Consider awarding the bid for the East Point Douglas Road Utility and Street Improvements
Project to Redstone Construction Co., Inc. in the amount of $1,416,542.85, contingent on the
execution of a purchase agreement with CenturyLink for Parcel Identification Number
2202721320005.
STAFF RECOMMENDATION
Award the bid for the East Point Douglas Road Utility and Street Improvements Project to
Redstone Construction Co., Inc., who submitted the lowest of the eight bids received.
BUDGET IMPLICATION: $1,650,000 $1,416,542.85
BUDGETED AMOUNT ACTUAL AMOUNT
SUPPORTING DOCUMENTS
� MEMO/LETTER: Letter from Mike Boex,
� RESOLUTION: Draft
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: Bid Tabulations
ADMINISTRATOR'S COMMENTS
Bolton & Menk, Inc., dated 4/3/13
i
4 1 � �4
ity Administrator Date
************************************************
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
Cottage
J Grove
� Pride and PCOSPerity Meet
To:
From:
Date:
Subject:
Mr. Gerry Herringer
Ryan R. Schroeder
March 20, 2013
East Point Douglas Road Extension
You had requested edification on municipal intent regarding the phasing of the East Point
Douglas road improvements.
In concert with the pending sale of approximately 22 acres of the Apache Chief Theater
property to Wal-Mart the City contracted with Bolton & Menk, Inc. for design of a two phase
improvement project of East Point Douglas Road. The first phase of this project is intended to
be constructed in concert with the Wal-Mart development. The total cost of this Phase I
construction is estimated at $2.975 million. Phase I construction will be funded by the
Developer (Wal-Mart) and by City utility funds.
The cost of the second phase of the East Point Douglas Road improvements is estimated at
$6.786 million (2012 dollars). The Phase II road improvements are anticipated to provide
benefit to 56.12 acres owned by Apache Chief, 2.11 acres owned by Mr. and Mrs. James Ross
and 5.67 acres owned by Forest Anderson et al. It is anticipated that the phase II road
improvement will occur in concert with significant development within the phase II development
area sufficient to provide a benefit to the development parcel(s). Historically, without a petition
from the landowners for the improvement due to the imminent development of those
properties, the improvement would not be ordered.
At the time of the Phase I I improvement project, the specific and relative benefit for those road
improvements would be allocated in accordance with the IMTF policy in place at the time of
construction as amended by a benefit analysis by an outside third party appraiser under
contract with the City of Cottage Grove as has been the practice of the City over the past five
years.
An alternative to development coordinated construction of Phase II could exist should the City
gain third party funding (federal, state, or county) sufficient to provide for the preponderance of
project costs such that in the opinion of the City and owners of property in the development
area the availability of the outside funding is of substantial benefit to these same parties.
�o� ���
m �
.
a"i0 eers &Suh`
April 3, 2013
BO IsTON $�. M� N K, I NC�
Consulting Engineers & Surveyors
2035 County Road D East • Suite g• Maplewood, MN 55109-5314
Phone (651) 704-9970 � Fax (651) 704-9971
www.bolton-menk.com
Honorable Mayor and City Council
City of Cottage Grove
12800 Ravine Parl<way South
Cottage Grove, MN 55016
Re: Bid Results
East Point Douglas Road Utility and Street Improvements
S.A.P. Project No. 180-122-010
Dear Honorable Mayor and City Council:
Bids for the East Point Douglas Road Utility and Street Improvements Project were opened on Thursday,
March 21, 2013, Eight (8) bids were received and ranged from $1,416,542.85 to $1,662,799.85. A Bid
Tabulation has been included. Copies will also be distributed to each Bidder after award by the City.
The following is a summary of the Bids received:
Contractor
Redstone Construction Co., Inc.
Northwest Asphalt, Inc.
Minger Construction, Inc.
Burschville Construction, Inc.
Kuechle Underground, Inc.
Ryan Contracting Co.
Northdale Const, Co. Inc.
Geislinger and Sons, Inc.
Total Base Bid
$1,416,542.85
$1,459,278.69
$1,498,159.50
$1,531,551.85
$1,567,956.42
$1,616,744.40
$1,634,593.59
$1,662,799.85
The low Bidder on the Project was Redstone Construction Company, Inc. with a Total Base Bid Amount of
$1,416,542.85. This was approximately 14% lower than the Engineer's Estimate of $1,650,000. If the City
Council decides to award the Project to the low bidder, then Redstone Construction Company, Inc, should be
awarded the Project on the Total Base Bid Amount of $1,416,542.85.
If you have any questions, please feel free to contact me at 651-968-7674.
Sincerely,
BOLTON & MENK, INC.
Mi�Boex; P.E,
Senior Project Manager
Enclosure
DESIGNING FOR A BETTER TOMORROW
Bolton & Menk is an equal opportunity employer
ABSTR.4CT OF B/DS
East Point Dougias Road Utiiity and Street Improvements
City of Cottage Grove, Minnesota
BMI Project No. N15.104975
1
2
3
4
5
6
7
8
9
�o
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
26
29
30
BASE BID:
MOBILIZATION
CLEARING AND GRUBBING
REMOVE SEWER PIPE (STORM)
REMOVE CONCRETE CURB AND GUTTER
REMOVE CONCRETE PAVEMENT
REMOVE BRUMINOUS PAVEMENT
REMOVE MANHOLE OR CATCH BASIN
SAWING CONCRETE PAVEMENT (FULL DEPTH)
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
SALVAGE SIGN
SALVAGE AND REINSTALL STREET LIGHT
SALVAGE AND REINSTALL FENCE
SALVAGE AND REINSTALL STORM SEWER PIPE
COMMON EXCAVATION (P)-STREET
COMMON EXCAVATION (P)-TRAIL & SIDEWALK
ROCK EXCAVATION
SUBGRADE EXCAVATION (El�
COMMON BORROW (C�-ONSRE
TOPSOIL 80RROW (C� - FROM STOCKPILE
EXCAVATION SPECIAL 1
EXCAVATION SPECIAL 2
SKID LOADER
STREET SWEEPER (VJITH PICKUP BROOM)
AGGREGATE BASE CLASS 5
AGGREGATE BASE CLASS5100% CRUSHED
MILL BITUMINOUS PAVEMENT (1.5'�
BITUMINOUS MATERIAL FOR TACK COAT
TYPE SP 12.5 WEARING COURSE MIXTURE (4,� SPECIAL
TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) SPECIAL
TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)
1
1
235
335
680
9780
4
75
1190
9
1
330
40
2705
430
810
340
1000
1640
10
1
20
20
7125
1255
1330
1395
1280
225
430
LUMPSUM
LUMPSUM
LIN F?
LIN FT
SQ YD
SQ YD
EACH
LIN FT
LIN FT
EACH
IUMP SUM
LIN FT
LIN FT
CU YD
CU YD
CU YD
CU YD
CU YD
CU YD
EACH
EACH
HOUR
HOUR
TON
TON
SQ YD
GAL
TON
TON
TON
.00
75
z
1
H:\C0771N1510497517_Biddin�Contract Documents1104975-BidA6stractxls
4
70
Page 1
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
TYPE SP 12.5 WEARING COURSE MIXTURE (4,�
TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,B)
PIPE BEDDING
15" RCP FLARED END SECTION, INCL TRASH GUARD
16" RCP FLARED END SECTION, WCL TRASH GUARD
12" RCP STORM SEWER CLA55 5
15" RCP STORM SEWER CLASS 5
18" RCP STORM SEWER CLASS 5
24" RCP STORM SEWER CLASS 4
CONNECT TO EXISTING STORM SEWER STRUCTURE
CONNECT TO EXISTING STORM SEWER PIPE
CONNECT TO EXISTING SANITARY SEWER
8" PVC SANITARY SEWER, 15'-20' DEEP
8" PVC C900 SANRARY SEWER, 15'-20' DEEP
8" PVC C900 SANITARY SEWER DROP W LET
30" SANITARY SEWER, 10'-15' DEEP
30" SANITARY SEWER, 15'-2D' DEEP
30" SANITARY SEWER, 20'-25' DEEP
30" SANITARY SEWER, 25'-3D' DEEP
IRRIGATION SYSTEM REPAIR
CONNECT TO EXISTING 24" WATER MAIN
12" BUTTERFLY VALVE AND BOX
24" BUTTERFLY VALVE AND BOX
6" GATE VALVE AND BOX
B" GATE VALVE AND BOX
HYDRANT
ADJUST VALVE BOX
VALVE BOX EXTENSION
HYDRANT RISER
6" DIP, CL 52 WATER MAIN, INCL POLY WRAP
8" DIP, CL 52 WATER MAIN, INCL POLY WR.4P
12" DIP, CL 52 WATER MAIN, INCL POLY WRAP
24" DIP, CL 51 WATER MAIN, INCL POLY WRAP
4" POLYSTYRENE INSULATION
DUCTILE IRON FITTINGS
ADJUST STORM SEWER CATCH BASIN CASTING
1130
1130
1715
1
2
301
729
1813
132
�
1
1
12
20
9
50
740
840
65
1
1
1
1
4
1
4
2
4
2
75
35
32
1560
10
3600
4
TON
TON
LIN FT
EACH
EACH
LIN FT
LIN FT
LIN Ff
LIN FI'
EACH
EACH
EACH
LIN FT
LIN FP
LIN FT
LIN FT
lIN FT
lIN FT
LIN FT
LUMPSUM
EACH
EACH
EACH
EACH
EACH
EACH
EACH
LIN FT
LIN FT
LIN FT
lIN FT
LIN FT
LIN FT
SQ YD
POUND
EACH
1
05.00
76
H:\COTfiN75104975V Biddin�Contrect Documents\10497SBidAbstractxis
1
100.00
3
167.
Page 2
67
68
69
7�
71
72
73
74
75
76
77
78
79
80
81
82
83
84
65
66
87
88
89
90
91
92
93
94
95
96
97
98
99
100
ADJUST SANITARY SEWER MANHOLE CASTING
2'u3' STORM SEWER CB, INCL R-3290-VB CSTG AND HDPE ADJ RINGS
2'X3' STORM SEWER SKIMMER STRUCTURE
4' DIA STORM SEWER CBMH, 8' DEEP, INCL R-3290-VB CSTG AND HDPI
4' DIA STORM SEWER CBMH, 8' DEEP, INCL R-4342 CSTG AND CONC S'
4' DIA STORM SEWER MH, 8' DEEP, INCL R-1642-B CSTG AND HDPE AD
4' DIA STORM SEWER MH, 6' DEEP, INCL 3' SUMP, R-1642-B CSTG AND
5' DIA SANITARY SEWER MH, 8' DEEP, INCL R-1642-B CSTG AND HDPE
4' DIA STORM SEWER STRUCTURE OVERDEPTH
5' DIA SANRARY SEWER STRUCTURE OVERDEPTH
CLASS 111 RANDOM RIPRAP
6" CONCRETE WALK
8" CONCRETE WALK-SPECIAL COLOR
8" CONCRETE WALK-SPECIAL COLOR AND IMPRINT TREATMENT
CONCRETE HYDRANTACCESS PAD
CONCRETE CURB AND GUTfER, DESIGN B618
6" CONCRETE DRIVEWAY PAVEMENT (RESIDENTIAI)
7" CONCRETE DRNEWAY PAVEMENT (COMMERCIAL)
TRUNCATED DOMES
PEDESTRIAN CURB RAMP
TRASH RECEPTACLE, INCL CONC PAD
BENCH, INCL CONC PAD
4" PVC, SCH 40, 2 CONDURS FOR PRIVATE UTILITY CROSSING
4" PVC, SCH 40, 3 CONDUITS FOR PRIVATE UTILITY CROSSING
6" PVC, SCH 40, 1 CONDUIT FOR PRIVATE UTILITY CROSSING
1.5 " NON-METALLIC CONDUIT
2 " NON-METALLIC CONDUIT
4" PVC, SCH 40, 1 CONDUIT FOR PRNATE UTILITY CROSSWG
HANDHOLE
LIGHTING UNIT
LIGHTING UNIT CONCRETE BASE
FEED POINT
THREE NO 6 AND NO B GROUND IN PLACE IN CONDUIT
TRAFFIC CONTROL
2
7
1
9
1
4
1
6
10
74
35
14000
29D
460
100
3810
80
315
136
825
1
1
300
100
100
95
415
500
2
12
12
1
2900
1
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
LIN FT
LIN Ff
CU YD
SQ FT
SQ FT
SQ FT
SQ FT
LIN Fi
SQ YD
SQ YD
SQ FT
54 FT
EACH
EACH
LIN FT
LIN FT
LIN FT
LIN FT
LIN Fi
LIN FT
EACH
EACH
EACH
EACH
LIN FT
LUMP SUM
H:\C07TN15104975\7 Bidding Contract Documenis\10497SBidP,bstractxls
4
1
Page 3
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
DETOUR
TYPE III BARRICADES
SIGN PANELS, TYPE C
DECIDUOUS TREE 2.5" CAL B&B - PRINCETON ELM
DECIDUOUS TREE 2.5" CAL B&B - GINKO, AUTUMN GOLD
DECIDUOUS TREE 2.5" CAL B&B - NORTHWOOD MP,PLE
DECIDUOUS TREE 2.5" CAL B&B - EASTERN PIN OAK
DECIDUOUS TREE 2.5" CAL B&B - SWAMP WHITE OAK
ORNAMENTALTREE 1.5" CAL B&B - PRAIRIEFIRE CRABAPPLE
ORNAMENTALTREE 1.5" CAL B86 - PAGODA DOGWOOD (CLUMP)
ORNAMENTALTREE 1.5" CAL B&B- IRONWOOD
ORNAMENTAL TREE 1.5" CAL B&B-AUTUMN BRILLIANCE SERVICEBEF
SILT FENCE, TYPE MACHINE SLICED
STORM DRAIN INLEf PROTECTION PER STANDARD DETAIL ER0.4A
STORM DRAIN INLET PROTECTION PER STANDARD DETAIL ER0.46
STORM DRAIN INLET PROTECTION PER STANDARD DETAIL EROIFC
STORM DR.41N INLET PROTECTION PER STANDARD DETAIL ERO-4D
TEMPORARY ROCKCONSTRUCTION ENTRANCE
SODDING TYPE MINERAL
WATER FOR TURF ESTABLISHMENT
HYDRAULIC SOIL STABILIZER TYPE 5
SEEDING, INCL SEED, FERTILIZER, AND CATEGORY 3 EROSION CONTI
SEEDING, INCL SEED, FERTILIZER, AND HYDROMULCH
PAVEMENT MESSAGE (RIGHT ARROIM POLY PREFORM
4" DOUBLE SOLID LINE YELLOW - EPDXY
4" SOLID LINE WHff E- EPDXY
4" BROKEN LINE WHRE-EPDXY
24" SOLID LINE WHITE- POLY PREFORM
1
1
106
14
13
10
9
12
9
9
15
10
2015
4
9
15
1
5
7620
25
2000
4285
6910
2
2000
1'I50
350
30
LUMP SUM
EACH
SQ FT
TREE
TREE
TREE
TREE
TREE
TREE
TREE
TREE
TREE
LIN FT
EACH
EACH
EACH
EACH
EACH
SQ YD
M GALLON
POUND
SQ YD
SQ YD
EACH
lIN Ff
LIN FT
LIN FT
lIN FT
TOTAL BID:
Contrador Name and Address: Redstone Const Co., Inc.
P.O. Box 218
Mora, MN 55051
PhOf10: 320-679A140
FaX. 320�7s-0154
Signed By: SYephen Johnson
Title: President
Bid Security: eond
Addenda None
Notihwest Asphalt, Inc.
1451 Stagecoach Rd
Shakopee, MN 55379
Phone: e52�as�aaa
F�C 952-445-1056
Signed By: Tony Kavfhold
Tltle: Project ManaBer
Bid Security: Bond
Addenda None
H:\COTI1N15104975V Biddine Contract DocumentsVO497S8idAbstractxis
3
10.00
Minger Construction, inc.
PO Box 236
Chanhassen, MN 55317
Ph0f18: 952-366-9200
F2X: 952368-93N
Sign2d By: Patrick MinBer
TiUe: President
Bid Security: eond
Addenda None
Burohville Const, Inc
11440 8th SL NE
Hanover, MN 55341
Phone: 7s3-a97-a2az
F�C 763-497-4266
Signed By: James Schendel
TIS10: President
Bid SeCU�ty: eond
Addenda None
Page 4
ABSTRACT OF BIDS
East Point Douglas Road Utility and Street Improvements
City of Cottage Grove, Minnesota
BMI Project No. N15.104975
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
26
29
30
BASE BID:
MOBILIZATION
CIEARING AND GRUBBING
REMOVE SEWER PIPE (STORM)
REMOVE CONCRETE CURB AND GUTTER
REMOVE CONCRETE PAVEMENT
REMOVE BITUMINOUS PAVEMENT
REMOVE MANHOLE OR CATCH BASIN
SAWING CONCRETE PAVEMENT (FULL DEPTH) '
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
SALVAGE SIGN
SALVAGE AND REINSTALL STREET LIGHT
SALVAGE AND REINSTALL FENCE
SALVAGE AND REINSTALL STORM SEWER PIPE
COMMON EXCAVATION (P)-STREET
COMMON EXCAVATION (P) -TR41L & SIDEWALK
ROCK EXCAVATION
SUBGRADE EXCAVATION (E�
COMMON BORROW (C� - ONSITE
TOPSOIL BORROW (C� - FROM STOCKPILE
EXCAVATION SPECIAL 1
EXCAVATION SPECIAL 2
SKID IOADER
STREET SWEEPER (WITH PICKUP BROOfvn
AGGREGATE BASE CLASS 5
AGGREGATE BASE CLASS5100% CRUSHED
MILL BITUMINOUS PAVEMENT (1.5'�
BITUMINOUS MATERIAL FOR TACK COAT
TYPE SP 12.5 WEARING COURSE MUCTURE (4,� SPECIAL
TYPE SP'12.5 WEARING COURSE MIXTURE (2,C) SPECIAL
TYPE SP 9.5 WEARING COURSE MIXTURE (2,B)
1
1
235
335
680
9780
4
75
1190
9
1
330
40
2705
430
810
340
1000
164D
10
1
20
20
7125
1255
1330
1395
1280
225
430
s
LUMP SUM
�UMP SUM
LIN FT
LIN FT
SQ YD
SQ YD
EACH
LIN FT
LIN FT
EACH
LUMP SUM
LIN FT
LIN Ft
CU YD
CU YD
CU YD
CU YD
CU YD
CU YD
EACH
EACH
HOUR
HOUR
TON
TON
SQ YD
GAL
TON
TON
TON
H:\C0T71N15104975\7 Bidding_Contrect DocumentsN0497SBidAbstract.zls
�
1
Page 5
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
so
61
62
63
64
65
66
TYPE SP 12.5 WEARING COURSE MIXTURE (4,F�
TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,6)
PIPE BEDDING
15" RCP FLARED END SECTION, INCL TRASH GUARD
18" RCP FLARED END SECTION, INCL TRASH GUARD
'12" RCP STORM SEWER CLASS 5
15" RCP STORM SEWER CLASS 5
1 B" RCP STORM SEWER CLASS 5
24" RCP STORM SEWER CLASS 4
CONNECT TO EXISTING STORM SEWER STRUCTURE
CONNECT TO EXISTING STORM SEWER PIPE
CONNECT TO EXISTING SANITARY SEWER
8" PVC SANITARY SEWER, 15'-20' DEEP
8" PVC C900 SANRARY SEWER, 15'-20' DEEP
8" PVC C900 SANITARY SEWER DROP INLET
30" SANRARY SEWER, 10'-15' DEEP
3D" SANITARY SEWER, 15'-20' DEEP
30" SANRARY SEWER, 20'-25' DEEP
30° SANITARY SEWER, 25'30' DEEP
IRRIGATION SYSTEM REPAIR
CONNECT TO EXISTING 24" WATER MAIN
12" BUTTERFLY VALVE AND BOX
24" BUTTERFLY VALVE AND BOX
6" GATE VALVE AND BOX
8" GATE VALVE AND BOX
HYDRANT
ADJUST VALVE BOX
VAIVE BOX IXTENSION
HYDRANT RISER
6" DIP, CL 52 WATER MAIN, INCL POLY WR4P
6" DIP, CL 52 WATER MAIN, INCL POLY WRAP
12" DIP, CL 52 WATER MAIN, INCL POLY WRAP
24" DIP, CL 51 WATER MAIN, INCL POLY WR4P
4" POLYSTYRENE INSULATION
DUCTILE IRON FITTINGS
ADJUST STORM SEWER CATCH BASIN CASTING
1130
1130
1715
1
2
301
729
1813
132
1
1
1
12
20
9
50
740
840
85
1
1
1
1
4
1
4
2
4
2
75
35
32
1560
10
3800
4
6
TON
TON
LIN F1'
EACH
EACH
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
EACH
LIN FT
LIN FT
LIN FT
LIN Ff
LIN FT
LIN F�
LIN FT
LUMP SUM
EACH
EACH
EACH
EACH
EACH
EACH
EACH
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
LIN FT
Sq YD
POUND
EACH
50.00
1
H:\COlTN1510497517 Bidding Contrect Documenls\10497SBidAbstrad.xis
.00
0
.50
�
B
Page 6
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
63
84
85
86
87
86
89
90
91
92
93
94
95
96
97
98
99
100
ADJUST SANITARY SEWER MANHOLE CASTING
2Sc3' STORM SEWER CB, INCL R-329D-VB CSTG AND HDPE ADJ RINGS
2'X3' STORM SEWER SKIMMER STRUCTURE
4' DIA STORM SEWER CBMH, S' DEEP, INCL R-3290-VB CSTG AND HDPI
4' DIA STORM SEWER CBMH, 8' DEEP, INCL R4342 CSTG AND CONC S'
4' DIA STORM SEWER MH, 8' DEEP, INCL R-1642-B CSTG AND HDPE AD
4' DIA STORM SEWER MH, 8' DEEP, INCL 3' SUMP, R-1642-B CSTG AND
5' DIA SANITARY SEWER MH, 8' DEEP, INCL R-1642-B CSTG AND HDPE
4' DIA STORM SEWER STRUCTURE OVERDEPTH
5' DIA SANITARY SEWER STRUCTURE OVERDEPTH
CLASS III RANDOM RIPRAP
6" CONCREfE WALK
8" CONCRETE WALK- SPECIAL COLOR
8" CONCRETE WAI.K - SPECIAL COLOR AND IMPRINT TREATMENT
CONCRETE HYDR4NT ACCESS PAD
CONCRETE CURB AND GUTTER, DESIGN 661 B
6" CONCRETE DRIVEWAY PAVEMENT (RESIDENTIAL)
7" CONCRETE DRNEWAY PAVEMENT (COMMERCIAL)
TRUNCATED DOMES
PEDESTRIAN CURB RAMP
TR4SH RECEPTACLE, INCL CONC PAD
BENCH, INCI. CONC PAD
4" PVC, SCH 40, 2 CONDUITS FOR PRIVATE UTILITY CROSSING
4" PVC, SCH 40, 3 CONDUITS FOR PRNATE UTILITY CROSSING
6" PVC, SCH 40, 1 CONDUIT FOR PRIVATE UTILITY CROSSING
1.5 " NON-METALUC CONDUIT
2 " NON-METALLIC CONDUIT
4" PVC, SCH 40, 1 CONDUIT FOR PRNATE UTILITY CROSSING
HANDHOLE
LIGHTING UNIT
LIGHTING UNIT CONCRETE BASE
FEED POINT
THREE NO 6 AND NO B GROUND IN PLACE IN CONDUIT
TRAFFIC CONTROL
2
7
1
9
1
4
1
6
10
74
35
14000
290
480
100
3810
80
315
136
825
1
1
300
100
100
95
415
500
2
12
12
1
2900
1
EACH
EACH
EACH
EACH
EACH
EACH
EACH
EACH
LIN F1'
LIN FT
CU YD
SQ FT
SQ FT
SQ FT
SQ FT
lIN FT
SQ YD
SQ YD
SQ FT
SQ Ff
EACH
EACH
LIN FT
LIN Ff
LIN FT
LIN FT
LIN FT
LIN FT
EACH
EACH
EACH
EACH
LIN FT
LUMP SUM
5
.83
.83
167.
H:\COTT�N15104975V_Bidding Conhact Documents1104975-BidAbstract.xls
14.50
7
Page 7
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
126
DETOUR
TYPE III BARRICADES
SIGN PANELS, TYPE C
DECIDUOUS TREE 2.5" CAL B&B - PRINCETON ELM
DECIDUOUS TREE 2.5" CAL B&B - GINKO, AUTUMN GOLD
DECIDUOUS TREE 2.5" CAL B&B - NORTH WOOD MAPLE
DECIDUOUS TREE 2.5" CAL B&B - EASTERN PIN OAK
DECIDUOUS TREE 2.5" CAL B&B-SWAMP WHITE OAK
ORNAMENTAL TREE 1.5" CAL B&B - PR4IRIEFIRE CRABAPPLE
ORNAMENTAL TREE 1.5" CAL 6&B - PAGODA DOGWOOD (CLUMP)
ORNAMENTAL TREE 1.5" CAL 6&B - IRONWOOD
ORNAMENTAL TREE 1.5" CAL B&B -AUTUMN BRILLIANCE SERVICEBEF
SILT FENCE, TYPE MACHINE SLICED
STORM DR41N INLET PROTECTION PER STANDARD DETAIL ERO-4A
STORM DRAIN INLEf PROTECTION PER STANDARD DETAIL ERO-48
STORM DR4IN INLET PROTECTION PER STANDARD DETAIL ERO�C
STORM DR41N INLEf PROTECTION PER STANDARD DETAIL ERO-4D
TEMPORARY ROCK CONSTRUCTION ENTRANCE
SODDING T'PE MINERAL
WATER FOR TURF ESTABLISHMENT
HYDRAULIC SOIL STABILIZER TYPE 5
SEEDING, INCL SEED, FERTILIZER, AND CATEGORY 3 EROSION CONTf
SEEDING, INCL SEED, FERTILIZER, AND HYDROMULCH
PAVEMENT MESSAGE (RIGHTARROV� POLY PREFORM
4" DOUBLE SOLID LINE YELLOW - EPDXY
4" SOLID LINE WHITE - EPDXY
4" BROKEN LINE WHITE-EPDXY
24" SOLID LINE WHITE- POLY PREFORM
1
1
106
14
13
10
9
12
9
9
15
10
zois
4
9
15
1
5
7620
25
2000
4265
6910
2
2000
1150
350
3�
5
LUMP SUM
EACH
SQ Fi'
TREE
TREE
TREE
TREE
TREE
TREE
TREE
TREE
TREE
LIN FI'
EACH
EACH
EACH
EACH
EACH
SQ YD
M GALLON
POUND
SQ YD
SQ YD
EACH
LIN FT
lIN Fi
LIN FT
LIN FT
Contractor N
Kuechle UnderBround, Inc,
PO Box 509
Kimball, MN 55353
Ph0(16: 320.196-866
F2X: 320396-8869
Slgfled By: Jerome Kuechle
TiflO: President
Bid SeCUfi1y: Bond
Addenda None
6
Ryan ConVacting Co
PO Box 246
Elko New Market MN,
PhOf12: 952-8943200
Fax: s52-asa-a2o7
SICJ�@d By: Thomas J. Ryan
Title: President
Bld SECUfI�: Bond
Addenda None
H:\COTt1N15104975\7 Biddin�Contract Documenls\104975-BidAbstract.xls
Northdale Const Co. Inc.
9760 71 st St NE
Albertvilie, MN 55301
Phone: �sa.�2e
F2X: 763�28�997
$19�Bd By: Phiiip B. Lesnar
TIllO: Vice President
Bid Secutity: eond
Addenda None
8
.00
Geislinger and Sons, Inc.
511 Central Ave PO Box
437 Watkins, MN 55389
Phone: s2a7sa-2ooe
Fax: sza�sa-2oo�
$IJf10d By: JeffGeislinger
Title: President
Bid Security: eond
Addenda None
Page 8
RESOLUTION NO. 2013-XXX
RESOLUTION AWARDING THE BID FOR THE EAST POINT DOUGLAS ROAD
UTILITY AND STREET IMPROVEMENTS PROJECT TO REDSTONE
CONSTRUCTION CO., INC. IN THE AMOUNT OF $1,416,542.85
WHEREAS, plans and specifications for the East Point Douglas Road Utility and
Street Improvements Project were completed according to City standards; and
WHEREAS, bids were requested to provide the necessary work; and
WHEREAS, eight firms submitted bids; and
WHEREAS, it appears that Redstone Construction Co., Inc. is the lowest
responsible bid; and
WHEREAS, it is the recommendation of the City Engineer that the bid be
awarded to Redstone Construction Co., Inc. in the amount of $1,416,542.85.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Cottage
Grove, County of Washington, State of Minnesota, the bid for the East Point Douglas
Road Utility and Street Improvements Project is awarded to Redstone Construction Co.,
Inc. in the amount of $1,416,542.85.
Passed this 3rd day of April 2013.
Myron Bailey, Mayor