Loading...
HomeMy WebLinkAbout2015-11-02 AGENDA(4711mcottage p� J Grove "dere Pode .,,,,,,erity Meet PLANNING COMMISSION REGULAR MEETING November 2, 2015 7:00 P.M. kTJ9; 1. Call to Order 2. Roll Call 3. Approval of Agenda 4. Open Forum 5. Chair's Explanation of Hearing Process 6. Public Hearings and Applications 6.1 61 Marine & Sports — Cases CUP2015-027, V2015-028, MS2015-029 Stu -Mac Properties c/o 61 Marine & Sports North, 11730 Point Douglas Drive South, has applied for a conditional use permit to allow the expansion of a legal nonconforming use west of the existing property on Parcel ID #36.027.21.42.0003; a variance to allow the expansion to be done without adding concrete curb and gutter and asphalt for the boat storage area;. a variance from the minimum landscaping requirements; a site plan review of the proposed expansion; and a minor subdivision to acquire a parcel of land southeast of Lot 1. . 6.2 Verizon on 81st Street Water Tank — Case CUP2015-040 Verizon Wireless LLC has applied for a conditional use permit to construct an 11 -foot 6 - inch by 25 -foot 6 -inch equipment shelter with a natural gas operated back-up generator inside the equipment shelter and to add 12 antennas on top the City's 3.0 million gallon water reservoir. A 12 -foot by 21 -foot hardsurface vehicle turnaround is proposed on the east side of the proposed Verizon equipment shelter. 7. Discussion Items 8. Approval of Planning Commission Minutes of September 28, 2015 9. Reports 9.1 Recap of October City Council Meetings 9.2 Response to Planning Commission Inquiries 9.3 Planning Commission Requests 10. Adjourn. Planning Commission Agenda November 2, 2015 Page 2 CONTINUED TO NOVEMBER 23. 2015 PLANNING COMMISSION MEETING Hillcrest Development Environmental Assessment Worksheet — EAW2015-041 Hillcrest Development LLC has applied for an Environmental Assessment Worksheet (EAW) for development of the Southeast Industrial Park, which will entail the development of 38.72 acres of land guided for Industrial use. The land in question is generally bordered by the Canadian Pacific Railway and Highway 61 to the north, Hamlet Park to the west, and 91 st Street to the south. The site is predominantly non-native grassland with a small amount of woods on its western boundary. Complete development of the site could result in construction of up to 560,000 square feet of industrial space, depending upon the future user. The City of Cottage Grove is the designated Responsible Governmental Unit (RGU). The publication date for this project in the Minnesota Environmental Quality Board (EQB) Monitor will be October 26, 2015, with the formal review and comment deadline date of November 25, 2015. 11COCG-FS1\groupslplanning1201512015 Agendas12015-11-02 PC Agenda.dou