Loading...
HomeMy WebLinkAbout2015-08-12 PACKET 04.F. REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETIN ITEM # DATE � .f` ��5 , . PREPARED BY: Parks and Recreation Zac Dockter ORIGINATING DEPARTMENT DEPARTMENT HEAD � * * * � * * * * * * � * * * * * * * � * * * * * * * * * * * * * * � * * � * * * * ,� * � �: * * COUNCIL ACTION REQUEST: Consider approving Change Order No. 1 in the value of an $11,450 addition to the 2015 Woodridge Building Project. STAFF RECOMMENDATION: Approve Change Order No. 1 in the value of an $11,450 addition to the 2015 Woodridge Building Project. BUDGET IMPLICATION: $0 $0 BUDGETED AMOUNT ACTUAL AMOUNT ADVISORY COMMISSION ACTION: DATE REVIEWED APPROVED DENIED ❑ PLANNING ❑ ❑ ❑ ❑ PUBLIC SAFETY ❑ ❑ ❑ ❑ PUBLIC WORKS ❑ ❑ ❑ ❑ PARKS AND RECREATION ❑ ❑ ❑ ❑ HUMAN SERVICES/RIGHTS ❑ ❑ ❑ ❑ ECONOMIC DEV. AUTHORITY ❑ ❑ ❑ ❑ ❑ ❑ ❑ SUPPORTING DOCUMENTS: � MEMO/LETTER: 8I41�5 ❑ RESOLUTION: ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: � OTHER: Change Orders from Project Manager ADMINISTRATORS COMMENTS: . _ �� �� Ci y Ad ' istrator Date * * * * � * * * * * * � * * * * * * * * � * � * * * * � * * � * * � � * * * * * * * � � * * H:1Woodridge\Building Construction 2015\Change Order 1\Council Action Form-Change Order 1.doc Cdttag� Grove �herQ Pride and�'ro5Per{ty Meet TO: Honorable Mayor and City Council Craig Woolery, Interim City Administrator FROM: Zac Dockter, Parks and Recreation Director DATE: August 4, 2015 RE: Change Order No. 1 —Woodridge Park Building Background/Discussion During construction of the Woodridge Park building, some changes to original building construction plans were necessary. They are as follows: 1. Both roofing bidders on this project bid 10 squares short based on a misunderstanding of the contract. An additional 10 squares of roofing must be added to the contract. 2. The soils below the building were over-excavated during utility construction (under a separate contract from this project). In order to correct the soils prior to footings, the concrete contractor was required to haul in sand, pack and grade the pad. 3. During inspection review, it was identified that an additional floor drain would be required. 4. Several electrical needs were identified as the project began. Additional service was needed for the recreational facility equipment which was not in the originaf contract, vapor/vandal proof fixtures were requested by maintenance staff,temporary electrical connection to bridge the gap between services off of the old and new transformers and a minor upgrade to conduit to allow for wire room. Recommendation It is recommended to approve Change Order No. 1 in the value of an $11,450 addition to the 2015 Woodridge Building Project. CFiANGE OIRDER WOODRIDGE PARK ACTtV#TY BUILDING 9000 90fh Street South # 9 . Ctit#age Grove, (i�N 55016 Date: 7/1 Z/2015 TO(Cantractor) ATLAST ROOFiNG GO., 1NG 61�5 225TH STREET EAST � HAMPTON, MN 55031 You are tlirected to make the fioliowing chang�s in#his cpntract: Add all Roofing Materials to Complete 1�Additional Squares of Roof 'The Driginal Con$rac�Sum was...................... ......... ...:.............. .....:.................... $4,�5Q,00 Net Change by Pr�viously Authorized Change Order............ ......:............................ $0.80 The Con#r�et sum will be(increased){decreased) by........... ......... .......... ............... $1,000.00 The hfew Contract Sum including this Chang�Order wilf be.. .................. ................. $5,250.00 .. Signature ofthe Contractor indicates his agreement herewith, including any adjustments in the Contract Sum. Au�horized. • ���%�'L�L/'1 ���'2y��.n2 Owner. Contractor: � 1 `� Dafe: Date• � ` � � �' : Architecf: A � -�--�------� Date• �'//�g� y`" �' CHAtd(;E.O{4DER WOODRIDGE PARK ACTIVITY�UILDIfVG 9000 90th Street South � � Cottage Grove,IVlfd 550�i6 Date: 6/9/20�i 5 TO(Contractor) SCHLOMKA EXCAVATING INC. 2511 CARVER AVENUE MAPLEWOOD, MN 55119 You ar�directed fio make�he following changes in�his contract: Provide all Labor and Equipment to Fill and Compact the Exisiting Foundation Excavation to Established Bottom of Footing Elevation 7he Origimal Contrac�Sum w�s................................ ............................................. $6,135.00 Ne�Ghange by Pr�viously Authorizetl Change Order.. ............................ ...:............ $0.00 7he Contract Sum will be{increa�ed)(decreased)by........... ......... .......................... $4,525.00 The New��ntracf Sum including this Change Order will be.. .................................... $10,660.00 .. Signature of the Contractor indicates his agreement herewith, including any adjus#ments in the Contract Sum. Authorized: Owner: Contractor: �aGl��G�'1�0�'1'��fa Date: D�tec 6/09/15 � Architect: Date: f C�A��E.��DER �UOOD�IDGE PAt�K AGTIVITY BUILDIfdG 90nE19Qth 5treet South � '� Cottage Grvve,�ttA1550�t6 . qate. '�t97l�t115 T�7(Cantractcr�) AJ ALBERTS PLUML3CT�(; ` 7975 AF7'4R!'RQAD � VUD�WBURY,MPt 55125 �'ote�re di��eot to m�tc�the fiollowrinc�ahanges in�hi�cor�#raet: LA$UR ' Add 5torm Drainage P(an Rev3ew by State of Minnesota Add F1oor Drain at Raom�02,SCorage The�r�g�nal Con�rac��urn�ras ........': ..............e..... ..........a............,...,......,........... �9,850.00 �e�C�a�eage my F+revec�usiyAu�l�arizer�Chan�e Order. ..................� ......... ._...........,.. ��.00 T'h��n�ra�t��rn rvit!be(increased}{decreased}by..................... ...................e...... �4a0.00 Tta�New��nt�a�t�ua��n�l[odia�g tl�is Change Orc��r�itl t��. ...._.. �10,3UO.U0 .. " S�gnature of tlie Cs�ntractar ind(cates his agreement herewikh,inciuding any adjustmenfs in the Con�r�Gfi Sum. e4tattt�rized: - C�1�I�10C: C�91���GtOP: �3���: �a�8• � �,rch6tec�: �ate: . 4�� � CHANGE ORDER WOODE2IDG�PARK ACTIVITY BUILDING 9000 9QEh Street South # 1 Gottage Grove,MN 55016 Date: 7i17/209 S TQ{Contractor} KEL�.ER EI..EGTRIC INC. 1064 WOODHtL.L[3RIV� WOODBIJRY, MN 55125 Yau ar�directed Eo make the foUowing�hanges in this contract: MATERIALS Pravide(25j 2"and 3" PVC Elbows to be as sleeves for future Spiash Pad Change Specified Lighk Fi�ctures frdmWrapped Fixtures to Vapor Proof Fixtures Chang�Ele#rical Service from 200 Amp to 4Q0 Amp Privid�Temparary�fectrical Setvice at existing Pad Mount Transformer TheOriginal Contract Sum was.............................................................................. $5,8$2.8U Net Chan�e by Prevlously Autharized Change Order................................................ $p.QO The Contract Sum wiil be(increased)(decreasedj by...............................�................ $3,875.003 The New Contract�um#ncluding this Change drd�r wiN b�....................................... $9,7'57.00 SIgnature dfi fhe Contractor indica�es his agreemenf herewith,including any adjustments in the Contract Sum. Autharized: ` `rf/ , �/` ��r Owner: Cantractor:� � �'G1�� t'� `C� Date: Date: � •�.L.��l � ti Architect: � Date: " 36 � . . . . .. . .. ... .. . . CHANGE ORDER WOODRIQGE PAFtK AC7'IVITY BUI�QiNG 9000 90th Street South � � Cottage Grave, MN 55096 Date: 71171201 S TO(Contractor� K�LLER ELECTRIC INC. 1�64 WQ(�DH[�L[]RIVE WOODBURY, MN 55925 You are direc�ed ta m�ke the foliowing changes in this contraat: LABOR I�rovide(25}2"and 3"PVC�Ibows to be as s(eeves for future Spiash Pad Change Specified Light Flxtures from Wrapped Fi�ures ta Vapor Proaf Fixtures Change�lefrical Servic�frnm 200 Amp#0 400 Amp Privlde Temporary�Isctrical Service at existing Pad Mount Transformer The Original Contract Sum was.............................................................................. $$,000.00 Net Ghange by Previously Authorized Change Order................................................ $E3A0 7he Can#ract Sum w�Ci be(increased}{decreased}by................................................ $�t,6UdA0 The New Csntract Sum inciuding tfiis Change Order wilf be....................................... $8,600.OQ Signaturs af#he Contractor indicates his agreement herewith, including any adjustments in the Contract Sum. Authorized: J.�` J G, , .�,,. Qwner: Cc�ntractor: %' � '` Date: C1ate: �`"�� � � Arch�tect: Date: �� �