HomeMy WebLinkAbout2013-11-20 PACKET 04.C.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM # � �
DATE 11 /20/201 . .
PREPARED BY: Community Development Jennifer Levitt
ORIGINATING DEPARTMENT DEPARTMENT HEAD
***************�����***��*�*******�*�***********
COUNCIL ACTION REQUEST
Consider adopting a resolution authorizing final payment in the amount of $23,249.52 to
Hardrives, Inc. for the 2011 Pavement Management Project.
STAFF RECOMMENDATION
Adopt the resolution. Hardrives, Inc. has satisfactorily completed the work in accordance with
the contract plans and specifications.
SUPPORTING DOCUMENTS
� MEMO/LETTER: Letter, Dave Sanocki 11/12/2013
� RESOLUTION: Draft
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: Final Payment
ADMINISTRATORS COMMENTS
� l
Date
**��*�*********************************�********
RESOLUTION NO. 2013-XXX
RESOLUTION APPROVING FINAL PAYMENT IN THE AMOUNT OF
$23,249.52 TO HARDRIVES, INC.
FOR THE 2011 PAVEMENT MANAGEMENT PROJECT
WHEREAS, the City Engineer has certified that work has been satisfactorily
completed; and
WHEREAS, the original total contract amount was $986,588.53. There
were no change orders for this project. The actual contract amount completed was
$978,263.11; and
WHEREAS, the project has been satisfactorily completed in accordance
with the contract plans and specifications;
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Cottage Grove, County of Washington, State of Minnesota, that $23,249.52 is to
be paid to Hardrives, Inc. for the final payment of the 2011 Pavement
Management Project.
Passed this 20th day of November 2013.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
� ., .
November �2, 2013
Stantec Consulting Services Inc.
2335 Highway 36 West
St. Paul MN 55113
Tel: (651) 636-4600
Fax; (651) 636-1311
Jennifer Levitt, PE
City Engineer/Community Development Director
1280o Ravine Parkway South
Cottage Grove, Minnesota 55oi6
Re: 20�1 Pavement Management Project
City of Cottage Grove
Stantec Project No.193800128
Dear Jennifer,
Enclosed please find three (3) copies of the �� and Final Request for Payment for the 2011 Pavement
Management Project. The Contractor for this project is Hardrives, Iric. In addition to the Request for
Payment, the Contractor has submitted their IC-134 forms.
PROJECT REVIEW �
This project began in May, 2o1i and was substantially completed in the fall of 2or2. Final punch list items
were recently completed in September 2013.
CONSTRUCTION COST OVERVIEW
The Original Contract amount for this project was $986,588•53• '�e Final Construction Amount is
$978,263.11. The Final Construction amount for this project was $8,325.42 under the Original Contract
Amount. The total under run was due primarily from the final bituminous amounts being under plan
quantity.
RECOMMENDATION
The Contractor, Hardrives, Inc. has satisfactorily completed the Worlc in accordance with the contract plans
and specifications. Therefore, it is recommended that final payment of $23,249•52 be made to the
Contractor and the project be accepted by the City of Cottage Grove.
After acceptance, please distribute all copies of the Request for Payment as appropriate. If you have any
questions about this project or require further information please contact me 65i
Regards,
STANTEC CONSULTING SERVICES INC.
R
�
Dave Sanoclu
Senior Project Manager
Enclosures
copy: Craig Larson
File
Design wlth community In mind
r
�
Stantec
CONTRACTOR'S REQUEST FOR PAYMENI°
2011 PAVEMENT MANAGEMENT PROJECT
STANTEC PROJECT N0. 193800128 / 000048-10289-0
SUMMARY
1 Original Contract Amount
2 Change Order - Addition
3 Change Order - Deduction
4 Revised Contract Amount
5 Value Completed to Date
6 Materia) on Hand
7 Amount Earned
8 Less Retainage
9 Subtotal
10 Less Amount Paid Previously
11 Liquidated damages -
12 AMOUNT DUE THIS REQUEST FOR PAYMENT NO.
$
$
0.00
0.00
0
$ 986,588.53
$ 986,588,53
$ 978,263.11
$ 0.00
$ 978,263.11
$ 0.00
$ 978,263.11
$ 955,013.59
$ 0.00
$ 23,249.52
7/FINAL
Recommended for Approval by:
STANTEC
�
ro tractor:
HARDRIVES INC.
Specified Contract Compietion Date:
4810289 R EQ7Ff nai.xism
Approved by Owner:
CITY OF C�'tTAGE GROVE
Date:
Recommended for Approval
CtTY OF COTTAGE GROVE
City Engineer
Date:
� Item
PART 1- PINE COULEE & COUNTRYWOOD:
1 MOBILIZATION
2 TRAFFIC CONTROL
3 POTHOLE AND VERIFY EXISTING ROAD SECTION
4 REMOVE TREE
5 REMOVE BITUMINOUS PAVEMENT
6 REMOVE BITUMINOUS DRIVEWAY PAVEMENT
7 REMOVE CONCRETE DRIVEWAY PAVEMENT
8 SALVAGE AND REINSTALL MAILBOX POST
9 BOULEVARD VEGET'ATION STRIPPING
10 ADD ROCK
11 RECLAIM BITUMINOUS PAVEMENT
12 SUBGRADE PREPARATION
13 COMMON EXCAVATION (EV) - STREET
14 SUBGRADE EXCAVATION (EV)
15 AGGREGATE BACKFILL
16 AGGREGATE BASE, CLASS 5
17 SAWING BITUMINOUS OR CONCRETE PAVEMENT
18 TYPE SP 12.5 NON-WEAR COURSE
19 BITUMINOUS MATERIAL FOR TACK COAT
20 TYPE SP 12.5 WEAR COURSE
21 SAW AND SEAL
22 SIGN PANELS �
23 8618 CONCRETE CURB AND GUTTER
24 BITUMINOUS DRIVEWAY APRON
25 CONCREfE DRIVEWAY APRON
26 PATCH GRAVEL DRIVEWAY
27 TOPSOIL BORROW (LV)
28 SODDING
29 SEED AND HYDROMULCH
30 EROSION CONTROL BLANKET
31 APPLICATION OF WATER FOR TURF ESTABLISHMENT
32 JEf AND CLEAN DRIVEWAY CULVERTS
33 REMOVE STORM SEWER PIPE
34 REMOVE STORM SEWER STRUCTURES
35 12" CMP CULVERT
36 12" CMP FLARED END SECTION
37 12" RCP STORM SEWER, CLASS 5
38 15" RCP STORM SEWER, CLASS 5
39 18" RCP STORM SEWER, CLASS 5
40 24" RCP STORM SEWER, CLASS 3
41 CONNECT TO EXISTING CMP PIPE
42 2' X 3' CB, INCL R3260V6 CSTG AND HDPE ADJ RINGS
43 4' DIA STORM SEWER CBMH, W/ SUMP, INCL
R3260V6 CSTG AND HDPE AD] RINGS
44 4' DIA STORM SEWER CBMH, INCL R4342 CSTG AND
HDPE AD] RINGS
45 4' DIA STORM SEWER CBMH, W/ SUMP, INCL R4342
CSTG AND HDPE ADJ RIN6S
46 ADJUST CATCH BASIN CASTING
47 12" RCP FLARED END SECTION, INCL TRASH GUARD
48 15" RCP FLARED END SECTiON, INCL TRASH GUARD
49 18" RCP FLARED END SECTION, INCL TRASH GUARD
50 24" FLARED END SECTION, INCLUDING TRASH
GUARD
51 CLASS III RANDOM RIPRAP
52 CONCRETE SPILLWAY
53 MINOR DITCH GRADING
54 SILT FENCE, 7YPE MACHINE SLICED
55 PROTECTION OF CATCH BASIN IN STREET - -
56 PROTECTION OF CATCH BASIN, NON-STREET
57 PROTECTION OF FLARED END
58 6" DRAINTILE
ConfracE Unit Current Quantity
Unit Quanti�yr Price Quantity to Dafe
LS
LS
EA
EA
SY
SY
SY
EA
LF
TN
SY
SY
CY
CY
TN
TN
LF
TN
GAL
TN
LF
SF
LF
SY
SY
SY
CY
SY
SY
SY
MG
LF
LF
EA
LF
EA
LF
LF
LF
LF
LS
EA
1
1
24
2
1285
1310
260
83
23500
4230
28215
32650
2130
210
2110
1620
270
4275
1500
3215
5730
52
1700
1265
310
40
1525
225
13550
465
70
270
560
9
60
4
272
516
211
70
1
1
9233.04
1613.50
50.60
968.11
1.84
5.25
6.01
91.43
0.22
10.84
0.98
0.66
9.27
9.27
9.06
11.53
2.36
52.50
2.14
52.65
1.91
, 44.10
11.35
9.55
41.14
5.63
13.36
5.38
1.08
1.61
26.89
6.45
6.45
161.35
23.66
161.35
25.82
26.35
30.12
41.95
274.30
1632.87
1
i
30
8
1400
1420
240
83
23000
4463
28000
32000
1433
418.5
1594
1552
280
3707
1047
2670
5363
52
1824
3025.27
210
EA 1 2340.66
EA 10 1786.69
EA
EA
EA
EA
EA
3 2048.08
2 168.85
2 698.11
2 812.13
3 918.62
EA
CY
SY
LF
LF
EA
EA
EA
LF
1
60
44
725
400
- 2
14
3
350
1426.34
80.68
50.83
12.00
1.99
96.81
96.81
86.05
12.91
1617
604 4930
12500
340
87.6
598
9
60
4
417
515
167
68
1
1
Amoun�
�o Date
$9,233.04
$1,613.50
$1,518.00
$7,744.88
$2,576.00
$7,455.00
$1,442.40
$7,588.69
$5,060.00
$48,378.92
$27,440.00
$21,120.00
$13,283.91
$3,879.50
$14,441.64
$17,894.56
$660.80
$194,617.50
$2,240.58
$140,575.50
$i0,243.33
$2,293.20
$20,702.40
$28,891.33
$8,639.40
$0.00
$21,603.12
$26,523.40
$13,500.00
$547.40
$2,355.56
$0.00
$3,857.10
$1,452.15
$1,419.60
$645.40
$10,766.94
$13,570.25
$5,030.04
$2,852.60
$274.30
$1,632.87
1 $2,340.66
13 $23,226.97
3 $6,144.24
2 $337.70
3 $2,094.33
2 $1,624.26
3 $2,755.86
1
47
1303
322
12
2
490
$1,426.34
$3,791.96
$0.00
$15,636.00
$640.78
- - - $0:00 - -
$1,161.72
$172.10
$6,325.90
4810289RE47Final.xlsm
� Item
59 CONNECT DRAIN TILE TO STRUCTURE
60 INFILTRATION FEATURE
61 LAWN EDGING
62 PERENIAL NO 1 CONT
63 GRASSES NO 1 CONT
64 SHRUBS NO 2 CONT
65 PRIVATE UTILITY CROSSING
TOTAL PART 1- PINE COULEE & COUNTRYWOOD:
PART 2- PINE COULEE PARK:
66 MOBILIZATION
67 COMMON EXCAVATION (P) - PARKING LOT
68 AGGREGATE BACKFILL
69 AGGREGATE BASE, CLASS 5
70 TYPE SP 9.5 NON-WEAR COURSE
71 BITUMINOUS MATERIAL FOR TACK COAT
72 TYPE SP 9.5 WEAR COURSE
73 6618 CONCREfE CURB AND GUTTER
74 SIGN PANELS
75 4" SOLID LINE, WHITE PAINT
76 PAVEMENT MESSAGE, HANDICAPPED SYMBOL -
PAINT
77 6" DRAINTILE
78 INFILTRATION FEATURE
79 TURN REINFORCEMENT MAT
80 6" CONCREI'E SIDEWALK
81 CONCREfE PEDESTRIAN CURB RAMP
82 TRUNCATED DOME PANEL
83 COMMON EXCAVATlON (P) - TRAIL OR SIDEWALK
84 AGGREGATE BASE, CLASS 5, 100% CRUSHED - TRAIL
OR SIDEWALK
85 TYPE SP 9.5 WEAR COURSE - TRAIL
86 COMMON EXCAVATiON (P) - PLAY COURT
87 AGGREGATE BACKFILL - PLAY COURT
88 AGGREGATE BASE, CLASS 5, 100% CRUSHED - PLAY
COURT
89 TYPE SP 9.5 NON-WEAR COURSE - PLAY COURT
90 BITUMINOUS MATERIAL FOR TACK COAT - PLAY
COURT
91 7YPE SP 9.5 WEAR COURSE - PLAY COURT
92 SURFACE COATING
93 BASKEfBALL POLE AND BACKBOARD
94 GAZEBO FOUNDATION
95 CONCREfE PAD
96 TRASH RECEPTACLE, INCL CONC PAD
97 BUR OAK 2.5" CAL B&B
98 SWAMP WHITE OAK 2.5" CAL B&B
99 1.5" PVC CONDUIT
100 SILT FENCE, TYPE MACHINE SLICED
101 SEED AND MULCH
TOTAL PART 2- PINE COULEE PARK:
PART 3 - HOWARDS ADDITION:
102 MOBILIZATION
103 TRAFFIC CONTROL
104 POTHOLE AND VERIFY EXISTING ROAD SECTION
105 REMOVE BITUMINOUS DRIVEWAY PAVEMENT
106 REMOVE CONCREfE DRIVEWAY PAVEMENT
107 RECLAIM BITUMINOUS PAVEMENT
108 HAUL EXCESS RECLAIM MATERIAL OFF SITE
109 REMOVE AND REPLACE CONCRETE CURB AND
GUTfER
110 SUBGRADE PREPARATION
Unit
EA
SY
LF
EA
EA
EA
EA
LS
CY
TN
TN
TN
GAL
TN
LF
SF
LF
EA
LF
SY
SY
SF
SF
SF
CY
TN
TN
CY
TN
TN
TN
GAL
TN
SF
EA
LS
SF
EA
EA
EA
LF
LF
SY
LS
LS
EA
SY
SY
SY
6Y
LF
SY
Contract Unit Current Quantity Amount
Quantity
4
425
535
376
86
84
30
1
560
555
425
92
34
70
360
2
400
i
60
40
20
52
80
16
30
Price
69.92
38.72
9. i.4
9.14
10.76
31.19
16.14
3118.88
i1.32
11.25
13.88
68.00
2.14
68.00
12.26
80.68
1.34
80.67
12.91
44.10
21.51
4.84
4.84
43.03
12.00
50 15.63
15 68.00
71 12.02
36 13.10
41 15.70
10 68.00
5
10
900
1
1
475
2
4
3
150
700
4000
2.14
68.00
2.15
1613.49
6222.70
4.84
1200.00
527.08
527.07
6.45
1.99
1.08
1 3500.43
1 968.09
4 50.60
21 5.77
4 12.02
5350 0.57
- 520 - 8.69
500 22.21
6400 0.81
Quantity to IDate to Date
4 $279.68
420 $16,262.40
260 $2,376.40
5$7 $5,365.18
172 $1,850.72
104 $3,243.76
35 $564.90
$803,186.67
1
560
699
515
80
105
61
340
2
422
$3,118.88
$6,339.20
$7,863.75
$7,148.20
$5,440.00
$224.70
$4,148.00
$4,168.40
$161.36
$565.48
1
80
40
20
269
96
16
30
$80.67
$1,032.80
$1,764.00
$430.20
$1,301.96
$464.64
$688.48
$360.00
40 $625.20
14 $952.00
70 $841.40
36 $471.60
40 $628.00
10 $680.00
5 $10.70
10 $680.00
961 $2,066.15
1 $1,613.49
1 $6,222.70
378 $1,829.52
2 $2,400.00
4 $2,108.32
3 $1,581.21
150 $967.50
841 $1,673.59
6280 $6,782.40
$77,434.50
5346
- - 624 -
750
5346
$3,500.43
$968.09
$0.00
$0.00
$0.00
$3,047.22
$5,422.56 -
$16,657.50
$4,330.26
4810289R Eo7Flnal.xlsm
PVo.
111
112
113
114
115
116
i17
118
119
120
121
122
123
Contrack
Item Unit Quantity
SAWING BITUMINOUS OR CONCRETE PAVEMENT LF 70
TYPE SP 12.5 NON-WEAR COURSE TN 720
BITUMINOUS MATERIAL FOR TACK COAT GAL 270
7YPE SP 12.5 WEAR COURSE TN 540
SAW AND SEAL LF 1050
SIGN PANELS SF 11
BITUMINOUS DRIVEWAY APRON SY 21
CONCREfE DRIVEWAY APRON SY 4
REMOVE PERMANENT BARRICADE EA 2
PERMANENT BARRICADE EA 2
SODDING SY 220
APPLICATION OF WATER FOR TURF ESTABLISHMENT MG i
PRIVATE UTILITY CROSSING EA 12
TOTAL PART 3- HOWARDS ADDITION:
TOTAL PART 1- PINE COULEE & COUNTRYWOOD:
TOTAL PART 2- PINE COULEE PARK:
TOTAL PART 3- HOWARDS ADDITlON:
TOTAL WORK COMPLETED TO DATE
Unii:
Price
1.89
53.00
2.14
53.00
1.91
44.10
18.68
43.57
53.79
322.70
5.38
26.89
16.14
Curren� Quan�ity Amount
Quantity to Da�e �o Dati�
70 $132.30
602 $31,906.00
250 $535.00
530 $28,090.00
950 $1,814.50
11 $485,10
$0.00
$0.00
2 $107.58
2 $645.40
$0.00
$0.00
$0.00
$97,641.94
$803,186.67
$77,434.50
$97,641.94
$978,263.11
4810289R E47Flnal,xism
n
PRO]ECT PAYP7EfdT' S1°ATUS
OWNER CITY OF COTTAGE GROVE
STANTEC PROJECT N0, 193800i28 / 000048-10289-0
CONTRACTOR HARDRIVES INC.
CHANGEORDERS
No.
Date
PAYMENT SUMMARI�
No. From
1 05/01/2C
3
4
5
6
7/FI�
07
11
Material on Hand
4810289REQ7Final.xlsm
To
�11 05 23 2011
�11 06 27 2011
11 07 20 2011
11 11 28 2011
11 12 21 2011
l i 02 02 2012
12 10/25/2013
277,400.87
195,754.91
32,691.14
51,240.43
45,626.92
23.249.52
RetainagE
14,600.05
33,142.12
' 43,445.01
45,165.59
47,862.46
Amoun�
.000.92
842.31
900.11
311.83
249.13
013.59
263.11