Quote Award - 80th Street & East Point Douglas Road Left Turn Lanes
Staff Recommendation
Adopt Resolution 2016-118 awarding the quote for the 80th Street South/East Point
Douglas Road - Left Turn Lane Extensions Project to Hardrives, Inc.
ATTACH MENTS:
Description Type Upload Date
Letter from Bolton & Menk Cover Memo 7/1/2016
Quote Plan Sheets Exhibit 7/1/2016
Resolution Resolution 7/1/2016
• = BOLTON 8� M � N K , I NC�
. Consulting Engineers & Surveyors
" 2035 County Road D East•Suite B• Maplewood, MN 55109-5314
Phone(651)704-9970• Fax(651)704-9971
www.bolton-menk.com
June 30, 2016
Honorable Mayor and City Council
City of Cottage Grove
12800 Ravine Parkway South
Cottage Grove, MN 55016
Re: Quote Results
80th Street South/East Point Douglas Road—Left Turn Lane Extensions
Dear Honorable Mayor and City Council:
At times,the 80t"Street eastbound and westbound left turn lanes at East Point Douglas Road/Hardwood
Avenue provide inadequate stacking, resulting in unacceptable service levels. As redevelopment in the area
occurs service levels will continue to decline, particularly the westbound left. In an effort to mitigate these
concerns, it's proposed to lengthen the existing left turn lanes by removing portions of the existing median.
Completing the work this year will ensure the improvements are in place prior to the expected increases in
traffic.
Quotes for the 80th Street South/East Point Douglas Road Left Turn Lane Extension Project were opened on
Thursday,June 30, 2016. Quotes were sent out to four (4) contractors, and two (2) quotes were received
which ranged from$89,701.75 to $130,574.25. A Quote Tabulation has been included. Copies will also be
distributed to each Bidder after award by the City.
The following is a summary of the Quotes received:
Contractor Total Base Bid
Hardrives, Inc. $89,701.75
Park Construction $130,574.25
The low Bidder on the Project was Hardrives, Inc. with a Total Base Bid Amount of$89,701.75. This compares
to the Engineer's Estimate of$95,000. If the City Council decides to award the Project to the low bidder,
then Hardrives, Inc.should be awarded the Project on the Total Base Bid Amount of$89,701.75.
If you have any questions, please feel free to contact me at 651-968-7674.
Sincerely,
BOLTON & MENK, INC.
��
Michael Boex, P.E.
Senior Project Manager
Enclosure
DESIGNING FOR A BETTER TOMORROW
Bolton&Menk is an equal opportunity employer
ABSTRACT OF QUOTES
80th Street South/East Point Douglas Road-Left Turn Lane Extensions
City of Cottage Grove,Minnesota
BMI Project No.N14.112007
1 2
Hardrives,lnc. Park Construction
ITEM APPROX. UNIT UNIT
NO. BID ITEM QUAN. UNIT PRICE AMOUNT PRICE AMOUNT
BASE BID:
� MOBILIZATION 1 LS
$7,500.00 $7,500.00 $17,500.00 $17,500.00
2 TRAFFIC CONTROL 1 LS
$10,000.00 $10,000.00 $5,700.00 $5,700.00
3 REMOVE CONCRETE PAVEMENT 585 SY
$13.85 $8,102.25 $22.00 $12,870.00
4 REMOVE BITUMINOUS PAVEMENT 115 SY
$13.85 $1,592.75 $40.00 $4,600.00
5 REMOVE CONCRETE CURB AND GUTTER 520 LF
$8.15 $4,238.00 $6.50 $3,380.00
6 SALVAGE AND REINSTALL SIGN 1 EA
$125.00 $125.00 $112.00 $112.00
� CONCRETE CURB AND GUTTER 520 LF
$28.90 $15 028.00 $28.00 $14 560.00
$ CONCRETE MEDIAN 335 SY
$60.00 $20,100.00 $69.00 $23,115.00
9 PATCH BITUMINOUS PAVEMENT 365 SY
$60.00 $21 900.00 $128.00 $46 720.00
10 SIGN,TYPE C 1 EA
$325.00 $325.00 $395.00 $395.00
11 PAVEMENT MESSAGE,LT ARROW-EPDXY 2 EA
$185.00 $370.00 $282.00 $564.00
12 4"SOLID WHITE LINE-EPDXY 255 LF
$1.65 $420.75 $4.15 $1 058.25
TOTAL BASE BID: $89,701.75 $130,574.25
Contrador Name and Address:Hardrives,Inc. Park Construdion
14475 Quiram Dr. 1481 81st St NE
Rogers,MN 55374 Minneapolis,MN 55432
Phone:7s3-a2a-aaas Phone:7s3-7asssoo
Fax:7s�a2a-aasa Fax:7s3-7i 7-s23a
Signed By:Mike Leuer Signed By:Charlie Borene
Title:Gen.Mgr. Title:Div.Mgr.
Addenda None Addenda None
H:\COTT\N14112007\3_DesignW_Calculations\Quotes\112007-Quote Abstrad.xls Page 1
�
0
� ��_.��, .� � � a�� - - ��. .,� �
�1 ���i� �. ` j � ' -` o.'' �;�w ,.s.k� � • ;-7 �'� K
;� - — .�� ��,P���;.Q 1 ' 1 ":� i-ry^,�'"_. > ..r � + �g�a i.i.-: w - -• ---- --��' . � �• �
� ,a , 4, Q ,,�, '� _a�� �� ,� � � � � �•� �
e,� � =��=
- `> ut '� •
P
. ' . _ OO H _ -�j� ,�
- ,�,. ' �-- � '� ':� � r)i � �: �:: _ . . ��� �� ��� 1�1�1 ��� 1 ��� Y
�p• -(: i i L � �si — �T ��
-• �, . �I' ' ..!'� �'� • x�. � �� �A� Z .--� ��•,��. I a • • ��Y `t j i��� _ �, . . .
�y 1 '� ,�i � _ _ . � - . - - - - . . ��.�.��; �,��a
_ � � � ; • . � . .
,-� � ��' � �
�� ���
-=�___ . : �.�.... ,. , „ ' � - �-n
��. ..� --------------
f - �T ' �
. . � ,. 1+'y" �� . '. , _ i 1� � '�� .� � 0
^S _ �
• . s , — � � � �
"�.� � ;;:t_' � ' � . Y♦ � . . ' � � � a�
� _ ' ' ' . . . . . . J . ��• . t �� 'l�R�� +�`�`i!' ��•��^� �a�` y�,` _ �
�V—
. . - � '.� . .;�' -� 0
�r;, ,�.�
� ��
REMOVE 345 SY CONCRETE PAVEMENT
� PROTECT EXISTING CURB AND GUTTER� SAWCUT CONCRETE PAVEMENT(TYP) �
- - - - - - .-f.1,/ . �
1'� .I • '- .': i ..I.�: :.J'. : •. � :! • �,�. a '11` .« . i : . .' ':t•'.��-.:♦ '�I�••I�.. • • ••' ; r
� •Yi, ,. . .i.• '.. • .*:� .. .: •.�.:11 y ' . • . .i.jV ' • ': ••
i . • •' �
, . . �. . .. . ' .
� . . . . '� .• ' ! �..,. . ' .. •� ' :•,! ' ,�. .• .
. ••
.• ';., ... �. • '.�'..��, �e . .}, .i�'� :,t•�: . • •+ t .�� ��'m'' ��• - �� �- .�
s ,
... •'.• � �t..... :.. � .. . •1! X��•'�'.� � ���____
. •,.
�`•�- •. i•�• . • . �.. ' �..:. i . .a , � � — � + � ,
' ,...' � • ___—___--�— —___—_ ,
— � — • �, ••��• �••�.
�_ _— �__� �������
TT �����_����
// REMOVE 65 SY (
SAWCUT BITUMINOUS PAVEMENT TYP J BITUMINOUS PAVEMENT
( ) REMOVE 290 LF CONCRETE NOTES: �
CURB AND GUTTER 1. TRAFFIC CONTROL SHALL BE PROVIDED FOR ALL WORK PER THE MNDOT
TEMPORARY TRAFFIC CONTROL FIELD MANUAL,2014.
2. HIGH EARLY CONCRETE SHALL BE USED FOR ALL CONCRETE WORK.
p + + + 3. CONTRACTOR SHALL REMOVE AND DISPOSE OF EXCE55 MATERIALS OFFSITE.
iY OOIh SlCee l SO. 6. SAWCUTTING SHALL BE PERFORMED FULL-DEPTH(INCIDENTAL TO REMOVALS).
,.�� 7. PAYMENT FOR PATCH BITUMINOUS PAVEMENT SHALL INCLUDE EXCAVATION,
� � ^�' CLA55 5 AGGREGATE BASE,BITUMINOUS TACK COAT, BITUMINOUS PAVEMENT
. . .w--
� AND COMPACTION OF ALL MATERIALS. �
_- . 8. PAYMENT FOR CONCRETE PAVEMENT SHALL INCLUDE EXCAVATION,CLA55 5 +-+ �
'� ' _ ' AGGREGATE BASE,ANDCONCRETE PAVEMENT. �
�� A, f� �� � � ' • `' • , � ti � i � � 9. EACH TURN LANE MAY BE COMPLETED INDIVIDUALLY OR CONCURRENTLY. ONCE 0 N
� � �.� WORK ON A TURN LANE BEGINS,THE CONTRACTOR SHALL HAVE 8 CALENDAR � �
� �'�ti�•� ,�`�, - � , �'" � DAYS TO COMPLETE WORK AT THAT LOCATION. SUBSTANTIAL COMPLETION FOR �
L. � . � � � •' � BOTH TURN LANES SHALL BE ON OR BEFORE OCTOBER 15,2016. y �
� .. ' -- . � t T ' � '� � � +�� � � O
.,_ '� ' W �
. _ - _ V 1
. - � rlf�-h `i� ' , •`- �`l��. �'�,� � O- -
1 ', .. .—� . � � �
� 1 �
r�j� � +�.'•� • t �� I�� � < < + .,« INSETA:STREETPATCHING L �
, _ , � �._ z �, . �r. _ .j fB �
`� — . . . 2 Q
� , — �
�A INSTALL 210 SY CONCRETE
ZT PAVEMENTPERINSETB 2"-SPWEB340B �!►�
2"-SPWEB340B �_ �
2"-SPN W B330B
�� . + � ���,o- � 10"-CLA55 5 AGGREGATE BASE
g .
. .°. '.e �. ' .. ...e. ' . a
.
:.. . . ----_
10:1TAPER ----------
N � - - � INSET B:CONCRETE MEDIAN t �
PATCH 200 SY BITUMINOUS .ti INSTALL 290 LF B624
PAVEMENT PER INSET A CONCRETE CURB AND GUTTER
LEFT TURN ARROW-EPDXY
120 LF 4"SOLID WHITE
STRIPE-EPDXY gOth Street So.
.:�,,,r,
� ' � • � � - �
,, � •1 � �
�
� 4"-CONCRETEPAVEMENT-3F52 •� y
��� A� Q� �� �� r � � ���`'� f 4" -CLA555 AGGREGATE BASE � �
� 1 ������ �''f• � .♦ � � - .%. -�'� � �
.. : " _ +,. � k � ¢'� � � �.� �__ N . ['�� '�r W �
•�. °
o zo ao �"���a"�����`�"���"��"`w�'�°�"'��°"°���`°��w`�`��""�° ������ CITY OF COTTAGE GROVE, MINNESOTA
arMEOR�NOER�o�RE�s�PER��soNANor�,r��Ao��r��N�o g0 LTO N 8c M E N K 1 N C. nn's SHEEr
PROFESSIONALENGINEER UNDERTHE WWSOFTHE S7ATE OFMINNESOTA. /
HORZ. ,,, n� Consulting Engineers & Surveyors EWEo AK TURN LANE EXTENSIONS �
SCALE FEET ��A�•- ��
yvl/�`�+ 2035CountyRoadDEast,SuiteB-Maplewood,Minnesota ss�o9 M,B 80TH STREET&EAST POINT DOUGLAS ROAD
csolmn&nnenk,inczois,nn2ighcs2eserved MICHAELJ.BOEX � Phone:651-704-9970 Email:Maplewood@bolton-menk.com vNo.
H:��oTT�N14112oor�,o��3o�M,5�-Q�o�eP,a�Shee�.dwg6n4no169:1,:23AM aas�e 06/24/2016 www.bolton-menk.com EASTBOUND LEFTTURN LANE
x � }- � � �
_ �-�- �
. � , �
. � �►��-*�-�—�-��� . ' � �+1�,;;,, ,.
. � t . _ _� s!� 0
. , _;�-,
• �� - — � - .
. .
SAWCUT BITUMINOUS PAVEMENT(TYP)
REMOVE 230 LF CONCRETE
CURB AND GUTTER SAWCUT CONCRETE PAVEMENT(TYP)
REMOVE 50 SY
BITUMINOUS PAVEMENT
� �~ --------�— � ------- ------�.-s� � .� ,� _----- —� I I
----- � .� : � •.. ,•.�,. .s• . . _�7 � � �
�. -*�.�,. a� . .• ��.. .
r-- .�.•s.l•.. . . tti'. i!.•. ;y. •:�t.,.. , :a.'• � 1
—=,rr• „i. � . • .
�'� +�'Y� .. . . • . �• . 11' i . . . . . . •• •`,Ni _ '
• . r : '.� .�....• .:y
�'• •. .. _ . •�L _ . . . `'J.'. . �' ,.
� REMOVE 240 SY NOTES:
CONCRETE PAVEMENT 1. TRAFFIC CONTROL SHALL BE PROVIDED FOR ALL WORK PER THE MNDOT
TEMPORARY TRAFFIC CONTROL FIELD MANUAL,2014.
PROTECT EXISTING 2. HIGH EARLY CONCRETE SHALL BE USED FOR ALL CONCRETE WORK.
CURB AND GUTTER gOlh SlCeel SO. 3. CONTRACTOR SHALL REMOVE AND DISPOSE OF EXCE55 MATERIALS OFFSITE.
�= 6. SAWCUTTING SHALL BE PERFORMED FULL-DEPTH(INCIDENTAL TO REMOVALS).
t i � 7. PAYMENT FOR PATCH BITUMINOUS PAVEMENT SHALL INCLUDE EXCAVATION,
CLA555 AGGREGATE BASE,BITUMINOUS TACK COAT, BITUMINOUS PAVEMENT
AND COMPACTION OF ALL MATERIALS.
8. PAYMENT FOR CONCRETE PAVEMENT SHALL INCLUDE EXCAVATION,CLA55 5
AGGREGATE BASE,AND CONCRETE PAVEMENT.
9. EACH TURN LANE MAY BE COMPLETED INDIVIDUALLY OR CONCURRENTLY. ONCE
WORK ON A TURN LANE BEGINS,THE CONTRACTOR SHALL HAVE 8 CALENDAR
DAYS TO COMPLETE WORK AT THAT LOCATION. SUBSTANTIAL COMPLETION FOR
�i� � . rt ��y� � .,� BOTH TURN LANES SHALL BE ON OR BEFORE OCTOBER 15,2016. �
.. 'l.�f
! . - i�
, i � - �f�
.� � � ' � � ' -� .
. ,
� , r � .
� INSETA:STREET PATCHING
— � • •�
- ' � �'` ' -` �" +.�.� ' 1�
_ - �— . .. . ��� . . ' � �aL -. ''�' " J�
' _ _ ��-]
LEFT TURN ARROW-EPDXY INSTALL 175 LF B624
CONCRETE CURB AND GUTTER
PATCH 165 SY BITUMINOUS TRANSITION FROM B624 TO B618 2"-SPWEB340B
PAVEMENT PER INSET A CONCRETE CURB AND GUTTER 2"-SPWEB340B
135 LF 4"SOLID WHITE INSTALL 55 LF B618 2"-SPNWB330B
STRIPE-EPDXY CONCRETE CURB AND GUTTER � ��- 10"-CLA55 5 AGGREGATE BASE
� �:� ----------
.. . . .�A.. .•:;'..:`r.. . ... ., ' ,a: . _ . . , ���_ INSET B:CONCRETE MEDIAN
INSTALL1255YCONCRETE�� ,e • '•
PAVEMENT PER INSET B X D�
��r
.,..n �
=T 80th Street So.
SALVAGE AND REINSTALL SIGN
4"-CONCRETEPAVEMENT-3F52
4" -CLASSSAGGREGATEBASE
J ��. "i�� �� -� s� � i/� ♦� ' � - • _ ltri � -�l�-�'� -� - ti - �� ,
�- , r ?• �'.
o zo ao �"���a"�����`�"���"��"`w�'�°�"'��°"°���`°��w`�`��""�° ������ CITY OF COTTAGE GROVE, MINNESOTA
arMEOR�NOER�o�RE�s�PER��soNANor�,r��Ao��r��N�o g0 LTO N 8c M E N K 1 N C. nn's SHEEr
PROFESSIONALENGINEER UNDERTHE WWSOFTHE S7ATE OFMINNESOTA. /
HORZ. ,,, n� Consulting Engineers & Surveyors EWEo AK TURN LANE EXTENSIONS �
SCALE FEET ��A�•- ��
yvl/�`�+ 2035CountyRoadDEast,SuiteB-Maplewood,Minnesota ss�o9 M,B 80TH STREET&EAST POINT DOUGLAS ROAD
csolmn&nnenk,inczois,nn2ighcs2eserved MICHAELJ.BOEX � Phone:651-704-9970 Email:Maplewood@bolton-menk.com vNo.
H:��oTT�N14112oor�,o��3o�M,5�-Q�o�eP,a�Shee�.dwg6n4no169:1,:35AM aas�e 06/24/2016 www.bolton-menk.com WESTBOUND LEFTTURN LANE
RESOLUTION NO. 2016-XXX
RESOLUTION AWARDING THE 80TH STREET SOUTH/EAST POINT
DOUGLAS ROAD — LEFT TURN LANE EXTENSIONS PROJECT TO
HARDRIVES INC. IN THE AMOUNT OF $89,701.75
WHEREAS, quotes were requested to provide the necessary work for the
80th Street South/East Point Douglas Road — Left Turn Lane Extensions Project;
and
WHEREAS, two firms submitted quotes; and
WHEREAS, it appears that Hardrives, Inc. provided the lowest accepted
quote; and
WHEREAS, it is the recommendation of the City Engineer that the quote
be awarded to Hardrives, Inc. in the amount of $89,701.75.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of
Cottage Grove, County of Washington, State of Minnesota, that the 80th Street
South/East Point Douglas Road — Left Turn Lane Extensions Project be awarded
to Hardrives, Inc. in the amount of $89,701.75.
Passed this 6th day of July 2016.
Myron Bailey, Mayor