HomeMy WebLinkAbout2013-03-20 PACKET 07.A.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 3/20/13 .
PREPARED BY: Community Development Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
*************************�**********************
COUNCIL ACTION REQUEST
Consider awarding the bid for The Preserve at Cottage Grove Project to Hardrives, Inc. in the
amount of $227,748.65.
STAFF RECOMMENDATION:
Award the bid for The Preserve at Cottage Grove Project to Hardrives, Inc., who submitted the
lowest of the five bids received.
BUDGET IMPLICATION: $249,000.00
BUDGETED AMOUNT
ADVISORY COMMISSION ACTION
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES/RIGHTS
❑ ECONOMIC DEV. AUTHORITY
❑
SUPPORTING DOCUMENTS
�_ -
$227,748.65
ACTUAL AMOUNT
REVIEWED
❑
❑
❑
❑
❑
❑
❑
APPROVED
❑
❑
❑
❑
❑
❑
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
� MEMO/LETTER: Letter from Dave Sanocki,
� RESOLUTION: Draft
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: Bid Tabulations
ADMINISTRATOR'S COMMENTS
Stantec, dated 3/7/13
-- _ � � �
� ��
ity Administrator Date
*�***************�****�*************************
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
Stantec
March 7, 2013
Stantec Consulting Services Inc.
2335 Highway 36 West
St. Paul MN 55113
Tel: (651) 636-4600
Fax:(651)636-1311
Honorable Mayor and City Council
City of Cottage Grove
7516 80 Street S
Cottage Grove, MN 55016
Re: The Preserve at Cottage Grove
Project No. 193801735
Bid Results
Dear Honorable Mayor and City Council:
Bids were opened for the Project stated above on Thursday, March 7, 2013. Transmitted herewith is a copy
of the Bid Tabulation for your information and file. Copies will also be distributed to each Bidder once the
Project has been awarded.
There were a total of 5 Bids. The attached bid tabulation summarizes the results of the Bids received.
Contractor
Low Hardrives, Inc.
#2 Northwest Asphalt, Inc.
#3 Valley Paving, Inc.
#4 Bituminous Roadways, Inc.
#5 Midwest Asphalt Corporation
Tota/ Base Bid
$227,748.65
$230,172.00
$235,887.85
$245,949.25
$246,813.50
The low Bidder on the Project was Hardrives, Inc. with a Total Base Bid Amount of $227,748.65. This
compares to the Engineer's Estimate of $249,000. These Bids have been reviewed and found to be in order.
If the City Council wishes to award the Project to the low Bidder, then Hardrives, Inc. should be awarded the
Project on the Total Base Bid Amount of $227,748,65.
Should you have any questions, please feel free to contact me at (651) 604-4905.
Sincerely,
STANTEC CONSULTING SERVICES, INC.
� � '
r�
David R. Sanocki, P.E.
Enclosure
�%��
��
���
Item
Num
Project Name: The Preserve at Cottage Grove I hereby certily that this is an exad
reprodudion ofbids receiued.
Client Projed No.: Projed No.: 193801735 n,� �-�
�Cr}'
Bid Opening: Thursday, March 7, 2013, at 10 A.M., CSi" Owner: City of Cottage Grove f�
David R. Sanodri
License No. 40973
Bidder No. 1 Bidder No. 2 Bidder No. 3 Bidder No. 4
BID TABULATiON Hardrives, Inc. Northwest Asphalt, Inc. Valley Paving, Inc. Bituminous Roadways, Inc.
Item
Units
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
v
18
19
20
21
22
23
24
25
26
27
28
29
30
BASE BID: . .
MOBILIZP.7ION
TRAFFIC CONTROL
INSTALL TEMPORARY MAILBOX
SALVAGE AND REINSfALL MAILBOX CLUSTER
SAWING BI'fUMINOUS PAVEMENT AND DRNEWAY
PAVEMENT
REMOVE BITUMINOUS PAVEMENT
PATCH/DRNEWAYlTRAIL
SAWING CONCRETE CURB/CONCRETE DRNEWAY
REMOVE CONCREfE DRNEWAY PAVEMENT
REMOVE AND REPIACE CONCREfE SIDEWALK
6" CONCREfE DRNEWAY APRON
6" CONCRETE HYDRANT PAD
RECLAIM BITUMINOUS PAVEMENT (FULL DEPTH)
HAUL AWAY IXCESS RECLAIMED MATERIAL OFF-
SITE (LV1
SUBGRADE PREPARA7ION
TYPE SP 12.5 NON WEARING COURSE MDCT'URE (2,6)
TYPE SP 12.5 WEARING COURSE MIXTURE (2,6)
SAW AND SEAL 7RANSVERSE JOINTS IN
BITUMINOUS WEAR COURSE
6618 CONCRETE CURB & GUTfER
BITUMINOUS MATERIAL FOR TACK COAT
PATCH BITUMINOUS DRNEWAY
DRIVEWAY SEALING
CONCREfE PEDESIRIAN CURB RAMP
TRUNCATED DOME SURFACE
ADJUST CATCH BASIN CASRNG
ADJUSI' MANHOLE CASTING
ADJUST VALVE BOX
SfORM DRAIN INLEf PROTECT'ION
STREET SWEEPER WITH OPERATOR
TOP SOIL BORROW (LV)
SODDING TYPE LAWN
TOTAL BASE BID:
LS
LS
EA
EA
LF
SY
LF
SY
SY
SY
EA
SY
TN
SY
TN
TN
LF
LF
GAL
SY
EA
SF
SF
EA
EA
EA
EA
HR
CY
SY
Unit Price Total
1
40
$3,000.00
$1,000.00
$21.40
$160.00
$2.00
$6.00
$6.00
$12.70
$54.00
$42.50
$215.00
$1.40
$6.20
$0.25
$55.90
$57.70
$4.00
$10.45
$2.40
$45.00
$215.00
$4.80
$32.10
$185.00
$450.00
$300.00
$75.00
$120.00
$25.00
$4.55
�i
Contrdctor Name and Address:
Phone:
Fax
Signed By:
Title:
Bid Security:
Addenda Acknowledged:
�es, Inc.
Qui2m Drive
„MN 55374
iony E. Kieger
sion Manager
Bond
$1,917
$40,967
$15,000.00
$2,000.00
$20.00
$50.00
$2.00
$6.00
$3.00
$6.00
$44.75
$43.80
$160.00
$2.15
$4.30
$1.95
$40.00
$40.00
$5.84
$8.90
$3.00
$30.00
$150.00
$5.10
$35.00
$350.00
$600.00
$200.00
$100.00
$100.00
$25.00
$4.25
$15,000.00
$2,000.00
$800.00
$500.00
$1,600.00
$3,060.00
$75.00
$102.00
$5,146.25
$27,375.00
$1,120.00
$16,297.00
$1,139.50
$14,956.50
$35,400.00
$28,400.00
$7,008.00
$38,270.00
$930.00
$600.00
$750.00
$1,479.00
$1,400.00
$3,150.00
$15,000.00
$1,200.00
$900.00
$200.00
$2,000.00
$5,000.00
$1,030.00
$11.00
$129.00
$3.00
$8.50
$11.00
$33.00
$57.00
$47.75
$165.00
$0.50
$9.00
$0.75
$61.00
$61.00
$4.65
$9.15
$0.01
$35.00
$1,200.00
$5.25
$36.05
$103.00
$360.00
$200.00
$105.00
$125.00
$30.00
$4.40
Total
$5,000.00
$1,030.00
$440.00
$1,290.00
$2,400.00
$4,335.00
$275.00
$561.00
$6,555.00
$29,843.75
$1,155.00
$3,790.00
$2,385.00
$5,752.50
$53,985.00
$43,310.00
$5,580.00
$39,345.00
$3.10
$700.00
$6,000.00
$1,522.50
$1,442.00
$927.00
$9,000.00
$1,200.00
$945.00
$250.00
$2,400.00
.85
Northwest Asphalt, Inc.
1451 Stagemach Road
Shakopee, MN 55379
Lance Guentrel
Project Manager
Bid eond
Vailey Paving, Inc
8800 13th Avenue E.
Shakopee, MN 55379
952-445-8615
952-445-0355
Charlie Borene
Project Manager
Bid Bond
None
Unit Price '
$5,000.00
$1,000.00
$20.00
$155.00
$2.10
$8.00
$6.85
$26.00
$67.00
$43.00
$145.00
$2.00
$6.85
$0.65
$58.00
$60.00
$6.15
$9.35
$3.30
$34.00
$385.00
$5.35
$36.85
$250.00
$515.00
$240.00
$150.00
$135.00
$35.00
$4.45
$�.
$�.
Bituminous Roadways, Inc.
1520 Commerce Drive
Mendota Heights, MN 55120
651-686-7001
651-687-9857
7ohn Kittieson
Vice President
Bid Bond
None
1938017358i.xlsm BT-1
�%�� -
w�
sfarrtec
BID TABULATION
Item
Num Item Units
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
BASE BID: ..........
MOBILIZATION
IRAFFIC CONTROL
INSTALL TEM PORARY MAILBOX
SALVAGE AND RQNST'P,LL MAILBOX CLUSfER
SAWING BITUMINOUS PAVEMENTAND DRNEWAY
PAVEMENT
REMOVE BITUMINOUS PAVEMENT
PATCH/DRNEWAY/TRAIL
SAWING CONCRETE CURB/CONCREfE DRNEWAY
REMOVE CONCRETE DRNEWAY PAVEMENT
REMOVE AND REPLACE CONCREfE SIDEWALK
6" CONCREfE DRNEWAY APRON
6" CONCREfE HYDRANT PAD
RECLAIM BITUMINOUS PAVEMENT(FULL DEPTH)
HAUL AWAY IXCESS RECLAIMED MATERIAL OFF-
S1TE f�Vl
SU66RADE PREPARATION
7YPE SP 12.5 NON WEARING COURSE MDCTURE (2,6)
'TYPE SP 12.5 WEARING COURSE MIX7URE (2,6)
SAW AND SEAL TRANSVERSE JOINTS IN
BITUMINOUS WEAR COURSE
6618 CONCRETE CURB & GUTiER
BITUMINOUS MATERIAL FOR TACK COAT
PATCH BITUMINOUS DRNEWAY
DRIVEWAY SEALiNG
CONCRETE PEDESTRIAN CURB RAMP
TRUNCATED DOME SURFACE
ADJUST CATCH BASIN CASRNG
ADJUST MANHOLE CAS7ING
ADJUST VALVE BOX
STORM DRAININLET PROTECTION
SfREEf SWEEPER WIl'H OPERATOR
TOP SOIL BORROW (L�
SODDING'tYPE LAWN
TOTAL BASE BID:
LS
LS
EA
EA
LF
SY
LF
SY
SY
SY
EA
SY
l7d
SY
TN
liV
LF
LF
GAL
SY
EA
SF
SF
EA
EA
EA
EA
HR
CY
SY
1
Bidder No. 5
Midwest Asphalt
$11,000.00
$1,100.00
$10.50
$130.00
$3.00
$6.00
$4.00
$9.00
$63.50
$49.70
$150.00
$0.50
$7.00
$0.60
$58.50
$57.10
$6.00
$10.00
$2.80
$41.00
$185.00
$6.30
$37.00
$350.00
$650.00
$180.00
$125.00
$125.00
$15.50
$6.00
$7
$1,125.00
$246,813.50
Contractor Name and Address: Midwest Asphalt Corporation
6340 Industrial Drive, Ste. 200
Eden Prairie, MN 55346
Signed By:) Matthew J. Timmers
Title: Vice President
Bid Securitv: Bid Bond
Addenda
1938017356T.xlsm BT-2
RESOLUTION NO. 2013-XXX
RESOLUTION AWARDING THE BID FOR THE PRESERVE AT COTTAGE GROVE
PROJECT TO HARDRIVES, INC. IN THE AMOUNT OF $227,748.65
WHEREAS, plans and specifications for The Preserve at Cottage Grove Project
were completed according to City standards; and
WHEREAS, bids were requested to provide the necessary work; and
WHEREAS, five firms submitted bids; and
WHEREAS, it appears that Hardrives, Inc. is the lowest responsible bid; and
WHEREAS, it is the recommendation of the City Engineer that the bid be
awarded to Hardrives, Inc. in the amount of $227,748.65.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Cottage
Grove, County of Washington, State of Minnesota, the bid for The Preserve at Cottage
Grove Project is awarded to Hardrives, Inc. in the amount of $227,748.65.
Passed this 20th day of March 2013.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk