HomeMy WebLinkAbout2013-02-06 MINUTES (SPECIAL MEETING)CITY OF COTTAGE GROVE
WEST POINT DOUGLAS WORKSHOP
A Joint meeting of the
City Council, Planning Commission
and Economic Development Authority
MINUTES
February 6, 2013
Pursuant to due call and notice thereof, a special meeting of the City Council, Planning
Commission, and Economic Development Authority was held at Cottage Grove City Hall, 12800
Ravine Parkway South, Cottage Grove, Minnesota 55016 on the 6th day of February, 2013.
Members Present:
Myron Bailey, Mayor
Justin Olsen, Council Member
Jen Peterson, Council Member
Derrick Lehrke, Council Member
Dave Thiede, Council Member
Craig Patterson, EDA Member
Ramona Westerberg, EDA Member
Paul Poncin, EDA Secretary/Treasurer
Maureen Ventura, Planning Commission Member
Ken Brittain, Planning Commission Member
Lise' Rediske, Planning Commission Member
Neal Heurung, Planning Commission Member
Members Absent: Laura Maciejewski, EDA Member
Jim Rostad, Planning Commission Chair
Elijah Harter, Planning Commission Member
Brian Pearson, Planning Commission Member
Chris Reese, Planning Commission Member
Randall Wehrle, Planning Commission Member
Staff Present: Ryan Schroeder, EDA Executive Director
Danette Parr, Economic Development Director
Robin Roland, Finance Director
Jennifer Levitt, Community Development Director
John Burbank, Senior Planner
John McCool, Senior Planner
Craig Woolery, Public Safety Director
Laura Bolstad, Economic Development Specialist
West Point Douglas Workshop - Minutes
February 6, 2013
Page 2
Others Present: Kevin Kielb, Bolton & Menk
Corrine Heine, Kennedy & Graven
Tony Jurgens, former EDA Member
I. Welcome
Mayor Bailey welcomed everyone to the meeting. He clarified that the purpose of the meeting is
to brainstorm options to encourage development / redevelopment along the West Point Douglas
corridor and to seek feedback as a part of formulating a workplan going forward.
II. Corridor Backqround
Economic Development Director Parr outlined the objectives of the meeting. She reviewed the
issues that need to be discussed, including current land uses and permitted land uses, the
financial implications in relation to the corridor, challenges, potential for incentives, vacant land
and structures, and how to best direct resources.
She also introduced the survey for all to complete after the meeting to make sure that everyone
has the opportunity to provide their input on the direction of the corridor.
Senior Planner McCool outlined the geographic boundaries and zoning history of the study
area. He explained that planned business districts were opened up to new uses in March 2012
to bring the zoning into compliance with the City's long term comprehensive plan. In addition,
Economic Development Director Parr pointed out that a plan for the Langdon area was already
created in conjunction with the Red Rock Corridor planning process.
Economic Development Director Parr then reviewed the current land uses in the corridor. Land
use by percentage of land area: 28% Commercial, 20% Public Facilities,19% Agricultural, 17%
Residential, 10% Vacant B-2 Land, 3% Industrial, and 3% Private Utility.
III. Buildinqs, Vacancies, & Potential
Economic Development Director Parr reported that the current nonresidential structures have
266,649 sq. ft. gross floor area, and staff has calculated the potential for an additional 411,672
square feet of commercial space on three of the vacant parcels (TCF, St. Paul Land Resources,
and Bootenhoff properties, totaling 41 acres cumulatively). She explained that the width and
depth of the sites vary, with 550 generally the largest lot depth in the study area.
The gross floor area of vacant space in non-residential structures within the study area is
approximately 57,857 gross square feet of floor area. This is approximately 22 percent of the
total gross floor area of all existing commercial structures within the study area. Without the
former Rush, Cottage Grove Motors and Majestic Ballroom buildings, the amount of vacant floor
space is reduced from 57,857 square feet to 23,622 square feet, which is a 10.2 percent
vacancy rate within the study area.
Redeveloping the former Rush (17.62 acres), former Cottage Grove Motor (3.04 acres) and the
former Majestic Ballroom (9.27 acres) sites could potentially provide 269,406 square feet of floor
area (based on commercial uses).
The Building Official and Planning staff have reviewed the former Rush/Rodeo and Majestic
Ballroom sites (information included in the packet), as well as a memo and tracking log of Public
Safety calls to the two sites since closings.
West Point Douglas Workshop - Minutes
February 6, 2013
Page 3
Council Member Olson asked if City staff have had any recent conversations with the school
district regarding whether they intend to move their bus storage facility on West Point Douglas.
Economic Development Director Parr replied that she was not aware of their long term plans.
Council Member suggested that this question should be raised at the meeting with them on
Friday. Economic Development Director Parr and City Administrator Schroeder agreed that
would be a good idea.
Planning Commissioner Heurung stated that he works for the school district, and he is aware
that they currently do not have enough space for busses. As a result, the district is
subcontracting bus service to two other companies.
Economic Development Director Parr pointed out that there are five nonconforming residential
structures in the corridor. The residential structure on the Acorn Mini Storage site, however, has
a conditional use permit.
Economic Development Director Parr highlighted the properties that the City owns in the
corridor, which is comprised of the Public Works facility property and parcels that the EDA has
acquired over time for redevelopment as a part of the Langdon effort.
IV. Corridor Advantages & Challenqes
Economic Development Director Parr said that she has recently contacted a number of
commercial real estate brokers to get their perspective on the corridor. She summarized the
brokers' feedback on the corridor's advantages & challenges.
Corridor Advantages:
1. "Great visibility to Hwy 61"
2. "Good traffic counts along Hwy 61"
3. "Rail service in close proximity" (beneficial for some land uses)
4. "Good Access" (based on land use)
Corridor Challenges:
1. "The Market is still rebounding — due to CG's location, it will still take a bit to get
development activity to begin."
2. "Zoning — we tend to get inquiries from non PB and B-2 type uses (more industrial in
nature or auto related)
3. "Depth and configuration of certain parcels can be tough"
4. What's around us currently" —"People have a hard time envisioning what it could be
because of what is or isn't already here"
5. "The rail isn't desirable next to commercial/retail/office"
V. Access Improvement Options
Community Development Director Levitt explained that part of the challenge with the corridor is
the road access to it. For that reason, Bolton & Menk was hired to create a traffic study of the
corridor.
At the South end of the corridor she reviewed the planned roadway extension that will make
West Point Douglas come to a tee at the newly aligned 100 St, which would then connect to a
folded diamond interchange at County Rd 19 and Hwy 61.
West Point Douglas Workshop - Minutes
February 6, 2013
Page 4
Traffic patterns outlined in the West Point Douglas Traffic Study:
65% trips are generated from the North
20% 80th
10% Grange
35% from the Hwy 61
35% of trips are generated from the South.
15% from Jamaica
20% from Hwy 61
The traffic study evaluated the level of service provided by the two signalized intersections in
the corridor to ensure that there will not be a failed condition in the short, mid, and long term.
The study found that there is a good level of service being maintained for the nearly 23,000 that
use 80 St. The study found no issues with the signalized intersections.
Community Development Director Levitt reviewed current traffic patterns, planned road
improvements to connect West Point Douglas to Innovation Rd, and three alternatives to
improve access to the study area.
Option A: Diamond Interchange from Hwy 61 between 80 St and Jamaica Ave
- Would provide full ingress and egress access
- The footprint of the entrance and exit ramps would consume homes near East Point
Douglas and West Point Douglas Land (number of homes not yet calculated), which
would be expensive and would reduce the amount of land that could be developed.
- Does not conform with the City's comprehensive plan
- MnDot would likely not allow full interchanges so close together.
- Study determined that Option A is not a viable option
Option B: Slip Ramp from southbound Hwy 61 exit ramp, merging traffic in right lane onto
West Point Douglas just North of 80' St
- Would involve land acquisition & possible contamination issues
- Would enable ingress from southbound 61
- Would not solve egress problems
- Would not enhance access from northbound Hwy 61 or 80 St/ Grange Ave
- Would save 64 seconds travel time
- 5,400 vehicles would benefit from Option B— only southbound traffic from Hwy 61
(35% of trips)
-$2.5M Cost (Does not include land acquisition or any environmental costs)
Option C: Add a slip ramp lane from Southbound Hwy 61 entrance ramp. Slip ramp would
curve to form a tee with West Point Douglas, allowing the traffic to turn North or South
onto West Point Douglas.
- Would not improve egress
- Would save 29 seconds travel time
- 10,140 vehicles would benefit from Option C— all traffic accessing West Point Douglas
from the North (Hwy 61, 80 St, & Grange - 65% of trips)
-$3.5M Cost (Does not include land acquisition or any environmental costs)
- More cumbersome that Option B(more turns)
- Would involve dealing with wetlands, land acquisition, and a retaining wall.
West Point Douglas Workshop - Minutes
February 6, 2013
Page 5
Option D: Bridge crossing pond from Hadley to W. Point Douglas.
- Likely RR Crossing Abandonment at Belden Blvd, which would negatively impact
nearby businesses.
- Challenging to deal with a pond that has a DNR impact classification.
- Bridge over the Hamlet Park Pond would not fit the park atmosphere that had been
planned for the area.
- Determined that Option D is not a viable option.
Planning Commissioner Heurung asked whether the estimates of the number of trips per day
that options B and C would impact are based on current or projected traffic levels. Kevin Kielb
with Bolton and Menk answered that the number trips per day on West Point Douglas is
currently 3,100, and with full build-out of the area the number of trips per day are projected to be
15,000. The numbers given for the quantity of trips per day that each option would impact were
based on that future projection.
Council Member Olson pointed out that it is difficult to project future traffic patterns without
knowing how the land will be used as it is developed. He also said that when retail businesses
evaluate site access they look at ease of use rather than the actual amount of drive time.
Council Member Thiede asked if the signage directing traffic to West Point Douglas could be
improved. Community Development Director Levitt stated that the existing signage is the
maximum allowed within the law. Planning Commission Member Brittain pointed out that
people in Cottage Grove know how to get to West Point Douglas, but the important thing is that
it is perceived as being inconvenient to access.
EDA Member Patterson asked about the possibility of doing both option B and C, and the group
discussed what that would entail. Former EDA Member Jurgens asked who we are trying to
accommodate with these solutions—traffic from Hwy 61, Cottage Grove citizens or people
already on 80 St? Discussion of priorities and the best interchange to accommodate those
priorities followed.
Council Member Olsen asked about the prospect of waiting to complete West Point Douglas
access improvements until the Sieben Bridge needs to be redone at some point in the future.
Community Development Director Levitt agreed that it would be far more cost effective to wait
until the existing bridge needs to be expanded, but she stated that the bridge at County Road 19
is a higher priority for the City right now because it has more deficiencies than the Sieben
Bridge.
Senior Planner Burbank asked if the similarity between Option C and the interchange in
Woodbury at Radio Drive and Hudson Rd might make it easier to get MnDOT approval.
Community Development Director Levitt explained that it would be a non-standard pattern, so
MnDOT may not approve it. It would likely require over $100k for the necessary modeling, but
MnDOT could still say no. Mayor Bailey provided more context about how Woodbury's
interchange was approved, and he suggested that the City look at how successful or
unsuccessful Woodbury's interchange has been to evaluate whether it would be worth the cost.
The group further discussed the advantages and disadvantages of the various proposals, as
well as other factors that would impact their success (e.g. congestion, egress problems, school
busses, traffic crossing paths, etc.).
West Point Douglas Workshop - Minutes
February 6, 2013
Page 6
VI. Funding for West Point Douqlas Improvements
A. Road and Utility Improvements
Community Development Director Levitt outlined the three phases of funding for potential road
and utility improvements on West Point Douglas Rd. Adjacent property owners would pay a
large portion of the cost of those improvements.
Phase -1, Belden Boulevard to Jamaica Avenue, approximately 10,560 LF in length.
Estimated Cost : $ 3,376,507.00
Phase -2, Jamaica Avenue to Islay Avenue, approximately 1,665 LF in length.
Estimated Cost: $ 577,296.00
Phase -3, Islay Avenue to 96 Street, approximately 1,614 LF in length.
Estimated Cost: $ 752,749.00
B. Access Improvements
For access improvements the City would use a tiered tax assessment system because the
improvement is not immediately adjacent to the property owners. In this three tiered system,
the properties closest to the improvement would pay the highest proportion of the cost.
EDA Member Westerberg described the negative impact the cost of the Jamaica roundabouts
assessment has had on her landlord, and she cautioned that another expensive assessment
would be difficult for businesses on West Point Douglas to bear.
Council Member Thiede suggested that light industrial or showroom/warehouse uses be
considered because access is not as big of an issue for them, so it would not require costly
access improvements. He asked if those uses had been considered. Economic Development
Director Parr stated that those uses are being seriously discussed. The commercial real estate
brokers she spoke to expressed that showroom/warehouse and light industrial users were the
type of businesses they anticipated attracting. Access would not be a problem for those uses,
and the current zoning allows for it. Planning Commission Member Heurung agreed that it
would be a better use of the corridor than uses like retail or entertainment that would create
traffic problems.
VII. Market Conditions
Economic Development Director Parr explained the challenging market conditions the corridor
faces. She gave examples of communities that have had success in developing a light
industrial/showroom area, such as Oakdale. She shared how she had met with the County
Assessor to discuss comparable properties, but unstable market conditions make it very difficult
to compare properties to discern the tax implications of different uses.
She directed the group's attention to the handout showing the price per square foot of each
property in the corridor. She pointed out that the prices are fluctuating rapidly.
In her conversations with real estate brokers, the brokers reported that commercial/retail
development in the Corridor is challenging due to access, rail, proximity to the
business/industrial park, and competition for commercial users in the same trade area. Many
brokers and landowners associate the land with showroom/light industrial uses. Current
property values may make infrastructure improvements challenging because the costs the
assessments can become higher than the property values.
West Point Douglas Workshop - Minutes
February 6, 2013
Page 7
VIII. Further Discussion
Mayor Bailey raised the following points:
1) Light industrial or warehouse/showroom space on West Point Douglas could be great
options for BEC businesses as they graduate from the accelerator. There could be
opportunity to provide assistance for their transition.
2) It's possible to make enhancements to light industrial
with the streetscape we would develop.
3) High density housing surrounding commuter rail could
areas that are more difficult to access.
buildings so that they look nice
be an option, especially in the
Council Member Lehrke expressed his concern that high density housing would not be a viable
option near commuter rail because of noise and other factors that are unattractive to potential
residents. Senior Planner Burbank pointed out that there is further information on the potential
for housing along the future commuter rail line in the Red Rock Corridor study. That study
suggested light industrial or warehouse/showroom uses along West Point Douglas for a number
of reasons.
Planning Commission Member Ventura said that it is difficult enough to get new retail in our
existing retail areas, so it would be a stretch to make retail work on West Point Douglas. Light
industrial would be a better fit and would be more attractive to potential developers. Council
Member Olsen suggested an entertainment venue or other destination venue could be more
compatible in the corridor. EDA Member Westerberg suggested a hotel with a waterpark would
be a destination that would draw people to the area. Economic Development Director Parr,
Mayor Bailey, and Council Member Lehrke pointed out potential problems with locating a hotel
right by the railroad.
Planning Commissioner Brittain brought up the potential hazard of West Point Douglas retail
competing with other commercial areas in the City. The City has several commercial/retail
areas and more planned. He asked how much more retail the population can support. He
suggested that over the long term it may make more sense to balance out retail in other areas
with light industrial and warehouse/showroom in the West Point Douglas area, which would in
turn make our existing and upcoming retail areas more attractive by increasing daytime
numbers. Economic Development Director Parr said that the 2009 McCombs retail potential
study projects the City's retail potential in terms of dollars of sales in retail sectors rather than in
square footage, so that study does not address how much land should be planned for retail use.
Council Member commented that the approach that Planning Commissioner Brittain suggested
makes a lot of sense. West Point Douglas could be developed to have a compatible non-retail
use (e.g. college or hospital) that would bring in employees that would in turn make the City's
retail areas more attractive.
Economic Development Director Parr encouraged everyone to submit a survey with their input
on the corridor.
Respectfully Submitted,
Laura Bolstad
Economic Development Specialist