HomeMy WebLinkAbout2014-07-16 PACKET 04.K. REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM # �
DATE 7/16/14 • k
.
PREPARED BY Community Development Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
�******�*�*****�:**:�*�:**�************��*�********
COUNCIL ACTION REQUEST
Consider awarding the quote for the 2014 Sanitary and Storm Sewer Cleaning and Televising
Project to Pipe Services Corporation in the amount of $31,247.30.
STAFF RECOMMENDATION
Adopt the resolution awarding the quote for the 2014 Sanitary and Storm Sewer Cleaning and
Televising Project to Pipe Services Corporation in the amount of $31,247.30.
BUDGET IMPLICATION: $28,122.57 $31,247.30 Stormwater/Sanitary Sewer
BUDGETED AMOUNT ACTUAL AMOUNT FUNDING SOURCE
ADVISORY COMMISSION ACTION
DATE REVIEWED APPROVED DENIED
❑ PLANNING ❑ ❑ ❑
❑ PUBLIC SAFETY ❑ ❑ ❑
❑ PUBLIC WORKS ❑ ❑ ❑
❑ PARKS AND RECREATION ❑ ❑ ❑
❑ HUMAN SERVICES/RIGHTS ❑ ❑ ❑
❑ ECONOMIC DEV. AUTHORITY ❑ ❑ ❑
❑ ❑ ❑ ❑.
SUPPORTING DOCUMENTS
� MEMO/LETTER: Memo from Ryan BurFeind dated 7/10/14
� RESOLUTION: Draft
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: Quote Tabulations
ADMINISTRATOR'S COMMENTS
�
�__ � �� 1
City Administrator Date
****************************�**********�********
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
Cottage
J Grove
� Pride and P�OSPerity Meet
To: Honorable Mayor and City Council
Ryan Schroeder, City Administrator
From: Ryan BurFeind, Graduate Engineer
Date: July 10, 2014
Re: 2014 Sanitary and Storm Sewer Cleaning and Televising
Backqround
The City conducts sanitary and storm sewer cleaning annually to ensure the infrastruc-
ture remains clear of debris to maintain required flows through the system. In addition to
cleaning, the system is also televised to� identify any damage or deficiencies that need
to be addressed to ensure the system continues to function as designed.
Discussion
The City requested quotes from two vendors for the annual cleaning and televising pro-
ject. Quotes were due on July 9, 2014, with two quotes being received. A summary of
the quotes can be seen in the attached quote tabulation.
The low quote for the project was submitted by Pipe Services Corporation in the amount
of $31,247.30. This compares to an Engineer Estimate of $28,122.57. The primary
reason for the quotes being higher than the Engineer Estimate is the large amount of
pipe that is located within easements. This pipe is more difficult to access than what is
located in the street and requires a specialized easement machine that is smaller and
less efficient to complete the jetting/cleaning.
Recommendation
It is recommended the City Council adopt a resolution awarding the project to the lowest
accepted quote supplied by Pipe Services Corporation in the amount of $31,247.30.
RESOLUTION NO. 2014-XXX
RESOLUTION AWARDING THE 2014 SANITARY AND STORM SEWER ,
CLEANING AND TELEVISING PROJECT TO
PIPE SERVICES CORPORATION IN THE AMOUNT OF $31,247.30
WHEREAS, quotes were requested to provide the necessary work for the 2014
Sanitary and Storm Sewer Cleaning and Televising Project; and
WHEREAS, two firms submitted quotes; and
WHEREAS, it appears that Pipe Services Corporation provided the lowest
accepted quote; and
WHEREAS, it is the recommendation of the City Engineer that the quote be
awarded to Pipe Services Corporation in the amount of $31,247.30.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Cottage
Grove, County of Washington, State of Minnesota, the 2014 Sanitary and Storm Sewer
Cleaning and Televising Project be awarded to Pipe Services Corporation in the amount
of $31,247.30.
Passed this 16th day of July 2014.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
Project Name: 2014 Jetting/Cleaning & Televising of Sanitary & Storm SewerSystem
Cottage
x �� Cro��` quote Opening: WednesdayJuly 9, 2014 at 3:00 PM Owner: Cottage Grove
� Pm ,,. , canni �
��=�e .�e /
'_.�
Quote No. l Quote No. 2
QUOTE TABULATION Hydro-Vac, Inc. Pipe Services Corporation
Item
Number Item Units Qty. Unit Price Total Unit Price Total
PART 1- SAN ITARY SE W E R
8" PVC Residential
1 lewel Ave S, LF 4,393 $ 1.50 $ 6,589.50 $ 0.70 $ 3,075.10
2 83rd St. S. LF 254 $ 1.50 $ 381.00 $ 0.70 $ 177.80
3 Jergen Ave. S. LF 1,204 $ 1.50 $ 1,806.00 $ 0.70 $ 842.80
4 Jensen Ave. 5. LF 1,465 $ 1.50 $ 2,197.50 $ 0.70 $ 1,025.50
5 Between lody Ln. and Jewel Ave. 5. LF 1,401 $ 1.50 $ 2,101.50 $ 0.70 $ 980.70
6 leffery Ave. S. LF 1,395 $ 1.50 $ 2,092.50 $ 0.70 $ 976.50
7 Between Jody Ln. and Jergen Ave. S. LF 1,025 $ 1.50 $ 1,537.50 $ 0.70 $ 717.50
8 Between Jewel Ave. S. and Jenner Ln. S. LF 807 $ 1.50 $ 1,210.50 $ 0.70 $ 564.90
9 Jewel Ln. S. LF 630 $ 1.50 $ 945.00 $ 0.70 $ 441.00
10 HillsideTr. LF 125 $ 1.50 $ 187.50 $ 0.70 $ 87,50
8" VCP Residentiai
11 83rd St. S. LF 614 $ 1.50 $ 921.00 $ 0.70 $ 429.80
12 Jergen Ave. S. LF 1,420 $ 1.50 $ 2,130.00 $ 0.70 $ 994.00
13 Jensen Ave. S. LF 1,652 $ 1.50 $ 2,478.00 $ 0.70 $ 1,156.40
14 81st St. S. LF 310 $ 1.50 $ 465.00 $ 0.70 $ 217.00
15 lefferyAve.S. LF 1,537 $ 1.50 $ 2,305.50 $ 0.70 $ 1,075.90
16 lenner Ln. S. LF 1,512 $ 1.50 $ 2,268.00 $ 0.70 $ 1,058.40
17 Janero Ave. S. LF 125 $ 1.50 $ 187.50 $ 0.70 $ 87.50
18 HillsideTr. LF 2,454 $ 1.50 $ 3,681.00 $ 0.70 $ 1,717.80
8" DIP
19 Jenner Ln. S. LF 1,086 $ 1.50 $ 1,629.00 $ 0.70 $ 760.20
12" RCP Line
20 Between Jensen Ave. S. and Jeffery Ln. S. LF 1,783 $ 1.50 $ 2,674.50 $ 0.70 $ 1,248.10
15" RCP Line
21 Between Jeffrey Ave. S. and Jasmine Ave. S. LF 1,359 $ 1.50 $ 2,038.50 $ 0.70 $ 951.30
22 Between Jeffery Ave. 5. and Janero Ave. S. LF 794 $ 1.50 $ 1,191.00 $ 0.70 $ 555.80
23 lanero Ave. S. LF 341 $ 1.50 $ 511.50 $ 0.70 $ 238.70
24 HillsideTr. 200 $ 1.50 $ 300.00 $ 0.70 $ 140.00
TOTAI PART 1 $ 27,886.00 $ 41,829.00 $ 19,520.20
PART 2 - STORM SEWER
12" RCP
25 80th St. S. LF 311 $ 1.50 $ 466.50 $ 0.70 $ 217.70
26 83rd St. S. LF 156 $ 1.50 $ 234.00 $ 0.70 $ 109.20
27 Jensen Ave. S. LF 87 $ 1.50 $ 130.50 $ 0.70 $ 60.90
28 Jergen Ave. 5. LF 441 $ 1.50 $ 661.50 $ 0.70 $ 308.70
29 Jeffery Ave. S. LF 235 $ 1.50 $ 352.50 $ 0.70 $ 164.50
30 Jenner Ln. S. LF 38 $ 1.50 $ 57,00 $ 0.70 $ 26.60
31 Jewel Ave. S. LF 119 $ 1.50 $ 178.50 $ 0.70 $ 83.30
32 Janero Ave. S. LF 161 $ 1.50 $ 241.50 $ 0.70 $ 112.70
33 HillsideTr. LF 675 $ 1.50 $ 1,012.50 $ 0.70 $ 472.50
34 90th St. S. LF 171 $ 1.50 $ 256.50 $ 0.70 $ 119.70
35 103rd St. S. LF 494 $ 1.50 $ 741.00 $ 0.70 $ 345.80
12" PVC
36 Grey Cloud Tr. S. LF 17 $ 1.50 $ 25.50 $ 0.70 $ 11.90
12" DIP
37 103rd St. S. LF 71 $ 1.50 $ 106.50 $ 0,70 $ 49.70
15" RCP
38 80th St. S. LF 623 $ 1.50 $ 934.50 $ 0.70 $ 436.10
39 Jewel Ave. S. LF 619 $ 1.50 $ 928.50 $ 0.70 $ 433.30
40 83rd St. S. LF 343 $ 1.50 $ 514.50 $ 0.70 $ 240.10
41 lensen Ave. S. LF 33 $ 1.50 $ 49.50 $ 0.70 $ 23.10
42 leffery Ave. S. LF 459 $ 1.50 $ 688.50 $ 0.70 $ 321.30
43 HillsideTr. LF 532 $ 1.50 $ 798.00 $ 0.70 $ 372.40
44 90th St. S. LF 689 $ 1.50 $ 1,033.50 $ 0.70 $ 482.30
18" RCP
45 80th St. S. LF 32 $ 1.50 $ 48.00 $ 0.70 $ 22.40
46 Jergen Ave. S. LF 358 $ 1.50 $ 537.00 $ 0.70 $ 250.60
47 leffery Ave. S. I.F 389 $ 1.50 $ 583.50 $ 0.70 $ 272.30
48 lennerLn.S. LF 103 $ 1.50 $ 154.50 $ 0.70 $ 72.10
49 JewelAve.S. LF 740 $ 1.50 $ 1,110.00 $ 0.70 $ 518.00
SO Hillside Tr. LF 660 $ 1.50 $ 990.00 $ 0.70 $ 462.00
Sl 90th St. S. LF 266 $ 1.50 $ 399.00 $ 0.70 $ 186.20
21"RCP
sz 80th St. S. LF 12s $ i.so 5 ss�,so S o.�o S s�.so
53 83rd St. S. lF 45 $ 1.50 $ 67.50 $ 0.70 $ 31.50
54 lergen Ave. S. LF 241 $ 1.50 $ 361.50 $ 0.70 $ 168.70
SS HillsideTr. LF 59 $ 1.50 $ 88.50 $ 0.70 $ 41.30
56 Between Jenner Ln. S. and Hiliside Tr. LF 90 $ 1.50 $ 135.00 $ 0.70 $ 63.00
24" RCP
57 Between lensen Ave. S. and leffery Ln. S. LF 157 $ 1.50 $ 235.50 $ 0.70 $ 109.90
58 lergen Ave. S. LF 184 $ 1.50 $ 276.00 $ 0.70 $ 128.80
59 Jenner Ln. S. Lf 168 $ 1.50 $ 252.00 $ 0.70 $ 117.60
60 Between Jeffery Ave. S. and Janero Ave. S. LF 505 $ 1.50 $ 757.50 $ 0.70 $ 353.50
61 HillsideTr, LF 567 $ 1.50 $ 850.50 $ 0,70 $ 396.90
62 JewelAve.S. LF 488 $ 1,50 $ 732.00 $ 0.70 $ 341.60
63 Grey Cloud Tr. S. LF 28 $ 1.50 $ 42.00 $ 0.70 $ 19.60
27" RCP
64 lennerLn.S. LF 90 $ 1.50 $ 135.00 $ 0.70 $ 63.00
30" RCP
65 Between Jensen Ave. S. and leffery Ln. S. LF 757 $ 1.50 $ 1,135.50 $ 0.70 $ 529.90
66 lody Ln. LF 259 $ 1.50 $ 388.50 $ 0.70 $ 181.30
67 Betweenlody Cir. S. and lody Ln. lF 1,085 $ 1.50 $ 1,627.50 $ 0.70 $ 759.50
68 Jenner ln. S. LF 135 $ 1.50 $ 202.50 $ 0.70 $ 94,50
69 Between Jeffery Ave. S. and Janero Ave. S. LF 285 $ 1.50 $ 427.50 $ 0.70 $ 199.50
70 Grey Cloud Tr. S. LF 558 $ 1.50 $ 837.00 $ 0.70 $ 390.60
71 103rd St. S. LF 346 $ 1.50 $ 519.00 $ 0.70 $ 242.20
33" RCP
72 Between Jensen Ave. S. and leffery Ln. S. LF 1,130 $ 1.50 $ 1,695.00 $ 0.70 $ 791.00
73 Jody Ln. LF 76 $ 1.50 $ 114.00 $ 0.70 $ 53.20
36" RCP
�a SOth St. S. lF 70 $ 1.so $ sos.00 S o.�o $ a9.00
75 Between Jeffery Ave. S. and Jasmine Ave. S. LF 441 $ 1.50 $ 661.50 $ 0.70 $ 308.70
76 Grey Cloud Tr. S. LF 42 $ 1.50 $ 63.00 $ 0.70 $ 29.40
TOTAL PART 2 $ 25,129.50 $ 11,727.30
TOTAL BASE QUOTE $ 66,958.50 $ 31,247.30
Contractor Name and Address: Hydro-Vac, Inc. Pipe Services Corporation
3181225th Street W 16281 Baseline Avenue
Farmington, MN 55024 Shakopee, MN 55379