strut Life
5so1 coat ( ;2.25 — $3.50)
Overlay
Roconstrw
20 Very Poor Pavements that have
significant amounts
00-S75.00)
of major distress,
0 Fa I I ad
3 95 1 (YEARS)
20 25
($10.00436.00)
City of Cottage Grove, Minnesota
2013 Pavement Management Project