HomeMy WebLinkAbout2015-12-21 PACKET 06.5.STAFF REPORT CASE: CUP2015-056
ITEM: 6.5
PUBLIC MEETING DATE: 12/21/15 TENTATIVE COUNCIL REVIEW DATE: 1/20/16
APPLICATION
APPLICANT: Ecoplexus, Inc.
REQUEST: A conditional use permit for a community solar garden on approximately
80 acres of land.
SITE DATA
LOCATION:
ZONING:
GUIDED LAND USE:
One-quarter mile south of 70th Street (CSAH 22) and one-quarter mile
north of 77th Street, east of Laverne Avenue
AG -1, Agricultural Preservation
Agricultural
LAND USE OF ADJACENT PROPERTIES: CURRENT
NORTH:
Agricultural
EAST:
Agricultural
SOUTH:
Agricultural
WEST:
Residential
SIZE: Site = 80 acres
Community Solar Garden = 37 acres
RECOMMENDATION
GUIDED
Agricultural
Agricultural
Agricultural
Rural Residential
Approval, subject to the conditions stipulated in this staff report.
Collage COTTAGE GROVE PLANNING DIVISION
J Grove
dere Prlde a',,,.spedtV Meet
Planning Staff Contact: John McCool, Senior Planner; 651-458-2874; imccool(cDcottage-grove. org
Application Accepted:, 12/8/15 60 -Day Review Deadline: 2/5/16
City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016
Planning Staff Report
Ecoplexus Inc. — Conditional Use Permit (Solar Collection Systu m)
Planning Case No. CUP2015-056
December 21, 2015
Proposal
Ecoplexus Inc. has applied for a conditional use permit application for the proposed construction
of a community solar garden on approximately 80 acres of land located approximately one-quarter
of a mile south of 70th Street, one-quarter of a mile north of 77th Street, and east of the Old
Cottage Grove neighborhood. The property is owned by Steven and Kathleen Geis. The illustra-
tion below shows the location of the 80 acres proposed for the community solar garden.
AT _I -
_ - PROPOSED COMMUNITY
SOLAR GARDEN SITE
{ BY ECOPLEXES, INC.
H Met_
'. CdteAO Cmvo '
�I � CenptM'. I
IN �. ]�P
O
_ � N
N E
S
_ 0 025 0.5 t - -
--� Mlles
Project Location Map
Review Process
Application Received: November 20, 2015
Acceptance of Completed Application: December 8, 2015
Tentative City Council Date: January 20, 2016
60 -Day Review Deadline: February 5, 2016
Planning Staff Report
Ecoplexus Inc — Planning Case No. CUP2015-056
December 21, 2015
Page 2 of 10
Ordinance Regulations
The City's Solar Collector System ordinance was adopted by the City Council on October 7, 2015
(Ord. No. 948). This ordinance defines a "community solar garden" as a solar -electric (photovoltaic)
array that provides retail electric power to multiple community members or businesses residing or
located off-site from the location of the solar energy system, under the provisions of Minnesota
Statutes 216B.1641 or successor statute."
Ecoplexus is proposing to develop a community solar garden as part of the Xcel Community Solar
Garden Program, as regulated by the Minnesota Statutes 2166.1641. This program will allow
individuals, businesses, schools, and civic entities (known as "subscribers") to purchase or "sub-
scribe" to a portion or a "share" of the output from a given solar garden. This allows subscribers
to purchase renewable energy at a savings compared to their current utility bill without making
costly upfront investments in a solar collection system. The City of Cottage Grove supported the
ordinance because of public interests in commercial solar collection systems relative to the State
of Minnesota Legislature's mandate to make solar power a more appealing option for home and
business owners. The overall objective for each public utility is to generate or procure sufficient solar
energy electricity to serve its retail electricity customers in Minnesota so that by the end of 2020, at
least 1.5 percent of the utility's total retail electric sales to retail customers in Minnesota is generated
by solar energy.
The City's solar collector system ordinance for community solar garden systems requires the
following:
• A conditional use permit is granted by the City.
The system is located within the designated areas shown in Exhibit A of the solar collector system
ordinance.
The system is located on a minimum of five acres of land.
• Applicant provides a de -commissioning plan to the City.
• A building permit is obtained from the City.
The standards and regulations contained in the solar collector system ordinance are complied
with.
Community Solar Garden Project
Ecoplexus Inc. is proposing a community solar garden on 80 -acres of land that will be leased from
the property owner.
The applicant is proposing to mount solar collection panels on four to six-foot tall metal racking
structures that are affixed to the ground using either driven posts or helical ground screws. These
types of ground -mounted systems allow stormwater infiltration under the solar panels and mini-
mized ground disturbance. The solar arrays are relatively low to the ground. The ground beneath
Planning Staff Report
Ecoplexus Inc — Planning Case No. CUP2015-056
December 21, 2015
Page 3 of 10
and around the solar collector panels will be seeded with a low -growing native seed mix that will
only require periodic maintenance. Illustrations of the ground mounted systems and solar arrays
are shown below.
The applicant states that Xcel Energy will probably require a set of "interconnection facilities" for
each one megawatt of solar electric energy generated. The proposed community solar garden
project will technically be five total solar gardens, each capable of generating one megawatt of
electricity. An interconnection facility consists of a meter, air switch, inverters, transformers, and
a main substation transformer, and will provide the interface between each one -megawatt solar
garden and the electrical grid by a utility company.
City staff has asked for more details describing these interconnection facilities. The applicant
stated that the details have not yet been prepared and that they continue to work on the design
with Xcel Energy. The applicant's written narrative states that these facilities are typically owned
and maintained by the utility company and the solar garden operator will require their own identical
set of interconnection facilities operating in parallel with the utility's facilities. At this time, the ap-
plicant believes the conveyance of electric energy generated by the community solar garden will
be five interconnection facilities centrally located within the solar panel array field and directed
along the north property line to the northwest corner of the 80 -acre site and westerly within 72nd
Street to Lamar Avenue. The applicant understands that all electrical lines must be underground,
Planning Staff Report
Ecoplexus Inc - Planning Case No. CUP2015-056
December 21, 2015
Page 4 of 10
but said that Xcel Energy has final jurisdiction over the interconnection scheme and that the pre-
cise number and locations of electrical distribution lines cannot be determined at this time. Since
nobody knows at this time how these interconnection systems will be designed, it is suspected
that additional utility poles and overhead power lines might be proposed. Because this is an
important element in considering the approval of this project, a condition of approval will not only
require that all power lines be placed underground within the interior of the community solar gar-
den properties, but also require that the utility company must place all new power lines necessary
to facilitate the interconnection between the community solar garden and the utility company's
electric grid underground. Details of this interconnection between the community solar garden
and the utility company's electric grid must be submitted to the City at the time the applicant files
their building permit application.
The illustration below shows the proposed site layout for the community solar garden project.
Lamar
Fields
/
F ieLd
MW
Fmfletd,
101 VA-
AV
Ir//
o
_ _
- -----
r.
3y...r
E
i.�
72"e Street
_
Extension and I
Existing
Turnaround
y {' Hill
Old Cottage 71
a
•..,�'-.-..,,..�,.=-.ate.-�.a-,-.�
'�.�....�+..�...�
�..,�...
.,....,,.wY.�.�..�•os"'�.'�'a'e'^`e�
Grove
706 ft.
Residential 1
Neighborhood
,.. r,...,...,..,......�.,.T...,...•....,...-..
I
I
I
'
EumfWA
Earmftgid
Proposed Site Plan
The applicant does not propose to remove any existing trees along the perimeter of the 80 -acre
site. No other landscaping improvements are proposed on the project site.
The applicant is proposing to start construction in late spring or early summer of 2016. It will take
approximately four months to complete the project. The community solar garden will be opera-
tional for approximately 30 years, after which it may be de -commissioned if no arrangement for
further use is determined.
Planning Staff Report
Ecoplexus Inc — Planning Case No. CUP2015-056
December 21, 2015
Page 5 of 10
Planning Considerations
Property Characteristics
The property is zoned Agricultural Preservation (AG -1) but the property owner does not participate
in the Metropolitan Agriculture Preserve Program.
The 80 acres of land is divided into two 40 -acre parcels (PIN 12.027.21.24.0001 and
12.027.21.13.0001) that are both owned by Steven and Kathleen Geis. The site's topography is
relatively flat to moderate slopes. Most of the 80 acres is farmed for cropland, except for a 0.75 -
acre treed area near the center of the site. A sliver of land along the property's southwest bound-
ary line is encumbered by trees and brush. An aerial photograph of the 80 -acre site is shown
below.
Lamar Fields a �'
I
Oe
.rt �
•k a-�J
vv: -
.
v;
• e
u(1k
n
it -
700 1,400
_._ Feet
2013 Aerial View of the 80 -Acre Site
Planning Staff Report
Ecoplexus Inc— Planning Case No. CUP2015-056
December 21, 2015
Page 6 of 10
I
6
i
Contours for the 80 -Acre Parcels
0 -PRM LQt.'
Agricultural uses exist on the north, east, and south sides of the site. Residential uses abut the
west property boundary line for the west 40 acres of the 80 acres. Trees exist along this common
boundary line between the agricultural and residential parcels. The photograph below shows the
common boundary line between the agricultural and residential uses.
The only public access is from a platted 66 -foot wide dedicated right-of-way located at the north-
west corner of the site. This dedicated right-of-way aligns with 72nd Street South in the Old
Planning Staff Report
Ecoplexus Inc — Planning Case No. CUP2015-056
December 21, 2015
Page 7 of 10
Cottage Grove neighborhood; 72nd Street and Laverne Avenue intersect, but an improved road-
way surface does not exist between these paved roads and the 80 -acre parcel. This area within
the dedicated right-of-way is a grass area that might be mowed by the City because it adjoins
Lamar Fields or by a neighboring property owner. Two photographs of this right-of-way corridor
are shown below.
Metropolitan Urban Service Area (MUSA)
The 80 -acre site is located outside the MUSA. The Future Vision 2030 Comprehensive Plan and
Future Land Use 2030 Plan designates the area east of Old Cottage Grove as an agricultural land
use. City utilities are not planned to be extended east of Old Cottage Grove for several decades.
Motor Vehicle Accessibility
As previously described, the only public frontage to the site is from a 66 -foot wide dedicated right-of-
way located in the northwest corner of the 80 -acre site. The distance between the 72nd Street and
Laverne Avenue intersection to the site is approximately 175 feet. The City Public Works Department
is requiring that the easterly extension of 72nd Street and temporary turn -around be constructed at
Planning Staff Report
Ecoplexus Inc— Planning Case No. CUP2015-056
December 21, 2015
Page 8 of 10
the applicant's expense. The design of this road extension must comply with the City's rural design
standards. Upon completing the construction of this public street and acceptance by the City Engi-
neer and Public Works Department, the City will thereafter assume maintenance responsibilities of
72nd Street, between Laverne Avenue and the east end of the cul-de-sac. The purpose of the tem-
porary turn -around is to permit motorists to turn -around. The City will plow snow on this new public
roadway.
The property owners, Steven and Kathleen Geis, will be required to provide a public roadway ease-
ment for that portion of the temporary turn -around to be constructed on their property. The illustration
below shows that part of 72nd Street and temporary turn -around to be constructed.
Proposed 72nd Street and cul-de-sac improvement
Once the project is operating, the use will generate minimal vehicular traffic on local streets.
Decommissioning Plan
A copy of the Decommission Plan dated November 20, 2015 was included in the applicant's con-
ditional use permit application submittal. This Plan describes the proposed community solar
garden as a five megawatt solar photovoltaic facility sited on the 80 -acres of land previously de-
scribed in this planning staff report. The Plan describes the decommissioning of the project's
operation and facilities necessary to be completed in order to restore the land to pre -construction
conditions.
The process of decommissioning will take approximately six months or less. All photovoltaic mod-
ules will be disconnected, removed from the racks, packaged, and transported to a designated
Planning Staff Report
Ecoplexus Inc — Planning Case No. CUP2015-056
December 21, 2015
Page 9 of 10
location for resale, recycling, or disposal. The panel racking system will be unbolted, disassem-
bled, and transported off-site for salvage or reuse. All electrical equipment, buildings, and foun-
dations will also be removed from the site. All access roads and parking areas will be removed to
allow the complete restoration of these areas. Clean topsoil would be imported on-site by dump
truck, replaced over the disturbed areas, and leveled to match the existing grades. The area will
be seeded with native grass species for the purpose of erosion control.
The Plan does not include a cost estimate for decommissioning the entire community solar garden
facilities. This cost estimate is required in order to determine the minimum financial guarantee
amount that the applicant is required to provide to the City. The applicant is required to provide
the City with a cash escrow, bond, or irrevocable letter of credit in an amount equal to 125 percent
of the accepted decommissioning estimate. The financial guarantee must be submitted to the City
before a building permit will be issued by the City.
Property Taxes
The 80 -acre site is zoned AG -1, Agricultural Preservation, and is currently being used for agricul-
tural crop production. Minnesota State Statute 272.0295 establishes a solar energy production
tax for solar gardens that are larger than one megawatt. The facility is required to pay $1.20 per
megawatt hour in taxes to the County in which the system is located. Property tax classification
changes from agricultural land to Class 3a -Utility, which is taxed at a higher rate.
Public Hearing Notices
The public hearing notice was published in the South Washington Bulletin and mailed to 32
property owners within 500 feet of the 80 -acre site on December 9, 2015.
Recommendations
That the Planning Commission recommend that the City Council approve Ecoplexus Inc.'s condi-
tional use permit to construct a community solar garden with the capability to generate up to five
megawatts of electricity as shown on the site plan prepared by Landform with a revision date of
December 1, 2015. The Planning Commission can consider staffs proposed conditions of
approval based on testimony and discussion at the public hearing. Conditions of approval for your
consideration are listed below.
The applicant is responsible to remove any gravel, dirt, or debris materials carried from
motor vehicles exiting from the community solar garden site and landing on that segment
of 72nd Street east of Laverne Avenue.
2. The applicant must provide to the City a cost estimate for decommissioning the entire com-
munity solar garden facilities. Upon the City's acceptance of the decommissioning cost
estimate, the applicant shall provide the City with a cash escrow, bond, or irrevocable letter
of credit in an amount equal to 125 percent of the accepted decommissioning estimate.
The financial guarantee must be remitted to the City before a building permit will be issued.
3. All on-site and off-site electric power lines necessary to interconnect the electric power
created from the community solar garden to the utility company grid system must be
Planning Staff Report
Ecoplexus Inc— Planning Case No. CUP2015-056
December 21, 2015
Page 10 of 10
underground. The only exception, if necessary, is at the connection point where the com-
munity solar garden underground electric line needs to be connected to the utility
company's existing power pole/local distribution line.
4. The applicant agrees to comply with minimum setback requirements for the solar array
system in the event the property owner decides to sell one of the two existing taxing
parcels.
5. The applicant/property owner is responsible for the cost of constructing a rural designed
street section and temporary turnaround for that segment of 72nd Street extending east of
Laverne Avenue. The applicant must complete right-of-way permit and grading permit ap-
plications for this street project. The City will issue both permits once the City receives all
the required submittals for the community solar garden project. A financial guarantee in the
minimum amount equal to 125 percent of the street construction project estimate must be
provided to the City before issuing any building permit.
6. The property owner grants to the City, without cost to the City, a roadway easement over
the temporary roadway turnaround located in the northwest corner of the 40 -acre parcel
with the property identification number 12.027.21.24.0001.
7. The project must comply with the City's Solar Collector System Ordinance regulations.
Prepared by:
John McCool, AICP
Senior Planner
Attachments:
CUP Application and Exhibits dated November 20, 2015
Decommissioning Pian dated November 20, 2015
Existing Conditions — Sheet C1.1
Site Plan, Grading, Drainage, Paving, & Erosion Control Plan — Sheet C2.1
Landscaping Plan — Sheet L2.1
Typical Community Solar Garden dated December 2, 2015
ECOPLEXUS INC.
Cottage Grove, Minnesota
APPLICATION FOR
CONDITIONAL USE PERMIT
November 20, 2015
L A N D F O R M
From Site to Finish • •
INTRODUCTION
On behalf of Ecoplexus Inc., Landform is pleased to submit this application for a conditional use permit to
allow for the construction of a community solar garden on approximately 80 acres located southwest of
the intersection at County Road 22 (701h Street South) and County State Aid Highway 95 (Manning
Avenue South) (PID # 120272124001 and 120272113001). Ecoplexus Inc. is proposing to develop a
community solar garden as part of the Xcel Energy Community Solar Garden Program per Minnesota
State Statute §21613.1641. The land will be leased from the property owner.
Community solar gardens are low impact developments that allow individuals, businesses, schools and
civic entities — known as "subscribers" — that have limited options to install their own on-site solar panels
to purchase or "subscribe" to a portion or a "share" of the output from a given solar garden. This allows
subscribers to purchase clean, renewable energy at a savings compared to their current utility bill, without
making costly upfront investments in a solar system.
Minnesota State Statute 272.0295 establishes a solar energy production tax for solar gardens that are
larger than 1 Megawatt(MW). The facility is required to pay $1.20 per megawatt hour in taxes to the
County in which the system is located. Property tax classification changes classification from 2a -
Agricultural Land to Class 3a -Utility, which taxed at a higher rate.
SITE PLAN
The subject property is zoned Agricultural Preservation District (AG1) and guided Agricultural in the 2030
Cottage Grove Comprehensive Plan. The properties to the north, east and south are zoned AG1 and
guided Agricultural; the properties to the west are zoned R4 and guided Single Family Residential.
Section 11-4-10 of the Zoning Code allows Community Solar Gardens in the AG Zoning District on
parcels greater than five acres within designated areas on the Solar Collection System Areas map, with
the approval of a conditional use permit. The construction of a solar garden is compatible with the
surrounding agricultural uses. We have prepared a site plan that complies with all of the requirements for
the construction of a community solar garden at this site.
Panel Configuration
Solar panels will be mounted on 4-6 foot tall metal racking structures that area affixed to the ground using
either driven posts or helical ground screws. These types of configuration require minimal ground
disturbance and allows for stormwater infiltration under the panels.
Electric Distribution Lines
ESS`15014 L H N t) F O R M November 20, 2015
Project Narrative 2
Current Xcel protocol calls for a discrete set of "interconnection facilities" for each 1 megawatt garden
(there will technically be five total gardens on the property). "Interconnection facilities" consist of a meter,
air switch, and recloser, and provide the interface between the solar garden and the electrical grid. Please
see the attached pictures showing what these facilities look like. Typically, these facilities, which are
owned and maintained by the utility, are mounted on 1-3 utility poles arranged in a row. The garden
operator will require their own identical set of interconnection facilities operating in parallel with the utility's
facilities. Normally, interconnection facilities could be shared between all 5 megawatts; however, in order
to comply with Minnesota statues and Public Utility Commission regulations that require each 1 megawatt
garden to be able to operate independently of each other, Xcel is requiring unique interconnection
facilities for each 1 megawatt block.
Ecoplexus understands that Cottage Grove's preference is for all electrical lines and associated
equipment to be buried underground, and is actively working with Xcel to fulfill this request. Given that
Xcel has final jurisdiction over the interconnection scheme, the precise number and locations of electric
distribution lines cannot be determined with any certainty, at this time. However, Ecoplexus will work with
Xcel to attempt to ensure that all such lines and equipment are either buried underground or minimized to
the extent possible, such as by hosting multiple pieces of equipment on a single pole.
Landscaping
Aerial photos show evergreen trees located on the neighboring parcels to the west of the site, providing
nearby residents with high quality visual screening. A low -growing seed -mix combined with both native
and pollinator species will be used between and underneath the arrays to facilitate stormwater infiltration
and to help incorporate the overall facility into the landscape. Vegetation will be maintained by crews on
an as -needed basis. The site is currently a cleared field; however, there are a minimal number of trees
that remain and may be impacted by solar panel placement. A tree survey has been included with the
plans.
Surface Water Drainage
A report regarding stormwater management was submitted to the South Washington Watershed District
for their review and comments on 11/30/2015. Solar panels that have underground vegetation produce
little to no increase in water volume runoff on site or to surrounding properties.
Access
We are working with the City Engineer to improve 72nd Street South to provide access to the site. After
construction, the site will require only minimal access throughout the year to maintain vegetation and to
make repairs on panels.
Interconnection Agreement
ESS15014 L A N D F O R M November 20, 2015
Project Narrative 3
An interconnection agreement is pending approval from Xcel Energy. The utility is currently behind on
processing applications and cannot provide a timeline in which the applications will be approved.
Because current federal law incentivizes solar gardens that are constructed prior to the end of 2016, we
would like to entitle the site at the same time Xcel processes the Interconnection Agreement, and would
be amenable to providing the Interconnection Agreement as a condition of receiving the building permit.
In the meantime, Ecoplexus is willing to provide a copy of the interconnection application, if requested to
do so.
Decommissioning Plan
A decommissioning plan that outlines the anticipated means and cost of removing the system at the end
of its serviceable life or upon the facility becoming a discontinued use is included with this application.
The plan identifies the financial resources that will be available to pay for the decommissioning and
removal of the system.
Project Phasing
There are no plans to phase the development of the garden. All 5 megawatts will be installed
simultaneously over the course of the 3-4 month construction phase.
CONDITIONAL USE PERMIT
Cottage Grove permits the construction of a community solar garden in the AGI zoning district on sites
over 5 acres upon approval of a Conditional Use Permit (CUP). Section 11-2-9 of the Zoning Ordinance
provides 11 standards of evaluation to be considered in approving a conditional use permit. Our proposed
plan addresses these standards as follows:
The use will be in conformity with the City's Comprehensive plan and with the purpose, intent
and applicable standards of this title.
A community solar garden is consistent with the Comprehensive Plan's Land Use policy to
encourage energy efficient design in all public and private construction as part of a goal to
include environmental sustainability into all land use decisions and investments in
infrastructure. Community solar gardens minimize impacts to the natural and cultural
environments while investing in infrastructure to produce local clean energy sources.
A community solar garden is also consistent with the purpose of the AG -1 district. Solar
panels preserve and protect agricultural land for future use. The low impact nature of the
development allows prime agricultural land to rest, and the seed mixes help enrich the soils.
Unlike housing or other infrastructure, panels can be easily removed and allow land to be
farmed after removal.
ESS15014 L A N D F O R M November 20, 2015
Project Narrative 4
2. The use shall be located, designed, maintained and operated to be compatible with the
existing or intended character of that zoning district in which it is located.
The location, design, maintenance and operation of a community solar garden is consistent
with the rural characteristics of the surrounding area The nature of a community solar garden
requires the types of large tracts of open land found in the Agricultural Preservation District.
Very few dwellings or buildings would be impacted by the visual characteristics of the site due
to the distance between the residential uses and the placement of the panels shown on the
site plan. The residential uses to the west are currently screened from property with fencing
and a thick line of trees. The solar arrays are relatively low to the ground and would be
consistent with the height of surrounding crops. The site will be planted with a low -growing,
native; seed mix that will enhance the rural feel of the area. The facility will only require
periodic maintenance and is essentially self-operating after construction.
3. The use shall not depreciate values of surrounding property.
The use will not depreciate values of surrounding properties. The surrounding properties
consist of agricultural tracts with few dwellings and buildings within view of the site. Solar
gardens require minimal site impacts, do not produce emissions or pollutants, and have no
detrimental effects on surrounding properties. The use is compatible with the rural
development and farming operations of the Agricultural Preservation District. Solar arrays
can be easily removed and do not negatively impact the soils, ensuring that the host
property remains adaptable to new development.
A solar garden is a very benign, innocuous land use. The facility will produce no odors, air
emissions, or hazardous materials. Additionally, it will not produce any noises that are
discernible beyond the interior of the facility. (The only component of the facility that will
make any noise are the inverters, which produce a slight electrical "hum" that can be heard
within an approximate radius of 100'.)
After construction of the facility is complete, vehicular trips tolfrom the site will consist of a
single pickup truck several times a year for routine maintenance. As such, the facility will
produce effectively no traffic whatsoever during its operational life. Moreover, solar facilities
are generally considered to be less invasive uses than even traditional agriculture, given that
farming can create nuisances in the form of dirt kicked up by tractors, odors from fertilizer
application, and migration of pesticides and herbicides from the soil into the groundwater.
ESS15014 L A N D F O R M November 20, 2015
Project Narrative 5
Regarding land values, negative impacts to property values are typically associated with
certain types of nuisances, including noise, oder, traffic, and hazardous materials.
Ecoplexus has commissioned a licensed real estate appraiser to perform a number of
"matched pair analyses" for its proposed solar developments in North Carolina. Like
Minnesota, North Carolina features dozens of 5 megawatt solar facilities sited on semi -rural
and peri -urban land, often at the periphery of municipalities, and usually situated near some
degree of residential development. Matched pair analyses evaluate prices for nearly
identical homes, with the main difference between that one set of homes is adjacent to a
solar farm while the others are not. The analyses also look at sales prices of the same
homes before and after construction of the facility. None of the analyses produced any
evidence of deleterious impacts on property values due to the presence of the solar facility.
This is due to the fact that solar produce none of the types of nuisances -- noise, odor,
traffic, or hazardous materials -- that are associated with land uses thought to have a
negative impact on property values.
4. The use shall not be hazardous, detrimental or disturbing to present and potential
surrounding land uses due to noises, glare, smoke, dust, odor, fumes, water pollution,
vibration, general unsightliness or other nuisances.
The proposed community solar garden will not be hazardous, detrimental or disturbing to
present and potential surrounding land uses due to noises, glare, smoke, dust, odor, fumes,
water pollution, vibration, general unsightliness or other nuisances. The proposed solar
garden will not produce smoke, dust, odors, fumes, vibration or significant amounts of glare.
The only noise generated by any of the solar garden components is an electrical "hum"
produced by the inverters, which can be heard within a radius of approximately 100 feet.
Given that the required setback is 100 feet from residential properties and the inverter will be
located in the interior of the panels, no noise from the solar garden will be audible by
adjoining properties. Additionally, solar panels utilize specialized glass that is designed to
absorb, rather than reflect, light; as such, the amount of reflectivity produced from the facility
will be significantly less than that of a lake or body of water.
5. The use shall generate only minimal vehicular traffic on local streets as defined by the
transportation element of the comprehensive plan. The use shall not create traffic congestion,
unsafe access or parking needs that will cause inconveniences to the adjoining properties.
The use will generate only minimal vehicular traffic on local streets and will not create traffic
congestion, unsafe access or parkiing needs that will cause inconveniences to the adjoining
properties. Solar gardens do not increase traffic or demands from increased population.
ESS15014 L A N D F O R M November 20, 2015
Project Narrative 6
Ecoplexus is proposing to provide access by extending 7201 Street to the northwest corner of
the site. The extension will be constructed in accordance with municipal design standards.
Additionally, the project will enhance public utility infrastructure by providing a renewable
electricity source.
6. The use shall be served adequately by essential public services, such as streets, police, fire
protection and utilities.
The use will be adequately served by essential public services, such as streets, police, fire
protection and utilities. The use will not introduce any additional demand on existing public
facilities and utilities, or essential services. Solar gardens do not require services related to
roads and public facilities, as they do not increase traffic or demands from increased
population. The project will enhance public utility infrastructure by providing a locally
produced, renewable electricity source.
The use shall not create excessive additional requirements at public cost for public facilities
and services and shall not be detrimental to the economic welfare of the city.
A community solar garden will not create excessive additional requirements at public cost for
public facilities and services and will not be detrimental to the economic welfare of the City.
Allowing for a community solar garden supports the development of renewable energy that
would directly support local energy use and the environmental health of the community by
reducing air pollution from coal power plants that contribute to asthma and lung damage, as
well as arsenic, lead, cadmium, and other toxic heavy metals that increase incidences of
brain damage, cancer, and birth defects.
8. The use shall preserve and incorporate the site's important natural and scenic features into
the development design.
The use will preserve and incorporate the site's important natural and scenic features into the
development design. In addition, the long-term, static nature of the solar garden allows the
soil to rest for an extended period of time, and beneficial nutrients and microorganisms that
are diminished as a result of intensive farming to reestablish themselves. A low growing seed
mix that incorporates pollinator friendly -plant species will enhance the rural feel of the
landscape.
ESS15014 L A N D F O R M November 20, 2015
Project Narrative 7
9. The use shall cause minimal adverse environmental effects.
A community solar garden will cause minimal adverse environmental effects. The presence
of vegetation on the site will decrease the amount of runoff currently generated by existing
agricultural uses, reducing overall runoff and actually improving water quality. The panels
are non-toxic and do not produce any emissions or contribute any other particulate matter to
the environment that would influence the environmental quality of the City.
10. The use shall not adversely affect the potential development of adjacent vacant land.
The use will not adversely affect the potential development of adjacent vacant lands. The low
intensity use is easily removed and does not impact soils or other natural resources, making
adjoining properties adaptable to new development. Development on surrounding land would
not be impacted by the facility, as it will not produce noise, is non-toxic and operates safely.
Because the arrays are low to the ground, future developments could incorporate
landscaping and screening into their site design if they did not care to view the panels from
their property.
11. In case of floodplain applications, the following items shall be considered in addition to the
aforementioned criteria:
There are no floodplains on site.
SUMMARY
We look forward to working with the City of Cottage Grove to facilitate the construction of a clean -energy
producing community solar garden. We respectfully request that this item be placed on the December 21,
2015 Planning Commission meeting and the January 20, 2015 City Council meeting.
CONTACT INFORMATION
This document was prepared by:
Landform
105 South Fifth Street, Suite 513
Minneapolis, MN 55401
Any additional questions regarding this application can be directed to Mary Matze at
mmatze@landform.net or 612.638.0227.
ESS15014 L A N D F O R M November 20, 2015
Project Narrative 8
ecplexus
Decommissioning Plan
For
COTTAGE GROVE, MINNESOTA
NOVEMBER 20, 2015
NOV ? 0 4010
CITY
CITY .
eceptexus
Decommissioning Plan Disclaimer
This Decommissioning Plan has been prepared by Ecoplexus for the purpose of assisting with decisions
related to the development of a proposed solar photovoltaic project and shall not be: (a) used for any
other purpose; or (b), provided to, relied upon, or used by any third party.
This report contains opinions, conclusions, and recommendations made by Ecoplexus, using its
professional judgment and reasonable care. Any use of or reliance upon this report is subject to the
following conditions:
• The plan being read as a whole, with sections or parts hereof read or relied upon in context.
• The conditions of the site may change over time (or may have already changed) due to natural
forces or human intervention, and Ecoplexus takes no responsibility for the impact that such
changes may have on the accuracy or validity of the observations, conclusions, and
recommendations set out in this plan.
• The plan is based on information readily available to Ecoplexus and will be revised based upon
final construction and site conditions as needed.
E
Decommissioning Plan — Cottage Grove, Minnesota
Table of Contents
Commissioning Plan Disclaimer...................................................................................................................2
1. Introduction..............................................................................................................................................4
1.1 Project Description...............................................................................................................................4
1.2 Solar Energy System Use Permit Requirements —Unified Development Ordinance (LIDO -1-2013).4
1.3 Purpose of Report .................... —........................................................................................................ 4
2. Decommissioning After Ceasing Operation..............................................................................................6
2.1 Equipment Dismantling and Removal.................................................................................................6
2.1.1 PV Modules..................................................................................................................................6
2.1.2 Electrical Equipment, Buildings and Foundations........................................................................7
2.1.3 Roads, Parking Area and Substation Yard....................................................................................7
2.1.4 Other Components......................................................................................................................7
2.2 Site Restoration...................................................................................................................................7
2.3 Management of Wastes and Excess Materials...................................................................................8
2.4 Emergency Response and Communications Plans....................................................................::.......8
2.4.1 Fire...............................................................................................................................................9
2.4.2 Personal Injury.............................................................................................................................9
2.4.3 Spills .............................................................................................................................................
9
2.5 Decommissioning....................................................... .................... ...................................................
10
3. Decommissioning During Construction (Abandonment)..................................................::..:.................12
3.1 Equipment Dismantling and Removal...............................................................................................12
3.2 Site Restoration.....................................................................—..........................,..............................12
3.3 Management of Wastes and Excess Materials.................................................................................12
3.4 Emergency Response and Communications.....................................................................................12
4. Restoration of Land Negatively Affected by the Facility.........................................................................13
3
1. Introduction
1.1 Project Description
The Ecoplexus Cottage Grove Solar Energy Project (the "Project") is a five megawatt (MW) (AC) solar
photovoltaic facility sited on an approximately 80 acre parcel located at southwest of the intersectiotion
at County Road 22 (70"' Street South) and County State Aid Highway 95 (Manning Avenue South). The
Parcel Numbers are 120272124001 and 120272113001. The parcel is owned by Steven and Kathleen
Geis, and is currently being used for agriculture. The subject property is zoned Agricultural Preservation
District (AGI) and guided Agricultural in the 2030 Cottage Grove Comprehensive Plan. The properties to
the north, east and south are zoned AG1 and guided Agricultural; the properties to the west are zoned R4
and guided Single Family Residential. Aerial photos show evergreen trees located on the neighboring
parcels to the west of the site, providing nearby residents with high quality visual screening.
The Project is a renewable energy generation facility, which will use solar photovoltaic technology to
generate electricity. Electricity generated by solar photovoltaic panels will be converted from direct
current (DC) to alternating current (AC) by inverters and then stepped-up (via pad -mounted inverter
transformers and a main substation transformer) to a voltage of 34.5 kV prior to being connected to the
existing local distribution line
Construction of the Project is estimated to begin in late spring or early summer of 2016, and is anticipated
to require approximately four months to complete, with Project commissioning anticipated prior to the
end of 2016. It is expected that the Project will be operational for at least the duration of 30 years, after
which it may be decommissioned if no arrangement forfurther use is determined.
1.2 Conditional Permit Requirements
Section 11-4-10 E of the Cottage Grove Zoning Ordinance requires a decommissioning plan be submitted
with all applications for a community solar garden.
1.3 Purpose of Report
This Report explains how the Project developer proposes to restore the Project Location' to a clean and
safe condition at the end of the Project. This includes retiring the elements of the renewable energy
generation facility, restoring the land and water, and managing the excess materials and waste
Section 2 of the report describes the decommissioning plan upon the completion of the Project's
operation. Section 3 describes the decommissioning plan if Project abandonment takes place during
construction and prior to operation of the Project. Section 4 provides the activities to be completed in
order to restore the land to pre -construction conditions.
4
"Project Location" means, when used in relation to a renewable energy project, apart of land and all or part of any building or structure in, on
or over which a person is engaging in or proposes to engage In the project and any air space in which a person is engaging in or proposed to
engage in the project
2. Decommissioning After Ceasing Operation
Figure 2.1 depicts the site plan and the proposed Project facilities. It is anticipated that the Project
equipment will have a useful lifetime of at least 30 years, which can be extended significantly beyond this
timeframe with proper maintenance, component replacement, and repowering.
For this section of the Plan, it is assumed that the Project will be decommissioned after 30 -years, and that
the process of decommissioning will take 6 months or less. The Contractor of the Project will ensure that
the entire Project Location is restored backto its pre -construction condition (successional vegetation land
use or as may be appropriate at that time) and thatthe decommissioning is conducted in accordance with
the applicable local, state, and federal requirements.
During decommissioning, mitigation measures similar to those used for a construction site (e.g. sediment
and erosion controls) will be implemented and maintained by the Contractor and inspected by the
Contractor's Environmental Site Inspector. The Contractor will be responsible for preparing and
submitting environmental monitoring reports to the Contractor's Project Managerto ensure conformance
with applicable regulatory requirements
Overall, no significant adverse impacts to the environment are expected as a result of decommissioning
the Project.
2.1 Equipment Dismantling and Removal
All decommissioning and removal of electrical devices, equipment, and wiring/cabling will be conducted
in accordance with local, state, and federal standards and guidelines. Any electrical decommissioning will
include obtaining the required permits and following of appropriate lockout/tag out procedures before
de -energizing, isolating, and disconnecting electrical devices, equipment, and wiring/cabling.
2.1.1 PV Modules
There will be approximately 25,000 PV modules (TBD by final design). Each module contains 72 poly-
crystalline solar cells. All modules will be disconnected, removed from the racks, packaged and
transported to a designated location for resale, recycling, or disposal. If the modules are not to be reused
in a different location, the glass and silicon are expected to be reclaimed and the aluminum frames
recycled. Any disposal or recycling will be done in accordance with local by-laws and requirements. The
connecting underground cables and the junction boxes will be de -energized, disconnected and removed.
The panel racking system supporting the modules will be unbolted and disassembled by laborers using
standard hand tools, possibly assisted by a small portable crane. The vertical steel posts supporting the
racks and all steel support piles (driven orscrewed) will be completely removed by mechanical equipment
and transported off-site for salvage or reuse. Any demolition debris that is not salvageable will be
transported by truckto an approved disposal area. Other salvageable equipment and/or material will be
removed from the site for resale, scrap value, or disposal, depending on market conditions.
6
2.1.2 Electrical Equipment, Buildings, and Foundations
All decommissioning of electrical devices, equipment, and wiring/cabling will be in accordance with local,
municipal, provincial and federal agencies standards and guidelines. Any electrical decommissioning will
include obtaining the required permits, and following lockout/tag out procedures before de -energizing,
isolating, and disconnecting of electrical devices, equipment, and wiring/cabling.
Decommissioning will require dismantling and removal of the electrical equipment, including inverters,
transformers, underground cables and overhead lines, the prefabricated inverter enclosures, and any
electrical switchgear. The equipment will be disconnected and transported off-site by truck. The larger
slab -on -grade concrete foundations and support pads will be broken up by mechanical equipment
(backhoe -hydraulic hammer/shovel, jackhammer), loaded onto dump trucks and removed from the site.
Smaller pre -cast concrete support pads will be removed intact by cranes and loaded onto trucks for reuse
or be broken up and hauled away by dump trucks.
Prior to removal of the transformers, the oil will be pumped into a separate industry -approved disposal
container and sealed to prevent any spill during storage and/or transportation. Equipment and material
may be salvaged for resale or scrap value depending on the market conditions.
2.1.3 Roads, Parking Area and Maintenance Building
Unless retained for other purposes, all access roads, the parking area and the maintenance building will
be removed to allow for the complete restoration of these areas. Typically, any granular base covering
these areas would be removed using a wheel loader to strip off the material and dump trucks to haul the
aggregate to a recycling facility or approved disposal facility. The underlying subsoil, if exhibiting
significant compaction beyond what originally existed) will then be diced using a tractor and disc
attachment to restore the soil structure and to aerate the soil. Clean topsoil would be imported on-site
by dump truck, replaced over the area and leveled to match the existing grade if appropriate. Depending
upon the time of year and the planned use of the land, the area will be seeded with native grass species
for the purpose of erosion control.
2.1.4 Other Components
Unless retained for other purposes, removal of all other facility components from the site will be
completed, including but not limited to surface drains, culverts, and fencing. Anything deemed usable
shall be recovered and reused. All other remaining components will be considered as waste and managed
according to local, state, and federal requirements. For safety and security, the security fence will likely
be the final component dismantled and removed from the site.
2.2 Site Restoration
The Project doesn't include any permanent changes to the original use of the land. Therefore, it will be
possible to restore the site to its pre -construction condition by ensuring:
FA
Site cleanup followed by general surface grading and, if necessary, restoration of surface drainage swales,
ditches, and tile drains (if present).
Any excavation and/or trenching caused by the removal of building or equipment foundations, rack
supports and underground electrical cables will be backfilled with the appropriate material and leveled to
match the ground surface.
The roads and parking areas will be removed completely, filled with suitable sub -grade material and
leveled.
Any compacted ground will be tilled, mixed with suitable sub -grade materials, and leveled.
Prepared soil with all the nutrients required for crops to grow will be spread as necessary.
Native vegetation will be planted as appropriate to provide a rapid return of nutrients and soil structure,
and protect against erosion.
2.3 Management of Wastes and Excess Materials
All waste and excess materials will be disposed of in accordance with local, state, and federal regulations.
Waste that can be recycled under municipal and/or private recycling programs will be recycled
accordingly. Waste cannot be recycled and requires disposal will be disposed of in a state licensed facility
by a properly licensed hauler. It is not anticipated that hazardous waste requiring special disposal will be
generated, with the exception of the transformer oil, which shall be disposed of in accordance with local,
state, and federal requirements.
2.4 Emergency Response and Communications Plans
The following describes the Project Emergency Response and Communications Plan as it pertains to the
decommissioning phase of the Project. As noted in Section 2.5, prior to initiating any decommissioning
activities, the Contractor will notify the local authorities, public, and relevant government agencies of the
Contractor's intent to decommission the Project.
During decommissioning, the Contractor will coordinate with the local authority, public, and others as
required, providing them with information about the ongoing activities. Besides regular direct/indirect
communication, a sign will be posted at the gate of the facilitywhich will include the Contractor's contact
information (telephone number, e-mail, and mailing address) should the public have any questions,
inquiries, or complaints. All inquiries will be directed to the Contractor's Project Manager who will respond
to the inquiry accordingly,
Three potential emergency scenarios, including fire, personal injury, and spills, are discussed with regard
to the emergency response and communications procedures to be used. In the event of an emergency,
0
the Contractor will mobilize its resources to the site to respond to the event. All Project personnel will be
trained in the emergency response and communications procedures.
2.4.1 Fire
Fire extinguishers will be located in strategic locations such as Projectvehicles and the construction trailer.
A sign will be erected near the front gate of the facility; the sign will include instructions to call both 911
and the Project phone number, should a passerby notice an emergency.
If a fire occurs, Project personnel will attempt to extinguish it, only if it is safe to do so. If there is any risk
of personal injury, extinguishing the fire will not be attempted. If a fire cannot be extinguished using the
hand-held extinguishers, the Project area will be evacuated and Project personnel will immediately call
911 to summon the local fire department (and ambulance if required). Project personnel will notify
inhabitants at all adjacent properties if the fire appears able to move off of the Project site. All staff on
site during the life of the Project will be trained In the procedure to deal with a fire and the use of an
extinguisher.
All incidents will be documented and kept on file. Documentation will include date of incident; date of
reporting; name of reporter; description of the incident; cause of the incident; actions taken;
communications to outside groups and internal personnel; and follow-up required.
2.4.2 Personal Injury
Duringthe decommissioning phase, work will be completed by a licensed Contractorwho will establish its
own Health and Safety program.
Should a personal injury occurthat does not require an ambulance, the injured workerwill be treated on-
site and, if necessary, transported to the hospital. First-aid supplies and maps to the local hospitals will be
kept in the construction trailer. If the injury is more severe, the Contractor will call 911 and assist the
injured worker until emergency personnel arrive.
In all cases of personal injury, the Project Construction Manager and the Project Facility Manager will be
notified immediately. All incidents will be documented and kept on file. Documentation will include date
of incident; date of reporting; name of reporter, name of injured; description of the incident; cause of the
incident; actions taken; communications to outside groups and internal personnel; and follow-up as
required by Health and Safety Regulations.
2.4.3 Spills
Spills are the unintended release/discharge of material to air, land, or water. The most likely
decommissioning spill scenarios include: the release of sediments into water bodies, sewage from
portable washrooms, and hazardous materials (e.g., compressed gases and petroleum hydrocarbons)
from containers or vehicles.
9
Should as pi I I occur, the following will be implemented:
• Evaluate the scene for risks to human health and safety.
• Stop the spill, if it is safe to do so.
• If there is immediate danger to human health, contact 911 for assistance, and notify anyone who
may be directly impacted or is in harm's way.
• Notify the Contractor's Site Manager and if applicable, the Project Facility Manager.
• Contain and clean-up the spill using on-site spill kit.
• If required, contact outside spill response contractorfor assistance.
• Document and report the spill to outside agencies, as required.
Aspill kitwill be available on-site duringthe decommissioning phase and will contain equipment necessary
for spills response. This will include absorbent pads; an absorbent broom; polyethylene bags; neoprene
gloves; protective goggles; plastic bins or metal drums; and multipurpose granular sorbents.
Spills that could potentially occur during the life of the Project, and may need to be reported include:
• Non -approved releases/discharges (including those to air, land, and water).
• Discharge of fluids greater than 10 gal from a vehicle.
• Mineral oil releases greater than 10 L from an electrical transformer.
• Discharges (including sediment) into water bodies.
2.5 Decommissioning Notification
Prior to initiating any decommissioning activities, the Contractor will notify the local authorities (to
include Currituck County and the local fire department), the public, and other relevant parties of the
Contractor's intent to decommission the Project.
10
Preliminary Site Plan — Cottage Grove, Minnesota
11
3. Decommissioning During Construction (Abandonment)
In the event that construction and associated work is not completed, all equipment, foundations, and
imported material (including roads) will be removed from the site in accordance with applicable
municipal, state, and federal requirements. The process of decommissioning the Project is assumed to
take approximately 3 months, but could be less depending upon what stage of completion the Project is
at prior to decommissioning.
3.1 Equipment Dismantling and Removal
Equipment dismantling and removal will be determined according to the activities completed and
components installed at the time of Project cancellation. Therefore, the plan and related activities as
outlined in Section 2.1 will be the same activities implemented if the Project were to be abandoned prior
to commencing operations.
3.2 Site Restoration
Site restoration will be determined according to site development to date. Therefore, the plan and related
activities as outlined in Section 2.2 and Section 4 will be the same activities if the Project were to be
abandoned prior to commencing operations.
3.3 Management of Wastes and Excess Materials
Management of waste and excess material will be determined by activities completed and components
installed at the time of abandonment. Therefore, the plan and related activities as outlined in Section 2.3
will be the same activities if the Project were to be abandoned priorto commencing operations.
3.4 Emergency Response and Communications
The same procedure described in Section 2.4 will be followed if the Project is to be abandoned prior to
commencing operations.
12
4. Restoration of Land Negatively Affected by the Project
Following decommissioning of the Project, if any lands are negatively affected by the Project, the
Contractor is committed to restoring the site as close to its pre-construction state as feasible.
The following actions are anticipated to restore the site to its pre-construction state:
• All equipment, foundations and imported material (including roads) will be removed from the site
in accordance to applicable local, municipal, provincial and federal guidelines and regulations.
• If applicable, damage to existing tile drains (if found to be present on the site) caused by the
Project will be repaired/restored.
• Any excavation and/or trenching caused by the removal of building or equipment foundations,
rack supports, and underground electrical cables will be backfilled with the appropriate material
and leveled to match the ground surface.
• Should the subsoil be negatively affected and compromise the future productive use of the land,
the following will be implemented: first, the topsoil will be removed and stockpiled. Next, the
subsoil may be ripped and tilled prior to grading it; and finally, topsoil will be replaced to its
original condition and revegetated.
• Should the soil be negatively affected and compromise the future productive use of the land,
nutrients may be added orfertllizers deployed.
• Topsoil and compost will be blended where required, spread, and replaced to original depth.
• Seeding with approved seed mixture and mulching during the appropriate seasonal conditions
will be based on the final intended use of the land (e.g., agricultural crop production, fallow,
successional vegetation, other).
13
i� � lsi ���? 4 s�si�EF i ���s��fl;�4� t E3sttsst E ll:?lft,flalladd114laai4il�€`s441 1�a'��af3s !;�if]�ijjij?1ia; mm,
�aa.;€'AlflSi:-il;4as 43,
1�ttt
5
s5ss�:s£3i@@Stet?�@i:$s§4ii8836�§ez::sd°.? saee?�@Y?k€.aa95:5&79una 34.ai§w�iS�aAO�€.FE.iaef.€€?»>§$�..;s�sset
t €
if I 31 f ! as f
1411}l'd 'Jig fill
s�,aisrlal�14111,1eillsl�tEtillAi€s�t�1���llial1�a111�t1i1t��=�s�141�11,11�,ii:P,tlatltlaaSaat;�tills,t�ilt9
$9 9k'Ah-SYai„ 5° x 6
:...s.._.�."."s.§.:•�e4s53�sae.344§x?si°83�3s
- ----
�2!
\
2 ~�\ /. /
\,\
�
§
|§
(m
z
w
0