HomeMy WebLinkAbout2016-03-02 PACKET 04.L.
Feasibility Report for
Hadley Avenue and 95 Street Improvements
th
Prepared for:
City of Cottage Grove, Minnesota
March 2, 2016
Stantec Project No. 193803447
I hereby certify that this report was prepared by me
or under my direct supervision and that I am a duly
licensed Professional Engineer under the laws of the
State of Minnesota.
__________________________________________________
David R. Sanocki, P.E. Reg. No. 40973
March 2, 2016
CITY OF COTTAGE GROVE
TABLE OF CONTENTS
TABLE OF CONTENTS ...................................................................................................................................... 1
PROJECT SUMMARY ....................................................................................................................................... 2
INTRODUCTION ........................................................................................................................................... 2
PROJECT SCOPE ......................................................................................................................................... 2
Required Improvements........................................................................................................................ 3
Required Easements .............................................................................................................................. 4
Required Permits ..................................................................................................................................... 4
Construction Coordination ................................................................................................................... 4
PROJECT COSTS .......................................................................................................................................... 5
Estimated Construction Costs .............................................................................................................. 5
Hadley Avenue South and 95 Street South Ï Summers Landing Cost Participation ................. 5
th
FINANCING ................................................................................................................................................. 6
RECOMMENDATIONS TO COUNCIL ......................................................................................................... 6
PROJECT SCHEDULE ....................................................................................................................................... 7
APPENDIX
Hadley Avenue & 95Street Preliminary Cost Estimate
th
FIGURES
Figure 2 Hadley Avenue and 95 Street Improvements - Project Layout
th
Figure 3 Hadley Avenue and 95 Street Improvements - Roundabout
th
Figure 4 Hadley Avenue and 95 Street Improvements - Utilities
th
Figure 5 Hadley Avenue and 95 Street Improvements - Cost Participation
th
Street Improvements - Assessable Parcels
Figure 6 Hadley Avenue and 95
th
Hadley Avenue and 95 Street Improvements 1
th
CITY OF COTTAGE GROVE
PROJECT SUMMARY
INTRODUCTION
This report addresses the proposed improvements for Hadley Avenue South between 90 Street
th
South and approximately 600 feet south of 100 Street South, and 95 Street South between
thth
Mississippi Dunes Boulevard and 500 feet east of Hadley Avenue South.
The proposed improvements include constructing a roundabout at the intersection of Hadley
Avenue South and 95 Street South; including storm sewer, concrete pavement, trail extensions,
th
lighting, irrigation, and landscaping. Hadley Avenue South and 95 Street South are proposed
th
to be reconstructed; including B618 curb and gutter, new bituminous pavement, turn lanes,
bituminous trails, storm sewer, water main, sanitary sewer, lighting and boulevard trees. The
general project location is shown below in Figure 1 below. It is anticipated that this project would
be constructed during the 2016 construction season.
PROJECT SCOPE
:
This project consists of utility and street improvements in the general location shown in Figure 1
Figure 1 Ï General Project Location
Hadley Avenue and 95 Street Improvements 2
th
RI
EQUIRED MPROVEMENTS
The project includes improvements to Hadley Avenue South between 90 Street South and
th
approximately 600 feet south of 100 Street South, and 95 Street South between Mississippi
thth
Dunes Boulevard and 500 feet east of Hadley Avenue South (see figure 2 in the appendix of this
report). A roundabout at the intersection of Hadley Avenue South and 95 Street South, public
th
trail extensions, street lighting and landscaping are all included in the proposed improvements to
be constructed in 2016.
A cost estimate has been included in the appendix of this report.
S
I
TREET MPROVEMENTS
Street South currently exists as a two way stop
The intersection of Hadley Avenue South and 95
th
controlled intersection; 95 Street South traffic has to stop. This intersection is proposed to be
th
reconstructed with a roundabout (see figure 3 in the appendix of this report). The proposed
roundabout will be constructed with concrete curb and gutter, concrete pavement and a
landscaped center roundabout area.
Hadley Avenue South, both north and south of the roundabout, is proposed to be fully
reconstructed with B618 curb and gutter, new bituminous pavement, turn lanes, bituminous trails,
storm sewer, water main, sanitary sewer, lighting and boulevard trees.
95 Street South, both east and west of the roundabout, is proposed to be fully reconstructed
th
with B618 curb and gutter, new bituminous pavement, turn lane, bituminous trails, storm sewer,
lighting and boulevard trees.
All street improvements will be designed to meet Municipal State Aid and City of Cottage Grove
standards.
TI
RAIL MPROVEMENTS
Eight-foot wide bituminous trails are proposed to be extended and/or reconstructed on both
Street South. The Summers Landing developer will be
sides of Hadley Avenue South and 95
th
responsible for the costs associated with constructing the trails along the west side of Hadley
Avenue South between 90 Street and 95 Street. The Summers Landing developer will also be
thth
responsible for the costs associated with constructing the trails along the north side of 95 Street
th
South between Hadley Avenue South and Mississippi Dunes Boulevard.
SLI
TREET IGHTING MPROVEMENTS
Cobra street lights are proposed to be installed within the four legs of the roundabout at Hadley
Avenue South and 95 Street South. Lighting within the center of the roundabout is proposed
th
and will be very similar to the lighting installed in the roundabout at the intersection of 70 Street
th
South and Keats Avenue. Ravine style lighting (single luminaire) is proposed to be installed on
both sides of Hadley Avenue South and 95 Street South outside of the roundabout area.
th
LI
ANDSCAPING MPROVEMENTS
The center of the roundabout is proposed to be landscaped and irrigated. The landscaping will
include hardwood trees, shrubs, perennials and ornamental grasses. This will be very similar to
what was installed at the intersection of 70 Street South and Keats Avenue. Boulevard
th
hardwood trees are proposed to be placed on both sides of the road on Hadley Avenue South
and 95 Street South.
th
Hadley Avenue and 95 Street Improvements 3
th
UI
TILITY MPROVEMENTS
The sanitary sewer for this project will be directional drilled and extended from the southeast
corner of the Pine Hill Elementary School property. This sanitary sewer extension is necessary to
provide service for future phases of the proposed Summers Landing Development. The Summers
Landing developer will be responsible for all costs associated with extending the sanitary sewer
from the southeast corner of the Pine Hill Elementary School to the west side of Hadley Avenue
South.
Old ductile iron water main, between six and twelve inches in diameter, will be replaced within
Hadley Avenue South from 90 Street South to 92 Street South. The proposed Summers
thnd
Landing 1 Addition water main will connect to the existing water main located on the east side
st
of Hadley Avenue South at the intersection of 94 Street South. The Summers Landing developer
th
will be responsible for all costs associated with extending the water main from the east side of
the Hadley Avenue South to the west side of Hadley Avenue South at the intersection of 94
th
Street South.
New storm sewer is proposed to be installed along both Hadley Avenue South, 95 Street South
th
and within the proposed roundabout area. The existing storm sewer system in Hadley Avenue
South, south of 94 Street, will be utilized. The existing storm sewer system in 95 Street South will
thth
also be utilized.
RE
EQUIRED ASEMENTS
All public utilities will be located under the public street right-of-way and within dedicated utility
easements. Additional right-of-way will be obtained from the Summers Landing developer for
the improvements proposed in the northwest corner of the roundabout at Hadley Avenue South
and 95 Street South. An easement will have to be obtained from the Pine Hill Elementary
th
School for the proposed sanitary sewer and storm sewer extensions.
P
R
EQUIRED ERMITS
This project requires the following permits:
MPCA General Storm Water Permit (NPDES Permit)
MPCA Sanitary Sewer extension Permit
MN Department of Health Water Main Permit
C
C
ONSTRUCTION OORDINATION
Street, trail and utility extensions proposed with this project will require the project contractor to
stay in regular contact with the Summers Landing Developer to coordinate work schedules, site
access, testing, etc.
Hadley Avenue and 95 Street Improvements 4
th
PROJECT COSTS
ECC
STIMATED ONSTRUCTION OSTS
Street South and
A detailed cost estimate for improving Hadley Avenue South between 90
th
approximately 600 feet south of 100 Street South, and 95 Street South between Mississippi
thth
Dunes Boulevard and 500 feet east of Hadley Avenue South, have been prepared and is
included in the appendix. All costs are based on anticipated unit prices for the 2016
construction season, and they include an additional 30 percent for indirect costs associated with
the project. Costs for required right-of-way and easements are not included. An overall
summary of the estimated cost is shown below:
Hadley Avenue South $3,569,566
95 Street South $666,707
th
Roundabout $1,522,860
Summers Landing: Sanitary, Water & Trails $345,248
TOTAL PROJECT COSTS*$6,104,381
*Right-of-way and easement costs are not included.
HAS95SSÏSLCP
ADLEY VENUE OUTH AND TREET OUTH UMMERS ANDING OST ARTICIPATION
TH
The below referenced amounts will be assessed and/or collected from the Summers Landing
developer:
Table 1.1 Ï Summers Landing Cost Participation
Developer
Responsibility Developer
Assessments Total Costs(Percent) Cost
Hadley Avenue turn lanes adjacent to
Summers Landing $46,742100%$46,742
Hadley Avenue costs: 90 Street to 95
thth
Street (excludes turn lanes & trails
adjacent to development) $1,242,43030% $372,729
95 Street costs: Hadley Avenue to
th
Mississippi Dunes Blvd. (excludes trails
adjacent to development) $430,77150%$215,385
Roundabout costs (Intersection of 95
th
Street & Hadley Avenue) $1,171,43040% $468,572
Summers Landing: Sanitary, Water &
Trails $265,575100% $265,575
Non-participating (Water main, Hadley
Avenue south of 95 Street & 95 Street
thth
east of Hadley Avenue) $1,538,7290% $0
Total Construction Costs $4,695,677 $1,369,003
30% Indirect Costs (legal, engineering
and administration) $1,408,703 $410,701
Total Project Costs $6,104,380 $1,779,704
Hadley Avenue and 95 Street Improvements 5
th
FINANCING
The improvement costs for this project would be financed through the use of a number of
dedicated funds and special assessments. The Summers Landing Developer will be funding a
portion of the improvements as outlined in table 1.1. Following is a breakdown on the proposed
project financing:
City of Cottage Grove $4,283,076
Summers Landing Developer $1,779,704
Assessments* $41,600
TOTAL PROJECT COSTS $6,104,380
*Assessment amounts were based on the City Policy
and benefit appraisals (see figure 6 in the appendix of
this report for assessable parcels). Based on the City
policy approximately $210,165 would be collected
through assessments ($150,050 for Pine Hill Elementary
School, $60,115 for 9015 Hadley Avenue South). The
benefit appraisal amounts received for assessable
parcels are less than the amounts calculated through
the CityÔs special assessment policy ($9,600 for Pine Hill
Elementary School, $32,000 for 9015 Hadley Avenue
South).
RECOMMENDATIONS TO COUNCIL
The proposed improvements in this report are necessary, feasible and cost-effective related to
general engineering principles. The feasibility of this project as a whole is subject to the financial
review. The following recommendations are made:
Adopt this report as the guide for improving the streets described.
The City conducts a legal and fiscal review of the proposed project.
The City installs the improvements as described within this report, with construction being
started in 2016.
The below tentative schedule be implemented for the project.
CA
R
EQUEST FOR OUNCIL CTION
Accept the feasibility report and order the Public Hearing.
Hadley Avenue and 95 Street Improvements 6
th
PROJECT SCHEDULE
The following is a proposed project schedule:
Council Approves Feasibility Report, Calls for Public Hearing and March 2, 2016
Orders the Preparation of the Plans and Specifications
Council Holds Public Hearing April 6, 2016
Approve Plans and Specifications and Set Bid Date April 20, 2016
Project Bid Date May 26, 2016
Contract Award June 1, 2016
Construction Completed October 15, 2016
Assessment Hearing November, 2016
Hadley Avenue and 95 Street Improvements 7
th
APPENDIX
FIGURES
90THST
92NDST
94THST
95THST
97THST
98THST
100THST
PlotDate:02/23/2016-6:38pm
Drawingname:V:\\1938\\active\\193803447\\CAD\\Dwg\\193803447XPFO2.dwg
Xrefs:,XSXT,CGimage,48PRCL,S14147-BNDY,_HATCH,193803447XSNO
94THST
95THST
PlotDate:02/23/2016-9:25am
Drawingname:V:\\1938\\active\\193803447\\CAD\\Dwg\\193803447XPFO3.dwg
Xrefs:,XSXT,CGimage,48PRCL,S14147-BNDY,_HATCH,193803447XSNO
>
>
>
>
>
>
l
ll
l
>
90THST
>
>
>
>>
>>
>
>
>
>
>
l
>
l
l
SS
>
l
l
>
>>
>
l
>
SEEVIEW2
>
>
>
>
>
>
l
ll
>
>
>
>>>>>>>>>>>>
>
>
>
>
>
>
>>>>>
>>
>
>>
>
>
>
>
>
>
>>
>
>
>
>
>
>
>
>
>>
>>>>
>>
>>
>>
>>
>>
>>
>>
>>
llllllllll
lll
>
>
llll
lll
llll
ll
llll
>
>>ll
>
>
l
l
l
>
SSSS
S
>>
92NDST
>
>
>>
>
>
>
>
>
>
>
>
>>
>
>
>
>
>>
ll
>
>
lll
l
97THST
>
>
>>
>>
>>
>>
>>
>
>>
>>>>
>>
>>>>
>>
>>
>>
>>
>>
>
>
>
>
l
l
>
>
>
>
>>
>>
>
>
>>
SS
ll l
l ll
l
l
94THST
>
>
>>
>>
l
>
>
ll
l
l
98THST
>
>>>
>>
>
>
95THST
>>
l
l
ll
>>
>>>>
>>
>>>>
>
l
lll
>>
100THST
>>
>
>
>l
l
l
l
l
SEEVIEW1
PlotDate:02/24/2016-2:57pm
Drawingname:V:\\1938\\active\\193803447\\CAD\\Dwg\\193803447XPFO4.dwg
Xrefs:,XSXT,CGimage,48PRCL,S14147-BNDY,_HATCH,193803447XSNO
90THST
92NDST
94THST
95THST
97THST
98THST
100THST
PlotDate:02/23/2016-6:37pm
Drawingname:V:\\1938\\active\\193803447\\CAD\\Dwg\\193803447XPFO5.dwg
Xrefs:,XSXT,CGimage,48PRCL,S14147-BNDY,_HATCH,193803447XSNO