HomeMy WebLinkAbout2016-11-28 PACKET 06.1.EOE
to,
v
U)
v
0
v
0
0
W
0-
w
73
m
O
m
v
D
D �
.a Z
0
N
0
0
rt
rr
O
rf
3
0
O
O.
O
U)
U)
r~
0
CL
CO)
CA
m
O
0
O
z
'O
C
0
E
m
z
v
D
3
N
00
m
m
O
C
0
r
m
m
m
n
�7
O
1
'INw
v,
m
N
I
i
�'q
,^
r
0
N
r
Cl)
X
D
"
v
v
z
D
m
p
Cl)
••'
c
o
m
a
o
cn
gwmzm
D
z
..
m0D0o
z
c0wm
o
D
-I -�
-�_ =o
c
D
m
n
m
a) (D CD = 2) n
Z
O� rFQ.-0 CCDM NCL
2
Ov
0
rr O O rt.
n
cD Q. O. �' cc
G±
0
(D
O
= 0 M== 2) v
n
0
M
;un
su
CD
'-co 0 0,CL�
�.
rt
OS m < Er OS O
CL
CD
m
Q.
O
�D
0 = O rt
v
to z ..,, CD
(Q O
r
0••
CD
Q B rt
r0
n
N
O
00
O
�
O0
rt Q Or- 0•
�1
��-000
CD
� N NCQ � � ncD
m
vi vi O C
rr 0 w w� 0�
cn
r O
O 0 UCO
.Q
N
O
y
Q
� O `D <
,Oy 'O'' ( Z
(OD
O' 0)
CD
cI
s1 '.3 --1
(D
(DD
h p I 'a 0 --1 Q
e0 -r
0
=
r'r * D)
fl: 3 O
Q
O
(D
Al
Q.
Q. n N r�i O n
CO)
rr-000)
c�CD
w0Z7*�c�
CD CL
D
m0 oCD
=_ 0m
�CcD
Q=O
0 m
Qv
<
Q.r
;
= -s
UlN. ?
_
(D
<O
70- CD —
=Cn
(DD—
Cn
CD
(Dh-a-
CDDQ.O4�
t0n0m
Q
�?O
-0 -0 Q - f(D
Q. Q.
CD CD
a.)rl'
CD o -0 f1 fl1
rt
3 QCT
Al tU
,;f0 l�D
'y (Q o 3 rt
oCD � Nv
rt o
Q. Q
I
0
O
z
'O
C
0
E
m
z
v
D
3
N
00
m
m
O
C
0
r
m
m
m
n
�7
O
1
'INw
v,
m
N
I
i
�'q
,^
Planning Staff Report
Norris Square Redevelopment
Planning Case No. ZA2016-061, PP2016-062,
SP2016-063, and CUP2016-064
November 28, 2016
Proposal
Presbyterian Homes (PHS/CG Center, LLCA) has filed the following applications:
A. Zoning amendment to amend the approved Planned Development Overlay (PDO);
B. Preliminary plat for PHS Cottage Grove Inc. 3rd Addition, which creates five lots and one
outlot
C. Conditional use permit to allow a 72-bed skilled care center
D. Site plan review for the redevelopment and expansion of the Norris Square campus located
on the southwest corner of 80th Street and Hadley Avenue including a 64-apartment inde-
pendent living building and a 72-bed skilled care center with interconnecting enclosed archi-
tectural corridors, required parking, and expansion of the communal town center.
Location Map
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 2 of 18
Proposed Site Plan Detail
Review Schedule
Application Received: November 2, 2016
Acceptance of Completed Application: November 2, 2016
Parks Commission: November 14, 2016
Public Services Commission: November 21, 2016
Planning Commission November 28, 2016
Public Hearing for Fire Station Land Swap and Easement Vacations: December 7, 2016
Tentative City Council Date: December 21, 2016
60-Day Review Deadline: January 1, 2017
Construction is planned to begin in the spring of 2017.
Background
The existing Norris Square Senior housing building was constructed in 2006 as a residential
portion of a planned development overlay. The balance of the site that is currently being devel-
oped was originally approved with a variety of commercial buildings.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 3 of 18
2006 Master Site Plan
A robust commercial market for the balance of the PDO never materialized, and to date the only
commercial development constructed is the new G-Will Liquor building that was built in 2014.
G-Will Building Elevations
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 4 of 18
Existing Site Conditions
Given the lack of commercial interest, the applicant identified the need to construct the pro-
posed senior housing redevelopment based on the need and success of the current facility and
market demands.
Planning Considerations
Site Plan
The proposed site development includes a 64-apartment independent living building and a 68-
unit/72-bed skilled memory care center with interconnecting enclosed architectural corridors, re-
quired parking, and expansion of the communal town center. The parking in front of the existing
building will be removed/relocated and replaced with a landscaped courtyard.
Courtyard Detail
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 5 of 18
Proposed Site Plan
Unit Information
The table below breaks down the size and configuration of the units within the new buildings.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 6 of 18
Preliminary and Final Plat
The expansion on the site requires that the current plat be reconfigured to accommodate the
new buildings and supporting infrastructure. The preliminary plat is detailed below:
Land Use
The City of Cottage Grove’s Future Vision 2030 Comprehensive Plan identifies the property as
Commercial. The land use plan is shown below:
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 7 of 18
Zoning
The zoning classification of the property is PDO, Planned Development Overlay. In this zoning
district, housing for seniors is listed as a permitted use and assisted living as a conditional use.
Public Utilities
The property is located within the Metropolitan Urban Service Area (MUSA) and can be ade-
quately serviced by public utilities. The existing well house, water tower, and antenna leases will
not be impacted by the redevelopment project. The City will retain ownership of the parcels
(Lots 4 and 5) on which these utilities are located.
Utility Plan
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 8 of 18
Transportation
80th Street and Hadley Avenue are designated as a major collectors and were designed to ac-
commodate the proposed expansion at the site. The traffic study completed in 2006 included the
review of a more intense commercial generator at this node and did not identify any traffic
concerns.
Parks and Private Open Space
The Parks Element of the Comprehensive Plan does not identify any planned parks or open
space in the development area. Based on this fact, a cash dedication requirement in lieu of land
dedication will be memorialized in the Developer Agreement.
Parking
The new site plan has been designed with 309 above and underground parking spaces, which is
of sufficient quantity to meet the ordinance criteria requirements of 260 spaces. There is also a
shared parking requirement as a component of the Planned Development Overlay. The site
reconfiguration removes and replaces 48 spaces.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 9 of 18
Sidewalks and Trailways
As a component of the project, the existing sidewalk network will be reconfigured and expanded
to allow access in and around the site. As proposed, the new network meets City policies and
expectations for sidewalks and trails.
Sidewalk Connection Details
Grading
The grading on the site will reconfigure finished grades around the current facility and create
new building pads for the additional buildings and connecting common area. Best practices for
stormwater management will be required of the contractor during construction. The proposed
grading plan is included below:
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 10 of 18
Proposed Grading Plan
Surface Water Management
Stormwater management of the site was completed with the original site development. The pro-
posed development includes the relocation of private stormwater pipes and involves the vaca-
tion and dedication of new easements. The management of the surface water on the site will be
completed in accordance with the standards established by the South Washington Watershed
District.
Environmental Review
The environmental review for the site was completed with the original redevelopment. No wet-
lands were identified.
Landscaping
The landscaping for the project will be designed to meet the City’s landscaping ordinance
requirements. A landscaping detail identifying suggested tree locations and species is shown
below.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 11 of 18
Landscape Detail
Based on the required landscape criteria, the developer proposes to plant the following:
TREES SHRUBS
29 – Deciduous trees 44 – Large Shrubs
27 – Conifer trees 44 – Small Shrubs
56 – Total Number of Trees 88 – Total Number of Shrubs
Architecture
The proposed building was designed with exterior construction materials similar and comple-
mentary to the existing Norris Square housing structure, as well as the current design practices
being followed by the City on other development projects. A detail of the mock wall that was
completed with the original construction project is below.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 12 of 18
Construction Material Wall Mock-Up
The table below identifies information related to the proposed buildings.
Elevation Detail from Neighboring Residences
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 13 of 18
Entry Elevation Detail
First Floor Interior Plan Details
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 14 of 18
Second and Third Floor Interior Plan Details
Fire Station One
As a component of the Central Fire Station construction project, Fire Station One will be de-
commissioned. A facet of this redevelopment project is that the station and property will be
acquired by the applicant through a negotiated real estate agreement and incorporated into the
new site plan. The Developer will be responsible for the demolition of the building. The City will
be leasing the building until the Central Fire Station construction is completed.
Fire Station Detail
The recommendation from the City’s Planning Staff, Technical Review Committee, and Public
Services Commission is for the City Council to decommission Fire Station One as a component
of this project.
Summary
The site is properly guided and zoned.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 15 of 18
The planned commercial land uses proved to not be viable for this site.
There is a demonstrated need for additional senior housing in the community.
The site can be adequately served by public utilities.
The existing well house, 150,000 gallon water tower, and supporting well house will not be
negatively impacted by the proposed project.
All City departments have reviewed and support the project.
Fire Station One has been determined to be obsolete and surplus property.
Recommendation
That the Planning Commission recommend that the City Council approve the following applica-
tions subject to the conditions listed below:
A. Zoning amendment to amend the approved Planned Development Overlay (PDO);
B. Preliminary plat for PHS Cottage Grove Inc. 3rd Addition, which creates five lots and one
outlot
C. Conditional use permit to allow a 72-bed skilled care center
D. Site plan review for the redevelopment and expansion of the Norris Square campus located
on the southwest corner of 80th Street and Hadley Avenue including a 64-apartment inde-
pendent living building and a 72-bed skilled care center with interconnecting enclosed archi-
tectural corridors, required parking, and expansion of the communal town center.
Conditions of Approval
1. The 2006 approved commercial site plan for the site is invalid and replaced by the site plan
approved by the City Council on December 21, 2016.
2. The PHS Cottage Grove 3rd Addition final plat is approved by the City and recorded at the
Washington County Recorder’s Office.
3. The recorded plat shall contain public drainage and utility easements as required by the
City Engineer.
4. The property owner shall provide and record any drainage and utility easements as
required by the City Engineer that are not included in the final recorded plat as a separate
document.
5. All applicable permits (i.e.; building, electrical, grading, and mechanical) and a commercial
plan review packet must be completed, submitted, and approved by the City prior to the
commencement of any construction activities. Detailed construction plans must be
reviewed and approved by the Building Official and Fire Marshal.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 16 of 18
6. The applicant receives all required permits from the City of Cottage Grove Building Divi-
sion prior to construction.
7. Final grading and drainage plans must be submitted to the South Washington Watershed
District for review. The final grading plan shall meet the approval of the City Engineer.
8. Irrigation shall be provided for all sodded and mulched landscaped areas. Lawn care and
maintenance must extend all the way to the curb of Hadley Avenue and 80th Street. The
irrigation system shall consist of an underground sprinkling system that is designed by a
professional irrigation installer to meet the water requirements of the site’s specific vege-
tation. The system shall be detailed on the final landscape plan.
9. Installation of landscaping shall occur in a timely fashion and be consistent with an ap-
proved plan. A letter of credit in the amount of 150 percent of the landscape estimate
shall be submitted to the City as required by City ordinance. The financial guarantee shall
be in effect for one year from the date of installation to ensure the installation, survival,
and replacement of the landscaping improvements.
10. Final architectural plans, lighting details, and exterior construction materials and colors
must be reviewed and approved by the Community Development Department prior to the
issuance of a building permit.
11. All comments included in the memorandum from Ryan Burfeind, City Project Engineer,
dated November 22, 2016, shall be included on the final construction drawings.
12. All site lighting must meet City Code requirements. All light fixtures must be downward
directed with cut-offs. The specifications of all light fixtures must be provided with the ap-
plication for a building permit. The light poles and fixtures shall be consistent in design
and color with those at the other properties in the Norris Square Planned Development
Overlay project.
13. The grading and erosion control plan for the site must comply with NPDES II Permit re-
quirements. Erosion control devices must be installed prior to commencement of any
grading activity. Erosion control must be performed in accordance with the recommended
practices of the “Minnesota Construction Site Erosion and Sediment Control Planning
Handbook” and the conditions stipulated in Title 10-5-8, Erosion Control During Construc-
tion, of the City’s Subdivision Ordinance. The applicant shall be responsible for the costs
for the City to inspect the site in relation to erosion control conformance.
14. The applicant must provide the City with an as-built survey of all private utilities prior to
issuance of certificate of occupancy.
15. All mechanical units shall be screened as required in Title 11-6-4 of the City’s Zoning Ordi-
nance.
16. All mechanical equipment screening consistent with the principal building architecture
must comply with City ordinance regulations and be reviewed and approved by the
Community Development Department prior to the issuance of a building permit.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 17 of 18
17. Trash enclosures must be constructed with footings and building materials that are con-
sistent with the principal building’s exterior materials.
18. The applicant shall be responsible for maintaining the sidewalks and removing snow
and/or ice from sidewalks on the site.
19. A bike rack will be required in the final parking design per City policy.
20. Storm sewer pipe must be reinforced concrete pipe (RCP).
21. Retaining walls greater than four feet in height shall be designed by an engineer and sub-
mitted to the City Engineer for review and approval. A fence or guard rail along the upper
elevation of a four-foot or higher retaining wall must be installed.
22. Decorative fencing not necessary for motor vehicle safety shall be commercial grade or-
namental fencing meeting the City’s Gateway North design specifications that are similar
to a Montage Commercial Majestic 3/4 – Rail Fence design.
23. The applicant is responsible for removing debris from all adjacent public roadways during
their grading and construction process. These streets shall be swept clean daily or as
needed.
24. A “STOP” sign shall be installed at each exit drive. Each sign shall be ten feet from the
roadway edge and two feet from the driveway edge. The bottom of the sign shall be six
feet from the ground. The “STOP” sign shall be a 30-inch sized sign having a high inten-
sity face. Said sign shall be mounted on a 6-foot – No. 3 and 8-foot – No. 2 steel post.
The applicant may request the City’s Public Works Department to install said “STOP”
signs, but must reimburse the City for actual costs incurred.
25. The Norris Square Development Overlay Master Plan (Resolution 2006-221) is amended
to substitute including a 64-apartment independent living building and a 68-unit, 72-bed
skilled care center with interconnecting enclosed architectural corridors, required parking,
and expansion of the communal town center.
26. A photometric plan showing the calculated candlepower throughout the site showing
compliance with the City ordinance is required to be submitted prior to issuance of a
building permit.
27. Rubbish, garbage, and recycling containers must be stored within an enclosed structure
compliant with City ordinance screening requirements and shall be maintained at all
times so as not cause odors or other public nuisances.
28. The applicant must submit a stormwater management plan for the private stormwater
sewer and underground stormwater storage facilities.
Planning Staff Report
Norris Square Redevelopment
November 28, 2016
Page 18 of 18
29. A pre-construction meeting with City staff and the contractor must be held before site
work begins. The contractor shall provide the City with a project schedule for the various
phases of construction.
30. Two freestanding monument signs are allowed on the project site in the locations detailed
on the approved site plan. The monument sign must not encroach on any public right-of-
way and must comply with the City’s Sign Ordinance size and height requirements.
31. The developer enters into a development agreement with the City.
32. The planting of new trees within the Hadley Avenue Road right-of-way must be space a
minimum of 45 feet apart. The developer is required to stake the location of each new
tree within the public right-of-way and contact the City Forester for inspection and
approval before planting the boulevard trees.
Prepared by:
John M Burbank, AICP
Senior Planner
Attachments
Project Architectural Plans
Colored Architectural renderings
Project Civil Plans
Colored Site Plan
To: Jennifer Levitt, PE, Community Development Director/City Engineer
John Burbank, Senior Planner
From: Ryan Burfeind, PE, Project Engineer
Date: November 23, 2016
Re: Norris Square Phase 2 Engineering Review Comments
This memo summarizes the review of the Norris Square Phase 2 civil plans. This review is
based upon documents prepared by BKBM Engineers dated 11/1/16.
General
1. All City of Cottage Grove standard detail plates referenced can be found on the City
website at www.cottage-grove.org, under Engineering Department, and shall be
included in the plans.
2. Grading and utility record plans containing surveyed as-built information shall be
submitted to the City upon completion of the project, in both PDF and DWG format.
3. Plan and profile views will need to be included for public utilities that will be located
onsite.
4. An NPDES construction stormwater permit shall be required for the project.
th
5. A right-of-way permit will be required for any work within the 80 Street/Grange Blvd or
Hadley Avenue right-of-ways.
6. A stormwater maintenance agreement shall be executed with the City for all stormwater
management BMP’s located onsite.
7. All retaining walls over 4 feet shall be designed by a registered professional engineer
and a building permit secured through the Cottage Grove building department.
Street/Sidewalk
8. City sidewalk work shall conform to detail plate STR-10.
9. Any costs related to City streetlight conflicts will be the responsibility of the applicant.
10. Please verify the turn radius is adequate for EMS vehicles to reach the front entrance of
the care center building.
Water Main
11. Water lines shall be rodded both vertically and horizontally under the buildings.
12. Water main shall be DIP.
13. Hydrants will require hydrant pads per detail plate WAT-9.
14. Please verify the location of the existing water main on the south side of the proposed
independent living facility. Based on the original design plans it appears to have run
parallel to the sanitary sewer and connect at the valve that is shown in Hadley Avenue.
15. Any existing service leads that are not utilized on this project shall be removed.
Norris Square Phase 2 Engineering Review Comments
November 23, 2016
Page 2
16. The existing water main that is being lowered along the independent living will need to
be tested by plugging the pipe ends, eliminating the need for the new valves on each
end of the lowered section.
17. Valves shall be provided on each leg of the water main tee that is located between the
turnaround island and parking lot island. Currently only two valves are shown, this will
allow for isolation of the various legs in the future.
18. Existing valves at the water tower site should be shown on the plan.
19. The valve shown on the water tower connection will need to be moved to the connection
point so it can be used to test against.
20. Please verify if the domestic/fire services will split internally or external of the buildings.
21. Per the Fire Marshall, the FDC will need to be moved from its current location on the
existing building to the front of the town center. The new town center/link layout would
eliminate access to the current FDC location.
22. Water main work will need to be phased accordingly to maintain service to the existing
building. Please notify Rick Alt, Cottage Grove Utilities Foreman, at 651-458-2842 prior
to starting work on the City water main.
Sanitary Sewer
23. The sewer service sizes will need to be included on the utility plan.
24. As the existing building sewer service is 8”, it will not be able to be tied directly into the
City 8” sanitary sewer line. The existing end manhole on the City 8” sanitary sewer line
is too close to the west link building and will need to be removed, with a new manhole
set for the 8” service to connect to.
25. Please notify Rick Alt, Cottage Grove Utilities Foreman, at 651-458-2842 prior to
starting work on the City sanitary sewer system. Work will need to be planned to
prevent disruption of service to the existing building.
Storm Sewer
26. Storm sewer work shall be planned accordingly to maintain service to the G-Will Liquors
property.
27. Please verify there is an existing sump located in the catch basin immediately
downstream of STRM #27. A sump will need to be located on this line prior to
discharging to water quality treatment pond #3.
28. Please verify the need for STRM #21. If STRM #21 could be eliminated, STRM #22
could be connected directly STRM #7.
Erosion Control
29. Silt fence shall conform to detail plate ERO-1.