Loading...
HomeMy WebLinkAbout2013-02-20 PACKET 04.J.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 2/20/13 PREPARED BY Community Development Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR COUNCIL ACTION REQUEST Consider providing municipal consent for the CSAH 22 (70th Street) [SAP 082 - 622 -010, 180- 020 -006]; CSAH 20 (Military Road) [SAP 082 - 620 -009, 180 - 020 -006]; and CSAH 19 (Keats Avenue) [082- 619 -023, 180 - 020 -007] Road and Utility Improvements Project. STAFF RECOMMENDATION Adopt the resolution providing municipal consent for the 70th Street /Military Road /Keats Avenue Road and Utility Improvements Project. BUDGET IMPLICATION $ $ BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE SUPPORTING DOCUMENTS ® MEMO /LETTER: Memo from Jennifer Levitt dated 2/14/13 ® RESOLUTION: Draft ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: ❑ OTHER: ADMINISTRATOR'S COMMENTS: COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED []OTHER CITY OF COTTAGE GROVE MINNESOTA To: Honorable Mayor and City Council Ryan Schroeder, City Administrator From: Jennifer M. Levitt, P.E., City Engineer Date: February 14, 2013 Re: Municipal Consent for CSAH 22 (70th Street), CSAH 19 (Keats Avenue) and CSAH 20 (Military Road) Road and Utility Improvements Background /Discussion The City of Cottage Grove, South Washington Watershed District (SWWD), and Washington County have been working for many years to develop and design the improvements at the 70th Street and Keats Avenue intersection, along with the road realignment of 70th Street east of Keats Avenue. As part of the road improvements, the SWWD needs to have a 72 -foot overflow pipe constructed from approximately Joliet Avenue to the east to connect with a natural draw that leads to the Mississippi River. This pipe is critical to meet the demands of the northern part of the watershed district, which is outlined and provided for in the City's Stormwater Manage- ment Plan and AUAR. The timing of the County's project and the SWWD pipe project perfectly came together for a cost - effective project to achieve both agencies' objectives. In addition, the project times work well with the City's need to extend utilities and turn lanes to serve developments occurring to the north of 70th Street (Newland and DR Horton). Also, the necessary storm pipe from the SWWD that is required to be added to the City's storm sewer conveyance system to provide for addi- tional flood protection coincides with the City's 2013 Pavement Management Project. The project provides for the following: 1. Utility extensions to the new developments (Newland and DR Horton) and to Military Road to facilitate future development. 2. Turn lanes for the new developments (Newland and DR Horton) north of 70th Street. 3. Roundabout at 70th Street and Keats Avenue with landscaping, decorative lighting, and irrigation. 4. Trail extension on Keats Avenue from Jorgensen Lane to Indian Boulevard. 5. Road rehabilitation on Keats Avenue from Indian Boulevard to Military Road. 6. Road rehabilitation on 70th Street from Rose of Sharon Church to Keats Avenue. 7. Road realignment of 70th Street from Keats Avenue to Kirkwood Avenue with a bitu- minous trail. 8. Terminating the Old 70th Street access from the east to Keats Avenue and con- structing a new public street to connect the new 70th Street alignment and the old 70th Street alignment. 9. Installation of a 72 -inch pipe from Joliet Avenue along the new 70th Street alignment and then south for 1100 feet. 10. Installation of a storm sewer vault structure at Joliet Avenue for stormwater control. Honorable Mayor, City Council, and Ryan Schroeder Municipal Consent for Road and Utility Improvements (70th St., Keats Ave., Military Rd.) February 14, 2013 Page 2 The approximate construction cost to the City is $1,141,718, plus there is right -of -way acquisi- tion, design, and construction engineering costs totaling approximately $594,530. The City funds that will be used to support these project costs are developer fees, water area fund, sanitary sewer utility, street light utility, and MSA. Recommendation It is recommended the Council adopt the attached resolution providing municipal consent for the CSAH 22 (SAP 082 - 622 -010, 180 - 020 -006), CSAH 20 (SAP 082 - 620 -009, 180 - 020 -006) and CSAH 19 (082- 619 -023, 180 - 020 -007) Project. 2 RESOLUTION NO. 2013 -XXX A RESOLUTION APPROVING A WASHINGTON COUNTY PROJECT WITHIN MUNICIPAL CORPORATE LIMITS WHEREAS, a County Recommended Plan, dated February 5, 2013, for State Aid Project No. 082 - 619 -023, State Aid Project No. 082 - 620 -009, and State Aid Project No. 082 - 622 -010, showing proposed pavement improvements for County State -Aid Highway No. 19, County State -Aid Highway No. 20, and County State -Aid Highway No. 22 within the limits of the City of Cottage Grove as a State Aid Project has been prepared and presented to the City. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Cottage Grove, County of Washington, State of Minnesota, supports the County continuing with the development of final plans necessary for the construction of the project. Passed this 20th day of February 2013. Myron Bailey, Mayor Attest: Caron M. Stransky, City Clerk