Loading...
HomeMy WebLinkAbout2016-03-16 PACKET 07.A. REQUEST OF CITY COUNCIL ACTION COUNCIL AGENDA MEETING ITEM �� DATE 3/16/16 • . PREPARED BY: Community Development Jennifer Levitt ORIGINATING DEPARTMENT STAFF AUTHOR * * * * * * * * * * * * * * * * * * * * * * * * * � * * * * * * * * * * * * * * � * * * * * * * COUNCIL ACTION REQUEST: Consider awarding the bid for the CP Rail Water Main Improvements Project to Minger Construction Company, Inc. in the amount of$150,737.50. STAFF RECOMMENDATION: Adopt the resolution. BUDGET IMPLICATION: $200,000 $150,737.50 BUDGETED AMOUNT ACTUAL AMOUNT SUPPORTING DOCUMENTS: � MEMO/LETTER: Letter from David Sanocki, Stantec dated 3/4/16 � RESOLUTION: Draft ❑ ORDINANCE: ❑ ENGINEERING RECOMMENDATION: ❑ LEGAL RECOMMENDATION: � OTHER: Bid Tabulations ADMINISTRATOR'S COMMENTS: °_� � } �� � � � � �J r; ,� � , � , � � � � �'� � � �'''. f City Administrator at �� * * * * * * * * * * * * * * * * * * * * * * * * * * * � * * * * * * * * * * * * * * * � * * * * COUNCIL ACTION TAKEN: ❑ APPROVED ❑ DENIED ❑ OTHER �� Stantec Consulting Services Inc. 2335 Highway 36 West,St.Paui MN 55113 March 4, 2016 Honorable Mayor and City Council City of Cottage Grove 12800 Ravine Parkway Cottage Grove, MN 55016 Re: CP Rail Water Main Improvements Stantec Project No. 193803373 Bid Results Dear Honorable Mayor and City Council: Bids were received for the Project stated above on March 3,2016. Transmitted herewith is a copy of the Bid Tabulation for your information and file. Copies will also be distributed to each Bidder once the Project has been awarded. Bids were received from 13 contractors. The following summarizes the results: Confractor Base Bid Contracfor Base Bid Low Minger Const. Co., Inc. $150,737.50 #8 Northwest Asphalt Inc. $189,625.30 #2 Hydrocon, Inc. $169,672.00 #9 Carl Bolander&Sons LLC $202,200.00 #3 Burschville Const. Inc. $174,009.80 #10 Frattalone Companies $208,972.75 #4 Alcon Construction Co. $174,425.00 #11 Penn Contracting Inc. $215,444.00 #5 Ryan Contracting Co. $176,097.80 #12 Northdale Const. Co. $233,814.84 #6 G.F. Jedlicki, Inc. $183,074.30 #13 Valley-Rich, Inc. $246,370.00 #7 Park Const. Co. $184,904.50 The low Bidder on the Project was Minger Construction Co., Inc.with a Total Bid Amount of $150,737.50,which compares to the Engineer's Opinion of Probable Costs of$200,000. These Bids have been reviewed and found to be in order. If the City Council wishes to award the Project to the low Bidder, then Minger Construction Co., Inc.should be awarded the Project on the Total Bid Amount of$150,737.50. Should you have any questions, please feel free to contact me at 651-604-4905. Sincerely, STANTEC CONSULTING SERVICES INC. �K . David R.Sanocki, P.E. Enclosure beslgn Nrlth�omn7us�i#y yn mind RESOLUTION NO. 2016-XXX RESOLUTION AWARDING THE BID FOR THE CP RAIL WATER MAIN IMPROVEMENTS PROJECT TO MINGER CONSTRUCTION COMPANY, INC. IN THE AMOUNT OF $150,737.50 WHEREAS, plans and specifications for the CP Rail Water Main Improvements Project, were completed according to City standards; and WHEREAS, bids were requested to provide the necessary work; and WHEREAS, three firms submitted bids; and WHEREAS, it appears that Minger Construction Company, Inc. is the lowest responsible bid; and WHEREAS, it is the recommendation of the City Engineer that the bid be awarded to Minger Construction Company, Inc. in the amount of$150,737.50. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Cottage Grove, County of Washington, State of Minnesota, the bid for the CP Rail Water Main Improvements Project is awarded to Minger Construction Company, Inc. in the amount of $150,737.50. Passed this 16th day of March 2016. Myron Bailey, Mayor Attest: Joe Fischbach, City Clerk � Stantec Project Name:CP RAIL WATER MAIN IMPROVEMENTS IherebycerGlythatthisisan ervd rnnmdiirYinn nfhids rapivad. City Project No. Project No.: 193803373 ���-�� Bid Opening:Thursday,March 3,2016 at 10:30 A.M.,CST Owner:City of Cottage Grove,MN David R.Sana�ki,P.E. G'cense No.40973 Bidder No.1 Bidder No.2 Bidder No.3 Bidder No.4 BID TABULATION Minger Construction Co.,Inc. Hydrocon,Inc. Burschville Construdion Inc. Alcon Construction Item Num Item Units Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total PART 1-GENERAL 1 MOBILZATlON LS 1 $16,000.00 $16,000.00 $7,500.00 $7,500.00 $8,500.00 $8,500.00 $6,000.00 2 TRAFFtC CONTROL LS 1 $250.00 $250.00 $10,000.00 $10,000.00 $18,000.00 $6,000.00 3 COMMON IXCAVA7ION GY 5550 $3.25 $18,000.00 $10,000.00 $10,000.00 $18,037.50 $3.58 $19,869.00 $6.00 $33,300.00 $7.00 $38,850.00 4 TEMPORARY HYDROMULCH SY 5350 $0.60 3 210.00 $1.00 5 350.00 $1.05 5 617.50 $1.10 $5,885.00 TOTAL PART 1-GENERAL $37,497.50 $42,719.00 $65,417.50 $60,735.00 PART 2-WATER MAIN 5 REMOVE&SALVAGE 20"DIP WAl'ER MAIN LF 960 $14.00 $13,440.00 $20.00 $19,200.00 $15.00 $14,400.00 $11.50 6 REMOVE&SALVAGE 20"BUTTERFLY VALVE&BOX EA 1 $430.00 $11,040.00 7 REMOVE&SALVAGE 24"X 20"TEE EA 1 $2,000.00 $430.00 $2,500.00 $2,500.00 $750.00 $750.00 $750.00 $750.00 8 36"RCP CASING PIPE LF 40 $150.00 �2�000.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 $750.00 $750.00 �a,000.00 �zso.00 gio,oaa.00 �zoo.00 �s,000.00 �sso.00 gis,zoo.00 9 12"DIP WAl'ER MAIN,CLASS 50,INCL.POLY WRAF LF 50 $75.00 $3,750.00 $75.00 $3,750.00 $55.00 $2,�so.00 $105.00 $5,250.00 10 20"DIP WAl'ER MAIN,CLASS 51,INCL.POLY WRAF LF 20 $110.00 $2,200.00 $100.00 $2,000.00 $150.00 $3,000.00 $250.00 $5,000.00 11 INSTAL�SALVAGED 20"DIP WATER MAIN LF 960 $37.50 $36,000.00 $40.00 $38,400.00 $25.00 12 INSTALL SALVAGED 20"BUTTERFLY VALVE&BOX EA 1 $1,400.00 $24,000.00 $23.00 $22,080.00 13 12"BUTTERFLY VALVE&BOX EA 1 $1,900.00 $1,400.00 $1,250.00 $1,250.00 $1,000.00 $1,000.00 $800.00 $800.00 14 20"BUTTERFLY VALVE&BOX EA 1 $4,600.00 $1,900.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $3,000.00 $3,000.00 15 20"PUSH ON PIPE GASKET EA 35 $56.00 �4,600.00 $4,000.00 $4,000.00 $6,500.00 $6,500.00 $5,000.00 $5,000.00 16 24"PUSH ON GASI�T EA 2 $61.00 �1,960.00 $100.00 $3,500.00 $80.00 $2,800.00 $110.00 $3,850.00 17 20"FtELD LOK GASKET EA 16 $573.00 $122.00 $100.00 $200.00 $86.00 $172.00 $120.00 $240.00 18 20"DIP 22.5 DEGREE BEND EA 3 $2,200.00 �9�168.00 $540.00 $8,640.00 $850.00 $13,600.00 $760.00 $12,160.00 19 20"DIP SIEEVE EA 1 $2,100.00 $6,600.00 $1,100.00 $3,300.00 $1,400.00 $4,200.00 $1,550.00 $4,650.00 20 20"X 12"TEE EA 1 $2,500.00 �2�100.00 $1,500.00 $1,500.00 $1,200.00 $1,200.00 $1,600.00 $1,600.00 21 24"X 20"CROSS EA 1 $3,300.00 �Z�500.00 $1,750.00 $1,750.00 $1,750.00 $1,750.00 $2,100.00 $2,100.00 22 12"PLUG EA 1 $121.00 �3,300.00 $7,500.00 $7,500.00 $6,000.00 $6,000.00 $4,600.00 $4,600.00 23 20"PLUG EA 1 $535.00 $121.00 $300.00 $300.00 $600.00 $600.00 $600.00 $600.00 24 12"MEGALUG EA 4 $84.00 $535.00 $1,000.00 $1,000.00 $1,100.00 $1,100.00 $1,050.00 $1,050.00 25 20"MEGALUG EA 16 $250.00 5336.00 $140.00 $560.00 $110.00 $440.00 $95.00 $380.00 26 24"MEGALUG EA 2 $300.00 �4,000.00 $350.00 $5,600.00 $370.00 $5,920.00 $280.00 $4,480.00 27 CONNECTTO DQSTING WATER MAIN EA 3 $2,500.00 $600.00 $450.00 $900.00 $450.00 $900.00 $340.00 $680.00 $7,500.00 $2,500.00 $7,500.00 $2,000.00 $6,000.00 $750.00 $2,250.00 28 IMPROVED PIPE FOUNDAlION LF 1030 $2.60 2 678.00 $0.10 103.00 $0.01 10.30 $6.00 $6,180.00 TOTAL PART 2-WATER MAIN $113,240.00 $126,953.00 $108,592.30 $113,690.00 BID SUMMARY TOTAL PART 1-GENERAL $37,497.50 $42,719.00 $65,417.50 $60,735.00 TOTAL PART 2-WATER MAIN 113 240.00 126 953.00 108 592.30 113 690.00 TOTAL BASE BID $150,737.50 $169,672.00 $174,009.80 $174,425.00 Cont2ctor Name and Address:Minger Construction Co.,Inc. Hydrocon,Inc. Burschville Const.Inc. Almn Construction Corporation 620 Corporate Drive 6265 Glaaer Drive 11440 8th St NE,PO Box 65 1700 North Broadway,Ste 108 Jordan,MN 55352 North Branch,MN 55056 Hanover,MN 55341 Rochester,MN 55906 Phone:952-368-9200 651-6742757 763-497-4242 507-258-5287 Fax 952368-9311 651-6742735 763-497-4266 507-258-7350 Email:lukema(2minqerconst.com hydroconlC�Dmsn.com estimatin burschvilleconstruction.comalconconstanoutlook.com Signed By:Luke Minger Thomas M.Hais James E.Schendel Ros Badger Title: President President President President Addenda Acknowledged:None None None None 193803373-BidTab.xlsm QT-1 � Sfantec Bidder No.5 Bidder No.6 Bidder No.7 Bidder No.8 BID TABULATION Ryan Contracting Co. G.F.Jedlicld,Inc. Park Construction Co. Northwest Item Num Item Units Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total PART 1-GENERAL 1 MOBILZATION LS 1 $8,300.00 $8,300.00 $8,500.00 $8,500.00 $9,000.00 $9,000.00 $7,500.00 $7,500.00 2 7RAFFIC CONTROL LS 1 $500.00 $500.00 $3,600.00 $3,600.00 $525.00 $525.00 $1.00 $1.00 3 COMMON IXCAVATION CY 5550 $5.00 $27,750.00 $6.00 $33,300.00 $7.00 $38,850.00 $6.50 $36,075.00 4 l'EMPORARY HYDROMULCH SY 5350 $0.25 $1,337.50 $1.00 $5,350.00 $0.55 $2,942.50 $1.50 $8,025.00 TOTAL PART 1-GENERAL $37,887.50 $50,750.00 $51,317.50 $51 601.00 , PART 2-WATER MAIN 5 REMOVE&SALVAGE 20"DIP WATER MAIN LF 960 $20.00 $19,200.00 $20.00 $19,200.00 $18.00 $17,280.00 $19.00 $18,240.00 6 REMOVE&SALVAGE 20"BUTTERFLY VALVE&BOX EA 1 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $628.00 $628.00 $600.00 $600.00 7 REMOVE&SALVAGE 24"X 20"TEE EA 1 $1,500.00 $1,500.00 $600.00 $600.00 $628.00 $628.00 $600.00 $600.00 8 36"RCP CASING PIPE LF 40 $200.00 $8,000.00 $150.00 $6,000.00 $195.00 $7,800.00 $75.00 $3,000.00 9 12"DIP WATER MAIN,CLASS 50,INCL.POLY WRAF LF 50 $100.00 $5,000.00 $50.00 $2,500.00 $68.00 $3,400.00 $58.50 $2,925.00 10 20"DIP WATER MAIN,CLASS S1,INCL POLY WRAF LF 20 $250.00 $5,000.00 $83.00 $1,660.00 $105.00 $2,100.00 $110.00 $2,200.00 11 INSTALL SALVAGED 20"DIP WATER MAIN LF 960 $40.00 $38,400.00 $38.00 $36,480.00 $32.00 $30,720.00 $61.30 $58,848.00 12 INSTALL SALVAGED 20"BUTTERFLY VA�VE&BOX EA 1 $2,000.00 $2,000.00 $2,500.00 $2,500.00 $1,620.00 $1,620.00 $2,120.00 $2,120.00 13 12"BUTTERFLY VALVE&BOX EA 1 $3,000.00 $3,000.00 $3,500.00 $3,500.00 $2,310.00 $2,310.00 $1,944.00 $1,944.00 14 20"BUTTERFLY VALVE&BOX EA 1 $5,000.00 $5,000.00 $6,500.00 $6,500.00 $4,970.00 $4,970.00 $4,840.00 $4,840.00 15 20"PUSH ON PIPE GASKET EA 35 $100.00 $3,500.00 $120.00 $4,200.00 $241.00 $8,435.00 $127.00 $4,445.00 16 24"PUSH ON GASKET EA 2 $200.00 $400.00 $132.00 $264.00 $251.00 $502.00 $131.00 $262.00 17 20"FlELD LOK GASKEi' EA 16 $600.00 $9,600.00 $565.00 $9,040.00 $720.00 $11,520.00 $566.00 $9,056.00 18 20"DIP 22.5 DEGREE BEND EA 3 $1,000.00 $3,000.00 $1,700.00 $5,100.00 $1,450.00 $4,350.00 $1,460.00 $4,380.00 19 20"DIP SLEEVE EA 1 $1,500.00 $1,500.00 $1,600.00 $1,600.00 $1,340.00 $1,340.00 $1,450.00 $1,450.00 zo 20^x i2^�e � i �s,000.00 �s,000.00 �z,zoo.00 gz,zoo.00 g2,iso.00 �z,iso.00 �z,izs.00 �2,i2s.oa 21 24"X 20"CROSS EA 1 $8,000.00 $8,000.00 $6,500.00 $6,500.00 $5,720.00 $5,720.00 $6,435.00 $6,435.00 22 12"PLUG EA 1 $500.00 $500.00 $390.00 $390.00 $294.00 23 20"PLUG EA 1 $1,500.00 $1,500.00 $880.00 $880.00 �294•00 $226.00 $226.00 $871.00 $871.00 $860.00 $860.00 24 12"MEGALUG EA 4 $150.00 $600.00 $250.00 $1,000.00 $275.00 $1,100.00 $168.00 $672.00 25 20"MEGALUG EA 16 $300.00 $4,800.00 $500.00 $8,000.00 $572.00 $9,152.00 $440.00 $7,040.00 26 24"ME�ALUG EA 2 $600.00 $1,200.00 $650.00 $1,300.00 $621.00 $1,242.00 $624.00 $1,248.00 27 CONNECTTO DQSIING WATER MAIN EA 3 $3,000.00 $9,000.00 $3,800.00 $11,400.00 $1,880.00 $5,640.00 $1,500.00 $4,500.00 28 IMPROVED PIPE FOUNDA7ION LF 1030 $0.01 $10.30 $0.01 10.30 $9.50 $9,785.00 $0.01 $1030 TOTAL PART 2-WATER MAIN $138,210.30 $132,324.30 $133,587.00 $138,024.30 BID SUMMARY TOTAL PART 1-GENERAL $37,887.50 $50,750.00 $51,317.50 $51,601.00 TOTAL PART 2-WATER MAIN 138 210.30 132 324.30 133 587.00 138 024.30 TOTAL BASE BID $176,097.80 $183,074.30 $184,904.50 $189,625.30 Contractor Name and Address:Ryan Contracting Co. G.F.Jedlicki,Inc. Park Construction Company Northwest Asphalt,Inc. 26480 France Ave.,PO Box 246 2471 Galpin Court,Ste.110 1481 81st Avenue NE 1451 Stagecoach Road Elko New Market,MN 55020 Chanhassen,MN 55317 Minneapolis,MN 55432 Shakopee,MN 55379 Phone:952-8943200 952-9347272 763-786-9800 952-945-1003 Fax 952-8943207 952-9347273 763-717-6237 952-445-1056 Email:tomr(a�rvancont.com jedlickipfa�aoi.com mchristianson arkconsUvctionco.co Nlerea�nwasphalt.net Signed By:Thomas].Ryan Garrett Jediicki Michaei Christianson Tyler Enright Titie:President President Vice President Project Manager Addenda Acknowiedged:None None None None 193803373-BidTab.xlsm QT-2 � Stantec Bidder No.9 Bidder No.10 Bidder No.11 Bidder No.12 BID TABULATION Carl Bolander&Sons Frattalone Companies,Inc. Penn Contracting,Inc. Northdale Construction Co.Inc. Item Num Item Units Qty Unit Price Total Unit Price Total Unit Price Total Unit Price Total PART 1-GENERAL 1 MOBILZP,TION �s i �io,000.00 �io,000.00 gio,��o.00 $io,no.00 �io,000.00 2 TRAFFIC COMROL �.s i g2ss.00 g2ss.00 �io,000.00 �io,o2s.00 gio,o2s.00 3 COMMON IXCAVATION CY 5550 $2.50 $13,875.00 �547.50 $547.50 $2,500.00 $2,500.00 $11,865.00 $11,865.00 4 TEMPORARY HYDROMULCH SY 5350 $1.00 $4.55 $25,252.50 $9.00 $49,950.00 $6.00 $33,300.00 TOTAL PART 1-GENERAL $5,350.00 $4.50 $24,075.00 $130 $6,955.00 $0.89 $4,761.50 $29,510.00 $60,645.00 $69,405.00 $59,951.50 PART 2-WATER MAIN 5 REMOVE&SALVAGE 20"DIP WATER MAIN LF 960 $50.00 $48,000.00 $21.50 $20,640.00 $24.00 $23,040.00 $45.42 $43,603.20 6 REMOVE&SALVAGE 20"BUTTERFLY VALVE&BOX EA 1 $395.00 $395.00 $157.50 $157.50 $2,250.00 $2,250.00 $1,750.00 $1,750.00 7 REMOVE&SALVA6E 24"X 20"TEE EA 1 $395.00 $395.00 $157.50 $157.50 $2,000.00 $2,000.00 $1,750.00 $1,750.00 8 36"RCP CASING PIPE LF 40 $275.00 $11,000.00 $139.50 $5,580.00 $140.00 $5,600.00 $267.08 $10,683.20 9 12"DIP WATER MAIN,CLASS 50,INCL.POLY WRAF LF 50 $95.00 $4,750.00 $69.50 $3,475.00 $67.00 $3,350.00 $72.63 $3,631.50 10 20"DIP WATER MAIN,C1A55 51,INCL.POLY WRAF LF 20 $115.00 $2,300.00 $109.50 $2,190.00 $110.00 $2,200.00 $100.04 $2,000.80 11 INSTALL SALVAGED 20"DIP WATER MAIN LF 960 $35.00 $33,600.00 $53.75 $51,600.00 $49.00 $47,040.00 $28.00 $26,880.00 12 INSTALL SALVAGED 20"BUTTERFLY VALVE&BOX EA 1 $1,500.00 $1,500.00 $1,160.00 $1,160.00 $2,112.00 $2,112.00 $2,556.25 $2,556.25 13 12"BUTTERFLY VALVE&BOX EA 1 $2,500.00 $2,500.00 $1,840.00 $1,840.00 $2,279.00 $2,279.00 $2,936.18 $2,936.18 14 20"BUTTERFLY VALVE&BOX EA 1 $5,000.00 $5,000.00 $4,510.00 $4,510.00 $5,157.00 $5,157.00 $5,424.35 $5,424.35 15 20"PUSH ON PIPE GASKET EA 35 $150.00 $5,250.00 $84.75 $2,966.25 $101.00 $3,535.00 $126.36 $4,422.60 16 24"PUSH ON GASKET EA 2 $225.00 $450.00 $94.25 $188.50 $116.00 gzsz.00 $136.00 �2�z.00 17 20"FIELD�OK GASKET EA 16 $750.00 $12,000.00 $563.00 $9,008.00 18 20"DIP 22.5 DEGREE BEND EA 3 $1,500.00 $551.00 $8,816.00 $663.14 $10,610.24 19 20"DIP SLEEVE EA 1 $1,500.00 �4,500.00 $1,980.00 $5,940.00 $1,548.00 $4,644.00 $1,251.43 $3,754.29 20 20"X 12"TEE EA 1 $1,850.00 �1,500.00 $1,030.00 $1,030.00 $1,449.00 $1,449.00 $2,402.53 $2,402.53 21 24"X 20"CROSS EA 1 $5,600.00 �1,850.00 $1,560.00 $1,560.00 $2,128.00 $2,128.00 $1,633.05 $1,633.05 $5,600.00 $4,940.00 $4,940.00 $6,052.00 $6,052.00 $5,071.03 $5,071.03 22 12"PLUG EA 1 $320.00 $320.00 $200.50 $200.50 $275.00 $275.00 $625.78 $625.78 23 20"PLU� EA 1 $850.00 $850.00 $716.50 $716.50 24 12"MEGALUG EA 4 $1,900.00 $755.00 $755.00 $1,507.40 $1,507.40 25 20"MEGALUG EA 16 $550.00 ���600.00 $118.50 $474.00 $133.00 $532.00 $158.58 $634.32 $8,800.00 $344.00 $5,504.00 $406.00 $6,496.00 $507.97 $8,127.52 26 24"MEGALUG EA 2 $750.00 $1,500.00 $463.50 $927.00 $481.00 $962.00 $623.55 $1,247.10 27 CONNECT TO DQSTING WATER MAIN EA 3 $4,000.00 $12,000.00 $5,760.00 $17,280.00 28 IMPROVED PIPE FOUNDA'fiON LF 1030 $3,500.00 $10,500.00 $8,720.00 $26,160.00 TOTAI.PART 2-WAl'ER MAIN $1.00 $1,030.00 $6.10 $6,283.00 $4.50 $4,635.00 $6.00 $6,180.00 $172,690.00 $148,327,75 $146,039.00 $173,863.34 BID SUMMARY TOTAL PART 1-GENERAL $29,510.00 $60,645.00 $69,405.00 $59,951.50 TOTAL PART 2-WA'TER MAIN 172 690.00 148 27.75 146 039.00 173 863.34 TOTAL BASE BID $202,200.00 $208,972.75 $215,444.00 $233,814.84 Contractor Name and Address:Carl Bolander and Sons LLC Frattalone Companies,Inc. Penn Contracting,Inc. Northdale Construction Co.,Inc. 2515tarkey Street 3205 Spruce Street 13025 Centrai Avenue NE 9760 71st Street NE St.Paui,MN 55107 St.Paul,MN 55117 Biaine,MN 55434 Albertvilie,MN 55301 Phone:651-2246299 651-4840447 763-767-2141 763-428-4868 Fax 651-223-8197 651-484-7839 763-767-2545 763-428-4997 Email:markCa�bolander.com beneCo�frattaloneco.com penncontractinq(o�msn.com phili(o�northdaleconst.com Signed By:Mark R.Ryan Nick Frattalone Dean luxenburg Phiiip B.Lesnar Title: President CEO President Vice President Addenda Acknowledged:None None None None 193803373-BidTab.xism QT-3 � Stanfec Bidder No.13 BID TABULATION Valley-Rich,Inc. Item Num Item Units Qty Unit Price Total PART 1-GENERAL 1 MOBILZATION LS 1 $5,000.00 $5,000.00 2 IRAFFIC COMROL �.s i �i,000.00 �i,aao.00 3 COMMON IXCAVATION GY 5550 $9.00 $49,950.00 4 TEMPORARY HYDROMUI.CH SY 5350 $1.20 $6,420.00 TOTAL PART 1-GENERAL $62,370.00 PART 2-WATER MAIN 5 REMOVE&SALVAGE 20"DIP WATER MAIN LF 960 $20.00 $19,200.00 6 REMOVE&SALVAGE 20"BU7TERFLY VALVE&BOX EA 1 $3,000.00 $3,000.00 7 REMOVE&SALVAGE 24"X 20"7EE EA 1 $4,000.00 $4,000.00 8 36"RCP C0.SING PIPE LF 40 $120.00 $4,800.00 9 12"DIP WATER MAIN,CLASS 50,INCL POLY WRAF LF 50 $80.00 $4,000.00 10 20"DIP WATER MAIN,CLASS 51,INCL.POLY WRAF �F 20 $160.00 $3,200.00 11 INSTALL SALVAGED 20"DIP WAl'ER MAIN LF 960 $30.00 $28,800.00 12 INSTALL SALVAGED 20"BU'fTERFLY VAI.VE&BOX EA 1 $3,000.00 $3,000.00 13 12"BUiTERFLY VALVE&BOX EA 1 $3,000.00 $3,000.00 14 20"BUTTERFLY VALVE&BOX EA 1 $6,000.00 $6,000.00 15 20"PUSH ON PIPE GASKEf EA 35 $450.00 $15,750.00 16 24"PUSH ON GASKEf EA 2 $450.00 $900.00 17 20"FIELD LOK GASKET EA 16 $950.00 $15,200.00 18 20"DIP 22.5 DEGREE BEND EA 3 $5,000.00 $15,000.00 19 20"DIP SLEEVE EA 1 $3,900.00 $3,900.00 20 20"X 12"TEE EA 1 $4,000.00 $4,000.00 21 24"X 20"CROSS EA 1 $8,650.00 $8,650.00 22 12"PLUG EA 1 $300.00 $300.00 23 20"PLUG EA� 1 $2,000.00 $2,000.00 24 12"MEGALUG EA 4 $500.00 $2,000.00 25 20"MEGALUG EA 16 $1,000.00 $16,000.00 26 24"MEGALUG EA 2 $1,000.00 $2,000.00 27 CONNECTTO DQSTING WATER MAIN EA 3 $3,000.00 $9,000.00 28 IMPROVED PIPE FOUNDATION LF 1030 $10.00 $10,300.00 TOTAL PART 2-WATER MAIN $184,000.00 BID SUMMARY TOTAL PART 1-GENERAL $62,370.00 TOTAL PART 2-WATER MAIN 184 000.00 TOTAL BASE BID $246,370.00 Contractor Name and Address:Valley-Rich Co.,Inc. 147 N.Jonathan Bivd. Chaska,MN 55318 Phone:952-448-3002 Fax 952-448-3362 Email:John anvalievrich.com Signed By:]ohn Miklya Title:CFO Addenda Acknowiedged:None 193803373-Bidfab.xlsm QT-4