Community Development
Title of Request
Authorize Feasibility Report for 2017 Pavement Management Project
Staff Recommendation
Adopt Resolution 2016-107 authorizing the preparation of a feasibility report for the 2017
Pavement Management Project for District C-3, a portion of District F-3, and a portion of
District B-1.
ATTACH MENTS:
Description Type Upload Date
Council Memo Cover Memo 5/25/2016
2017 PM Areas Map Exhibit 5/25/2016
Resolution Resolution 5/25/2016
Cottage
J Grove
�here Pride and prOSPerity Meet
To: Honorable Mayor and City Council
Charlene Stevens, City Administrator
From: Ryan Burfeind, PE, Project Engineer
Date: May 25, 2016
Re: 2017 Pavement Management —Authorization of Feasibility Report
Backqround
The next scheduled Pavement Management Area as outlined in the Capital Improvement Plan
includes streets in three residential areas of Cottage Grove:
• Prestige Estates Neighborhood: Streets north of 80th Street, east of Kingston Park,
and west of Cottage Grove Trail Way Corridor (District C-3).
• Jamaica Ridge Neighborhood: Streets north of East Meadow Cliff Ravine, east of
Jamaica Ave, south of 80th Street, and west of Jeffery Avenue (a portion of District F-3).
• Rolling Hills Neighborhood: Streets north of Crestview Elementary and Park High
School, east of Hinton Avenue, and west of North Ideal Park and Nina's Park (a portion
of District B-1).
Included with this memo is a project location map that highlights the proposed areas.
Discussion
The Prestige Estates, Jamaica Ridge, and Rolling Hills Neighborhoods are proposed for recon-
struction due to the poor condition of the streets. Similar to the 2015 and 2016 Pavement
Management projects, these streets are experiencing failure due to stripping. Jamaica Ridge
and Rolling Hills are also experiencing severe cracking.
Feasibility Report: The next step in the project development process is the preparation of a
feasibility report. It is recommended that the feasibility report be ordered at this time to deter-
mine the physical and economical feasibility of providing the necessary public improvements.
Recommendation
It is recommended the City Council adopt a resolution authorizing the preparation of a feasibility
report for the 2017 Pavement Management Project for District C-3, a portion of District F-3, and
a portion of District B-1.
fxt CUT[:���' I.
s���irP°�u��.�,�� 2017 Pavement ManagementAreas � -;�-�
��� �.
Legend � �
2017 Pavement Management
CG City Boundary e �
CG Major Roads �
- ISD 833 property
Wetland �
- Park and Open Space ( Il ' �
� r
� Mississippi River O
PARCELS 1 ROI I I ng H I I IS
Area B-1 Prestige Estates
�� � Area C-3
U �
❑ � �
0 � tree �
�
�
o -�
Jamaica Ridge �[J
- I_
� Area F 3
Location Map 1 \v Q
•=' \%
. y y �
� ` �
':'.:;1 ''''.:: ��
Community Development
Date:5/23/2016 M:\M tmen jects\M De rtm t P ects_20 Enginee 0 m t Ma en Map\2017 Pavement Man gementAreas.mxd
RESOLUTION NO. 2016-XXX
RESOLUTION AUTHORIZING THE PREPARATION OF A FEASIBILITY
REPORT FOR THE 2017 PAVEMENT MANAGEMENT PROJECT
WHEREAS, based upon the City Council's acceptance of the Capital
Improvement Plan, the next step in the development process is the preparation
of a feasibility report; and
WHEREAS, it is recommended at this time to determine the physical and
economical feasibility of providing the necessary public improvements; and
WHEREAS, the City desires to assess the cost of said improvements to
all benefitted properties.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of
Cottage Grove, County of Washington, State of Minnesota, that a feasibility
report for the 2017 Pavement Management Project be authorized.
Passed this 1 st day of June 2016.
Myron Bailey, Mayor