HomeMy WebLinkAbout2016-01-06 PACKET 04.K. REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA
MEETING ITEM #
DATE 01/06/16 .
PREPARED BY: Finance Robin Roland
ORIGINATING DEPARTMENT DEPARTMENT HEAD
* * � :� � � * � * * * * * * * * * * � * * * * * * * * � � * � * * * * * * * * * * * * * * * * *
COUNCIL ACTION REQUEST:
Consider adoption of the 2016-2020 Capital Improvement Plan
STAFF RECOMMENDATION:
Adopt the 2p16-2020 Capital Improvement Plan
BUDGET IMPLICATION:
BUDGETED AMOUNT ACTUAL AMOUNT
ADVISORY COMMISSION ACTION:
DATE REVIEWED APPROVED DENIED
� PLANNING 12/21/15 � � ❑
❑ PUBLIC SAFETY ❑ ❑ ❑
❑ PUBLIC WORKS ❑ ❑ ❑
❑ PARKS AND RECREATION ❑ ❑ ❑
❑ HUMAN SERVICES/RIGHTS ❑ ❑ ❑
❑ ECONOMIC DEV. AUTHORITY ❑ ❑ ❑
❑ ❑ ❑ ❑
SUPPORTING DOCUMENTS:
� MEMO/LETTER:
� RESOLUTION:
❑ ORDINANCE:
❑ ENGINEERING RECOMMENDATION:
❑ LEGAL RECOMMENDATION:
� OTHER: 2016-2020 CIP
ADMINISTRATORS COMMENTS:
,
,� .� ;,
�
�� t
' `� + 'r �� � �-�5
, �
City Adminis ra or Date
* * * * * * � � * * * * * * * * � * * � * * * * * * � * * * * * * * * * * * * * * � * * * * � *
H:\Council itemslcouncil-action template.docx
Cottage
Grove
�here Pride and ProsPerity Meet
To: Mayor and City Council Members
Charlene Stevens, City Administrator
From: Robin Roland, Finance Director
Date: December 30, 2015
Subject: Consider Adoption 2016-2020 Capital Improvement Plan and a resolution
adopting an amendment to the Comprehensive Plan 2030 to incorporate the
CIP
Introduction
The 2016-2020 Capital Improvement Plan (CIP) is attached for Council consideration.
Discussion
The attached document is based on conversations with the City Council during the course of the
2016/2017 budget discussion and subsequent to two workshops this fall regarding prioritization
of capital projects.
The 2016-2020 CIP includes Pavement Management projects, Park Development and
Improvement projects, municipal facility and joint public safety facility projects, as well as road
projects resulting from commercial and residential development.
The Planning Commission held a public hearing on the CIP at their December 21, 2015 meeting.
This public hearing is required for amendment of the City's Comprehensive Plan, which includes
the CIP. Excerpts from the minutes of that meeting are included with this memo. The 2016-
2020 CIP was approved unanimously.
The first two years (2016 and 2017) of the CIP document function as the "work plan" for city
capital projects, however, all projects are brought to the Council prior to feasibility reports,
acquisition or construction.
For 2016, the CIP includes $20.2 million in projects as follows:
HERO Center $2,920,000
Fire Station #2 450,000
Matching grant funds 10,000
Public Landscape initiative 55,000
Volunteer tree planting 5,000
Hamlet Park- Develop Park & skateboard repair 188,000
Granada Park- Remove tennis courts, regrade, trail 50,000
Park properties - Surveying & installation of posts 17,000
Cedarhurst meadows park development 100,000
Arbor Meadows - install irrigation & playground 20,000
Kingston Park- playground remodel 100,000
Oakwood park- entrance and parking lot 360,000
Parks - design & planning 15,000
Spot replacement/slip lining - Sewer 50,000
System improvements - Streetlights 100,000
Storm water maintenance 250,000
Swanlund utilities 20,000
Upper Ravine district infrastructure 50,000
Water Meter Replacement project 206,250
Pull well - annual maintenance 70,000
95th Street Extension 1,263,200
Hadley Avenue street work 90th - 100th 3,475,000
Jamaica Ave - 70th to Military with roundabout 3,800,000
80th Street (CSAH19 to TH 61) Reconstruction 1,590,733
PM 2016 - D2, F3, F5 4,464,286
Sealcoating projects 553,000
$20,183,269
Action Requested
Approve the 2016-2020 Capital Improvement Plan and adopt the resolution amending the
Comprehensive Plan 2030 to incorporate the CIP.
EXCERPT FROM UNAPPROVED MINUTES OF THE
DECEMBER 21, 2015, PLANNING COMMISSION MEETING
6.6 Capital Improvement Program 2016-2020 — Case CP2015-048
The City of Cottage Grove has applied for a comprehensive plan amendment to
amend the Capital Improvement Program (CIP) for 2016-2020. Continued from
November 23, 2015, Planning Commission meeting,
Roland summarized the staff report. Olsen explained why the improvements to 80th
Street are being done in a piecemeal fashion, which is to reconstruct the portions of
80th Street that will be impacted by ongoing development later to prevent damage
from heavy truck traffic and to be cognizant of the debt load. Roland recommended
approval of the comprehensive plan amendment.
Rostad asked how much of the HERO Center funding would the City bonded for.
Roland responded that the majority of the funding for the HERO Center will come from
the State because it is a regional facility. She stated that the $3.2 million in the CIP is
a placeholder and is based on a percentage of the estimated project cost. Cottage
Grove will share the cost of the center with the City of Woodbury, Inver Hills
Community College, and Regions Hospital. Olsen stated that the HERO Center will
be a profit center for the City. Roland noted that as a revenue center, it will be a
potential source of the bond repayment.
Fox asked if 80th Street is a county road. Roland responded no.
Brittain noted that there is an area on the road improvement project map that was
constructed in 1995 and is scheduled for reconstruction in 2028, and asked about
plans to maintain that roadway over the next 13 years. Roland stated that the general
operating budget should have funds to cover the costs of thin overlays for those
delayed projects. The City has the manpower and machinery in the budget to do thin
overlays on those roadways to heighten the level of maintenance and sustainability
until they are part of a pavement management project. Brittain asked if there would be
any assessments involved with the thin overlay. Roland answered no. Olsen provided
information on the thin overlay process.
Brittain opened the public hearing. No one spoke. Brittain closed the public
hearing.
Brittain made a motion to approve the amendment to the CIP 2016-2020. Fox
seconded. Motion passed unanimously(8-to-0 vote).
RESOLUTION NO. 2016-
RESOLUTION APPROVING A COMPREHENSIVE PLAN AMENDMENT TO
THE CITY'S COMPREHENSIVE PLAN 2030 TO INCORPORATE THE
CAPITAL IMPROVEMENTS PLAN
WHEREAS, THE City of Cottage Grove has prepared an amendment to
the implementation element of the City's Comprehensive Plan 2030 for the
Capital Improvements Plan (CIP) 2016-2020; and
WHEREAS, the Planning Commission held a public hearing on December
21, 2015; and
WHEREAS, the public hearing was opened for public testimony and not
written or verbal testimony was received; and
WHEREAS, the Planning Commission unanimously found that the 2016-
2020 CIP is consistent with the City's Comprehensive Plan 2030.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Cottage Grove, County of Washington, State of Minnesota, hereby approves the
amendment to the Implementation Element of the City's Comprehensive Plan
2030 to adopt the 2016-2020 Capital Improvement Plan (CIP).
Passed this 6th day of January 2016.
Myron Bailey, Mayor
Attest:
Joe Fischbach, City Clerk
City of Cottage Grove
Capital Improvements Plan
2016-2020
Introduction
The Capital Improvement Plan (CIP) is a planning device to schedule proposed public
improvements and purchases over a five-year period. The Plan matches proposed expenditures
and revenues by project within an affected fund. A capital improvement is defined as a capital
expenditure that is greater than $15,000 with a life expectancy of five years or longer. Capital
improvements are projects, which require acquisition, construction, or replacement of various
public facilities, public buildings, infrastructure, utilities and parks in the community.
Every effort has been made to draft the document as conservatively and realistically as possible
while maintaining the integrity of the funds. The concept of.fund integrity includes accounting for
certain project costs in particular designated funds that are only used for those purposes for which
they are collected. These major funding sources include the operating funds (the General Fund
and Enterprise Funds), the development fees and charges (including the Area and Park Trust
Funds), as well as identifying larger general projects that are expected to be financed with the
issuance of general obligation bonds to be repaid with future property tax levies.
This CIP shows a total capital investment of$20.2 million for 2016 of which $6 million is related
, to the 2016 Pavement Management/80th Street resurFacing project and $5 million is related to
infrastructure improvements related to development.
This document covers the period from 2016 to 2020, but we have included the 2015 projects from
last year's CIP for reference. If a project identified in last year's CIP as a 2015 project will not be
started in 2015, it has been reflected in 2016 or later.
The document is organized by the funding sources of the improvement project. Over the next
five years $108.1 million in projected improvements have been identified. Included in this $108.1
million is $24.7 million in levy supported debt. The remaining dollars come from other identified
sources. One additional component of the CIP is to identify projects beyond the five year period.
The majority of the projects identified as beyond 2020 will likely take the next 15 to 20 years to
complete and will inevitably change over the years as Council priorities change.
The 2014-2018 CIP reflected a significant change due to City Council revised prioritization of
projects. After a review of over 60 projects totaling $107 million, projects were classified as
"Mandatory" "High Priority" and "Desired". Further categorization included projects which were
development driven or reliant upon third party funding. At the end of the workshop, over $50
million in projects did not receive a priority designation. Many of these projects were shifted to
beyond 2018 while funding was concentrated on the shorter term: The 2016-2020 CIP continues
this prioritization.
2016-2020 CIP Introduction
�omparison of total funding by year to last years CIP
2016 2017 2018 2019 total16-18
2016-2020 CIP $ 20,183,269 $ 17,820,320 $ 24,747,950 $ 15,984,060 $ 78,735,599
2015-2019 CIP $ 13,288,550 $ 32,662,800 $ 12,546,000 $ 41,343,200 $ 99,840,550
Difference('15to'16) $ 6,894,719 $ (14,842,480) $ 12,201,950 $ (25,359,140) $ (21,104,951)
During the 2014-2015 budget process, the City Council identified their desire to find a funding
source for improvements to existing park properties as several of the improvement projects were
part of the failed 2012 Park Referendum. Council directed that revenues from the lease of water
tower space for cell phone antennas should be moved beginning in 2014 to a separate fund to
provide for the future renovation and replacement of existing parks and park equipment. These
lease revenues had previously been allocated to the Water Utility fund to support expenses of
water tower painting projects.
SummarY of Improvements
Sealcoating Fund (p. 66)
The sealcoating fund was created in 2007 to provide for the costs of sealcoating roads and trails
on a seven year cycle. The primary funding source for the projects in this fund is the franchise fee
collected by providers on monthly electric and natural gas utility bills.
In an agreement with Xcel Energy, franchise fee revenue in 2015 was be reduced as an offset to
funding necessary for undergrounding electrical service which was desired by the Council. This
revenue reduction is reflected in the fund analysis. The costs of the annual sealcoating program
will be scaled back to maintain fund integrity in those years. An increase in franchise fees to their
pre-agreement level was approved effective February 1, 2016.
Enterprise Funds
The projects included in the Enterprise Fund section are those projects, which would be paid for
from the Water, Sanitary Sewer and Storm Water Utility Funds. Each of the enterprise funds is
supported by user fees charged for the services provided by each fund.
Storm Water Utility (p. 67)
The Storm Water Utility Fund projects include various drainage improvements and
maintenance of the storm water utility system.
The Storm Water Utility Fund was initiated with the 2002 budget year. CIP projects identified
and prioritized by staff cannot exceed the financial constraints of the fund. The 2016 projects
identified include storm water improvements to be completed with the Pavement Management
Project and various storm water ponds improvements. Commitments of the fund for the next
five years are for various storm water activities throughout the City. A five percent increase
to the storm water fee occurred in 2014 and 2015; another five percent will occur in 2016
bringing the annual rate to $56 to support funding of these commitments.
Water Utilitv (p. 68)
The major water utility fund improvement in 2015-2016 was the repainting of two water towers
at a cost of $1.3 million. Further included in the fund are costs for pulling one well for
maintenance purposes each year at$70,000 and the utility portion of pavement management
projects, totaling $748,000 in the next 5 years.
2016-2020 CIP Introduction
The CIP also identifies a "Meter replacement program" which began in 2013 at a cost of
$225,000 per year for five years. This project involves replacement of all water meters in the
City which are over 20 years old and is being completed with contracted labor.
Sanitarv Sewer Utilitv (p. 69)
The sanitary sewer utility includes $1.5 million in projects to be completed in the next five
years, mostly projects completed along with pavement management projects.
Street Liqht Enterprise (p. 70)
The improvements scheduled for the Street Light Utility are traffic signals and system
improvements including the potential replacement of luminaries with LED fixtures and feed
point electrical work.
Park Improvement Capital Project Fund (p. 71)
In 2013, the City Council directed that revenues derived from the leasing of space on the City's
Water Towers/Reservoirs for Cell phone antennas should be allocated to the purpose of
renovation of existing parks and replacement of playground equipment. This revenue source will
fund a total of over$650,000 in park and playground renovations over the next five years.
Park Trust (p. 72)
Improvements scheduled in the Park Trust Fund include the purchase of additional parkland,
planning and development of parks and trails, and installing playground equipment in new parks.
Revenues coming into the Park Trust Fund have been calculated to reflect the anticipated housing
growth and a greater dedication of park land instead of park dedication fees. The goal is to
maintain a minimum year end cash balance of approximately $100,000. Projects will be delayed
if revenues are not available
Municipal Building Fund (p. 73)
This fund derives its revenue from accumulated transfers from the General Fund pursuant to the
Fund Balance policy, as well as several years of dedicated tax levy dollars.
Subsequent to the completion of the PS/CH construction project, needs assessments for
renovation of Fire Station #2 will be funded from this fund.
MSA Construction Fund (p. 74)
The construction of new streets and the rehabilitation of existing streets in the Pavement
Management Program as well as other street reconstruction projects make up the vast majority
of Capital Improvement Projects. Funding for these projects come from Municipal State Aid
(MSA), Developer Charges and Special Assessments.
Streets included on the "state aid" system are eligible to receive state aid for a portion of the
projects. The MSA annual construction allotment was $1.4 million in 2015; the model included in
this CIP anticipates no increase in these dedicated funds per year. The projecfis noted below and
in the CIP will depend on development, the timing of which will vary due to factors including the
economy and available land.
The projects identified with their anticipated MSA funding over the next 5 years include: �
2016-2020 CIP introduction
2016 95'h St Extension Street, reconstruction 928,000
2016 80th Street phase 1 Reclamation 1,100,000
2016 Hadle Avenue Street work-90th to 100th 3,015,000
2016 Jamaica Ave at 70'" Street work 950,000
2017 65th Street Street 2,400,000
2017 70'h & Hardwood Intersection 750,000
2018 80th Street Phase 2 Reclamation 390,000
2018 Ravine Parkwa , Phase 3&4 Street, Upper Ravine 4,000,000
2018 70th & Hardwood Safet 1,000,000
2018 Brid e maintenance Brid e maintenance 100,000
2019 E Pt Douglas to CSAH 19 Phase 2 Cottage View 303,000
2020 CSAH 19 and TH 61 Bridge/Overpass improvement 4,000,000
2020 Ravine Parkwa Phase 5 Street Upper Ravine 1,000,000
2020 80th Street Phase 3 Reclamation 650,000
Total $20,586,000
Pavement Management Fund (p.75)
Pavement Management Projects are reflected in this listing. The summary sheet identifies other
funding sources when available, but for most projects it will be necessary to issue debt to be
repaid with a property tax levy to finance the project. The continuation of the pavement
management program includes assessments for a portion of each project which would also be
used to repay the debt.
The Pavement Management projects included in the next five years total $8.6 million, of which
$3.6 million would be assessed to benefiting property owners and $7.3 million would be bonded.
Future property taxes levies would repay these bonds.
Fundin
Location Total Assessments Debt Other
2016 D2-Hadley, W of
Harkness, F3, F5 4,464,300 1,781,000 3,675,500 788,800
2017 B1, F3-Jamaica Ridge,
80t"place&Sandy Hills
5 2,013,300 906,000 1,754,300 259,000
2019 F5-Pine
Meadows1,3,4,5 &
Sandy Hills 7,8 2,147,000 966,300 1,870,800 276,200
8,624,600 3,653,300 7,300,600 1,324,000
Area Funds
The Water, Storm Sewer and Sanitary Sewer Area Funds are capital project funds that provide
the resources to construct general infrastructure. Projects totaling $2.5 million are expected to
be funded from the area funds over the next 5 years. The funding sources for these funds are
area charges against developing properties. The area charges are based on rates established
by the City Council. Before these projects can be completed, the funds available in each of the
area funds need to be considered. It may be necessary to postpone projects if the revenue
sources are not available to complete the project.
2016-2020 CIP Introduction
Water Area Fund (p. 76)
The largest project in the water area fund for the next five years is an additional well for$1.5
million. A number of projects have been postponed from prior years because of the slowdown
the construction industry. For example, a water supply and distribution plan was completed
in January 2006 that indicated thafi the East Ravine water tower would be needed in 2010,
based on development trends at that time. However, based on the reduction in new
construction activity this tower has been postponed until 2019. If resources are not available
in the fund to complete the projects identified in the water supply and distribution plan then
bonding may need to be considered. A new water treatment plant has been included in the
_ post 2020 projects for$15 million. The construction of the water treatment plant will likely be
funded with a combination of utility revenue bonds and area fund monies when the need
arises.
Sanitary Sewer Area Fund (p. 77)
The projects identified for the Sewer Area Fund will have adequate funding through 2018
based upon conservative estimates and current rates. Bonds were issued for the construction
of the trunk sewer line in the Upper Ravine District of the East Ravine that was completed in
late 2007. The bonds will be repaid by the area charges collected as the Upper Ravine District
is developed. The bond payments are included in the debt service column. Additional projects
may be identified for this fund as future needs arise.
Storm Water Area Fund (p, 78)
There are no projects identified in the Storm Water Area Fund from 2016-2020. However, if
the projects identified are part of larger project (i.e. if they are part of a street reconstruction
project) and the larger project is moved up it may be necessary to issue debt to finance and
complete the project. The debt would then be repaid with future storm water area charges or
storm water utility charges. There is an additional $20.7 million of projects identified beyond
2020.
Debt Schedule (p. 80)
The included debt projection schedule anticipates issuing levy-related debt primarily to fund the
pavement management program. Typically, with a pavement management project, special
assessments against benefiting properties cover a portion of the cost (the CIP uses an
assessment estimate of 45% as recommended by the IMTF task force) and the remainder of the
construction cost is then paid through a property tax debt levy or from the utility funds:
Pavement management related debt is matched to the assessment term, which is 15 years. The
debt schedule provided includes the current levy amounts for all bonds issued to date and
includes estimated levies for the pavement management projects currently identified
Tax Capacity 2012 2013 2014 2015 2016
Actual tax Base $ 24,496,075 $ 22,684,800 $ 23,990,640 $ 27,165,777 $ 27,981,000
%Challge -8.1% -7.4% 5.8% 13.2% 3.0%
The City's target for bonded debt as a percentage of total market value is at 0.81% which is the
Median for AA1 Cities. For 2016, that percentage will be 0.78%.
2016-2020 CIP Introduction
Conclusion
City staff has prepared this document in conjunction with those projects and capital items that are
known and for which costs can be reasonably estimated. The CIP should be considered a
planning tool and the projects included for 2016 and 2017 serve as a work plan for staff. This
"work plan" means that these are the projects that staff will bring to Council for authorization
before proceeding with a feasibility study, acquisition, or construction. All projects detailed in this
document will be included in their respective budgets if the need is established at that time.
City of Cottage Grove,MN
Capital Improvement Plan 2016-2020
PROJECTS BY PROGRAM CATEGORY
PROGRAM CATEGORY 2015 2016 2017 2018 2019 2020
General Public Buildings
HERO Center 2,920,000 16,880,000
Fire Station#2 10,000 450,000 9,000,000
General Public Buildings total 10,000 3,370,000 9,000,000 16,880,000 - -
Parks&Recreation Facilities
Matching grant funds 10,000 10,000 10,000 10,000 10,000 10,000
Public Landscape initiative 50,000 55,000 50,000 50,000 50,000 50,000
Volunteer tree planting 5,000 5,000 5,000 5,000 5,000 5,000
Hamlet Park-Develop Park&skateboard repair 220,000 188,000 10,000 10,000 10,000 10,000
Hamlet Park North Enhancement 225,000
Granada Park-Remove tennis courts,regrade,trail 50,000
Park properties-Surveying&installation of posts 20,000 17,000
Cedarhurst meadows park development 100,000 100,000
Arbor Meadows-install irrigation&playground 20,000 40,000
Kingston Park-playground remodel 100,000
Pine Glen&Old Cottage Grove Parks-Play equipment 70,000
Pine Tree Valley Park-Play equipment 50,000
Woodridge Park-Park building 285,000
Oakwood park-entrance and parking lot 360,000
Parks-design&planning 15,000 15,000 15,000 15,000 15,000 15,000
Michaels Pointe Park(Ryland plat) � 400,000
"Old Cottage Grove Park"ice rink boards replacement 17,000
Ravine Parkway Park 400,000
Inclusive playground 750,000
Camel's Hump Park-develop&trails 470,000
Swanlund Park 500,000
Parks&Recreation Facilities 1,175,000 920,000 840,000 385,000 1,447,000 140,000
Public Utilities Facilities
Spot replacemenUslip lining-Sewer 50,000 50,000 50,000 50,000 350,000 50,000
System improvements-Streetiights 100,000 100,000 100,000 100,000 100,000 100,000
Storm water maintenance 250,000 250,000 250,000 250,000 250,000 250,000
Swanlund utilities 20,000 20,000 20,000 20,000 20,000
Upper Ravine district infrastructure 50,000 50,000 100,000 100,000 100,000 500,000
Water Meter Replacement project 206,250 206,250 225,000
Puil weil-annual maintenance 70,000 70,000 70,000 70,000 70,000 70,000
Bridge Maintenance 100,000
Repaint interior&exterior of Water tower 730,000
Well#12 150,000 1,500,000
Public Utilities Facilities total 1,456,250 746,250 815,000 840,000 2,390,000 990,000
City of Cottage Grove,MN
Capital Improvement Plan 2016-2020
PROJECTS BY PROGRAM CATEGORY
PROGRAM CATEGORY 2015 2016 2017 2018 2019 2020
Street&Road Improvement Projects
95th Street E�ension 1,263,200
Hadley Avenue street work 90th-100th 3,475,800
Jamaica Ave-70th to Military with roundabout 3,800,000
Everwood 4th&73rd to 70th
Hemingway N of 95th 303,784
E Pt Douglas/Ravine Pkwy to CSAH 19 8,000,000
80th Street(CSAH19 to TH 61)Reconstruction 1,590,733 1,892,950 3,520,600
CSAH 19 and TH 61 22,900,000
CSAH 19&E Pt Douglas intersection safety improvements 600,000
Jamaica&95th Traffic control 250,000
70th Street(in three phases) 750,000 1,000,000
65th Street 3,200,000
Ravine parkway Phase 3,4,5 4,000,000 1,000,000
PM 2015-F2,90th St,Grey Cloud 6,433,000
PM 2016-D2,F3,F5 4,464,286
PM 2017-F3,B1,C3 2,013,320
PM 2019-E1a 2,147,060
Sealcoating projects 388,100 553,000 602,000 750,000 750,000 750,000
Road&Street Improvement projects total 7,124,884 15,147,019 7,165,320 6,642,950 12,147,060 28,170,600
GRAND TOTAL $ 9,766,134 $ 20,183,269 $ 17,820,320 $ 24,747,950 $ 15,984,060 $ 29,300,600
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
FACILITIES AND PARK PROJECTS
Funding Sources 2016 2017 2018 2019 2020
Tax Levy $ - $ - $ - $ - $ _
Bonded Debt $ 360,000 $ 9,000,000 $ 3,540,000 $ - $ -
State/Other Government Units $ 2,920,000 $ - $ 13,340,000 $ - $ -
Park Improvement fund $ 385,000 $ 20,000 $ 90,000 $ 77,000 $ 70,000
Park Trust Fund $ 115,000 $ 365,000 $ 240,000 $ 1,315,000 $ 15,000
Landscape Initiative $ 60,000 $ 55,000 $ 55,000 $ 55,000 $ 55,000
Municipal Building Fund $ 450,000 $ - $ - $ - $ -
Other: $ - $ 400,000 $ - $ - $ -
TOTAL 4,290,000 9,840,000 17,265,000 1,447,000 140,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements 1,160,000 - - - -
Engineering/Architect 2,242,000 15,000 15,000 15,000 15,000
' Admin/Legal - - - - _
Construction 808,000 9,750,000 17,175,000 1,357,000 50,000
Maintenance 10,000 10,000 10,000 10,000 10,000
Other 70,000 65,000 65,000 65,000 65,000
TOTAL 4,290,000 9,840,000 17,265,000 1,447,000 140,000
Project Balance $ - $ - $ . $ . $ _
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Titie Project Description
HERO Center This project is a joint effort between the City of Cottage Grove, Inver Hills Community College,
Regions Hospital and City of Woodbury. Initial funding for planning was approved by the State
Department Legislature in 2014.
Facilities
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt 3,540,000
State/Other Government Units 2,920,000 13,340,000
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal Building fund
Other:
TOTAL 2,920,000 - 16,880,000 - -
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements 1,160,000
Engineering/Architect 1,760,000
Admin/Legal
Construction 16,880,000
Maintenance
Other
TOTAL 2,920,000 - 16,880,000 - -
Project Balance $ - $ - $ - $ - $ .
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Fire Station#2 Reconstruction/Remodeling of Fire Station#2.
Department
Facilities
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt 9,000,000
State/Other Government Units
Park Improvement fund
Park Trusf Fund
Landscape Initiative
Municipal Building 450,000
Other:
TOTAL 450,000 9,000,000 0 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect 450,000
Admin/Legal
Construction 9,000,000
Maintenance
Other
TOTAL 450,000 9,000,000 0 0 0
Project Balance $ - $ - $ - $ - $ .
,
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description �
Public Landsca e initiative 2016-Arbor Meadows&West Point Douglas Road
2017-Pine Tree Valley/Pine Tree Parks&90th Street
Department 2018-CG Traiiway Corridor&Jamaica 100th to Triangle park
Parks 2019-Hinton Ave, 70th to Woodbury border&Oakwood Park
2020-Hardwood Ave btwn 70th&80th&Public Facilities
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative 60,000 55,000 55,000 55,000 55,000
Municipal Building
Other:
TOTAL 60,000 55,000 55,000 55,000 55,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other 60,000 55,000 55,000 55,000 55,000
TOTAL 60,000 55,000 55,000 55,000 55,000
Project Balance $ - $ - $ - � - � -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Park Desi n and Piannin Funding for design and planning of parks as development occurs.
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 15,000 15,000 15,000 15,000 15,000
Landscape Initiative
Municipal Buiiding
Other:
TOTAL 15,000 15,000 15,000 15,000 15,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect 15,000 15,000 15,000 15,000 15,000
Admin/Legal
Construction
Maintenance
Other
TOTAL 15,000 15,000 15,000 15,000 15,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Matchin Funds Pro ram Funds used to match donations from outside organizations on specific park projects
Departrnent
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 10,000 10,000 10,000 10,000 10,000
Park Trust Fund
Landscape Initiatiue
Municipal Building
Other:
TOTAL 10,000 10,000 10,000 10,000 10,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Eng ineering/Architect
Admin/Legal
Construction
Maintenance
Other 10,000 10,000 10,000 10,000 10,000
TOTAL 10,000 10,000 10,000 10,000 10,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Park survey&post instailation Phase V of surveying and installing park identification posts.
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 17,000
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL 17,000 - - - -
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect 17,000
Admin/Legal
Construction
Maintenance -
Other
TOTAL 17,000 - - - _
Project Balance $ - $ - $ . $ _ $ .
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Titie Project Description
Oakwood Park Re-align parking lot entrance and regrade/replace parking lot
(in conjunction with development of the hotel site N of Ruby Tuesday)
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt 360,000
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL 360,000 0 0 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 360,000
Maintenance
Other
TOTAL 360,000 0 0 0 0
Project Balance � - $ - $ - � ' � '
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CA_PITAL IMPROVEMENT PROGRAM
Project Title Project Description
Hamlet Park 2016-Park development&skateboard repair
2017-Regrade football/soccer fields&skatepark improvements
2018-North park enhancement&skatepark improvements
Department 2019-skatepark improvements
Parks- 2020-skate ark im rovements
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 188,000 10,000 10,000 10,000 10,000
Park Trust Fund 225,000
Landscape Initiative
Municipal building
Other:
TOTAL 188,000 10,000 235,000 10,000 10,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 178,000 225,000
Maintenance 10,000 10,000 10,000 10,000 10,000
Other
TOTAL 188,000 10,000 235,000 10,000 10,000
Project Balance ' $ - $ . $ _ $ . $ _
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPI7AL IMPROVEMENT PROGRAM
Project Title Project Description
Arbor Meadows 2016-install irrigation
2019-playground(with Pavement Management)
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park improvement fund 20,000 40,000
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL 20,000 0 0 40,000 0
ProjectExpenses 2016 , 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 20,000 40,000
Maintenance
Other
TOTAL 20,000 0 0 40,000 0
Project Balance $ - � - � - � ' � "
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project description
Granada Park Remove tennis courts, re-grade field, install trail, bocce bail ct.
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 50,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 50,000 0 0 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 50,000
Maintenance
Other
TOTAL 50,000 0 0 0 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Replace Playground
equipment 2016 Kingston Park
2018-Pine glen&Old Cottage Grove Parks
Department 2020-Pinetree Valley Park
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Uni#s
Park Improvement fund 100,000 70,000 50,000
Park Trust Fund
Landscape Initiative
Municipal buifding
Other:
TOTAL 100,000 0 70,000 0 50,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
E ng i neeri ng/Arch itect
Admin/Legal
Construction 100,000 70,000 50,000
Maintenance
Other
TOTAL 100,000 0 70,000 0 50,000
Project Balance $ - $ - � - � - � -
.
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Inclusive Playground Develop and Construct'Inclusive'playground:designed for accessibility
by all children-special needs and those with physical and cognitive disabilities.
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units �
Park Improvement fund
Park Trust Fund 350,000
Landscape Initiative
Municipal Building
Other: Donations 400,000
TOTAL 0 750,000 0 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 750,000
Maintenance
Other
TOTAL 0 750,000 0 0 0
Project Balance $ - $ - $ - $ - $ .
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Michaels Point Park Construction of park as part of Michaels Point residential development
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 400,000
Landscape Initiative
Municipal building
Other:
TOTAL - - - 400,000 -
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 400,000
Maintenance
Other
TOTAL - - - 400,000 -
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
' 5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Titie Project Description
Replace ice rink boards in"Old Cottage Grove"park
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 17,000
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL 0 0 0 17,000 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 17,000 .
Maintenance
Other
TOTAL 0 0 0 17,000 0
Project Balance $ - $ - $ - $ - $ _
�
CITY OF COTTAGE GROVE
� 5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Ravine Parkway Park develop and construct park
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 400,000
Landscape Initiative
Municipal Building
Other:
TOTAL 0 0 0 400,000 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Eng i neeri n g/Arch itect
Admin/Legal
Construction 400,000
Maintenance
Other
TOTAL 0 0 0 400,000 0
Project Balance $ - $ - � - � - � -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Swanland Park Construction of park in Swanland property development
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 500,000
Landscape Initiative
Municipal Building fund
Other:
TOTAL 0 0 0 500,000 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 500,000
Maintenance
Other '
TOTAL 0 0 0 500,000 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project description
Cedarhurst Meadows Park Complete development of the western side of Cedarhurst Meadows Park
(Cayden Glen)
Department
Parks
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 100,000
Landscape Initiative
Municipal builiding
Other:
TOTAL 100,000 0 0 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering/Architect
Admin/Legal
Construction 100,000
Maintenance
Other
TOTAL 100,000 0 0 0 0
Project Balance $ - $ - S - � ' � '
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM �
ALL TRANSPORTATION AND PUBLIC WORKS PROJECTS
Funding Sources 2016 2017 2018 2019 2020
Tax Levy $ - $ - $ - $ - $ -
Bonded Debt $ 3,826,304 $ 2,554,280 $ 1,259,400 $ 2,780,815 $ 2,417,600
State of Minnesota/MSA $ 5,992,109 $ 3,150,000 $ 4,490,000 $ 1,303,000 $ 5,650,000
Washington County $ 1,600,000 $ 350,000 $ - $ 641,000 $ 8,150,000
FederallGrant Funding $ - $ - $ - $ - $ 10,033,000
Area funds $ 140,000 $ 100,000 $ 250,000 $ 1,600,000 $ b00,000
Utilityfunds $ 2,166,431 $ 954,040 $ 713,550 $ 1,566,245 $ 923,000
Assessments/Developerfees $ 1,595,426 $ 250,000 $ - $ 5,876,000 $ 717,000
Other: $ 553,000 $ 602,000 $ 750,000 $ 750,000 $ 750,000
TOTAL 15,873,270 7,960,320 7,462,950 14,517,060 29,140,600
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easemenfs/Utility Relocat $ - $ - $ 150,000 $ - $ 500,000
Engineering/Archifect $ 2,704,705 $ 352,330 $ 370,000 $ 377,810 $ 616,130
Admin/Legal $ 287,382 $ 79,095 $ 40,360 $ 84,250 $ 138,300
Construction $ 11,994,933 $ 6,743,895 $ 6,322,590 $ 13,185,000 $ 27,316,170
Maintenance $ 886,250 $ 785,000 $ 580,000 $ 870,000 $ 570,000
Other $ - $ - $ - $ - $ -
TOTAL 15,873,270 7,960,320 7,462,950 14,517,060 29,140,600
Project Balance $ - $ 0 $ - $ - $ _
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGf�AM
Project Title Project Description
Sealcoatin The annual seal coating program was initiated in 1994 and is implemented in a seven year cycle.
Assigned areas are seal coated each year-new streets iwo to three years after final
bituminous wear surtace has been placed and after their first sealcoating on a seven year
Department rotation. New streets within developments are incorporated into the plan as they are added to the
Public Works system.The purpose of sealcoating is to improve the quality and extend the life of City streets.
Seal coating delays the need for costly street reconstruction or other corrective work for which a
portion of the costs are assessed to the adjacent property owners.
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessments/Developer fees
Other:sealcoat fund 553,000 602,000. 750,000 750,000 750,000
TOTAL 553,000 602,000 750,000 750,000 750,000
Project Expenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal 43,000
Sealcoating Contract/Rock 300,000 512,000 640,000 650,000 650,000
Maintenance 210,000 90,000 110,000 100,000 100,000
Other
TOTAL 553,000 602,000 750,000 750,000 750,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Pavement Mana ement 2016-D2,F3,F5(S of Pinehili Elementary,N of 95th,E of Hadley,W of and including Harkness)
2017-F3,B1
Department 2018-See 80th Street Project
Public Works 2019-E1 a,F5
2020-See 80th Street Project
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt 3,675,502 1,754,280 1,870,815
State of Minnesota/MSA
Washington County '
Federal/Grant Funding
Area funds
Utility funds 788,784 259,040 276,245
Assessments/Developer fees
Other:
TOTAL 4,464,286 2,013,320 0 2,147,060 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering 964,858 352,330 377,810
Admin/Legal 183,782 79,095 84,250
Construction 3,315,646 1,581,895 1,685,000
Machinery&equipment
Other
TOTAL 4,464,286 2,013,320 0 2,147,060 0
Project Balance $ - $ 0 $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
95th St Extension-Phase I Construction of three lane section from Hadley Avenue to Mississippi Dunes Blvd
Inlcudes 50%of the cost of construction of a roundabout at 95th and Hadley
Developer fees,although reflected in 2016,will be collected as phases of the development are built out.
Department (assume an 8 year build out)
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA 928,007
Washington County
Federal/Grant Funding
Area funds
Utility funds
AssessmenUDeveloperFees 335,193 ,
Other:
TOTAL 1,263,200 - - - -
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering 378,960
Admin/Legal
Construction 884,240
Machinery&equipment
Other
TOTAL 1 263,200 - - - -
Project Balance $ - $ - � - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM '
Project Title Reconsfruction of Hadley Avenue from 100th Street to 90fh Street, inlcudes LED
Hadley Avenue-90th to 100th streetlights&stormwater improvements. Also inciudes the cost of construction of a
mini roundabout at 90th&Hadley and 50%of the cost of construction of a
roundabout at 95th and Hadley
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
7ax Levy
Bonded Debt
State of Minnesota/MSA 3,015,567� '
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees 460,233
Other:
TOTAL 3,475,800 0 0 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering 1,042,740
Admin/Legaf
Construction 2,433,060
maintenance
Other
TOTAL 3,475,800 0 0 0 0
Project Balance $ - $ - $ - $ - $ -
r
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Jamaica Avenue(70th to
Military) Upgrade to MSA roadway to accommodate development. Once completed,roadway
will be turned back to Washington County.
Department Project includes construction of roundabout at Jamaica and 70th, upgraded streetlighfs and
Public Works reconstruction of Jamaica from Indian Bivd to 70th street
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA 950,000
Washington County 1,600,000
Federal/Grant Funding
Area funds 90,000
Utility funds 360,000
Assessments/Developerfees 800,000
Other:
TOTAL 3,800,000 - - - -
Project Expenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 3,800,000
Machinery&equipment
Other
TOTAL 3,800,000 - - - -
Project Balance $ - $ - $ - $ - � -
�
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
SOth Street Reconstruction 80th Sfreet reconsfruction from Hwy 61 to Keats Avenue
*2016-Jamaica to Ideal
Department *2018-Keats to Jamaica
Public Works *2020-Ideal to Hwy 61
Funding Sources 2016 �2017 2018 2019 2020
Tax Levy
Bonded Debt 150,802 1,259,400 2,417,600
State of Minnesota/MSA 1,098,535 390,000 650,000
Washington County .
Federal/Grant Funding
Area funds
Utility funds 341,397 243,550 453,000
Assessment/Developer Fees
Other:
TOTAL 1,590,734 0 1,892,950 0 3,520,600
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements•
Engineering 318,147 370,000 616,130
Admin/Legal 60,600 40,360 138,300
Construction 1,211,987 1,482,590 2,766,170
Machinery&equipment
Other
TOTAL 1,590,734 0 1,892,950 0 3,520 600
Project Balance $ - $ _ $ _ $ _ $ _
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM '
Project Title Project Description
Ravine Parkwa
2018-Phase3&4 Construciton-McHattie/V1lolterstorFf
2020-Phase 5 Construction Gobel(divided section)
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA 4,000,000 � 1,000,000
� Washington County
Federal/Grant Funding
Area funds
Utilify funds
Assessment/Developer Fees
Other:
TOTAL 0 0 4,000,000 0 1,000,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 4,000,000 1,000,000
Machinery&equipment
Other
TOTAL 0 0 4,000,000 0 1,000,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Upper Ravine District
Infrastructure Develo ment As residentiai development occurs in the East Ravine,various infrastructure will be
constructed to support the new housing. This infrastructure will be paid for by
Department developers either through City financed construction supported by assessments
Public Works or by Developer constructed of same.
2020-Land will need to be ac uired in the East Ravine for construction of a new water tower
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 50,000 100,000 100,000 100,000 500,000
Utility funds
AssessmentslDeveloper funds
Other:
TOTAL 50,000 100 000 100,000 100,000 500,000
ProjectExpenses 2076 2017 2018 2019 2020
Land/Easements 500,000
Engineering
Admin/Legal
Construction 50,000 100,000 100,000 100,000
Machinery&equipment
Other
TOTAL 50,000 100,000 100,000 100,000 500,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Water meter replacement
project Replacement of 1500 water meters per year at a cost of$135 per meter.
First year of Project was 2013. Contracted services(labor and meters)
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Areafunds
Utility funds 206,250 225,000
Assessment/Developer Fees
Other:
TOTAL 206 250 225,000 0 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction
Machinery&equipment 206,250 225,000
Other
TOTAL 206,250 225,000 0 0 0
Project Balance $ - S - $ - $ - � -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
CSAH 19 and TH 61 Reconstruction/realignment of bridge/overpass over highway 61 at County Rd 19(Innovation Road)
Project includes extension of West Point Douglas Road, Extension of 100th Street, reconstruction
Department of West Point Douglas from Belden to Jamaica and a potential slip lane.
Public Works 2017-Intersection control at County Rd 19 and East Point Douglas Road.
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA 4,000,000
Washington County 350,000 8,150,000
Federal/Grant Funding 10,033,000
Area funds
Utility funds
Assessment/Developer Fees 250,000 717,000
Other:
TOTAL 0 600 000 0 0 22,900 000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 600,000 22,900,000
Machinery&equipment
Other
TOTAL 0 600,000 0 0 22,900 000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
East Point Douglas Road-
Ravine Parkway to CR 19 Construction of roadway and infrastructure to support Phase II of the CottageView
retail/commercial development. Project would include reroute of frontage road
to a new access point off of County Road 19 with appropriate traffic signal.
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt 910,OOQ
State of Minnesota/MSA 303,000
Washington County 516,000
Federal/Grant Funding
Area funds
Utility funds 395,000
AssessmenUDeveloper Fees 5,876,000
Other:
TOTAL - - - 8,000,000 -
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 8,000,000
Machinery&equipment
Other
TOTAL - - - 8,000,000 -
Project Balance $ - $ - $ - � - S -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Annual well maintenance Each year a weil is'pulled'for inspection and repair of the pump and other
vital parts.
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
� Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federai/Grant Funding
Areafunds
Utility funds 70,000 70,000 70,000 70,000 70,000
Assessment/Developer Fees
Other:
TOTAL 70,000 70,000 70 000 70 000 70,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction
Maintenance 70,000 70,000 70,000 70,000 70,000
Other
TOTAL 70,000 70,000 70 000 70 000 70,000
Project ealance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Annual sewer line
maintenance/spot sliplining 2019-Repairs to sewer line due to suifuric gas pipe degredation in West Central
Ravine
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 50,000 50,000 50,000 350,000 50,000
Assessment/Developer Fees
Other:
TOTAL 50,000 50,000 50,000 350,000 50,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction
Maintenance 50,000 50,000 50,000 350,000 50,000
Other
TOTAL 50,000 50,000 50,000 350,000 50,000
Project Balance $ - $ - $ - $ - � -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Streetlight system improvements
Department
Pubiic Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Areafunds
Utility funds 100,000 100,000 100,000 100,000 100,000
Assessment/Developer Fees
Other:
TOTAL 100,000 100,000 100,000 100,000 100,000
ProjectExpenses 2016 2017 2018 2099 2020
Land/Easements
Engineering
Admin/Legal
Construction
Maintenance 100,000 100,000 100,000 100,000 100,000
Other
TOTAL 100,000 100,000 100,000 100,000 100,000
Project Baiance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
construct Well#12
Department
Public works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 150,000 1,500,000
Utility funds
Assessment/Developer Fees
Other:
TOTAL 0 0 150,000 1,500,000 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements 150,000
Engineering
Admin/Legal
Construction 1,500,000
maintenance
Other
TOTAL 0 0 150,000 1,500,000 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Stormwater maintenance
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 250,000 250,000 250,000 250,000 250,000
AssessmentlDeveloper Fees
Other:
TOTAL 250,000 250,000 250,000 250,000 250,000
ProjectExpenses 2016 2017 2018 2019 2020
LandlEasements
Engineering
Admin/Legal
Construction
maintenance 250,000 250,000 250,000 250,000 250,000
Other
TOTAL 250 000 250,000 250,000 250,000 250,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Swanlund Utilities Trunk water to Minnesota Pipeline Facility
Trunk Sanitary from Hamiet Park to Swanlund Property
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 20,000 20,000 20,000 20,000 20,000
Utility funds
AssessmenUDeveloper Fees
Other:
TOTAL 20,000 20,000 20,000 20,000 20,000
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 20,000 20,000 20,000 20,000 20,000
maintenance
Other
TOTAL 20,000 20,000 20,000 20,000 20,000
Project Balance $ - $ - $ - � - � -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Bridge Maintenance Spot painting,guardrail upgrades,wingwall&abutment repairs
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA 100,000
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees
Other:
TOTAL 0 0 100,000 0 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 100,000
maintenance
Other
TOTAL 0 0 100 000 0 0
Project Balance $ - $ - $ - $ - $ _
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
70th Street 2017-Phase I TH 61 to Hinton Ave
2019-Phase II Hinton Ave to Jamaica Ave
2021 -Phase III CSAH 19 to TH 95
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of Minnesota/MSA 750,000 1,000,000
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees
Other:
TOTAL 0 750 000 0 1,000,000 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 750,000 1,000,000
maintenance
Other
TOTAL 0 750 000 0 1,000,000 0
Project Balance $ - $ - � � � " $ "
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
65th St Infrastructure improvements due to the construction of a Middle School at 65th and
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt 800,000
State of Minnesota/MSA 2,400,000
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees
Other:
TOTAL - 3,200,000 - - -
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
Admin/Legal
Construction 3,200,000
Machinery&equipment
Other
TOTAL - 3,200,000 - - -
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IIVIPROVEMENT BUDGET
2016-2020 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Traffic si nal Jamaica&95th
Department
Public Works
Funding Sources 2016 2017 2018 2019 2020
Tax Levy
Bonded Debt
State of IVlinnesota/MSA
Washington County 125,000
Federal/Grant Funding
Area funds
Utility funds 125,000
Assessments/Developer fees
Other:
TOTAL 0 0 0 250,000 0
ProjectExpenses 2016 2017 2018 2019 2020
Land/Easements
Engineering
AdminlLegal
Construction 250,000
Machinery&equipment
Other
TOTAL o 0 0 250,000 0
Project Balance $ - $ - $ - S - $ -
City of Cottage Grove
CIP 2016-2020
Funding Summary by Year
2015 2016 2017 2018 2019 2020 Total'16 to'20 Post 2020 Total All
Funding Source
Park Improvement 525,000 385,000 30,000 90,000 77,000 70,000 652,000 4,508,000 5,160,000
Public Landscape Initiative 55,000 60,000 55,000 55,000 55,000 55,000 280,000 895,000 1,175,000
ParkTrust 33,831 475,000 365,000 240,000 1,315,000 15,000 2,410,000 8,796,000 11,206,000
Donations-Playground - - 400,000 - - - 400,000 - ' 400,000
Sealcoating Fund 388,100 553,000 602,000 750,000 750,000 750,000 3,405,000 970,450 4,375,450
Municipal Building/Debt 10,000 450,000 9,000,000 3,540,000 - - 12,990,000 5,000,000 17,990,000
Assessments 1,790,719 797,931 250,000 - - - 1,047,931 13,384,917 14,432,848
MSA 1,615,402 5,992,109 3,150,000 4,490,000 1,303,000 5,650,000 20,585,109 2,400,000 22,985,109
PM/Streets Bonds 5,870,154 3,186,304 2,059,200 1,259,400 2,810,088 2,417,600 11,732,592 16,359,342 28,091,934
DeveloperAsmts/Fees 1,699,210 2,030,426 250,000 - 5,876,000 717,000 8,873,426 11,066,500 19,939,926
Other Governments - 4,520,000 350,000 13,340,000 641,000 18,183,000 37,034,000 2,900,000 39,934,000
Utility-Storm Wtr 463,871 591,905 327,060 322,454 332,179 384,751 1,958,349 1,689,865 3,648,214
Utility-Street Lights 297,026 351,168 130,210 128,404 132,216 100,000 841,998 1,138,275 1,980,273
Utility-Sewer 256,475 308,629 303,627 210,168 500,325 164,874 1,487,623 2,032,446 3,520,069
Utility-Water 1,113,191 411,797 428,223 155,226 572,252 273,375 1,840,873 1,058,888 2,899,761
Area-Water 103,600 60,000 110,000 260,000 1,610,000 500,000 2,540,000 23,925,000 26,465,000
Area-Sewer 10,000 10,000 10,000 10,000 10,000 - 40,000 - 40,000
Area-Storm Wtr 240,000 - - - - - - 20,710,000 20,710,000
' Unidentified - - - - 17,680,667 17,680,667
14,471,579 20,183,269 17,820,320 24,850,652 15,984,060 29,280,600 108,118,901 134,515,350 242,634,251
City of Cottage Grove,MN
Capital Improvement Plan 2016-2020
Sealcoating Fund
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Aggregate tax $ 26,135 $ 26,236 $ 28,000 $ 28,000 $ 28,000 $ 28,000 $ 28,000 $ 28,000
Franchise fees 540,767 542,689 360,100 525,000 574,000 635,000 635,000 635,000
Investment Interest (3,306) 3,746 - - - - -
Charges for services 86,903 270,928 - - - - -
Developer charges 27,286 37,381 - - - - -
Total Revenue 677,785 880,980 388,100 553,000 602,000 663,000 663,000 663,000
EXPENDITURES
Commodities -
Contractual services 735,240 741,512 388,100 553,000 602,000 750,000 750,000 750,000
Total Expenditures 735,240 741,512 388,100 553,000 602,000 750,000 750,000 750,000
Other Financing Sources(uses)
Total transfers - - - - - _ _ _
Increase(decrease) in fund balance (57,455) 139,468 - - - (87,000) (87,000) (87,000
)
Balance beginning ofyear 371,061 313,606 453,074 453,074 453,074 453,074 366,074 279,074
Balance end of year 313,606 453,074 453,074 453,074 453,074 366,074 279,074 192,074
G oal 150,000 150,000 150,000 150,000 150,000 150,000 150,000 150,000
City of Cottage Grove,MN
Capital Improvement Plan 2016-2020
Stormwater utility Fund
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
ChargesforServices $ 649,343 $ 684,119 $ 712,650 $ 750,400 $ 787,920 $ 827,316 $ 868,682 $ 912,116
Intergovernmental-Counfy/State 49,461 47,437
Interest (1,736) 1,693 1,000 1,000 1,000 1,000 1,000 1,000
Miscellaneous
Total Revenue 697,068 733,249 713,650 751,400 788,920 828,316 869,682 913,116
EXPENDITURES
Operating expenses 659,580 449,936 329,195 338,905 356,572 367,269 378,287 389,636
Pavement Management 70,186 68,050 213,871 341,905 77,060 72,454 82,179 134,751
Annual maintenance projects 178,353 250,000 250,000 250,000 250,000 250,000 250,000
Total Expenditures 729,766 696,339 793,066 930,810 683,632 689,723 710,466 774,387
OTHER FINANCING SOURCES(USES)
Transfers in
Transfers out (35,020) (35 020) (35 020) (35 020) (35 020) (35 020) (35 020)
Totai othersources - (35,020) (35,020) (35,020) (35,020) (35,020) (35,020) (35,020)
Increase(decrease)in fund balance (32,698) 1,890 (114,436) (214,430) 70,268 103,573 124,195 103,709
Beginning balance 186,772 154,074 155 964 41 528 (172 902) (102 634) 939 125 134
Ending balance 154,074 155,964 41 528 (172 902) (102 634) 939 125 134 228 843
Goal 400,000 400,000 400,000 400,000 400,000 400,000 400,000 400,000
City of Cottage Grove,MN
Capital Improvement Plan 2076-2020
Water utility Fund
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Charges for Services $ 1,932,646 $ 1,827,571 $ 2,185,950 $ 2,185,950 $ 2,015,450 $ 2,015,450 $ 2,015,450 $ 2,015,450
Intergovernmental-County/State
Lease revenue 408,740 - - - - - - _
Interest (17,130) 68,571 70,000 70,000 70,000 70,000 70,000 70,000
Misceilaneous 28,184 41,371 12,000 12,000
Total Revenue 2,352,440 1,937,513 2,267,950 2,267,950 2,085,450 2,085,450 2,085,450 2,085,450
EXPENDITURES
Operating expenses 1,376,664 1,351,095 1,567,230 1,598,575 1,630,546 1,663,157 1,696,420 1,730,349
Water meter replacement project 279,219 194,364 206,250 206,250 225,000
Well maintenance 29,033 70,000 70,000 70,000 70,000 70,000 70,000
Water tower painting 605,000 730,000
Pavement management 47,210 106,941 135,547 133,223 85,226 190,252 203,375
East Point Douglas phase II 312,000
Total Expenditures 1,684,916 2,197,669 2,680,421 2,010,372 2,058,769 1,818,383 2,268,672 2,003,724
OTHER FINANCING SOURCES(USES)
Debtservice (263,691) (132,300)
interfund loan 802,500 456,685 435,000 435,000 435,000 445,000 337,500 -
Transfers in 69,400
Transfers out (35,815) (166,550) (166,550) (166,550) (166,550) (166,550) (166 550) (166 550)
Total other sources 572,394 157,835 268,450 268,450 268,450 278,450 170,950 (166,550)
Increase(decrease)in fund balance 1,239,918 {102,321) (144,021) 526,028 295,131 545,517 (12,272) (84,824)
Beginning balance 3,611,235 4,851,153 4,748,832 4,604,811 5,130,839 5,425,970 5,971,487 5,959,215
Ending balance 4,851,153 4,748,832 4,604,811 5,130,839 5,425,970 5,971,487 5,959,215 5,874,392
Goal 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000
City of Cottage Grove,MN
Capitai improvement Plan 2016-2020
Sewer Utility Fund
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Charges for Service $ 2,175,478 $ 2,137,263 $ 2,300,400 $ 2,300,400 $ 2,346,408 $ 2,393,336 $ 2,441,203 $ 2,490,027
Intergovernmental-County/State _
Interest (3,307) 40,320 75,000 75,000 75,000 75,000 75,000 75,000
Miscellaneous - 14,493 2,000 2,000
Total Revenue 2,172,171 2,192,076 2,377,400 2,377,400 2,421,408 2,468,336 2,516,203 2,565,027
EXPENDITURES
Operating Expenses 1,926,503 1,983,721 2,178,330 2,245,000 2,289,900 2,335,698 2,382,412 2,430,060
PavementManagement 82,257 65,495 206,475 258,629 253,627 160,168 367,325 391,336
Sewer sliplining-spot replacement 50,000 50,000 50,000 50,000 50,000
E Point Douglas Rd-Phase II 83,000
Total Expenditures 2,008,760 2,049,216 2,434,805 2,553,629 2,593,527 2,545,866 2,882,737 2,821,396
OTHER FINANCING SOURCES(USES)
InterFund loan 367,500 28,326 107,500 450,000
Transfers in
Transfers out (29,200) (181,610) (181 610) (181 610) (181 610) (181 610) (181 610) (181 610)
Total othersources 338,300 (153,284) (181,610) (181,610) (181,610) (181,610) (74,110) 268,390
Increase(decrease)in fund balance 501,711 (10,424) (239,015) (357,839) (353,729) (259,140) (440,644) 12,021
Beginning balance 2,324,072 2,825,783 2,815,359 2,576,344 2,218,505 1,864,776 1,605,636 1,164,992
Ending balance 2,825,783 2,815,359 2,576,344 2,218,505 1,864,776 1,605,636 1,164,992 1,177,013
Goal 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000 1,725,000
City of Cottage Grove,MN
Capital Improvement Plan 2016-2020
Streetlight utility Fund
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Charges for Services $ 531,558 $ 636,480 $ 513,600 $ 538,900 $ 565,845 $ 594,137 $ 623,844 $ 655,036
Intergovernmental-County/State
Interest (18,677) 27,446 30,000 30,000 30,000 30,000 30,000 30,000
Miscellaneous 49,279 22,330 222,500 222,500 207,500 207,500 207,500 207 500
Total Revenue 562,160 686,256 766,100 791,400 803,345 831,637 861,344 892,536
EXPENDITURES
Operating expenses 662,778 704,186 669,595 678,110 691,672 705,506 719,616 734,008
Pavement management 656,043 26,541 197,026 251,168 30,210 28,404 32,216 52,826
Hardwood Streetlights 22g,2�2
Annual system improvements 100,000 100,000 100,000 100,000 100;000 100,000
Total Expenditures 1,318,821 958,939 966,621 1,029,278 821,882 833,910 851,832 886,834
OTHER FINANCING SOURCES(USES)
Transfers in
Transfers out (9,000) (45,850) (45,850) (45 850) (45 850) (45 850) (45 850) (45 850)
Total other sources (9,000) (45,850) (45,850) (45,850) (45,850) (45,850) (45,850) (45,850)
Increase(decrease)in fund balance (765,661) (318,533) (246,371) (283,728) (64,387
) (48,122) (36,338) (40,148)
Beginning balance 2,415,907 1,650,246 1,331,713 1,085,342 801,614 737,227 689,104 652 767
Ending balance 1,650,246 1,331,713 1,085,342 801,614 737,227 689,104 652,767 612,619
Goal 1,665,000 1,665,000 1,665,000 1,665,000 1,665,000 1,665,000 1,665,000 1,665,000
City of Cottage Grove, MN
Capital Improvement Plan 2016-2020
PARK IMPROVEMENT FUND (515)
Projected Financial Position
2014 2015 2016 2017 2018 2019 2020
ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
$ $ $ $
REVENUES
Cell Tower Leases 403,817 352,765 360,000 360,000 360,000 360,000 360,000
Interest � 3,192 4,821 3,108 2,889 6,218 8,980 11,900
Tax levy �
Total Revenue 407,009 357,586 363,108 362,889 366,218 368,980 371,900
EXPENDITURES
Lamar Park Water Filtration ' 7,200
Donations-matching funding 10,000 10,000 10,000 10,000 10,000 10,000
Bike park 3,000
Kingston Park-landscaping 5,624
Hamlet Park-Develop Park&skateboard repair 17,755 151,471 188,000 10,000 10,000 10,000 10,000
Hearthside park ball fields 4,588
Granada Park-Remove tennis courts, regrade,trail 50,000
Park properties-Surveying&installation of posts 4,135 17,000
Swimming Pool-demolish&backfiil 20,500
Arbor Meadows-install irrigation&playground 20,000 40,000
Kingston Park-playground remodel 100,000
Hamlet Park-regrade football/soccer fields 10,000
Woodridge Park-Park building 8,220 302,157
Pine Glen&Old Cottage Grove Parks-Play equipment 70,000 50,000
Old Cottage Grove Park-Rink boa[ds 17,000
Dog Park-Improvements/Land Purchase
Thompson Grove play facility
Totai Expenditures 62,299 472,351 385,000 30,000, 90,000 77,000 70,000
OTHER FINANCING SOURCES(USES)
'Transfer from general fund gp,887
Total other sources gp,887 _ _ _ _ _
Increase(decrease)in fund�alance 425,597 (114,765) (21,892) 332,889 276,218 291,980 301,900
Beginning balance - 425,597 310,832 288,940 621,829 898,048 1,190,028
Ending balance 425,597 310,832 288,940 621,829 898,048 1,190,028 1,491,928
Goal 180,000 180,000 180,000 180,000 180,000 180,000 180,000
City of Cottage Grove, MN
Capital Improvement Plan 2016-2020
PARK TRUST FUND(570)
Projected Financial Position
2014 2015 2016 2017 2018 2019 2020
ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Bonds issued 360,000
Park Dedication Fees 63,575 9,000 200,000 200,000 200,000 100,000 100,000
speciai assessments 43,621 41,877 40,132 38,386 36,641
Interest 4;068
Donations 900 400,000
Miscellaneous-Refunds&Reimbursements
Total Revenue 67,643 9,900 603,621 641,877 240,132 138,386 136,641
EXPENDITURES
Miscellaneous 5,767 3,348
Gateway north 7,375
Sunny Hiil Park 24,118 7,771
Cedarhurst meadows(E Ridge Woods) 19,214 1,765
Cayden Glen Traii 16,490
Cayden Glen park 36,649 100,000
Parks-masterplanning 3,089 15,000 15,000 15,000 15,000 15,000
70th St traii 23,510
Oakwood Park-entrance&parking lot 360,000
Michaels Pointe Park 400,000
Ravine Parkway Park 400,000
Hamlet Park North Enhancement 225,000
Inclusive playground 750,000
Camel's Hump Park-develop&trails 476,284 (5,652)
Swanlund Park 500,000
East Ravine-Central Neighborhood Park 1,100,000
Total Expenditures 585,897 33,831 475,000 765,000 240,000 1,315,000 1,115,000
OTHER FINANCING SOURCES(USES)
Transfer from General Fund 64,700
Totai other sources 64,700 - - - - - _
Increase(decrease)in fund balance (453,554) (23,931) 128,621 (123,123) 132 (1,176,614) (978,359)
Beginning balance 242,906 (210,648) (234,579) (105,958) (229,081) (228 949) (1 405 563)
Ending balance (210,648) (234,579) (105,958) (229,081) (228 949) (1 405 563) (2 383 922)
Goal 100,000 100,000 100,000 100,000 100,000 100,000 100,000
- City of Cottage Grove, MN
Capital Improvement Plan 2016-2020
MUNICIPAL BUILDING FUND (525)
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020.
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
� $ $ $ $
REVENUES
Property taxes 574,012 499,836 500,000 500,000 500,000 510,000 505,000 505,000
intergovernmental 35,038
tower rental -PW Tower 15,240 15,696 15,000 15,000 15,000 15,000 15,000 15,000
Miscellaneous 174,149 94,495
Total Revenue 798,439 610,027 515,000 515,000 515,000 525,000 520,000 520,000
EXPENDITURES
PSCH final expenses 224,249 24,500
Municipal building expenses 4,040
Fire station and PW expenses 89,432 4,000
Fire Station#2 10,000 450,000 9,000,000
Total Expenditures 313,681 32,540 10,000 450,000 9,000,000 - _ _
Other Financing Sources (uses)
Bond proceeds 9,000,000
Transfer out for intertund loan (524,359) (519,777) (515,193) (510,610) (506,029) (511,447) (506,864) (502,281)
Transfer from General Fund
Total othersources (524,359) (519,777) (515,193) (510,610) 8,493,971 (511,447) (506,864) (502,281)
increase (decrease) in fund balance (39,601) 57,710 (10,193) (445,610} 8,971 13,553 13,136 17,719
Beginning balance 270,846 231,245 288,955 278,762 (166,848) (157,877) (144,324) (131,188)
Adjustment to interfund loan
Ending balance 231,245 288,955 278,762 (166,848) (157,877) (144,324) (131 188) (113,469)
Goal 500,000 1,000,000 1,500,000 2,000,000 2,500,000 2,500,000 2,500,000 2,500,000
City of Cottage Grove, MN
Capital Improvement Plan 2016-2020
MSA CONSTRUCTION FUND
Projected Financial Position
2014 2015 2016 2017 2018 2019 2020
ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Municipal State Aid Construction funds $ 1,696,196 $ 1,615,402 $ 5,992,109 $ 3,150,000 $ 4,490,000 $ 1,303,000 $ 5,650,000
special assessments 214,400 151,500 125,000 125,000 125,000 125,000 125,000
Intergovernmental-County/State 288,640 5,000 1,600,000 350,000 641,000 18,183,000
developerfees 124,563 1,595,426 250,000 5,876,000 717,000
Interest 29,749 35,983 45,264 46,967 48,686 50,423 50,928
Miscellaneous
Total Revenue 2,353,548 1,807,885 9,357,799 3,921,967 4,663,686 7,995,423 24,725,928
EXPENDITURES
Professional services-miscellaneous 79,105 5,837
CR 70/19 27,474 2,727
East Point Douglas(walmart) 144,603 105,296
95th Street extension 1,263,200 250,000
70th&Meadowgrass 468,530
Hardwood Ave sidewalk/trails 187,167 19,713
Ravine parkway Phase 3,4, 5 4,000,000 1,000,000
Jamaica Ave-70th to Military 58,219 3,800,000
Hadley Avenue street work 90th-100th 3,475,800
65th Street at (Middle School) 3,200,000
80th Street(CSAH19 to TH 61) Reclamation 58,623 1,590,733 1,892,950 3,520,600
Bridge maintenance 100,000
East Point Douglas-Phase 2 cottage view 8,000,000
CSAH 19 and TH 61 600,000 22,900,000
70th&Hardwood 750,000 1,000,000
Total Expenditures 906,879 250,415 10,129,733 4,550,000 5,992,950 9,250,000 27,420,600
OTHER FINANCING SOl[RCES(USES)
Bond Proceeds 150,802 800,000 1,259,400 910,000 2,417,600
Transfers in 670,502 791,397 � 243,550 395,000 453,000
Transfers out-PM (85,276) (1,227,863)
Totalothersources 585,226 (1,227,863) 942,199 800,000 1,502,950 1,305,000 2,870,600
Increase(decrease) in fund balance 2,031,895 329,607 170,265 171,967 173,686 50,423 175,928
Beginning balance 2,164,909 4,196,804 4,526,411 4,696,676 4,868,643 5,042,329 5,092,753
Ending balance 4,196,804 4,526,411 4,696,676 4,868,643 5,042,329 5,092,753 5,268,680
Goal 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
City of Cottage Grove, MN
Capital Improvement Plan 2016-2020
PAVEMENT MANAGEMENT FUND
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
Actual Actual ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
$ $ $ $ $
REVENUES
MSA 1,009,252
special assessments 4,221 345,080 - 534,300 271,800 - 289,900
SWWD 271,444 316,528 -
Interest 1,191 15,084 5,368 6,320 11,727 14,562 14,707 17,754
Miscellaneous 800
Total Revenue 1,286,108 676,692 6,168 540,620 283,527 14,562 304,607 17,754
EXPENDITURES
PM 2011 16,486 1,419
PM 2013- 5,505,349 29,254
PM 2014-F1 105,670 2,671,092 31,578
PM 2015- F2, 90th, Grey Cloud Tr 4,932,090
PM 2016- D2, F3, F5 82,002 4,464,286
PM 2017-F3, B1, EPD 2,013,320
PM 2019-E1a, F5 2,147,060
Total Expenditures 5,627,505 2,671,092 5,074,924 4,464,286 2,013,320 - 2,147,060 -
Revenue over Expenditures (4,341,397) (1,994,400) (5,068,756) (3,923,666) (1,729,793) 14,562 (1,842,453) 17,754
Other Financing Sources (uses)
Bond proceeds 5,633,524 5,870,154 3,675,502 1,754,280 1,870,815
Transfers from park funds
Transfers from MSA fund
Transfers from utility funds 188,258 180,756 356,909 788,784 259,040 276,245
Total othersources 5,821,782 180,756 6,227,063 4,464,286 2,013,320 - 2,147,060 -
Increase (decrease) in fund balance 1,480,385 (1,813,644) 1,158,307 540,620 283,527 14,562 304,607 17,754
Beginning balance (193,007) 1,287,378 (526 266) 632 041 1 172 661 1 456 188 1,470 750 1 775,357
Ending balance 1,287,378 (526,266) 632 041 1 172 661 1 456,188 1 470 750 1,775 357 1 793 111
Goai (this fund should break even) - _ _ _ _ _ _ _
c°`t��� 2016-2029 Pavement Management Pro'ects ��
crnv� ,
�ar.euo�.�reem5comv�¢c �
w..��.q4'�tm.'°.
����a t
Legend ti�-�-� , -,-_- � „ � , -� _� ; �,� -�-�.
I = (;���,�� a � rj�2U21 j � � � k .�� t r�`�1� ,� '� j + [ , � , ` . �
�_ � �i�.[��� - � .,d��' x : � :�
2016 Pavement Management � � �� -��� '�� ,' �- "�'�d�`� w� � 2021 � 1� �_ _
- F ,
� �A���:� �__
2017 Pavement Management �-, � �`�,� , t + ,�, -� 2028 r �� 2028 3 =s�� � s h F f 2029 - --
��`'�, t �� �� � 1 � . � �- a ' ;. F _ � P,N ` _ -"�-�
2018 Pavement Management � 1 � � -- � � '• Y'-� � > ;i �l,f :
3
/ � ( ! ,
- !4 ��
� 2019 Pavement Management ����= �-'z� � -� 2017 � � '���� � ���$ �'� � '
r
� a,n - � � �v�� � _�� �_ � � -�r
s . �— .H_ ,
'• : .��� -wa� � .s,c . -� s t�'� i 1�.�
�+2020 Pavement Management _ ..` . ,� ,= r �� ; ,1 F„ a��^,`. '�, L
" S�j .,t`!:�.4 Nkkk4+'�
2021 Pavement Mana ement ��L� - 2020 ��;r�� 2016 ` , �, 2017 '� � r � ���_��,
�� ��
g +1 � , , �a�� � °.� � 2028 .�� � ��
2022 Pavement Mana ement ���' ��
g a��� �' - � � ��,� � ,� s, ° � s ��, �, � t,, �i �� , : .
,
2023 Pavement Management '� ;: _ � 2022 �r ���,�*�;'�a �'"�'`� ` y ` x V` - 2018 � - -
� � �.��t,. wx �� �
, � � �t� � �_ � 2027 � �, L ' 2021 2016
2024 Pavement Mana ement } �+; n ,,4, �" 3 -T'
5 � � � � �; ���� .�h , �� � � - �
. ,. �". . ... .f, ..i/��d;r � �� tt � - _ {
2025 Pavement Management ` �� _�� i � ��� � , ,', 2023T .�� � r` " > �,�, 't �2017 � :
�; �
�, r , ..� :;_
� ; �': .,. � r 7
�„�TM���9�2026 Pavement Mana ement i _�;: 7 <=�= r�' ``:�� , � - : .F��,�° � ' � -- -
� rr
g E������� r �t, 2019 ' �z��; 2026 � � �7 1r 2021
s � � , ,\ '2024 , � � t � - X �
�=-�2027 Pavement Management � � t � �� f r � � � � �- }~ - � '� ��� _
�, . �>` ; , � ` y� �} � � _ � __ _
� .; }
-
���-�2028 Pavement Management � — ��� s �: F � i. _ �'� ._ ;'v_` � ,�� � `� � � 2022 _� f � --���
�..0 �_'t' �� �, t ±e� ' "' . � i
2029 Pavement Management �-�`w"'L'' `"" � ---------
i_...
�� � � ����� 2029 2025 ��� r� �
_...
CG City Boundary -- � � , ,,,,�,� � „ ,
—.�____ , ,� �
rr �, �� �T �
_ -�, � _ �,�:� �� < � ��� i < <, �
. __�__ .___._�
_ _____
CG Ma�or Roads � �, � � �� , �,� �s� ����=u��� ��;-,-� �
� 2016 - ..... �_...._ 1. 2022 ' , �
ISD 833 property �� � } '� i; � � '� � s r �
r -
, �__ _ � � ' r--- -- --�__��_ .�
� � -.- I
u� x_
� .. 4 � -- �-....., j�.�. , . .
r _I.�p�
r Wetland �'�_ �� ��'�� � F � �� " � �
� - � _
Park and Open Space � l � � , ���" --� `a�, � i
� � _ ___ 2�25 - - � --�-`-- - -1
� Mississippi River i r u: , � . -
t�� �me�i .
, : "Sic'Y . . � `� . .
�� �.1 _� � _ _ __ .
rr
,__
� PARCELS ` � 1�,:.� - p,� ;T�� ( � ,`I�` �1 �- � � 4J
�� �� ! � 1 I � yf�� I
�..� � ( � �L= l I -
Location Map � �-�1--�'�. �� � i �--�-` � ��'�,
_, ��
.,
; ,` --- �
� • ,, - , _�______1____ � � � �_� � � ;
� �` � � ��� � ��� � - -
;� �,; �' ,
;r--� ��� ;
' — ;. ,��� — �
., �� � � � i �� � �' r - -
, , ,
; � � � ���� �
.,, _
._.�_.
' -�"_- � ' '
�.�: -� ,�,�,-���„�- _ _ i � _ `' zozs �
,. : f y
Dat 12/15/2015` - II( y I IT� � � t �~ � � ~
M:1 �GIS De artm�nt Pro e ts\ ,, a �0 �� ��y �
_ p 1 ���4k��� � 1 la���� �����t��������,'�'�'����F��t � ro�ect�tnx � ,
— },,t s .�"��. � �[il��.; i i y . � r�: r ��,y,..�; ( C �,a�,�
City of Cottage Grove,MN
Capital Improvement Plan 2016-2020
Water Area Fund
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Developerfees $ 248,883 $ 282,479 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 150,000
Special Assessments 6,479 10,492 10,000 10,000 10,000 10,000 10,000 10,000
Intergovernmental-County/State
Interest (20,927) 40,468
Miscellaneous
Total Revenue 234,435 333,439 160,000 160,000 160,000 160,000 160,000 160,000
EXPENDITURES
East Ravine infrastructure development 271,981 50,000 50,000 100,000 100,000 100,000 500,000
Jamaica Ave-70th to Military 30,000
95th Street Phase 1 E�ension 13,600
swanlund property 10,000 10,000 10,000 10,000 10,000
Miscellaneous 18,180 20,880
CR 70/19 25,128 345,665
Weil#12 150,000 1,500,000
Total Expenditures 43,308 638,526 103,600 60,000 110,000 260,000 1,610,000 500,000
OTHER FINANCING SOURCES(USES)
Bond Proceeds
Transfers in
Transfers out
Total othersources - _ _ _ _ _ _ _
Increase(decrease)in fund balance 191,127 (305,087) 56,400 100,000 50,000 (100,000) (1,450,000) (340,000)
Beginning balance 2,629,501 2,820,628 2,515,541 2,57'1,941 2,671,941 2,721,941 2,621,941 1,171,941
Ending balance 2,820,628 2,515,541 2,571,941 2,671,941 2,721,941 2,621,941 1,171,941 831,941
Goal 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000
City of Cottage Grove,MN
Capital Improvement Plan 2016-2020
Sewer Area Fund
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Developer fees $ 212,433 $ 317,554 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000
Special Assessments 11,143 9,643 15,000 42,375 41,280 40,184 39,090 37,994
Intergovernmental-County/State
I nterest
Miscellaneous
Total Revenue 223,576 327,197 215,000 242,375 241,280 240,184 239,090 237,994
EXPENDITURES
East Ravine infrastructure development 278,180
CR 70/19 24,646
Swanlund property 10,000 10,000 10,000 10,000 10,000 10,000
Miscellaneous 11,787
Total Expenditures 11,787 302,826 10,000 10,000 10,000 10,000 10,000 10,000
OTHER FINANCING SOURCES(USES)
Debt Service-principal&interest (289,440) (291,215) (287,727) (288,978) (289,877) (295,340) (295,220)
Transfers in
Totalothersources (289,440) (291,215) (287,727) (288,978) (289,877) (295,340) (295,220) -
Increase(decrease)in fund balance (77,651) (266,844) (82,727) (56,603} (58,597
) (65,156) (66,130) 227,994
Beginning balance (461,804) (539,455) (806,299) (889 026) (945 629) (1 004 226) (1 069 382) (1 135 512)
Ending balance (539,455) (806 299) (889,026) (945 629) (1 004 226) (1 069 382) (1 135 512) (907 518)
Goal 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
City of Cottage Grove,MN
Capital Improvement Plan 2076-2020
Storm Water Area Fund ,
Projected Financial Position
2013 2014 2015 2016 2017 2018 2019 2020
ACTUAL ACTUAL ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED
REVENUES
Developerfees $ 343,945 $ 241,401 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000 $ 200,000
Special Assessments 4,810 2,260 5,000 81,843 78,769 75,695 72,621 69,549
Intergovernmental-County/State 513,516
Interest (18,323) 29,065
Miscellaneous 4,769
Total Revenue 330,432 791,011 205,000 281,843 278,769 275,695 272,621 269,549
EXPENDITURES
East Ravine infrastructure development
Jamaica Ave-70th to Military
Oakwood NPDES basin 240,000
80th St Box Culvert 368,581 128,621
Gateway pond 4,660
Miscellaneous 50,670 19,887
MS dunes 4th Stormwater basin 33,008
Everwood 4th 30,714
Total Expenditures 456,919 179,222 240,000 - - _ _ _
OTHER FINANCING SOURCES(USES)
Bond Proceeds
Transfers in(out) 83,736
Total other sources - 83,736 - _ _ _ _ _
Increase(decrease)in fund balance (126,487) 695,525 (35,000) 281,843 278,769 275,695 272,621 269,549
Beginning balance 2,150,050 2,023,563 2,719,088 2,684,088 2,965,931 3,244,700 3,520,395 3,793,016
Ending balance 2,023,563 2,719,088 2,684,088 2,965,931 3,244,700 3;520,395 3,793,016 4,062,565
Goal 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000 2,500,000
Future General Levy versus Debt Service Levy Impact
2010 2011 2012 2013 2014
Tax Capacity Estimated(actual through 2015) 28,727,814 26,665,455 24,496,075 22,684,801 23,990,640
(3%increase after 2016)
General Levies
General Fund Levy 3%Increase after 2015 10,797,300 10,929,100 10,929,100 10,867,000 11,265,030
Public Safety/City Hall interfund loan SSQ000
EDA Levy 2%Increase after 2017 106,000 106,000 106,000 108,100 108,100
Park shelter/playground equipment/landscape initiative - - - 30,000 -
Building replacement/interfund loan after 2013 - - - 30,000 500,000
Future Debt Reduction/Pavement Management - - 648,205 - -
TotalGeneralLevies 10,903,300 11,035,100 11,683,305 11,585,100 11,873,130
3.28% 1.21% 5.87% -0.84% 2.49%
General Levies Tax Rate 0.3094 03359 0.3901 0.4196 0.4016
%increase 7.57% 8.58% 16.14% 7.54% -4.27%
Debt Levies
Existing debt 1,251,700 859,750 557,945 574,550 496,000
Debt service increase mitigation - 346,400 - - -
New PM debt - - - 81,600 330,000
Total debtservice 1,251,700 1,Z06,150 557,945 656,150 826,000
Debt Service Tax Rate 0.0436 0.0452 0.0228 0.0289 0.0344
%increase -25.90% 3.81% -49.65% 26.99% 19.03%
Gross Levy (General Levies and Debt Levies) 12,155,000 12,241,250 12,241,250 12,241,250 12,699,130
Fiscal Disparities/TIF 2,015,782 2,078,077 2,126,696 2,067,667 2,237,549
NetLevy 10,139,218 10,163,173 10,114,554 10,173,583 10,461,581
0.49% 0.24% -0.48% 0.58% 2.83%
Total Tax Rate 0.3529 0.3811 0.4129 0.4485 0.4361
6.50% 7.99% 834% 8.61% -2.77%
Assumptions:
Tax Capacity increase 2%after 2014
General Fund Budget5%Increase peryear
Taxes Paid by Average Value Home
Taxes Paid
Taxable Market Value 228,000.00 207,400.00 204,000.00 187,800.00 196,100.00
%Change -6.52% -9.04% -1.64% -7.94% 4.42%
CityTaxesPaid 807 794 767 754 772
MVHC reduction (64) (71) - - -
Net City Taxes Paid 743 723 767 754 772
-5.53% -2.70% 6.02% -1.69% 2.39%
90 0 93 0 47 0 59 0 71 0
2015 2016 2017 2018 2019 2020 2021 2022 2023
27,165,777 27,999,915 28,840,000 29,705,000 30,596,000 31,514,000 32,459,000 33,433,000 34,436,000
11,915,100 12,569,300 12,946,379 13,334,770 13,734,813 14,146,858 14,571,264 15,008,402 15,458,654
111,500 111,500 113,700 116,000 118,300 120,700 123,100 125,600 128,100
500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000
12,526,600 13,180,800 13,560,079 13,950,770 14,353,113 14,767,558 . 15,194,364 15,634,002 16,086,754
5,50% 5.22% 2.88% 2.88% 2.88% 2.89% 2.89% 2.89% 2.90%
0.3821 0.3977 0.3992 0.4008 0.4022 0.4037 0.4051 0.4064 0.4077
-4.87% 4.08% 0.39% 0.38% 0.37% 036% 0.35% 033% 0.32%
875,500 890,000 1,487,157 1,779,135 1,594,991 1,981,442 2,242,216 2,490,221 2,726,411
195,671 191,727 282,031 205,774 192,005 236,190 116,265
875,500 890,000 1,682,828 1,970,862 1,877,022 2,187,216 2,434,221 2,726,411 2,842,676
0.0322 0.0318 0.0584 0.0663 0.0613 0.0694 0.0750 0.0815 0.0825
-6.40% -1.37% 83.57% 13.71% -7.53% 13,13% 8.05% 8.74% 1.23%
13,402,100 14,070,800 15,242,907 15,921,632 16,230,135 16,954,774 17,628,585 18,360,413 18,929,430
2,146,936 2,046,134 2,046,134 2,046,134 2,046,134 2,046,134 2,046,134 2,046,134 2,046,134
11,255,164 12,024,666 13,196,773 13,875,498 14,184,001 14,908,640 15,582,451 16,314,279 16,883,296
7.59% 6.84% 9.75% 5.14% 2.22% 5.11% 4.52% 4.70% 3.49%
0.4143 0.4295 0.4576 0.4671 0.4636 0.4731 0.4801 0.4880 0.4903
-4.99% 3.65% 6.55% 2.08% -0.75% 2.05% 1.48% 1.65% 0.47%
219,800.00 222,000.00 224,200.00 226,400.00 228,700.00 231,000.00 233,300.00 235,600.00 238,000.00
12.09% 1.00% 0.99% 0.98% 1.02% 1.01% 1.00% 0.99% 1.02% '
879 873 951 988 995 1033 1065 1100 1117
879 873 951 988 995 1033 1065 1100 1117
13.86% -0.64% 8.88% 3,85% 0.78% 3.78% 3.12% 3.25% 1.57%
66 0 65 0 120 0 136 0 1Z6 0 143 0 154 0 168 0 170