HomeMy WebLinkAbout2014-12-03 PACKET 04.D. REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 12/3/14 �
.
PREPARED BY Community Development Jennifer Levitt
ORIGINATING DEPARTMENT STAFF AUTHOR
**********************************�********�:****
COUNCIL ACTION REQUEST
1) Consider approving the preliminary plat named Glengrove Industrial Park 4th Addition that
would create one industrial lot and two outlots, which will be located approximately 2,100
feet west of Jamaica Avenue and south of 97th Street.
2) Consider resolution approving the final plat named Glengrove Industrial Park 4th Addition.
STAFF RECOMMENDATION
1) Adopt the resolution approving the preliminary plat.
2) Adopt the resolution approving the final plat.
ADVISORY COMMISSION ACTION
�1
■
■
■
■
►1
■
PLANNING
PUBLIC SAFETY
PUBLIC WORKS
DATE
11/24/15
PARKS AND RECREATION
HUMAN SERVICES/RIGHTS
ECONOMIC DEV. AUTHORITY 9/9/14
SUPPORTING DOCUMENTS
REVIEWED
❑
❑
❑
❑
❑
�
❑
� MEMO/LETTER: Memo from John McCool dated 11/25/14
� RESOLUTION: Draft - Preliminary Plat
Draft - Final Plat
APPROVED
�
❑
❑
❑
❑
❑
❑
DENIED
❑
❑
❑
❑
❑
❑
❑
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: Preliminary and Final Plat
Excerpt from unapproved minutes of the 11/24/14 Planning Commission meeting
ADMINISTRATOR'S COMMENTS
� �� c I
- City Administrator Date
*********�****�*************�***�**�********�***
COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER
Cottage
� Grove
� Pride and Prosperity Meet
TO: Mayor and Members of the City Council
Ryan Schroeder, City Administrator
FROM: John McCool, Senior Planner
DATE: November 25, 2014
RE: Glengrove Industrial Park 4th Addition — Preliminary and Final Plat Approval
Proposal
The City of Cottage Grove is proposing to subdivide approximately 87.3 acres of land into a 24-
acre parcel and two outlots consisting of approximately 2.0 and 61.3 acre parcels. The 24-acre
parcel is the future site for the Leafline Labs, LLC's pharmaceutical manufacturing and
processing facility. Outlot A is part of a stormwater basin that is part of the overall stormwater
drainage system for the entire 87.3-acre parent parcel. Outlot B will likely be subdivided in the
future as additional development occurs in this vicinity.
The property is located between 97th Street and 100th Street, east of Hemingway Avenue. A
location map is shown below:
Location Map
Review Process
Application Received: October 29, 2014
Acceptance of Completed Application: October 29, 2014
Tentative City Council Date: December 3, 2014
60-Day Review Deadline: December 27, 2014
Honorable Mayor, City Council Members and Ryan Schroeder
Glengrove Industrial Park 4th Addition — Preliminary Plat and Final Plat Applications
November 25, 2014
Page 2 of 5
Planning Commission Recommendation
The Planning Commission reviewed the Glengrove Industrial Park 4th Addition preliminary plat
application at their public hearing on November 24, 2014. No public testimony or written
comments were received at that the public hearing.
The Commission unanimously (8-to-0 vote) recommended to the City Council that the preliminary
plat be approved. An excerpt from the Planning Commission's unapproved minutes is attached.
Background
On September 17, 2014, the City Council held a public hearing for the conditional use permit and
site plan for Leafline Labs, LLC's proposed pharmaceutical manufacturing and processing facility
At that time, it was reported that the 24-acre site for that project will be subdivided in the future if
the Minnesota Department of Health selected Leafline Labs to be one of two medical cannabis
manufacturing facilities in the state. This facility is proposed to be constructed on Lot 1, Block 1 of
the proposed Glengrove Industrial Park 4th Addition. The proposed preliminary and final plats are
consistent with the proposed boundaries for the Leafline Labs project.
Planning Considerations
Site Characteristics
The majority of the proposed site is relatively flat and is currently used for cropland. Windbreaks
comprised of mature coniferous and deciduous trees and volunteer brush of varying species bi-
sect the center of the property and along the north, east, and south boundary lines. Some of the
wooded areas will be removed for construction of private access roads, public utilities, and onsite
drainage basins for the Leafline Labs project. The balance of the parent parcel will continue to be
farmed until another industrial project is proposed. A 2013 aerial photo of the site is shown below:
r. � ,
R' _.
- ., ., _:
� �.
��� � �,. �
/� - - - ,—.-� '`�
� C:,
�. .
'S •'
, ►4
! � �
I
i ; �� � ���
,,; �
.� `�
;' � '
_� -
S a� F •;
i �z -
M �
' � ' .. �.
- - ,:, -, - -
'�� -T .�j ��a. . f 7 ,. �
. �� �� _ �.� ?i .
t ' •„ - :� ., : ., I f x ,: J � ' , � �'�.i
1�thStreet -�_-:�,_ _-�=-._,t.' ;� ., �.
_ _ -- • 'R'�" . _ -��� ,� �.'." �... �;
.
+
__;�
�� , ,
,�
�
'%�
_ _ - _�-_
�
•
I
a
�
:�
�:..
� . _�,�. . .�.�+ --_ - .._�,,.� _ .�•.:..:•.:� —_
, � '�' 4 � � �! � .
e 0 �$0 � ������ . .... . -�,, � .
( .._ . • . . � _. .
2013 Aerial Photograph of the Property to be Subdivided
n
�4 .
� a '
♦ )��;. ':
, • �� �
���'%�'�,,
, --_.:;
Honorable Mayor, City Council Members and Ryan Schroeder
Glengrove Industrial Park 4th Addition — Preliminary Plat and Final Plat Applications
November 25, 2014
Page 3 of 5
Comprehensive Plan
The future land use in the City's Future Vision 2030 Comprehensive Plan for this area is
industrial. The proposal to subdivide this property into a 24-acre industrial parcel and two outlots
is consistent with the land use plan. The property is in the Metropolitan Urban Service Area
(MUSA).
Preliminary and Final Plat
The parent parcel for the proposed Glengrove Industrial Park 4th Addition is approximately 87.3
acres of land that is legally described as Outlot B of Glengrove Industrial Park 3rd Addition. The
Glengrove Industrial Park 3rd Addition was subdivided in 2006. At that time, all the public right-of-
way for Hemingway Avenue, 100th Street, and 97th Street were dedicated to the City. Re-platting
Outlot B in Glengrove Industrial Park 3rd Addition will not require any additional land dedication
for right-of-way purposes. The proposed preliminary plat provides drainage and utility easements
that are necessary to adequately serve current and future development in this area. A copy of the
preliminary and final plat for Glengrove Industrial Park 4th Addition is shown below:
� � �--� .--� � �
� ��
11i_::_.� '
GL�NGROVE TNDUSTRTAL YARK 4TH ADDTTTUN
�
..-- -------- -- --...... �
-�- . � .. ._.. ..
i '�
I ,
i I
� �
� .„ .� .».. ....
,... ,,.
' ^ - -
� r
� l._.,._..� ................--
�.': t . _ � . _ .
, � --)
----- ._ -- -------�..� � , j,
„ .. I . ----�-,-���� _
I . � �, , ••.e.- ,ii�_ .� _ �
'� �, � � T � �; , ; I . I .
.-.
�
,, � � ., �
' ' � ��- _ . u .f .� .. ... ,� -
., _, ,.
„
�-------- ------ ---_ ___. ___
. .. . , �,,. ..
-�:i_ _ J
� , .a --�- '.
: �. . : -r. , �
,_ _�- - � -- �r - ' i 1
_ � ._-.r� ' ........... I �
�. <<:r �
I ` • t
'� I 0 l O C R t !
1
y i y 1
I
F
, I ._....,.a....._. �i
�
>•
i s� :.
I � •
�
I
t ._j ___'__ '_- _'�___ __ ___ __ '__ _— _—� .
` . ...
0 U f � 0 T 0 I
.1 '
I � �
i
I
---- --- ----- ----- ----- ---- ---- ------ ----------- -
--�t--- ----------- ------ ----- ___ i-- �-
— - -- -------- ' i
.._ a--
..�„_ ,.,:.; .
_.. ,, .
.�. .... -- .. . -�--
--------- ---- — - '- '-_.-_--....__.. -�}
..'�t��� ...,-
�I
-- -- _ �_
•" � • —
Preliminary/Final Plat for Glengrove Industrial Park 4th Addition
Util►ties
The property is in the Metropolitan Urban Service Area (MUSA). City utility services (e.g. water
and sanitary sewer) are available in this area and are adequately sized to accommodate the pro-
posed Leafline Labs project and other future projects in this area. City sanitary sewer and water
service stubs will be extended to the front property boundary line of Lot 1, Block 1. Public
Honorable Mayor, City Council Members and Ryan Schroeder
Glengrove Industrial Park 4th Addition — Preliminary Plat and Final Plat Applications
November 25, 2014
Page 4 of 5
drainage and utility easements will be platted on Lot 1, Block 1 for the future extension of city
utilities to property south and west of Lot 1, Block 1.
The extension of trunk sanitary sewer and watermain will be necessary along the west side of the
site. A drainage and utility easement over these trunk utilities is shown on the plats.
Stormwater Management Plan
A stormwater basin exists in the north-central area of the 87.3-acre parent parcel. This basin is
part of the stormwater management system of this area of the Cottage Grove Business Park. A
drainage and utility easement will be platted over the entirety of Outlot A and a portion of Outlot B
that is directly west of Outlot A. Outlot A in the Glengrove Industrial Park 4th Addition is required
to be deeded to the City without cost to the City for regional ponding purposes. This Outlot is the
east one-half of the existing regional stormwater basin.
Other drainage and utility easements will be platted along parcel boundaries. These easements
are consistent with the City's Subdivision Ordinance regulations.
Grading
The only site grading that will occur within this proposed subdivision plat will be on Lot 1, Block 1.
This is the site for the Leafline Labs's pharmaceutical manufacturing and processing facility if they
are selected by the Minnesota Department of Health for the manufacturing of inedical cannabis
pharmaceutical products. If Leafline Labs is not selected, then the City will not proceed with
platting of this property.
Public Hearing Notices
Public hearing notices were mailed on November 13, 2014, to 12 property owners who are within
500 feet of the site. In addition, the public hearing notice was published in the South Washington
Bulletin on November 12, 2014. No written comments or oral testimony was received at the
public hearing.
City Department Review
Representatives from various City Departments reviewed the preliminary plat application and did
not have any formal recommendations or comments. It was noted that the proposed 40-foot wide
drainage and utility easement bisecting the northern portion of Lot 1, Block 1 accurately overlays
the proposed secondary access drive for Leafline Lab's project. This was a requirement at the
time the Leafline Lab's site plan and conditional use permit was approved by the City Council.
No comments or recommendations were received from other advisory commissions.
Development Agreement
The Cottage Grove Economic Development Authority (EDA) reviewed the project at their Sep-
tember 9, 2014 meeting. At this meeting, the EDA approved the purchase and development
agreement for a+/-40,000 square foot pharmaceutical manufacturing facility on a+/-20 acre
parcel in the Cottage Grove Business Park. The City Council approve the Development
Agreement as recommended by the EDA and an amendment to the Agreement will be presented
to the City Council at the December 3, 2014 meeting.
Honorable Mayor, City Council Members and Ryan Schroeder
Glengrove Industrial Park 4th Addition — Preliminary Plat and Final Plat Applications
November 25, 2014
Page 5 of 5
�' •1111''1�•' •1
That the City Council accept the Planning Commission's recommendation approving the preliminary
plat application for the industrial subdivision named Glengrove Industrial Park 4th Addition. The City
Council is requested to take the following actions:
1) Adopt the attached resolution approving the preliminary plat named Glengrove Industrial
Park 4th Addition.
2) Adopt the attached resolution approving the final plat named Glengrove Industrial Park 4th
Addition.
ATTACHMENTS:
Preliminary Plat
Final Plat
GLENGROVE INDUSTRIAL PARK 4TH ADDITION
i SE 1/4 �' ' �
SEC. 30 y.W ��4 �
SEC 21
I 4 � e.v�•ma>min��.�u.�o�a�n.e �rioryw�Mmi�...�m�d<one.rrvenhoo • w�m..m mnen.umw.e�w.�•.em.n.awu....xavodo. 'c�u ix `u
_ �.a�niMnn.o�w•�em.n.eMU�.r..xo��mexery.x•e,..i.,..ne�..�mn.�.u.. �
6 VICININMAP
xorrowu � c i/a wa. oe ^s. m e (
� I ��n.�pGL 21 Q• 21
� J • _____—_____—__—_____ I _____—________—_ a ' y$ .._ • � ._ .. �. �. ... �...� .. • �.�..� .
- • � � mso �ae.o ... . .. .. ....... . ... s �-eo.�� rs-stao� � s - - �_ _ i•:^ :• ,:' .. ..
N BD'18'3Y' E 1]9208 MT14'J9� ^a 10.1t $ �-- _.
:�: / i �
/ a�4 - �
''• �—"..,`_' ____""____ ____""'_"_"_"_'Ts�i53"_ "__'_"___'__' ______"'_'____ ____'____� _""_ '_ � —
. / �c �, , - j T • N, � -T-, --- r -- ��
i ,aew j'
i �d� � � a•, a�,. ��w�cc o�r i I I b y nu� �aew 'T--"" _ N erze•+r x�aan
� �` M�,. ..� '.,� .� �� �� � 1 IW ¢� - ------ 8 � - _
• /' J''� � � �''� �. / � 'i �'" I Ic �a.'�. ------------
����.'� �,�--� l/ � 0 U T L 0 T''� A?�I I� / ��� `" 'Z
� � ,o
' � i `\ �i (� 1 ��- � � g
i
i «i =
i g ,i g ; : �.a�o• . nm, o �� � ,o � I ,a � �
� , ,;,� - , �� � ��«�N.�, �
e i `------ - --- / � eert avn.M mwsmu wmc na �
_________—_ b 'mnnx �
, - �,�T� � �� �--� � ��� � ��
� 1
__�__ ;_ � 'j — � /N � I
I F-10 N e-0Y11' E b1m � I
� �i �
I i . � N wuaucx • umirc woc+r � 0 T 7 i
� S � � � f q i
i � j ( B L 0 C K 1 $�
i � �� i
i
i I - - . '
i I � �' .� '
i '
I i • ' � � i
I i � a.uwrs . unurc usoort 8� bC� ,
' f• I '•5 �\ �� I �� ? !
I •' Y � • � I _�_ ',�_ � s' _l_ �� �
�
'�' .. . ________— ____ __________'____—______
I
w � • m.u'Ap• w t�WA3
.�. R I . . 1� 2
I �
� ;;gl ' OUTLOT B '
s:=I '
� � '
i's: , • , �� '
i � � �
i , '
i
� , i = _ k i
i i I �,�& i
i
i � � '
i �
i '
i '
i '
i �
i i '
I � i
I � 1
i POI GCK'�MV.Y�Ix�W MIN�. tl�Nt ]�w ImIiKK1 Pen nlNa�+C N�MIq��L �ImrtiOx�
� 1-10 � '
� 10 —I
� i Q I �7:
� � � 1 ----------------------- - ---------------------------------------------------------------------------- a � A,o �--------- 1 ---------------------1--------� ���
�------- � ---------------------
� N er�e'no" e zixi�a
au"i tae�o i Wo1]a'r g .....�,. ..—...-.-� .. — N EPSJ'ws' W �OY.OE
es'e'»_txiw_ '::: J;.^:CC: _ .�Ii.� xer�aa'+s_ � � w�.w
,� �om H :'Jf, i
���_������ ...
N b'[l �_ ���������_ ��
� ��_
� _ � '� _ _ � _ _ _ _ _ _ � � _ _ _ — _ _ � � _ _ � _ _ _ _ — _ _ � _
s�i� a. n wx:, L¢�„ -----�_---------- ow'.o`�:d ------
(w,e rw� wi oae ,. m, iwa nce. m -� sw c v sa. m. mv. n. xee m
fwc w:e wro� a ' � ' �ii ` . °," wv n. n —��
iw,����.,a, w. wr �� uow)
BOLTON 6 MErvK, irvc.
SHEEf OF 2 SHEEfS
- � � � � .
RE�OLl1TION APPROVING THE PRELIMINARY PLAT NAMED
GLENGROVE INDUSTRIAL PARK 4TH ADDITION
WHEREAS, the City of Cottage Grove has applied for a preliminary plat to develop an
industrial subdivision named Glengrove Industrial Park 4th Addition. This subdivision is the
second phase for the Glengrove Industrial Park 3rd Addition, which was platted in 2006. The
Glengrove Industrial Park 4th Addition consists of one 24-acre industrial lot and two outlots
located on property legally described as:
Outlot B, Glengrove Industrial Park 3rd Addition, according to the recorded plat thereof,
Washington County, Minnesota.
WHEREAS, public hearing notices were mailed to surrounding property owners within
500 feet of the proposed development site and a public hearing notice was published in the
South Washington County Bulletin; and
WHEREAS, the Planning Commission held the public hearing on this application on
November 24, 2014; and
WHEREAS, the public hearing was open for public testimony and no public testimony
was received; and
WHEREAS, the Planning Commission by an 8-to-0 vote, recommended to the City
Council the approval of the Glengrove Industrial Park 4th Addition preliminary plat, subject to
certain conditions.
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Cottage
Grove, Washington County, Minnesota, hereby approves the preliminary plat application filed by
the City of Cottage Grove for an industrial subdivision plat named Glengrove Industrial Park 4th
Addition, subject to the following conditions:
The applicant submits as-built drawings to the City upon completion of the
stormwater basin, storm sewer piping, and water and sanitary sewer systems. This
information must be submitted to the City before the City can issue the certificate
of occupancy.
2. Concrete aprons for all private access drives shall be constructed per City
requirements.
3. The grading and erosion control plan for the site must comply with NPDES II Permit
requirements. Erosion control devices must be installed prior to commencement of
any grading activity. Erosion control must be perFormed in accordance with the
recommended practices of the "Minnesota Construction Site Erosion and Sediment
Control Planning Handbook" and the conditions stipulated in Title 10-5-8, Erosion
Control During Construction, of the City's Subdivision Ordinance.
Resolution No. 2014-XXX
Page 2 of 2
4. Construct a six-foot wide concrete sidewalk along 97th Street South. Pedestrian
ramps must be constructed on each side of the site's access drives for Lot 1, Block
1 of Glengrove Industrial Park 4th Addition.
5. Outlot A in Glengrove Industrial Park 4th Addition must be deeded to the City without
cost to the City for regional ponding purposes.
Passed this 3rd day of December, 2014.
Myron Bailey, Mayor
Attest:
Caron M. Stransky, City Clerk
• � � i � • ��.
RESOLUTION APPROVING THE FINAL PLAT NAMED
GLENGROVE INDUSTRIAL PARK 4TH ADDITION
WHEREAS, the City of Cottage Grove applied for a final plat to develop an industrial
subdivision named Glengrove Industrial Park 4th Addition. This subdivision is the second phase
for the Glengrove Industrial Park 3rd Addition, which was platted in 2006. The Glengrove
Industrial Park 4th Addition consists of one 24-acre industrial lot and two outlots located on
property legally described as:
Outlot B, Glengrove Industrial Park 3rd Addition, according to the recorded plat thereof,
Washington County, Minnesota.
WHEREAS, the Planning Commission held the public hearing on November 24, 2014 for
the proposed preliminary plat named Glengrove Industrial Park 4th Addition; and
WHEREAS, the Planning Commission unanimously (8-to-0 vote) recommended approval
of the preliminary plat on November 24, 2014, subject to certain conditions; and
WHEREAS, the City Council subsequently accepted the Planning Commission's recom-
mendations and approved the preliminary plat (Resolution No. 2014-XXX) on December 3, 2014;
and
WHEREAS, City staff found the final plat substantially consistent with the approved prelimi-
nary plat; and
NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of Cottage
Grove, Washington County, Minnesota, hereby approves the final plat application filed by the
City of Cottage Grove for an industrial subdivision plat named Glengrove Industrial Park 4th
Addition, subject to the following conditions:
1. The conditions stipulated in Resolution No. 20140-XXX, which approved the
preliminary plat named Glengrove Industrial Park 4th Addition, must be complied
with.
Passed this 3rd day of December, 2014.
Attest:
Myron Bailey, Mayor
Caron M. Stransky, City Clerk
.. .� ....• i •
• : ' . 1 . ■ � , � �
6.2 Glengrove Industrial Park 4th Addition — Case PP2014-044
The City of Cottage Grove has applied for a preliminary plat to create one industrial
lot to be located on 23.87 acres of land that is approximately 2,100 feet west of
Jamaica Avenue and south of 97th Street.
McCool summarized the staff report and recommended approval subject to the
conditions stipulated in the staff report.
Brittain asked if the state does not award the project to Leafline, would this property
still be platted. McCool responded that the City would not record the plat. He noted
that the announcement should be made by the December 3 City Council meeting.
Rostad asked about the plans for the building and property layout. McCool responded
that information on the site plan, which was unanimously approved by the City Council
at their meeting on September 17, was provided to the Commission at their September
22 meeting. Rostad asked if any additional approvals, such as variances, would be
necessary. McCool stated that no variances would be necessary as they comply with
all the requirements of the City ordinances.
Rostad opened the public hearing. No one spoke. Rostad c/osed the public
hearing.
Brittain made a motion to approve the preliminary plat for Glengrove lndustrial
Park 4th Addition, subject to the conditions listed in the staff report. Wehrle
seconded.
Motion passed unanimously (8-to-0 vote).