HomeMy WebLinkAboutMinutes i�
��tJV�
�ri°t �
y � ...............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
���� �ri e ar�d PC�� t
MINUTES
COTTAGE GROVE CITY COUNCIL January 18, 2017
COUNCIL CHAMBER
12800 RAVINE PARKWAY SOUTH
REGULAR MEETING - 7:00 P.M.
1. CALL TO ORDER
The City Council of the City of Cottage Grove, Washington County, Minnesota, held a
regular meeting on January 18, 2017, at Cottage Grove City Hall, 12800 Ravine
Parkway. Mayor Bailey called the meeting to order at 7:00 p.m.
2. PLEDGE OF ALLEGIANCE
The audience, staff, Mayor, and City Council Members recited the Pledge of Allegiance.
3. ROLL CALL
The following were present: Mayor Myron Bailey, Council Member Steve Dennis,
Council Member Wayne Johnson, Council Member La Rae Mills, and Council Member
Dave Thiede.
Also present were: Charlene Stevens, City Administrator; Korine Land, City Attorney-
LeVander, Gillen & Miller, PA; Ryan Burfeind, Asst. City Engineer; Zac Dockter, Parks
and Recreation Director; Joe Fischbach, HR Manager/City Clerk; Jennifer Levitt,
Community Development Director/City Engineer; Sharon Madsen, Communications
Coordinator; Molly Pietruszewski, Parks and Recreation; Robin Roland, Finance
Director; Craig Woolery, Director of Public Safety; Gary Orloff, Working Foreman.
4. OPEN FORUM
Mayor Bailey asked if anyone in the audience wished to address the Council on any
item that was not on the agenda. As no one wished to address the Council, Mayor
Bailey closed the open forum.
5. ADOPTION OF AGENDA
Mayor Bailey stated they'd be pulling Item 11A off of the Consent Agenda this evening
because they will be having a workshop prior to taking any further action.
Motion by Council Member Thiede, second by Council Member Dennis, to adopt the
agenda without Item 11A. Motion carried: 5-0.
CITY OF COTTAGE GROVE • 12800 Ravine Parkway • Cottage Grove, Minnesota 55016
www.cottage-grove.org • 651-458-2800 • Fax 651-458-2897 • Equal Opportunity Employer
City Council Meeting Minutes
January 18, 2017
Page 2
6. PRESENTATIONS
A. Receive Inclusive Playground Donations Totaling $56,000
Accept Inclusive Playground donations of.� 1. Western Refining and
SuperAmerica - $25,000. 2. Stantec Consulting Services - $6,000. 3.
Cottage Grove Lions Club - $10,000. 4. St. Paul Park Newport Lions Club
- $15,000.
Mayor Bailey asked the City Council Members and Molly Pietruszewski and Zac
Dockter, Director of Parks and Recreation, to join him to receive the donations for the
Inclusive Playground.
Matthew Sieh from Western Refining and SuperAmerica was asked to step forward; he
introduced Carolyn Hieb of SuperAmerica and the Lions Club, who was with him. He
stated one of SuperAmerica's core values is to give back to the communities in which
they live and work. Matthew stated they had been approached about the Inclusive
Playground and they knew they wanted to participate. Carolyn was instrumental in
helping with securing the donation for this project, as she's also a member of the
Cottage Grove Lions Club; she was able to make sure that Western Refining and
SuperAmerica understood the value of a $25,000 donation and what that would mean to
the community. Mayor Bailey thanked Matthew and Carolyn for their work in securing
the donation and also for the other donations they make to the community.
Tom Bader and Lee Mann of Stantec Consulting Services stated they're the engineers
for the City of Cottage Grove and have worked with the City for a long time. Stantec's
slogan is "We design with community in mind," so that's the base and fiber of what they
do as a company. They said they look forward to seeing the playground completed and
presented a donation of$6,000 to Mayor Bailey; Mayor Bailey thanked them for
Stantec's donation.
Randy Lewis of the Cottage Grove Lions Club stated their vision was community
service, family, and fun, and the Inclusive Playground really exemplified every aspect of
that. One of their members, Patrick Forsythe, is on the Inclusive Playground committee,
and he shared his passion for it with others in the club. It's been an easy project for
them to get on board with and to see it happen within the community; he presented a
donation of$10,000 to Mayor Bailey. Randy was thanked by Mayor Bailey, who stated
the Cottage Grove Lions have been an integral part of the community and how they give
back to make Cottage Grove great.
Secretary Greg Langbehn of the St. Paul Park Newport Lions Club presented a
donation of$15,000 to the Inclusive Playground; he stated they believe in giving back to
the community, and while Cottage Grove is a neighboring community, they're proud to
do this. He stated they've applied for a $100,000 grant from Lions Club International
Foundation; if they receive that grant, the total amount will be donated to this project.
City Council Meeting Minutes
January 18, 2017
Page 3
Mayor Bailey stated the St. Paul Park Newport Lions Club has stepped up with many
Cottage Grove projects, and it was nice to see the Lions Clubs working together to
make things happen in the community.
Mayor Bailey again thanked all of those who had donated to the Inclusive Playground;
he can't wait for it to become a reality later this year.
B. Afton Apple Donation to the Public Safety Board
Presentation of check from Afton Apple's fall fundraising in the amount of
$5,321 to the Cottage Grove Public Safety Board for Fire Department
education.
Karin McCarthy, of the Cottage Grove Public Safety Board, stated they're a nonprofit
organization that works to provide support for the Cottage Grove Public Safety
Department, which includes Police, Fire, and EMS. They've previously had fundraisers
to purchase various items: The first K9, Blitz, and his expenses; a portable speed
trailer; and a chip reader for animals that get lost in the City, which helps the Police
Department and prevents animals from being placed in the Humane Society. This year
they're helping the Fire Department.
Sarah and Mike Parkos and the Femling family, of Afton Apple Orchard, were present.
Sarah stated their family has owned and operated Afton Apple for 28 years; they're a
small family business striving to provide a memorable apple orchard experience with the
ability to pick your own apples, raspberries, strawberries, and pumpkins. They added a
corn maze to their orchard 16 years ago, and each year they have the opportunity to
create a unique design, which have mostly been farm related; when trying to come up
with this year's design, they wanted to get the community involved and wanted to show
their gratitude and support for people dedicating their lives to being the real heroes. So,
they carved the theme, "Thank Your Local Heroes" in their 15-acre cornfield and they
felt the least they could do was hold a fundraiser and give back to the community. They
coordinated with the Washington County Sheriffs Office, Hastings Fire & Police,
Woodbury Fire, and Cottage Grove Fire & Police to host fundraisers for their Public
Safety Departments. The fundraising included donations from a portion of an adult corn
maze admission and the "Fill the Firefighter's Boot" contest. Public Safety personnel
were present at the corn maze on weekends for meet and greets, to show safety
equipment, and answer public safety questions. The "Fill the Firefighter's Boot" contest
was on three weekends, represented by Hastings, Cottage Grove, and Woodbury
Public Safety. Each City was challenged to collect the most on-site donations into a
firefighter's boot from corn maze customers, and they matched the donation of the
winning City. They're also donating $3 from each paid adult corn maze admission each
day of the weekend to the featured Department. The fundraiser of corn maze
admission sales and "Fill the Firefighter's Boot" contest was very successful. The
support for the "Thank Your Local Heroes" theme was mind blowing, and they are
completely thrilled to be giving back over $21,000 to the community. Cottage Grove
Public Safety did a remarkable job representing first responders by bringing out several
City Council Meeting Minutes
January 18, 2017
Page 4
Fire Rescue vehicles and Police equipment on the weekend of October 22 and 23.
Cottage Grove was the City with the most donations for the "Fill the Firefighter's Boot"
contest, so they matched the total of$142 and donated $284.
Sarah stated on behalf of Afton Apple, including their families, employees, and
customers, they were privileged to donate a grand total of$5,321 to Cottage Grove
Public Safety for Public Safety education. She thanked Cottage Grove Public Safety for
their outstanding service.
Karin McCarthy, on behalf of the Cottage Grove Public Safety Board and the Public
Safety Departments in Cottage Grove, thanked them for the very generous donation
and stated it would be put to wonderful use for the City. Mayor Bailey stated Afton
Apple also got involved with the Cottage Grove Strawberry Festival and made sure the
City had enough fresh strawberries at the concession stands, etc. He stated once again
it was nice to see surrounding communities and businesses helping Cottage Grove with
fundraising and supporting our City.
7. CONSENT AGENDA
A. Approve the January 4, 2017 City Council Regular Meeting Minutes.
B. Receive and place on file the approved minutes for the Arts Commission
Meeting on December 6, 2016.
C. Schedule Local Open Book Meeting and Acknowledge Regional Meetings.
D. Adopt Resolution 2017-003 accepting donations received in the Fourth
Quarter of 2016.
E. Accept donation from Conway and Katherine Olson in the amount of
$11,000 towards the purchase of cross country ski and snowshoe trail
grooming equipment.
F. Adopt Resolution 2017-004 extending the closing date for the Land
Exchange Agreement with Presbyterian Homes an additional 90 days.
G. Reappoint Myron Bailey to the Economic Development Authority.
Council Member Dennis wished to pull Item D and Mayor Bailey wished to pull Item E
for further comment and/or discussion.
Council Member Dennis stated he wanted to recognize donations made to the Inclusive
Playground in the Fourth Quarter of 2016: Alene Colvin Fundraiser; Becky Uecker;
Rosemount Lions; C. Carlin-31 Gift Vendor; Krista Bolad; L. Jameson-Keep Collective;
Advanced Sportswear; Cottage Grove Middle School Special Ed & Reaching All
Humans-Craft Fundraiser; Tennis Sanitation; Jamberry Nails-Mallory Martin-Vendor
Fundraiser; Whenever Fitness; Ryan Sundell; Bolton & Menk; Stantec; Vadnais Heights
Lions Club; Thrivent Financial; Dorie Hanson; Cottage Grove Lions; Western Refining &
SuperAmerica; St. Paul East Parks Lions Club; Andersen Corporate Foundation.
Additionally, there was an unrelated donation for the Bike Park from Rumpca
Excavating in the amount of$4,918.50, for services and materials that were given.
City Council Meeting Minutes
January 18, 2017
Page 5
Council Member Dennis stated making a difference in the community can come in many
different ways, and it doesn't have to be volunteering on a commission, etc. but can be
simply by donating money to the City for a designated project; no amount is too small,
and it's always appreciated. He thanked all of the above people and/or businesses for
their generous donations.
Mayor Bailey stated that he pulled Item E, which was to accept a donation from Conway
and Katie Olson in the amount of$11,000 toward the purchase of cross country ski and
snowshoe trail grooming equipment. Early last year, Mayor Bailey was speaking with
Conway Olson, who stated he liked some of the changes being made at River Oaks
Golf Course. He had suggested the golf course might be a great place to actually put in
some trails; Mayor Bailey agreed but stated the City didn't really have the right
equipment to groom trails. Mr. Olson asked if he could make a donation, Mayor Bailey
got Director pockter involved, and they came up with what would be needed to groom
trails; in fact, the equipment might also be utilized in other ways throughout the City.
Conway and Katie Olson are very passionate about cross-country skiing and wanted to
give back to the City of Cottage Grove. Mayor Bailey thanked them for their generous
donation toward the equipment, which has been ordered, and will help expand trail
options in Cottage Grove.
Motion by Council Member Thiede to approve the Consent Agenda, second by Council
Member Mills. Motion carried: 5-0.
8. APPROVE DISBURSEMENTS
A. Approve payment of check numbers 199495 to 199610 in the amount of
$447,252.71 and EFT Payment of$861,307.19.
Motion to approve disbursements by Council Member Mills, second by Council Member
Johnson. Motion carried: 5-0.
9. PUBLIC HEARINGS — None
10. BID AWARDS — None.
11. REGULAR AGENDA
A. Classification and Compensation Study
Staff Recommendation: Approve the proposal to conduct a Classification
and Compensation Study with Springsted in the amount of$38,500.
This item was pulled by Mayor Bailey for a future meeting.
12. COUNCIL COMMENTS AND REQUESTS
City Council Meeting Minutes
January 18, 2017
Page 6
Council Member Mills stated there's a Stone Soup Thrift Shop fundraiser coming up on
Saturday, January 28, which will be a luau; tickets are available, $10 for adults and
teens and $5 for children. The tickets can be purchased at Park Place, the Stone Soup
Thrift Shop, and also online.
Council Member Johnson stated after the last snowfall, he realized people need to be
reminded of how important it is to shovel out the fire hydrant in your area. It could help
you or your neighbor someday to make sure the Firefighters can access the fire
hydrants, as seconds and minutes matter.
Council Member Johnson stated due to social media, there are more ways than ever to
really stay informed on what is going on in the City with new developments, new stores,
current School Board information, information on community groups, etc. He
encouraged everyone to be part of the community and stay informed.
Council Member Johnson stated he had a chance to tour the Cottage Grove Public
Works Department. He stated it's a great department, they really care about the
community, and they're very prompt in responding to citizens' requests. He was very
impressed with everyone there, and the City should be proud of them.
13. WORKSHOPS — OPEN TO PUBLIC
A. 2017-2021 Capital Improvements Plan
Staff Recommendation: Workshop discussion of 2017-2021 Capital
Improvements Plan, including Central Fire Station presented by Wold
Architects.
Mayor Bailey asked Community Development Director/City Engineer Jennifer Levitt to
begin the workshop on the Capital Improvements Plan (CIP). Director Levitt informed
the new Council Members that's a five-year plan for roads, utilities, park projects, and
buildings; she advised they'd be discussing all of those tonight except parks, which will
be dealt with at the next Council Meeting. Tonight they'd focus on anything being
planned in the next two years. This evening they'd start with buildings, one of which is
the Central Fire Station; the plans and specifications for that will be voted on at the next
Council Meeting and the bid date will also be established. Director Levitt advised
regarding budget, she would not be speaking on that, but Finance Director Robin
Roland would do so later on. The other building is the Hero Center; that project is
currently under preliminary design. The Council will be meeting with the City of
Woodbury's City Council on February 9, so there will be more information gleaned at
that time. The Hero Center will hopefully be constructed in 2018. Regarding the Ice
Arena, they're looking at the north and south refrigeration system replacement and roof
replacement in 2020.
Director Levitt asked John McNamara of Wold Architects to speak about the Central
Fire Station. Mr. McNamara wanted to give everyone an update on the design process
City Council Meeting Minutes
January 18, 2017
Page 7
and the direction they were going, as they'd be going out for bids soon. The site on
80th Street will be completely reconstructed; there will be two main parking lots, one for
the public, and one for the apparatus. There will be an additional parking area in the
back of the station for staff. He reviewed the building layout; they're looking at
expanding the garage from five drive-through bays to six. The proposed colors for the
exterior brick as well as the colors chosen for the interior were shown. He gave
specifics of the interior design on all three levels.
Mr. McNamara reviewed the schedule: February 1 they'll be looking for Council
approval of the plans and specifications, to go out for bid. In February and early March,
they'd obtain bids; the project will be awarded in early April, with construction starting in
the spring.
Regarding the budget, they're at $7,900,000 for the general building construction, which
includes some schematic design costs and costs for the demolition of Fire Station 2.
Right now, they believe the total project cost will be approximately $9,000,000, which is
a bit higher than it had been; the sixth bay and in-floor heat and heated apron are some
amenities that they might choose to do without. He reviewed some changes they might
want to make to the plans, specifically, installing in-floor heat to the apparatus bay
instead of overhead heat, but that would be an added cost. They would also need to
upsize the boilers and other control work if those changes were made, which would be
added costs. The monument sign is being provided; however, the electronic reader
board is a fairly expensive item, approximately $60,000. On bid day, they can discuss
the relative importance of each item. Mr. McNamara asked if there were any questions
from Council.
Mayor Bailey stated he thought the heated apron is a priority, based on what had
happened with the sidewalk at City Hall; he personally felt the electronic reader board
should be way down the list.
Council Member Thiede asked if the in-floor heat was actually more cost effective,
energy wise; Mr. McNamara stated there are some savings but it would not affect the
rebates. Council Member Thiede asked about the solar panels on the previous City Hall
and if those had been factored in; Mr. McNamara stated there's about a $16,000
premium on that, but they felt those should be included so they're already part of the
cost.
Council Member Johnson asked several questions, including if the design had been
copied from another city's existing fire station, it had been built this way, and it worked
great; if there was going to a rough type of tile installed in the public portion of the
building to prevent slippage and, if so, how easy that would be to keep clean with
muddy shoes, etc. Mr. McNamara stated they'd toured many fire stations and got input
on what worked best. A rough tile would be used in the public portion, and there would
be a walk-off mat in the main entry vestibule and the hallway, as you enter the building;
the tile used would be easy to clean.
City Council Meeting Minutes
January 18, 2017
Page 8
Council Member Johnson asked with all the glass used to help heat the building in the
winter if that would create problems in the summer with excessive heat. Mr. McNamara
stated it's very energy-efficient glass and felt there'd be more of a benefit in the
wintertime. Council Member Johnson asked if that specific glass was readily available
should it break; Mr. McNamara stated that yes, it was pretty common in the building
trades. Council Member Johnson asked about maintenance on the building; Director
Levitt stated the maintenance people take a close look at the plans and specifications;
they look at lighting, the HVAC, the boiler systems, and identify anything that might be
more challenging for maintenance and they try to minimize those. They also work
closely with them to develop a maintenance plan for the facility.
Council Member Johnson asked what ensured that the price quoted will remain and
won't become excessively more expensive; Mr. McNamara stated right now it's a
budget number, it's going out for bid, and the bids are going to tell them if they were on
track. Based on the information they had, Wold felt relatively confident that their
numbers were accurate. Council Member Johnson clarified that he's not worried about
that; it's when the project is done and there have been many changes made, what the
final cost will be. Mr. McNamara stated they break the project up into work scopes and
make sure it's as clear as possible; he stated they try to alleviate contractors pointing
the finger at each other. He stated he won't say there aren't going to be any issues
because that's not reality; however, theirjob is to reduce that as much as possible, and
they have a pretty good track record of doing so. Council Member Johnson asked if
there's a chance that this cost could be 10% higher, if they're getting change orders.
Mr. McNamara stated there's a contingency earmarked going into it, to help offset any
of those costs that arise. Director Levitt stated that with the Kraus-Anderson contract
there's a maximum price guarantee, so there's a lot of emphasis that Kraus-Anderson is
putting in when reviewing these plans and specifications because they also have to
absorb risk.
Council Member Thiede asked with the design and the landscaping, etc. if the
maintenance budget would need to be increased or if they'd be able to do the work with
the existing staff. Director Levitt stated the Parks Department actually did the detailed
landscaping design on the project and gave a lot of insight on how to efficiently maintain
the exterior. Public Works also gave insight on plowing and the most efficient way to do
it so as not to damage curbs, etc. Every Department has touched this project and next
week they'll have one more chance to vet any concerns and issues.
Engineer Levitt stated there were a couple key road projects that are moving ahead:
• Hadley Avenue and 95th Street is one of those, near the new Summers Landing
subdivision. The project began in 2016 and will continue this year.
• 65th Street, which will come before the Council as they get ready to actually bid
the project. The project was ordered on December 7; negotiations with the
adjacent landowners are being finalized for the necessary right of way, and she
expects that will be completed within the next month. Ten-E Packaging in
Newport has requested to have water extended to their facility so they're working
City Council Meeting Minutes
January 18, 2017
Page 9
with them on the expenditure for the extension of water. The overall project cost
is approximately $4,200,000; $2,600,000 will be paid by the School District for
those improvements.
• A project with Washington County at Keats Avenue and East Point Douglas
Road and the ramps that connect to Highway 61. They'll reconstruct the road
and the new entrance into Ravine Park. That entire area will be able to be
developed with all utilities, water, sanitary sewer, storm sewer, and a road
network to support that development. Mayor Bailey asked Engineer Levitt if all of
the agreements were in place; she stated they're very close to having everything
finalized. Council Member Thiede asked about the new entrance to Ravine Park
and if that would go across; Engineer Levitt stated that it would. Council Member
Johnson asked if there had ever been a six-legged roundabout; Engineer Levitt
stated Cottage Grove was the first to build a six-legged roundabout, located at
Jamaica Avenue. She stated the new roundabout will be concrete, similar to
Jamaica. Engineer Levitt reminded everyone that Ravine Park would be closing
shortly, as they begin work on the mitigation storm projects. There will no longer
be flooding, there will be bridges, trails, fishing piers, and it will be an exciting
enhancement to the area.
• Washington County will be very busy in Cottage Grove this year with
construction; they will be reconstructing 70th Street from Highway 61 all the way
to Hinton Avenue. The roundabout will not be constructed at Hinton and 70th
Street until 2019 because it has not yet been formally approved by the State;
Engineer Levitt felt that Washington County would want a roundabout, as
opposed to a stoplight. 70th Street to Meadow Grass will close first, from May to
July; once that reopens, 70th Street will then close from Meadow Grass to the
area near Hinton Avenue, as that's in conjunction with the 65th Street project.
• Engineer Levitt stated another road project is at 80th Street and East Point
Douglas Road. Hy-Vee is a large traffic generator and with the redevelopment of
the Home Depot site, there will be more traffic at the stoplight; therefore, they'll
be installing an additional right-turn lane. There will be significant traffic signal
work forthcoming. They're anticipating Hy-Vee will possibly open in early
summer so they want the right-turn lane roadwork done in time for Hy-Vee's
opening.
• Ravine Parkway is the linchpin to enable the City to move forward with
development in that quadrant of the City; without it, they will not be able to
access residential parcels that are already being developed. This project will
build the City's tax base, and there's much interest in that area. The total project
is $5,200,000, and this is a Chapter 429 project.
• In 2018, there were aspirations to get rid of the thumping sound on 80th Street,
but that's one project that might have to be pushed off.
• Engineer Levitt stated they're also proposing to improve 100th Street from Ideal
Avenue to Hemingway. They're anticipating if a developer comes in, they have
to be prepared to extend sanitary sewer, various utilities, and extend the roadway
and turn lanes that facilitate that. They're optimistic with changes in the
marketplace and want to be in a position and financially ready to be able to move
City Council Meeting Minutes
January 18, 2017
Page 10
forward with that project. This is not being currently designed, but it's on the
edge of moving forward as development comes forth in the business park. That
has about a $2,300,000 price tag.
• The bridge on Grey Cloud needs touch-up paint; they call it their"fractured
critical bridge." They need to plan for some paint preservation projects on it,
which is planned for 2018.
• In 2019, there will be a roundabout at Hinton Avenue and 70th Street; the total
cost is approximately $2,600,000. They anticipate the Cottage Grove share will
be just over $600,000. Washington County owns three legs of the intersection
and Cottage Grove only owns Hinton; therefore, Cottage Grove will only pay 25%
of the cost.
• In 2019, there's a pavement management area to the west of Jamaica Avenue,
north of 90th Street, which has a cost of about $1,000,000; this might be another
project that might have to be moved further into the future.
• Engineer Levitt described the new Ravine Parkway and the new Ravine Park
entrance and explained how the connection would be made northward to the
other side of the road. Council Member Thiede asked about the placement of
East Point Douglas Road; Engineer Levitt stated there were multiple options on
how that road could be placed, depending on what future developers wanted
and/or needed. Mayor Bailey stated some developers have commented that the
piece of property is too big to take all at once, and so breaking it up would be
beneficial; the landowners are okay with that, also. Council Member Johnson
asked if that area would be zoned commercial; Engineer Levitt stated yes, but
there would be some mixed use zoning as it moves toward 90th Street.
• They're looking at redoing 80th Street from Ideal Avenue to Highway 61; that's a
$5,000,000 project. They've also added Harkness Avenue reconstruction; this is
the Harkness Avenue that is actually from Hardwood Avenue to Hardwood
Avenue, near Oakwood Park and Las Margaritas. There's a road that kind of
winds through there and there's some great potential for development there; it
could stage for development so they're proposing funding for that.
• Regarding the new six-legged roundabout, the new bridge over Highway 61 that
connects to 3M and across the property, that's put in the fifth year; anytime that
they're trying to seek third-party funding, we're always more competitively
positioned in year five. Council Member Thiede stated that part of that project
involves a County road; Engineer Levitt agreed and stated they could look for
some federal dollars.
• Washington County has plans for 70th Street, from County Road 19 all the way
to trunk Highway 95, so they're expecting in the future they'll have cost
participation with that.
• Engineer Levitt explained that various utility funds support the maintenance
projects in the CIP and explained details about that. Growth in Cottage Grove
makes the City have to start anticipating a new well, so they're expecting that in
2019, which will be offset by the Water Fund. There will also be a business
water tower park slated in there, only if there's a high water user in the business
park; however, they're budgeting and analyzing and anticipating that so they can
City Council Meeting Minutes
January 18, 2017
Page 11
be positioned for that. There's the sanitary sewer utility fund for larger
maintenance activities.
• The Belden Lift Station (located near the Youth Service Bureau) will be coming
before you for approval, $700,000. There's currently only one lift station in the
City of Cottage Grove; everything else flows by gravity. However, the lift station
has some limited capacity and not a very big factor of safety. As Dominium is
added onto it and other commercial redevelopments, the volume of sewage is
increasing, so the capacity has to be built to provide good customer service.
There will be some additional sanitary sewer lining projects that need to take
place to support the sanitary sewer system.
Council Member Johnson asked if they're looking five years ahead if they're using
today's dollars; Engineer Levitt replied they put some inflationary dollars in there to try
to offset that. They estimate about 3.5% per year. Engineer Levitt stated it's also
important to look at our utility rate structure for various utilities so we can budget for the
larger capital projects.
The final enterprise utility fund is the enterprise streetlights. They budget about
$100,000 annually for streetlight enhancements; those are typically done in conjunction
with pavement management and other areas where they've had problems with
reliability. The streetlight fund also pays for traffic signals. They anticipate with the
growth in the business park with high morning and evening peak hours, they might start
seeing traffic congestion, so they're programming for that in 2019.
Mayor Bailey asked if they're going to keep the stop signs up at 95th Street; Engineer
Levitt stated with the project on Hadley Avenue, between 95th Street and 100th Street,
there's a reason to have those and it buys us more time to continue to evaluate.
Therefore, they're in no hurry to take down those stop signs.
Finance Director Robin Roland commented that Engineer Ryan Burfeind deserved a lot
of credit for the work he did on tonight's presentation, as he helped her out a great deal.
Director Roland explained that when the City issues debt, we are statutorily required to
identify how much the City will contribute in the levy each year toward the debt service
for those bonds. For 2017, $190,000 of the $985,000 goes toward the Ice Arena in the
levy each year; the balance of the amount of debt service for those bonds comes from
fees that the City charges the Hockey Association and the School District. Those
revenues plus the City's contribution fund that debt service. The rest of the $985,000 is
currently pavement management debt; that includes bonds from 2009, 2012, 2014,
2016, and 2017, which were just issued in December. They moved the pavement
project ahead so it could be prefunded and we didn't have to start making debt service
payments on that until 2017, in the second part of the year.
For 2017, Director Roland stated we're moving toward building a Central Fire Station.
We're looking at about $9,000,000 of debt service on that; we anticipate issuing that
City Council Meeting Minutes
January 18, 2017
Page 12
debt on a CIP timeframe. That means we have the option of financing certain facilities
in the City, essential buildings (which include police Stations, fire stations, and city hall)
but not park buildings or community centers. CIP bonds are what we're anticipating
using for the construction of the Central Fire Station. There are statutory requirements;
we have to produce a CIP, which we then have a public hearing about so the public can
comment on that CIP, which includes the $9,000,000 Central Fire Station. Once the City
holds that public hearing, there's a 30-day period where there's a reverse referendum
situation; that means if there are people in the community who do not want the facility,
do not believe it is an essential facility, and want to have a general referendum on it,
they are allowed to bring a petition, and if it meets certain criteria, the City Council has
to hold a referendum. They don't feel there's a high probability of that occurring
because it is an essential building, the City's been very open in communicating to the
public about the Central Fire Station, and what it's going to take and the plan to reduce
from four fire stations to two fire stations. On February 15, the City Council will be
asked to call for a public hearing; that public hearing will be held on March 15, and
they'll talk about what the debt levy will do to the City's levy. After the public hearing,
the 30-day period elapses, and without a petition, then we are approved to go forward
and issue debt. The debt would be issued at the Council Meeting on April 19. They will
take bids on the fire station project significantly enough in advance of issuing the debt
so that if there is an issue, the estimates are wrong and it will cost more, the Council will
have the option to accept the bids or not accept the bids, prior to the City actually
issuing debt. That puts the City in a safer position and we're able to identify how much
money we really need. We may not need the full $9,000,000, which would be great. If
it's needed, we want to be in a position to do that.
With the bond market the way it is right now, they anticipate that the debt service on the
$9,000,000 bonds will be somewhere in the $600,000-$690,000 a year debt levy. That
is 4.87% of our current levy, so with one bond issue, if all things remain the same, we
would increase the levy by that 4.87%. Staff knows that one bond issue with that much
of an increase in the levy is going to be very difficult because they're also looking at
maybe increasing the general levy by 3% each year.
During the course of the budget, they discussed several things as a proposal to
moderate the impact of the debt. The City currently has $500,000 each year which is
assigned to an Interfund Loan that paid for City Hall. There are four different funds that
funded this building; the Water Fund, the Sewer Fund, the Closed Debt Fund, and the
Closed Construction Fund. Each of them has anywhere from $1,500,000 to almost
$3,000,000 in outstanding loans among the funds; we levy $500,000 every year to pay
those loans back. Council has always said that the Water and Sewer funds absolutely
have to be paid back because those are fees that we collected for future use in the
projects that Engineer Levitt has already highlighted. However, the Closed Debt Fund
and the Closed Construction Fund both had significant cash balances that we drew
upon to help build City Hall because we didn't bond for City Hall. So, staff is going to
propose that we have Council forgive the loan to the Closed Debt Fund and the Closed
Construction Fund; in doing so, adjust the financing structure for the next 15 years so
City Council Meeting Minutes
January 18, 2017
Page 13
that the required annual debt levy is only $250,000 per year. The $250,000 that we are
not levying for that Interfund Loan would then go to offset the debt service that we're
issuing for the Fire Station. So, we're essentially refinancing our debt and wrapping it
together.
Because it has been over seven years, there's also the opportunity to call the 2009
Pavement Management Bonds; if they were called on February 1, 2018, it's
approximately $1,300,000 in cash that we have in the Closed Debt Fund in addition to
the money that's been earmarked for this building. If we were to call those bonds, in
addition to reducing the debt levy, we would have another $175,000 available to us that
we would not have to levy for the 2009 bonds that would offset that debt service. So
combined the $175,000 and the $250,000 would significantly knock down the debt
service. Director Roland stated she's also not sure what the bond market is going to do
in the future.
Discussion ensued amongst the Mayor, Council Members, and Director Roland
regarding tax base increases for the future, retiring TIF Districts, etc. and ways to
decrease the future projected levy of 7.07% by lowering expenses or modify the debt
levy if funds are available to offset that, which is what has happened for the last couple
of years. There are a couple very healthy Pavement Management Debt Funds because
there were a lot of special assessments. Director Roland stated that the $690,000 is a
large cushion, but she again indicated that she didn't know what the bond market was
going to do between now and April.
Pavement Management Debt for all of the upcoming projects Engineer Levitt spoke
about will be another $200,000 in Pavement Management Debt in the future. So, if any
of those projects were postponed, you could postpone the additional $200,000 debt.
Regarding the Hero Center, the $290,000 is based on a $4,000,000 bonding
requirement that the City would have to go through; the State would pay $8,000,000,
Woodbury would pay $4,000,000, and we've got our fingers crossed that it will show up
on the State's bonding forecast but that's possibly not until 2020. City Administrator
Charlene Stevens stated that there's credit that Cottage Grove would receive for the
value of the land, but she didn't know how that credit would be determined. Without the
State funding, the Hero Center project will not go forward; they've got that listed for
2018 but that's not certain.
The debt service jumps to $1.157 in 2018 because we issued debt in December, and
that will be the first payment for the 2016-2017 Pavement Management Bonds. In
2018, the $985,000 plus our new debt for 2016-2017, but without the $175,000 where
we would refinance the 2009 Pavement Management debt.
Council Member Johnson asked if the $690,000 is when the fire station's done in 2018,
so that's when the debt service begins; Director Roland stated they were required to
actually levy so they have the cash on hand for the following year. The debt service
City Council Meeting Minutes
January 18, 2017
Page 14
gets paid on February 1 of each year, so they actually have to collect the cash in the
year and then pay it in 2019. Council Member Johnson asked if the $690,000 was just
interest; Director Roland stated that's principal and interest.
Mayor Bailey stated the $690,000 moved up to the $1,800,000, which is with the Hero
Center and the Pavement Management for 2019. The following year all of that would
increase except for pavement management because there are debt levies.
Director Roland stated 1% is $147,000, so the $690,000 is about 4.8%, so there'd be
3% that you'd need to effectively reduce it, which would be the amount that the General
Fund levy would increase. Council Member Johnson asked what happened in 2015
that taxes took such a jump; Director Roland stated in 2015 there was a 5% increase in
the property tax levy. Council Member Johnson asked if it was because of extra debt or
if it was just budgetary or operational. Director Roland stated it was a combination of
the two. Mayor Bailey stated there were capital projects and they had to do catch up,
and a lot of equipment was purchased that year. Council Member Johnson stated there
seemed to be a lot of debt and asked if they couldn't do projections going forward.
Director Roland stated they had done projections, but they also had a flat tax levy for
about five years; there was no increase in the dollar levy so the City's effectively playing
catch up for that period of time. Council Member Johnson asked if the ongoing debt
would ever improve; Administrator Stevens stated that type of debt service typically
doesn't go away, especially with new buildings, which tend to be the spikes that occur.
Council Member Johnson assumed the Hero Center was originally set up that other
cities were going to come in and use it, and you're also going to save money from
having to go to other places to do training. Administrator Stevens stated that's still the
intent. Mayor Bailey stated that if we're going to use Federal or State money to fund the
project, we have to allow the public to utilize it during certain times. There's a public
benefit to having it in Cottage Grove, as well as efficiency for the officers to have it
close. Council Member Johnson asked if it would ever get to the point where it would
help repay the debt; he was advised that was not expected. Director Woolery stated
they're still working on other components with other agencies or Washington County.
Council Member Thiede asked if that would happen in 2018; Administrator Stevens
stated whether that will actually happen depends on the State Legislature and their
ability to do a bonding bill, which they haven't been particularly good at in previous
years, or if this would rise to a higher priority. They're proceeding along that timeframe
that they would be on the governor's bonding tour for 2018. Council Member Thiede
asked if that would get pushed out, if it would affect the 5.49%. Director Roland stated
to get down to 0 from the 7%, you would not be able to issue debt for the fire station,
and you would not be able to increase the General Fund levy by 3%. Director Roland
stated the 2018 budget numbers were not balanced and they were already at a 5%
increase to the levy.
Director Roland stated these were their choices: Obviously, everything can change, and
the Central Fire Station might come in under $9,000,000, and we wouldn't need to issue
City Council Meeting Minutes
January 18, 2017
Page 15
all $9,000,000, and the debt service isn't the $690,000, maybe it's $600,000 or
$550,000. The solution that they can present to reduce some of the impact is to call the
bonds for February 1, 2018; that reduces the debt service by $175,000, and then they'll
present a plan to refinance the Public Safety/City Hall debt service for 2018 and
beyond. You'll probably see that around the same time that you'll see the bonds being
sold in April, as a recommendation. Director Roland stated the choices are stark to a
certain extent, but other things can impact this; none of these take into consideration
what is known as a levy limit. We haven't had those for a few years and maybe we
won't have them next year, but that always lurks in the back of people's minds,
particularly when we have a surplus in the General Fund at the state and perhaps they
want to do some tax relief and they don't want local governments to necessarily take
advantage of that, so they would set levy limits, but that's not in this scenario and she's
not thinking about that at this point.
Council Member Thiede stated there are certain things in the CIP that are committed to,
such as projects with Washington County and maintenance money. He felt they need
to start taking a look at maintenance down the road and potentially pushing those out.
Administrator Stevens said there's potential to look at some of the pavement
management projects to see if those could be pushed out further, if some of these other
projects are higher priority. As they go forward with the joint meeting with Woodbury for
the Hero Center, the question is if that project is important in 2018 or could it be a 2020
bonding project?
Director Roland stated the bond rate that we're estimating at this point is higher than
we've estimated in the past; the debt that was issued in December is at less than 2%.
She stated that you could think about recent political changes and what the market has
done and what the Federal government has done, which have all had an impact on
where bond rates are going. Council Member Johnson asked how that affects bond
rates; Director Roland stated it affects the interest rate, the interest that we pay, but
what we try to do in all of these scenarios is look at a flat debt levy. It isn't principal and
interest that goes up and down; we would have a flat number. Director Roland stated at
this point they're not anticipating the rate will go down.
Director Roland stated she started at $500,000 for 2017. As you can see, the total levy
is just shy of$15,000,000. If everything is equal and we issue all of the debt that's
included here, by 2021 your total levy would be well in excess of$17,000,000. Council
Member Johnson asked if there was a cap; he was advised there was not. Council
Member Thiede stated we just had to figure out how many homes needed to be built
and how many businesses needed to be put in without necessarily TIF to support that.
Director Roland stated in all fairness, the Hy-Vee and the Home Depot are both in a TIF
District, so growth in that basically adds to the TIF District but not to the City's tax base
until 2028.
Council Member Johnson asked what surrounding cities' debt is; Director Roland stated
they looked at debt per capita when they did the budget in December. Cottage Grove's
City Council Meeting Minutes
January 18, 2017
Page 16
debt per capita is similar to Woodbury's, so the amount of debt per person for Cottage
Grove is approximately $414. Woodbury's is approximately $420 per person.
Mayor Bailey stated they had to also discuss parks and park improvements;
Administrator Stevens stated that will take place on February 1, which is why the parks
were not discussed this evening. This information will be presented to the Planning
Commission, and it will be back before the Council for adoption on February 15.
Director Roland advised it goes to the Planning Commission because it's part of the
City's Comprehensive Plan. Administrator Stevens stated the figures for 2018-2019 are
pretty clear; as you get further out, those projections are just that, more of a projection
than actual costs.
Mayor Bailey stated he felt the only decrease that could be made in the coming years
was pavement management because we're pretty much locked in with Washington
County on the other projects and/or roads and the Central Fire Station. Hopefully, we'll
come in at or below the projected cost for the Central Fire Station. Before the next
Council meeting, he'd like to hear if some of the pavement management projects were
pushed off so we'd know what effect that would have.
Council Member Johnson stated pavement management also involves assessments to
the homeowners, so that's always a touchy subject. So, if it gets pushed off, that might
make a homeowner feel better because they wouldn't have to pay an assessment.
Administrator Stevens stated the challenge is with any maintenance that you push off,
you might be buying some time and saving some dollars, but you don't want to push it
off so far that something that would have been less than a reconstruction becomes a
reconstruction. Mayor Bailey stated that that's what happened in his neighborhood.
Council Member Johnson asked if that's basically the only place where there was
wiggle room; Mayor Bailey stated in the early years, yes, unless we went to Washington
County and told them we didn't want to do the Hinton roundabout in 2019. Then you're
going to have citizens driving on a very nice-looking road, who come upon an
intersection that's already been an issue, and the City and County are going to have to
try to piecemeal it together for a few years. We're going to be dealing with those issues.
Some of the projects in queue right now, like the County Road 19 project is a queue to
grow the Cottage Grove site, the Ravine Parkway is absolutely in queue to expand the
housing options to the north or to the Woodbury border. Administrator Stevens stated
65th Street was a function of growth and had not been in the City's projections in the
CIP; that was driven in part by the new school, but that also drives growth and potential
for housing in that area.
Council Member Thiede stated having a 12.5% increase to residents' taxes in the next
two years probably isn't even thinkable, so we're going to have to really look at options.
Director Roland stated perhaps you want a 7% increase in your tax base for 2018.
Council Member Thiede stated we want the tax base to grow quicker than our
expenses; a tax increase of 12.5% over the next two years won't go over well with the
City Council Meeting Minutes
January 18, 2017
Page 17
residents of Cottage Grove. Council Member Thiede stated we need to look at what
could be adjusted. Mayor Bailey stated hopefully they'll get back to stability.
14. WORKSHOPS — CLOSED TO PUBLIC — None.
15. ADJOURNMENT
Motion by Council Member Thiede, second by Council Member Dennis, to adjourn the
meeting at 9:14 p.m. Motion carried: 5-0.
Minutes prepared by Judy Graf and reviewed by Joe Fischbach, HR Manager/City
Clerk.