HomeMy WebLinkAbout2003.09.09 PACKET CITY OF COTTAGE GROVE
•
ECONOMIC
DEVELOPMENT
AUTHORITY
AGENDA
September 9, 2003
7:30 A.M.
1. Call to Order
2. Roll Call
3. Approval of August 12 Regular Meeting Minutes
4. Business Items
• A. Project Updates
B. Organizational Structure
C. Gateway Update
D. Hamlet Storm Sewer/Park
E. Clear Channel Property Purchase
F. Golf Tournament Debriefing
G. Industrial Park Employment Data
H. Calendar
5. Miscellaneous Business Items
6. Adjourn
Next Meeting Date: October 14, 2003
•
G:\Economic Development\E D A\Agendas\2003\September 9 Regular.doc
CITY OF COTTAGE GROVE
ECONOMIC
DEVELOPMENT
AUTHORITY
MINUTES
August 12, 2003
Pursuant to due call and notice thereof, a regular meeting of the Economic Development
Authority was held at City Hall, 7516 80th Street South, Cottage Grove, Minnesota on the 12th
day of August 2003. •
CALL TO ORDER
The meeting was called to order at 7:30 a.m. by EDA President Wolcott.
ROLL CALL
• Members Present: Jim Wolcott, EDA President
Sandy Shiely, EDA Vice-President
Gerry Weingartner, Authority Member
Dick Pederson, Authority Member
Mike Wennen, Authority Member
Al Boche, Authority Member
Glen Kleven, Authority Member
Members Absent:
Others Present: Ryan Schroeder, City Administrator
Ron Hedberg, Finance Director
Steve Barrett, Management Analyst
Scott Johnson, Management Analyst
Colby Johnson, South Washington County Bulletin
APPROVAL OF MINUTES
Authority Member Dick Pederson moved to approve the July 8, 2003 EDA Minutes. Mike
Wennen seconded the motion and the motion carried unanimously.
•
Economic Development Authority- Minutes
August 12, 2003 •
Page 2
PROJECT UPDATES
There are currently 13 restaurants on the city's active project list. There are a few
potential relocations also on this list. Industrial leads for the city have been slow lately.
Some industrial projects are waiting for better economic projections before building their
projects. CCE Technologies is talking about expanding their current facility in the
industrial park. Kim Lindquist and Michelle Wolfe recently met with a realtor who
represents a recording studio that is interested in the industrial park. Finally, the city has
a body shop that is interested in locating in the industrial park.
GATEWAY
G-Will Center - KKE is currently drawing up improvement plans for the G-Will Center.
They will upgrade the rear of the building first and consolidate the dumpster locations.
The façade will be upgraded in the future.
Cottage Square -The city continues to work on a proposal for the Cottage Square site.
Hamlet Park Ponding — A stormwater ponding project in Hamlet Park would require an
expansion of existing facilities. This project would also take away industrial property in •
the industrial park. In June, the City Council met with residents. They discussed
expanding Hamlet Avenue and adding housing units. Also, MNDOT expressed concerns
over the current water levels in Hamlet Park. We may be able to sell some of the sub-
soil rock to help pay for this project. This will be determined in the near future. Staff put
together a drawing of the 20 acre pond, flume system, and the expansion of the Hamlet
ball fields. Some portion of this property is already directed to use for ponding. Ryan
Schroeder informed the EDA that it is important to improve the drainage and ponding to
help with the storm water issues that were created with development in the 1960's, 70's,
and 80's. Rock exists 5 to 6 feet below surface levels. The rock will need to be removed
and crushed. The proposed storm water project would create up to an 800 foot buffer
between the industrial sites and the residential sites. The ball fields will also be graded
to take on storm water for a 100-year storm. Glen Kleven asked if the storm water would
kill the grass on the fields. Other EDA members thought the grass would be fine after
the flooding. Mr. Schroeder also informed the EDA that the city needs to wait for the
results from the soil borings before making a decision on this project. There will be a
neighborhood meeting on August 20th to discuss plans for Hamlet Park. There are
currently no bids in hand for dredging the pond at Hamlet. A road would still need to be
built to expand the housing in the area. Up to 18 single family homes are projected on
this site. This will depend on the depth of the bedrock on the site. The major concern for
the current residents is the wlume of traffic in the area.
HWY 61 PONDING
Steve Barrett is currently working with Clear Channel to replace billboards in exchange
for storm water ponding space and $1.00. He has received positive feedback from
• Economic Development Authority- Minutes
August 12, 2003
Page 3
Council on pursuing this option. Clear Channel would be left with 3 billboards that would
be limited in square footage to no more than exists on current sign faces. The current
structures are outdated and can only be replaced through this agreement with the city.
Jim Wolcott asked if the DNR has been contacted about turning the property into a storm
water holding area. Staff will contact the DNR about the project and make the
agreement contingent on the approval of affected state agencies. Mr. Schroeder has
been in contact with Joe-Bob properties on the other land parcel br this project.
EDA GOLF OUTING
Staff will be recognize and thank eight developer/builders for their contributions to the
City of Cottage Grove since 1997. This year's recipients include Orrin Thompson,
Kingsborough Homes, Custom One Homes, McGough, Gunderson Construction,
Goldridge Group, BRAA, and Xcel Energy. Staff would like to give out annual awards to
developers for their work in Cottage Grove at the golf outing.
CGAA
Al Boche informed the EDA that the CGAA has donated $30,000 to the city to pave the
north parking lot at Kingston Park.
• PROMOTIONAL VIDEO
Mayor Shiely informed the EDA that the Hastings promotional video is located at
hastingsmn.org. Tom Mortice from the Chamber of Commerce will look into putting
together something similar for the City of Cottage Grove.
ADJOURN
The EDA adjourned at 8:45 a.m.
Respectfully submitted,
Scott Johnson
Management Analyst
•
CITY OF COTTAGE GROVE
• MINNESOTA
To: Economic Development Authority Members
From: Scott Johnson, Management Analyst .P
Date: August 26, 2003
Subject: Project Updates
P
Attached is the list of active projects. Since the August meeting we received four new
inquiries. These include a 10,000 sf Recording Studio, 215,000 sf Industrial user, a restaurant,
and a wood manufacturer. Ryan Schroeder also met with a light industrial business on
September 3rd to discuss the possibility of relocating to Cottage Grove (ED-03-010).
Attachment
•
•
ACTIVE LEADS QUERY EDA PACKET 9/3/2003
Proposal ID Project Description SF/Acres Needed •
ED-00-31 Grove Plaza NA
ED-01-001 90,000 SF Retail 90,000
ED-01-006 Re-Development
ED-01-021 Remodel
ED-01-037 Multi-tenant Industrial 80,000- 100,000 SF
ED-02-004 Office 2 acres
ED-02-007 Restaurant
ED-02-015 Remodel
ED-02-016 Bank
ED-02-017 Bank
ED-02-018 Manufacturer 30 acres
ED-02-023 Restaurant
ED-02-025 Office/Warehouse
ED-02-026 Biotech
ED-02-027 Redevelopment
ED-02-028 Commercial
ED-02-029 Manufacturing
ED-02-030 Commercial
ED-02-031 Commercial
ED-02-035 Multi-tenant Office/Warehou 20-30 acres
ED-02-037 Truck Repair 40,000 to 50,000 SF on 4-6 acres
ED-02-040 Mixed-use 50-300 acres
ED-02-041 Commercial
•
ED-02-042 Industrial 10 acres/80,000 SF
ED-02-043 Industrial 250,000 to 300,000 sf
ED-02-045 Light Manufacturing 3-4 acres
ED-02-046 Industrial 2 acres
ED-02-047 Redevelopment Commercial
ED-03-001 Light Manufacturing
ED-03-004 Light Manufacturing 10,000 sf
ED-03-005 Warehouse/Indoor Storage
ED-03-006 Manufacturing 7.25 acres/90,000 sf
ED-03-007 Restaurant
ED-03-008 Manufacturing 40,000-50,000 sf
ED-03-009 Manufacturing 25,000-35,000 sf
ED-03-010 Light Industrial 2 acres
ED-03-011 Office Building 5,000-15,000 sf
ED-03-012 Car Dealership/Senior Housi
ED-03-013 Distribution Center 15-40 acres
ED-03-014 Light Industrial 100,000 sf
ED-03-015 Restaurant
ED-03-016 Restaurant
ED-03-017 Restaurant 1 acre
ED-03-018 Body Shop
ED-03-019 Restaurant
ED-03-020 Industrial _ •
Page 1
ACTIVE LEADS QUERY EDA PACKET 9/3/2003
• Proposal ID Project Description SF/Acres Needed
• ED-03-021 Recording Studio 10,000 sf
ED-03-022 Industrial 215,000 cf
ED-03-023 Restaurant
ED-03-024 Wood Manufacturing
•
•
Page 2
City of Cottage Grove
•
Memo
To: Economic Development Authority
From: Ryan R. Schroeder
Date: 09/03/03
Re: Organizational Structure
As the EDA is most likely aware, Assistant City Administrator Michelle Wolfe has left
the City of Cottage Grove to become the City Administrator for the City of Arden Hills,
Minnesota. Her professionalism and insight will be missed.
Due in large part to fiscal issues foisted upon the City by the State of Minnesota the
vacancy created by Michelle leaving Cottage Grove will not be filled as-is. Instead,
11111 the City Council has consolidated the departments of Finance and Administration
with Mr. Ron Hedberg as the department director. A 2004 budget allocation is
remaining to fill a mid level technical/professional position.
Since the beginning of 1999, we have followed a generalist work team approach to
administrative and economic development responsibilities and tasks. For the six
years before that, the City had had an Economic Development Director position. The
generalist approach has been successful in creation of development activity and we
are expecting to continue that approach. The change is that Ron Hedberg will
become increasingly involved in EDA activities in the future.
The message we attempt to send to the development community is that they can call
any of a dozen different staff people at the City for assistance with their project. Each
of these persons has differing areas of expertise but all of them are intended to be
available to developers, contractors or future businesses. The enclosed page from
our marketing materials denotes the members of our development team (including
EDA and Councilmembers). That same team will continue to be in place absent one
individual position.
EDA Action: For informational purposes
•
•Page 1
•
GROW Fl PARTNERS
Mayor
Sandy Shiely
City Council
Mark Grossklaus
Cheryl Kohls
Pat Rice
Jim Wolcott
Economic Development Authority
Al Boche
Glen Kleven
Dick Pederson
•
Sandy Shiely
Gerry Weingartner
Mike Wennen
Jim Wolcott
Economic Development Team
Steve Barrett
Neil Belscamper
John Burbank
Les Burshten
Ron Hedberg
Scott Johnson
Bob LaBrosse
Kim Lindquist
John McCool
Ryan Schroeder
Harry Taylor
Michelle Wolfe
•
City of Cottage Grove
•
Memo
To: Economic Development Authority
From: Ryan R. Schroeder
cc: Mayor and City Council
Date: 08/27/03
Re: Gateway Update
The most recent meeting with the General Contractor, Arcon, and the grading
contractor, DLR, occurred on August 27, 2003. At that meeting, we received
projections as to when various project facets would be started and/or completed.
Status as of that date was:
• 1. All municipal utility work is complete but for the first 300 feet of Hardwood
Avenue, fka East Point Douglas Road. That work will be performed as part of the
reconstruction of the roadway and associated grading changes.
2. Gas lines apparently have all been rerouted. It is believed that cable and
telephone lines have also been rerouted. There is a small section of electric
cabling between US Bank and 1501 that needs to be relocated. Absent this
relocation, scheduled work in this portion of the project will be delayed.
3. Curb and Gutter installation is scheduled to commence on August 28. The
operation will start at 73`d with the segment up to 70th completed first. This will be
followed by the segment south of 73rd. The entire curbing operation is expected
to take 4-5 days. Openings in the curbing will be left on Hardwood Court and on
Hardwood Avenue at the Oakwood Commercial site to facilitate haul routes. That
curbing will be completed concurrent with the completion of the first 300 feet of
Hardwood Avenue north of 80th Street.
4. The signals at 80th and East Point were shut down this morning in favor of four
way stop signs for signal relocation work. That work is scheduled to be complete
by Friday, August 29.
110
•Page 1
5. Grading and soil export from Oak Park Commons will commence as soon as a •
class five surface exists on Hardwood Court.
6. Grading of the 1501 property may commence during the week of September 1.
The operation is about a week in duration. Due to grade changes on Hardwood
Court and Oak Park Commons retaining walls are not necessary on the east side
of the 1501 property. Curbing is expected to follow immediately behind that.
Once the class five is installed, following curbing, the entrance on existing East
Point will be closed and graded out. Pavement will match the existing parking lot
without an additional overlay. Paving of the parking lot is expected in early
October. Irrigation and expansion of the parking lot lighting is not a responsibility
of the City. 1501 would at that point use the same access route as US Bank.
Restoration of the disturbed areas on 1501 will be conducted as part of the MSA
project. Community development will manage directional and permanent signage
installation.
7. The Tutor Time access will be rerouted to the northbound East Point Douglas
roadway on or about September 3. Community Development will deliver flyers to
Tutor Time to be used to inform their customers. The contractor will install
directional signage.
8. Weis Construction will be informed that access to their site must come from 70th
down Hardwood Avenue.
H:\September03Gateway.docID
i
•Page 2
•
HARDWOOD AVE.
Q___________ J
./ '------.__________„_' 1,1 1 i( i
____,
I `
, , _ .
'''-- ,
....
. __ 4,4,, .,
I
L4� Flltwir", OAKWOOD
- PARK
• . _. _____ t . C. ''‘
ti] i
1 . \\,4, ___..„..._
1111
..--""leJ Idr;*
_______,----.)_____I
0
- rry:. '1 t 7
z''''?:.
: g= m ni 11- I 7.-- ,1,,-. #4 3 s:1- +-I r -
\\\ A\ z 1 li
XE
.__.�
- -.r�!-- — S 0TH ST. _- �--
-IFF ,,
--I.---1- ink , 1, i., ..,. ..70 :.,_.> P\-\\..,.c
e9
11110Plie, of e? 1\4/110/ 7 /r \.--• --)/ v
'\/-4t\ . r- ` P P
((,\
'-'1/4)
W E r .0.•0'
N al
S. 5-27-03Ak�\\ 7\y/44:
. # r , • _
'm ® Gateway Redevelopment Area
Feel
City of Cottage Grove
Memo
To: Economic Development Authority
From Ryan R. Schroeder
Date: 09/03/03
Re: Hamlet Storm Ponding
At the EDA meeting of August 12, 2003, as part of the Gateway District update we
informed the EDA that the storm ponding/flume through that portion of the Industrial
Park north of 95th Street contemplated over the past several years had grown in size
and scope. This item was then referred to a neighborhood meeting on August 20.
The neighborhood meeting was followed by a Council workshop on the same item
later that same evening. The agenda materials from that workshop are enclosed for
• your review.
As a result of a positive meeting with the neighborhood and a favorable reading from
the City Council we have requested a September 3, 2003 authorization by Council of
preparation of plans and specs for construction of storm ponding south of Hamlet
Park. We initiated negotiations for purchase of the property in question on August
21, 2003. As noted in the Council agenda item it is expected that the property
boundaries of Hamlet Park would be expanded by approximately 13.5 acres south of
existing Hamlet Park. Further,that fee title for storm ponding to the south and east of
that parcel would be acquired to the extent of approximately 18.43 acres. In addition,
9.19 acres would be set aside for a residential extension of existing Hamlet Avenue.
All told, approximately 33 acres of the original 79-acre parcel would remain for future
industrial development. Additionally, three acres of the pond area, proposed to be
constructed under the City contract, would be allocated toward ponding for the
residential and future industrial users. In theory, therefore, approximately 400,000
square feet of industrial construction could still occur on the remaining parcels at a lot
coverage between 25% and 30%.
Funding for this acquisition comes from both the Park Trust and the Storm water area
funds. Pond construction is from the Storm water area fund. Before actual
construction of additional facilities for Hamlet Park, a north-south roadway would
need to be constructed connecting to 95th Street. It would be expected that that
roadway would receive cost shares from the WAG Farms development parcels, CP
•
•Page 1
Rail, which also benefits by the road, and perhaps with a contribution from the Park •
Trust as well for access to the Hamlet park and parking lot. The cost of the portion of i
the roadway borne by the remaining WAG Farms development parcels is estimated
at $0.60/square foot of developable land. This cost is comparable to our
grading/infrastructure costs in that portion of the Industrial Park south of 95th Street.
EDA Action: For information and discussion.
•
•
•Page 2
City of Cottage Grove
•
Memo
To: Mayor and City Council
From Ryan R. Schroeder
Date: 08/20/03
Re: Hamlet Storm ponding solutions
Council has had a number of varied discussions regarding Hamlet Park and it's
development and expansion, Hamlet Avenue and it's expansion, the 79 acre WAG
Farms property and it's eventual industrial development as well as storm ponding
associated with all of these topics and potential conflicts between future industrial
operations on WAG Farms and CP Rail properties. These varied discussions have
resulted in the creation of a redevelopment TIF district on portions of this property in
• order to provide a revenue source for construction of projects that would buffer the
marshalling yard from land uses to its' west, creation of a Hamlet Park expansion
plan, and various layouts for Hamlet Avenue extensions and storm drainage facilities
south of Hamlet Park. These various planning activities have also resulted in 2002
CIP funding of $477,000 in Hamlet area drainage improvements and another 2003
allocation of $676,000 for Gateway storm sewer improvements relocated to the
Hamlet area. Council has also directed that sales proceeds from the Oakwood
Commercial site be redirected to the Park Trust Fund, ostensibly to provide for
revenues for the Hamlet Park expansion project. Those revenues have been
projected at$1.4 million.
While we have been identifying revenue sources to accomplish park expansion and
storm sewer improvements, we have been working through design issues at a more
deliberate pace. It has been contemplated that, as has been our practice, as
development occurs that will provide the impetus to cause final design and a
development schedule for infrastructure servicing the development and the larger
regional system. However, as Council is aware, concerns expressed by MNDOT
regarding potential Highway 61 flooding has caused us to work outside of our normal
development phasing on this project. As a result of those concerns we are currently
cleaning inlet pipes into the Hamlet system, we are attempting to gain estimates on
dredging the Hamlet ponds, we are designing expansions of those ponds as well as
an expansion of that system and we are attempting to identify how that system can
• work around a park and playfield expansion and an expansion of Hamlet Avenue.
•Page 1
Council has hosted a public meeting in the past to allow property owners on Hamlet
Avenue an opportunity to discuss an expansion of the roadway with corresponding •
housing development. At that meeting (June 18, 2003), staff presented various
development scenarios on a 12.179-acre site. Those scenarios ranged from a 54-
unit townhouse project at 4.4 units/acre down to various single-family developments
of 23 to 26 units or 1.8 to 2.13 units per acre. By way of comparison, the existing
8900 block of Hamlet has 15 lots on 5.08 acres, or 2.95 units/acre. Another random
nearby area, 8700—8900 of Grenadier, Greystone and Grospoint totals 60 lots over
18.69 acres for a per acre density of 3.21. On the other end of the scale is 66th Court
south in the Highlands addition with 23 lots over 11.29 acres for a density of 2.04.
Kingsborough Woods 1 and 2 has a density of 2.4 units per acre. We recently
requested BRAA to redraw the Hamlet expansion as we refined our storm water
planning. What has resulted is a proposed subdivision of 9.19 acres with 18 lots for a
density of 1.96 units/acre. We are projecting that this subdivision concept could
create in the neighborhood of a $400,000 value for the property owner. It is currently
zoned R-3. As such, the owner would not need to rezone the property to provide for
this development. A suggestion made by a neighborhood resident was that the •
property owner be asked to donate the property for ponding or park expansion. We
did make the request, which was declined. Further, given the existing sanitary sewer
through the middle of the property and the existing topography of the site there would
be very little utility of the site for ponding. Park land could result in an expanded use
of the site over ponding but certainly, the highest and best use of the site is for
residential development. Our observation is that City involvement in predesign of this
subdivision allows for potential improvement in the project from what would otherwise •
be expected to occur (much like our East Ravine Master Planning). A neighborhood
meeting has been scheduled for 6PM on August 20 to review this concept as well as
park and storm water concept drawings.
The expansion of Hamlet Park is presently shown on the concept drawings at 11.46
acres to include four additional ballfields. In addition, we are anticipating perhaps an
additional two-acre parcel east of the ballfield expansion piece in order to provide for
an estimated 200 to 250 additional parking stalls. The expectation is that the ballfield
area would be graded such that it would provide for a stomiwater catchment area in
a large storm event (100-year). Further, that actual development of the ballfields
would not occur until a roadway access is provided to the parking area from 95th
Street. That roadway would be expected to be constructed concurrent with future
industrial park development. The park acquisition budget would be $600,000 with
proceeds from the Park Trust Fund. Grading and development costs have not been
estimated at this time.
The storm ponding scenario as presently drawn includes 18.43 acres of ponding,
1.48 acres of drainage ditch (flume) and 3.98 acres of property severed from
remaining WAG Farm holdings that is not presently perceived as developable (due to
the location of the sewer line and steep slopes). The proposed budget for acquisition
of this 23.89 acres is $700,000. This budget is suggested as the future ponding
provides some residual benefit to the remaining development parcel and the severed
•
•Page 2
•
parcel isn't developable at this time and so doesn't represent an expected cost item.
• Actual pond and flume construction cost will vary depending on the characteristics of
the subsoil, the actual construction methods and approach to the project (such as
development timeframes). For instance, pond construction will result in availability of
fill material. If that fill material can be sold, or graded into adjacent future
development sites the project would have a much more favorable cost/benefit than if
we need to immediately export soils for disposal. We are continuing to analyze those
cost items and project approach. We are sensitive to the impacts of construction
activities on nearby neighborhoods. However, post construction the ponding and
park improvements will provide for buffering between existing residential and future
industrial users well beyond what could normally be expected. In some cases that
buffer would approach 800 feet. It is also contemplated that long term; this ponding
system would provide the same level of amenity to the community as exists from the
existing Hamlet pond system.
In addition to this ponding, we are proposing an expansion of the existing Hamlet
pond. We also would be reshaping the pond outlet and most likely adjusting the
elevation of that outlet in order to reduce the NWL of Hamlet Pond as requested by
MNDOT.
We are enclosing a draft of the Hamlet Avenue / Hamlet Park / Hamlet Pond
expansion concept for your review. At the time of preparation of this memorandum,
we are awaiting a small correction in this plan. The plan as drawn shows an
• expansion of the current Hamlet Park, parking lot that is accessed off 89th Street.
That resulted from a miscommunication with Engineering. The next draft will show
that parking area just east of the Hamlet playfield expansion at the northwest
extension of the proposed Glendenning Road which will access 95th Street.
Council Action: Workshop item; general direction requested.
\\CG_FS2\CG_FS2_MAIN\USERS\RSCHROED\Hamlet Ponding August 03.doc
•
•Page 3
-1 Mil :11.*Z4fa, a"''':\ ' N\ ' \
-)
v N /,- , ..,, t.
\ •-\ .
a��`'IMENI,L.1440 • �\' .. ss' >,,..- .. /\N , 1,4<..4ttp‘o,:**1 ala
:wAN; ''4 .-)
,/a,a'4,4/ll"It
gr4%ip,144P*ft
T..1iii1tv\11Av4.T.ia%rI,-wit4W'l'
.li\.A.e..0oalnlrNtl-i)a4ilf.ws,1
li.kI4A•\.lt
Ilst*
A\\11rX
'_4_1,_.'_
ti,::.s\'...7,,\4:_:.._:':.'\'c''''''1'P.l'4`,.)\k,:,'•,'-,7,,;1;',;‘1.-,,'4\,tF1.,'..41.I1'',1I...,.L.
/,(&1r::i,
Z,%I'''',‘,
.Nf-_6.:::N::N:.'1'''„'N4:.'"--1:"N:..1:7\)'7'1W!1c:1/4‘:k*1-'Np
SA\l
♦b�%,ppm t� d.�� \1N16_.,\'N\t• -Ns--i‘.‘'
i, SN'r/AT
'?.
tittk,
'\:\
7♦4 SIJ\04.0 1 \ \..
,W:111i1\\°i1N
-44: 41 WAS '�, `,_.,I- sk 1 a 11! ;\( ' I \ \\
'w.----;-71 0 \
r416,44111113irmi 0
iliii
gyp, 4,,,,,, :.,,,
l `...__,
•
•r, •
til
,,
. i
1
‘\ , 1( ' \ if 7\\.
--, 1\ It v-_____A_NO
. ,„111t,t,t__Ak _______ * '1'1,'N) 1 1fii.
\ '� 1001-cori 1112 11111 4% 1,k,t\r, r\
�', 1 U
1 \ 1 Im X11. 1 -. AL.. ik,,N
; _ ill ,�`-1 j1 1 rI II_� �, =.ia IMAI'
�,I ,,
� tea--- a
\\ �� ` V ! \;II \ vT j
�I /�� ,.._____„
, . ...._ f,vvl� a,... '---:',,,,,,,,, ‘011;
���!�I _ : I
. ,
, ",
or.- ,
,,,,,,,, A \
1\- ----J . Ip i
! ( I
(� , ---..�_�' ---,,-•„, • c.,
1x• _`� \111
\\ ) / ., 1\) , , N,
sm \ a
\!.,i.,.____,,
ii‘
. , 1,, ma
' * - - EVA ...* ,-, \ ''' I \ ,
1 Hi . 0 rjr , 40844?i , \,, __A-2 4°: ,e111 S\\\1 -/-\1
iiih, I:. k,..,,,,,ii,\ l _k_„(
1 ' FAIN "Vali =1- tif. N,. ak' ;ilk.
N NISI INE7/4p ,a7.0, ',7,\ .. ' ____-7.0,1 . i 0. ,, `--r- N__
rift- i isme rep . ,,IN,' ,, ''''A
111111•1111
112;1 mai airm relita
' \ -Al \_r
,� ant no �n1�[lmil moo sin•Nrinuft ."� '' aI_ _.
ILI diAm34, Roll
... l ,wtfit -.0;,z‘,.. , \ _.2.,, 1 i in
iA
Lie ' V .A. _____1_
0
II 1,41Mlir ''' II ,,Ntirflita
r , ' ' \ . • (i, 9z-
i I 1 °'7 •air ' ,; urni iffehlAwft avardrr.-- -- \ c L
-�
I
� AM ,ala .I.1 1>.�,►WWII /MIMI '
I, WHIM o r,
la id U f°. 8-5-03
• Ci= City of Cottage Grove
Economic Development Memo
To: Economic Development Authority
From: Steven Barrett, Management Analyst
Date: Thursday, September 4, 2003
Subject: Update — Highway 61 Drainage Acquisition
Here is an update on property acquisition for the future storm water pond located
on the east side of Highway 61.
1. Clear Channel Communications. Discussions are ongoing with Clear
Channel on the acquisition of their two parcels. Negotiations have centered
on two elements. The first is square footage. Clear Channel currently has
approximately 2,800 square feet of ad space on the site. Of that,
• approximately 2,100 square feet is comprised of the three large multi-face
billboard structures, which they intend to replace.
Our hope is to limit the total new square footage to 2,100 square feet. Clear
Channel is hoping to keep a total of 2,800 square feet on the three new
structures, to reflect no net loss of advertising square footage. The City's
position is that in exchange for the permanency of the new structures, Clear
Channel should sacrifice some square footage.
Finally, the City has begun discussing possible height restrictions on the new
billboard structures. The City's position is that the area will be better served
from an aesthetic standpoint with lower standing billboards. Clear Channel
has so far expressed concern over this subject, but they haven't ruled
anything out and they're willing to discuss it.
2. Joe-Bob Properties. Discussions will begin with Joe-Bob Properties once
we get a better handle on any DNR issues relating to the creation of our
storm water pond site (see below), and after we continue progress toward an
agreement with Clear Channel. Formal discussions will begin the week of
September 8.
3. DNR Requirements. I am discussing the DNR requirements relating to the
storm water issues on the site with a couple engineers with Bonestroo,
• Rosene, Anderlik and Associates. I will provide a verbal update of these
discussions at the meeting on Tuesday.
(1:=ACITY OF COTTAGE GROVE
• MINNESOTA
•
To: EDA Members
From: Scott Johnson, Management Analyst
Date: September 2, 2003 4
Subject: 2003 EDA Golf Outing
120 golfers participated and 23 businesses sponsored the 2003 EDA golf outing on August
19th at River Oaks Golf Course. Attached is a memo that breaks down the revenues and
expenses for 2003. The EDA made a profit of$1,097.86. This is the first time the tournament
has a made a profit in its 8 year history. The EDA tournament will be held next year on August
17th at River Oaks.
.
•
lir 3/41.
MEMO
_.....j
TO: EDA Members 41
FROM: Scott Johnson
DATE: September 9, 2003
RE: EDA GOLF TOURNAMENT EXPENSES
Here is a breakdown of revenues and expenses for the 2003 EDA Golf
Tournament:
REVENUES EXPENSESIII
Entrance fees $11,920 River Oaks Golf Course $4,955.50
Hole Sponsorship Signs $332.28
Groovy Brush $1,013.46
Postage $804.60
Copies of invite $85.98
Dining Room $3,630.32
TOTAL REVENUES $11,920
(Still waiting for five more
checks ) Total w/ TOTAL EXPENSES $10,736.16
Checks
$12,540
ENDING BALANCE 2003: (-$1,097.86)
ENDING BALANCE 2002: ($125.13)
ENDING BALANCE 2001: ($5,290.78)
ENDING BALANCE 2000: ($3,469.61) •
• CITY OF COTTAGE GROVE
PRESS RELEASE
Fax To: South Washington County Bulletin 651-459-9491
St. Paul Pioneer Press 651-228-5113
Attn: Becky Byers
Minneapolis Star and Tribune 612-673-4359
MN Real Estate Journal 952-885-0818
Economic Development Assoc. MN 651-290-2266
Metro East Development Partnership 651-223-5484
City Business 612-288-2121
MN Dept. Trade & Economic Development 651-296-1290
MAEDC 651-290-2266
From: Scott Johnson, Management Analyst
Date: September 2, 2003
Re: 2003 EDA Golf Outing
FOR IMMEDIATE RELEASE
Contacts: Ron Hedberg 651.458-2832
Ryan Schroeder 651.458-2822
•
Cottage Grove, MN
2003 EDA Golf Outing in Cottage Grove
Cottage Grove, MN. The Cottage Grove Economic Development Authority
sponsored a golf tournament at River Oaks Golf Course in Cottage Grove
on August 19, 2003. The event brought together architects, builders,
planners and development experts. Tournament sponsors included;
• Bonestroo, Rosene, Anderlik and Associates
• Xcel Energy
• Merchants Bank
• MMIC Benefits
• Olson General Contractors
• Welsh Companies
• First Industrial Realty Trust, Inc.
• Newland Communities •
• Wells Fargo
• Ehlers & Associates
• Anchor Bank
• TKDA
• 3M
• KKE
• WSB & Associates
• McGough Construction
• Goldridge Group
• Cottage View Drive-In Theater
• Mainstreet Bank
• Metro East Development Partnership
• Hydrocon Inc.
• Country Inn & Suites
• Burschville Construction
The Economic Development Authority is an organization designed to
bring new development opportunities to the City of Cottage Grove. The
August 19th EDA Golf tournament brought together 120 development •
professionals from all around Minnesota and exposed them to the
development possibilities in Cottage Grove.
•
•
8th Annual EDA Golf Outing /August 19, 2003
Growth Partner Award Recipients •
Categories for 2003:
Top Residential Builders from 1997 through 2002
Top Commercial Builders from 1997 through 2002
Top Corporate EDA sponsors
Residential Builders:
1. Orrin Thompson Homes: Over the six year period Orrin Thompson Homes is
our most productive housing builder at a total of 471 homes with a total of
$60,511,795 in building permit value. Currently Orrin Thompson is building in
the Pine Summit neighborhoods north of 70th Street and west of Hinton
Avenue.
2. Custom One Homes: Over the six year period Custom One Homes has been
our second most productive builder with 79 custom homes with a total
building permit value of$18,133,615. Custom One is our top producer of
market value per unit. They are currently finishing up the many phases of the
Hidden Valley subdivisions south of 70th Street east of Harkness Avenue.
3. Kingsborough Homes: Over the six year period Kingsborough Homes is our
number three builder at 76 total units. With a total building permit value of
$14,158,608 Kingsborough Homes is also our number two producer of market
value per unit. Kingsborough is just starting the Mississippi Dunes
subdivision located south of 95th Street and west of Hadley Avenue. •
Commercial Builders:
1. McGough Construction: McGough is the commercial contractor with the
highest total market value and largest amount of square footage constructed
by one contractor over the past six years with a total of$8,300,000 building
permit value for 234,846 square feet between construction on the 3M campus
and the Renewal by Andersen headquarters and manufacturing facility. The
latter project received the Economic Development Association of Minnesota
Business Retention Project of the Year designation for 1998 projects.
2. The Goldridge Group: Goldridge has completed two new commercial projects
since 1999 including the new Tutor Time Daycare in the Gateway District and
the 76 unit Country Inn and Suites Hotel project. The hotel project is laudable
in that it is on a 3.1 acre triangular site that also made provision for an
Applebee's Restaurant and included shared parking with those two projects
and the adjacent School District Program Center. Goldridge has the
distinction of creating the highest square foot value of all commercial
developers over the past six years.
3. Gunderson Construction: Gunderson completed the new Advance
Corporation headquarters and manufacturing facility in the industrial park in
2001. This project not only represents the highest square foot market value
of any project in the Park to date but it was also one of the three industrial
projects in 2001 that jointly received the Economic Development Association
of Minnesota Best Business Attraction Award. Particularly laudable is that the
• site required creativity to shoehorn the project on a very narrow site while at
the same time constructing a state of the art manufacturing facility.
Corporate EDA Sponsors:
1. Xcel Energy: Xcel has been a partner with the City of Cottage Grove since
initiation of an economic development strategic vision by the City in 1991.
Xcel has sponsored every one of our annual golf outings. Xcel was the first
organization to sponsor our marketing campaign in 2001 and has continued
to do so in 2002 and 2003. Resulting from their sponsorship has been the
receipt by the City of the Economic Development Association of Minnesota
Best Direct Mail Campaign, granted in 2003. We consider Xcel, which
provides both electric and natural gas in Cottage Grove, as a partner with
every project that we complete.
2. Bonestroo, Rosene, Anderlik & Associates: Bonestroo Engineering has been
the lead civil engineering consulting firm for the City of Cottage Grove for over
forty years. Over the past six years Bonestroo has represented the City on
almost all of our major development projects representing 1056 new homes
and 889,195 square feet of new commercial and industrial construction in
addition to public facility and redevelopment projects. Bonestroo has also
been a sponsor of our marketing campaign including a gold sponsorship in
2002 and a platinum level sponsorship for 2003.
• Over the past six years Cottage Grove has worked with 21 different commercial builders
on 27 new commercial projects in addition to several tenant buildout projects. Eleven
different residential developer builders and numerous construction companies,
engineering firms, architects, bankers and real estate professionals have also partnered
with us on various projects. We also consider every commercial and industrial operator,
totaling over 3.7 million square feet of facilities as our partners. The annual EDA golf
outing is intended to celebrate those partnerships and to reinforce our ongoing mission
of creating future Growth Partners.
F:\USERS\RSCHROED\8th Annual EDA Golf Outing Awards.doc
S
City of Cottage Grove
•
Memo
To: Economic Development Authority
From: Ryan R. Schroeder, Scott Johnson
CC: Mayor and City Council
Date: 09/02/03
Re: Industrial Park Employment Data
As the City Council, and its' Economic Development Authority, continues to
work toward building quality community spaces, employment centers, and
retail neighborhoods we wanted to provide an update on what is being
created by development of the industrial park. In addition to development of
• about$30,000,000 in taxable market value over the past several years the
City has also begun to create additional generation of economic activity
through the wages paid by employers. While many of those wages are
transported out of the community due to residence of employees, a share of
that payroll is spent within the community in restaurants or other retail venues.
It is also important to note that a significant percentage of Cottage Grove
residents currently work outside the community. As additional employment
opportunities are created within the community a portion of current and/or
future Cottage Grove residents will hold those new jobs.
We have not yet been able to gain statistics from every employer within the
industrial area of Cottage Grove. Existing data, from Up North Plastics,
American AgCo, CCE Technologies, Advance Corporation, TradeHome
Shoes, Renewal by Andersen, and Cogentrix total 755 existing jobs. Those
jobs are estimated to average more than $25.6 million in annual payroll with
an average production floor position at about$16/hour.
•Page 1
Employees in Cottage Grove manufacturing facilities reside throughout the
metro area. Surprisingly, the largest cohort of employees is from within the •
City of St. Paul at 36.6% of total manufacturing employment. The east and
northeast metro contributes another 23.3% of the total while Cottage Grove
residents make up 12.7% of the total population of manufacturing employees.
Wisconsin follows close behind Cottage Grove at 12.5% with the south metro
contributing another 12.3% of industrial park employees. Finally, rivers must
in fact be a barrier to employment with Minneapolis, the west and northwest
metro in total contributing 2.6% of employees among all jobs provided by
Cottage Grove manufacturers.
•
•Page 2
e (MCITY OF COTTAGE GROVE
MINNESOTA
To: EDA Members
From: Scott Johnson Id'
Date: September 2, 2003
Subject: Calendar
EDA Meeting September 9
EDA Meeting October 14
Wells Fargo Ribbon Cutting October 17 12:30 PM
EDA Meeting November 11 (Reschedule—Veteran's Day)
EDA Meeting December 9
• Schmid and Son Ribbon Cutting To be determined
Park and Ride Ribbon Cutting To be determined
G:\Economic Development\E D A\Documents\2003\Aug Calendar.doc
•