HomeMy WebLinkAbout2013-11-20 PACKET 04.M.REQUEST OF CITY COUNCI� ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 11 /20/13 '
.
PREPARED BY: Community Development Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
**********************************�*****�*******
COUNCIL ACTION REQUEST:
Consider adopting a resolution approving the final plat to be known as Everwood 4
Addition.
2. Consider adopting a resolution approving the final feasibility report dated 10/09/2013,
and the plans and specifications for Everwood 4 Addition as completed by Stantec.
3. Consider adopting a resolution approving the Development Agreement with MJR
Developers, LLC and Aspen Grove, LLC, for the development of the Everwood fourth
Addition.
STAFF RECOMMENDATION
1. Adopt a resolution approving the final plat to be known as Everwood 4 Addition.
2. Adopt a resolution approving the final feasibility report dated 10/09/2013, and the plans
and specifications 2013 for Everwood 4 Addition as completed by Stantec.
3. Adopt the resolution approving the Development Agreement with MJR Developers, LLC
and Aspen Grove, LLC, for the development of the Everwood fourth Addition.
ADVISORY COMMISSION ACTION
❑ PLANNING
SUPPORTING DOCUMENTS:
DATE REVIEWED APPROVED DENIED
N/A ❑ ❑ �
� MEMO/LETTER: Memo from John M. Burbank dated 11/15/13
� RESOLUTION: Draft — Final Plat approval
Draft — Development agreement
❑ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
�OTHER: Feasibility Report
Final Plat
Development Agreement
Resolution 06-196 Approving
Preliminary Plat
ADMINISTRATOR'S COMMENTS
City Administrator Date � `/ -� �`
�
****��**********�*******************************
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
CITY OF COTTAGE GROVE
� MINNESOTA
TO: Honorable Mayor and City Council
Ryan Schroeder, City Administrator
FROM: John M. Burbank, Senior Planner
DATE: November 15, 2013
RE: MJR Develo�ers, LLC — Final Plat and Development Agreement Approval for
Everwood 4 Addition Subdivision
Introduction
MJR Developers, LLC has filed a final plat application to develop a detached single-family
residential subdivision named Everwood 4 Addition. This is the last addition for this
subdivision and consists of 10 lots for detached single-family homes on Aspen Cove which is
west of Hardwood Avenue and south of Everwood 3� Addition.
A location map is shown below and a copy of the Everwood 4th final plat is attached.
Project Location Map
Honorable Mayor, City Council, and Ryan Schroeder
Everwood 4th — Final Plat and Development Agreement Approval
November 15, 2013
Page 2 of 7
''' # � i_ �
rr�,��
; � .i; i,tr*f;;��;i:
1�
�
N
l
�
�
1
�
�`
\
! MF tJa
.�.
� .�t� S:+te
( . sc �p �'�.
nat ae aot+
�i�rctrss�sr
.
�
� ti
1 �
i �
� �
� fi� � L
y crt 4 � �
� � �
7 1
�
� � �
� �' ^7
� �,M h��
�
t
1
�
Y�
4�
I'lfi�
o�,� e�a ��,sq. c�.��.�� Q.
ds3m tlwE
� �
'�—�{ .
a �
---i---� �—�---
p�lyd !i prk Y� �liit m� eljurh�
lat Ihy, ulrye t�t�ir ah:�n,
ia1� 1G 9et h sWl� a�d uqpth�
aY+�t Ik� a� �Mn. en +7�! qa!
E7QW##t 4J'2 t#i lS' 11 (FC#� IfMY
�a b"f�t q �lUi ��i�ida
!�N nw..� �1ars ta. �s ea N�
8',�tOP�hSitd rYh yE
•ura:.. e fs nri ty x rrd, rra,
pbz mmar_v+l �id ori R�iCb
b�� k'n 1�s:m, u+l� aik,em�a
m+ a��, �{���� a� �e� t+�n
tM� fy� EVib� Hi'ffb'{El�t�
CiVA}' CA^.1dno'a S�BM'.. (1lM 6Y"�
1 O
' �.
� �
�
�
(
�
I
t
—a�
,,��w
34 6 G} 4G9 tSb
�'9�� �Ik FH8't
1 I�rt°}r — �b Fn€�E
f, .;�
ti t i ��
"�,
�a
. +`'1`
CVGI WVVU Y MUUILIVII r1I1Q1 r1Q1. L/ClQll
Honorable Mayor, City Council, and Ryan Schroeder
Everwood 4th — Final Plat and Development Agreement Approval
November 15, 2013
Page 3 of 7
Discussion
The City Council approved the comprehensive plan, rezoning, and preliminary plat applications
for this project on September 20, 2006. The conditions approving the preliminary plat have
been incorporated into the final plat. The final plat is consistent with the approved preliminary
plat. The developer has previously graded the site with the initial development, and some
additional grading will be required for this project. The project is properly guided and zoned for
residential land use. The commercial lot included in the preliminary plat is guided commercial
and zoned residential. The commercial rezoning of the commercial parcel will be project
specific and appropriate at the time of that development.
rreuminary riat
The grading of the site is tentatively scheduled for fall of 2013.
The construction of public improvements is tentatively scheduled for spring 2014.
The developer will be installing the public utilities in accordance with City policies, ordinance
criteria and supervision.
In addition to approving the final plat and the feasibility report, Council is requested to adopt a
resolution approve the Development Agreement, and approving the plans and specifications.
The draft Final Plat, Grading Plan and Feasibility Report are attached.
Honorable Mayor, City Council, and Ryan Schroeder
Everwood 4th — Final Plat and Development Agreement Approval
November 15, 2013
Page 4 of 7
The final plat was distributed to other City departments and utility companies for review and
comment. Minor changes related to easement dimensions were made to the final plat based
on the review comments. The final plat will be required to be modified to create an Outlot over
the landscaped center cul-de-sac island. The homeowners will be required to own and
maintain this outlot.
The City has prepared the construction plans and specifications and the developer will
construct all the public improvements.
Based on the lapse in time from the initial plat to this project, the feasibility study was updated
to reflect current construction costs. Preparation of the Feasibility Report dated October 9,
2013 was based on the assumption that the sanitary sewer and stormwater would be
constructed to the east. This routing option was identified in the report as being the most cost
effective and feasible routing for those utilities. The final plans for this route is being
coordinated with the Minnesota Land Trust who hold a conservation easement over the City
property surrounding the plat. This route was reviewed with the Trust and approved in
preliminary concept for during the initial development of the plat in 2006.
� �- _ � �Sx���,-�-°'��u ' t 'k :�.;�: ' ��.; ■ _ ���
, t - ., 1'•�J� y
- =i - - - v ,r .�t � `?' . �i#.. �t �''� � . , _ t. . ' �S.' � �
�, * i • •_ `��
j `� �f � - � - � � -- — - ._ x,•o.�o n�d �,�n' . � _ _+,,...,w�. . � _,vF • . " . i - � � -
� � �' ' � � � i . �� . � � '- �. .. . r _ . 's 7 l � , � t _,� � .
—,> � , ,k � '� —4 p � ; � - r _
° � � � - - � �rr�n � ,� . � M -�c * � : . �
�� �-�� .. ' . . �' . . �- a � i �.'+. . i � ! m st* [� ., .: � Y � �
� � ', y u Et i_ �.t i � - � - ., r a i m l � . , � � � m sn � -c:ca �� i st c.e+ aa��r �# �' � � _ , �
� , . .: } n .n r •run �.. � � � � t � �.- T3 1 . Fi � y, . # � ,3i '' T 1
- t � y s, �� d `t �' '`3 t ��a � �� : x /'fir- �' � r -[' � . -
-, � ��� - ;: , � k , j , �,
�i -. .� �_ t r i . � r �y ! - '� ' t - 2 r �'':� .
1 � � r .. `� �c un u rt � ° uc` - � ♦ � �_ y z � { y:�� � , .
�i:c y �.a,TM � _. ti � �. �i - � � � i�'.�=a � �f `� �� 1 `' ._ i `' � 3, - f _, .
� Kr
. '°F' �- ,1 d :. �j� � --s.+..' j �...' j C _ : yd . t " � ' � J l � '
���� L � - : rn ' ` 1 ��' l C t d`— • J �
9 � � � � f � r'F� '� '8 . `.
� - � - ry '��mv: cec. 3c��1� ��P, � i!.;r _ _ �,�� � ..>�ti. i...'.f�( . `� n .r
7 "'ys '� _E :, . Y 4 � .� '-� � _ .ds �''� � I .. � , � r � i " - : t -�,��'�[" Y � ` .�Y �-ut ,w � � y ,Y.
� �'^ i -�` .i � �}� ' � ��� ,� '� t � ; � ���.
� ' , � ' j �, 1 � ��.� r ��'' N �'"
. # i'� r � - � . , s� .__.._I'_._F � _ ' �'� r �, ' ���+4:`'
� .� ti �'f�� � � " _ � . I � � n t { . � , �' 3; : <� � 7 u�i
Tt-'� r,c • m�vr x.cu / �.t� � 1 � o �
I. � ' `� . . \ / .., � . �- �r .
�4-v' � \ ''��.� t � I+i << �� ' P ` i' ^�� � ,
�. . f� � �� , �
'�,�._.. t - I , r = c: f sy.r� � �� _ � - � ti , � ' ; �, � .. . � .
�i`E 4�'. . / .
���j_ .;� � ,,.f�
�r - � w ��• , . � f l � - � a H i ? . I '+ ;.:j_, . ... r . �; �C .
' i�'1 -� � . ,,� + �}� ` _ � � .�`- . �� • { • .
� - �, 1 � W�.° t . -ftY .' � _ i . J / `. � . � � .
� � . j " . v wux q� � / ' #� , � Y
:. � � s- t r.
,c,c �' �
r �I'y j. 7 'z:�i �a '� '? : . ' .
r � i' � � � t ' .rS � 4 � �_ '� r- �� 4 � ��� � ��' � - -
� - � -. t � �.Y' 4 Ic'e � � 1 � . ` ��, � ���
, � y _ �� r � - � � .
_ � - 1 '�• , '�`� � � �i i �� t . �/ .. � ` � �_Z
.` � � � 4 �� }_ -� � 1_
_1.�. 1 - � �s ' '� .� {� t �." � �` �i , �..
l � ,:. �, , re
FFCiPti=�.FDUTILITYIi9PRU'dt:'�I�ffT6 - -� 'J — ����(�� ��...«�o.�.�.�....���.
� �
CITY OF COTTa r u:01'E F[� �P.E: 3 �
EI�ERV:CX�D 4TH ADDITIOV i.,-� Ae. a.: � ��
Utility map
Honorable Mayor, City Council, and Ryan Schroeder
Everwood 4th — Final Plat and Development Agreement Approval
November 15, 2013
Page 5 of 7
Offsite Ponding
The surFace water management ponding for the Everwood subdivision has been temporarily
held on the location of this final plat. The permanent ponding that is designed for the entire
subdivision will be constructed along the west side of Harwood Avenue. The developer will be
constructing the two cell stormwater basin. No easement will be required, as the pond will be
located within public right-of-way.
Trails
The preliminary plat approval included the requirement for recreational and transportation
trails. The Transportation trail is along the west side of Hardwood Avenue from East Point
Douglas Road to 73� Street. The City will be cost sharing on a portion of this trail, and the
commercial lot associated with the subdivision will carry some of the costs for the portion of the
trail that is adjacent to it. The recreation trails are located along Harwood Avenue and on the
"Old Farm Road" on the commercial lot. The farm road trail will be developed in the future by
the developer of that lot. These recreation trails will be constructed with wood chips. In the
detail below, the recreation trails are identified in purple and the transportation trails in orange.
The City will also be financing the construction of a missing sidewalk link in blue along the west
side of Harwood Avenue between East Point Douglas Road and Harkness Avenue. This walk
is required to serve the White Pines Senior Housing and the balance of the Southpoint Ridge
commercial development.
-�, �,�,�� , .� ¢ �,, � ,, � : , -� � �� ,� , _ � � ,a,�, :
�, _ + -
.. 'h.' _ I "'' £ _ - t . st`���. � 1 �, f +i ��y .,. Y r �'.. :
� �. ,t ,�• .�' - ' l�1 , .� f�.= s. � � A yi .� t K�` pyS � `�t � �-�� . �� 1j
: - r , ' ,��'
R ' ; �`�+r '� --�` . � , } ,� .�+�`: �, }Y , ? ,: �''"� '' t`�yi.. � :. t� � ' r � �'���,tF.: i j ' r _
�y _�rf �x tt�'��FC't '_t'° .':"�'` tr:� "f�. . rL y }`t �.- 6 �;.�-� ..7iw�wawr+m I��cd�<•�•yt � --
. � �`.a.,�' ,-!'�£-: sat .i.:s ` yt �.- e:, �F �n'- �c•�aw. _.--, , •
� ./ si :c� { r -,. ai!' �` �T� ?3� . t �ifTFi!±M �� � _ _ . - '. � '{
� �' _ y ��� �-' ` � . r � � � . p � . . 1 . / ` .1 �
A a ,
�♦�` - ��� � r�1 1 � S _t "a'� � '�t� . P ., ���i� i
( _ »£= '1� � � _ L� �� � - ti..� �4 . � � � 1 . "S.� }f 4 � �' � � f �i : J __. r � f �`•'
5, r J 1� i r�r�m�wsnia �i{��1 � �� � ���. � r.^L' � :_� � n -�,�•- � - '��' � �r 4 � ��i�
t F � k�, ��b � F � .-� ' ,Y �'� i;� f yk :. !' �; � � -'i r��`S t.�.. t� .. I � ciaomcnwx �
� � 7 �7� �'f� t �� 2'1s zrv � . � ,1 ���� }i � 5 a •' n �-�� .. < � ,
asS. � .-,�, 'a �..� .:`+t�`AT-I� . . ..-'� n.�i�� �•� � , � �.`
P� f I �� L �' & `� �� - 4 G, � ' _ +.`'�'� � `, �� I , .. . � � � __.. _ `„ .,,;nu, , ,
J .3s ,t y �� : i'�" r ,��_ t '{ � � _� ' .. . ... � �
'� � � rZ�;?' � �'�, �q :� � ,�. ,� ' —a,M � '
L I f.. �5-' a ei. t, � t . s � a e'n� �.� � �����¢f
r I i y. � ". _ I � `.-+ .�� D r . . , !.'� e'ky 'R�� '��� �s.i � .a
� �, � - ; `�i + ..��� + �1 � `__ <� �. � f . i �.Y , � � �1 � . � g m.� ��� �'. � .,
< , 4� � _ � � � � , �- i } � � � - <<:,
�_ � { , , � �
� ��� r.. rj'� 1_u� y ' �" _.- P �, `� a: , ._� .- .�i / .. ` x.
�) ' (_ � 4t � r � waam�nw�nlaY�� � ti. �wrArmnrsaarvai� �� �-. 1
it: . � r.� - � �"�. F� i 7 �'4; c�.l� , � t �r r.._�{. - - t` f . .�� �1
L � � ` � ��t� � � • .:u9 „ � '
,�, �,�` � { �� - � '�4 1��� ` �r� y ' • � � � ,_� � _
� , � � �
' � N�:[ �- % '�--� � ,ri� f�7� �r �M _,r' � �-'r� � (� � � qA. E �_ L {j1 ��
i
r ��: +:.� € _ 7
� p y ', r _' <� Y � �a ti . _ _ . � R ' 4 ` �. Ri,
�' + f��l r , _ l'� !' � .. � J � t�i� < �; .y rr,l�'� - , w �, , . Y .�:; � $ ,
J � f �- r�� ,II� � , :'` �, � � � � y �'_ ,� . pi ,e„ ,m� '� i ��� 4 � -. � . �t'. ,
`:R '�.•,` 1 $ _ f � ` .r�J 'f ; � �� i .( ���l�., '`� .�`± .� �,��¢� ��a � �-` •' ���: n.s�l,y . .- . � .�..'.��.
� � ..
I '. I ( .� , t � � �i� � ,� --.� . . . t ,'� L � � ' �,'S� < . �/
� � f1 �• � � / y .' �. ; . � � : � , . -.
� ti r � � I
�� I �� � � (- � � ���}, - • �� �' Y � � i �- e � nn,.. r �nuaass,r.,. �.. " � ,!
� � Z..��I �- � � �'A.. aT � ��L t���'�`�� f" j .T; d `~' � ��t /,i 1
r � ° �,9�� r' � ( ,.� �� ;= `
, - I � �.� h - �,�� r - ;l ,� �,- _ , ! - = r � ,�s��: � '�� . .� !�
q �!l t - r S�i'. ���y�� ■' I rs r �� t a � r ` 3' l 6 - �#.� E �� S �.� _+�,•
.�' ' __� '� � �
s � �_�f �t . ✓� '��Y�� �� r �`' � ,; r�' � ,� s " k � � J ,�
�� �� � � � �
� - �, � - � _�� '�s � .�� ,. ;�� �,._'� '�'
PkpFO`EC? �ID�F1�FlLk, Tf�4IL'; S STF EET ]� 1FRCNEtd�tITS ���/'� - .�,,,.�...,�.�..�.,.�,.....,,...,,..,�
r :' .1
LI71' pF CUTi A:�E I.RU`:E RGIIFE: 2 1
EL'ERVd:70D4TFIADDITION :��E� ��x:: ��
Trailway Route Detail
Honorable Mayor, City Council, and Ryan Schroeder
Everwood 4th — Final Plat and Development Agreement Approval
November 15, 2013
Page 6 of 7
Park and Open Space
The park dedication for this subdivision was a combination of land dedication and cash. The
cash dedication fee for the 10 lots is $2,200 dollars per lot. This fee is required to be paid at
the time of the recording of the plat. The area of land that was dedicated in lieu of cash is
highlighted in the hatched area below. Due to the conservation easement encumbering the
property, full credit was not given on the dedication. The negotiated amount was the reference
$2,200 per lot fee.
Area Charges
The area charges required for the proj�ct total $67,919 and are detailed in the attached
feasibility report. These fees are required to be paid at the time of the recording of the plat.
Summary
The project is properly guided and zoned for residential land use.
The final plat is consistent with the preliminary plat for the site.
The project is found to be feasible.
The City prepared the construction drawings for the project.
The developer will be installing the public improvements in 2014.
Financial sureties will be held by the City during the development of the subdivision.
The developer shall be responsible for on site improvements including yard sod, boulevard
trees, and driveway aprons.
Park Land dedication detail
Honorable Mayor, City Council, and Ryan Schroeder
Everwood 4th — Final Plat and Development Agreement Approval
November 15, 2013
Page 7 of 7
Recommendation
The City Council is requested to take the following actions:
1) Accept the feasibility report and approve the final construction drawings for Everwood
4th Addition.
2) Adopt the attached resolution approving the final plat named Everwood 4th Addition.
3) Approve the Development Agreement with MJR Developers, LLC and Aspen Grove,
LLC, for the development of the Everwood 4th Addition.
RESOLUTION NO. 2013-XXX
RESOLUTION APPROVING THE FINAL PLAT NAMED
EVERWOOD 4 ADDITION
WNEREAS, MJR Developers, LLC has applied for a final plat to develop a single-family
residential subdivision named Everwood 4 Addition. The final addition in the Everwood
Subdivision located within the West Draw planning and development of the community. The
development phase is comprised of 10 lots for single-family homes and one outlot. The subdivi-
sion would be located on property legally described as:
Outlot A, Everwood 3rd Addition,
City of Cottage Grove, County of Washington, State of Minnesota.
WHEREAS, the property is properly guided and zoned for the single family residential
subdivision;
WHEREAS, the City Council approved the preliminary plat for Everwood Addition on
September 20th, 2006 (Res. No. 2006-196); and
WHEREAS, City staff found the final plat substantially consistent with the approved prelimi-
nary plat.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Cottage
Grove, Washington County, Minnesota, hereby approves the final plat application filed by MJR
Developers LLC for a residential subdivision plat named Everwood 4 Addition. This final plat
consists of 10 lots for single-family homes located on the property legally described above. The
approval of this final plat is subject to the following conditions:
The developer and builders must comply with all city ordinances and policies.
2. The developer must abide by the conditions stipulated in Resolution No. 2006-196,
which approved the preliminary plat, except as hereafter modified.
3. All utility, drainage, and development plans must conform to the plans approved by
the City Engineer. The developer may start rough grading of the lots before the plat
is filed, if a MPCA Construction Storm Water Permit has been issued and the City
has been furnished with a cash escrow or letter of credit in the minimum amount
specified in the approved development agreement.
4. Development of this project must comply with the grading and erosion control plans
as approved by the City Engineer.
5. The developer must construct or install and pay for the following:
a) Pave streets
b) Concrete curb and gutter
c) Street lights
Resolution No. 2013-XXX
Page 2 of 4
d)
e)
fl
g)
h)
i)
1)
k)
Water system (trunk and lateral) and water house service stubs
Sanitary sewer system (trunk and lateral) and sanitary house service stubs
Storm sewer system
Street and traffic control signs/signals
Shaping and sodding drainage ways and berms in accordance with the
drainage development plan approved by the City Engineer
Adjust and repair new and existing utilities
Sidewalks and trails
Erosion control, site grading and ponding
These Improvements must be in conformance with City approved plans and
specifications and will be installed at the sole expense of the developer in
conformance with Title 10, Chapter 5 of the City Code.
The form of the financial security is subject to the reasonable approval of the City.
6. The developer shall be responsible for on site improvements including yard sod,
boulevard trees, and driveway aprons.
7. An Outlot (Outlot A) shall be created over the landscaped Cul-de-sac Island.
8. The Homeowner's Association for this development is responsible for the mainten-
ance of all vegetation and landscaping lying within the landscaped cul-de-sac islands
(Outlot A)
9. The City will supply the street light poles and luminaries. The Developer will pay the
City for street light poles and street light luminaries. This fee is due and payable at
the time of executing the development agreement.
10. The final wear course shall be completed when at least 90 percent of the houses on
that street segment have been constructed.
11. After the site is rough graded, but before any utility construction commences or build-
ing permits are issued, the erosion control plan shall be implemented by the Devel-
oper and inspected and approved by the City. The City may impose additional
erosion control requirements if it is determined that the methods implemented are
insufficient to properly control erosion.
12. The final plat and declaration of private covenants must be recorded with the
Washington County Recorder's Office before any building permit can be issued.
13. Before final financial guarantees are released, a certificate signed by a registered
engineer must be provided. This certificate will state that all final lot and building
grades are in conformance to drainage development plan(s) approved by the City
Engineer.
14. The developer must comply with all the recommendations of the City Engineer
including:
Resolution No. 2013-XXX
Page 3 of 4
• A minimum of a 30' easement is required for the storm sewer that is proposed
to be routed east and between lots 1 and 2 of block 2.
• A minimum of a 30' easement is required for the sanitary sewer that is
proposed to be routed east and between lots 2 and 3 of block 2.
• EOF's require a 20' drainage and utility easement. It is recommended to place
the proposed EOF (currently between lot 4 and 5 block 1) between lot 5 block 1
and lot 1 block 2(a 30' outlot currently exists).
• Modify the proposed rear lot grading on lot 3 block 1 to avoid routing drainage
across lot 4 block 1. If this cannot be accomplished then a drainage and utility
easement will be required across the rear of lot 4 block 1 to contain drainage
routed off of lot 3 block 1.
15. The park boundary marker(s) must be installed at the corners of private properties
abutting public property as designated by the city's Parks director. Residential lots
designated to have a boundary marker(s) must have the marker(s) before a Cer-
tificate of Occupancy can be issued for the house on that particular residential lot.
16. The developer shall pay $2,200 per lot for park dedication requirement prior to the
release of the plat for recording with Washington County.
17. The Developer shall post a letter of credit or escrow to the City for the estimated cost
of the boulevard trees, four yard trees, and ten shrubs on each lot.
18. All mailboxes and location of mailboxes must comply with the U.S. Postal Office
guidelines and regulations. Mailboxes placed at the curb shall all be the same design
and color.
19. Once a homeowner occupies a house, the homeowner is responsible for the
maintenance and upkeep of the boulevard area that abuts their property. The
Developer must ensure that all builders keep all streets free of debris and soil until
the subdivision is completed. Warning signs shall be placed when hazards develop
in streets to prevent the public from traveling on said street(s) and directing them to
detour routes. If and when the street becomes impassible, such streets shall be
barricaded and closed. In the event residences are occupied prior to completing
streets, the developer must maintain a smooth driving surface and adequate
drainage on all streets until they are completed and accepted by the City. The
developer hereby agrees to indemnify and hold the City harmless from any and all
claims for damages of any nature whatsoever arising out of developer's acts or
omissions in perForming the obligations imposed upon developer by this paragraph.
20. The Developer shall be responsible for installing trails and sidewalks as deigned in
the approved feasibility study and plans and construction drawings for the
subdivision.
Passed this 20th day of November, 2013.
Myron Bailey, Mayor
Attest:
Resolution No. 2013-XXX
Page 4 of 4
Caron M. Stransky, City Clerk
RESOLUTION NO. 2013-XXX
RESOLUTION APPROVING THE FEASIBILITY REPORT
AND CONSTRUCTION PLANS AND SPECIFICATIONS FOR THE FINAL PLAT NAMED
EVERWOOD 4 t " ADDITION
WHEREAS, MJR Developers, LLC has applied for a final plat to develop a single-family
residential subdivision named Everwood 4 th Addition. The final addition in the Everwood
Subdivision located within the West Draw planning and development of the community. The
development phase is comprised of 10 lots for single-family homes and one outlot. The subdivi-
sion would be located on property legally described as:
Outlot A, Everwood 3rd Addition,
City of Cottage Grove, County of Washington, State of Minnesota.
WHEREAS, the City prepared a feasibility study for the subdivision dated October 9, 2013
and the project was found to be feasible; and
WHEREAS, the Developer will be utilizing plans and specifications designed and
approved by the City in the installation of the the public improvements within the subdivision;
and
WHEREAS, the approved plans and specifications are in conformance with the information
included within the feasibility report.
WHEREAS, the Developer will be installing the public improvements within the
subdivision in accordance with current City ordinances and policies; and
WHEREAS, a development agreement and financial sureties will be required as a
component of the subdivision development.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Cottage
Grove, Washington County, Minnesota, hereby approves the Everwood 4th Addition feasibility
report dated October 9, 2013, and the related construction plans and specifications prepared by
Stantec in conformance with the utility and road improvements information detailed in the
approved feasibility report.
1. The developer and builders must comply with all city ordinances and policies.
2. Modifications to final construction plans and specifications shall be permitted in
writing by the city Engineer.
Passed this 20th day of November, 2013.
Attest:
Myron Bailey, Mayor
Caron M. Stransky, City Clerk
RESOLUTION NO. 2013-XXX
RESOLUTION APPROVING THE DEVELOPMENT AGREEMENT
FOR THE FINAL PLAT NAMED
EVERWOOD 4 ADDITION
WHEREAS, MJR Developers, LLC has applied for a final plat to develop a single-family
residential subdivision named Everwood 4 Addition. The final addition in the Everwood
Subdivision located within the West Draw planning and development of the community. The
development phase is comprised of 10 lots for single-family homes and one outlot. The subdivi-
sion would be located on property legally described as:
Outlot A, Everwood 3rd Addition,
City of Cottage Grove, County of Washington, State of Minnesota.
WHEREAS, The City requires development agreements for residential, commercial and
industrial development within the community; and
WHEREAS, Everwood 4 Addition is a residential subdivision; and
WHEREAS, MJR Developers, LLC is the developer of the plat to be known as Everwood 4tn
Addition; and
WHEREAS, Aspen Grove, LLC is a property owner of the plat to be known as Everwood 4tn
addition.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Cottage
Grove, Washington County, Minnesota, hereby adopts a resolution approving the
Development Agreement with MJR Developers, LLC and Aspen Grove, LLC, for the
development of the Everwood 4th Addition.
Passed this 20th day of November, 2013.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
DEVELOPMENT AGREEMENT
EVERWOOD 4TH
THIS DEVELOPMENT AGREEMENT ("Agreement") is entered into on the 20�' day of
November, 2013 by and between MJR Developers, LLC, a Minnesota Limited Liability
corporation, and Aspen Grove LLC, a Minnesota limited liability coiporation, jointly referred to
as the "Developer", and the City of Cottage Grove, a municipal corporation, situated in the
County of Washington, State of Minnesota, hereinafter refened to as the "City."
RECITALS
A. At the time this Agreement is recorded, the Developer is the fee owner of the parcels of land
described in E�ibit "A", which is to be developed as a subdivision in the City bearing the
name `Bverwood 4th" and may sometimes hereinafter be referred to as the "Subject
Property" or the "Subdivision".
B. The Developer proposes to develop the final phase of the Subject Property, which is being
platted into ten (10) lots for the construction of detached single-family homes situated in the
City of Cottage Grove, County of Washington, State of Minnesota.
C. The City approved the Everwood preliminary plat (Resolution No. 2006-196) on September
20, 2006 and the Everwood 4th final plat on August 14, 2013, a single-family development
on 5.31. The Everwood preliminary plat consists of twenty eight (28) single family lots.
The Everwood 4th fmal plat consists of ten (10) single-family lots and one (1) outlot.
D. The City requires that certain public improvements, which are herein referred to as the
"Public Improvements" and include, but are not limited to storm drainage systems, sanitary
sewer, water, grading, street lighting, trails, sidewalk, curb and gutters, and streets, be
installed to serve the Subject Property and other properties affected by the development of
the Subject Property, all at the expense of the Developer, all as set forth herein and in the
Plans Approved November 20, 2013.
E. The Developer will perform other work and install cei improvements within the Subject
Property, which work and improvements typically consist of drainage swales, erosion
control, street cleaning and the lilces thereof and which improvements to the Subject
s�
Properly shall be refei�red to herein as "On-Site Improvements". Public Improvements and
On-Site Improvements are collectively referred to as the "Improvements."
F. The Developer shall develop the Subject Property and install the Public Improvements in
confot�mance with the plans and specifications prepared by the City and approved on
November 20, 2013 and referred to as the "Approved Plans". The Approved Plans shall not
be amended without the prior vv�itten approval of the Developer and the City.
NOW, THEREFORE, IT IS HEREBY AND HEREIN MUTUALLY AGREED, in
consideration of each party's promises and considerations herein set forth, as follows:
1. Request for Plat Approval. The City approved the final plat for Everwood 4th on November
20, 2013. This residential subdivision is located in the City of Cottage, Grove, County of
Washington, State of Minnesota, and is legally described in E�ibit A.
2. Conditions of Approval. The City hereby approves the final plat and this Agreement on the
conditions that:
a. The Developer enters into this Agreement and abides by the conditions stipulated in the
resolution approving the final plat and the terms of this Agreement.
b. All the lots within Everwood 4th are required to be part of a homeowners association.
c. The Developer provides to the City upon execution of this Agreement:
i. An irrevocable letter of credit or cash in the amount of $547,365.80 as detailed in the
table below:
(See next Page)
-2-
Street paving
Sanitary sewer system
Water system
Water & Sanitary house services
Storm sewer
St, lighting (base, conduit, wiring, etc.)
Bituminous Trail
Mulch Trail
Concrete Sitlewalks
General
Sub-total
Park Improvements
Final Street 1, 2&3
Sub•total
Ponding Credit
Bituminous Trail Credit
Concrete sidewalk credit
Grading Escrow Deposit
Sub-total
Total
' ACTUAL COSTS WILL BE DEDUCTEDICREDITED
Est. Costs (not including
30% Eng.)
y80,415.00
$67,085.00
�2,600.00
$14,910.00
$167,014.00
�12,745.00
�142,688.00
$45,825.00
$29,249.00
a� 16,175.00
�578,706.00
$0.00
$33,492.00
$33,492.00
DEDUCTIONS
EST. COSTS
-$24,571.36
-$120,485.00
-$29,249.00
•3174,305.36
$404,400.64
125%
125%
125%
125%
125%
125%
125%
125%
125%
125%
LOC
�100,518.75
�83,856.25
$3,250.00
$18,637.50
�208,767.50
^� 15,931.25
�178,360.00
$57,281.25
$36,561.25
$20,218.75
�723,382.50
�0.00
$41,865.00
$41,865.00
Cash Payment 12% of
Est.
$12,062.25
a�8,050.20
$312.00
$1,789.20
�20,041.68
$1,529.40
$17,122.56
$5,499.00
$3,509.88
$1,941.00
$71,857.17
$0.00
�5,023.80
$5,023.80
-
-$150,606.25
-$36,561.25
-$217,881.70
$547,365.80
-$5,000.00
$65,683.90
DEVELOPMENT FEES AND CHARGES
EST. CO5TS EST. COSTS
Misc $0.00 100% �0.00
Sanitary SewerArea Charge 2013 Rate 514,860.00 100% �14,860.00
WaterArea Charge 2013 Rate �17,025.00 100% $17,025.00
Stormwater Area Charge 2013 Rate �36,035.00 100% $36,035.00
AUAR Fee 2013 Rate �0.00 100% $0.00
Major Road Fee 2012 Rate $0.00 100% �0.00
Street Light Poles $2,250.00 100% $2,250.00
Street Light Luminaires $2,250.00 100% $2,250.00
Street Sealcoating $1,535.00 100% $1,535.00
Trail Sealcoating �1,953.00 100°/o $1,953.00
Boundary Markers $1,035.00 100°/a $1,035.00
Grading escrow $22,346.00 100% �22,346.00
Sireet Light Utility Charge $588.00 100% $588.00
SUB-TOTAL $99,877.00 $0 $99,877.00
TOTALS $504,277.64 �547,365.80 $242,441.87
-3-
The letter of credit must be issued by a bank that is detei7nined by the City to be solvent and
creditworthy and in a form acceptable to the City. If the City determines at any point that
the bank no longer satisfies its requirements, it can require the Developer to get a new letter
of credit fiom a different bank.
ii. Proof of public liability and proper�ty damage insurance covering personal injury,
including death and claims for property damage which may be caused by reason of the of
the Developer's work or the work of its contractors or subcontractors is required. Limits for
bodily injuty or death shall not be less than $1,000,000 when the claim is one for death by
wrongful act or omission or for any other claim and $2,000,000 for any number of claims
arising out of a single occurrence. Limits for propei damage shall not be less than
$500,000 for each occui�rence. The Developer must keep the insurance in force at all times
that construction for the development is in progress. The City must be named as an
additional insured on the policy and the policy or an endorsement to the policy must provide
that the insurer must give the City at least ten (10) days' advance written notice prior to
cancellation or termination of the insurance policy; and
iii. A cash payment for required development in the amount of $242,441.87 as shown in the
table above.
If any funds held under this agreement exceed the amount necessary to reimburse the City
for its costs under this paragraph, such funds shall be returned to the Developer without
interest. If it appears that the actual costs incurred will exceed the estimate, the Developer
and the City shall review the costs required to complete the project and the Developer shall
deposit additional sums with the City.
d. The Developer records the final plat with the County Recorder within six (6) months after
City Council approval of the final plat.
e. The Developer agrees to furnish all labor, materials and equipment per the resolution
approving the final plat for Everwood 4th and perform the Public Improvements and utility
repair and adjustment in conformance with the approved plans.
3. Develonment Plans and Ri�ht to Proceed. The Developer may not consnuct any
Improvements until all the following conditions have been satisfied:
a. This Agreement has been fully executed by both parties and filed with the City Clerlc.
b. The necessary securities, wananties, and escrows as required by this Agreement have been
received by the City.
c. The City has issued a letter stating that all conditions of this paragraph have been satisfied
and that the Developer may proceed.
-4-
The Developer agrees that the Improvement worlc shall be done and performed in a
wor•lcmanlike manner and all materials and labor shall be in shict conformity with the
Approved Plans and City ordinances. Any material or labor supplied rejected by the City as
defective or unsuitable per the Approved Plans shall be removed and replaced with
approved material to the reasonable satisfaction or approval of the City at the cost and
expense of the Developer.
The Developer sha11 submit a written schedule indicating the progress schedule and order of
completion of the Improvements. It is further agreed that upon receipt of written notice
from the Developer of the existence of causes over which the Developer has no control
which will delay the completion of the Improvements, the City Council, in its discretion,
may extend the date herein for completion and that any security required shall be continued
to cover the Improvement work dui7ng this extension of time. It is distinctly understood and
agreed that all Improvement wor•k covered by this Agreement shall be done at no expense to
the City unless otherwise agreed to by the City and the Developer. The City agrees to
sealcoat the st�eets in the subdivision, at the City's expense, within two (2) years following
the installation of the wear course paving in the Subdivision.
The Developer agrees to have all Improvements substantially done, including the
bituminous wedge on the street and fully completed to the reasonable satisfaction and
approval of the City Engineer on or before November 15, 2014, except all concrete work
must be completed by October 15, 2014 and the wear course/final lift of all sneets in the
subdivision must be completed within three (3) years from the date all other Public
Improvements are accepted by the City or when ninety percent (90 %) of the houses have
been constiucted, whichever is sooner. The Developer is responsible for the future
expenditures to remove the temporary wedge, pave the wear course, repair curb and gutters,
and restore impacted areas and any other Improvement that must be completed.
4. The Developer shall not do any work or furnish any materials not covered by the Approved
Plans or this Agreement, for which reimbursement is expected from the City, unless such work
is first or•dered in writing by the City as provided in the Approved Plans. Any such work or
materials which may be done or furnished by the Developer's contractor without such written
order first being given shall be at the Developer's own risk, cost and expense and the Developer
hereby agrees that without such written order the Developer will make no claim for
compensation for work or materials so done or furnished.
It is further agreed, anything to the conhary herein notwithstanding, that the City, City Council
and its agents or employees shall not be personally liable or responsible in any manner to the
Developer, the Developer's contractor or subcontractors, material men, laborers or to any other
person or persons whomsoever, for any claim, demand, damages, actions or cause of any action
of any kind or character arising out of or by reason of the execution of this Agreement or the
perfoimance and completion of the Improvement work and the Improvements and that the
Developer will save the City harmless from all such claims, demands, damages, actions or
causes of action or the costs, disbursements and expenses of defending the same, except for any
such claims, demands, damages, actions or causes of action caused by the misconduct or
negligence of the City or someone acting on its behalf.
��
5. Stakin�, Surveyin� and Inspections. Developer must provide all staking and surveying for the
Improvements in order to ensure that the completed Improvements confoi�rn to the Approved
Plans. The City will provide for constiuction inspections, witness testing, review testing reports,
conduct erosion conhol inspections and attend project meetings at the Developer's expense but
in no case shall such expense exceed the cash payment for twelve percent (12%) of
Improvement costs identified above and paid by the Developer as part of this Agreement.
Developer must notify the City Engineer at least forty eight (48) houz•s in advance, not including
weekend days or holidays, for inspection seivice or scheduling of tests to be performed.
6. Street Li�hts. The City will furnish the street light poles and luminaries. The Developer is
responsible for installing the street lights and providing all other street light improvements as
shown on the Approved Plans.
7. Final Inspection/Acceptance. Upon completion of the Improvements, the City Engineer and
representatives of the Developer's contractor and/or engineer will promptly make a final
inspection of the Improvements. Before final acceptance and release of the securities by the
City is made the Developer, the City Engineer shall be satisfied that all work is satisfactorily
completed in accordance with the Approved Plans and all City inspections for the work were
performed, and the Developer's engineer shall submit a written statement attesting to the same.
The Developer's contractor performing the Public Improvements for the Developer must submit
to the City a one hundred percent (100%) warranty maintenance bond that shall run for a
minimum of one (1) year. Said bond shall run from the date of acceptance by the City of all
Public Improvements. At the time of final acceptance of the Public Improvements, if it is
detel�nined by the City that the Approved Plans were not adhered to, or that the Public
Improvement work was done without City inspections, the Developer agrees to increase the
length of the one hundred percent (100%) war�anty maintenance bond up to a maximum of five
(5) years as reasonably determined by the City Engineer. The wat7anty period for streets
commences after the final placement of the wear course.
The City Engineer will notify the Developer in writing of the City's approval of the
Improvements and schedule the request for acceptance by the City Council. The final approval
and acceptance of the Improvements by the City Council shall constitute final approval and
acceptance by the City without further action on the part of any party hereto.
8. Default by Developer. In the event of default by the Developer as to any of the Improvement
work to be performed hereunder by the Developer, its successors or assigns, and the
continuance of such default after written notice fiom the City and the expiration of the Cure
Period (as defined below), the City is granted the right to declare any sums provided by this
Agreement due and payable in full, and the City may draw upon any financial guaranty(ies)
posted in conformance with this Agreement, provided, however, the Developer shall first be
given an opportunity to cure the default for a period of at least thirty (30) days (except in
emergency situations) thereafter as provided below. Said notice will be addressed to the
Developer at the address shown below in Section 18. In the event the City draws from any
-�-
financial guaranty(ies) sums that exceed the costs or damages to the City, the City will promptly
return such excess amounts to the Developer.
Notwithstanding anything to the contrat•y contained in this Agreement, if the City detei7nines
that the Developer is in default of any of the terms of this Agreement, the City shall promptly
notify the Developer of the default and/or non-compliance. The City agrees to provide the
Developer a reasonable and appropriate amount of time, which shall not be less than thii
(30) days, for the Developer to correct any noted defaults, based on the measures that will
need to be taken by the Developer to correct the default ("Cure Period"). In the event
Developer fails to correct said non-compliance within the designated Cure Period, the City
may talce any other remedy or action available to the City under the terms of this Agreement.
9. Denial of Permits. Breach of any term of this Agreement by the Developer or failure to comply
with City ordinances shall be grounds for denial of building or occupancy pei�nits for buildings
within the Subdivision until such breach is con•ected by the Developer.
10. Attorneys' Fees. The Developer will pay the City's reasonable attoiney's fees to be fixed by
the Court in the event a suit or action is brought to enforce the teims of this Agreement, or in the
event an action is brought upon a bond or letter of credit furnished by the Developer as provided
herein.
11. Assi�nment. The Developer may not hansfer or assign any of its obligations under this
Agreement without the pi7or written consent of the City, which shail not be unreasonably
withheld, conditioned or delayed.
12. A�reement to Run with Land. The City agrees to record this Agreement among the land
records of Washington County, Minnesota and the Developer agrees to record the `Bverwood
4th" fmal plat at Washington County, Minnesota. The provisions of this Agreement shall lun
with the land and be binding upon the Developer and its successors in interest. Notwithstanding
the foregoing, no conveyance of the Subject Property or any part thereof shall relieve the
Developer of its liability for full performance of this Agreement unless the City expressly so
releases the Developer in writing.
13. Release. Upon completion and approval of all Improvements required herein, including
completion and acceptance of the Improvements and satisfaction of all of the Developer's
obligations under this Agreement, the City agrees to execute an instiument (in form sufficient to
remove this Agreement as a further encumbrance against the Subject Property) releasing all of
the Subject Property from the terms of this Agreement.
14. Severability. The provisions of this Agreement are severable, and in the event that any
provision of this Agreement is found invalid, the remaining provisions shall remain in full force
and effect.
15. Consent. The Owner represents and wai7ants that the Developer is the only person or entity
interested in the Subject Property.
�r�
16. Anplicable Law. This Agreement shall be governed by and construed in accordance with the
laws of the State of Minnesota.
17. Chan�es in Official Controls. For two (2) years fiom the date of this Agreement, no
amendments to the City's Comprehensive Plan or official controls shall apply to or affect the
use, development density, lot size, lot layout or dedications of the approved preliminary plat and
final plat unless required by state or federal law or agreed to in writing by the City and the
Developer.
18. Notices. Required notices to the Developer shall be in writing, and sha11 be either hand
delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail
at the following address:
MJR ,LLC. - Minnesota
Attn.: Mike Rygh
Suite 101
6939 Pine Arbor Drive,
Cottage Grove, MN 55016
Notices to the City shall be in writing and shall be either hand delivered to the City
Administrator, or mailed to the City by certified mail in care of the City Administrator at the
following address:
City of Cottage Grove
Attn.: City Administrator
12800 Ravine Parkway South
Cottage Grove, MN 55016
19. Prior A�reements. This Agreement supersedes and replaces any prior development
agreements affecting the Subject Property.
20. Mail Boxes. The Developer is responsible for the placement of a mailbox for all the lots within
the Subdivision and must comply with the United States Postal Service's mailbox design and
placement guidelines. The mailboxes must be of similar design and color within the Subject
Property.
21. Sidewalk and Trail Maintenance. The City will be responsible for snow removal or
maintenance on any hails or sidewallcs created as a result of this project.
22. Park Dedication and Park Improvements. During the earlier platting phases of the property
it was deteimined that the cash parlc dedication per lot for the entire subdivision would be
reduced to $2,200 per unit based on the lands that were dedicated being encumbered by a
restrictive conservation easement. The Park dedication fees shall be submitted to the City by the
Developer prior to the plat being released with Washington County for recording.
23. Off-site Trail Improvements. The Developer will finance and construct all the trail segments
and sidewalks identified in the feasibility report for the project. The City will credit the
-s-
Developer for the Hardwood concrete sidewallc and the bituminous trailway segment installed
along Hardwood Avenue north of the mulch natural trail.
24. Credits
The cost and surety table in this agreement reflects credits for costs already incui7ed by the
developer and for cost participation by the City.
IN WITNESS OF THE ABOVE, the parties have caused this Agreement to be executed on
the date and year written above.
SIGNATURES APPEAR ON NEXT PAGE
-9-
MJR DEVELOPERS, LLC
B
Mike J. Rygh
Its : Chief Manager
CITY OF COTTAGE GROVE:
e
:
Myron Bailey, Mayor
Caron M. Stransky, City Clerk
ACKNOWLEDGEMENT FOR CITY
STATE OF MINNESOTA
COUNTY OF WASHINGTON
)
)ss.
)
The foregoing instrument was acknowledged before me this day of
, 2013, by Myron Bailey, Mayor and Caron M. Stransky, City Clerk of the
City of Cottage Grove, a Minnesota municipal corporation, on behalf of the corporation.
(Notary Seal)
Notaiy Public
ACKNOWLEDGEMENT FOR DEVELOPER
STATE OF MINNESOTA
COUNTY OF
)
)ss.
)
On this day of , 2013, before me, a notary public within and
for said County, personally appeared Mike J. Rygh, Chief Manager of MJR Developers, LLC, a
Minnesota limited liability coiporation on behalf of said coiporation.
(Notary Seal)
THIS DOCUMENT DRAFTED BY:
Community Development Department
City of Cottage Grove
12800 Ravine Parkway South
Cottage Grove, MN 55016
Notary Public
-lo-
ASPEN GROVE, LLC, a Minnesota limited liability Corparation.
By:
Matthew Francis
ACKNOWLEDGEMENT FOR DEVELOPER
STATE OF MINNESOTA )
)ss.
COUNTY OF )
On this day of , 2007, before me, a notary public within and
for said County, personally appeared Matthew Francis, Governor of ASPEN GROVE,LLC, a
Minnesota Corparation, on behalf of said corporation, to me personally known, each by me duly
sworn, did say that he is respectively the Govemor ofASPEN GROVE,LLC, named herein and he
did acknowledge and execute said instrument to be his free act and deed on behalf of said
Corparation.
Notary Public
Notary Seal)
THIS DOCUNIENT DRAFTED BY:
Community Development Department
City of Cottage Grove
12800 Ravine Parkway South
Cottage Grove, MN 55016
11-
EXHIBIT "A"
LEGAL DESCRIPTION OF THE SUBJECT PROPERTY
Lot A Subdivision Cd 2656 EVERWOOD 3RD ADDITION on file and of record in the office of
the Registrar of titles, Washington County, Minnesota (containing 5.31 acres, mor•e or less)
s��
Cottage
� / Grov�
�'�'� �'h P Meet
� e • �
re ana �
Pride �
Feasibility Report
Everwood 4 Addition
Street and Utility Improvements
Cottage Grove, Minnesota
October 9, 2013
Project No. 193802369
I hereby certify that this report was prepared by me or under my direct
supervision and that I am a duly licensed Professional Engineer under
the laws of the State of Minnesota.
��+✓� . ..��l�.r.....� '
David R. Sanocki, P.E. Reg. No. 40973
October 9, 2013
CITY OF COTTAGE GROVE
PROJECT SUMMARY
INTRODUCTION
This report addresses the proposed utility and street improvements for the Everwood 4 Addition located
at the west end of Aspen Cove South and south of the Timber Ridge 5 Addition development. The
Everwood 4 Addition, which will consist of 10 single-family lots, is the last phase of the Everwood
Addition. The preliminary plat for the Everwood Addition was approved on September 20, 2006. All of
the lots will receive City sanitary sewer, storm sewer, water, and street improvements.
PROJECT SCOPE
This project consists of utility, street and trail improvements in the general location shown in Figure 1
below.
�� -
� �" �4m s�r sotm► ".
T1MBBi piOGE TRAQ. SQUTH �./ !
\
I
��
: ` �
� ♦ ��
►♦♦
�
\�
G�,
�
, � �
�
�
�
n
�
�
��
�
�
Evenvood 4" Addition - Street and Utility Improvements Z
' PROPOSEA TRAIL, STREE�
& UIILTfY IMPROVEM9�II'S
REQUIRED IMPROVEMENTS
This project includes the construction of public sanitary sewer, water main, storm sewer, public trails,
sidewalk and street to service the proposed development. The proposed street, trails, sidewalk and
utility layouts are shown on Figure 2 and 3 in the appendix of this report. Sanitary sewer, water main,
storm sewer, and street improvements are proposed for all lots in the Everwood 4 Addition
Development.
SANITARY SEWER
Two sanitary sewer options were reviewed for providing service to the proposed Everwood 4 Addition
development.
The first option reviewed would involve directional drilling sanitary sewer south through the White Pines
Senior Living property in the Southpointe Ridge development. This route would run parallel to the
existing water main and would include up to 400 feet of directional drilled sewer. It would be necessary
to directional drill to avoid impacting the existing White Pines building, parking lot, retaining wall and
trees. This route would ultimately connect to the south at an existing sewer line in East Point Douglas
Road. Digging up East Point Douglas and the adjacent trail, restoring the road and trail, providing trafFic
control and obtaining additional utility easements, add to the cost of this option. The total length to run
sanitary sewer to the south through White Pines is approximately 1,700 feet.
The second option reviewed would involve directional drilling sanitary sewer east toward the existing
sanitary sewer line in Hardwood Avenue. This route would include approximately 340 feet of directional
drilled sewer. An existing 8" sanitary sewer stub is located in the west right-of-way of Hardwood Avenue.
Tying into this existing stub will not impact Hardwood Avenue and there is no trail along the west side of
Hardwood Avenue. The total length to run sanitary sewer to the east to Hardwood Avenue is
approximately 550 feet.
Routing sanitary sewer through White Pines is not viable. Significantly more sanitary pipe would have to
be installed with this option. In addition, this alignments close proximiry to the White Pines building
creates challenges if future sanitary sewer maintenance and/or repair is required. Routing the sanitary
sewer east to Hardwood Avenue is significantly more cost effective and has fewer impacts to existing
facilities. Therefore, the sanitary sewer connection to Hardwood Avenue option is recommended.
WATER MAIN
8" ductile iron water main was installed during phase 1 of the Everwood Addition and is readily available
within the proposed Aspen Cove south right-of-way. Water main is currently looped from the Timber
Ridge 5 Addition to Southpointe Ridge.
A portion of the existing water main that falls within the 4th Addition of Everwood is proposed to be
salvaged and reinstalled after the sanitary sewer is constructed. It would be very difficult to keep this
water main in place while the sanitary sewer is installed at a greater depth without undermining the
water main. Since this water main was installed in a previous phase of the development, the developer
will be credited the cost to salvage and reinstall the water main as part of the Everwood 4 Addition
project.
Water service to the White Pines Senior Living will not be interrupted with this project. The water main
servicing White Pines Senior Living is looped and water service will be maintained from East Point
Douglas Road during project construction.
Everwood 4" Addition - St�eet and Utility Improuements 3
STORM SEWER AND STORM WATER MANAGEMENT SYSTEM
The feasibility of routing storm water south through the existing White Pines development has been
reviewed. The storm sewer and ponding system for White Pines is not designed or sized to
accommodate development flows from the Everwood 4 th Addition. If storm sewer is routed south it
would run parallel to the existing water main and would include up to 1160 feet of directional drilled
storm sewer pipe. It would be necessary to directional drill to avoid impacting the existing White Pines
building, parking lot, retaining wall and trees. In addition, storm sewer pipe would have to be directional
drilled south under State Highway 61 to the Gateway Storm Sewer pond constructed in 2012. The total
length to run storm sewer to the south through White Pines and to the south side of State Highway 61 is
approximately 2,400 feet. Routing Everwood 4 Addition storm water south through White Pines is not
the most cost effective and feasible option.
Routing storm sewer east to Hardwood Avenue is the most feasible and recommended option for storm
water conveyance. Storm sewer would be installed throughout the Everwood 4 Addition and then
routed east down the hill toward Hardwood Avenue. Approximately 550 feet of storm sewer (320 feet of
it directionally drilled) would be installed. The storm sewer installed along Hardwood Avenue will be
open cut in areas with minimal tree loss, thus reducing costs with no negative environmental impacts.
The proposed storm sewer system would discharge into an existing swale adjacent to Hardwood Avenue.
This existing swale drains south along the west side of Hardwood Avenue to a storm sewer outlet located
adjacent to East Point Douglas Road. From this flared end inlet, storm water is routed through a trunk
storm sewer system that crosses Trunk Highway 61 and discharges into the Hamlet Park Pond regional
ponding system.
In the recent past, the capacity of Hamlet Park Pond has been significantly expanded to lower the high
water levels in the upper portions of the pond to alleviate flooding at the trunk highway, improve
stormwater conveyance through the system, and improve the water quality treatment perFormance of the
system. The stormwater discharges from Everwood 4th Addition would be controlled to at or below
existing discharge rates from the site, therefore the existing storm sewer conveyance system and Hamlet
Park Pond system are adequately sized to accommodate the stormwater discharges from the Everwood
4th Addition.
Under this scenario, for Everwood 4 th Addition to meet the City's storm water management requirements,
it will be necessary to make the following modifications to the existing swale:
• Grade a berm across the southern end of the swale and provide a restricted outlet to adequately
control the discharge rate from the Everwood 4 th Addition.
• Construct a sediment basin at the outlet of the storm sewer system draining down the hill from
Everwood 4 Addition to provide pretreatment of runoff prior to discharging to the storm water
outlet. The construction of this basin would require a berm across the existing drainage swale
and a skimmer structure will be provided as the outlet.
• The main section of the existing drainage swale, between the sediment basin and the
downstream outlet restriction, would be reconstructed as a biofiltration swale, which would
include a series of rock check dams, an engineered soil ditch section, turf reinforcement mat,
native seed, and draintile running the length of this section.
• The sediment basin and biofiltration swale would be lined with 1 foot of clay to limit infiltration
along the length of these features.
Evenvood 4" Addition - Street and Utility Improvements
It should be noted that since the original Everwood development review in 2006/2007, the City has
started restricting the use of infiltration practices within Wellhead Protection Areas in accordance with
guidance from the MN Department of Health. As the proposed storm water management area adjacent to
Hardwood Avenue is located within a Wellhead Protection Area, infiltration practices are not allowed.
Therefore, a biofiltration system would need to be designed to meet the City's water quality
requirements.
STREET� PATHWAYS AND SIDEWALKS
The proposed street will be an extension of Aspen Cove South constructed as part of the Everwood 3rd
Addition. The proposed street improvement includes the installation of B618 concrete curb and gutter
and the first lift of bituminous. A bituminous wedge will be placed to protect the curb and gutter until the
final lift of bituminous is placed. The final lift of bituminous would be installed approximately three years
after the bituminous base lift has been placed or when at least 90% of the homes are constructed. It is
anticipated that the final lift of bituminous for the Everwood is and 3� Additions would also be placed
when the final lift of bituminous is placed for Everwood 4 Addition.
Two 8-foot wide bituminous trail segments are proposed to be constructed as part of this project and are
shown in Figure 2 of the appendix of this report. The first bituminous trail segment is proposed to be
located between lot 5 block 1 and lot 1 block 2 of Everwood 4 Addition and will provide a connection to
the future Camel's Hump Overlook Park (see Figure 4 in the appendix of this report). The second
bituminous trail segment is proposed to be constructed east of Everwood 4 Addition and along
Hardwood Avenue. This path is proposed to extend from East Point Douglas Road South, northerly along
the west side of Hardwood Avenue to approximately 500' south of the intersection of 73r Street South
and Hardwood Avenue. The developer would be credited for constructing any trail segment constructed
along Hardwood Avenue located north of the proposed ravine mulch trail connection. This trail segment
is approximately 2100' in (ength.
A wood mulch trail is proposed to be constructed from the west side of Hardwood Avenue and be
extended northwest up the existing ravine to Meadow Grass Avenue South. The trail in this area will
have 4:1 slopes at times (25% grade) to reach Meadow Grass Avenue South. Given the existing terrain
constraints, this trail proposed will not be ADA accessible in all locations.
An 8' concrete sidewalk is proposed to be constructed on the south side of Hardwood Avenue between
East Point Douglas Road and Harkness Avenue. A concrete sidewalk exists on the west side of East Point
Douglas Road. Concrete sidewalk also exists along the west side of Hardwood Avenue between Harkness
and 80 Street. The developer will be credited for constructing this concrete sidewalk segment.
REQUIRED EASEMENTS
All public utilities will be located under the public street right-of-way and/or within dedicated utility
easements. Easements will be required where City utilities run along lot lines.
REQUIRED PERMITS
This project requires the following permits:
■ MPCA General Storm water permit (NPDES Permit)
■ MPCA Sanitary Sewer extension permit
■ MN Department of Health Water Main Extension permit
Evenvood 4" Addition - Street and Utility Improvements 5
PRO]ECT COSTS
ESTIMATED CONSTRUCTION COSTS
A detailed cost estimate has been prepared for the construction of the utilities and streets to serve this
development (See appendix). All costs are based on anticipated 2013 construction pricing. Indirect costs
for administrative, legal, engineering and contingencies associated with the project have not been
included in this report. No costs have been included for capitalized interest.
Table 1.1— Estimated Construction Costs for the Everwood 4" Addition Deve% ment
Site Improvement Estimated Construction per Lot
Cost
General $16 175 $1 618
Sanita Sewer $67 085 $6 709
Water Main 2 600 260
Services 14 910 1 491
Storm Sewer 167 014 16 701
Street Im rovements $80 415 8 042
Bituminous Trail 142 688 14 269
Street Li htin $12 745 1 275
Concrete Sidewalk $29,249 $2,925
Mulch Trail $45,825 $4,583
Subtotal 578 705 57 871
Pondin Credit* $24 571.36 2 457
Bituminous Trail Credit** $120 485 ($12,049)
Concrete Sidewalk Credit $2g 249 ($2,925)
Subtotal 174 306 17 431
Total Est. 2013 Construction Costs 404 400 40 440
2013 Im rovement Escrow 125% 505 500
Final Streets Escrow 125% *** $41 865
Total Escrow **** $547 364
A tota) of $24,571.36 ($10,749.97 for Everwood 1 and $13,821.39 for Everwood 3r was
previously paid for pond dedication.
** Northern trail credit ($91,041) and trail dedication paid as part of Everwood 3` ($15,223.23) and
commercial lot deferred ($14,221).
*** The final streets has been broken down in the appendix of this report. The total escrow amount
for the Everwood 4 th Addition is $25,690.00. The total additional escrow amount for the
Everwood 1 5Y and 3` Addition is $16,174.50.
**** The Developer will be required to provide an escrow to the City for the proposed Everwood 4tn
Addition improvements totaling $547,364. This amount is 125% of the total estimated
construction costs for the proposed 2013 improvements ($505,500), 125% of the total estimated
construction costs for the fina) street improvements ($41,865). The Developer will also have to
submit a separate site grading and erosion control escrow, in the amount of $22,346 prior to
commencement of site grading operations (as shown in the table below).
Everwood 4" Addition - Street and Utility Improvements 6
Table 1.2 — Site Grading & Erosion Control Items for the Everwood 5� Addition Deve%pment
Site Grading And Erosion Control Items:
(Developer Responsibility)
Unit Unit Price Tota/ Cvst
Site Gradin Restoration: Re-S read To soil P CY 1425.0 $2.00 2 850
Site Gradin Restoration: MnDOT 250 Seed & Mulch AC 5.3 650.00 3 452
Misc. Site Gradin LS 1.0 3 000.00 3 000
Erosion Control - Tem . Rock construction entrance EA 2.0 1 000.00 2 000
Erosion Control - SiltFence Machine Sliced LF 1400.0 $3.00 4 200
Street Swee er With Pick U Broom HR 3.0 $125.00 $375
Pond Maintenance & Cleanin LS 1.0 2 000.00 2 000
Total $17,877
Est. Escrow (125%) $22 346
AREA CHARGES
The total area of the Everwood Addition is 49.5 acres. Of that total area, 5.31 acres is proposed for the
Everwood 4 Addition project. The net acreage for the Everwood 4 Addition that will be used to
calculate the Sanitary, Water, and Storm area charges is 5.31 acres and will be split among the proposed
10 residential lots.
Table 1.3 - Area Charges, Everwood �f Addition Deve%pment - Single
Area Char es Total Per Lot
Sanita Area Char e $14 860 $1486
Water Area Charge $17,025 $1,703
Storm Area Char e- Sin le Famil 36 035 3 603
Total Area Char es 67 919 6 792
CITY FEES
The below referenced fees also apply to this project and are listed in the 2013 City Fee schedule:
Table 1. 4— City Fees, Everwood 4 Addition Deve%pment - Single Family
Fee Total PerLot
Ci Su lied Pole & Luminaires 4 500 $450
Street Light Utili and Surcharge $588 $59
Park and O en S ace Identification Markers 1 035 104
Seal Coatin : Streets 1 535 $154
Seal Coatin : Bituminous Trails $1 953 $195
Total Fees $9 611 $961
Evenvood 4 Addition - Street and Uti/itylmprovements 7
DEVELOPER COST SUMMARY
The following table summarizes the developer's costs for this project. These costs are the developer's
costs only for the Everwood 4 Addition.
Table 1.5 - Deve%pers Cost Summary, Everwood � Addition Deve%pment - Single
Site Im rovement Total Per Lot
General 16 175 1 618
Sanita Sewer $67 085 6 709
Water Main $2 600 2 756
Services $14 910 1 491
Storm Sewer $167 014 $16 701
Street Im rovements 80 415 $7 997
Bituminous Trail $142 688 $6 571
Street Li htin 12 745 1 275
Concrete Sidewalk $29 249 $2 925
Mulch Trai) 45 825 4 583
Pondin Credit 24 571.36 2 457
Bituminous Trail Credit $120 485 12 049
Concrete Sidewalk Credit 29 249 2 925
Total Est. 2013 Construction Costs 404 400 40 440
Area Char es
Sanita Area Char e 14 860 1 486
Water Area Char e* 17 025 1 703
Storm Area Char e- Sin le Famil 36 035 $3 603
Total Area Char es 67 919 6 792
Ci Fees
Ci Su lied Pole & Luminaires $4 500 $450
Street Li ht Utili and Surchar e $588 $59
Park and Open Space Identification
Marker 1 035 104
Seal Coatin : Streets $1 535 $154
Seal Coatin : Bituminous Trails 1 953 $195
Total Fees $9 611 $961
Total Est. Costs 481 929
FINANCING
The developer will finance the costs for all public improvements for the proposed Everwood 4 Addition
Development including all applicable Area Charges and other City fees described in this report. The
developer will also be responsible for costs associated with testing, surveying and inspection.
Evenvood 4 Addition - Street and Uti/ity Improvements 8
RECOMMENDATIONS TO COUNCIL
It is the finding of this report that the proposed improvements are necessary, feasible and cost effective.
The following recommendations are made:
■ Adopt this report as the guide for development of the proposed improvements.
■ The Developer installs the public improvements with construction being substantially completed
by November 15, 2014.
� The Developer install the final lift of bituminous for the streets after three years or after 90% of
the homes in the development have been constructed.
■ No concrete curb shall be placed after October 15, 2014.
REQUEST FOR COUNCIL ACTION
■ Order the preparation of Plans and Specifications for this project.
PROJECT SCHEDULE
The project schedule is for the Everwood 4 Addition is as follows:
Development Agreement to Counci) November 6, 2013
Site Grading Begins
April 2014
Utility Construction Begins May 2014
Substantial Completion* November 2014
*Everwood Addition Final Street Construction will occur upon 90% build out of the homes in the project,
or no later than the third year after construction.
Evenvood 4 Addition - Street and Utility Improvements 9
�� �_-,, �/
Everwood 4th Addition - Preliminary Cost Estimate
Item
PART 1 - GENERAL
Total Est. Est.
Unit Quantity Unit Cost Total Cost
1 MOBILIZATION LS 1.0 $3,000.00 $3,000.00
2 TRAFFIC CONTROL LS 1.0 $2,000.00 $2,000.00
3 STREET SWEEPER WITH PICK UP BROOM HR 5.0 $125.00 $625.00
4 TEMPORARY HYDROMULCH AC 1.6 $2,000.00 $3,200.00
5 SEED AND HYDRO MULCH AC 1.6 $2,500.00 $4,000.00
6 TOPSOIL BORROW (LV) CY 190.0 $15.00 $2,850.00
7 BIOROLL LF 250.0 $2.00 $500.00
Total Part 1- General $16,175.00
PART 2 - SANITARY SEWER
8 8" PVC SANITARY SEWER PIPE, SDR 35, 10-15' DEEP
9 8" HPDE SANifARY SEWER PIPE, DIRECTIONAL DRILL
10 4' DIA SANITARY MN, INCI. R-1642-B CSTG & HDPE ADJ. RINGS
11 4' DIA SANITARY MANHOLE OVERDEPTH
12 CONNECT EXISTING SANITARY SEWER TO MANHOLE
13 TELEVISE SANITARY SEWER
14 ADJUST FRAME & RING CASTING
15 8"X4" PVC WYE, SDR 26
16 IMPROVED PIPE FOUNDATION
Total Part 2- Sanitary Sewer
LF 650.0 $35.00 $22,750.00
LF 390.0 $50.00 $17,000.00
LF 6.0 $2,700.00 $16,200.00
LF 25.0 $150.00 $3,750.00
en i.o �i,000.00 gi,000.00
LF 990.0 $1.50 $1,485.00
EA 6.0 $350.00 $2,100.00
en io.o �iso.00 �i,soo.00
LF 650.0 $2.00 $1.300.00
$67,085.00
PART 3 - WATER MAIN
17 8" GATE VALVE AND BOX EA 1.0 $1,800.00 $1,800.00
18 CONCRETE HYDRANT ACCESS PAD EA 2.0 $400.00 $800.00
Total Part 3- Water Main $2,600.00
PART 4 - SERVICES
19 4" PVC, SCH. 40, SANITARY SERVICE PIPE LF 380.0 $12.00 $4,560.00
20 4" PVC, SCH. 40, SANITARY RISER PIPE LF 50.0 $15.00 $750.00
21 1" CORPORATION STOP EA 11.0 $125.00 $1,375.00
22 1" CURB STOP & BOX EA 11.0 $175.00 $1,925.00
23 1"7YPE"K" COPPER WATER SERVICE LF 350.0 $18.00 $6,300.00
Total Part 4 - Services $14,910.00
PART 5- STORM SEWER AND STORM WATER MANAGEMENT SYSTEM
24 REMOVE AND DISPOSE 12" TEMPORARY HDPE PIPE lF 175 $5.00 $875.00
25 REMOVE AND DISPOSE 48" DIA. STRUCTURE W/ORIFICE, DRAIN TILE AND 10" OUTLET LS 1.0 $2,500.00 $2,500.00
PIPE
26 SALVAGE AND REINSTALL RIP-RAP CY 8.0 $50.00 $900.00
27 12" RCP STORM SEWER, CLASS 5 LF 130.0 $30.00 $3,900.00
28 15" RCP STORM SEWER, CLASS 5 LF 850.0 $35.00 $29,750.00
29 18" HDPE STORM SEWER, DIRECTIONAL DRILL LF 320.0 $75.00 $24,000.00
30 15" RCP FLARED END SECTION, INCL. TRASH GUARD EA 2.0 $1,500.00 $3,000.00
31 18" RCP FLARED END SECiION, INCL. TRASH GUARD EA 1.0 $2,000.00 $2,000.00
32 CLASS III RANDOM RIPRAP W/FABRIC CY 60.0 $100.00 $6,000.00
33 2'x3' CB, INCL. R-3290-V CSTG. AND HDPE AD]. RINGS EA 2.0 $1,500.00 $3,000.00
34 4' DIA STORM SEWER CBMH, INCL. R-3290-V AND HDPE ADJ. RINGS EA 3.0 $2,000.00 $6,000.00
35 4' DIA STORM SEWER MH, INCI. R-1642-B AND HDPE ADJ. RINGS EA 2.0 $2,000.00 $4,000.00
36 5' DIA STORM SEWER CBMH, W/SUMP, INCL. R-1642-B AND HDPE ADJ. RINGS EA 1.0 $3,500.00 $3,500.00
37 POND O�TLET STRUCTURE EA 2.0 $3,000.00 $6,000.00
38 IMPROVED PIPE FOUNDA7ION LF 1300.0 $2.00 $2,600.00
39 PROTECTION OF CATCH BASIN IN STREET EA 5.0 $250.00 $1,250.00
40 6" PERFORATED PVC DRAIN TILE, SCHEDULE SDR 26 - HARDWOOD AVENUE LF 950.0 $20.00 $19,000.00
41 ClEANOUT - HARDWOOD AVENUE EA 6.0 $250.00 $1,500.00
42 COMMON EXCAVATION (P) - HARDWOOD AVENl1E CY 458.0 $6.00 $2,748.00
43 FINE FILTER AGGREGATE - HARDWOOD AVENUE CY 357.0 $30.00 $10,710.00
44 GRADE 2 COMPOST - HARDWOOD AVENUE CY 153.0 $35.00 $5,355.00
45 POND LINER (P) - HARDWOOD AVENUE CY 704.0 $25.00 $17,600.00
46 7URF REINFORCEMENT MAT - HARDWOOD AVENUE SY 1721.0 $6.00 $10,326.00
47 SEEDING, MNDOT 328 MIX, INCL SEED & FERTILI2ER - HARDWOOD AVENUE AC 0.5 $Z,000.00 $1,000.00
Totat Part 5- Storm Sewer and Storm Water Management System $167,014.00
Page 1 of 3
Total Est. Est.
Item Unit Quantity Unit Cost Total Cost
PART 6 - STREETS
48 SAWING BITUMINOUS PAVEMENT LF 25.0 $4.00 $100.00
49 REMOVE BITUMINOUS PAVEMENT SY 670.0 $3.00 $2,010.00
50 REMOVE CONCRETE CURB AND GUTTER LF 20.0 $5.00 $100.00
51 SUBGRADE EXCAVTION (EV) CY 130.0 $8.00 $1,040.00
52 SUBGRADE PREPARATION - STREET SY 13830.0 $1.00 $13,830.00
53 4" PVC, SCH. 40, 3 CONDUIT PRNATE UTILITY CROSSING LF 60.0 $9.00 $540.00
54 A6GREGATE BACKFILL CY 630.0 $8.00 $5,040.00
55 AGGREC�ATE BASE, CIASS 5, 100% CRUSHED TN 1000.0 $14.00 $14,000.00
56 2.0", 7YPE SP 12.5 NON-WEARING COURSE MIXTURE (2,8) TN 275.0 $65.00 $17,875.00
57 BITUMINOUS WEDGE LF 1070.0 $3.00 $3,210.00
58 B618 CONCRETE CURB AND GUTTER LF 1070.0 $12.00 $12,890.00
59 SIGN PANNEL, NPE C SF 10.0 $45.00 $450.00
60 CONCRETE DRIVEWAY APRONS SF 1100.0 $5.00 $5,500.00
61 CONNECT DRAIN TILE TO STRt1CTURE EA 5.0 $200.00 $1,000.00
62 9" PERFORATED PVC DRAIN TILE, SDR 26 LF 360.0 $8.00 $2,880.00
Total Part 6 - Streets $80,415.00
PART 7- BITUMINOUS TRAILS
63 SILT FENCE, TYPE MACHINE SLICED LF 3320.0 $3.00 $9,960.00
64 COMMON EXCAVATION (P) - TRAIL CY 3380.0 $14.00 $47,320.00
65 GEOTEXTILE FABRIC SY 3690.0 $1.75 $6,457.50
66 AGGREGATE BASE, CLA55 5, 100% CRUSHED TN 1400.0 $16.00 $22,400.00
67 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) TN 490.0 $75.00 $36,750.00
68 SAIVAGE & RESPREAD TOPSOIL BORROW (LV) CY 2520.0 $5.00 $12,600.00
69 TEMPORARY HYDROMULCH AC 1.6 $2,000.00 $3,200.00
70 SEED AND HYDRO MULCH AC 1.6 $2,500.00 $4,000.00
Total Part 7- Bituminous Trails $142,687.50
PART 8 - LIGHTING
71 ASSEMBLE AND INSTAIl CITY SUPPLIED LUMINAIRE AND POLE EA 3.0 $750.00 $2,250.00
72 CONCREIE POLE BASE EA 3.0 $1,200.00 $3,600.00
73 CONNECTTO FEEDPOINT EA 1.0 $1,700.00 $1,700.00
74 #6 AWG WIRE LF 1460.0 $1J5 $2,555.00
75 HANDHOLE EA 1.0 $700.00 $700.00
76 1.5" NON-METAILIC CONDUIT LF 485.0 $4.00 $1,940.00
Total Part 8 - Lighting $12,745.00
PART 9 - CONCRETE SIDEWALK
77 COMMON EXCAVATION (P) - SIDEWAIK CY 215.0 $14.00 $3,010.00
78 GEOTEXTILE FABRIC SY 645.0 $1.75 $1,128.75
79 AGGREGATE BASE, CLASS 5, 100% CRUSHED TN 145.0 $16.00 $2,320.00
80 6" CONCREfE SIDEWALK SF 4055.0 $5.00 $20,275.00
81 CONCRETE PEDESTRAIN CURB RAMP SF 160.0 $5.00 $B00.00
82 TRUNCliTED DOME SURFACE SF 20.0 $45.00 $900.00
83 TOPSOIL BORROW (LV) CY 25.0 $15.00 $375.00
88 SOD SY 110.0 $4.00 $440.00
Totai Part 8- Concrete Sidewalk $29,248.75
PART 10 - MULCH TRAIL
89 CIEARING AND GRUBBING LS 1.0 $15,000.00 $15,000.00
90 SITE GRADING LS 1.0 $10,000.00 $10,000.00
91 ENGINEERED MULCH LF 690.0 $6.00 $4,140.00
92 18" RCP STORM SEWER, CtA55 5 LF 60.0 $45.00 $2,700.00
93 18" RCP FLARED END SECTION, INCL. TRASH GUARD EA 4.0 $2,000.00 $8,000.00
94 TEMPORARY HYDROMULCH AC 0.5 $2,000.00 $1,000.00
95 SEED AND HYDRO MULCH AC 0.5 $2,500.00 $1,250.00
96 EROSION CONTROL BLANKET, CATE60RY 3 SY 2490.0 $1.50 $3,735.00
Total Part 8- Mulch Trail $45,825.00
Total Part 1 - General $16,175.00
Total Part 2- Sanitary Sewer $67,085.00
Total Part 3- Water Main $2,600.00
Total Part 4 - Services $14,910.00
Total Part 5- Storm Sewer and Storm Water Management System $167,014.00
Total Part 6 - Streets $80,415.00
Total Part 7- Bituminous Trails $142,687.50
Total Part 8 - Lighting $12,745.00
Total Part 9- Concrete Sidewaik $29,248.75
Total Part 30 - Mulch Trail $45,825.00
Est. Total Construction Costs $578,705.25
Est. Indirect Costs (30%) $0.00
Bituminous Trall Credit ($91,041.25)
Concrete Sidewalk Credit ($29,248.75)
Est. Total Project Costs $458,415.25
2013 Est. Escrow (125%) $573,019.06
Final Streets Escrow (125a/o) $41,864.50
Total Escrow $614,883.56
Page 2 of 3
Total Est. Est.
Item Unit Quantity Unit Cost Total Cost
SITE GRADING AND EROSION CONTROL ITEMS:
(DEV RESPONSIBILI7'Y)
1 SITE GRADING RESTORATION: RE-SPREAD TOPSOIL (P) CY 1425.0 $2.00 $2,850.00
2 SITE GRADING RESTORATION: MnDOT 250 SEED & MULCH AC 5.3 $650.00 $3,451.50
3 MISC. SITE GRADING LS 1.0 $3,000.00 $3,000.00
4 EROSION CONTROL - TEMP. ROCK CONSTRUCTION ENTRANCE EA 2.0 $1,000.00 $2,000.00
5 EROSION CONTROL - SILTFENCE, MACHINE SLICED LF 1400.0 $3.00 $4,200.00
6 STREET SWEEPER WITH PICK UP BROOM HR 3.0 $125.00 $375.00
7 POND MAINTENANCE & CLEANING LS 1.0 $2,000.00 $2,000.00
ToWI $17,876.50
Est. Escrow (125%) $22,345.63
4TH ADDITION FINAL STREETS:
(DEV RESPONSIBILITY AND COVERED IN FINAL STREET PLANS)
1 REMOVE AND MILL BITUMINOt1S WEDGE SY 950 $2.00 $1,900.00
2 REMOVE & REPLACE CONCRETE CURB & GUTTER (PRIOR TO WEAR COURSE PAVING) LF 160 $20.00 $3,200.00
3 AD)UST SANITARY FRAME & RING CASTING EA 3 $900.00 $1,200.00
4 ADJUST STORM FRAME & RING CASTING EA 1 $400.00 $400.00
5 ADJUST WATER MAIN GATE VALVE EA 2 $250.00 $500.00
6 1.5" 7YPE SP 12.5 WEARING COURSE MIXTURE (2,C) TN 160 $80.00 $12,800.00
7 BITUMINOUS MATERIAL FOR TACK COAT GAL 138 $4.00 $552.00
Total $20,552.00
Est. Escrow (125%) $25,690.00
iST & 3RD ADDITIONS FINAL STREE7S:
(DEV RESPONSIBILITY AND COVERED IN PINAL STREET PLANS)
1 REMOVE AND MILL BIiUMINOUS WEDGE SY 1,195 $2.00 $2,390.00
2 REMOVE & REPLACE CONCRETE CURB & GUTTER (PRIOR TO WEAR COURSE PAVING) LF 315 $20.00 $6,300.00
3 AD7UST SANITARY FRAME & RING CASTING EA 8 $400.00 $3,200.00
q ADJUST STORM FRAME & RING CASTING EA 5 $400.00 $2,000.00
5 ADJUST WATER MAIN GATE VALVE EA 2 $250.00 $500.00
6 1.5" 7YPE SP 12.5 WEARING COURSE MIXTURE (2,C) TN 285 $80.00 $22,800.00
7 BITUMINOUS MATERIAL FOR TACK COAT GAL 350 $4.00 $1,q00.00
Total $36,590.00
Est. Escrow (125%) $48,237.50
Escrow Currently Being Retained $32,063.00
$16,174.50
NORTHERN TRAIL SEGMENT
1 SILT FENCE, TYPE MACHINE SLICED LF 2105.0 $3.00 $6,315.00
2 COMMON EXCAVATION (P) - TRAIL GY 2200.0 $14.00 $30,800.00
3 GEOTEXTILE FABRIC SY 2335.0 $1.75 $4,086.25
4 A6GREGATE BASE, CIASS 5, 100% CRUSHED TN 890.0 $16.00 $14,240.00
5 7YPE SP 9.5 WEARING COURSE MIXl11RE (2,6) TN 310.0 $75.00 $23,250.00
6 SAIVAGE & RESPREAD TOPSOIL BORROW (LV) CY 1580.0 $5.00 $7,900.00
7 TEMPORARY HYDROMULCH AC 1.0 $2,000.00 $2,000.00
8 SEED AND HYDRO MULCH AC 1.0 $2,500.00 $2 450.00
NORTHERN TRAIL SEGMENT $91,041.25
Page 3 of 3
FIGURES
_ - _
� ,aTwf,! ..� � : ^3" z -: r�. 17`� .Fr �'yr � . r `� - i �K , x �p'. 'G � . .'.\ ��_�... /;;. �,' �'� i �• '
�. `� "`' ..�. � � .s �6� + .. � +f ,0. � � . _ �,� , ^` �r�c d �(.� r' �,as'Sa - �. <jit�, � ^ - �. ' � \ � -. � y � � _ `
���;�c � �a ��` :. � s�� - �-T' � . ? . � i �" .-�� '".., a+e.:t -7 � ��c „�; �� �. �
�--..� _ �, �.'`� i� . .,� .. 1 •. �: �" �.'���.'2+h�^- _ �� �ry ''��� �- .. t � . y�,,, � .Si�, �' ��'c vt� ; ."".�'� - � ' � � �9'� ��� X. � _ ��� �
. �1B ...... ,�.�" :� ., c r t - i�1i T -'�r . . .
� � ' �.F �'T ����..� � . � � �-s � r '� � _ � a -. .i �.�'�Tt � 3 . ` . ,�i ^' c .
,� _
�. . . � FJmTiNG9iNf�J0U51itAR yr .,. �.`_� �, �. 2 �n �. '1 �l... r ��. � �.;,.. a. �.�. .,.a �. � _ �, 'f t!,.� i
. C ..I,�.
R�.F' s c 7` r 5 ;3� r : -'v ", - - � - �' --- ; �,-� � �'� �+KT,�,}.. � - *y . 1 7 � '"'y�� S.�" 1j T�.� ,� u Y — �'{� , �"' j t �
_ ,..�. , _ � . : r � /
- ..�_ -�,�`..u�..�L'C. ^ ro� �`,�.�.J�G".'Al.,�',f<x.^.''�' �'�` �.�� ..� k �+�� �S'��t�^ �_ ry rr ,. �St'.X '4r'« .
' ,. ,
�, _ _
_ �.� .. ,� _ . /
_ ��_�_��� r — �.
..,, w . : -� +, -'. �� y' + : S�.�u- v ~ 1 'x? r ? f — ��t�b7F�: � t . ~ � _ ' � � � ��
�� � �r �"1 a" � , � .' I � � � � ,, � � . �, 1Y � � � _ y_ . M r r � � T fi.� _ _ r �) ' . " . ', L � . I. �
`� ..,� t ��..., ..,� �- ..` �� �.. �: a ���" �_,� - s; . ,1` � - - 4 k� a �` _: � � . . �ee t� ! h"�° a.
a .
■ .,
�
.
S� , .. . _- � �� - �. : x, �?'� , a ! � �' - -
~ r "'�"��__> "'2 � ., -r} .t � � � 4 �� �,�, v t -�'. yt, � } "� - Man11u ` al�
. � ' �..' ,) '' ! r
. .� j. . � ' - � .
`�� :- -��. � �PROPOSED 8' BIIUMRJIXIS iPAR G . fi . ° / � • t , C � � � l }• w- „� - �{ � . • ..... I � I¢a['r [ a
�.
.' - ' � `` . ` � n.' � .�' . � rt�1 — � ' _ r.,: . .. .' '} rrryne�t��c�.
ti _. _
;�� a � s . .,, ;.; � �' r'. � �c„ � � .. .: �, `Y 7'� ' � .� - . �? oasrtn� coNCa� soen�auc e � i f
: � ---
�! .:�= � ...r� 4 .t- - r . �• �� . �_ _ __ �`',� r : r . . i. ' nrh �
i. . ��
� , r E+ ' . " . .. � .� � �� .� 1 ' .. � �� � �� , g ^ � . � Z ��� •4 � .�� ' �' '��. __�._�� .. � 1� 14t1 !� �,
' .� ^t" � y5 '� .: ' '. . . \.. - . 1R. .,� ,� ' " . "".' IPROPOSEDB'O]NQ1EfE5IDEWPIK� .r1�t
,. � ' -, '�t '`^'+A� :J" z ">" �.; ' I I � - �
'Z . ' .. ... 1 � � WffH2E�0`EDAGGREGATE � i _ WQ �� t
- a. � ..Y� �.. � _ . . r ..�r� r4' -�. �.. . �. X , .t. � r 'f � J . . _ R I orc � � ! (
I � . i �� . �. � . �c � � � ` .�,..�'.,� �.�w _ r{.- � � . ��w A- � ..,. � �� �.
,yF �. 4 T K V . :. e• -' s t 'tc L �f�` y -� Z � �
�� Ii „°�,�"� - +t aT Y... V �:��:'1l-C r. � _� � +y- .. . HPADWOODA--'�'^---•�UESOUiH .�'.�4` 5 .n,/'� ' .w� _ �i� A .
�. � \ ' � � x ~1`1x .}� �� ��� �_� _ . _ - •. •
^ �
_ � 1 — _. .. ' - ..
."l�• �4 �� '"M�+� � � _ 'IM� � �. ,1 �" . /� f �� . ____`�c.'°,ly'�"�T
�L . . -P �,,� _ �.,, 4.,�?� �S�'w. � ; ;� �, ' . "�"� � ... ,--.. _ . � �. - . � j �rsr cowr ooua.0 aono sovM F�'�. .
R � -. , � 1 '1 ,? A . w v�, , , �rtY9n , � YK' '''�' � '
+ 1... � � .. 1.—s.� :�� �A._��jt � 1. .. +�, 1
, � � � a . � , �, ; ��-: �, a � . �'°4 .. ...� �� � .�''3 � .
� �� �' �. i i r .# � _ . -- 4. � .-n �c- :'es t . �r � 'r r� '4 . �� msrs oE�o urrm_ a �! � ti
4„ ' .'`� ����- � r ( i� r '� 1 .. . +.a. r-��.�.- - y . R 4 i ��.:.)� t
I - � � F . � r ,. .. Y - , f : �. p - : . i p�' ' � �/' . ,� �t t ' ( M � �i. , - E .. ti'
' . ��.' �! : � - . . V�"'j ., f : -y
�• i � �'� � - � _ � �� cc � ` t.,,. . `` !r �y � M` r - � k .� r _ 4 ^ ya ,� � _
s � �, . � Nsar �. ,._ .� : , _ . � ' � ,�'�'' ,P � fi � : . ' . .
.. � �� ,� .. � \ _ ''. ` � x �, �: �}aaoPOS�s�M _�..-,uw+�aa[�i ' '�- -�aes m'ruMmousmni� a � �� �x�.
� � :
_r-r `.. J ` ' r .:, �,�` -/� �".,� t ,�. " � .'E4r� � � r - -"":'? .
. . r � I � . � � � r .r.� Z � i ^ ,n � '� � S " � ,, . . . ,.' � . - : ..\ fi r '�" �.
� 1. _ . �.��re.�� _(�� i - ` � � , rl �,y� .- � �� 4r" - J . , = -- .:. �.._ -* n ' r -
, ,� - _ . . � `_ 1 � � • !��' �' "'`.. y �I � 1' 9 _ � , PAOROSED 8 9STUM➢VOUS TrVuL '� � d �.. +� ;:,, �`! �:. .
r�� �!.`' J�'�-... _ V • _ �. � _ �i .�' ^ti ' ��Ji� �.'�,�;,�:� e . ie�aaz..�: Z - .-_ i _ w -Gt)d r�,L, : , °- i � ��, _ �" - y c- ~
: _ .ti � �/ i �.� � f �,�,.:. r ��✓ r�..� � I .. K�S�I r . a'q�..: � .v �':, / - •X.. � � y��,,, ' �'�'m�•n` . � e :
� .. � � „ �.. ; I , ,
� �'� --- - --� ._ C" -- � C� _ . . . ;,(� ..� _... � Y : ,]� ,� r
, � � (�:. i ' q ; I��� ' '` �: � -- "'� � ` �r : - , ; _ ��� y r i: �
�. � �� Y � ' � IN�f-0RMAT10lULOURDOK I
` •� 4 `�� � ` . .,�
`� Z � �7
- i ' �{ _ I
�°� �,r` . '�y.�,� �]I� ; 1��.. �� �-`, . � _ 19 `°?� �',`_ +�-, �.:..r -° �y ` � > .. _ �� 5 � __ s � ..� _ 2 - ./ �c � "'"`
,-. �.> _ � 1�� . ` -� i! ..� .".� i . ._ '. !� _ � ti_ .. ' f a �
.,._ � � 7 ° ,.
_. ' rt ,
�; .,� ..� j .. � 'i..L _,.:: �I, ' ' �„ �- �'., ' �..� w�, " .�,.. . � � 1 � � t.` . .: � �/ _
:
r_.. .:.� M � o� t .: , -,�. -.:`� `�,�_ ��. -r :. ^ asz . Y,t'' -2 :�
! �
�.. ., �.^ . ,: :.� ., .. - � � e: -�<�����- �.,,*^' . ' '',s'. 'v' - C.: %"
. .. ... _ :.__- ,: ..:..._ ' : . . �
y '.. .
, . _ . � � ..- ^- �-�` r ., -�_- r - �., � -., ,
♦�.A � :.� .: � _ i, II�.�. __. '� i� � - �... .. - .'li..� � "� � / � I . . :/...` .. i . . � t
t
r �
yl • � . :� .'�' j�� I ' �� '� •.. 1`L..l , � ' ' � � .._:.� - � I . . 9+-.'1
�. . a ;-. � i - 7 � k . .' � . � �...�,',\ � . p :� _ . � ; � .�� i e t _ � 3 � wn�r�xrs -� i� ,
' �� . 1 '- �]� �� ,., . �-� `� _ . .
f "1 _' , I i � _� �� �� � T ` � � � L � � �'h �� '. ScN� . I ��.
� -
�. . � � 1 / : � .4 � �'�'y � � -+y-A .:�� i ° � ".f "�'` "-. ° � . - �,�
+ u .. �. s, , �`�� - • �� f ► +. �, t � ° .., f � � . �^ . 'w'" 2 .� a�,r.^ �
i�.;�" _. � �._ . � r T s� .�.b��.'��i \ . ` �r �ti � -._ � ' �. 4? � y �
5 . ' n � � �. I � j'' . � ,'''- � 1 . � �• � - . . '� // � � YA '� _ 1 5 �� rw, J 4 FUIUItE 6 BITUMINOUS TAAiL✓ ` - f f ''� � . . //
� ��� 4 � M� e +� r • �.
. .i; � �_°��3 .I �����;�, ' ' � •, � %`rF r4 ', �7 �. lilu / "�'�' ' "r' ' 'w��. . r � �♦ . ��..�/ . 1 . . , �
, � , ..
�i I �,i f �l ' �� y � , l . ... �d w- _ �� • �, ,I.? '"' a• f } . /r
. . � � ;��� ��:� .. fF ���� _ ��,' , �.1=:�4 --� , ���-5� , : - � � t � �� . �� 1 �� ,. � �. :
r � P ,���` � _ T -.� ; � , � , �,.
_ � f� �f�� �ir �, , � /�� �`� '�� � �.+ :�,r t 1 �„' .�. r, �� .x ,r. �~ �.. � �, ;��
'r�7 � g�'x � t � �r' ' t"'i,"�� �"- � i �� ,r';� �� _ �` L _ ti K l. .,"° 1 Z
. �
4��. „s�j i�G�S -l �" d ,r",I I � � %y.`� �`d���' �-:-'�� �� � . ;, , _ . .� ..
<
� . ':.� �. _ > .._ '� � ��� ` y �, fr' �, �� '," iX � I .. dy r �s..-�.r�.�- 1 r�nvowcscr+ - �. . . - � i i � �A a us ua
_ —�'' �' � '•----k c"�__-.- �� �� ,;,F �',� ,� ti -��, 1' � " � � F'r ,�.-"".r• r . . , i , .. _ J'' ��� ro�nmi�
^ �1 _ : .t-:, � �: 'r, �
!'l2C�POSED 5iut'�fJALK, lRl�ILS & S uk�� � �u�u .�v ��i ,�.„ ��, `� „�,,,..
CITY OF COTTAGE GROVE FIGURE: 2
VI�
EVERWOOD 4TH ADDITION DATE: OCi2013 ��
,� i — .. _ ;z� . T _
� �� �� _� � . � � ._ ' a �•r .''� C � -- � ���'+ �l r ��.'" 4� _ �r . ..w.. � . r� - � � � �;�\ +.r = � .. -�.. .. _� _. . ��/r�l�
� J � �Y,
� .
� �� '� . .' . � .� �;
_ � � �
_ -,r!�f' �,KE .
.
� � -, _ -� . t_-'------
.�. -.. ��_.-3_ �- � .-�" � - � �� � ------
� � '-"-. ' - �- � -- .- --, ��
Y _ i � _
.
. . .._ � � �'�
-..', y�..� _ .. � _._.. �-� � .- _": �:.t-.,:\ � . ._ HARDWOOD AVENUE SOUTH . _ � � �.- �.�.�—_ _ -- _ _ _ _ �. �
. . . --,. . s � - " � �.' " _ "' ' - � -'� :.� . .
... . { . . '. . .. _� .� '�'fr�- _ _ �- - , ` ' �
• .- � "' _.' ' - _ — _' - '
�-..'. ^ --'.0 "..�{'�w.•' ' . ' ...� _ - _, .. _=.--_ - \� � ... " _ _' - , . ._ _ i � r . \� . � - _. _ ��.'
_�' � /'
;... _.. r � -� �-- - _-- - _ _ _ -
� . � � . V .�. . _ .-s- .._ . .. ' _�
— '. .� c�. ,_��
'..� , 4 : . �'�.. ., � �+Z/.1� ._ • � � . . � � - . .
�--
�— — � _ _ — . . � . .
�` G•:. ' ". ,.. . 1.. -- -`.. _=_.. - �� _ _ - _- _ __ _ - _ _ _/c �'�. "'A' s� ' .t• . .
.. . _. - , �. � �' �' � " �__, C
t-� ... . . -���.. _ .�, . _..'_"--.._rm___-..,.,- . � .- '__ . . _ ..__ _
. . -._ '.rl. � �. .^.. _ .. ._ ._ � -
�.r"'+e.�� � •, � ,' . ,-:'.�`� �._ ;._ _� �'...' �„" - ..;:,. G - -. - =- - - ' _ . , __._ " � 6. � .
� �.
^. � _ ' � } � d - _ _ _ _ _
- S., r i'`� R . -� r .�.• m __, -r . � � _ . � 'i y .. � . �. .
� ` � � � '� " � 1 � � �` , � , ... + � . � PROPOSED STORM SEWER �� �•. �"< � �, �
�. __.- . i� .- ., : .
.- Y }`' . ` ` . :� .. .-._ •: '' � ,.i !:+r�"' .r . ` _ " ' . ' �. . r, ,�� _
. ' � �. , ♦ .^ �. •�-'� !_�
- �-`�� 7 X�^ " � . , "PROPOSED STORM SEWER� � . � � CONNECT TO . -'���� � '`( �TROPOSED_ SEWER y`+.�`� SEWER & STORM WATER, � ♦ ��-�� �'�3. , .~ ' '.',� .
�q_;J�+i � _ _ � � � EX SANITARY SEWER � �' � y \r �! ' MANAGEMENT SYSTEM� ' Z � _'�+ ' y .�_ �-�' ,. � f%
'
,• _ _
Z . _ ..� . c� :e ..,, �-i,�� � ,,, �^-•.�--.c,- -�..-.' .
,,
.._. ' ..�r� . - _- �. �: . ." a�`S� 'r� ��. �- . ;y , . � ' �,a �'� - xyr � . Y � 'v'� _ � ti 'a' �_�,.
,. _ . . _ �. . htk� I � � �3. : �-�C
I. ' _�'�- 'C ' ' ;: ' - �a L ' � �j� 7 C `. � � { �, `'i�'��' r � _ f " _ �'_ ' '
, ��. . � .n. '�_`. -.. _`' a ♦��� �._ �� ..l t 3 � � � 1+., � l . '
� � � t ! � � PROPOSED DIREC110NAL � t�i '� � � �� r � �- .= " l : , ° ,. V � 4 y � '` '� - � ��r -
� I DRIILED SANITARY SEWER . , -
� . �. � �r.... � ... T — '.. N• + " _ . !�,"' N . . . � 4 C� .. •��
1 �
�� + �'' . �- :' f L - . ' " _ ;,,�PROPO� SED DIRECi10 AL, � i r� - � �o
MEADOW GRA55 : , ,.�'` � .._ .- � �1'�"..v :: �� � - ��G., � � �RILLED STORM SEwER 's' _ _ �K �' � � � �pe'
� AVENUE SOU7H I - .,: - � '� , ' ,+ '�.. .. . 7 "7".• "! ; .� `�. - / � . - t � �. � . . Q / =� a
- - -r-�� a; - { �.'. � .: 4� a Y ,i 'R `� V �,,�. r -,.-� �e
-- �_.i 4 t '�. ..^ , .. ��� �^ �- c �-� � i ,a �� ��� `�.'�
• • �� 'Sr � •� �?' • STORM SEWER � A � " _�'�+�,�� w �,� yY �� � . _ � .,�' ��� /% �/
- „' t KI�. _ - _V1w.��4�-., ,,-•--- % ' c _ ; :l'+'lW,r .. " '�M �� M ;" o .,. �/ '�
.f__ : _ . r_ '-� � : J � .� h � �
� .. � ��.. �-c�"'?'� _ - - � � � -
. .t��
..:. , ',. ---- . - ��. .BLOCK 2 � _.. ,� - � i, '°t" . �i_ . n� . +n 2 .
� ti. �-� - . � .- PROPOSED SANITARY SEWER .= l ' . � _ ��� � j" � Y' - ti a � /�
�� t � '� y '�' ��... - , ' /�- ' _ � . ` y �E% WAiERMAIN ��.' ' r � V�G� f 1� ��'�� �y '.'� �C��
� � , � _ �.� . , / �.N ' - - � � �;��-
�..�;,; . = .� ,ln � . ,. W� � - �. 1 ->_�'�t e �- ..:. � rt a � 4;� :.
_ -._ ' � ��P .a .,. - � a-. �'�r. �, �y .,�
,
_ •.�
.
.
'�' . � ' f J t � � �' T .
� t � A � f' '<_.
... x . , . ,,.. _ _ _ _ � . - ,,.e . ,.,,� i �;'� _
-.. _ �,�� �.,......� :-=.�� ' �,� .5� . .� � _ ' � �.�.
�.. ---� -�:-,,,.�
� �
V .�' - _ ,. - .,
. - - '
� . � -,�.ti����� �'-.. E%. STORM SEWER .,. � �_ ..._ � _�..r�j' i.A _ .'�_V„� ' ' ( a��
'�' . ! . . . .� _'..� _�'.: � - � _ ��+�
-,q _ � �.�� ,5;�,' � - '� L �Y� � ���� � � - _
� '-e . ,�.y; S _ �"'E%. SANIiARY SEWER �-"� BLOCK 1 kL - " 'r �` �' y � � J � -' ��
' :, `� t`�'.i: _.._ , � , . ,_� . . L � : �� . "� _ . ,�i ��- � --.
�q4'�-'-�� r` `!� i _ � j-�� �_� 3 I .h ..:,�... _ 1 _ � , 2 _ _ - � ��..\.
,' . � r F M}' i ' t . . � f � � /� �` I
� � / �./ .._. .-`/ / ' J _Y ' J` _ /
��^ ^ � J�_ ///�SPEN COVE S�U1H '�...: � - ., . ' , "'"T � ; I � � � �_ ���/� - 7�� .
: � p ,' .. . _ . . . . .. , �
� ..i$ p .���:. , . � � . �� ^ :.` � `,.\ J��� �' .
� .' � � � 7�� . .l• PROPOSED WATER MAIN - � . ., i � (� ' � _ �/ . . . •
�
...� [1. �f 1�� ` n
. �_
- \ :, �,, . :� ' �`- S` -_ _ : � - . .
...�,� _' _ �, ..' ' . � �,-. ' . _
N
' y � � � . .�"� " Y� R R � . 'R � � 'i �.. ��� .1
— � ��� � ` � ��[ ... l � .:�4.�..� - . . � I I ' .
l/ = � �
� � - �� � �C` -C � .d oi ,��WHITEPMES� /�. ,'�.. � ...
3 ' � � ` �� - � , �^�'' . t � ., . _ ..� SENIOR LIVING i _ 14 � .
.o I '"'� � ` ' � . / " .
t ' �� �'' ,L - 1' .�r. "` `.4.. ,'y ' _ ' . ,y . : _-,.,, ' r; � , � . -r , � , �."` , . �.
� , "^, ` `. ^ - r . , , i • -
r - .� r� � �� .��� 7 • �.�s-� - � ' 'R� �� �'"/ -
t F � _
��..__ �^+Y,+,t-- `�j.�'� �i a � � � � . '` � ,.i � �-�. . . t _ ��` I1'. - ./ �
A , . �.., ( _ �- ---"'''� / . �' . � - . , '- t- ' ' - ... , 1 1 _� . .
- �— - ^ \ _ . - ;.� . . ' - - ... , f' � 1 -.
� - - r - �� _.�^, in, yn � � .�' J � �.y4 s l - � c :. r , � X +'» j �, / 1 , Z
.
��'. 'T �. � � �• J � I � _.�.��•a� � � . �`� _ ��F— � ,� � a:l I IW . /�
,� ` �� _ . ._ _ . _.. � .. . . �`. .. .. � �� � �,� . �0 �5 150
� � � — •� v�: � � ' Horizonko� ca_ le In Feet
I .�Y _ ' _
f='RO�-'OSED u � 1L1 i`r �i��rs.v�� ���i�iV i 5
CITY OF COTTAGE GROVE
EVERWOOD 4TH ADDITION
FIGURE: 3
DATE: ]ULY 2013
L�
��
�
.��w,�,.��a�.�.�,�w�.,�:�.,�.�
� � . ��' .�� . . . � � y � _ �{4 l 1 _ �h ' , µ � �
.: ; ; _._. k� � -- ,j i - , , ., � h
•r — , .. . � - �,;� ,� :� _ ti� � �, ,r
� ��: . - - -- - �� •:,` N � � � � � r � �. + : , ' F, c'b. H" t7�Y; 77�� anuaee oitunmouslan[� �.• . / Y.� ., - �-:�'�r,``
' ' �.. ; ° �� �� - � . .i.._ : . . ��+ � r l,m ' �'` _ e ; fi � �sPaoaosEO� g� r� _' . r,,.. r. , _ . . ' _ �. - . . `"� . . : � i :�ti , .. �.
� 7 ' a � � � .�� - r . . �+' ,/. ��� , r I 1"' ., .r� '�
�` i] I . , ,�' -: � ,: � �„� �l'• � 4- s ,_ � '� t , : ,� ' ^ �c � •�r� t
'� ��, .-^ i� "a � '- ,����- - � 3^�� � � l �s�.`� _ � �nnocoseoserruramou>�rua '��4„ �;��. � "t _ _ .� � � y� ../A.
.�'. , � . '. { , f. l''�i ' �; Y�'". _ qA L . ' � BLOCK2 {� <�'�Y _, i . �'F _ . e�-�F ��( .. } � ^ � �. �y L .
_ � � ( _ n 't ? � .T �. � j 2 G - _ - ,:. ..
^'r �'s ! i 1 i - 1 � • l ,:. q �` 4 ,,,� /J � tA � # l . �+' ,.n i F t r � /
. _ L' �� � 5 ' I F � �/' ` r., I . 3^A "i" ` -i ' �.� _ � q �Y . ,l � �� _ ��3� IpiMATIONnlIXIR00 p � 1 � � .
u �
'-� ----� � - �- d '. : . > . _._{. x.l,. a� . ..- _ . ,� � � ,� �, . � � �
. . , �
._ �� W a. _ 6�� �M �c� . - � ' ,5 � � K' + '� 1.,
1+ �� .� � I ��`� _ - �.. ti � �1 . +� � ` �I �1 "GV � _. � �5'i� _ +� �.± '.� + l+N4; .'• �
�"r� ?' r�.�.,�� - � J7'"S � 't' �7 'F � ,�,� ` r .`,rs,- �. -�' �_�. i � �.�+�.. �`„�.,
,_ .. � .-`` _ .�: ``"� .' '� . `r � . _ . `{ . ewcK. x%n _ -.:�r i
, .y�
� J
� ,:��:.� I� � � l V�/� ` � �- �:_ . I'�`":';,,�,,,,x. :'� �y�urv! . . �` _ ,:,� 3� a �. ., �'. j �i�� --^� � � -
, -_ . - ":� �-. ^ � ` , - .. � - � . / �
I � ,., � . � � � �.,� . ry ' �i , n 't' /1 � _ r `�,.� � .
- I r . �" �s� �� .\\ � �` V� .��� �. /.-..T. �.X9' . �"L..��` � - :-/ � . _,� /
- � � � J :. ;� ,. _ �� : � � _ Y y ; � �� ��g .: :�`
� ` �ee . _ � I ; �J � � � J � �r ! _ �. %'. �� .. t , serv�� uvw� ,/� ' i .
��,,. � ��,r' l�' • �4 � -.� /�`r fM J3 ' ..+ �. . . _ ". . :�p;:
t ' � I�� '_ � � . ��yJ .% �';?-" � .' � y � - .."_ -,F _.` � t S' �.�ee . . ,
� � r - y+ � `+ ` �.- �.i - - �-_��_ � �^ ; � r J. _ ,
� � i `:, X7 �� T � -� 1' t, A� -. . � �, ' , . �. "1 � Y ��'� � �-`- �w..c, vruae s e �_,� � « � .'.��'4 � 1 j � �' � .. / , �
� � �, �
-' c � -� ,.. , f , � i � . _ � � ;;
. . =�;_ ; � � , ^ � � r', r :
— _. , _
..�,�- � �, _ _ , ' -a : t . �,�. � �
�' _ � , � `s � ; � . - _ �,v� C �`Y � , , � �., — � ,�� ; X � ' /�- . _� . n ,:
r r 1 - :� o „r �S '' � y! . � _ ^v- 3r" � . � . � . • � / , � � . � . ` r � f
� `^l ��''�� _ �f � � �- �� r=� .�g _-��-' '� � ,;, ;� � t}, / ���.'�j :� ��.
I , q a - 'e �' C, ���6���'�- _ . y .e� � .�-'� ��1� �v .a�..� ` , �...F .� ,�` !`�" �
� 1: - �C. i r+' ,�.�'' I � T .+r : S i ��.� �n: j��"' �
� �,j �4� S �� +�1 �r.l',;•; /,C;3��;� � l) ��� T �>.__ �„f � _� _ - � �, ` '�� i � ,�+� y�" i� �,.
,-
. T ' � ' � :^- J
� T
.. _� '. � ,_.�_-.—. � --.' . ..�.F. � ^ f .,-:. ._ �� "..�� : { � 'i y 7 . �. _� •a.-:�}wnrru�wc`scrv ��_' � . � � r�.� � ! J 1� :Iy �i ���
.._. � ' y � J,�,�-� ..� � ��.. _ ' ' , . � -
I _ - ' .,� 3�'� �.��' ,:: �� �Wr�j� ,�� _,�'ii�."'`; � � 1 i �. - w4_== .�,u�;, ' = y� - . , r � . -fi;;, .
;� � � �r , � _ - � ' �c CAMEL'S HUMP � �' ,� ,✓' `�';, t, Y /!, .
i � / . c! � /
: s+s �. � �r i '� � `� - ��� � - - a � : s I OVERLOOK PARK . . i o � , � � �. W ��-. .� J
i� � i � b �.: �� � � ,. �5.�, - � � _ ��. _ _ ` ; � 4 r ,^ ,� � . � . .. � J, ' / � �,
..���4 3� �: '�' I - �„�.� "'.�� '1'h ��i a .�' �"� . �/ ..- �' t, ��+
I � -'t � � _. yh,� �.� r � � z> ,.c�` �i n , ,_ w ,; . .
.. �� I� � �.C� � . r"+ ?ee�'� 'ti � . � . t�/'� ..'
' �.' I t ��.:�.:\" � ��� I �.w ` ��� _ a� T' ��✓ t � i w �j._ j :.�� 1 �`�.�, .
I -l � � __ 9 ax ti ' , .y.,,,,, r .�< +L � F � � �. � �3'%� � ,!}r 'r' ��E.,.�•.
_ _
� '1 ..: "1 - a ".. ' 7,1� . _ � -..` 'b "t � � � .r,,l� J��.. .-�^: L
�� l �ti - _ - ' .r. .c � �� �, - : 1n A '. , '°� .!� �„ / " �'.0
- !. y � `= . ,.._._ - - -- i" � ' �'a - '�' / "� � .. P y � � . �" � �;. -+�
�..- _' -.« - ., �� ' .�.a t �'+' . } ./ M � . 7+ •L i. ��.� 1�.�� . �/ ` � J .
.
i
.. � � , , (� ; " `. Y
� •.: ,^ t���{ u'"' .�j'( ' ) � - �z_`x c, fj � .. . ♦ . �{�q � � �-. �`• �.
. � ,�
i :' . . YJ � y _ . . � � wc w �,. . ' '� �1 ...,~ � � �` � � . . t�t
j �r r ti � " - 'nl '�,y ti -za � _i� t �... . _ �___ � ,� 3� e , � � i . r' �F. �
�`' � :� �,...y� ' i� ;, e t ' � � � � ti � t , r ��'� wrur�rauiarw��, .; r A.� � '=l�P ,R �
,sy,' w r r' -, .s ' --, � � ' r - , .
�� �,..-- P � , . _ , . �� .. ,.._- � �:_ tlt 7 � +� : � cec' � . /' �� � � .?.� i ►'. �.
7[ +��+V �+��^': - � - _'e �F ..^t 4 _ .-�P ..' � � '�'�' ' �, 1 �c
�;1 r � '^ �,. .+z' .�-�� . n. :-_ �. w`.z c-'r' - --` r��'".= ° .:�2. �L � �.� , `�� �� � - �p�r ,Z;
� . X , ^
(,°.`� _�. r : ��, . `` . ,..: ' ,t _i`—SrL�i�'_- �...r' = . „,�il ts8"��. ;� r , i ,_,y_ ��,� � �� Y� _��(
:�„t+. c.. at- ' f :. p�.�; ..- 'i'.�:;�. .. ..., 'LF :..-.., -::_ I��rrur�e enu�NOUS ^�..�� y .. - - �'�' . �'Y.�.. . �"'4:,'"'!':,� `'�'` + � ,�`, { �',.��,`:
� �'� ' ^� - ' � �.'��.. i.
�_ � � ^rr *7. - . .,,.f'r � kr �' - -r'- a :`'it,s +'� ` � � r ' ^ �' ' �^ �" ,
� ' t � . �=�., .. � xy � -;' �� . :, �_.. � _ � Y.Y ��.r ._,,���.�j'.? �' .4�: . fwunounao�,.r.w� r. /��� /� r�'��� . . . N � . . , � .r `<�''. -:<��..
, .i '�. ,.. ] 5 ` , . ; f,^ � . ;,: ' *. � '�'-.. -� v �_. 'g` �_ �- .� :. �vk , ���' . . ..;: w �:�'� ��.?4�' . i�' � .
3 .. �? VC. �: �Y'+, �~ ^ 1 ' , C - �' � L `7 - 1 .H' ":if �d:: . . . . ,
. t 'r ,. .�. � Na., c--- '" � � ,�" . '' �„�.... � �_�� � -f,'-� � +A a..'. �i Y •.i..d� ;'�} �
',:� .:��, �C r ' : , -_ ' ,+. �...-`': r._ ""t' -'�,.� ;�;? .,r^ ..� � . x. ��� �t`.. , ,` t r / d� � „"� ` y ��� -
i, ��' �s + 'r. .. .� ,r,z �':cJ�' .. � ._ . :-iC=c$ ,y .;a : ��2 ��� _ 7� - C� + '^�? a �p �:, � 1 ,k„ ° ! 1 � � � � }Tn �� -,�. � `�� �
' " � ' � � � s't.
- . ' ����� ( . � 'S- ' R �, � �, J + � y ' y � �4 ,- ���`' � . I
� � .T-:. T � ��16 �.,�-'' �@' .' h � j �':.�wwfuvaroru�ovrwac:.. � ,r �,y._.it �.. - �h "y� e�.y�. f �'' :"� S S ` •,T`
�:� �- �+\ - � x r,i..� ,ia.: '�iCa � •. C\F. i `". * .��. �° rn.�' . �� J �.+(S �., i` .-�'" ,y � "74 ( ,_ ?' _ G ,',�� �
"S` 6 � �. . � t ��' �, . � F � ` l �' Z
+� �iax : 1 ,, +r , , ,, �^; � ! � �� �. c.d' � . $St+'' i' t . . a.. � ,a: �\�i� � � �
i 4 ' � t l�►'i i �!� '� . 4 �:
^ ,
!.�, r�-. '^> � fa � F , � � .wSG l t� 'A� j 19 � � J � ' r ' 'cp � '�+- � d�i, y; .
:.H r�,�- ;.i"°a - r fS :- - , . 1 � r♦ � : ' _ .�'.A - .e +� .� �� r �_� �^��f_ "�' . .�,m �� o us sso
� - " : ,,,, � r - � "a" •"` - _ � � _ " .. j y {.. � . . i� � , , .��,'��aT ✓ �.'� �K i � � lbrmnml�
�.� I ��:_ � Ic: .L ���. ii.1 l,�if�iC�� i ivo ir' �.�v_, . , �.-.:�. .� . . . , ti.n�rv..om..�,.a_�„_a_�mmm.m.�..�.����*.,�.m-��w„ae.ov..�n,.�.mwn��%t�.�.,�
, _ .. �� . �� p
CITY OF COTTAGE GROVE FIGURE: 4
EVERWOOD 4TH ADDITION DATE: ]ULY2013 ��
EVERWOOD 4TH �1 DD/T/ON
\
\
\
�
\
\
\
</.j; 1 1��
.., , �; 0 00�� /�
N ��� r�
1 �p��%�i \o
��
�� �
/
�� 5 �
� /
^��
i
.
/ /^
�
e".� �L/�� / \�
:k ^� �j � ��
9� / / 1�
/ // 4
� /
c'�,
� ,
�� -
�
<' ; �
� ^
'� 1
�
,,
.=.
:-
�� i
�.
..
� �
�. ,�
��,
..
c,��
O
� 'c�
�� �
� r'6'
� �0..
._. ) ,"
\ � \ � /;\ ' � Zr'j� p� � \�j �; � � � � �
/ `� rc i
\ 1 �� , � / ° ���� \ �� `��� ��?��O !� %��/ � / �
�// � D`5, --�` ` � `s // /�� \
/ � 0 ���` �/ // � �
\
\ \
\ \
1
,-_ I I
�. ' � �-
` "� '`', I
\ � r L _ ' ; .�./ i j � ♦ r` : i 'Cs
�. �� `� "p I `'; �'i
^ 't' � :i
CP °'� ;T' ;? ; �
1 o��� - - - - ��•,�� I „ :
�!�, a ' Q� p.,�`.1' !, I
. .�
1 � �'! ! � ; i �� 16 �°�1� I
/ O O. � . � ♦ �o
� • c� j �.�� . � � �i , �,�
�
�� � � �i -- � �s��' � \
� �
� \
� � �� ; . �
`$ �� � � \
N30°26'28"W - ----'� `�, ��i / 1 0
i � A ��'`''---- - N54°13'00 �E \ 6 � '
� � OUTLOTA� ; � ^,�M
�` 1 �° ��`.�' i \ ^� ^�� ,�'
�` ��S�o'32" �' �i , 2 N v,
��� � ' \ ��
Detail �� '
� '�� 1
� I NO $COIB i� �
\ `'�----'� r�G �v\� '•
� �6o / � a
X /
t�
� ,
•=-
��^�
� ��
. �
�
. ,
. �.
.--
�� i
.�
..
� �
�. ,�
�' i
..
�otn st�c s
�ti g � s ���� .�`�\. , -�: $�;�°•�z• 3
�� / �� � � �� ` �
/ j ; °' `�� . -' <\ �
\ � � .�, �° � �,\
� / ���1 j�ll� �=���49�5w;X � •�� �
'� �? � �' �%i f i � � � � L=43.33 °`.�� \.P
Os O�� � �' � �, �. b • o
�L oo ','v4i ..LgiW i ii�� � ID
r � �
� �
L i � � � 173.0 �� � � �
� R=30.pp �=I °° � I �
I � _=c `ri i o
W I , �=30.44 �t. ' � ' � �
O �� � ry�� � I�
O �� '�� �� s • I� '
O 0 a ��. / � P e� y� �, �` . '�' �
Z L � �N90�OQ����W� � J � � �y ��/6���d
SH6 �. �`ifL�� � o��
M r — — — 130.07 — — — p1 Datail �.� �y�
ai � f., �,�� � �'' �. ��� 4
fT � � .��
rn ; � �� o ;;
� �� , rn �_
m� � :� �a� � OUTLOT A ,
�� . , 4 �,� � ��.
2
�`
Drainage and Utility Easementa are
shown thus:
II
5 �{
o � 0
---�—J L—�---
Being 5 feet in width and adjoining
lot Iines, unlesa otherwisa shown,
and 10 feet in width and adjoining
street lines as ahown on the plat.
O Denotes 1/2 inch by 14 fnch iron
pipe with plastic cap inscribed
MN PLS 14376 has been aet or will
ba set fn accordanca with MS
505.021, Subd. 10.
• Denotea 1/2 inch by 14 fnch iron
pipe monument found and marked
by PLS No. 14376, unleas otherwiae
noted.
The orientation of this bearing
systam is basad on tha Washington
County Coordinate System. (NAD 83)
� � — E cn
11= � Ng1°OS'47" c�r
�' 165.8 �
��
��
' �� I
cn — —
rr �
� l i
� 2 �,
��e: Rs 3�•0� .35 �;
��.a' ,.�s41s �
'� 1� � • �
, � 0$ Zg°10 5
-;' ��29.51 �
` �— — — — — — — — — — J
� � � S80�D��QD�E �
� -- 14.5.63 -- �
� N �
� /� I
�" �� L � � ��ry �
�i �:. �
NE 1/4
`
N
� O\
� \
�� ���\
, s
`�s
O�
(cs�w No. sz)
�7�
$It@
�° �
�
SE 1/4 a° y
NW 1/4
�
sw �/4
vTcinity Map
Not fo Soale
Sec. 7 ond 8, T. 27, R. 21
1 � • 9�
•o,
3
0
O
0
O
0
O
�
0
�
�
N
M
KNOW ALL PERSONS BY THESE PRESENTS: That MJR Developers, LLC, a Minnesota limited liability company, fee owner of the following described property
situated in the County of Washington, State of Minnesota, to wit:
Outlot A, EVERWOOD 3RD ADDITION, according to the record plat thereof.
Has caused the same to be surveyed and platted as EVERWOOD 4TH ADDITION and do hereby donate and dedicate to the public for public use forever the
public way as shown on this plat, and also dedicate the easements created by this plat for drainage and utility purposes only.
In witness whereof said MJR Developers, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this
day of , 20
MJR DEVELOPERS, LLC
Mike J. Rygh, Chief Manager
STATE OF MINNESOTA
COUNTY OF
The foregoing instrument was acknowledged before me this day of , 20 by Mike J. Rygh, Chief Manager of MJR
Developers, LLC, a Minnesota limited liability company, on behalf of the company.
Notary Public, County, Minnesota
My Commission Expires
I hereby certify that I have surveyed and platted or directly supervised the survey and plat preparation of the property described on this plat as EVERWOOD
4TH ADDITION; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on the plat; that
all monuments depicted on the plat have been or will be correctly set within one year as indicated on the plat; that all water boundaries and wet lands as defined
in MS 505.01, Subd. 3 existing as of the date of this certification are shown and labeled on the plat; that all public ways are shown and labeled on the plat.
Jeffrey D. Lindgren, Land Surveyor
Minnesota License Number 14376
STATE OF MINNESOTA
COUNTY OFDAKOTA
The foregoing Surveyor's Certificate was acknowledged before me this
Notary Public, Dakota County, Minnesota
My Commission Expires
day of , 20 by Jeffrey D. Lindgren, Land Surveyor.
CITY OF COTTAGE GROVE, MINNESOTA
This plat was approved by the City Council of Cottage Grove, Minnesota this _
requirements as set forth in Minnesota Statutes, Section 505.03, Subdivision 2.
Signed: Mayor
WASHINGTON COUNTY SURVEYOR
Pursuant to Chapter 820, Laws of Minnesota, 1971, this plat has been approved this
e
Washington County Surveyor
WASHINGTON COUNTY AUDITOR/TREASURER
There are no delinquent taxes, the current taxes due and payable for the year
, 20
e
Washington County Auditor/Treasurer
day of , 20 , and hereby certifies compliance with all
Signed:
day of , 20
e
Assistant County Surveyor
WASHINGTON COUNTY RECORDER
Document Number
I hereby certify that this instrument was filed in the office of the County Recorder for record on this
_.M., and was duly recorded in Washington County Records.
e
Washington County Recorder
50 0 50 100
Scale in
1 Inch = 50
iF:�
Feet
Feet
Clerk
20 at
day of
o'clock
/'�/EDLU/VD
PLANN/NG ENG/NEER/NG SURI/£Y/NG
O�/ a �� 3j 2 V � \�� ' I �
. N -�� � \ p ��t3� I!
`� �` � i,,� �Z
\\ �/� �' \ •p N �N I
�, i 5 N� o� I
�sn.. � o � ��, \° �
�, e o\��, w \°� �
?) �� o � ° 6 '� cr� \� h
p s o ..
�L �---- t� O � L--------�
o -- o � �p� o 0
119.50 S89°49'19"W o�, 120.34 S89°49'19"W
l Z
day of
have been paid, and transfer has been entered this
e
Deputy
e
Deputy
e
STATE OF MINNESOTA
COUNTY OF WASHINGTON
CITY OF COTTAGE GROVE
)
)
)
Receipt#: 34465
RE5
GRV Filed
No Delinquent Taxes
Transfer Entered
Retum to:
CIN OF COTfAGE GROVE
7516 80TH ST S
GOTTAGE GROVE MN 55Q16
3641298
$46.aQ
Certified Filed and/or recorded on:
4l3012007 9:58 AM
3641298
O�ce of the County Recorder
Property Records & Taxpayer Services
Washington County, MN
Kei+inJCorhi�l Cnunh�Rerorder
I, the undersigned, being the duly qualified and acting City Clerk of the
City of Cottage Grove, Minnesota, DO HEREBY CERTIFY, that I have carefully
compared the attached copies of Resolution No. 06-196 of the City of Cottage
Grove with the original on file in my office and the same is a full, true and
complete transcript therefrom.
WfTNESS, my hand as such City Clerk and the corporate seal of the City
this 23rd day of April, 2007.
�-�� � - �-
Caron M. Stransky U �
City Clerk
- � � �� ' � �-,.
<�' �
„� SEqt��.
, a , :
., ":. � . • -
G:1planning�2006\Planning Cases\043CP Evenvood-ju1241043CP Everwood Res. No. 06-196 Recording Cover.doc
RESOLLITION NO. 06-196
RESOLUTl�N APPROVfNG TH� PRELtMfNARY PI..AT NAM�D
EVERWOOD ADDITfON
WHEREAS, MJR Qevelopers has applied for a preliminary plat for subdivision to be
known as Everwood Addition. The development, which wiil consist of 28 single family lots and
4 outlots, would be located on property legally described as:
Parcel 1:
That part of the Southwest Quarter. ofi Section 8, Township 27, Range 21,
Washingfon County, Minnesofa, described as commencing at a point ori the
west line of said Southwest Quarter of the Southwest Quarter of Section 8
distant 33.OQ feet South af the northwest corner of said Sauthwest Quarter of the
Southwest Quarter, thence North 89 degrees OQ minutes 10 second East,
assumed bearing, along a line parallel with the north line of said Southwest
Quarter of fihe Soufihwest Quarter of Secfiion 8, a distance of 561.Q0 feef ta the
point of beginning of the land to be described; thence South 7 degrees 59
minutes 50 seconds East, a distance of 786.72 feet; thence South 66 degrees
00 minutes 10 seconds West, a distance of 193.99 feet to the most northerfy line
of Parcel 43C, Minnesota Department of Transportation Right of Way Plat No.
82-2�; thence North 73 degrees 11 minutes 53 seconds West, along said most
northerly [ine of Parcel 43C, a distance of 507.10 feet ta sa.id west line of the
Southwest Quarter of the Southwest Quarter; thence. North 0 degrees 37
minutes 41 seconds West, along said west fine of the Soufihwest Quarter af the
Southwest Quarter, a distance of 734.66 feefi to said norfhwest corner of said
Southwest Quarter of the Southwest Quarfer of Section 8; thence North 89
degrees 00 minutes 1 D seconds East, along said north line of the Southwest
Quarter of the Southwest Quarter of Section 8 a distance of 556.74 fee# to the
intersection with a line which bears North 7 degrees 59 minutes 50 seconds
West from the point of beginning; thence South 7 degrees 59 minutes 50
seconds East a distance of 33.25 feet to the point of beginning.
Parcel 2:
Ail tha# part of the Southeast Quarter of the Southeast Quarter of Section 7,
Township 27, Range 21, Washington County, �Vlinnesota which lies northeasterly
Resolufion No. 06-196
Page. 2:of 5
of the following described Iine: Beginning at a point on the north line of said
Southeast Quarter of the Soufheast Quarfer which is 92.85 feet west from the
nortfieast corner of said Southeast Quarter of the Sflufheast Quarfer; thence
south�ast�rly to a poinf on the east line of said Sou#h�ast Quarter of the
Southeast Quarter, thence soutl�easteriy to a point on the east line of said
Sautheast Quarter of the Southeast Quarter which is 92.85 feet south of said
northeast corner and there terminating,
Parcei 3:
The East Half of the Norfheast Quarter of the Southeast Quarter of Section 7,
Township 27, Range 21, Washingfon County, Minnesota.
Parcel 4:
The Norfhwesf Quarter of the Soufihwest Quarter of Section 8, Township 27,
Range 21, Washington County, Minnesota, Except the East 726.01 feef.
WHEREAS, MJR Deve(opers also applied for a co►nprehensive plan amendment to
expand the Metropolifan Urban Services Area (MUSA) boundary and to change the land use
from Rural Residential to Mixed Use for low density residential and cam►nercial development,
and a zoning amendment to change the zoning from R-2, Residential Estate, to R-2.5,
Residentia(; and
WHEREAS, public hearing notices were mailed to surrounding property owners within
500 feet of the proposed development site and a public hearing notice was published in the
South Washington County Bulletin; and
WHEREAS, the Planning Commissian held a public hearing on these applications on
August 28, 2006; and
WNEREAS, the public hearing was open for public testimony and testimony from the
applicant and the public was received and_ entered into the public record; and
WHEREAS, the P(anning Commission, on a f-to-2 vote, recommended approval ofithe
preliminary plat for Everwood Addition, subject to certain. conditions.
NOW, THEREFORE, BE IT RESOLVEq, fhat the City Council af the City of Cottage
Grove, Washington County, Minnesota, hereby approves the preliminary plat applicafion filed
by MJR Develapers fior Everwood Addifion, which would consist of 28 single family lots and 4
outlots to be located on the property legally described above. The approval is subject to the
following conditions:
1. The final plat must conform to the preliminary p[at dated September 14, 2006,
except for additiona( required easements.
Resolution No. 06-196
Page 3 of 5
2. The developer must petition fhe City for public improvements and enter into a
subdivision agreement with the City for the instalfation of and payment for all
pubiic improvemenfs in the subdivision and adjacent public roadways, pursuant
to Title 1fl of the City Code.
3. The approvals are subject fo applicant receiving appropriate written approvals
from the Minnesota Land Trus# and any required judiciary approval.
4. The applicant receive appropriate building permits from the City, and permits or
approvals .from other regulatory agencies inciuding, but not limited to, fhe South
Washington Watershed Districf, DNR, and the Minnesota Po(lution Control
Agency.
5. The revised grading and utility plan must be submifted to Cify staff for review and
approval prior to the submission o# the final plat plan applications to #he City. All
emergency overflow swales must be identified on the grading and erosion control
plan. Drainage calculations musfi be submifted prior to City Counci) review of the
preliminary plat.
6. The applicant must submit a fina! construction managemen# plan that includes
erosion controi measures, project phasing for grading work, areas designated for
preservatian, a crushed-rock construcfion entrance, and construction-rela#ed
vehicle parking for sfaff review and approval prior to issuance of a grading
permit.
7. A pre-construction meeting with City staff and the confiractor must be held before
site work begins. The contractor will provide the City with a project schedule far
the various phases of canstruction.
8. �rosion control devices must be installed prior to commencement of any grading
acfivity. Erasion control shall be performed in accordance with the recommended
pracfices of the "Minnesota Construction Site Erosion and Sediment Contral
Planning Handboak" and the conditions stipcalated in Title 10-5-8, Erosion Control
During Construction, of the City's Subdivision Ordinance.
9. The developer must pay for required public improvements, all trailway
improvement costs, stop signs, area charges, park dedication fees, and the
required off site ponding costs.
10. Outlo#s A, B, and C must be conveyed to fhe City of Cottage Grove at the time of
recording of the final piat.
11. The boundaries of Outlofs A, B, and C will be identified in accordance with
required pubfic property monument policies.
Resolution No. 06-196
Page 4 of 5
12. A temporary public trailway easement documenfi for the recreational frail located
on Out[ot D be created by the applicant and recorded with Washingfon Couniy at
the time of the recording of the final plat.
13. A permanent public trailway easement document for the finai recreaEional trai{
(ocation on Outlpt D must be created by the applicant and recorded with
Washington County at the time of the development of Outlot D.
14. ['ark dedication requirements wiil be rriet through a cash payment for the 29 Iofs,
with the total amount based on fees in effect at fhe time the final plat is
approved. The commercial park dedication is required at the time of approval
and development.
15. The developer must install an six-foof concrete sidewalk con#orming to City
standards along Hardwood Avenue and East Aoint Douglas Raad.
16. The developer must insta(I a wood chip recreational trail and eight-foot wide
bituminous pathways as determined on the final grading pian in Outlots A, B, and
C. The applicant will pay 100 percent af the cost for development of recreation
trails on all pub(icly dedicated land.
17. Tree mitigation is required in accordance with ordinance criteria.
18. There must be a total of four yard frees and ten shrubs an each residential lot.
19. The applicant must hire a city-approved arboris# to assist with all facets of tree
preservafion on the site. The arborist will supervise installation and maintenanca
of tree preservation fencing and the tree and brush removal process.. Mitigative
measures to aid in preservation of tr�es siated to remain will occur based upon
the recommendations of the arborist. Should frees designa#ed for preservation
be removed, the applicanf will rep(ace the trees in accordance with the ordinance
criteria. Trees designated for preservation which are found to be harmed, dis-
eased, ar dying, or are not suited for focation into the project may be removed
based upon the recommendation of the arb.orist in agreement wifh the City and
the applicant. Trees removed wilf be replaced as required by ordinance. The
developer must install snow fencing or similar fencing material around all trees or
groups ofi trees thaf are to be preserved prior to any grading acfivify on the site.
20. The appficant must submit appropriate engineering information for retaining
walls. Any fencing on retaining walls musf be decorative and subject to staff
review and approval.
21. A stop sign musf be installed at any (ocations deemed appropriate by the city
engineer based on the sign installation requirements adopted by the cify.
22. The street names identified on fhe fina! plat must be consistent with the street
names in the existing residential development.
Resolution No. 06-196
Page 5 of 5
23. All monument signs must comply with the Cify's Sign Ordinance and only be
placed on private property. The Homeowners Association is responsible for the
maintenance of all signs.
24.
25.
The applicant must submit private covenanfs which detaifs the following:
o The homeowners association is responsible for all ownership and
maintenance of landscaping improvements, fencing, and outlots as depicted
an the final plat.
• Monument.s9gns will be maintained by the homeowners association.
• Any fencing provided on the site will be canstructed af materials that are
uniform in design and color.
• Ail signs, mailboxes, and accessory lighting will be uniform in materials and
design and be approved as part of the landscape plan.
• Protection and infringement management of all publicly owned open space
and areas located in the private canservation easement.
The developer must advise horrtebuyers fihat they are responsible to maintain the
boulevard area that abuts their property all the way to the curb of the street.
26. 7he devefoper is responsible for street sweeping responsibilities or the costs fbr
the entire designated construction haui route to 70th Sti�ee# during the
deve(opment of the subdivision.
27. The final plaf will incorporate all comments received from the City's consulting
engineer as identified in the final City Council agenda packet.
Passed this 20th day of September 2006.
'� � � -� .
S ndra 5hiely, Mayor �
Atfest:
C'_-�'i�N� l' 1-� /�" 1 ��z-�[—GC/Y e
Caron M. Stransky, �ity Clerk