Loading...
HomeMy WebLinkAbout2013-04-17 PACKET 04.K.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM # DATE 4/17/13 � PREPARED BY Community Development Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR ***********�**********************�************* COUNCIL ACTION REQUEST Consider awarding the 2013 Pond Improvement and Sediment Removal Project to the lowest accepted quote, supplied by Rumpca Excavating, for $62,580.00. STAFF RECOMMENDATION Award the 2013 Pond Improvement and Sediment Removal Project to Rumpca Excavating. BUDGET IMPLICATION: $72,570 BUDGETED AMOUNT ADVISORY COMMISSION ACTION ❑ PLANNING ❑ PUBLIC SAFETY ❑ PUBLIC WORKS ❑ PARKS AND RECREATION ❑ HUMAN SERVICES/RIGHTS ❑ ECONOMIC DEV. AUTHORITY ❑ SUPPORTING DOCUMENTS �_ $62,580.00 ACTUAL AMOUNT FUNDING SOURCE REVIEWED ❑ ❑ ❑ ❑ ❑ ❑ ❑ APPROVED ❑ ❑ ❑ ❑ ❑ ❑ ❑ DENIED ❑ ❑ ❑ ❑ ❑ ❑ ❑ � MEMO/LETTER: Memo from Allan Larson dated 4/9/13 � RESOLUTION: Draft ❑ ORDINANCE: ❑ ENGWEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: � OTHER: Quote Tabulation ADMINISTRATOR'S COMMENTS L Date *�**********************�************��*******�* COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER Cottage / Grove � Pride andProsperity Meet TO: Mayor and Members of the City Council Ryan Schroeder, City Administrator FROM: Allan Larson DATE: April 9, 2013 RE: 2013 Pond Improvement and Sediment Removal — Quotes Background/Discussion Quotes were opened for the 2013 Pond Improvement and Sediment Removal Project on April 5, 2013. Transmitted herewith is a copy of the quotes for your information and file. The Project consists of improvements to five ponds: PART 1— Pond L-P1 (Jasmine Avenue/93rd Street) PART 2— Pond TG-P4 (Grange Boulevard/Hamlet Park) PART 3— Pond WD-P4.3 (North of Highland Hills Boulevard) PART 4— Pond WD-P19.1 (North end of Hinton Park Avenue) PART 5— Pond C-P7 (Isleton Avenue/Irvin Avenue) Requests for quotes were sent to five contractors (Ryan Contracting, Rumpca Excavating, Hydrocon Inc., Kusske Construction, and Nadeau Excavation). Three quotes were received. The following summarizes the results of the quotes received: Pond No. Rumpca Excavating Nadeau Excavation Hydrocon Inc. Pond L-P1 $10,350.00 $11,010.00 $22,475.00 Pond TG-P4 $10,675.00 $10,985.00 $16,425.00 Pond WD-P4.3 $9,630.00 $10,172.00 $26,225.00 Pond WD-P19.1 $18,550.00 $19,610.00 $36,625.00 Pond C-P7 $13,375.00 $14,985.00 $23,975.00 TOTAL $62,580.00 $66,762.00 $125,725.00 The low quote on this project is Rumpca Excavating at $62,580.00. The low quote compares favorably to the Engineer's Estimate of $72,570.00. Recommendation It is recommended to award the project to the lowest accepted quote, supplied by Rumpca Excavating, Inc. at $62,580.00. RESOLUTION NO. 2013-XXX RESOLUTION AWARDING THE 2013 POND IMPROVEMENT AND SEDIMENT REMOVAL PROJECT IN THE AMOUNT OF $62,580.00 WHEREAS, quotes were requested to provide the necessary work for the 2013 Pond Improvement and Sediment Removal Project; and WHEREAS, three firms submitted quotes; and WHEREAS, it appears that Rumpca Excavating, Inc. provided the lowest accepted quote; and WHEREAS, it is the recommendation of the City Engineer that the quote be awarded to Rumpca Excavating, Inc. in the amount of $62,580.00. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Cottage Grove, County of Washington, State of Minnesota, that the 2013 Pond Improvement and Sediment Removal Project be awarded to Rumpca Excavating, Inc. in the amount of $62,580.00. Passed this 17th day of April 2013. Myron Bailey, Mayor Attest: Caron M. Stransky, City Clerk �nn rl Traffic Control e imen emova of FES Sections Fine grading of pond side-slopes/boulevards Temporary Rock Construcl Entrance Remove & Replace Class III Random Rip Rap Sod, Include Fertilizer Street Sweeper w/operator ie'A iit LS 2013 Pond Improvement & Sediment Removal Bid Tabulation 4/5/2013 Opening 93 St.] Quantity Rumpca Excavation Nadeau Excavation Hy 1 $ 300.00 $ 300.00 $ 200.00 $ 200.00 $ LS 1 EA 1 CY 45 SY 350 HR 1 PART 2 Pond TG [Grange Blvd./Hamlf Traffic Control LS 1 e imen emova o ipe, & FES Sections Fine grading of pond side- lass III Random Rip Rap �d, Include Fertilizer treet Sweeper w/operato PART 3 - Pond WD-P4.3' e imen emova o ipe, Pond, & FES 1-856 Clear & Grub ine gra ing o pon side-slopes/boulevards emporary oc Construction Entrance Remove & Replace Class III Random Rip Rap Sod, Include Fertilizer Traffic Control IStreet Sweeaer w/oaerator LS SY HR CY LS EA CY SY LS HR 250 1 45 200 �ghland � 150 1 1 1 36 150 1 1 $ 16.00 $ 2,400.00 $ 18.00 $ $ 900.00 $ 900.00 $ 1,200.00 $ $ 600.00 $ 600.00 $ 750.00 $ $ 80.00 $ 3,600.00 $ 82.00 $ $ 6.50 $ 2,275.00 $ 6.50 $ $ 275.00 $ 275.00 $ 195.00 $ Subtotal $ 10,350.00 Subtotal $ n. Inc. 2,700.00 $ 75.00 $ 11,250.00 1,200.00 $ 2,500.00 $ 2,500.00 750.00 $ 850.00 $ 850.00 3,690.00 $ 120.00 $ 5,400.00 2,275.00 $ 6.00 $ 2,100.00 195.00 $ 125.00 $ 125.00 11,010.00 Subtotal $ 22,475.00 $ 16.00 $ 4,000.00 $ 18.00 $ 4,500.00 $ 30.00 $ $ 1,200.00 $ 1,200.00 $ 1,100.00 $ 1,100.00 $ 1,500.00 $ $ 80.00 $ 3,600.00 $ 82.00 $ 3,690.00 $ 120.00 $ $ 6.50 $ 1,300.00 $ 6.50 $ 1,300.00 $ 7.00 $ $ 275.00 $ 275.00 $ 195.00 $ 195.00 $ 125.00 $ Subtotal $ 10,675.00 Subtotal $ 10,985.00 Subtotal $ 11s Blvd.] $ 16.00 $ 2,400.00 $ 18.00 $ 2,700.00 $ 50.00 $ $ 1,300.00 $ 1,300.00 $ 1,300.00 $ 1,300.00 $ 10,500.00 $ $ 900.00 $ 900.00 $ 1,100.00 $ 1,100.00 $ 2, 500.00 $ $ 600.00 $ 600.00 $ 750.00 $ 750.00 $ 1,500.00 $ $ 80.00 $ 2,880.00 $ 82.00 $ 2,952.00 $ 75.00 $ $ 6.50 $ 975.00 $ 6.50 $ 975.00 $ 8.00 $ $ 300.00 $ 300.00 $ 200.00 $ 200.00 $ 200.00 $ $ 275.00 $ 275.00 $ 195.00 $ 195.00 $ 125.00 $ Subtotal $ 9,630.00 Subtotal $ 10,172.00 Subtotal $ 7,500.00 1,500.00 5,400.00 1,400.00 16,425.00 7,500.00 2,500.00 1,500.00 2,700.00 1,200.00 200.00 26.225.00 �eaiment Kemovai or FES 2-1856 & 2-4166 Clear & Grub Fine grading of pond side- slopes/boulevards i e es ora ion w ee , Fertilizer, Erosion Blanket Temporary Rock Construc Entrance emove ep ace Class III Random Rip Rap CY 100 LS 1 LS 1 AC 0.5 EA 1 .f`l'.i �il $ 16.00 $ 1,600.00 $ 18.00 $ $ 1,300.00 $ 1,300.00 $ 1,300.00 $ $ 900.00 $ 900.00 $ 1,250.00 $ $10,200.00 $ 5,100.00 $12,000.00 $ $ 600.00 $ 600.00 $ 750.00 $ $ 80.00 $ 3,600.00 $ 82.00 $ $ 275.00 $ 275.00 $ 195.00 $ >ubtotal $ 13,375.00 Subtotal $ GRAND TOTAL � $ 62,580.00 1,800.00 $ 66.00 $ 1,300.00 $ 6,000.00 $ 1,250.00 $ 1,800.00 $ 6,000.00 $ 10,000.00 $ 750.00 $ 850.00 $ 3,690.00 $ 80.00 $ 195.00 $ 125.00 $ 14,985.00 Subtotal $ $ 66, 762.00 ..�� �� . ��� �� :�� �� . ��� �� : � �� t .�� �� 975.00 $ 125, 725.00