HomeMy WebLinkAbout2013-08-14 PACKET 08.A.REQUEST OF CITY COUNCIL ACTION COUNCIL AGEND
MEETING ITEM #
DATE 8/14/13 •
PREPARED BY: Community Development Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
****************************�*�*�*****�*********
COUNCIL ACTION REQUEST:
�a
3
Consider approving an ordinance amending the City's Zoning Map to rezone approximately
2.38 acres (PID 08.027.21.34.0017) from B-1, Limited Business District to B-2, Retail
Business District.
Consider approving a resolution authorizing the publication by title and summary of the
zoning amendment ordinance.
Consider approving the site plan and conditional use permit applications to redevelop the
property at 7350 80th Street for a one-story commercial building of approximately 19,387
square feet and 75 off-street parking spaces.
STAFF RECOMMENDATION
1. Adopt the ordinance amending the City's Zoning map to rezone property from B-1 to B-2.
2. Adopt the ordinance summary resolution.
3. Adopt the resolution approving the site plan and conditional use permit for a commercial
building at 7350 80th Street.
ADVISORY COMMISSION ACTION
� PLANNING
SUPPORTING DOCUMENTS:
DATE REVIEWED APPROVED DENIED
7/22/13 ❑ � ❑
� MEMO/LETTER: Memo from John McCool dated 7/29/13
� RESOLUTION: Draft - Site Plan and CUP
Draft - Ordinance summary
� ORDINANCE: Draft
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: Excerpt from unapproved minutes of the 7/22/13 Planning Commission meeting
ADMINISTRATOR'S COMMENTS
Administrator
� f�
Date
*****************************************�******
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
Cottage
/ Grove
� Pride and PrOSPerity Meet
TO: Mayor and Members of the City Council
Ryan Schroeder, City Administrator
FROM: John McCool, Senior Planner
DATE: July 29, 2013
RE: 1509 Partnership Planning Applications — Proposed Goodwill Store Project
Proposal
1501 Partnership, 4350 Baker Road, Minnetonka, MN, has submitted the following planning
applications to redevelop a commercial site for purposes constructing a 19,387 square foot one-
story retail building (Goodwill Store) with 75 off-street parking spaces:
1. Rezone the property from B-1, Limited Business District, to B-2, Retail Business District.
2. Site plan approval for the construction of a commercial retail building with 75 off-street
parking spaces and an onsite stormwater basin.
3. Conditional use permit for the donation drop-off facility along the east side of the proposed
retail building.
The property address is currently 7350 80th Street South, but is recommended to be changed to
7375 Hardwood Court. The proposed retail building is shown on the base map below:
Location Map
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 2 of 13
Planning Commission Review
The Planning Commission held a public hearing on July 22, 2013 for the rezoning and condi-
tional use permit applications. Staff summarized the proposed re-development plan. The Plan-
ning Commission asked the applicant if they had considered other locations in Cottage Grove,
wondered if there is a market in Cottage Grove for this type of retail use, expressed concerns if
the new building becomes vacant, wanted information from the Woodbury Goodwill Store that
might indicate how many Cottage Grove residents shop there, general questions about a side-
walk connecting to the retail property east of the site, and if the proposed building could be
expanded for more tenant space.
The applicant reported that Goodwill has been constructing new stores in many second and
third ring metropolitan communities and Cottage Grove has been considered for several years.
Cottage Grove demographics are comparable to other community demographics where new
Goodwill stores were constructed. The applicant explained that new Goodwill Stores are archi-
tecturally designed to blend in with other major retailers and have a business plan that supports
the ongoing maintenance and operations. The proposed landscaping plan will enhance the vis-
ual appearance of the site and will be an improvement as compared to the site's existing condi-
tions. The applicant said Goodwill has no plans to sell the building or vacate the site, but the
building's design can easily be reused for other retail uses. The proposed development plan
maximizes the building size and provides adequate off-street parking, landscaping, and on-site
detention of stormwater runofF. The applicant stated that proposed development plan does not
provide any opportunities to construct an addition onto the building for more retail businesses.
The Commission acknowledged that older Goodwill Stores in other communities have different
market, image, and shopping experiences. In growing and more productive communities, mer-
chandise is reflective of the community that a Goodwill Store is located in. Merchandise from
other Goodwill Stores is moved to other stores to balance other communities' needs. In closing,
the applicant stated that other retailers respect Goodwill Stores, recognize they run a first class
operation, and will reflect the community they are in. The applicant said the only other site they
know of in Cottage Grove that Goodwill considered was the Home Depot redevelopment pro-
posal in the Grove Plaza Shopping Center. Since the former Coldwell Burnet site was for sale
and the Home Depot redevelopment proposal was not proceeding forward, Goodwill decided to
move forward with redeveloping the former Coldwell Burnet property.
Survey information from the Woodbury Goodwill Store indicating where customers are from is
not available. The Woodbury Goodwill Store said they do not ask for the customers' zip code.
The Goodwill Corporate Office explained that their check-out registers do have the ability to in-
put zip code information, but they do not utilize that function. For this reason, Goodwill is not
able to provide information about the percentage of customers shopping at the Woodbury
Goodwill Store that are Cottage Grove residents.
The Planning Commission unanimously recommended that the former 7350 80th Street prop-
erty be rezoned from B-1 to B-2 and unanimously recommended to the City Council that the site
plan and conditional use permit applications are approved, subject to certain conditions. The
findings of facts supporting the rezoning request and the conditions approving the site plan and
conditional use permit as documented in the Planning Staff Report are included in the attached
draft resolution. An excerpt from the Planning Commission's unapproved minutes is attached.
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 3 of 13
Ordinance Requirements
This parcel is currently zoned Limited Business District (B-1). The B-1 District was intended to
provide administrative and related office uses with more restrictive controls since they might be
reasonably close to residential uses. The applicant is requesting that the property be rezoned to
B-2, Retail Business, since the property is currently surrounded by other commercial properties
that are zoned B-2. The B-2 District is for retail sales and service types of businesses. The pro-
posed retail store is consistent with the B-2 zoning classification.
All the proposed building and off-street parking setbacks comply with the B-2 zoning district's
minimum development standards.
Planning Considerations
Existing Conditions
The site is currently occupied by a two-story office building, constructed in 1986. The existing
building will be demolished and the parking lot removed as part of this redevelopment proposal.
The layout of the existing building and parking area is shown below:
�
�
��.'�
!„
.
_ _ - - -- --
,; . -�- _ _ - i
� � , . �
� . 1fARpw�OQ C��,RT �
'S, ' '
O
�
Q 4 �
.�y .
� �
�
�, � ____�,,
� . ���, �
� � ��. �
,.
�,
� � �
. E: � r ,,,.,
�.._
t�� J
.�fi 9 t
E' ° M --
�-� � .,t ;�
f-:
. `" � i � �
,� i� �� ��� �iyy �
` y j w
; a
7��0 �
f ' �
� M � �
� �
� / , .-
I ,, �'��� z
��� �� � �. - �
�"� 80th STREET
�
�
� �e - �-�
r�� � � � � ����
,
, I; , ( t � 4, {
tt Ti' . r ,- — - r � . s' --�i
r►� P � �r � ���
r ����RC fE�Q��f� �F�
,� �
�
�
, ., _ �. . __ .
i _. .. t: �L.�� •• . ... , -i.��� � �
S - a �..
— _ e _ � � '� :-� —� -a -���i �._` _ ��, �., ti.
Existing Conditions
Comprehensive Plan - Future Land Use Designation
The future land use map in the City's Future Vision 2030 Comprehensive Plan shows this prop-
erty with a commercial land use designation. This land use designation is consistent with the
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 4 of 13
existing B-1, Limited Business, and requested B-2, Retail Business, zoning classifications. Other
properties north, west, south, and east of the subject property also have a commercial land use
designation. Rezoning this parcel to B-2 is still conforming to the commercial land use designa-
tion in the Comprehensive Plan. An excerpt from the Future Land Use Map showing the desig-
nated land uses surrounding the subject property is shown below.
Zoning
The B-1 and B-2 zoning classifications are consistent with the commercial land use designation
shown on the Future Land Use map of the City's Future Vision 2030 Comprehensive Plan. The
proposed rezoning and redevelopment of this property for retail commercial use is consistent
with the approved Comprehensive Plan.
Properties surrounding the subject property are currently zoned B-2, Retail Business District.
City staff supports the request to rezone the subject property to B-2. An excerpt from the City's
Official Zoning Map showing the zoning districts surrounding the subject property is below:
Excerpt from the Future Land Use Map — Future Vision 2030 Gomprehensive Plan
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 5 of 13
Proposed Development Plan
The applicant is requesting site plan approval to construct a 19,387 square foot retail building on
the east-central portion of the 2.38 gross acre site (approximately 2.04 net acres once the 80th
Street right-of-way is subtracted). The existing two-story office building will be demolished and
the existing parking lot will be removed. The proposed 75 parking spaces will be placed on the
north, west, and south sides of the new building.
The site will be graded to accommodate the construction of this new commercial building and to
provide a stormwater basin on the property. The proposed stormwater basin will be located in
the northwest corner of the site. A series of retaining walls ranging from one to nine feet in
height will be constructed between the west parking lot and stormwater basin. Another retaining
wall will be constructed above the top tier of existing retaining walls along the south side of the
south parking lot.
A fence is required along the upper level of any retaining wall that is four or higher. Because the
property is within the Gateway District, the fence design is required to be a black-colored com-
mercial strength welded steel panel. Existing fences in this area used black-colored Montage
Commercial Majestic 3/4 - Rail Fence manufactured by Ameristar. The design and materials of
any fencing on the subject property must match the specifications of the Montage Commercial
Majestic 3/4 - Rail Fence.
The illustrations below simulate the appearance of the site and retaining walls from Hardwood
Avenue and 80th Street.
Excerpt from the City's Official Zoning Map
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 6 of 13
View from the Hardwood Avenue and 80th Street Intersection Looking Northeast
View along 80th Street Looking North
View along 80th 5treet Looking to the Northwest
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 7 of 13
View from the Hardwood Court and Hardwood Avenue Intersection Looking to the Southeast
�� .
� _ �
Overhead View of the Site
���„�.s�� � -_���_ \
The westerly access drive on Hardwood Court will provide two-way access for motorists to enter
and exit the site. The public donation drive-thru drop-off is located on the east side of the build-
ing. The drop-off is completely enclosed. Overhead doors will be installed on the north and
south sides of the drop-off to allow motorists to exit onto Hardwood Court. The drop-off point
adjoins the indoor warehouse area of the building. When the donation drop-off is closed, motor-
ists must use the two-way access drive to exit the site.
Commercial vehicles accessing the loading docks will enter the two-way access drive and back
into the loading dock area located on the north side of the building. These vehicles will then exit
out the west access drive onto Hardwood Court. A copy of the site plan is shown below.
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 8 of 13
,
.,. . . ` - "'� � "4��'..
",FisY ." ' �.. , i '�' `: -:
� ,
,�,� � .
' , � „ , �Ei=�
Y .'.. �� Y N ;}f .��:. .
�i�. . ... _ k f -. �T K � � ` -;•�. 1 AS� . . . 4 .
�'� ��.��± e .�.... ��; ,� + L 1 ,, ,
aat .`+_ ' � r q
ya♦ 1 i .
� 1 • °SF�1e rs � 1. � {
i�s j.•�`'�ia'SZ�Ci�' � � -, -�_ , f
� ' . �� �� , , . � .titir . ti : � �`�— - -
�
� /� �';�' 4 :"c� �- �" _
r .5, i
�,� :� � .r, .. q � t�.
Y � � , ±
� �' = _�
¢, 1 �} ��� � .fS i
.� � y � ' :
4 '" '�. �1��:+. , A'.
i y
� , Fti
•.� ,� , a � �.+, .
}4 ` t.,,4t S i 4: � � y �� ',�.
, �'!r'i! '� y ,i�
N
., .. 1 ;�'-' ��
\ �� i y
1 � i
t� ' 47 �I
1 � 1 �1 ~�
� a
�F .x'_
�� `'� '�� ? "� � �'�
'a�
�
�,
�I
i.
y .
r
� i
a �3
' .
� � ' y '
�� :;p5 �� T • - --.._ . ". ._.
' , 1 t �
_-+v'
. 'Ll
�'�
��
4'�k t4' ``�4 ' � ¢ra;�� i �
.7' � �f : a
.� •
,
° `� �,' ` _'
- r . ..'"'
.� '.� '� '�• �
i' �
k
4� �,1 �
l��:
�
. . � .'I.'I �. .- . ' � : �'.L'.� �;;:::.
.. -
- t.x-
e . ...�
� —.—. "_'� '_'__ __�, _.�.:._:_ : ............. __. � �. :_
_ f*dIN tTR1.Ek ° .7�,�IFI
i.
l� T l -.
�' : 1 . . . .. ... . ....... . .
�
. .�. �. ' � �Z � _ _a..
�� � �
� �.�� � �� �� ! �t �I
� 1� i r� r _'
tl< 'M��. �.� .
�
€
�� J
.aa.�
�
� F; �
• { t
i f .•k� ,�
�_ ' ' �
Site Plan
Architectural Compliance
There is one customer entrance into the building located on the south side. The proposed
building provides some visual articulation with the use of columns at the main building entrance.
This visual articulation is enhanced through the use of storefront windows, a prefinished flush
seam metal panel canopy above, decorative cornices, as well as a parapet wall. The parapet
walls on all four sides of the building are accented with tan EIFS diamond accents. The store-
front windows are bordered with anodized metal frames.
The combination of brick, block, and exterior insulation finish system (EIFS) materials accent
elements that are incorporated into the building's design provide visual interest to the building.
The bottom half of the building is constructed of "misty grey" utility face brick and a"coral blend"
utility brick upper half. The top portion of the building is constructed with a rusty-brown colored
EIFS material.
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 9 of 13
� j � � ��� { - � ' � �_I -� --- PREFINISHEDMETALCAPFLASHING
---� __--.--_ --� �-"�—�.�__ .
� -- � - � � - `-� - _� -' EIFS COLOR I
. -..-- .-_.--- ----- —7
�' - � � � : - ''`-_ �-"'- EIFS COLOR 2
: . . . i . . . � . . . . �: . . .� -
— ! � � � � - UTIUTY FACE BRICKCOLOR 1
i : � �'`-- �'--' U'fILITYFACEBNICKCOLOR2
- — 1"INSULATED ALUMINUM GLAZJNG
C ± t10k1N E�
1
�, . ; j . i 1, ; �_�1_ }
t�.. . ._...._. .._ -.----
, I I 1
(3 \CAST ELEVATION
� t--�I .. . ...
OVERHEADDOORS '— !- �-, - � L
i � . '-,� -� �
CONCRETEBASE ,��-� .� . .,
� -� .--�---
� l ,_
_ _ _._
i
, � ,
__--- � � PREFINISHEDMETALCAPFLASHING
� - . _ � �---- - - EIPSCOLORI
- - � - ___- UTILRYFACEBRICKCOLORI
-� � � � ' { _ UTIL(TYFACEBRICKCOLOR2
� .
-- - r - - i -. _. --
i'_ .F__ -_..��__-_._ 1 '_' .4�__�
C Z N'E5� T CLEVA710N
SIGNAGEBYTENANT . .. ... ------
PREFINISHED FLUSH SEArd --_ - �. , i ��}.�� d - "-
METAL PANEL CANOPY � -. — --..1- - � � . - ! . - � _ : - '�_r + - - t � -- � - �-
� - , , - -; � . �- �T I= � , =
{. - - - 7 - .. .. �- � i
� _ i !�1 �=: y�� -�`��'�-��:. �-
��_ `
{ � S� OUTN CIEVFTION __ _ _
Building Elevations
— PREFINISHEDMETALCAPFLASHING
-� EIFS COLOR 2
— EIFS COLOR 1
— UTILITY FACE BWIXCOLOR 1
UTILITY FACE BRICKCOLOR 2
1°INSULATED ALUh11NUM GLAZING
� - PREFINISHEDMETALCAPPLASHING
_- �fSCOLOR2
— - � EIPS COLOR 1
� --- UTILITY FACE BRICK COLOR 1
UTILITY FACE BRICK COLOR 2
Because of the parapet wall design, the roof-top mechanical equipment will be screened from
public view on the west and south sides of the property. The roof-top equipment might partially
be visible from the higher elevations of the adjoining property to the east and from Oakwood
Park. The single-story building is 20 feet in height across the south and east elevations. To pro-
vide uniformity to the building's exterior, it is recommended that the EIFS — Color 1 material
extend across the north, east, and south sides of the donation drop-off part of the building.
Signage
The applicant is proposing wall signage above the awning in the center of the south elevation
(main entrance) of the building. Wall signs are permitted on elevations with street frontage, as
well as above the main entrance. The proposed wall signage appears to comply with City code.
A free-standing monument sign exists at the northwest, southwest, and southeast corners of this
site. The applicant is proposing to remove the monument sign near the northeast corner of the
site and continue to use the two other monument signs. These monument signs were allowed
on the property per the agreement between 1501 Properties and the City in 2003. These
monument signs are on the applicant's property and belong to the property owner. The occu-
pant of this new building is allowed to advertise on the two remaining monument signs and is
responsible for their maintenance and utility costs.
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 10 of 13
Parking
Twenty-five percent of the 19,387 square feet of gross floor area will be used for storing and
processing donated materials. The donation drop-off center is 683 square feet. The balance of
the floor area devoted to the sales floor, offices, mechanical room, and restrooms is approx-
imately 13,532 square feet. City ordinance requires one parking space for each 200 square feet
of retail space. This equates to 68 parking spaces. The site plan shows 75 parking spaces on
the site. All parking spaces and drive aisle widths comply with city regulations.
All the parking spaces and drive aisles will be hard surFaced with concrete curb and gutter along
the perimeter of the parking lot. Each of the parking spaces will be striped to delineate each
parking stall and handicap spaces.
A bike rack is proposed at the southwest corner of the building.
Loading and Refuse Area
The loading dock and refuse container is located on the north side of the building. The green
space between the 11 parking spaces north of the loading dock area and Hardwood Court will
be densely planted with six-foot tall black hill spruce trees. The purpose of these conifer trees is
to mitigate the public view of the loading dock area from Hardwood Court.
The turning movement into the site and loading dock for a semi-tractor/trailer combination is
sufficient to enter/exit the site and to back into the loading dock area. A trailer will periodically be
parked at the loading dock to load and unload merchandise.
The public drive-thru drop-off is located on the east side of the building. This drop-off enclosure
will permit donated materials to be retrieved from the vehicle and will provide cover from incle-
ment weather. During closed business hours, overhead doors on the south and north sides of
the enclosure will be securely closed.
Landscaping
The minimum open space requirement is 20 percent of the net (minus the stormwater basin)
land area. The proposed development plan provides 32 percent open space. The landscaping
plan proposes the planting of 25 overstory deciduous trees, 23 conifer trees, 55 large shrubs, 55
small shrubs, and numerous perennials on the perimeter of the site. The proposed quantities
meet the minimum landscaping requirements for plantings. Staff recommends that the
landscaping plan be accepted as proposed. The landscaping plan is shown below:
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 11 of 13
�� �,,r.�_ ...�s r ��` v �
_... ..� �
` -.�. ,�- ' �.:! °", a ,.r5.� �
y `� ` �, � � _
['F s'
�' t - ..r� . ! Yi
�...�.°" . ... � -
i �i � a
� ' ; °- � �. t�. �ff�iC� V ' . ' ,.
�� 5 �� � ��:r~' Kt � Ls� 7 ` � '� -� �< _ �'�' � ��[ s; �: �,� �' .
,� � � tit � � ,� . �
r � �. 1t 5ti.;�C�e't3°`r�� �y' 4" ti'�}`�`Ct„ �' t._., �� r
4'+ �j a �. � , �^._ ` S �. _ � � ,. . .. .
.�,.�'� r*-c 1 r . • " :. 's� °�� �
` �y� a�'i.�r� r ' 4 ' � ��.e,. ( �l � ._
. .n��{?'���� , . ..r�i : �'. � �x ,_ . . � ....: � a� kL-�. _ "'�'' —
_� . . ,
� :. . ... ...
Landscaping Plan
Grading
The existing retaining walls along 80th Street and east property line are not planned to be dis-
turbed. The applicant's consulting engineer will be responsible in evaluating the stability of all
existing retaining walls. If an existing retaining wall or portion of wall is determined to be un-
stable or unsuitable, then that wall or portion of retaining wall must be reconstructed.
Demolition of the existing two-story structure and parking lot is necessary for re-grading the site
to accommodate the appropriate building pad elevation and creating an onsite stormwater
basin. Because of the site's topography, additional retaining walls must be constructed to
accommodate building, parking, and stormwater facilities.
The applicant provided a drainage plan and stormwater calculations for this proposed develop-
ment plan. The City's consulting engineer (Stantec) has provided general comments based on
the applicant's development plan and stormwater calculations. A copy of their letter is attached.
The stormwater basin will not be an infiltration basin of stormwater. For this reason, it will be
necessary that a clay material must be deposited at the bottom of the basin to prohibit infiltra-
tion. The property owner of this site will be responsible for the on-going maintenance of the
basin. A document outlining the scope and frequency of maintenance for this basin must be
submitted with the building permit application.
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 12 of 13
�'
� Y �;� , "xi , ., r�' f � _: ;
. :.. �
;., }i . �. .. . .�: - P #.k 7 I• '*�� � k
�,�Y � u � `a �t�' "�'` _
: _, .
. .
ke s - T •,,, ,� s .
� _< ° -�_� ' � " ._ .
� _e-0-` I � �, F,,,r�"� � � AL'iF'C�;rf2 x d r` ` . - _
i�'� _ �_ < ,,,� �
� , . ". _ • > � . ' 4 ;jia ' ..
: . ., � A r,�
,;
t-
,. ,�� a. � ,
' ��:�� ��-���_� ° ... _ � �. , �' ,�� � � � ,,� -' -�
� �: , ..�. � . � ` � �
*�
�� *,
,.�:
�'•.,
�
t
Grading Plan
Utilities
The subject property is within the Metropolitan Urban Service Area (MUSA). The current sani-
tary sewer and water services connect to city utilities located in 80th Street. With the redeve-
lopment of this site, the utility connections will be abandoned to 80th Street and connect to
existing utility stubs that are located in Hardwood Court. All city utilities in this vicinity will provide
the necessary capacities to serve this proposed commercial structure. Development fees and
charges for redeveloping this site will be added to the building permit.
Public Hearing Notices
A public hearing has been scheduled for the Planning Commission meeting on July 22, 2013. A
notice announcing this public hearing was published in the South Washington County Bulletin
on July 10, 2013. Public hearing notices were mailed to 16 neighboring property owners on July
11, 2013.
Recommendations
"' .'°—,� __w. . � ;,�, ,
- •�... o:�
�:� -� -
.
_._
6. o ��
���"� 1_, __� - �--
That the City Council accepts the Planning Commission's recommendations in approving 1501
Partnership's rezoning, site plan, and conditional use permit applications to re-develop the
property located at 7350 80th Street by approving the following:
Honorable Mayor, City Council Members and Ryan Schroeder
1501 Partnership Planning Applications — Proposed Goodwill Project
July 29, 2013
Page 13 of 13
An ordinance amending the City's Zoning Map to rezone approximately 2.38 acres (PID
08.027.21.34.0017) from B-1, Limited Business District to B-2, Retail Business District; and
2. A resolution authorizing the publication by title and summary of the ordinance amending
City Code Title 11-1-6, Zoning Map; and
3. A resolution approving the site plan and conditional use permit applications to redevelop
the property at 7350 80th Street for a one-story commercial building having approximately
19,387 square feet of gross floor area with 75 off-street parking spaces as depicted on the
development plans with a July 18, 2013 revision date.
The findings of fact and conditions of approval as recommended by the Planning Commission
were incorporated in the attached draft ordinance and resolution for your consideration.
ORDINANCE NO. XXX
AN ORDINANCE FOR THE CITY OF COTTAGE GROVE, MINNESOTA
AMENDING CITY CODE SECTION 11-1-6, ZONING MAP, VIA REZONING
CERTAIN PROPERTY LOCATED AT 7350 80TH STREET SOUTH FROM
B-1, LIMITED BUSINESS, TO B-2, RETAIL BUSINESS
The City Council of the City of Cottage Grove, Washington County, Minnesota, does ordain
as follows:
SECTION 1. AMENDMENT. The City of Cottage Grove's Official Zoning Map as refer-
enced in Section 11-1-6 of the "Code of the City of Cottage Grove," County of Washington,
State of Minnesota, shall be amended by rezoning certain property with property identifica-
tion number being 08.027.21.34.0017 from B-1, Limited Business, to B-2, Retail Business.
Said property is legally described below:
OTL GATEWAY NORTH 1ST TOG W/THAT PT S 330FT OF W 593.91FT SE1/4-
SW1/4 82721 LYING ELY OF LN 60FT NELY OF FOLL DESC LN:BEG @ PT ON
S LN SD1/4-1/4 1010.23FT WLY FROM SE COR SD SE1/4-SW1/4 THN NLY
@RT ANG TO SD S LN 29.69FT THN NWLY 310.76FT ALG TCRV TO FT RAD
380FT CENT ANG 46DEG51'23"NWLY TANG TO SD CRV 85.69FT & SD LN
THERE TERM LOT D SUBDIVISIONCD 00965 SUBDIVISION NAME GATEWAY
NORTH FIRST ADD
Commonly known as 7350 80th Street South, Cottage Grove, Washington County,
State of Minnesota.
SECTION 2. REZONING. The Official Zoning Map shall be amended by changing the
zoning classification of the property legally described above from B-1, Limited Business, to
B-2, Retail Business, based on the following findings:
A. The purpose statement for the B-2 District accurately describes the best land
use for this corner lot.
B. The B-2 zoning classification currently surrounds the subject property.
C. The subject property is on the northeast corner of Hardwood Avenue and 80th
Street, both with a minor arterial roadway functional classification.
SECTION 3. EFFECTIVE DATE. This ordinance amendment shall be in full force and
effective from and after adoption and publication according to law.
Passed this 14th day of August 2013.
Myron Bailey, Mayor
Ordinance No. XXX
Page 2
Attest:
Caron M. Stransky, City Clerk
Published in the South VI/ashington County Bulletin on [Date].
RESOLUTION NO. 2013-XXX
RESOLUTION AUTHORIZING THE PUBLICATION OF
ORDINANCE NO. XXX BY TITLE AND SUMMARY
WHEREAS, the City Council of the City of Cottage Grove adopted Ordinance No. XXX,
to amend City Code Title 11-1-6, Zoning Map, to rezone certain property located at 7350 80th
Street South (PID 08.027.21.34.0017) from B-1, Limited Business District, to B-2, Retail
Business; and
WHEREAS, Minnesota Statutes, Section 412.191, subd. 4 allows publication by title
and summary in the case of lengthy ordinances; and
WHEREAS, the City Council believes that the following summary would clearly inform
the public of the intent and effect of the ordinance.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Cottage
Grove, County of Washington, State of Minnesota, that the City Clerk shall cause the following
summary of Ordinance No. XXX to be published in the official newspaper in lieu of the entire
ordinance:
Public Notice
The City Council of the City of Cottage Grove has adopted Ordinance No. XXX. The
ordinance amends City Code Title 11-1-6, Zoning, to rezone certain property located
at 7350 80th Street South (PID 08.027.21.34.0017) from B-1, Limited Business
District, to B-2, Retail Business. The full text of Ordinance No. XXX is available for
inspection at Cottage Grove City Hall during regular business hours and is posted at
the Washington County Park Grove Library.
BE IT FURTHER RESOLVED that a copy of the ordinance will be kept in the City
Clerk's office at City Hall for public inspection and that a full copy of the ordinance be posted in
a public place in the City.
Passed this 14th day of August 2013.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
RESOLUTION NO. 2013-XXX
A RESOLUTION APPROVING A SITE PLAN REVIEW OF A 19,387 SQUARE
FOOT RETAIL BUILDING AND A CONDITIONAL USE PERMIT TO ALLOW A
DONATION DROP-OFF FACILITY AT 7350 80TH STREET SOUTH
WHEREAS, 1501 Partnership has applied for a site plan review of a 19,387 square foot
retail building with 75 off-street parking spaces and an on-site stormwater basin and a condi-
tional use permit to allow a donation drop-off facility, on property legally described as:
OTL GATEWAY NORTH 1ST TOG W/THAT PT S 330FT OF W 593.91FT SE1/4-
SW1/4 82721 LYING ELY OF LN 60FT NELY OF FOLL DESC LN:BEG @ PT ON S
LN SD1/4-1/4 1010.23FT WLY FROM SE COR SD SE1/4-SW1/4 THN NLY @RT
ANG TO SD S LN 29.69FT THN NWLY 310.76FT A�G TCRV TO FT RAD 380FT
CENT ANG 46DEG51'23"NWLY TANG TO SD CRV 85.69FT & SD LN THERE
TERM LOT D SUBDIVISIONCD 00965 SUBDIVISION NAME GATEWAY NORTH
FIRST ADD
Commonly known as 7350 80th Street South, Cottage Grove, Washington County,
State of Minnesota.
WHEREAS, the applicant also applied for a zoning amendment to change the zoning of
the property described above from B-1, Limited Business, to B-2, Retail Business; and
WHEREAS, public hearing notices were mailed to property owners within 500 feet of the
property and a public hearing notice was published in the South Washington County Bulletin; and
WHEREAS, the Planning Commission held a public hearing on July 22, 2013; and
WHEREAS, a planning staff report, which detailed specific information on the property and
the application request was prepared and presented; and
WHEREAS, the public hearing was open for public testimony. The applicant attended
the public hearing. No written or oral testimony was received; and
WHEREAS, the Planning Commission unanimously (7-to-0 vote) recommended approval
of the applications, subject to certain conditions listed below.
NOW, THEREFORE BE IT RESOLVED, the City Council of the City of Cottage Grove,
Washington County, Minnesota, hereby approves the site plan review of a 19,387 square foot
retail building with 75 off-street parking spaces and an on-site stormwater basin and a condi-
tional use permit to allow a donation drop-off facility, located on the property legally described
above, subject to the following conditions:
All applicable permits (i.e.; building, electrical, grading, mechanical) and a commercial
plan review packet must be completed, submitted, and approved by the City prior to the
Resolution No. 2013-XXX
Page 2 of 4
commencement of any construction activities. Detailed construction plans must be
reviewed and approved by the Building Official and Fire Marshal.
2. The applicant receives building permits from the City of Cottage Grove prior to con-
struction.
3. Final drainage plans must be submitted to the South Washington Watershed District for
review.
4. Irrigation shall be provided for all sodded and landscaped areas, including the curbed
landscaped island interior to the parking lot. The irrigation system shall consist of an
underground sprinkling system that is designed by a professional irrigation installer to
meet the water requirements of the site's specific vegetation. The system shall be
detailed on the landscape plan.
5. Concrete aprons for all private access drives shall be constructed per City
requirements.
6. All site lighting must meet City Code requirements. All light fixtures must be downward
directed with cut-offs. The specifications of all light fixtures must be provided with the
application for a building permit.
7. Final architectural plans, lighting details, and exterior construction materials and colors
must be reviewed and approved by the Planning Department prior to the issuance of a
building permit.
8. The grading and erosion control plan for the site must comply with NPDES II Permit re-
quirements. Erosion control devices must be installed prior to commencement of any
grading activity. Erosion control must be perFormed in accordance with the recom-
mended practices of the "Minnesota Construction Site Erosion and Sediment Control
Planning Handbook" and the conditions stipulated in Title 10-5-8, Erosion Control Dur-
ing Construction, of the City's Subdivision Ordinance.
9. The applicant must provide the City with an as-built survey of all private utilities prior to
issuance of certificate of occupancy.
10. All mechanical equipment screening and trash enclosures must include a combination
of block and brick, consistent with the principal building.
11. The drive-thru shall not cause negative traffic impacts on public or private property.
12. The EIFS — Color 1 material is required to be constructed across the upper one-third of
the north, east and south sides of the donation drop-off part of the building.
13. Construct a six-foot wide concrete sidewalk along Hardwood Court, between Hardwood
Avenue and the easterly end of Hardwood Court.
Resolution No. 2013-XXX
Page 3 of 4
14. Construct a concrete walkway between the south parking lot and the Oak Commons
south parking lot, subject to the approval of the Oak Commons ownership.
15. A demolition permit is required for the removal of the existing structure.
16. Storm sewer pipe must be reinforced concrete pipe (RCP)
17. Utility and drainage easement over the stormwater basin shall be granted to the City.
18. An outdoor lighting plan must be submitted to the City for review and approval. All out-
door lighting fixtures must direct light in a downward direction.
19. Property address shall be 7375 Hardwood Court South.
20. Retaining walls greater than four feet in height shall be designed by an engineer and
submitted to the City Engineer for review and approval.
21. Dedicate to the City the southerly 66 feet of the property for public right-of-way
purposes.
22. The applicant is required to comply with the recommendations cited in the Stantec's
letter dated July 11, 2013.
23. The applicant is responsible in removing debris from Hardwood Court and Hardwood
Avenue during their grading and construction process. These streets shall be swept
clean daily or as needed.
24. The property owner is responsible for maintaining the stormwater basin. A document
outlining the scope and frequency to maintain this basin must be submitted with the
building permit application.
25. The design and materials of any fencing on the subject property must match the speci-
fications of the Montage Commercial Majestic 3/4 - Rail Fence. A fence is required
along the higher elevation of a retaining wall that is four feet or higher.
26. A"STOP" sign shall be installed at each exit drive. Each sign shall be ten feet from the
roadway edge and two feet from the driveway edge. The bottom of the sign shall be six
feet from the ground. The "STOP" sign shall be a 30-inch sized sign having a high inten-
sity face. Said sign shall be mounted on a 6-foot — No. 3 and 8-foot — No. 2 steel post.
The applicant may request the City's Public Works Department to install said "STOP"
signs, but must reimburse for actual costs incurred by the City.
27. Installation of landscaping shall occur in a timely fashion and be consistent with an ap-
proved plan. A letter of credit in the amount of 150 percent of the landscape estimate
shall be submitted to the City as required by City ordinance (Section 28-41(I)). The
financial guarantee shall be in effect for one year from the date of installation to ensure
the installation, survival, and replacement of the landscaping improvements.
Resolution No. 2013-XXX
Page 4 of 4
28. Irrigation shall be provided for all sodded and landscaped areas. The irrigation system
shall consist of an underground sprinkling system that is designed by a professional irri-
gation installer to meet the water requirements of the site's specific vegetation. The
system shall be detailed on the landscape plan.
29. Roof-top mechanical units shall screened as required in 11-6-4 of the City's Zoning
Ordinance.
30. The exterior color of the overhead doors for the drop-off donation drive-thru shall be a
color that is similar and complimentary to the color scheme for the exterior walls of the
building.
31. The area charges, connection charges, and related development fees and charges will
be added to the building permit fee.
32. Approval of the site plan and CUP applications are subject to the rezoning of the prop-
erty from B-1, Limited Business District, to B-2, Retail Business District.
Passed this 14th day of August 2013.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
EXCERPT FROM UNAPPROVED MINUTES OF THE
PLANNING COMMISSION MEETING ON JULY 22, 2013
6.3 Goodwill — Cases ZA13-024, SP13-025, CUP13-026
1501 Partnership has applied for a zoning amendment to change the zoning of the prop-
erty at 7350 80th Street South from B-1, Limited Business, to B-2, Retail Business; a site
plan review of a 19,387 square foot retail building; and a conditional use permit to allow a
donation drop-off facility.
McCool summarized the staff report and recommended approval of all the applications,
based on the findings of fact and subject to the conditions stipulated in this staff report.
John Johannson, Welsh Companies, 4350 Baker Road, Minnetonka, introduced Chris
Simmons, one of his partners; Mr. Burnett, the property owner; Mike Brandt, an engineer
with MFRA; and John Patterson, with Fendler & Patterson. Johannson stated that in general
they found the staff report to be thorough and accurate and they agree to the conditions. He
pointed out the western driveway onto Hardwood Court is a full access point; the other,
which is lined up with the donation center, is intended to be a one-way exit only. The front
entry faces south. The pond is new; when this property was developed, stormwater was not
a large issue. Mr. Brandt has spent considerable time in discussions with the Watershed
District, and they believe that the SWWD's conditions and requests for changes can be ac-
commodated. They also are agreeable with the EFIS change. He noted that they are not
asking for signage with these applications; that will be a separate permit. He believes that
Goodwill will request a sign on the western side of the building so it is visible from the high-
way interchange. The renderings in the application are not intended to represent all the
signage, but they will comply with the City Code.
Johannson asked if the proposed sidewalk along Hardwood Court would be installed within
the right-of-way. McCool responded yes. Johannson stated that their adjusted drawings
show the sidewalk going from the corner of Hardwood Avenue and Hardwood Court east to
the end of their property line, and asked for clarification of the condition. McCool stated that
the property line extends further east. It is about 20 feet short of the cul-de-sac of Hardwood
Court. Staff's recommendation is to have the sidewalk all the way from Hardwood Avenue to
the east end of their property. Johansson agreed to the sidewalk location. He pointed out
that one of the conditions lists "Harkness" and asked if that should say "Hardwood." McCool
responded yes and it will be changed. Johannson then provided background information on
Goodwill.
Brittain asked for more information on EFIS materials, including if the face would be uniform
or appear to be brick, if the wall itself would have some sort of pattern on it, and is it a pre-
fabricated wall or a solid flat shape with a color in it. John Patterson, Fendler & Patterson,
20341 Fairlawn Avenue, Prior Lake, explained that the building face is a combination of
brick, block, EFIS, and a couple bands of natural stone. The building face jogs in and out to
give it interest. It does not have a flat face and is not a prefabricated wall. Brittain asked if the
EFIS areas are large sheets or a veneer material. Patterson responded that it is a veneer
material on top of the concrete block. Brittain asked if the material comes in a brick size or is
it a big sheet size they cut out. Patterson explained that EFIS is stucco; it has insulation and
is troweled on for texture.
Excerpt from Unapproved Planning Commission Minutes
Goodwill — Cases ZA13-024, SP13-025, CUP13-026
July 22, 2013
Page 2 of 5
Rediske asked what the elevation difference is between the current hill and the proposed.
Patterson explained that the hill will be graded down slightly. Rediske asked if there is a de-
mand in Cottage Grove for a Goodwill or thrift store. Patterson responded that the board
determines which cities they feel a Goodwill store should be located in. Cottage Grove has
been a target for a number of years. Rediske asked what the demographics of the Goodwill
market are and will this one be similar to the Woodbury store. Patterson answered that all
their stores are the same. They get new and semi-used products. Rediske stated that she is
concerned about a Goodwill store being located on a focal point in the City and then deteri-
orating into one of the older Goodwills. Patterson responded that Goodwill has a new image
and the buildings that were built in the last eight or nine years are well kept and very clean.
Their leases generally are 10 years with a couple five year options, and the buildings are de-
signed for re-use. Johannson stated that the costs of new development are significant.
Goodwill has recently expanded to Maple Grove, Woodbury, St. Louis Park, and Edina. The
merchandise in their stores is reflective of the community. Their recent growth has been in
productive second ring suburbs with a responsible, desirable demographic. They have had
numerous requests from consumers to come to Cottage Grove. They also do research on
where they could locate a store. Rediske asked if there are any statistics on what percentage
of the Woodbury store's customers are from Cottage Grove. Johannson stated that he try to
find that information. Rediske asked if there would be room on the site for additional busi-
nesses. McCool responded only for the proposed building. Rediske asked if there would be a
sidewalk from the new building to the neighboring commercial building. McCool responded if
the adjoining property owner agrees, stafF would add a requirement that a sidewalk connect
to the parking area of the adjoining property.
Brittain asked about the grade between the two parking lots. McCool responded it is about
three feet, but there is a 20-foot span of green space between.
Harter asked if they are changing the image of Goodwill to make it more like a Savers.
Johannson responded that in the retail industry Goodwill has become a desirable user and
tenant. It is a use that other retailers respect; they don't run from Goodwill. Goodwill runs a
first-class operation and their stores reflect the community. They are a professional retailer
whose board of directors are executives with other retailers.
Rostad opened the public hearing. No one spoke. Rostad closed the public hearing.
Rostad asked for details on the retaining walls. McCool responded that they will look at the
existing walls to make sure they are structurally sound. Johannson stated that they are going
to look at the walls and make any necessary repairs. They will also refresh and maintain the
landscaping on the site. They would like to either paint or screen the large transformer on the
corner.
Rediske made a motion to recommend approval of the zoning amendment based on
the findings listed below. Harter seconded.
Findinps of Fact:
A. The purpose statement for the B-2 District accurately describes the best land use
for this corner lot.
Excerpt from Unapproved Planning Commission Minutes
Goodwill — Cases ZA13-024, SP13-025, CUP13-026
July 22, 2013
Page 3 of 5
B. The B-2 zoning classification currently surrounds the subject property.
C. The subject property is on the northeast corner of Hardwood Avenue and 80th
Street, both with a minor arterial roadway functional classification.
Motion passed unanimously (7-to-0 vote),
Rediske asked if the motions are passed tonight, will she receive a response to her question
regarding the number of Cottage Grove residents shopping at the Woodbury store. McCool
replied that staff will follow up on those questions for the Commission. Rediske asked if they
had looked at alternative locations in the City. Johannson responded that they looked at the
Home Depot parcel, the area by Target, and the new development by the Walmart. They
decided they preferred the 80th Street trade area.
Brittain made a motion to recommend approval of the site plan review of the retail
building and conditional use permit for a donation drop-off facility, subject to the
conditions listed below. Pearson seconded.
1. All applicable permits (i.e.; building, electrical, grading, mechanical) and a com-
mercial plan review packet must be completed, submitted, and approved by the
City prior to the commencement of any construction activities. Detailed con-
struction plans must be reviewed and approved by the Building Official and Fire
Marshal.
2. The applicant receives building permits from the City of Cottage Grove prior to
construction.
3. Final drainage plans must be submitted to the South Washington Watershed
District for review.
4. Irrigation shal/ be provided for all sodded and landscaped areas, including the
curbed landscaped island interior to the parking lot. The irrigation system shall
consist of an underground sprinkling system that is designed by a professional
irrigation installer to meet the water requirements of the site's specific vegeta-
tion. The system shall be detailed on the landscape plan.
5. Concrete aprons for all private access drives shal/ be constructed per City
requirements.
6. All site lighting must meet City Code requirements. Al/ light fixtures must be
downward directed with cut-offs. The specifications of all light fixtures must be
provided with the application for a building permit.
7. Final architectural plans, lighting details, and exterior construction materials
and co/ors must be reviewed and approved by the Planning Department prior to
the issuance of a building permit.
Excerpt from Unapproved Planning Commission Minutes
Goodwill — Cases ZA13-024, SP13-025, CUP13-026
July 22, 2013
Page 4 of 5
8. The grading and erosion control plan for the site must comply with NPDES ll
Permit requirements. Erosion control devices must be installed prior to com-
mencement of any grading activity. Erosion control must be performed in ac-
cordance with the recommended practices of the "Minnesota Construction Site
Erosion and Sediment Contro/ Planning Handbook" and the conditions stipu-
lated in Title 10-5-8, Erosion Control During Construction, of the City's Subdivi-
sion Ordinance.
9. The applicant must provide the City with an as-built survey of all private utilities
prior to issuance of certificate of occupancy.
10. All mechanical equipment screening and trash enclosures must include a com-
bination of block and brick, consistent with the principal building.
11. The drive-thru shall not cause negative traffic impacts on public or private
property.
12. The EIFS - Color 1 material is required to be constructed across the upper one-
third of the north, east and south sides of the donation drop-off part of the
building.
13. Construct a six-foot wide concrete sidewalk along Hardwood Court, between
Hardwood Avenue and the easterly end of Hardwood Court.
14. Construct a concrete walkway between the south parking lot and the Oak
Commons south parking lot, subject to the approval of the Oak Commons
ownership.
15. A demolition permit is required for the removal of the existing structure.
16. Storm sewer pipe must be reinforced concrete pipe (RCP).
17. Utility and drainage easement over the stormwater basin shall be granted to the
City.
18. An outdoor lighting plan must be submitted to the City for review and approval.
All outdoor lighting fixtures must direct light in a downward direction.
19. Property address sha11 be 7375 Hardwood Court South.
20. Retaining walls greater than four feet in height shall be designed by an engineer
and submitted to the City Engineer for review and approval.
21. Dedicate to the City the southerly 66 feet of the property for public right-of-way
purposes.
22. The applicant is required to comply with the recommendations cited in the
Stantec's letter dated July 11, 2013.
Excerpt from Unapproved Planning Commission Minutes
Goodwill — Cases ZA13-024, SP13-025, CUP13-026
July 22, 2013
Page 5 of 5
23. The applicant is responsible in removing debris from Hardwood Court and
Hardwood Avenue during their grading and construction process. These streets
shall be swept c/ean daily or as needed.
24. The property owner is responsible for maintaining the stormwater basin. A
document outlining the scope and frequency to maintain this basin must be
submitted with the building permit application.
25. The design and materials of any fencing on the subject property must match
the specifications of the Montage Commercial Majestic 3/4 - Rail Fence. A fence
is required along the higher elevation of a retaining wall that is four feet or
higher. ,
26. A"STOP" sign shall be installed at each exit drive. Each sign shal/ be ten feet
from the roadway edge and two feet from the driveway edge. The bottom of the
sign shall be six feet from the ground. The "STOP" sign shall be a 30-inch sized
sign having a high intensity face. Said sign shall be mounted on a 6-foot - No, 3
and 8-foot - No. 2 steel post. The applicant may request the City's Public Works
Department to install said "STOP" signs, but must reimburse for actual costs
incurred by the City.
27. Installation of landscaping shal/ occur in a timely fashion and be consistent
with an approved plan. A letter of credit in the amount of 150 percent of the
landscape estimate shall be submitted to the City as required by City ordinance
(Section 28-41(l)). The financial guarantee shall be in effect for one year from
the date of installation to ensure the installation, survival, and replacement of
the landscaping improvements.
28. Irrigation shall be provided for all sodded and landscaped areas. The irrigation
system shall consist of an underground sprinkling system that is designed by a
professional irrigation installer to meet the water requirements of the site's
specific vegetation. The system shall be detailed on the landscape plan.
29. Roof-top mechanical units shall screened as required in 11-6-4 of the City's
Zoning Ordinance.
30. The exterior color of the overhead doors for the drop-off donation drive-thru
shall be a co/or that is similar and complimentary to the co/or scheme for the
exterior walls of the building.
31. The area charges, connection charges, and related development fees and
charges will be added to the building permit fee.
Motion passed unanimously (7-to-0 vote).