HomeMy WebLinkAbout2013-12-18 PACKET 04.G.REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM # �
DATE 12/18/13 �
PREPARED BY: Community Development Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
:�***�***���*�********�********��***************�
COUNCIL ACTION REQUEST
Consider approving final payment in the amount of $5,245.58 to Rumpca Excavating, Inc. for
the Cottage Grove Middle School Stormwater Improvements project.
STAFF RECOMMENDATION
Adopt the resolution approving the final payment of $5,245.58 to Rumpca Excavating, Inc. for
the Cottage Grove Middle School Stormwater Improvements project.
BUDGET IMPLICATION: $
BUDGETED AMOUNT
ADVISORY COMMISSION ACTION
❑ PLANNING
❑ PUBLIC SAFETY
❑ PUBLIC WORKS
❑ PARKS AND RECREATION
❑ HUMAN SERVICES/RIGHTS
❑ ECONOMIC DEV. AUTHORITY
❑
SUPPORTING DOCUMENTS
DATE
$
ACTUAL AMOUNT FUNDING SOURCE
REVIEWED
❑
❑
❑
❑
❑
❑
❑
APPROVED
❑
❑
❑
❑
❑
❑
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
� MEMO/LETTER: Memo from Dave Sanocki, Stantec, dated 12/4/13
� RESOLUTION: Draft
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
❑ OTHER:
ADMINISTRATOR'S COMMENTS
�
Date
�***********�****���****�****************�*�****
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
RESOLUTION NO. 2013-XXX
RESOLUTION APPROVING FINAL PAYMENT IN THE AMOUNT OF
$5,245.58 TO RUMPCA EXCAVATING, INC. FOR THE COTTAGE GROVE
MIDDLE SCHOOL STORMWATER IMPROVEMENTS PROJECT
WHEREAS, the City Engineer has certified that work has been satisfactorily
completed; and
WHEREAS, the original total contract amount was $99,536.31. There were
no change orders for this project. The actual contract 'amount completed was
$104,911.66. The total overrun was due primarily to additional restoration work
completed on the site. The restoration amounts overran because the area of
disturbance was greater than that anticipated on the plan; and
WHEREAS, the project has been satisfactorily completed in accordance
with the contract plans and specifications.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Cottage Grove, County of Washington, State of Minnesota, that $5,245.58 is to be
paid to Rumpca Excavating, Inc. for the final payment of Cottage Grove Middle
School Stormwater Improvements project.
Passed this 18th day of December 2013.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
December 4, 2o1g
Stantec Consulting Services Inc.
2335 Highway 36 West
St. Paul MN 55113
Tel; (651) 636-4600
Fax; (651) 636-1311
Jennifer Levitt, PE
City Engineer/Community Development Director
1280o Ravine Parkway South
Cottage Grove, Minnesota 55oi6
Re: Cottage Grove Middle School Stormwater Improvements
City of Cottage Grove
Stantec Project No. i938o1�96
Dear Jennifer,
Enclosed please find three (3) copies of the 2nd and Final Request for Payment for the Cottage Grove Middle
School Stormwater Improvements. The Contractor for this project is Rumpca Excavating, Inc. In addition
to the Request for Payment, the Contractor has submitted their IC-134 forms.
PROJECT REVIEW
This project began in early August, 2oig and was substantially completed by the end of August, 2013. Final
punch list items were recently completed in October, 2oi3.
CONSTRUCTION COST OVERVIEW
The Original Contract amount for this project was $99,536.3i. The Final Construction Amount is
$104,911.66. The Final Construction amount for this project was $5,375•35 over the Original Contract
Amount. The total over run was due primarily from additional restoration work (topsoil borrow,
hydromulch with seed and erosion control blanket) completed on site. The restoration amounts overran
because the area of disturbance was greater than that anticipated on the plan. Restoration payment
amounts were governed by the unit prices outlined in the service agreement.
RECOMMENDATION
The Contractor, Rumpca Excavating, Inc. has satisfactorily completed the Work in accordance with the
contract plans and specifications. Therefore, it is recommended that final payment of $5�245•58 be made to
the Contractor and the project be accepted by the City of Cottage Grove.
After acceptance, please distribute all copies of the Request for Payment as appropriate. If you have any
questions about this project or require further information please contact me 6 5 1-60 4 - 49 0 5•
Regards,
STANrEC CONSUL ING SERVICES INC.
� �
Dave Sanocki
Senior Project Manager
Enclosures
F�,t:��"€ v� $� ,,<v�..*; �� s;:� , �,��.,t,{
COt�'T CT'O�'� REQUE�T` FO� P�,Y�E�`C
COTTAGE GROVE MIDDLE SCHOOL STORMWATER IMPROVEMENTS
STANTEC PROJECT N0, 193801796
SUMMARY
1 Original Contract Amount
2 Change Order - Addition
3 Change Order - Deduction
4 Revised Contract Amount
5 Value Completed to Date
6 Material on Hand
7 Amount Earned
8 Less Retainage 0%
9 Subtotal
10 Less Amount Paid Previously
11 Liquidated damages -
12 AMOUNT DUE THIS REQUEST FOR PAYMENT N0.
Recommended for Approval by:
STANTEC �a
$ 0.00
$ 0.00
$ 99,536.31
$ 99,536.31
$ 104,911.66
$ 0.00
$ 104,911.66
$ 0.00
$ 104,911.66
$ 99,666.08
$ 0.00
$ 5,245.58
2/FINAL
C v-�.`, y �,6 t_�,r-� ew.
RUMPCA EXCAVATING, INC.
Specified Contract Completion Date:
Approved by Owner:
CITY OF COTTAGE GROVE
Date: / f
i li3
193 801796 R E Q2 F I N A L. x I s m
� Item
�ASE BID:
1 MOBILIZATION AND TRAFFIC CONTROL
2 REMOVE CULVERT and INSTALL CULVERT SUPPLIED BY
COUNTY
3 MACHINE SLICED SILT FENCE
4 TEMPORARY ROCK CONSTRUCTION ENTRANCE
5 COMMON EXCAVATION (P)
6 CLAY LINER (CV) (P)
7 ENGINEERED SOIL MIX (70% FINE FILTER AG, 30% GRADE
2 COMPOST (CV) (P)
8 TOPSOIL BORROW (LV)
9 6" PERFORATED DRAIN TILE (INCLUDES ROCK AND
FABRIC WRAP
10 6" SOLID DRAIN TILE
11 8" SOLID DRAIN TILE
12 DRAIN TILE CLEANOUT
13 8" DRAIN TlLE CONCRETE HEADWALL
14 BIOLOGS (FIBERLOGS)
15 TURF REINFORCEMENT MAT W/#270 SEED
16 EROSION CONTROL BLANKET
17 HYDROMULCH WITH #270 SEED
18 SEED MIX #32-241 WITH MULCH
19 OVERSEED #270 SEED
20 OVERSEED #32-241 SEED
TOTAL BASE BID;
TOTAL BASE BID:
TOTAI. WORK COMPLETED TO DA7E
193801796REQ2FINAL.xlsm
Unit
LS
LS
LF
LS
CY
Cl'
CY
CY
LF
LF
LF
EA
EA
LS
SY
SY
SY
AC
SY
SY
Contract
Quantity
1
1
500
1
2,400
460
600
150
400
56
116
7
1
1
690
1,378
2,594
0.3
1,600
750
Unit
Price
5987.79
3200.00
2.75
1350.00
9.50
25.20
36.00
28.00
14.00
19.00
24.00
350.00
750.00
1210.00
8.07
2.09
1.05
2750.00
0.39
1.27
Current Quantity
Quantity �o Date
49
240
46
60
21
44
68
158
7
1
1
745
2323.3
2795.5
0,49
,4mount
to Date
1 $5,987.79
1 $3,200.00
5 $1,361,25
1 $1,350.00
o �zz,$oo.00
0 $11,592.00
0 $21,600.00
8 $6,104.00
8 $6,272.00
$1,292.00
$3,792.00
$2,450.00
$750.00
$1,210.00
$6,012.15
$4,855,70
$2,935.28
$1,347,50
$0.00
$0.00
$104,911.66
$104,911.66
$104,911.66
PR�]ECT P�YM�N'T �1°A'T11�
OWNER CITY OF COTfAGE GROVE
STANTEC PROJECT N0. 193801796
CONTRACTOR RUMPC,4 EXCAVATING, INC.
��.
;. �. -
I�
�' � �� � 1 ���.
, , � �.
3
Nfaterial on Wand
193801796REQ2FI NAL.xlsm
• .-
13
13
Paymen�
99,666.08
5,245.58
Retainag
5,245.58
.� �.. �
104,911.66
104.911.66