Loading...
HomeMy WebLinkAbout2013-10-28 PACKET 06.2.STAFF REPORT CASE: SP13 -031 ITEM: 6.2 PLANNING COMMISSION REVIEW DATE: 10 128113 TENTATIVE COUNCIL REVIEW DATE: 11/20/13 APPLICATION APPLICANT: Rademacher Companies REQUEST: A site plan review of a new 13,000 square foot retail building for G -Will Liquors to be built on 1.67 acres in Norris Marketplace. SITE DATA LOCATION: Generally located south of 80th Street and west of Hadley Avenue ZONING: B -2, Retail Business CONTIGUOUS LAND USE: NORTH: Commercial EAST: Park SOUTH: Residential WEST: Residential /Senior Housing SIZE: Building = 13,000 square feet DENSITY: N/A RECOMMENDATION Approval, subject to the conditions stipulated in this staff report. COTTAGE GROVE PLANNING DIVISION Planning Staff Contact: John M. Burbank, Senior Planner, 651 - 458 -2825 or Iburbank ()cottage- grove.org GACITYFILES\13 CITYFILES \031 SP G -Will Building 2013- 10- 28 \Planning\SP13 -031 G -Will Building SR cover 2013- 10- 28.docx Planning Staff Report G -Will Retail Redevelopment Planning Case No. SP2013 -031 October 28, 2013 Proposal Grant Rademacher, Rademacher Companies, has applied for a site plan review of a new 12,500 square foot retail building for G -Will Liquors to be built on 1.67 acres in Norris Market Place, which is generally located south of 80th Street and west of Hadley Avenue. The location map of the proposed retail building site and the site plan detail are shown below. Location Map `., BUTM Srti¢I n�eaxa mwnc NV�^In I �: Proposed Site Plan G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 2 of 19 Planning Considerations Pending Applications Applications for the preliminary and final plats for the creation of this development parcel have been filed by the current owners of the site. Action on this application is dependent on the action on those applications. Existing Conditions The site is currently vacant and has been since the redevelopment of the parent property for the Norris Square Senior Housing project in 2007. The existing site detail is shown below. Existing Conditions Comprehensive Plan — Future Land Use Designation The future land use map in the City's Future Vision 2030 Comprehensive Plan shows this prop- erty with a commercial land use designation. This land use designation is consistent with the zoning classifications. y F < i r a: r M l JJ!'1 ${TN 9T 3' Existing Conditions Comprehensive Plan — Future Land Use Designation The future land use map in the City's Future Vision 2030 Comprehensive Plan shows this prop- erty with a commercial land use designation. This land use designation is consistent with the zoning classifications. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 3 of 19 Ian Zoning This parcel is currently zoned Retail Business District (B -2) with a Planned Development Over- lay (PDO). The B -2 District is for retail sales and service types of businesses. The proposed re- tail store is consistent with the B -2 zoning classification, and off -sale liquor in buildings greater than 3,001 square feet is a permitted use in the underlying zoning. The PDO zoning approval requires site plan review for additional development that is in conformance with the approved site master plan. An excerpt from the City's Official Zoning Map showing the zoning districts surrounding the subject property is included below. _: d p p . \ l \ a Excerpt from the City's Official Zoning Map G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 4 of 19 Ordinance Requirements The proposed site is in conformance with the master site plan approved with the Planned De- velopment Overlay. The building and off- street parking and other site development items pro- posed comply with the B -2 zoning district's minimum development standards. The plan set date for this review is September 25, 2013. Modifications to this set will be necessary based on details in this report. Existing Planned Development Overlay Site Plan The approved PDO Development Plan for the site is included below. It includes final approval for construction of 33,600 square feet of retail and restaurant space, preliminary zoning approval of a 36,000 square foot two story medical /office building, and the preliminary zoning approval of 4,600 square feet for a stand -alone restaurant. 6 - � f I A m 109 x '+ Approved Master Site Plan G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 5 of 19 Proposed Development Plan The applicant is requesting site plan approval to construct a 13,000 square foot retail building on the northeast corner of the site. This is the former location of the BP Gas Station and Goodyear automotive buildings. BO1H Srt1E[1 nYUtp Ix1Nxa P�� I �n 1 � 1 =" Site Plan Commercial vehicles accessing the loading docks will enter the two -way access drive and back into the loading dock area located on the northwest side of the building. A truck turning analysis was submitted with the application materials and is detailed below. 80.34 vwmeeauevwo ❑a w ii — �O 11 S ' -- NSPM ll"f ]O4J3 RITE DATA mi w[1 —,iAn in 0a1 K1 —SLR! AP � U' I €= 'r r {& Truck Turning Pattern G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 6 of 19 The City's Technical Review Committee discussed the analysis diagram and noted that the ve- hicles in the 515 parking stall stack would be impacted by the truck turning route. The Committee recommended that the parking be redesigned and that the vehicles in the impacted spaces in this area be protected with a curbed interior landscape island. The applicant was notified about the Committee's recommendation. Gontlict Detail Traffic /Access The existing traffic study for the PDO was reviewed and updated based on the proposed use, the site design, and the access location and spacing from 80th Street. No issues or level of ser- vice problems were identified. Parking The current site design identifies 63 parking spaces. This matches the City requirements of 1 space per 200 square feet of gross floor area. Based on the current inclusion in a PDO, the pro- posed parking is also sufficient based on the shared parking identified in the approved master plan for the site. The cross access and parking agreement required as a component of the PDO approval needs to be implemented with this application and recorded with Washington County after approval by the Community Development Department. The two interior parking islands will be required to be curbed and landscaped versus the paint striping design as proposed. A bike rack will be required in the final parking design per City policy. i le Gontlict Detail Traffic /Access The existing traffic study for the PDO was reviewed and updated based on the proposed use, the site design, and the access location and spacing from 80th Street. No issues or level of ser- vice problems were identified. Parking The current site design identifies 63 parking spaces. This matches the City requirements of 1 space per 200 square feet of gross floor area. Based on the current inclusion in a PDO, the pro- posed parking is also sufficient based on the shared parking identified in the approved master plan for the site. The cross access and parking agreement required as a component of the PDO approval needs to be implemented with this application and recorded with Washington County after approval by the Community Development Department. The two interior parking islands will be required to be curbed and landscaped versus the paint striping design as proposed. A bike rack will be required in the final parking design per City policy. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 7 of 19 I ns I ■ ■'2 �.1 Parking and Drive Detail Curbing is proposed along the southern portion of the site. This is in conflict with the approved development plan which shows a shared parking field in this area. The applicant is proposing the curbing to create a finished look to the site and to control traffic creep onto the parent parcel. Based on the existing approved PDO development plan, curb cuts may be required in this area lot to accommodate the cross parking per the approved plan upon future development of the parent parcel. The owner of the 1.67 -acre site will be responsible for the costs of removal if not incorporated into the development project for the balance of the site. Curb Cut Area Detail i ft { Curb Cut Area Detail G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 8 of 19 Architectural Compliance The detail below shows the proposed building elevations and the proposed architecture of the site, which were designed to be harmonious with the existing Norris Square building. The proposed elevations include a combination of windows and faux windows. Final design of the faux windows needs to be reviewed and approved by the Community Development Depart- ment. The plan also includes awnings over the windows and faux windows. The final arrange- ment of the building on the site needs to have these awnings entirely on the applicant's property without minimizing the design of the awning as detailed on plan sheet A3.1. Based on the project being part of a Planned Development Overlay, it was recommended by the City's Tech- nical Review Committee that the building should have additional detail. The applicant responded to this request and provided modified plans for the building elevations which are detailed below. The changes included additional stacked stone surrounding the entrance fagade. Building Elevations Signage The applicant is proposing wall signage as detailed on the building elevation details above. Standard sign ordinance criteria are applicable with the exception that a free- standing monu- ment or pylon is prohibited as restricted by the PDO approval. GWill nquoo Opt 1 , Lighting The light emission analysis was included in the submittal materials. The plan identifies confor- mance to ordinance criteria. Modification of the future uses other than commercial land use may require modification of lighting on the site. The Tech Review Committee recommended that the G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 9 of 19 parking lot light standard in the 14/15 parking stack in the middle of the parking field should be shifted to the west and enclosed in a curbed landscaped island where it is currently shown as stripped. Decorative downward- directed goose neck wall lighting is proposed on the building. The light poles and fixtures on the entire site, including this parcel, must be consistent in design and color with those at the Norris Square Senior Housing development. r ' ! 4 t• a E L L L r, +. L 6 •, L ; L J, E L ,• e. 4 L r. L 4 r 4 r 4 b r• a ' I• L L 4 �' 4 r L L t L 4 L r ` r L b L 4 L L 1. b r ' L 4 b L E 4 ', L I 6 a. L ,. 4 E L II• L4L L E4 L4L r +a,rL b b 4 4a L L Lr L .. L � �, L L , L r • e, 4 ° • J LL r• L b L L r ' L L a b r• J L L ,+ r • +• ° r, L r� +._" r. a S ~ � L L r L r L L 4 L I• L 4 r L 4 4 r. L L t, I, !, 4 L r l,— . l r --- 'y r . — y � z L L 4 r, 4 r• a r• r L '! v `:a]y,�': L L I 4 "• +' L b L I LL r, L I 4 r• L L L r, L +. e• r L O 6 Jo E._t•.: _� _ L 4 6JL I s ° L J J. rr t L L —L--. L ' . b � ' . . — .•�� �... .I' -r• Tr', ." ,,rI, L,L I, L LLLi L + ! Jr, LL a � S .'LL L L '.b +I' ". L ; •r, L 4. , , L I + � % ,. "4Lr [, ,Lr b I L L I•L r, 4 L L L r L L J L L +. ;�;: + L 4 J L L' r L 4 I ` L S • e, I JI r , ! a J 4 L r I? L L L L ar rl Z r `r ' r r + � ' � J• >. +. rLL rf�X`j . ` •L L�cL Lrr Lr /,e, L l ' L L . L L r'4 L LI Ir rL+ - � "1 J ° J, ' r '•�•"' �- ). + ;i �: Jn;•' �, L LLL 4 L r + J` r L 4 L r• r r' 4 L a. b (. L J + r r. q G b 4 I, r, L S.- �_ - r ' L L r L a L J I• L L L L • L +` I, L L ' L r L� L L 4 L L b 1>� L +. J ' b i I, L L L '` J, ( 4 L + L L b r' L +, ; L ' r, r, L L L L L L 4 4 I • L L L I L L 6 1 4 L L 4 § 4 L ` r L' L ,, { L L ,, L L ' L L !, + 4 L J \ L • ,, E °+ . L r, L L r, L •r I•rr. t a r. + I! r,LL L I +, L L ' +' +• r. r ; r E rL L��':,rr'LL LeL4 q rr L �, ++ L b ,• L ' o L ' •'4 L I 4 !. L L L Y L{ 4 r L L L L L •' L + �' r r r +• L L L y a r J ' !• 4 r. L,L L L ,• L r, r L L �, L L L L�• L L 4 b 4 L , I L. L W' y e L L L q r -. L !• r b ,, I • L L I ' + L L r Lr, L'r (• L L b L L 6 L L r L L • 6 '' L L a I I• (. 4 L +• 1, ,• J r 4 J L 4 a 4 L 4 L L L L ,, +, r ' r r. i. "• r `' r ' ! r L r• b L \ ! I, 4 !'4 L L L J L L L L r L I, +. L L b ` a 4 +• r , L r• ° r' r, , ; •+ L L\ L r , r. 4 L +' L L L L e L L rLLLe 4 L,LL r. b L `L L 4 e L . E L L Lq e+ L L L L b L 4 r, L �` L 4 \• b /, b 4 !, L r L L L • b �� ! 4 L b L L L t r r, a L L E I � " L y ++ t, L4LL Le b L r• b Loading Dock The loading dock and refuse container is located on the north side of the building. A screening wall adjacent to the loading dock was recommended and is on the latest application submittal material. The trash enclosure will be required to meet City performance standards including footings and protection bollards. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 10 of 19 Loading and Refuse Area Screenina detail of loadina Landscaping The Technical Review Committee stated a concern over the lack of a landscaped buffer area adjacent to the parking area south of the parcel. The group stated an understanding that the ap- proved development plan does not have landscaping in this area, yet there would be the poten- tial for overflow parking traffic and driving to creep onto the unimproved area of the parent parcel lot even with the proposed curbing. The Committee identified two options as a solution. The first was to plat an additional 20 feet in that area to provide landscaping and snow storage. The second option was for the applicant to arrange for a temporary landscaping /snow storage easement in this area until such time that the parent parcel develops further. The applicant was advised of this concern and arranged for the easement option. They are proposing an irrigated sodded area over an undulating berm in this 20 -foot area. It is recommended that the landscaping plan be accepted as proposed, with additional shrub and perennial landscaping G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 11 of 19 between the building and the sidewalk on the north side of the building, the required 20 -foot landscaping buffer along the southern property line, and the curbed interior parking islands. The additional landscaping must be irrigated. The proposed landscaping plan for the project is shown below with the additional required landscape areas highlighted. Landscaping Plan The project also triggers the development and landscaping of the common plaza located on the corner of 80th Street and Hadley Avenue just east of the site and the streetscape in this area. This plaza is a component of the PDO approval. The current property owner is addressing the plaza and streetscape design with the preliminary and final plat applications. A copy of the origi- nal plaza design is shown below. One of the recommendations in the staff report for the plating of the property requires that the final design for the plaza and streetscape, a construction sche- dule, and financial guarantee must be submitted to the Community Development Department prior to the issuance of a building permit for this building. The Current property owner will be responsible for the improvements of the plaza and Hadley Avenue streetscaping. The landscaping and Streetscape improvements are being coordinated with Rademacher Companies and PHS. EON MEN a W Landscaping Plan The project also triggers the development and landscaping of the common plaza located on the corner of 80th Street and Hadley Avenue just east of the site and the streetscape in this area. This plaza is a component of the PDO approval. The current property owner is addressing the plaza and streetscape design with the preliminary and final plat applications. A copy of the origi- nal plaza design is shown below. One of the recommendations in the staff report for the plating of the property requires that the final design for the plaza and streetscape, a construction sche- dule, and financial guarantee must be submitted to the Community Development Department prior to the issuance of a building permit for this building. The Current property owner will be responsible for the improvements of the plaza and Hadley Avenue streetscaping. The landscaping and Streetscape improvements are being coordinated with Rademacher Companies and PHS. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 12 of 19 2006 Plaza Design LAWN OPEN SPACE SE2EETSCAPE EXAMPLE Original Street Scape Design Detail G-Will Site Plan — Planning Case SP-031 Planning Staff Report October 28, 2013 Page 13 of 19 Irrigation is required for all landscaped areas. The corner plaza and southern buffer area will be temporarily irrigated by Rademacher Companies until such time as the parent parcel develops further. Grading Based on the previous redevelopment on the site, minimal grading is required. Grading Plan 401 vl'P i t f l/ Grading Plan G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 14 of 19 r / T , t �•5 I y a �Lr�e - 4� � � � � i, q r d � � 1 • �y� 1� ,� I -�•*"*� °- : °2` :,:',. s � '�, { A � w s rev � ' �� ' 4 1 5 ' _ ° • 1 `� -`, r �a � P n I i, � 5 5 If ssi• Y I� 1it ns 6w ,ip_ �I M t r r J } , , PDO Site Master Grading Plan Surface Water Management The City Engineer has confirmed that the ponding created on the PDO site as a component of the initial site development was adequately designed to accommodate the water volume, rate, and quality management required for this project. Runoff is handled through a series of ponds and rain garden infiltration basins on the south side of the site. A benefit of the redevelopment accomplished through this PDO was that it increased the overall green space on the site com- pared to the old Cottage Square Shopping Center, and the management of the stormwater runoff from the site was drastically improved from previous levels. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 15 of 19 Utilities The subject property is within the Metropolitan Urban Service Area (MUSA). The current sani- tary sewer and water services are served from City utility lines located north of the site in 80th Street. Easements are required over all public utilities. Below is the proposed utility plan. • . I ACREAGE UM WMT f Water 1.67 $2,996.00 $5,000.32 Sanitary 1.67 $1,905 $3,181.00 Storm 1.67 $9,143 $15,268.81 Total $23,450.13 �; Aw Y"15':: rx�roxv u�nm fFl. O .... ' N EAR p e f�.l�493+Z`..r= AM - R n a [Y :T: YN: i I 0 `� m �� I -�• 6 1 1 I Pk Yn ..n, I I I _ utility Plan Development Charges The development of the property requires the payment of the following development charges. AREA CHARGE ACREAGE RATE /ACRE CALCULATED FEE Water 1.67 $2,996.00 $5,000.32 Sanitary 1.67 $1,905 $3,181.00 Storm 1.67 $9,143 $15,268.81 Total $23,450.13 The area charges, connection charges, park dedication and related development fees and charges will be added to the building permit fee. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 16 of 19 Site Plan Review Notices A public hearing is not required for site plans; however, public meeting notices were mailed to 16 neighboring property owners on October 16, 2013. Summary A. The proposed use is compliant with the City's Comprehensive Plan. B. The proposed use is permitted under the current zoning classification and overlay for the property. C. The proposed development can be served by public utilities. D. The surface water management for the project meets State, Watershed District, and City performance standards. E. The proposed site plan is in compliance with the approved site master plan for the PDO. F. The proposed construction materials are harmonious with the existing building in the PDO. G. The proposed construction materials are compliant with the City's architectural control ordinance. H. The site is adequately parked and has the ability to park additional vehicles with a required cross parking easement that will be required to be recorded. I. The revised traffic study did not identify any negative impacts from the proposed use. J. The revised traffic study did not identify any negative impacts from the proposed relocation of the drive entrance on Hadley Avenue. Recommendation That the Planning Commission recommend that the City Council approve the site plan to allow for the construction of a new 12,500 square foot retail building for G -Will Liquors to be built on 1.67 acres in Norris Market Place, which is generally located south of 80th Street and west of Hadley Avenue. Approval of the site plan is subject to the following conditions: 1. All applicable permits (i.e.; building, electrical, grading, mechanical) and a commercial plan review packet must be completed, submitted, and approved by the City prior to the com- mencement of any construction activities. Detailed construction plans must be reviewed and approved by the Building Official and Fire Marshal. 2. The applicant receives building permits from the City of Cottage Grove prior to con- struction. 3. The area charges, connection charges, park dedication and related development fees and charges will be added to the building permit fee. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 17 of 19 4. The cross access, landscaping and parking agreement required as a component of the PDO approval shall be recorded with Washington County after approval by the Commu- nity Development Department. 5. The annual liquor license shall be updated for the new location. 6. Final drainage plans must be submitted to the South Washington Watershed District for review. 7. The landscaping plan for the project shall be modified to include the addition of shrub and perennial landscaping between the building and the sidewalk on the north side of the building and a minimum of 20 feet of irrigated landscaping along the southern property line on additional platted property or dedicated easement area created for that purpose. 8. The final revised landscape plan shall be submitted to the Community Development Department for review and approval. 9. Irrigation shall be provided for all sodded and landscaped areas, including to the back of curb and the curbed landscaped island interior to the parking lot. The irrigation system shall consist of an underground sprinkling system that is designed by a professional irrigation installer to meet the water requirements of the site's specific vegetation. The system shall be detailed on the final landscape plan. The irrigation plan shall include the temporary irrigation connection of the Norris Marketplace plaza. 10. Installation of landscaping shall occur in a timely fashion and be consistent with an ap- proved plan. A letter of credit in the amount of 150 percent of the landscape estimate shall be submitted to the City as required by City ordinance. The financial guarantee shall be in effect for one year from the date of installation to ensure the installation, survival, and replacement of the landscaping improvements. 11. Prior to the issuance of the building permit for this site, the PDO corner plaza design, which includes monument signage, landscape plantings, decorative concrete, ornamental benches, City light poles and heads, and banners, shall be approved by the Community Development Department, and all required permits and financial sureties must be in place. 12. Concrete aprons for all private access drives shall be constructed per City requirements. 13. All site lighting must meet City Code requirements. All light fixtures must be downward directed with cut -offs. The specifications of all light fixtures must be provided with the ap- plication for a building permit. The light poles and fixtures shall be consistent in design and color with those at the Norris Square Senior Housing development. 14. Final architectural plans, lighting details, and exterior construction materials and colors must be reviewed and approved by the Planning Department prior to the issuance of a building permit. G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 18 of 19 15. The grading and erosion control plan for the site must comply with NPDES II Permit re- quirements. Erosion control devices must be installed prior to commencement of any grading activity. Erosion control must be performed in accordance with the recommended practices of the "Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the conditions stipulated in Title 10 -5 -8, Erosion Control During Con- struction, of the City's Subdivision Ordinance. The Applicant shall be responsible for the costs for the City to inspect the site in relation to erosion control conformance. 16. The applicant must provide the City with an as -built survey of all private utilities prior to issuance of certificate of occupancy. 17. All mechanical equipment screening and trash enclosures must include a combination of block and brick, consistent with the principal building. 18. The applicant shall be responsible for maintaining the sidewalks adjacent to the site. 19. A bike rack will be required in the final parking design per City policy. 20. Storm sewer pipe must be reinforced concrete pipe (RCP). 21. The two interior parking islands will be required to be curbed and landscaped versus the paint striping design as proposed. 22. Parking lot light poles shall be installed within a landscaped and curbed island. 23. The property address shall be 6999 80th Street South. 24. Retaining walls greater than four feet in height shall be designed by an engineer and sub- mitted to the City Engineer for review and approval. 25. The applicant is required to comply with the recommendations cited in the engineering letter dated September 19, 2013 from Ryan Burfeind. 26. The applicant is responsible for removing debris from Hadley Avenue and 80th Street during their grading and construction process. These streets shall be swept clean daily or as needed. 27. The property owner is responsible for maintaining the stormwater basin. A document outlining the scope and frequency to maintain this basin must be submitted with the building permit application. 28. The design and materials of any fencing on the subject property must match the speci- fications of the Montage Commercial Majestic 3/4 - Rail Fence. A fence is required along the higher elevation of a retaining wall that is four feet or higher. 29. A "STOP" sign shall be installed at each exit drive. Each sign shall be ten feet from the roadway edge and two feet from the driveway edge. The bottom of the sign shall be six feet from the ground. The "STOP" sign shall be a 30 -inch sized sign having a high inten- G -Will Site Plan — Planning Case SP -031 Planning Staff Report October 28, 2013 Page 19 of 19 sity face. Said sign shall be mounted on a 6 -foot — No. 3 and 8 -foot — No. 2 steel post. The applicant may request the City's Public Works Department to install said "STOP" signs, but must reimburse for actual costs incurred by the City. 30. Roof -top mechanical units shall be screened as required in 11 -6 -4 of the City's Zoning Ordinance. 31. The exterior color of the truck delivery overhead doors shall be a color that is similar and complimentary to the color scheme for the exterior walls of the building. 32. The design of the awning shall match the details on Plan sheet AM. 33. Prior the issuance of the building permit, the applicant shall sign the required minimum valuation agreement with the city. 34. A right -of -way permit shall be obtained prior to the completion of sidewalks, driveway aprons or other improvements related to the development of the site. Prepared by: John M Burbank, AICP Senior Planner Attachments: Project Narrative Overall Site Plan Building Elevations Floor Plan Landscaping Plan Grading Plan / LLL3�SSS E333 $ b3� s � N 4S�tl V m C o° W 3 Fgaa 3W o��g �o,IIllilllllll Hn w.. -.ffisses w�.m� �9 VJ °C z Q Q co w Q Z_ (� J_ :E J o J CO @ R$g J IRA, w 3 o W �z S O 8��y3 U N 5 H11 s a a ��s w NMI s E l i� I III I I g Ogg ��az � � g�gg� ��IM � i I "���� � Losgsus L- L- L3�vm L m a o - � n I o I ,I I d sl I � a w �s ID 1112111" @ gg fill I 6 SL�i� €E$.��afi9�s53�A�§8�$7�H6�L $ a 'dn`E @�4ed2�Eit €is[�s�e�Ye @ R$g k IRA, 3 o 9 ffi 9 I III I I g Ogg ��az � � g�gg� ��IM � i I "���� � Losgsus L- L- L3�vm L m a o - � n I o I ,I I d sl I � a w �s @ R$g k IRA, 3 o 9 ffi 9 w �s Lt° _ g \ ` u�� __�__, iI ubs o:) ^ T-9 \! )) � E) , A | : \(! 9 ' � \ §) /§ ; / z< / � 2 - - -- - -- ) (L § § ) \ oz/ ( \ w ff ( ( \ § 0 j ( \�[ /kw W0 - § . ` ) ( § ) ��~ u \ ( / � 2 / , §� 6S61-686-M:xej 006Z-Hb- EV:au04d elasauuOJ'anm9 afiGloJ EE W d° ° ula '•+ v^ vio5 NW'sa4e o n'oot a11o5'ua 011edv 86z _ SNODOII IIIM•D I�� e`.ei ^n VOESS NW�anapuV „IY1 �1 V,eealno9 eYel VUnna aOhi ' v ° {Y•'FF// Ntlld SIVAOW3MV 53INtldWOJ N3HJtlW3OtlN � E e 4 '`�3 ,BJJ UOS'A SNOIlIONOD DMISIX3 U o S,a n: naEAS €�p�j ; a HG ee ¢w e i se a as p eS � "€ g$iA � s r �y€ �K "e a ' S e €= N �6 s � �:RRa= � �k� E� @, [ �§" 8 v5 _ b'm $s53 `�§ w " X � E $ 8 m =�'n - §�� � d m g g q ;s 9 RAIN -9 m 513 8H ^� 7 €t� Y�€ i Msix th h W X a /I4 - � VENUE - HADLEY A .< 77 - -m,— - -- — i \ "s � �`�E.� as .�F- •-dr I �• \ �. 1 1; I ..II { m - - �sr•x '— ®.'� sue_ gi W I \ I I gh op I ey \ Ih \� I kz a \S9 / / i I H n 3 I \ I .. 1 „ p 1 ^`� ubsjoD ( ~° ~^ \ \| d! ° ® x (w ; A ®wwguen ;r�J� \( |§ t ~ � �! / ƒ)� e g; )§ (a,w J g) s ®dam ` : 111 \ r ) ( ))S .. .,� .. _ n %m , \ )I ._ _.�___ ! D __,__, uos !! aD m____.__ `]/ [ D " ° ±| U d! \%% $b » mqR §7® \� § ) \ ) ha k )( \ ! §� q ,� 656L-686-E9L oxeJ OOfiL- fia6-E9C :auoyd ¢posauulW'anvg afivlv� Irv. E E ¢� 3EfE " 4[055 Nb1'sOy oyL'001 a11^5''Q'11'dtl W 58OOaIl VN Ma. Nw'+amoytl a ;iEgi q MUIp Ntl d NOI1N3A3Nd P­ 53INtldW O 3y L pu¢na WEIG c g,tF N 5 {{�� dWJ 3HJtlW3OtlN UOS� 1►!'J NOIl IllOd W31VMWHOIS `.....'Na .. n il x svranlE S� \� ' .l ° ° a' @a a�a ' e@l x tl �� & a z pia ho I N � —__ ._ - _� _ j - � F e a % , " „' eu e" P •ea a j �\ I € e gas as eg Yae DiM <ks,a �$ rt§ k ! € ally ®° a nab a arp 4gn- i' It I gg s } as HER! P a gt ss&z 2�4,� 1p T 4 a 3e � a sk" is o� O @ ",, as Egg " a 81 51 91 % a !d G aq,, M� 3 e Fa bs 1 s. I a @ � uP la ¢ Fs $aNz �a4 € g; K y x 1 1 c Ey ° 1 1 E24 M 'gr NI g e - P '• \ � 3 gd �° a4 a �k� a � �€ a g€ F � § s "a a e a s y E %5 e�e Ka 53E EgH ,� § y 4 z a EE 3B I 1 ^ J @ e € s za ' @¢€ s sg �n a �$E3 g IEI A —_ A x�¢ t E 4Kk z p3 Se ip p , 8k s EE '-p k @# � pB° �y7 L I m : JOIN y� 01 & znk�rCCzn . b L 5 's �.. i+ a `E -, y. g aB kaP N : € a €° Pe6M �Fa.. rs�§ se a E e pT ,se sa ° ; 9s 2 Ke . a s `d r #� Ua € "" € °a" ° y 5a5 §ps'�'" a ekg�E� 11 ^5 €5 on ��`� gsaes ° 1 ° e 5, esa e tl kda P . @ &:' pz eg= e € @ e < . p ��� Es• '°a � €S x I, @ e �u eR gym@ Y`s id a s {1 of a e �5 n "x Y: I l n: n- °''� � @@ 6 €Fe s €`E § as C�K f ee a ?xti° :b of ap°a `s's ae k t yy IAI li "s�6 i s €k " deep .S Eg ..l, `� 'sk a€ d $ 1�n e° 3B€ � a 3 Ba € d @ __ "11H�9�4��az�ba.101 �.= 6b� .t+ eK s� ''BPS 13t -� €g `e' ka € r a 11" ° "° s a �•� - a e � _ =s g u #G� a "$� •'sg" yy •� s 3 u a„ ¢ e' g � . °�. w# ". Ka a P � t m ��g. `�`B� � o�° lie= & "a] a g S@ €ag� c�ra aKe�i& �•3a �ak `z�p �y� „�° 3 a PN a se !Blip M, g e • lirl /r�� ”( %�3 ! � �� P �3 5 '� �,�a� � ig 5 $ Ilia bEbg I igap G pool . a W1-13 c r ` c$ap Yai x K € - §uu agd F PPH . •$ y ' / 7 �.L° t, S g k WIN e K a � B 3 s § See Holz �€ ° i ss 45 she gg E €I8 eg 3 g d B 3< a P ke aP _ z 5-v ( f / �• a < - � 5a a § €e ,{ fi n ° g WHO # an y @ y{{ N 2€ 3 y � 3 y 12 •� 4 Y1 k�s��fi %F, 5� Sa� f, g 3�tF �59 S�aSS J F e} is $Eb %:" 1 P 6 gas � a° $ § 8 ie9E� ep & b Za p ag psk a 1 Y HIP € a E€ e K k € 9 x �k P aaa " @E -A 1 . s h e€P 5 e N F 9a C' as M eg a E kr . a &a� g!E 6s aga a � BlEs ig Y x �i3 z � k'y §a � °e SC e� � # @ G yyaaK. fG 5 a 2 a a 1 �E a ! F gg � � § R P2 F € � 1 imam g @� �g G:„ 11 01 � €9 rt 3 . A e nas: ^ - .w p ` u ON ____, ® ubs�D� _ _/ d� m '\ 1,.,. L' / /�!, u1iIN HM? ƒ \§(§l k kf §G& ~ ƒ9 . � _mm H e` Y p & 83 � a e 3 s° pk z a�E -W rc -- ° c SN u F tl ��55ryry Y � C - �U1 I m c° uu i5 'y ° u= �G ^G na i CC o g 0 \ zGy s s ee a t � E� 66 r Ay C_ g c S t �a 2 E rasyy 1 r-E fi56L- 68 >E9C :xe3 006L -68 >E9L :auayd 9WSS NNt v 41 oup'00[ a I.s r u4 ollotlV86Z O N tl AN3 �u'p ■ � '� e@osauulW'aAwgafieppo� saonan nlx -D LOE55 NW'lanoPUtl wenalno a�¢ Punou MOT E EE' [A[LjS 4 Eiji P O u0spo S�Itlt3� S3INVdWM� 3H3VW34tlN H e` Y p & 83 � a e 3 s° pk z a�E -W rc -- ° c SN u F tl ��55ryry Y � C - �U1 I m c° uu i5 'y ° u= �G ^G na i CC o g 0 \ zGy s s ee a t � E� 66 r Ay C_ g c S t �a 2 E rasyy 1 r-E Sall Il i; 47 IFa s, #! •gl . n P 5 i d f lcv s KT l,.. � al 3 !S/ i 3 84P bbA bb� be il$ 6 SS gy ji Sasae vaaa lAA:! AAIP 113 '€9# 1 9t#f A L 3 # a iE E ax u N: 1, t lit b.0 ! a #lfl •gl . n lilt 5 i d f lcv s KT l,.. � gaga a - 5 ae 1 sF a ° i §= s F #F I a3 € it O 1 e 4 q ya a lle y .. tl $ 1 x1! F { i3 i °FFb3aF 5 i d f lcv s KT l,.. � al 3 !S/ i 3 84P bbA bb� be il$ yg X F gy 3A3 Sasae vaaa lAA:! AAIP 113 '€9# 3� u e w 3 9t#f A Ie ! Mile 3 gaga a - 5 ae 1 sF a ° i §= s F #F I a3 € it O 1 e 4 q ya a lle y .. tl $ 1 x1! F { i3 i °FFb3aF 5 d a $p 3 IT cas e ,7! 'Nil Si( is I $ 1 x1! F { i3 i °FFb3aF 5 d a $p Al; t a e F if e !4i k I I :F Tir i§ �_ F $ 1 x1! F { i3 i °FFb3aF t fz 7 , 11 ,1 1 , 1 11 al .# a a # ��z °� # „G I `a - iw 4 6S6C6WE9L 4xvA N96L-68 >E9L :auoyd pYpsauulW W- afiepp" 04v pE�e; Wl0 NW'eayel oup'OOl apin5'aO 0 11otltl 86E SNOflaIl lllM'9 t e va a I� b..5 NW /aAOp uIp^■,/ p aN" pun" S20b1 • b ]6pi[F UOS�t���� Nd aJNIlNtlld tll 531NtldW00N3HOtlW30tltl 8 .... ks, 6Eti f \ 5 .@ 4y n�1.. M la3 -..� HAOLEY AVENUES' ) i 13 i dE 4 m i �e �fJ 1 11 t z i 0 ; 1 5 !pits 6 fa@ 37R; °g a! i'a ! €• ;s3ltF�FEB ig StE !s � i ��= �€ 't "i@ P� �' !9it, M y 1 E .l, si 5 i'@ 3, E;R®'!E l gg 8R 3 E�E1 @ E' RE €!Pi � � - � F Pt EF P79Y 5t t ° � i t vt p a @iP! 3e §t Y $ �9sj` °tRt6��ittja�l9l�e�ggERi g@ aii •e ¢ pp 99 qq ¢g € @!4t diIR9lRle'Eg €:E @E P�9: EBiE9..eP4RSt1a @ iui @.ES6$1g � aj 1 jR ii Al - R lily eie8p7pt : � C #� @6� 3 !P ! �ig5 &I ,E a 1 4, t , °E litf ! € #E'' a °@ !F ei R 1 S, p MIT !3�l RY R8 � tEl [a fl; ! 11 i;; �E� FlS l ¢ [ g 4a ®t i t °..lae j:1 a I l g p = l i at @ p !:§�d.t ° K r el , @ @Rt °t al q�e`3 €ajR�l ia'@ @s v sg@aR °af #lEEaaa lte. P ! - @.!� "�o ggeF!ai r = =psP e� tt3M .Fi s:sP:t. al. �.,il. Rtt :.9.&l3SIs E °B l.{,�P91 I.d ialn34 9� B' r 5 m 9 a S e 38 @ ; o � z s2 2 z g ' = = N A €s Y NU m N o �QU awo$ c ass €gg g�E � LsA EEw � x 9� B' r 5 E O Q CQ ,� 3a fans o W ��� <Q ��ollllllllllll � _ ° P.a a of > a a - qO �.a ° .�\� \ \ \ ° SO\C� °9 ° .a ° • • °a •d & n e � ° $ x m° ro.° a s ••' �„, a s ' •9 •S •,' ' O'ro d'•°o- & d �F 8fi?���A P 9� "_e SP`P a .° a ` —. �~° - i a a - •Y• .5� °n •a ° ° • °° a � 9 + s � a a a a "^� = aro ro ° ro ...a 'y°' aro . °° ° ° ° a a i'°' •a ro ° '°' ` �9��a oa €oaas € €� .° ro °,a ro ro ro ° .a ° ° ° ro ' a , e , . °° _ a .a ro . °° .° � a °� a °ro ° ,° ' °ro.a.a•° .° ° ro° ° " ' ' _ ' ' _ m J.a a .a .p •J / /. a °a � � .° _�, era ° a •. J - ° P.a a of > a a - qO �.a ° .�\� \ \ \ ° SO\C� °9 ° .a ° • • °a •d & n e � ° $ x m° ro.° a s ••' �„, a s ' •9 •S •,' ' O'ro d'•°o- & d �F 8fi?���A P 9� "_e SP`P a .° a ` —. �~° - i a a - •Y• .5� °n •a ° ° • °° a � 9 + s � a a a a "^� = aro ro ° ro ...a 'y°' aro . °° ° ° ° a a i'°' •a ro ° '°' ` �9��a oa €oaas € €� .° ro °,a ro ro ro ° .a ° ° ° ro ' a , e , . °° _ a .a ro . °° .° � a °� a °ro ° ,° ' °ro.a.a•° .° ° ro° ° " ' ' _ ' ' _ m Mill )\ st ! »e . § ! §h F§ §. N� aq �.; «.° § R, J �� I 4e �g 1111111111111 a �10111111�11� e000000uolowu 0111111111111 10000000000000 �a��s �v' � 3E aE.� a � 2 U ��Uga ��ollllllllllll � R, J �� I 4e �g 1111111111111 a �10111111�11� e000000uolowu 0111111111111 10000000000000 1 DDOODOOO�o�oo le0000000H0000 1111110a 11� D 0 a 00000000000 1 ooaoaoo000000 1000090000000 0010000 m °■ R§e e gait" I l \ l,gmmmn _w � | ., � \ _a �w � �; (Mi Cottage Grove kh ere Pride a,,?TOS9erIty Meet To: John Burbank From: Ryan Burfeind Date: September 19, 2013 Re: G -Will Liquors Plan Review This memo summarizes the engineering review of the Goodwill plans. This review is based upon documents submitted by HTG Architects, dated 08/30/13. General 1. Contractor shall obtain a City of Cottage Grove right -of -way permit for the installation of the new driveway aprons and sidewalk. 2. A surveyed as -built plan shall be provided to the City of Cottage Grove upon completion of the project. 3. Provide plan for onsite snow storage. Upon review of the site plan there does not appear to be adequate space for snow storage. 4. All City of Cottage Grove standard detail plates referenced can be found on the City website at cottage-g rove. org, under the engineering department, and shall be included in the plans. Street 1. Pedestrian ramp truncated domes shall be black in color. 2. City curb shall conform to detail plate STR -1 3. Street lights along 80 Street and Hadley Avenue shall conform to the concrete light pole detail plate STR -35. Water Main 1. Hydrant shall be installed per detail plate WAT -1. 2. Hydrant pad shall be installed per detail plate STR -27 Parking 1. Striped islands across from loading dock do not appear to provide enough clearance for trucks to make the turn around the parking stalls. Consider removing a set of parking stalls to move the islands back, and make them concrete to provide protection to parked vehicles. 2. Verify that the parking stall across from the trash enclosure along 80 Street has a large enough hammerhead to fully back out of the stall. Storm Sewer 1. Storm sewer system should be extended to the Hadley Ave. entrance to prevent stormwater from running off onto Hadley Ave. Landscaping 1. A streetscaping plan shall be submitted for 80 Street and Hadley Ave. that follows the example given below, taken from the Norris Marketplace planning case. ORNAMENTAL PLANTINGS ORNAMI:I.TAIAPSOISL'AtlNOAREAS r ORRAMENI'AL LIIiII11W .� STANDAPOSISI10111TVAitU ALONG THE STREETS r, s STREGTSCAPIG U XAhtPLE