HomeMy WebLinkAbout09A 2017 Pavement Management Project - Public Hearing, Order Project, and Authorize Preparation of Plans & Specifications City Council Action Request Form Meeting Date 9/7/2016 Department Community Development Agenda Category Public Hearings Title 2017 Pavement Management Project – Public Hearing, Order Project, and Authorize Preparation of Plans & Specifications Staff Recommendation 1) Hold the Public Hearing 2) Adopt Resolution No. 2016-XXX ordering the 2017 Pavement Management Project and authorizing the preparation of plans and specifications for Districts B1 and F3 Budget Implication Attachments Council Memo Resolution No. 2016-XXX Feasibility Report To: Honorable Mayor and City Council Charlene Stevens, City Administrator From: Jennifer Levitt, P.E., Community Development Director/City Engineer Ryan Burfeind, P.E., Project Engineer Date: September 1, 2016 Re: 2017 Pavement Management Project  Hold Public Hearing  Order Project  Authorize Preparation of Plans and Specifications Background On June 1, 2016, the City Council authorized a feasibility report for the 2017 Pavement Management Project as outlined in the Capital Improvement Plan (CIP) for the following areas: 1) A portion of the B1 residential area (Rolling Hills) generally bound by streets north of Crestview Elementary and Park High School, east of Hinton Avenue, west of North Ideal Park and Nina’s Park, and south of 75th Street. 2) A portion of the F3 residential area (Jamaica Ridge) generally bound by streets north of East Meadow Cliff Ravine, east of Jamaica Ave, south of 80th Street, and west of Jeffery Ave. 3) The C3 residential area (Prestige Estates) generally bound by streets north of 80th Street, east of Kingston Park, and west of Cottage Grove Trail Way Corridor. Information regarding the proposed improvements and assessments were presented to the City Council on August 3, 2016. Due to the poor pavement condition, along with good sub-grade soils and curb condition, a full pavement replacement and spot curb replacement were recom- mended for the Jamaica Ridge residential area. In the Rolling Hills neighborhood there were two different rehabilitation methods proposed. In the 3rd, 6th, and 7th Additions, a full pave- ment/spot curb replacement was proposed similar to Jamaica Ridge, due to the poor pavement condition and good sub-grade soils and curb condition. With the poor pavement and curb condi- tion, a full pavement replacement and full curb replacement, along with replacement of the street light wires with conduit were proposed in the Rolling Hills 4th and 5th Additions. Due to increased costs related to the full curb replacement in Rolling Hills, rehabilitation of the streets in Prestige Estates is recommended to be postposed to maintain a project cost as outlined in the Capital Improvement Plan. A neighborhood meeting for this project was held on August 4, 2016, at 7:00 p.m. at the Cottage Grove City Hall. There were 18 people in attendance. At this meeting a presentation was given highlighting the various improvements proposed for the 2017 project, along with information on the proposed assessments. Honorable Mayor, City Council, and Charlene Stevens 2017 Pavement Management Project September 1, 2016 Page 2 of 3 On August 10, 2016, the City Council approved the feasibility report and called for a public hearing to be held on September 7, 2016. All notices and publications have been completed according to State Statute. Discussion Summary of Road and Infrastructure Improvements The rehabilitation method proposed for the residential streets in the Jamaica Ridge area is to remove the existing asphalt surface and replace it with a new surface, which will consist of two lifts of bituminous. Spot curb replacement throughout the area will also be completed. Finally, minor utility improvements for sanitary sewer, water, street lights, and stormwater will also be included. The total estimated project cost for the Jamaica Ridge residential area is $714,599. The potential assessment for the improvements listed above is estimated at $3,504.51 per resi- dential buildable lot equivalent (RBLE). Single-family residential is assessed at a rate of 1.0 of the RBLE. The 2015 special benefit appraisal for similar improvements was $5,000, which supports the proposed assessment. The rehabilitation method proposed for the residential streets in the Rolling Hills 3rd, 6th, and 7th Additions are similar to Jamaica Ridge, involving the removal of the existing asphalt surface and replacing it with a new surface, which will consist of two lifts of bituminous. Spot curb re- placement throughout the area will also be completed. Finally, minor utility improvements for sanitary sewer, water, street lights, and stormwater will also be included. The total estimated project cost for the Rolling Hills 3rd, 6th, and 7th Additions is $626,397. The potential assess- ment for the improvements listed above is estimated at $3,193.72 per residential buildable lot equivalent (RBLE). Single-family residential is assessed at a rate of 1.0 of the RBLE. The 2015 special benefit appraisal for similar improvements was $5,000, which supports the proposed assessment. The rehabilitation method proposed for the residential streets in the Rolling Hills 4th and & 5th Additions is to remove the existing asphalt surface and replace it with a new surface, which will consist of two lifts of bituminous. Due to the poor condition, full curb replacement is also pro- posed to be completed. A 28-inch wide surmountable curb and gutter section is proposed in place of the existing 24-inch wide surmountable curb and gutter. Due to the age of the street light system in conjunction with the full curb replacement, placement of new street light wiring in conduit is proposed. Finally, minor utility improvements for sanitary sewer, water, and storm- water will also be included within the project area. The total estimated project cost for the Rolling Hills 4th and 5th Additions is $609,801. The potential assessment for the improvements listed above is estimated at $4,997.73 per residential buildable lot equivalent (RBLE). Single-family residential is assessed at a rate of 1.0 of the RBLE. The 2015 special benefit appraisal for simi- lar improvements was $5,100, which would support the proposed assessment. Project Funding Analysis The total project cost for the road and utility work is $1,950,797. According to the City’s policy, 45 percent of the total project cost for road work and utilities is assessed against the benefiting residential properties. The total project value that is assessed is $852,062. The Cost Estimate Summary can be viewed in Appendix C of the Feasibility Report. Honorable Mayor, City Council, and Charlene Stevens 2017 Pavement Management Project September 1, 2016 Page 3 of 3 Project Option Discussion Option #1: Order the project as outlined in the feasibility report. Total estimated project cost – $1,950,797 Total anticipated assessments – $852,062 The benefit of proceeding with the project is that soliciting for bids this winter will provide a stable bidding environment, which reduces the burden to the general taxpayers and the resi- dents adjacent to the project who are paying assessments. Another result of the new pavement is reduced maintenance costs associated with the streets in the project area. Those mainte- nance dollars and resources can then be reallocated to other parts of the community, which is a greater benefit to the general taxpayer. There are also similar benefits related to the repairs to the utilities in the project area. The CIP outlines a fiscally responsible plan to rehabilitate roads and utilities within the commu- nity and provide for park improvements. Past policy is to do park improvements/upgrades with the neighborhood street and utility improvements. By ordering the project, those plans stay true to that document and the Council’s direction given in the development of the CIP. Option #2: Do not order the project as outlined in the feasibility report. If the improvements related to the 2017 Pavement Management Project are not ordered, the roads will continue to deteriorate, which will result in increased maintenance costs. Those costs are borne by all taxpayers, not just the property owners that live on those streets. Future project costs will also be increased by 2.5 percent to 8 percent annually as a result of the construction index. When a pavement management project is delayed, it creates a domino effect by delaying all future pavement management projects. The cost of the domino effect is hard to capture, since there are pavement management projects planned each year into the future. The City’s approach since 1994 has been to ensure a safe condition and preserve the structural integrity of roads in a fiscally responsible manner. Independent third party benefit appraisals conducted since 2007 have concluded that this program improves property values within the project areas, as compared to the existing deteriorated condition. It should be noted to Council per Minnesota State Statute 429.031 that the resolution must be adopted by four-fifths vote for the project to be ordered and the project to proceed. Recommendation It is recommended the City Council adopt a resolution ordering the 2017 Pavement Manage- ment project and authorize preparation of plans and specifications for Districts B1 & F3. RESOLUTION NO. 2017-XXX A RESOLUTION ORDERING THE PROJECT AND AUTHORIZING PREPARATION OF PLANS AND SPECIFICATIONS FOR THE 2017 PAVEMENT MANAGEMENT PROJECT AREAS (PORTION OF DISTRICT F-3 AND PORTION OF DISTRICT B-1) WHEREAS, a resolution of the City Council adopted on August 10, 2016, fixed a date for the Council to hold a public hearing, pursuant to Minn. Stat. Chapter 429.011 to 429.111, on the proposed improvement benefitting properties that include: Rolling Hills Neighborhood (Portion of District B-1) 1) Homestead Avenue South from 77th Street South to 76th Street South 2) Homestead Avenue South from 76th Street South to cul-de-sac (7542-7596) 3) Homestead Avenue South from Homestead Avenue South to cul-de-sac (7565- 7573) 4) 76th Street South from Homestead Avenue South to Hyde Avenue South 5) Homestead Court South from Homestead Avenue South to cul-de-sac (7631-7697) 6) 77th Street South from Homestead Avenue South to Hyde Avenue South 7) 77th Street South from Hyde Avenue South to approximately 180 LF east of 77th Street Court South 8) 77th Street Bay South from 77th Street South to cul-de-sac (7893-7937) 9) 77th Street Court South from 77th Street South to cul-de-sac (7957-7997) 10) Hyde Avenue South from 77th Street South to 76th Street South 11) Hyde Avenue South from Hyde Avenue South to cul-de-sac (7659-7687) 12) Hyde Avenue South from 76th Street South to 75th Street South Jamaica Ridge Neighborhood (Portion of District F-3) 1) Jasmine Avenue South from Jamaica Avenue South to Upper 81st Street South 2) Upper 81st Street South from Jasmine Avenue South to approximately 170 LF east of Jasmine Avenue 3) Janero Avenue South from Jasmine Avenue South to Jamaica Avenue South 4) 81st Street South from Janero Avenue South to Jasmine Avenue South WHEREAS, ten days mailed notice and two weeks published notice of the hearing was given, and the hearing was held, at which all persons desiring to be heard were given an opportunity to be heard thereon; and WHEREAS, the City desires to assess the cost of said improvements to all benefited properties, other than for properties not proposed for assessment. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Cottage Grove, County of Washington, State of Minnesota: 1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasi- bility report. The improvement shall include road rehabilitation, water, storm sewer, sanitary sewer, and street lights. Resolution No. 2016-XXX Page 2 of 2 2. Such improvement is hereby ordered. 3. Bolton and Menk, Inc. is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. 4. The City Council declares its official intent to reimburse itself for the costs of the improvement from the proceeds of the tax exempt bond. Passed this 7th day of September 2016. Myron Bailey, Mayor Attest: Joe Fischbach, City Clerk Feasibility Reportfor 2017 Pavement Management Project City of Cottage Grove, Minnesota August 2016 Project Number N14.111570 August 10, 2016 Honorable Mayor and City Council City of Cottage Grove 12800 Ravine Parkway South Cottage Grove, MN 55016 RE: 2017 Pavement Management Project BMI Project No. N14.111570 Honorable Mayor and City Council Members, Enclosed for your review is the 2017 Pavement Management Project Feasibility Report. The project scope includes street rehabilitation and utility repairs within the Rolling Hills, Prestige Estates, and Jamaica Ridge neighborhoods, as identified in this report. This report describes the improvements necessary within the project area. Cost estimates for the proposed improvements are presented in the Report. We would be happy to discuss this report at your convenience. Please contact me at 651-968-7674 if you have any questions. Sincerely, BOLTON & MENK, INC. Michael Boex, PE Table of Contents Table of Contents ...................................................................................................... i Certification ............................................................................................................ iii Introduction ............................................................................................................. 1 Existing Conditions ................................................................................................... 2 Streets ....................................................................................................................... 2 Sanitary Sewer .......................................................................................................... 4 Water Main ............................................................................................................... 4 Storm Sewer .............................................................................................................. 4 Proposed Improvements .......................................................................................... 4 Streets ....................................................................................................................... 4 Walkway .................................................................................................................... 5 Sanitary Sewer .......................................................................................................... 6 Water Main ............................................................................................................... 6 Storm Sewer .............................................................................................................. 6 Storm Water Quality ................................................................................................. 6 Permits and Easements ............................................................................................ 6 Estimated Costs ........................................................................................................ 7 Cost Allocation .......................................................................................................... 7 Financing ................................................................................................................. 10 Public Hearing ........................................................................................................ 10 Project Schedule ..................................................................................................... 10 Conclusion and Recommendations ......................................................................... 10 Tables Table 1: Existing Street Section ................................................................................. 3 Table 2: Estimated Cost Summary ............................................................................. 7 Table 3: Residential Deductions ................................................................................ 8 Table 4: Residential Cost Allocation .......................................................................... 8 Table 5: Estimated Cost Per Residential Unit ............................................................. 9 Table 6: IMTF Cost Summary ..................................................................................... 9 Table 7: Cost Per Unit Comparison .......................................................................... 11 City of Cottage Grove, Minnesota Table of Contents 2017 Pavement Management Project Page i Appendix Appendix A: Existing Pavement Condition Photos ................................................... 13 Appendix B: Figures ................................................................................................ 23 Appendix C: Cost Estimate Summary ....................................................................... 36 Appendix D: Preliminary Assessment Roll ............................................................... 38 Appendix E: Pavement Cores .................................................................................. 44 City of Cottage Grove, Minnesota Table of Contents 2017 Pavement Management Project Page ii Certification Feasibility Report for 2017 Pavement Management Report City of Cottage Grove, Minnesota I hereby certify that this plan, specification or report was prepared by me or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. By: Michael Boex, PE License No. 44576 Bolton & Menk, Inc. Date: August 10, 2016 City of Cottage Grove, Minnesota Certification 2017 Pavement Management ProjectPage iii INTRODUCTION rdththstnd Part of the Rolling Hills 3 Addition, the Rolling Hills 4 - 7 Additions, Prestige Estates 1 - 2 Additions, Prestige Estates on the Park Addition, and Jamaica Ridge 1 st - 2 nd Additions have been identified as candidates for rehabilitation during the 2017 construction season as a part of the City of Cottage Grove's ongoing roadway rehabilitation program. The City Council authorized preparation of this report to determine the feasibility of rehabilitating these streets as a part of the 2017 Pavement Management Project. The Rolling Hills 3 rd - 7 th Additions are located east of Hinton Avenue and north of 80 th Street. They are part of Pavement Management District B, as shown on Figure 1. Prestige Estates 1 st - 2 nd Additions and Prestige Estates on the Park Addition are located north of 80 th Street and midway between Jamaica Avenue and County Road 19. They are part of Pavement Management District C, as shown on Figure 1. stndth The Jamaica Ridge 1 - 2 Additions are located south of 80 Street and east of Jamaica Avenue. They are part of Pavement Management District F, as shown on Figure 1. There are 19 residential streets within these neighborhoods totaling approximately 16,000 lineal feet. The purpose of this report is to further evaluate the work required for this street rehabilitation project, to provide an estimate of cost, and to establish a method of cost allocation or assessment in order to determine the physical and economic feasibility. This feasibility report examines the following street segments: Rolling Hills Neighborhood thth 1.Homestead Avenue So. from 77 Street So. to 76 Street So. th 2.Homestead Avenue So. from 76 Street So. to cul-de-sac (7542-7596) 3.Homestead Avenue So. from Homestead Avenue So. to cul-de-sac (7565-7573) 4.76 th Street So. from Homestead Avenue So. to Hyde Avenue So. 5.Homestead Court So. from Homestead Avenue So. to cul-de-sac (7631-7697) 6.77 th Street So. from Homestead Avenue So. to Hyde Avenue So. 7.77 th Street So. from Hyde Avenue So. to approximately 180 lf east of 77 th Street Ct. 8.77 th Street Bay So. from 77 th Street So. to cul-de-sac (7893-7937). 9.77 th Street Ct. So. from 77 th Street So. to cul-de-sac (7957-7997). 10.Hyde Avenue So. from 77 th Street So. to 76 th Street So. 11.Hyde Avenue So. from Hyde Avenue So. to cul-de-sac (7659-7687). 12.Hyde Avenue So. from 76 th Street So. to 75 th Street So. Prestige Estates Neighborhood 1.Jocelyn Avenue So. from 80th Street So. to Jenner Avenue So. 2.79th Street So. loop from Jocelyn Avenue So. to Jocelyn Avenue So. 3.Jenner Avenue So. from 80th Street So. to Jocelyn Avenue So. City of Cottage Grove, Minnesota Introduction 2017 Pavement Management Project Page 1 Jamaica Ridge Neighborhood st 1.Jasmine Avenue So. from Jamaica Avenue So. to Upper 81 Street So. st 2.Upper 81 Street So. from Jasmine Avenue So. to approximately 170 lf east of Jasmine Avenue 3.Janero Avenue So. from Jasmine Avenue So. to Jamaica Avenue So. 4.81 st Street So. from Janero Avenue So. to Jasmine Avenue So. If the City decides to proceed with the proposed street and utility improvements as described in this report, it is anticipated construction would begin in 2017 as shown in the detailed project schedule found on page 10. EXISTING CONDITIONS Streets The streets within these neighborhoods are urban-residential and are generally 32 feet wide (from face of curb to face of curb) with D412 concrete curb and gutter. However, 76 th Street between Hinton Avenue and Ideal Avenue is classified as a major and is 44 feet wide (from face of curb to face of curb). The streets in the Rolling Hills neighborhood were originally constructed in the mid 1980s through the early 1990s, the Prestige Estates neighborhood in the early 1990s, and the Jamaica Ridge neighborhood in the mid to late 1980s. The in-place pavement section of these streets A visual inspection was performed in 2016 to evaluate pavement surface conditions. The inspection determined the Pavement Condition Index (PCI) of these streets generally ranges from 35-45. Pavementair and generally have significant or major distress. Figures 2 - 3 depict the age of the streets within the neighborhoods and Figures 4 -5 depict the visual pavement rating for each street segment. In addition, there are sections of existing curb and gutter that have settled, cracked, or have other defects that will require replacement. Appendix A contains some representative photos of the existing pavement condition. Pothole repairs and skin patch overlays have been performed to keep the road in a drivable and thththth relatively smooth condition. In the Rolling Hills 4, 5, 6, and 7 Additions, a seal coat was last performed in 2011. In the Rolling Hills 3 rd Addition, a seal coat was last performed in 2012. In the Prestige Estates neighborhood, a seal coat was last performed in 2012. Also, in the Prestige Estates neighborhood, a temporary skin patch overlay across the entire width of the road was constructed in pieces in 2012 and 2013 on Jenner Avenue, 79 th Street, and part of Jocelyn Avenue. And in the Jamaica Ridge neighborhood, a seal coat was last performed in 2010. A significant amount of street maintenance funds have been used or are anticipated in upcoming maintenance cycles in these areas. Past experience on recent projects has shown that the pavement cracking pattern on streets of this general age and condition range extends well below the surface. In fact, the seal coat can help mask the cracking in some instances. It should be noted that the visual surface rating is a preliminary indicator of condition and potential rehabilitation techniques; it should not solely dictate the maintenance or rehabilitation strategy. Factors such as age, traffic projections, pavement strength, and pavement structure condition should also be considered. City of Cottage Grove, Minnesota Existing Conditions 2017 Pavement Management Project Page 2 Coring of the pavement was performed to determine the thickness of the existing street section and evaluate pavement condition. From the cores, it can be seen that the average section in the neighborhoods consists of approximately 3.75 inches of bituminous over 8 inches of base. The thicker than expected bituminous is in part due to multiple seal coat applications or a skin patch overlay, as well as difficulty in evaluating bituminous depths from the stripped cores. Table 1: Existing Street Section Existing Street Section Bituminous Aggregate No. Location Condition (in) Base (in) Moderate severe stripping, 1 8166 Janero Ave S (F3) 4 10.5 broken 2 8339 Jasmine Ave S (F3) Severe stripping, broken 4 9 3 8085 Jasmine Ave S (F3) Slight moderate stripping 3 8 4 7848 Jenner Ave S (C3) Slight moderate stripping 5 N/A* th 5 9501 79 St S (C3) Severe stripping, broken 4.5 7.5 6 7901 Jocelyn Ave S (C3) Moderate stripping, broken 4 8.5 th 7 7819 76 St S (B1) Moderate stripping, broken 4 7 8 7680 Hyde Ave S (B1) Moderate stripping 3 8 9 7945 77 th St S (B1) Severe stripping, broken 4 7.5 10 7698 Homestead Ave S (B1) Severe stripping, broken 3.5 7 11 7578 Homestead Ave S (B1) Slight moderate stripping 3.25 8 Average: 3.75 8.0 *Base not consistent with other locations. Soil encountered was granular with no crushed limestone present. All eleven cores within the residential neighborhoods displayed some degradation due to stripping. Stripping is generally described as the separation of aggregate from the asphalt due to moisture. The stripping found degrades the strength and durability of the pavement. Seven of the cores were noted as broken, meaning the stripping was severe enough that the top layer of bituminous fell apart as the core was extracted. The locations of stripping generally coincided with areas where Public Works has performed extensive maintenance via skin patch overlays and patching, whereas areas with slight stripping may not be visible at the pavement surface. Pictures of the pavement cores can be seen in Appendix E. Due to the granular subgrade soils and good aggregate base, the pavement structure as a whole is typically structurally sound. Therefore, the issue facing the City is typically functional and not structural meaning the recurring maintenance issues due to the stripped pavement material raveling and breaking apart. City of Cottage Grove, Minnesota Existing Conditions 2017 Pavement Management Project Page 3 Sanitary Sewer The sanitary sewer system within the project area consists primarily of 8-inch and 9-inch diameter VCP and PVC, with some 12-inch diameter RCP. The existing sanitary sewer has been televised to evaluate pipe condition. The televising reports show that the pipe is generally in good condition. However, some problems encountered in the existing sanitary sewer were root intrusion, cracked pipe and sags. Miscellaneous structure repairs including patching, lining, and other repairs were noted during the inspections. Water Main The water mains within the project area consist primarily of 6-inch diameter DIP, with 12-inch diameter th DIP along 76 Street. The mains were installed in conjunction with the development of the neighborhoods. The water mains are believed to be in good condition. However, projects of similar eras have had a similar condition. Therefore, some select valves will be checked for corrosion prior to street work occurring. Additionally, there are expected to be some valves which are not operational and will need to be addressed with the project. The valves will be operated and evaluated by Public Works prior to the start of the project. Storm Sewer The existing storm sewer has been televised to determine pipe condition and necessary repairs. In addition, storm structures were also inspected. Storm sewer mains are generally in good condition. However, some problems encountered in the existing storm sewer were cracked or broken pipes and dirty lines. Three storm stuctures in the Rollings Hills neighborhood and three storm structures in the Jamaica Ridge neighborhood were noted as being beyond the point of being effectively patched or repaired. Miscellaneous structure patching, lining, and other repairs were also noted during the inspections. PROPOSED IMPROVEMENTS Streets Due to the range of pavement ages within the neighborhoods, two primary rehabilitation methods replacement and mill-overlay. However, due to the observed depth and extent of the pavement stripping in the cores, extent of previous City maintenance, and past City experience with streets of this age and condition, a mill-overlay is not recommended at this time. While some streets may be able to successfully accept a mill-overlay, the severity of cracking in the base course is anticipated to vary greatly. Therefore, the project area was viewed as a whole for future maintenance and management. The risks typical of all mill-overlay projects, i.e. reflective cracking and the associated maintenance required were evaluated to determine acceptable risk levels. Past projects have shown that stripping of the pavement can extend well below the surface of the pavement, making complete removal of the stripped portions unfeasible. In those cases, the remaining pavement posed risk for excessive volume of cracking or raveling in the base course. City of Cottage Grove, Minnesota Proposed Improvements 2017 Pavement Management Project Page 4 Due to the types of distress present in the existing pavement, the anticipated acceleration of deterioration due to asphalt stripping, and risks associated with a mill-overlay at this age, the residential streets within the Rolling Hills neighborhood and the Jamaica Ridge neighborhood are proposed to undergo a full pavement removal and replacement with 3.5 inches of new pavement. The wear course is proposed to be virgin mix, excluding the use of recycled asphalt pavement (RAP). Due to budgetary constraints, the City has decided to delay the pavement replacement in the Prestige Estates neighborhood. The City will continue to monitor the deterioration until the pavement warrants full replacement. In addition, a portion of the neighborhood will likely need full curb replacement in the future. The concrete curb and gutter in the Rolling Hills 3 rd, 6 th, and 7 th Additions; and the Jamaica Ridge 1 st and 2 nd Additions is proposed to undergo spot replacement. The curb in poor condition will be evaluated for removal just prior to construction. Preliminary estimates indicate that approximately 36% will need to be removed and replaced in the Rolling Hills 3 rd, 6 th, and 7 th Additions; and approximately 29% will need stnd to be removed and replaced in the Jamaica Ridge 1 and 2 Additions. The t necessarily evenly distributed and there may be some long sections of curb replacement. Where conditions are favorable, the goal is that the concrete curb and gutter last two pavement lifecycles. thth The concrete curb and gutter in the Rolling Hills 4 and 5 Additions is proposed to undergo full replacement due to the large amount of curb damage in that neighborhood. Replacing all of the curb and gutter will: 1.Result in a more consistent product due to being machine laid versus hand poured 2.Produce a more uniform flow-line and improve drainage characteristics 3.Reduce the chance for differential settlement between panels The existing D412 concrete curb and gutter will be replaced with a surmountable curb and gutter. In locations where curb is replaced in front of driveways, curb will be removed and replaced and each driveway will be patched the entire width with in-kind materials as a part of the street rehabilitation process. In areas of spot curb replacement, this patch typically extends a few feet behind the curb. Concrete pads for community mailboxes will only be replaced in the areas with full curb replacement. Restoration is anticipated to consist of screened Loam Topsoil Borrow with seed and hydromulch. Traffic signs are proposed to be replaced as a part of this project to meet federal retroreflectivity requirements. In addition, signs will be evaluated for conformance to the adopted City sign policy and signs will be removed or supplemented as required. The existing street light system will be evaluated for repair. In areas where spot curb replacement is proposed, faulty direct-bury wiring will be replaced where necessary. In areas where full concrete curb replacement is proposed, the existing direct-bury street light wire is proposed to be replaced within a PVC conduit. The City has experienced increased maintenance due to deterioration of the existing direct-bury wire and the full curb removal process will likely impact the wiring. The new wire and conduit will require the installation of hand holes at every street light pole. Feed point cabinets and controllers will be evaluated in each neighborhood for replacement as a part of this project. Walkway Costs have been included in this report to update all pedestrian ramps to the current Americans with Disabilities Act (ADA) standards. Some segments existing trail or sidewalk may need to be removed in City of Cottage Grove, Minnesota Proposed Improvements 2017 Pavement Management Project Page 5 th order to construct compliant pedestrian ramps. In addition, the existing trail along 76 Street between Hinton and Homestead will be resurfaced. Sanitary Sewer Inline repairs are recommended to address cracks within the pipe. Where there are sags with a history of back-ups, it is recommended that the pipe be removed and replaced. The sanitary sewer manhole castings will be salvaged and reinstalled. The existing concrete adjusting rings will be replaced with new high density polyethylene (HDPE) adjusting rings to conform to current City standards. Water Main It is proposed that broken valve top sections be removed and replaced as a part of this project. It is anticipated that a small sample of valves be dug up in each neighborhood and checked for bolt corrosion this fall. Any corroded bolts would be replaced if necessary, and additional valves with like conditions could be dug up and checked if warranted. As a part of this process, the valve box would be replaced in conjunction with the work. Also, it is proposed to extend the hydrant barrel on any hydrant requiring adjustment. Finally, hydrants will be reconditioned by sandblasting and painting, and concrete hydrant access pads are proposed to be constructed in accordance with current City standards. Storm Sewer Generally speaking, the intent of this project is to rehabilitate the streets and not change existing drainage patterns. In-line repairs are recommended to address cracks and leaking or offset joints. Structures in poor condition will be replaced to conform to current City standards. Adjustment rings for manholes will be replaced with HDPE rings. Catch basin rings will not be replaced unless the curb adjacent to them is removed, or failure of the rings has occurred. The existing castings will be salvaged and reinstalled. Miscellaneous structure patching, lining, and other repairs will be performed as needed. Public Works staff provided input on areas with historic drainage concerns. No major flooding or drainage issues were noted; therefore only minor curb grade modifications are proposed to facilitate drainage. Storm Water Quality Storm water quality improvements are not required in this neighborhood due to no increase of impervious surfacing. PERMITS AND EASEMENTS A Phase II General Storm Water Permit from the MPCA would is anticipated to be required for the project because disturbance and restoration will likely exceed one acre. All streets in the project area are located within the South Washington Watershed District (SWWD), however, because there will be no disturbance to the existing subgrade a permit is not required. A Northern States Power encroachment agreement or permit is anticipated for the improvements in the Jamaica Ridge neighborhood along Jamaica Avenue. No additional drainage and utility easements are anticipated in the neighborhoods, however, this will be evaluated during the final design phase of the project. City of Cottage Grove, Minnesota Permits and Easements 2017 Pavement Management Project Page 6 ESTIMATED COSTS Cost estimates for the improvements have been prepared and are included in Appendix C. All costs for items to be constructed are based on anticipated unit prices for the 2017 construction season. All costs include a twenty-five (25) percent allowance for indirect costs associated with the project (engineering, administrative, financing, and legal) as well as a ten (10) percent contingency. No costs are included for capitalized interest during the construction period or before assessments are levied. The following is an overall summary of the estimated costs: Table 2: Estimated Cost Summary Estimated Cost Summary Location Estimated Project Cost Rolling Hills 4 th and 5 th Additions (Full Curb) $609,801.08 Rolling Hills 3 rd, 6 th, and 7 th Additions (Spot Curb) $626,397.32 Jamaica Ridge Additions (Spot Curb) $714,598.52 Total Estimated Project Cost: $1,950,796.92 Future Prestige Estates Additions $675,063.86 Costs presented include 10% contingency + 25% indirect costs Cost Allocation Assessments for this project will be based upon the "Infrastructure Maintenance Task Force Special Assessment Policy for Public Improvements," dated September 30, 2005, Revised August 8, 2012. All adjacent benefiting properties are proposed to be assessed. Per the Urban Residential policy, 45% of the project cost for both surface and subsurface improvements would be assigned to each individual residential lot on a unit basis. The intent of the City's policy is to treat all properties within a residential development as similar individual units regardless of lot frontage. The amount assessed is based on the City standard street section even if the width is greater. City funds would be responsible for the remaining 55% of the project costs. Per the policy, 100% of the project costs adjacent to the property are assessed to City-owned property. In areas where residential property was opposite City property, half of the street width was assigned to the residential area and the other half to the City. The estimated project assessments are as follows: Residential Land Use: Infrastructure costs adjacent to City property or other land uses are removed from the neighborhoods in order to determine the residential cost contribution. The policy also states that all urban/residential lots on urban/residential streets shall be assessed based on the city standard street section even if the width is greater. City of Cottage Grove, Minnesota Estimated Costs 2017 Pavement Management Project Page 7 Table 3: Residential Deductions Deductions to Residential Property Location City Property Street Width Estimated Assessment Deduct Rolling Hills 4 th and 5 th Additions $0.00 $21,180.07 $21,180.07 Rolling Hills 3 rd, 6 th, and 7 th Additions $30,236.65 $0.00 $30,236.65 Jamaica Ridge Additions $5,908.73 $0.00 $5,908.73 Totals: $36,145.38 $21,180.07 $57,325.45 Per the IMTF policy, urban residential lots on urban/residential streets within or outside the MUSA, 45% of the project costs for both surface and sub-surface assessments will be assessed. Table 4: Residential Cost Allocation Estimated Cost Allocation Per Policy Residential Assessed Estimated Estimated Residential Location Amount Project Cost Assessment Deduct Adjusted Cost (45% of Total) Rolling Hills 4 th and 5 th $588,621.01 $264,879.46 $609,801.08 $21,180.07 Additions Rolling Hills rdthth 3, 6, and 7 $596,160.68 $268,272.31 $626,397.32 $30,236.65 Additions Jamaica Ridge $708,689.80 $318,910.41 $714,598.52 $5,908.73 Additions Totals: $1,950,796.92 $57,325.45 $1,893,471.49 $852,062.18 Based on the table below, the total single family residential assessment is $4,997.73 per unit in the ththrdthth Rolling Hills 4 and 5 Additions, $3,193.72 per unit in the Rolling Hills 3, 6, and 7 Additions, and $3,504.51 per unit in the Jamaica Ridge Additions. City of Cottage Grove, Minnesota Estimated Costs 2017 Pavement Management Project Page 8 Table 5: Estimated Cost Per Residential Unit Estimated Cost Per Unit Assessable Assessed Amount Assessed Cost Per Location RBLE Units (45% of Total) RBLE Unit Per Policy Rolling Hills 4 th and 5 th Additions (Full Curb) 53 $264,879.46 $4,997.73 Rolling Hills 3 rd, 6 th, and 7 th Additions (Spot Curb) 84 $268,272.31 $3,193.72 Jamaica Ridge Additions (Spot Curb) 91 $318,910.41 $3,504.51 Totals: 307 $852,062.18 When the calculated assessment exceeds the special benefit appraisal, the single-family assessments will be proposed to be capped at the amount of the special benefit appraisal. If needed, City funds will cover the difference between the calculated assessment and the benefit appraisal. The 2015 benefit appraisal was $5,100 for full curb replacement and $5,000 for spot curb replacement. Since past benefit appraisals have supported the improvements in similar urban residential neighborhoods, benefit appraisals were not conducted in these neighborhoods. Summary: The IMTF policy therefore allocates costs in the following manner: Table 6: IMTF Cost Summary Estimated Cost Allocation Per Policy Residential Assessed Estimated Project Location Amount Other Funds* Cost** (45% of Total) Rolling Hills 4 th and 5 th $264,879.46 $344,921.62 $609,801.08 Additions Rolling Hills 3 rd, 6 th, $268,272.31 $358,125.02 $626,397.33 and 7 th Additions Jamaica Ridge $318,910.41 $395,688.11 $714,598.52 Additions Totals: $852,062.18 $1,098,734.75 $1,950,796.93 *See Appendix C for Fund Breakout ** Total Project Cost (10% contingency + 25% Indirect) City of Cottage Grove, Minnesota Estimated Costs 2017 Pavement Management Project Page 9 Financing Assessments are proposed to be levied based on the City's current assessment policy. The remainder of the project would be financed through a combination of City funds such as the General Tax Levy and Utility and Enterprise funds for items such as storm sewer and street lighting improvements. Figures 11 and 12 depict the assessable parcels for the project. PUBLIC HEARING Because the properties within the project area benefit from the proposed improvements, and the project will be partially funded through assessment, it will be necessary for the City to hold a public improvement hearing to receive comment on the proposed project and to determine further action to be taken. PROJECT SCHEDULE Below is the proposed schedule assuming starting construction in 2017: 06/01/2016 Council Orders Feasibility Report 08/03/2016 Council Workshop 08/04/2016 Hold Neighborhood Meeting 08/10/2016 Council Receives and Approves Feasibility Report Council Sets a Public Improvement Hearing Date 09/07/2016 Council Holds Public Improvement Hearing Council Orders the Preparation of the Plans and Specifications 01/04/2017 Council Approves the Plans and Specifications 02/09/2017 Project Bid Date 02/15/2017 Contract Award Spring 2017 Begin Construction September 2017 Complete Construction September 2017 Council Sets Assessment Hearing Date October 2017 Council Holds Assessment Hearing CONCLUSION AND RECOMMENDATIONS It is recommended that this report be used as a guide for the layout, design, and cost allocation for the public improvements to be made as part of the 2017 Pavement Management Project. It is further recommended that the owners of properties within the project limits be notified of the proposed improvements in order to provide comment. City of Cottage Grove, Minnesota Public Hearing 2017 Pavement Management Project Page 10 To determine project feasibility, a comparison was made between the costs estimated herein and the costs experienced for other similar projects within the City. These comparisons, on a per linear foot construction cost basis (no indirect project costs), are shown in the following table: Table 7: Cost Per Unit Comparison Cost Per Unit Comparison 2017 Pavement Management Project (Estimated) Rolling Hills 4 th and 5 th Additions Pavement Replacement Area & Full Curb $152.88 Rolling Hills 3 rd, 6 th, and 7 th Additions Pavement Replacement Area & Spot Curb $113.35 Jamaica Ridge Additions Pavement Replacement Area & Spot Curb $107.38 2016 Pavement Management Project (Bid Results) District D2 Pavement Replacement Area & Full Curb $142.93 District F3/F5 Pavement Replacement Area & Spot Curb $97.06 80 th Street $226.11 2015 Pavement Management Project (Bid Results) District F2/F3/F4 Pavement Replacement & Spot Curb $84.10 90 th Street $208.59 2014 Pavement Management Project (Bid Results) $92.63 2013 Pavement Management Project (Bid Results) District C1 & District C2 Pavement Replacement Area & Full Curb $151.18 District C2 Mill & Overlay Area $94.09 From the tabulation above, it can be seen that the cost to rehabilitate in the residential areas are similar to past projects of like scope. The increase depicted is partially due to the anticipated rise in construction and material costs and the additional curb and gutter replacement that will be necessary with this project. Financial responsibilities have been determined based on estimated project costs as well as adopted City policy. Funding sources consist of assessments to benefitted properties and use of existing designated City funds. Based on the information contained herein, it can be concluded that the construction of utility and street improvements is feasible. The deteriorated condition of the pavement, stable condition of the subgrade, and condition of the concrete curb and gutter suggest that various methods of rehabilitation be performed. The improvements are cost effective as they utilize the existing subgrade and keep existing curb wherever possible. City of Cottage Grove, Minnesota Conclusion and Recommendations 2017 Pavement Management Project Page 11 From an engineering standpoint, this project is feasible, necessary, cost effective, and can best be accomplished by letting competitive bids for the work under one contract in order to complete the work in an orderly and efficient manner. City of Cottage Grove, Minnesota Conclusion and Recommendations 2017 Pavement Management Project Page 12 Appendix A: Existing Pavement Condition Photos City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 13 Rolling Hills th Approximate Location: 7819 76 Street South Recent patching adjacent to and over previous patching and pavement fatigue Rolling Hills th Approximate Location: 7988 77 Street Curb and gutter settlement City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 14 Rolling Hills Approximate Location: 7939 Hyde Avenue Previous bituminous patching of asphalt stripping Rolling Hills Approximate Location: 7590 Homestead Avenue Alligator cracking and curb and gutter settlement City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 15 Rolling Hills Approximate Location: 7940 Hyde Avenue Extensive patching and failure around manholes Rolling Hills Approximate Location: 7656 Hyde Avenue Patching and failure adjacent to curb and gutter City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 16 Prestige Estates th Approximate Location: 9491 79 Street Temporary skin patch overlay across entire width of road Prestige Estates Approximate Location: 7970 Jenner Avenue Asphalt stripping and previous patching City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 17 Prestige Estates Approximate Location: 7930 Jenner Avenue Reflective cracking through temporary skin patch overlay City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 18 Prestige Estates Approximate Location: 7752 Jenner Avenue Asphalt stripping Prestige Estates Approximate Location: 7826 Jocelyn Avenue Asphalt stripping and previous route & seal of joints City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 19 Jamaica Ridge Approximate Location: 8194 Janero Avenue Asphalt stripping and previous patching Jamaica Ridge Approximate Location: 8381 Jasmine Avenue Failure around manholes City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 20 Jamaica Ridge Approximate Location: 8463 Jasmine Avenue Recent patching adjacent to and over previous patching Jamaica Ridge Approximate Location: 8169 Jasmine Avenue Small block cracking and pavement fatigue City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 21 Jamaica Ridge Approximate Location: 8115 Jasmine Avenue Small block cracking and pavement fatigue Jamaica Ridge Approximate Location: 9030 Upper 81 st Street Previous route & seal of joints City of Cottage Grove, Minnesota Appendix A: Existing Pavement Condition Photos 2017 Pavement Management Project Page 22 Appendix B: Figures City of Cottage Grove, Minnesota Appendix B: Figures 2017 Pavement Management Project Page 23 91daoRytnuoC htuoSeunevAaciamaJ htuoSeunevAnotniH KRAPEHTNOSETATSEEGITSERP htuoSeunevA daetse moH htuoS eune vAnotniH 80 th Street So uth Up per8 1st Street South JaneroAvenue South 81stStreet Sout h htuoSeunevA daetse moH htuoS eune vAnotniH 80th Street So uth Uppe r8 1stStr eet South JaneroAvenue * South 81stStreet Sout h * * * * * * * * * htuoSeunevA daetse moH htuoS eune vAnotniH 80th Street So uth Uppe r8 1stStr eet South JaneroAvenue South 81stStreet Sout h l >> >> > > > l > l l> l l > l > l > l > >> >> >> > > > l l l > l > > > > > > >>>> > > > > >> > l> > l>>> l ll l l l ll l ll htuoSeunevA daetse moH >> >> >> >> >>>> htuoSeune vAnot niH >>>> >> >>>> >>l ll ll >>>> llll >> l ll > > > l > l l l > >>>> llll l >> l > > > lllll 80 thStr eet South >> >>>> >>D >>S l ll D l lll l ll l l l lll > D >>> SS S >> >> DD>> D Up pe r81st Str eetSo uth D D ll l > > S S S S SSS JaneroAvenue S l l D > S S S S South S 81st Street S l l ll >> >> SS S South S > S D S S S > S l D l > S D S S S S D S D S S D D S S D D S S S D D S D D S S D D S D S S CONTROL S S D l S >> S D D S D S > > S > > D S S S S htuo SeunevAdaetse moH htuoSeune vAnot niH 80th Street So uth Up pe r81st Str eetSo uth JaneroAvenue South 81st StreetSouth Appendix C: Cost Estimate Summary City of Cottage Grove, Minnesota Appendix C: Cost Estimate Summary 2017 Pavement Management Project Page 36 Appendix D: Preliminary Assessment Roll City of Cottage Grove, Minnesota Appendix D: Preliminary Assessment Roll 2017 Pavement Management Project Page 38 Appendix E: Pavement Cores City of Cottage Grove, Minnesota Appendix E: Pavement Cores 2017 Pavement Management Project Page 44 GEOTECHNICAL EXPLORATION AND FACTUAL ENGINEERING REPORT /ƚƷƷğŭĻ DƩƚǝĻ ЋЉЊА ta tğǝĻƒĻƓƷ /ƚƩĻƭ /ƚƷƷğŭĻ DƩƚǝĻ aźƓƓĻƭƚƷğ bL tƩƚƆĻĭƷ ЊЏ͵ЏЊЎАВ͵ЋЉЉ tƩĻƦğƩĻķ CƚƩʹ Bolten And Menk, Inc. Attn.: Michael Boex, P.E. 2035 County Road D East Suite B Maplewood, MN 55109 July 14, 2016 Bolten and Menk, Inc. 2035 County Road D East Suite B Maplewood, MN 55109 Attn: Mr. Mike Boex, P.E. Subject: Geotechnical Exploration and Factual Engineering Report Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Dear Mr. Boex, In accordance with your request and subsequent authorization, Northern Technologies, LLC. (NTI) conducted a Geotechnical Exploration for the above referenced project. Our services included coring the pavement at eleven (11) locations in District B1, District C3, and District F3 within the City of Cottage Grove, as well as preparation of a factual engineering report. Our work was performed in general accordance with our proposal dated June 13th, 2016. Pavement core samples obtained at the site will be held for 60 days at which time they will be discarded. Please advise us in writing if you wish to have us retain them for a longer period. You will be assessed an additional fee if samples are retained beyond 60 days. We appreciate the opportunity to have been of service on this project. If there are any questions regarding the soils explored or our review and recommendations, please contact us at your convenience at (763) 433-9175. Northern Technologies, LLC. Kyler Bender, P.E. Richard Jett, E.I.T. Construction Services Manager / Graduate Engineer Principal Engineer Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 #®­³¤­³² 1.0 INTRODUCTION ................................................................................................................. 1 Њ͵ЊtƩƚƆĻĭƷ 5ĻƭĭƩźƦƷźƚƓ ͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ Њ Њ͵Ћ{ĭƚƦĻ ƚŅ {ĻƩǝźĭĻƭ ͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ Њ 2.0 EXPLORATION PROGRAM RESULTS .................................................................................... 1 Ћ͵Њ9ǣƦƌƚƩğƷźƚƓ {ĭƚƦĻ ͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ Њ Ћ͵Ћ{ǒĬƭǒƩŅğĭĻ /ƚƓķźƷźƚƓƭ ͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵͵ Ћ 3.0 CLOSURE ........................................................................................................................... 2 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 1.0 INTRODUCTION 1.1 Project Description It is our understanding that the project includes the reconstruction of the residential streets located in District B1, District C3, and District F3 (as outlined in the provided location plan) in Cottage Grove, Minnesota. 1.2 Scope of Services each approximate location within each district. The cores were advanced through both the asphalt and aggregate base layers and the approximate thicknesses of each layer were measured. Locations were marked by Bolten and Menk, Inc. personnel. The purpose of this report is to present a summary of our geotechnical exploration and provide pavement information based upon pavement cores obtained at the client-designated locations. 2.0 EXPLORATION PROGRAM RESULTS 2.1 Exploration Scope Pavement coring occurred on July 8th, 2016 at the approximate locations as presented on the Coring Location Diagram within Appendix A. A photograph of each core can be found in Appendix B. Page 1 of 3 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 2.2 Subsurface Conditions Table 1 provides the measured average thickness of the pavement cores obtained at the project area. Table 1: Pavement Core Thickness at Project Area Location Number Thickness of Pavement (in)* Depth of Base (in) 1 4 10.5 2 4 9 3 3 8 1 4 5 N/A 5 4.5 7.5 6 4 8.5 7 4 7 8 3 8 9 4 7.5 10 3.5 7 11 3.25 8 * Pavement thicknesses listed within Table 1 may differ from those within Appendix B. Some cores dissolved during the coring process. 1. Base not consistent with other locations. Soil encountered was granular with no crushed limestone present. 3.0 CLOSURE The scope of services for this project does not include either specifically or by implication any environmental or biological assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. Page 2 of 3 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Northern Technologies, LLC. has endeavored to comply with generally accepted geotechnical engineering practice common to the local area. Northern Technologies, LLC. makes no other warranty, expressed or implied. Northern Technologies, LLC. I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a Duly Licensed Professional Engineer under the Laws of the State of Richard Jett, E.I.T. Minnesota. Graduate Engineer Kyler Bender Date: 07/13/2016 Reg. No. 50971 Kyler Bender, P.E. Construction Services Manager / Principal Engineer Page 3 of 3 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 APPENDIX A BORING LOCATION DIAGRAM Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 APPENDIX B CORE PHOTOGRAPHS Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200 Cottage Grove 2017 PM Pavement Cores Cottage Grove, Minnesota NTI Project No. 16.61579.200