HomeMy WebLinkAbout2014-09-09 PACKET 05.A. To: Economic Development Authority From: Ryan R. Schroeder Date: September 5, 2014 Subject: Development Update 1. Building Permits (provided at the meeting) 2. Commercial Construction Rehab/Remodel: A. Burger King The interior remodeling is now complete B. Taco Bell The interior/exterior remodeling is about 75% complete. Additionally, they have completed a few site/civil improvements which will culminate in a mill/overlay of their parking lot C. Kok Funeral Home We anticipate issuing the C/O for this project by early October D. Rappaport Building (Point Douglas Plaza/former Hollywood Video) The C/O on the shell will be issued by mid next week. TI’s for AT&T have been underway/going well. It is anticipated that the TI’s for the two restaurant users will take about three months E. American Donor This new tenant is in the former Ed’s Trophies within the multi-tenant building behind Target (about 5,000 SF). Their TI’s should be complete in about 60 days 3. Residential: A. East Ridge Woods The contractor is scheduled to complete paving of the second addition (35 lots) by the second week of September B. Cayden Glen The infrastructure is substantially complete for this 92 lot subdivision with the first model home under construction. C. Swandlund Property/ Riverstone Subdivision On September 3 Council granted Concept Plan approval for 383 lots on this 160 th acre parcel located adjacent to Hadley Avenue and 95 Street. This proposed subdivision is just north of Mississippi Dunes and just south of Thompson Grove. According to the developer, Capstone Homes, the price points are intended to be within a $340,000 to $375,000 range. D. Everwood Subdivision th The 4 and final phase of this subdivision is under construction E. Oak Cove The infrastructure for this development will be under construction this fall 4. Infrastructure A. 2014 Pavement Management Council scheduled the assessment public hearing. Of note is that our appraisals support a $4,100 assessment, our estimates were that a $3,100 assessment would result and after project completion (with great bids) we are projecting a $2,100 benefit assessment will result. B. 2015 Pavement Management th C. 70/Meadowgrass Semiphore The bid for this project D. Michael’s Point Final Lift Council awarded the final lift contract to Hardrives on September 3. th E. 97 Street Extension Should anticipated Business Park projects proceed as desired we should anticipate th moving forward with connection of the two bifurcated segments of 97 Street with a bid in the winter for 2015 construction th F. Hadley and 95 Street As part of the Riverstone Subdivision it is anticipated that both Hadley Avenue and th 95 Street west of Hadley will be constructed/reconstructed to its final design. This likely will occur concurrent with first phase build out of Riverstone. G. Hardwood Lights th Street lights and new trail between 70 and East Point Douglas will be completed by the end of October H. Cedarhurst Meadows Park This Park, between Eastridge Woods and Cayden Glen, has been moving slower than expected. We anticipate a grand opening next spring I. Camel’s Hump It has been anticipate that the park overlook would be constructed in concert with the Oak Cove subdivision. However, due to price escalation we will rebid that work this winter for spring construction J. Sunnyhill Park This park, on the east side of the Pine Cliff subdivision, has just been seeded. The grand opening will be in the spring