HomeMy WebLinkAbout13B Capital Improvements Program (CIP) 2018-2022City of Cottage Grove, MN
Capital Improvement Plan 2018-2022
PROJECTS BY PROGRAM CATEGORY
PROGRAM CATEGORY 2017 2018 2019 2020 2021 2022
General Public Buildings
Central Fire Station 9,000,000
HERO Center 307,782 1,000,000 16,000,000
Ice Arena - refrigeration & roof replacement 2,500,000
PW land acquisition 1,400,000
General Public Buildings total
9,307,782
1,000,000
16,000,000
2,500,000
-
1,400,000
Parks & Recreation Facilities
Matching grant funds
-
10,000
10,000
10,000
10,000
10,000
Public Landscape initiative
7,117
60,000
60,000
55,000
55,000
100,000
Volunteer tree planting
100,000
5,000
5,000
5,000
5,000
5,000
Hamlet Park - Develop Park & skateboard repair
10,000
10,000
10,000
10,000
250,000
250,000
Hamlet Park Expansion
-
417,000
200,000
500,000
500,000
Grey Cloud Ball fields
264,626
60,000
100,000
500,000
100,000
100,000
CG Middle School Ball Fields
22,339
405,000
Arbor meadows playground equipment
41,862
70,000
70,000
70,000
70,000
70,000
Fitness trail construction
50,000
Pine Glen & Old Cottage Grove Parks - Play equir
36,365
40,000
Pine Tree Valley Park - Play equipment
50,000
3,000,000
LaMar & Hearthside play equipment
100,000
Meadowgrass, Hidden Valley & Highlands plya equipment
200,000
Oakwood park - entrance and parking lot
350,000
Parks - design & planning
15,000
15,000
15,000
15,000
15,000
Michaels Pointe Park
400,000
"Old Cottage Grove Park" ice rink boards replacement
17,000
Ravine Parkway Park
400,000
Inclusive playground
737,608
Highland basketball
80,000
Swanlund Park
500,000
Parks & Recreation Facilities
855,291
600,000
1,834,000
345,000
765,000
830,000
Public Utilities Facilities
Spot replacement/slip lining - Sewer
150,000:
50,000
350,000
50,000
50,000
50,000
Lift Station Improvements - Sewer
317,921
System improvements - Streetlights
100,000
100,000
100,000
100,000
100,000
100,000
Storm water maintenance
3,000
250,000
250,000
250,000
250,000
250,000
Swanlund utilities
20,000
20,000
20,000
20,000
20,000
Upper Ravine district infrastructure
264,626
100,000
100,000
500,000
100,000
100,000
Water Meter Replacement project
203,000
405,000
Pull well - annual maintenance
70,000
70,000
70,000
70,000
70,000
Bridge Maintenance
100,000
Well #12
90,397
2,100,000
construct Water Tower - Business park
3,000,000
Public Utilities Facilities total 1,128,944 3,195,000 890,000 990,000 3,590,000 590,000
City of Cottage Grove, MN
Capital Improvement Plan 2018-2022
PROJECTS BY PROGRAM CATEGORY
PROGRAM CATEGORY 2017 2018 2019 2020 2021 2022
Street & Road Improvement Projects
Hadley Avenue - North of 65th St
2,020,000
Hadley Avenue street work 90th - 100th
1,206,952
Jamaica Ave - 70th to Military with roundabout
210,439
E Pt Douglas/Ravine Pkwy to CSAH 19
80th Street (CSAH19 to TH 61) Reconstruction
CSAH 19 and TH 61
CSAH 19 & E Pt Douglas Road reconstruct & Rou
2,208,918
100th Street - ideal to Hemingway/Hadley
2,325,000
Jamaica & 95th Traffic control
70th Street (in three phases)
2,750,000
65th Street - ISD 833
2,772,612
E Pt Douglas & 80th St signals
536,663
Harkness Ave Reconstruction
Ravine parkway Phase 3, 4 , 5
358,474 7,219,500 1,941,000
4,635,400
8,000,000
1,892,950 5,070,000
22,900,000
250,000
3,162,000
1,400,000
E Pt Douglas & Jamaica 8,000,000
Sealcoating projects 286,710 240,000 750,000 750,000 750,000
Subtotal before PM 7,580,768 9,479,500 7,766,000 10,892,950 13,312,000 32,605,400
PM 2017 - F3, 131, EPD
PM 2018-D2 & F3
PM 2019 -Ela
PM 2021 - F5, 61
1,306,943
1,046,000
2,147,060
2,358,200
Road & Street Improvement projects total 8,887,711 10,525,500 9,913,060 10,892,950 15,670,200 32,605,400
GRAND TOTAL $ 20,179,728 $15,320,500 $28,637,060 $14,727,950 $20,025,200 $35,425,400
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
FACILITIES AND PARK PROJECTS
Funding Sources
2018
2018
2020
2019
2022
2020
-
2021
-
2022
Tax Levy
$
-
$
-
$
-
$
-
$
-
Bonded Debt
$
350,000
$
4,000,000
$
-
$
100,000
$
1,600,000
State/Other Government Units
$
1,000,000
$
8,000,000
$
-
$
-
$
-
Park Improvement fund
$
170,000
$
454,000
$
270,000
$
690,000
$
710,000
Park Trust Fund
$
15,000
$
1,315,000
$
15,000
$
15,000
$
15,000
Landscape Initiative
$
60,000
$
60,000
$
55,000
$
55,000
$
100,000
Municipal Building Fund
$
-
$
-
$
-
$
-
$
-
Other:
$
-
$
4,000,000
$
2,500,000
$
-
$
-
TOTAL 1,595,000 17,829,000 2,840,000 860,000 2,425,000
Project Expenses
2018
2019
2020
2021
2022
Land/Easements
-
-
-
- $
1,400,000
Engineering/Architect
1,015,000
15,000
15,000
15,000 $
15,000
Admin/Legal
-
-
-
- $
-
Construction
500,000
17,734,000
2,750,000
780,000 $
900,000
Maintenance
10,000
10,000
10,000
- $
-
Other
70,000
70,000
65,000
65,000 $
110,000
TOTAL 1,595,000 17,829,000 2,840,000 860,000 2,425,000
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
HERO Center This project is a joint effort between the City of Cottage Grove and the City of
Woodbury. Initial funding for planning was approved by the State Legislature in 2014.
Department Assumes 50% to be funded by the State Bonding bill.
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt * 4,000,000
State/Other Government Units 1,000,000 8,000,000
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal Building fund
Other: Woodbury
I
TOTAL 1,000,000 16,000,000 - - -
Project Expenses 2018 2019 2020 2021 2022
Land/Easements *
Engineering/Architect 1,000,000
Admin/Legal
Construction
Maintenance
Other
16, 000, 000
TOTAL 1,000,000 16,000,000 - - -
Project Balance $ - $ - $
* Actual bonded debt will depend on credit given to the City for the land contributed
Project Title
New PW & Parks F
Department
Public Works
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Description
2022 - Purchase Land
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt 1,400,000
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 0 0 0 0 1,400, 000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements 1,400,000
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other
TOTAL 0 0 0 0 1,400,000
Project Balance
Project Title
Ice Arena
Department
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project description
2020 - N/S rink refrigeration/rink replacement & roof replace - $2,500,000
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal builiding
Other: 2,500,000
TOTAL 0 0 2,500,000 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 2,500,000
Maintenance
Other
TOTAL 0 0 2,500,000 0 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Public Landscape Initiative 2018 - Hadley Ave - 100th to 90th (50,000), Joseph LaBath Settler's Island (10,000)
2019 - W Point Douglas - Jamaica to 80th (50,000), CG Trailway Corridor (10,000)
Department 2020 - 90th St. - Jamaica to CR19 (50,000), Kingston Park (5,000)
Parks 2021 - Jamaica - 100th to Triangle Park (50,000), Pine Tree Pond & Valley Parks (5,000)
2022 - Hinton - 70th to Woodbury Border (50,000). Hamlet Park South (50,000)
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL
60,000 60,000 55,000 55,000 100,000
60,000 60,000 55,000 55,000 100,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other 60,000 60,000 55,000 55,000 100,000
TOTAL 60,000 60,000 55,000 55,000 100,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Park Design and Planning Funding for design and planning of parks as development occurs.
2018 - Arbor Meadows for Pavement Management
Department
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 15,000 15,000 15,000 15,000 15,000
Landscape Initiative
Municipal Building
Other:
TOTAL 15,000 15,000 15,000 15,000 15,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other
TOTAL
Project Balance
15,000 15,000 15,000 15,000 15,000
15,000 15,000 15,000 15,000 15,000
Project Title
Department
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Description
Funds used to match donations from outside organizations on specific park projects
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL
10,000 10,000 10,000 10,000 10,000
10,000 10,000 10,000 10,000 10,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other 10,000 10,000 10,000 10,000 10,000
TOTAL 10,000 10,000 10,000 10,000 10,000
Project Balance $ - $ - $ - $ - $ -
Project Title
Oakwood Park
Department
Parks
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Description
Re -align parking lot entrance and regrade/replace parking lot
(in conjunction with development of the hotel site N of Ruby Tuesday)
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt 350,000
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL 350,000 0 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 350,000
Maintenance
Other
TOTAL 350,000 0 0 0 0
Project Balance $ - $ - $ - $ - $
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Hamlet Park 2018 - Skatepark improvements
2019 - Hamlet Expansion - water, sewer, grading, skatepark improvements
2020 - Hamlet Expansion - 2 ballfields & skatepark improvements
Department 2021 - Parking lot & streets
Park.- 2022 - Hamlet Expansion - trails. landscaping. shelter. and 2 ballfields
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal building
Other:
10,000 427,000 210,000 500,000 500,000
TOTAL 10,000 427,000 210,000 500,000 500,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 417,000 200,000 500,000 500,000
Maintenance 10,000 10,000 10,000
Other
TOTAL
10,000 427,000 210,000 500,000 500,000
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project description
Pavement Replacement 2018 - Fitness Trail - $50,000
2021 - Replace Highlands Basketball Court
Department
Parks
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 50,000 80,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 50,000 0 0 80,000 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 50,000 80,000
Maintenance
Other
TOTAL 50,000 0 0 80,000 0
Project Balance $ - $ - $ - $ $ _
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Replace Playground
equipment 2018 - Old Cottage Grove Park
2020 - Pinetree Valley Park
2021 - Lamar & Hearthside Parks
Department 2022 - Meadow Grass & Hidden Valley Parks - $100,000
Parks 2022 - Hiahlands Park - $100,000
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 40,000 50,000 100,000 200,000
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL 40,000 0 50,000 100,000 200,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 40,000 50,000 100,000 200,000
Maintenance
Other
TOTAL 40,000 0 50,000 100,000 200,000
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Michaels Point Park Construction of park as part of Michaels Point residential development
Department
Parks
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 400,000
Landscape Initiative
Municipal building
Other:
TOTAL - 400,000 - - -
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 400,000
Maintenance
Other
TOTAL - 400,000 - - -
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Old Cottage Grove Parks Replace ice rink boards in "Old Cottage Grove" park
Department
Parks
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 17,000
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL 0 17,000 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other
17,000
TOTAL 0 17,000 0 0 0
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Ravine Parkway Park Develop and construct park
Department
Parks
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 400,000
Landscape Initiative
Municipal Building
Other:
TOTAL 0 400,000 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 400,000
Maintenance
Other
TOTAL 0 400,000 0 0 0
Project Balance $ - $ - $ - $ - $
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Swanland Park Construction of park in Swanland property development
Department
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund 500,000
Landscape Initiative
Municipal Building fund
Other:
TOTAL 0 500,000 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 500,000
Maintenance
Other
TOTAL 0 500,000 0 0 0
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Pavement Management
Projects 2021 - Arbor Meadows Park Improvements
2022 - Heartside Park Improvements - $100,000
2022 - River Oaks Scenic Overlook Improvements - $100,000
Department
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal Building
Other: Donations
100,000 200,000
TOTAL 0 0 0 100,000 200,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other
100,000 200,000
TOTAL 0 0 0 100,000 200,000
Project Balance
Project Title
Grev Cloud Ball Fields
Department
Facilities
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Description
20018 - Grey Cloud Softball Field Improvements
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund 60,000
Park Trust Fund
Landscape Initiative
Municipal Building
Other:
TOTAL 60,000 0 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction 60,000
Maintenance
Other
TOTAL 60,000 0 0 0 0
Project Balance $ - $ - $ - $ - $
Project Title
Grey Cloud Softball Field
Improvements
Department
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2028 CAPITAL IMPROVEMENT PROGRAM
Project Description
Improvements to the softball fields near Grey Cloud Elementary
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State/Other Government Units
Park Improvement fund
Park Trust Fund
Landscape Initiative
Municipal building
Other:
TOTAL
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering/Architect
Admin/Legal
Construction
Maintenance
Other
TOTAL - - - -
Project Balance $ - $ - $ - $ - $
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
ALL TRANSPORTATION AND PUBLIC WORKS PROJECTS
Funding Sources
2018
2019
2020
2021
2022
Tax Levy
$
-
$
-
$
-
$ -
$ -
Bonded Debt
$
1,297,000
$
2,870,815
$
9,259,400
$ 4,673,200
$ 3,758,400
State of Minnesota/MSA
$
4,385,000
$
2,426,300
$
390,000
$ 1,703,000
$ 8,420,000
Washington County
$
-
$
2,000,000
$
-
$ 516,000
$ 8,150,000
Federal/Grant Funding
$
-
$
-
$
-
$ -
$ 10,033,000
Area funds
$
4,387,200
$
300,300
$
500,000
$ 4,576,000
$ 997,000
Utility funds
$
994,000
$
1,446,845
$
963,550
$ 1,166,000
$ 1,120,000
Assessments/Developer fees
$
1,670,000
$
924,400
$
-
$ 5,876,000
$ 717,000
Other:
$
967,300
$
814,400
$
750,000
$ 750,000
$ -
TOTAL 13,700,500 10,783,060 11,862,950 19,260,200 33,195,400
Project Expenses
2018
2019
2020
2021
2022
Land/Easements/Utility Relocation
$
-
$
-
$
500,000
$
250,000
$ -
Engineering/Architect
$
2,406,200
$
1,460,080
$
2,216,000
$
4,002,000
$ 1,942,500
Admin/Legal
$
39,000
$
263,045
$
40,360
$
191,300
$ -
Construction
$
10,190,300
$
8,189,935
$
8,536,590
$
14,246,900
$ 30,782,900
Maintenance
$
1,065,000
$
870,000
$
570,000
$
570,000
$ 470,000
Other
$
-
$
-
$
-
$
-
$ -
TOTAL 13,700,500 10,783,060 11,862,950 19,260,200 33,195,400
Project Balance $ - $ - $ - $ - $
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Sealcoating The annual seal coating program was initiated in 1994 and is implemented in a seven year cycle.
Assigned areas are seal coated each year - new streets two to three years after final
bituminous wear surface has been placed and after their first sealcoating on a seven year
Department rotation. New streets within developments are incorporated into the plan as they are added to the
Public Works system. The purpose of sealcoating is to improve the quality and extend the life of City streets.
Seal coating delays the need for costly street reconstruction or other corrective work for which a
portion of the costs are assessed to the adiacent orooertv owners.
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessments/Developer fees
Other: sealcoat fund 240,000 750,000 750,000 750,000
TOTAL 240,000 750,000 750,000 750,000 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Sealcoating Contract/Rock
Maintenance
Other
TOTAL
Project Balance
650,000 650,000 650,000
240,000 100,000 100,000 100,000
240,000 750,000 750,000 750,000 0
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Pavement Management 2018 - D2 & F3 (Prestige Estates & East Meadow Cliff)
2019 - E1 a (Thompson Grove Estates 3rd & 4th)
Department 2020 - See 80th Street Project
Public Works 2021 - F5, B1 (Sandy Hills 7&8, Pine Meadows 5th, E Meadow Cliff, Pine Tree Pond E 1 st)
2022 - See 80th Street Proiect
Funding Sources
2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
417,000 1,870,815 2,057,200
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds
119,000 276,245 301,000
Assessments/Developer fees
Other:
510,000
TOTAL 1,046,000 2,147,060 0 2,358,200 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 233,000 377,810 524,000
Admin/Legal 39,000 84,250 87,300
Construction 774,000 1,685,000 1,746,900
Machinery & equipment
Other
TOTAL 1,046,000 2,147,060 0 2,358,200 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Upper Ravine District
Infrastructure Development As residential development occurs in the East Ravine, various infrastructure will be
constructed to support the new housing. This infrastructure will be paid for by
Department developers either through City financed construction supported by assessments
Public Works or by Developer constructed of same.
2020 - Land will need to be acquired in the East Ravine for construction of a new water tower
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 100,000 100,000 500,000 100,000 100,000
Utility funds
Assessments/Developer funds
Other:
TOTAL 100,000 100,000 500,000 100,000 100,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements 500,000
Engineering
Admin/Legal
Construction 100,000 100,000 100,000 100,000
Machinery & equipment
Other
TOTAL 100,000 100,000 500,000 100,000 100,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Water meter & radio reader
replacement project Replacement of 1500 water meters & radio read devices per year.
Contracted services (labor and meters)
Department
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 405,000
Assessment/Developer Fees
Other:
TOTAL 405,000 0 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 50,000
Admin/Legal
Construction
Machinery & equipment 355,000
Other
TOTAL 405,000 0 0 0 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Ravine Parkway
2018 - Keats Ave to Jamaica Ave
2019 - Hinton Ave to Idsen Ave (Calarosa)
Department 2021 - Wolterstorff
Funding Sources
2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
4,285,000 1,676,300 1,400,000
Washington County
Federal/Grant Funding
Area funds
1,817,200 200,300
Utility funds
Assessment/Developer Fees
900,000
Other:
217,300 64,400
TOTAL 7,219,500 1,941,000 1,400,000 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 1,203,200 324,000 300,000
Admin/Legal
Construction 6,016,300 1,617,000 1,100,000
Machinery & equipment
Other
TOTAL 7,219,500 1,941 000 1,400,000 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
80th Street Reconstruction 80th Street reconstruction from Hwy 61 to Keats Avenue
*2020 - Keats to Jamaica
Department *2022 - Ideal to Hwy 61 - Includes East Point Douglas from 80th Street to T -intersection. Includes
Public Works pavement replacement, spot curb replacement, and modification of Hardwood signal for dual lefts.
Upgrading to concrete section from Highway 61 to Hemingway would add $3,000,000 in total costs.
Funding Sources 2018
2019 2020 2021 2022
Tax Levy
Bonded Debt
1,259,400
State of Minnesota/MSA
390,000 4,420,000
Washington County
Federal/Grant Funding
Area funds
Utility funds
243,550 650,000
Assess ment/Developer Fees
Other:
TOTAL 0 0 1,892,950 0 5,070,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 370,000 1,170,000
Admin/Legal 40,360
Construction 1,482,590 3,900,000
Machinery & equipment
Other
TOTAL 0 0 1,892,950 0 5,070 000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
CSAH 19 and TH 61
Reconstruction/realignment of bridge/overpass over highway 61 at County Rd 19 (Innovation Road)
Department Project includes extension of West Point Douglas Road, Extension of 100th Street, reconstruction
Public Works of West Point Douglas from Belden to Jamaica and a potential slip lane.
Funding Sources 2018 2019 2020
2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
4,000,000
Washington County
8,150,000
Federal/Grant Funding
10,033,000
Area funds
Utility funds
Assessment/Developer Fees
717,000
Other:
TOTAL 0 0 0 0 22,900,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction 22,900,000
Machinery & equipment
Other
TOTAL 0 0 0 0 22,900 000
Project Balance
Project Title
Ravine Parkway - East Point
Douglas Road to CSAH 19
Department
Public Works
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Description
Construction of roadway and infrastructure to support Phase II of the CottageView
retail/commercial development.
Funding Sources 2018
2019 2020 2021 2022
Tax Levy
Bonded Debt
910,000
State of Minnesota/MSA
303,000
Washington County
516,000
Federal/Grant Funding
Area funds
Utility funds
395,000
Assessment/Developer Fees
5,876,000
Other:
TOTAL - - - 8,000,000
-
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 1,850,000
Admin/Legal
Construction 6,150,000
Machinery & equipment
Other
TOTAL - - - 8,000,000
-
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Annual well maintenance Each year a well is 'pulled' for inspection and repair of the pump and other
vital parts.
Department
Public Works
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 70,000 70,000 70,000 70,000 70,000
Assessment/Developer Fees
Other:
TOTAL 70,000 70,000 70,000 70,000 70,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction
Maintenance 70,000 70,000 70,000 70,000 70,000
Other
TOTAL 70,000 70,000 70,000 70,000 70,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Description
Annual sewer line
maintenance/spot sliplini
2019 - Repairs to sewer line due to sulfuric gas pipe degredation in West Central
Ravine
Department
Public Work:
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 50,000 350,000 50,000 50,000 50,000
Assessment/Developer Fees
Other:
TOTAL 50,000 350,000 50,000 50,000 50,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction
Maintenance 50,000 350,000 50,000 50,000 50,000
Other
TOTAL 50,000 350,000 50,000 50,000 50,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Streetlight system improvemen Annual cost to refurbish and upgrade the City Streetlight infrastructure.
Department
Public Works
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 100,000 100,000 100,000 100,000 100,000
Assessment/Developer Fees
Other:
TOTAL 100,000 100,000 100,000 100,000 100,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction
Maintenance 100,000 100,000 100,000 100,000 100,000
Other
TOTAL 100,000 100,000 100,000 100,000 100,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
construct Well #12 2018 - Construct Well #12
Department
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 2,100,000
Utility funds
Assessment/Developer Fees
Other:
TOTAL 2,100,000 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 450,000
Admin/Legal
Construction 1,650,000
maintenance
Other
TOTAL 2,100,000 0 0 0
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Stormwater maintenance Annual costs of pond and structure maintenance for City Stormwater system.
Department
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 250,000 250,000 250,000 250,000 250,000
Assessment/Developer Fees
Other:
TOTAL 250,000 250,000 250,000 250,000 250,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction
maintenance 250,000 250,000 250,000 250,000 250,000
Other
TOTAL 250,000 250,000 250,000 250,000 250,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Swanlund Utilities Trunk water to Minnesota Pipeline Facility
Trunk Sanitary from Hamlet Park to Swanlund Property
Department
Public Works
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 20,000 20,000 20,000 20,000 20,000
Utility funds
Assessment/Developer Fees
Other:
TOTAL 20,000 20,000 20,000 20,000 20,000
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction 20,000 20,000 20,000 20,000 20,000
maintenance
Other
TOTAL 20,000 20,000 20,000 20,000 20,000
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
?roject Title Project Description
3ridge Maintenance Spot painting, guardrail upgrades, wingwall & abutment repairs
Department
'ublic Works
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA 100,000
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees
Other:
TOTAL 100,000 0 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction 100,000
maintenance
Other
TOTAL 100,000 0 0 0
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
70th Street
2019 - Roundabout at Hinton Ave & 70th Street
Department
Public Works
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA 750,000
Washington County 2,000,000
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees
Other:
TOTAL 0 2,750,000 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 400,000
Admin/Legal
Construction 2,350,000
maintenance
Other
TOTAL 0 2,750,000 0 0
Project Balance $ - $ - $ - $ - $ -
Project Title
Traffic signal
Department
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Description
Jamaica & 95th
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds 250,000
Assessments/Developer fees
Other:
TOTAL 0 0 250,000 0 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering
Admin/Legal
Construction 250,000
Machinery & equipment
Other
TOTAL 0 0 250,000 0 0
Project Balance
Project Title
Harkness Ave Reconstruction
Department
Public Works
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project description
Reconstruct Harkness Avenue to an urban section with utilities, from Oakwood
Park to the north Hardwood Ave intersection.
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt 1,706,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 1,456,000
Utility funds
Assessment/Developer Fees
Other:
TOTAL 0 0 0 3,162,000 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements 250,000
Engineering 728,000
Admin/Legal 104,000
Construction 2,080,000
maintenance
Other
TOTAL 0 0 0 3,162,000 0
Project Balance $ - $ - $ - $ - $
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project description
Industrial Park Water Tower Construct water tower on City property north of the South East Industrial Park.
Department
Public Works
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees
Other: Land Sale
3,000,000
TOTAL 0 0 0 3,000,000 0
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 600,000
Admin/Legal
Construction 2,400,000
maintenance
Other
TOTAL 0 0 0 3,000,000 0
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
100th Street Construction of 100th Street from Ideal Avenue to phase line between Hemingway and Heath Avenues.
9 Ton Road Design for Business Park Access
Department
Public Works
Funding Sources 2018
2019 2020 2021 2022
Tax Levy
Bonded Debt
1,000,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds
400,600
Assessment/Developer Fees
924,400
Other:
TOTAL - 2,325,000 - - -
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 358,270
Admin/Legal 178,795
Construction 1,787, 935
Machinery & equipment
Other
TOTAL - 2,325,000
- - -
Project Balance
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Hadley Avenue Reconstruct I Reconstruct Hadley Avenue north of 65th Street for Amundson Development
Department
Public Works
Funding Sources
2018 2019 2020 2021 2022
Tax Levy
Bonded Debt
880,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
370,000
Utility funds
Assessment/Developer Fees
770,000
Other:
TOTAL 2,020,000 - - - -
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 470,000
Admin/Legal
Construction 1,550,000
Machinery & equipment
Other
TOTAL 2,020,000
- - -
Project Balance $ - $ - $ - $ - $
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
Jamaica Ave - 70th to Military Reconstruction of Jamaica Ave from Rose of Sharon church to Military Road to the
urban four lane section roadway.
Department
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt 3,758,400
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds 877,000
Utility funds
Assessment/Developer Fees
Other:
TOTAL 0 0 0 0 4,635,400
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 772,500
Admin/Legal
Construction 3,862,900
maintenance
Other
TOTAL 0 0 0 0 4,635 400
Project Balance $ - $ - $ - $ - $ -
CITY OF COTTAGE GROVE
5 YEAR CAPITAL IMPROVEMENT BUDGET
2018-2022 CAPITAL IMPROVEMENT PROGRAM
Project Title Project Description
East Pt. Douglas & Jamaica Reconstruction & realignment of the East Point Douglas Road intersections at Jamaica Ave and the
Cub/Target entrances.
Department
Public Works
Funding Sources 2018 2019 2020 2021 2022
Tax Levy
Bonded Debt 8,000,000
State of Minnesota/MSA
Washington County
Federal/Grant Funding
Area funds
Utility funds
Assessment/Developer Fees
Other:
TOTAL - 8,000 000 - -
Project Expenses 2018 2019 2020 2021 2022
Land/Easements
Engineering 1,846,000
Admin/Legal
Construction 6,154, 000
Machinery & equipment
Other
TOTAL - 8,000,000
- -
Project Balance $ - $ - $ $ - $ -
�� BOLTON ,�z�z4N��o��P�A�e��e
� � � � � B�rnsviLLc, MN 55337-1649
V
Ph�. 1952) 890-0509
Real People.Real Solutions. Fax�. f9521 89�-8065
3olton-Menkcom
MEMORANDUM
Date: October 3Q 2017
To: City of Cottage Grove
N7om: BryanNemeth, P.E., PTOE
Keith Kormaq E.I.T.
Subject EaetPointDouglaeRoadConceptDeeign
Background
The etudy uea involvee four intereectione wMch will be referred to ae the following:
• Jamaica Avenue &90�' Sheet(Sigrtalized)
• Jamaica Avenue &East Point Douglae Road(Sigrtalized)
• East Point Douglas Road& Weet En[rance (Exieting TugeUCub Sigial Entrance)
• East Point Douglas Road&East Entrance(Exieting TugeUCub Un-Sigrtalized Entrance)
The East and W eet Entrancee along East Point Douglas Road ue to the east of Jamaica Avenue allowing
acceee to local busineeeee.
The sigrtalized intersection of Jamaica Avenue and East Point Douglas Road experiences excessive
queuing for weetbound t}¢ough and left tuming velriclee that, at timee, extends into the eignali�ed
intersection of East Point Douglas Road and[he West ENrance. Options were explored to more
efficierdly move[raffic t}¢ough t}us uea and relieve congestion in anticipation of a fiill-build of[he
Shoppee at Cottage View uea eaet of Walmart.
2040 Traffic Forecasts
Significant haffic giowth ie expected in the uea due to the piopoeed conetruction of a Bue Rapid Traneit
(BRT) Station to the weet of the proj ect location and future commercial and reeidential giowth neu
Walmart. Traffic forecaete for 2040 were developed based onthe giowth from the BRT, commercial and
regdential grow[h on East Point Douglas Road neu Walmart, and a proposed background grow[h of 0.5%
per yeu based on 2030 forecaste and]rietorical volume c}tangee in the uea. Forecaets were developed for
the AM and PM peak hours.
Exieting and future daily traffic forecaets were eetimated baeed on the peak hour forecaste for the major
roadways.
Roadway Segment Existing 2040 Forecast Yearly Growth
AADT AADT Rate
JamaicaAvenue SouthofEPDR 19,400 23,800 0.8%
JamaicaAvenue NorthofEPDR 12,900 16,700 1.0%
EastPointDo lasRoad EastofJamaica 15,100 2Q200 12%
EastPointDouglasRoad WeetofJamaica 8,600 11,700 12%
xqcorr���aaqzoiaV,�,�-eeo sgroqz_e.anmwazyVc_eae�=�\zoi�e.eommoase•co�emaas�Ae eommoase•co�aema.gomamo-e�ao�
- o+BMenk6xne4mbVF�-�LLniiye'uGaei
Narne: FastPointDouglasRoadConceptDesign
Date: 10/30/2017
Page: 2
It ehould be noted that haffic forecasts for the BRT were not yet acailable at the time of tlrie artalyeie.
Therefore, tdpe were eetimated baeed on the potential eize of the puking faality for the etation and moet
of the tdpe being concentrated in the AM peak hour inbound(weetbound on Eaet Point Douglae Road)
and PM peak hour(eaetbound on East Point Douglas Road).
Operational Analysis
A level of eervice(LOS)analyeie of the peak houre was completed using the exieting tuming movement
coun[s in Trafficware Synchro/SunTraffic. The LOS resul[s ue based on average delay per vehide as
calculatedby the Highway Capacity Manual(HCM)6�'Editioq wMch definee the level of eervice, baeed
on con[rol delay. W ersections and each intersection approach ue given a ranldng from LOS A[luough
LOS F.LOS A indicatee the beet traffic operati�, with velriclee experiencing mirtimal delaye. LOS A
t}¢ough D ie generally perceived ae acceptable to ddvere. LOS E indicatee [hat an intereection ie
operating at, or very neu ite capacity and that ddvere experience coneiderable delaye. LOS F indicatee an
intereection where demand exceeds capacity and ddvere experience eubetantial delaye.
Several configuratione were evaluated with a eummuy of optione below. Only the c}tangee from exieting
condifione ue noted
• Existing geometry and traffic
o This artalysis was used as a baseline, allowing comparison for potential reconfigurations.
• Altemative 1 (2040 Traffic)
o Dual weetbound left tum lanee for East Point Douglae Rce.d at Jamaica Avenue.
• Altemative 2(2040 Traffic)
o Dual weetbound left tum lanee for East Point Douglae Rce.d at Jamaica Avenue.
o Convereion of eigrtalized intereection at East Point Douglae Road and the W eet En[rance
to a righUin/righUout(RII20)configuration.
o Convereion from a eide street etop con[rolled inteiaection at Eaet Point Douglae Road and
the East En[rance to a multi-lane roundabout configuration, elrifted elightly weet from the
curren[location.
• Altemative 3 (2040 Traffic)
o Dual westbound, northbound, and eouthbound left tum lanee for the Jamaica Avenue and
East Point Douglas Road intereection.
o Convereion of eigrtalized intereection at East Point Douglae Road and the W eet En[rance
to a RII20 configuration.
o Convereion from a eide street etop con[rolled inteiaection at Eaet Point Douglae Road and
the East En[rance to a multi-lane roundabout configuration, elrifted elightly weet from the
curren[location.
3oLLo-e Menk I::r equa oppoluuD�zmL-um.
Narne: FastPointDouglasRoadConceptDesign
Date: 10/30/2017
Page: 3
A summary of[he PM peak hour levels of service and wes[bound maximum approach queues ue shown
in Table 1 and Table2, reepectively. Table A1 t}¢ough Table AS in the Appendix ehowthe delay and
queue length for each movement.
Ta6Ie7.EastPoint Douglas Road Traffic OpemtionsAnalysis(PMPeak HourJ
Limiting
Intersec[ion Year Scenaio IntersectionControl Intersection Mazimum Movement
Delay(1.) Delay-LOS(2.) 3
2015 Ntislin (3eomet Side Sfreef Sfo 3 A 18 C SBT
E PointDo�glas Alt 1 Side Sfreef Sfo 13 B 44 E SBR
Rd&EastFnhance 2040 AIt2 Mvlfi-LoneRovndobouf 8 A 12 B NBLT/R
AIt3 Mvlfi-LaneRavndabouf 8 A 12 B NBLT/R
EPointDo�glas �015 Ntislin (3eomet Si nolizedlnfersecfion 22 C 63 E SBT
Rd&West Altl Si nalizedlnfersecfion 3] D 158 F SBR
Fnhavice �040 AIt2 RZRO 12 B 104 F SBR
Alt 3 RZRO 5 A 16 C SBR
2015 Ntisling(3eomehy Si nalized Infersecfion 32 C 85 F EBT
JarnaicaAve&E Altl Si nolizedlnfersecfion 42 D 88 F NBL
PointDo�glasRd 2040 AIt2 Si nolizedlnfersecfion 3] D � F NBL
AIt3 Signalizedlnfersecfion 28 C 4] D EBT
2015 Ntislin (3eomet Si nalizedlnfersecfion 10 B 1b C WBL
JarnaicaAve& Altl Si nolizedlnfersecfion 10 B 46 D EBL
90NSt 2040 AIt2 Si nalizedlnfersecfion 9 A 48 D WBL
AIt3 Signalizedlnfersecfion 9 A 46 D WBL
1.Delay in secovds pec vehicle
2.Maamum delay avd IdJS ov avy approach avd/oc movement
3.Lirtriling Movemevt is the highest delay movemevt.
Ta6Ie 2.Maa9mum WutboundQueuu at/amaim&E.PointDouglas
Maximum West6ound
Intersection Year Scenario Intersection Control Queue(ft)
2015 F4istin Geomet 625
JarnaicaAve&E Altl 1150
PomtDo�glasRd 20.M10 AIt2 Sign¢[izedlntersecHon 525
AIt3 400
A summary of queues can be found below:
Existing(Current Geometry and 2015 Volumes):
• The current configuration and[raffic volumes see sigruficant maYimum queues. Queue
formation etarts at the Jamaica and East Point Douglae Road intereection and extends to the
east beyond the Eaet Point Douglae Road Weet Entrance intereection.
A�r�roas�e i <zoao vomm��:
• W eetbound traffic at Jamaica and East Point Douglas Road continuee to back up to the east.
Traffic extends t}¢ough both intereectione to the east and down t}¢ough 92vtl Sheet to the
eouth. Theee queuee block the north and eouth approachee for the East and Weet En[rancee,
3oLLo-e Menk I::r equa oppoluuD�zmL-um.
Narne: FastPointDouglasRoadConceptDesign
Date: 10/30/2017
Page: 4
causing velricle backupe up to 250 feet for the east intereection and up to 400 feet for the weet
inteiaection.
• Nor[hbound left and right tum maYunum queues extend into and block[he[luough lanes at
Jamaica and Eaet Point Douglas Road.
• Southbound left tum and[hrough lane maYunum queues extend beyond[he tum lanes at
Jamaica and Eaet Point Douglas Road.
A�r�roas�ez <zoao vomm��:
• W eetbound maYunum queuee extend from Jamaica and East Point Douglas Road to just west
of the roundabout at Eaet Point Douglae and the Eaet En[rance exit lanee. North and eouth
appioachee ue blocked at the Eaet Point Douglas W eet En[rance, caueing maYimum queuee
up to 325 feet.
• Norfhbound left turrting maximum queuee block the f}¢ough lanee at Jamaica and East Point
Douglas Road.
• Southbound left tum and[hrough lane maYunum queues extend beyond[he tum lane leng[hs
at Jamaica and East Point Douglas Road.
Alternative3 (2040 Volumes):
• W eetbound maYunum queuee extend from Jamaica and East Point Douglas Road to
approrimately 400 feet eaet(75 feet beyond the W eet En[rance inteiaection). The northbound
appioach at the EaetPoint Douglae Weet Entrance has maYimum queuee of 200 feet Theee
queuee ue coneidered acceptable.
While only the PM peak hour results ue shown, Altemative 3 was analyzed with 2040 AM peak hour
volumee to verify t}tat the configuration will work t}¢oughout the day. Reeulting levele of eervice and
queue formatione ue coneidered acceptable.
Conclusions
Alternative 3 ie the piefeired option with reduced delaye and que�ing patteme to}tandle increased traffic
volumes from planned growth in[he uea. The addition of dual left tuming lanes at Jamaica Avenue and
East Point Douglas Road for[he nor[hbound, southbound, and wes[bound approaches reduces delays and
ehortene queuee t}¢oughout the network The introduction of a roundabout at the Eaet Enhance and a
righLin/righLout at the W eet En[rance reducee conflicting traffic movemente and conflict pointe. A
reduc[ion in conflict poiNs typically reeults in fewer collieione for motoriete, making tlrie optionthe eafer
and more efficient configuration.
3oLLo-e Menk I::r equa oppoluuD�zmL-um.
,
meerseaion movemeneoeiaylseWenl
Intersettlon Yea� Smnatlo IntersettlonConOol Oelay�l.� NBL NBT NBP SBL SBT SBP EBU EBL EBT EBP WBL WBT WBP
2915 Fti � 6vm+h bFi¢Sn¢¢t.4o 3 A IJ B IS C 5 A IS C 18 C 6 A 5 A 1 A 1 A 5 A 1 A 1 A
E Pa�t�nelaz Ntl bFi¢Snee+.4o 13 B J2 E 36 E 28 � JO E JO E JJ E 9 A 1 A 1 A 11 B @ B 11 B
RL&EenEWe�ce 29J0 Nt2 M¢G-In¢AowdnWm 8 A @ B @ B @ B 11 B 11 B 11 B 6 A 6 A ] A ] A 9 A 10 B 10 B
Nt3 M¢G-I n¢AowdnWm 8 A @ B @ B @ B 11 B 11 B 11 B 6 A 6 A ] A ] A 9 A 10 B 10 B
�Q� �� 2915 Fti � 6vm+h ST naiv¢dlm¢rs¢clon 22 C J8 � 25 C @ B J8 � E3 E 30 C 3J C 16 B 8 A 10 B IS B 6 A
RL&Wen ��� ST^a�dlm¢rs¢clon 3] � J3 � 3J C 16 B 59 E A E 158 F 56 E 23 C 11 B 26 C 33 C 19 B
� ce 29J0 Nt2 ABO @ B 26 � IOJ F ] A ] A 6 A 3 A
Nt3 ABO 5 A 13 B 16 C 6 A 6 A 2 A 1 A
2915 Fti � 6vm+h ST naiv¢dlm¢rs¢clon 32 C 28 C 3] � ] A 35 � 39 � 8 A 80 F 86 F ] A J] � JO � 9 A
]emaiceAve&E Ntl ST noiv¢dlm¢rs¢clon J2 � 88 F 3J C 19 B ]1 E 30 C 8 A 65 E S3 � 6 A 81 F 28 C @ B
Pai�t�w�azRL 29J0 Nt2 ST naiv¢dlm¢rs¢clon 3] � 80 F 31 C ] A 61 E 31 C 8 A 61 E J2 � J A TI E 2J C 9 A
Nt3 ST naiv¢dlm¢rs¢clon 28 C JS � 32 C ] A J] � 3J C 6 A JJ � J] � 5 A JI � 22 C 10 B
2915 Fti � 6vm+h ST naiv¢dlm¢rs¢clon 10 B @ B 10 B 5 A 10 B 8 A J A 2J C 23 C J A 26 C 2J C ] A
]emaiceA�u& Ntl ST noiv¢dlm¢rs¢clon 10 B 10 B 5 A 3 A @ B 5 A 2 A J6 � JS � 5 A JS � JI � IJ B
�N9t 29J0 Nt2 ST naiv¢dlm¢rs¢clon 9 A 9 A J A 3 A @ B 5 A 2 A JJ � J8 � 6 A J8 � J3 � 16 B
Nt3 ST naiv¢dlm¢rs¢clon 9 A 9 A 5 A 3 A @ B 5 A 2 A JS � JJ � 5 A J6 � 38 � @ B
I.�eleym vmdxpuvekcle
LQSTffi1as115
,
�e�e�e���,
IMersx�lon Yea� Scenatlo In�ersec�lonCOM�oI EBL/T EBT/P WBL/T WBL/T/P WBT/P NBL/T/P SBL/T/P
Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw
2915 ETss! pea�e SNeSn�tSm 95 ]5 0 95 95 IW 50 IW 50 195
EP.mmt�anelazRL& Ntl S-�deSn�tSm 95 ]5 95 50 IW 95 �5 2!q IW 950
EaztETtrerca 29W Nt2 MWElareR+wdrzWw 50 50 50 50 50 95
N�3 MWeIureR+wdaMw 50 50 50 50 50 )5
pyeueLengl�s
IMersx�lon Yea� Scenatlo In�ersec�lonCOM�oI EBL EBT] EBT2 EBP WBL WBT] WBT2 WBT/P NBL NBT/P NBP SBL/T SBP
Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw
2915 61is! pea�e StndvedIDtnseso+n ]5 I50 50 1]5 �5 Z15 95 195 95 50 95 IW ]5 I50 50 195 I50 3I5 50 195 50 195 ]5 I50
EF�t�anelazF'& (iltl SindvedIDtnsesAn ]5 2!q �5 245 IW 3W 95 195 95 IW ]5 2!q IW 2R5 I50 950 I50 95 �5 I50 ]5 2!q 1]5 4W
WestENam�m 29W (ilt2 WRO 0 95 95 95 95 I50 50 'llq 50 I50 ]5 Z15 195 395
Nt3 WRO 0 95 0 95 95 95 95 ]5 95 ]5 �5 2!q 50 195
pyeueLengl�s
IMersx�lon Yea� Scenatlo In�ersec�lonCOM�oI EBL EBT EBP WBL] WBL2 WBL/T WBT WBP NBL] NBL2 NBT] NBT2 NBP SBL] SBL2 SBT] SBT2 SBP
Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw
2915 61is! pea�e StndvedIDtnseso+n ]5 Z15 1]5 4W 50 'llq IW 950 3W 3I5 �5 Z15 I50 95 1]5 3W I50 95 �5 3W 195 95 �5 2!q 195 95 95 ]5
]m�ev¢Ave&EFai�t Ntl SindvedIDtnsesAn 195 95 I50 J95 ]5 2!q 195 95 Z15 350 195 950 IW 95 Z15 SW 'Lq 595 'Lq dq I50 SW 'Lq 350 ]5 4W 195 3W 95 ]5
�anelazF' 29W Nt2 SindvedIDtnsesAn 195 95 195 395 95 'llq 195 2R5 950 395 IW 950 ]5 1]5 Z15 A50 1]5 395 I50 950 IW 3W 1]5 350 ]5 245 195 95 95 ]5
Nt3 SindvedIDtnsesAn 195 950 195 395 50 'llq IW 2R5 'llq 395 195 2R5 ]5 I50 IW 'llq I50 2R5 1]5 Z15 I50 950 ]5 3W ]5 I50 195 1]5 50 I50 195 2R5 95 ]5
pyeueLengl�s
IMersx�lon Yea� Scenatlo In�ersec�lon COM�oI EBL/T EBT/P WBL WBT/P NBL NBT] NBT2 NBP SBL SBT SBT/P
Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw Fvg Maw
2915 61is! pea�e StndvedIDtnseso+n ]5 195 95 ]5 50 IW 50 IW 50 195 ]5 1]5 �5 2!q 95 IW 50 ]5 50 195 50 1]5
]m�ev¢Ave&.WIA9t ��� StndvedIDtnseso+n ]5 1]5 95 IW 50 195 50 195 50 IW 50 IW 50 IW 95 50 50 IW 50 I50 50 IW
29W Nt2 StndvedIDtnseso+n ]5 1]5 95 IW 50 IW 50 195 50 IW 95 IW 50 IW 95 50 50 ]5 50 I50 50 195
Nt3 StndvedIDtnseso+n ]5 1]5 95 195 50 I50 50 195 50 IW 50 I50 50 I50 95 50 50 IW 50 IW 50 195
LOSTablacils
,. �`�" x� � � � ,!� � ' ^ . :*�� ,tr. � +�, �, S �=' �
�.� �
�, � j � ..� � ,,,L
, _
�, , i < � _ �� � ` �
� � '� �� �� l��i .r � 7 � �1�31! m \ �� '�'�
a � u� . ,�,.n t .zh� ', . � � � � a�� �,i .. .?.e �,
� �� .�"� � ��, . � �� ' � > �� �� � � � at "��
,
��y� �
� _ . .., y ..,.:� .
4 �'�.�, �/'-7 i- �" � � . A � . 19 .:� ' p �0 , �Y ��� � ���
„ . ,
���"''` � . � . . a � b, � _ *�
� � ��� �F ^ ,�, ;, fm�� � � ��✓i � ,. � Q�r
. ,
� .
q„ ` � . w _ .� �y� ._ � �� , , .
�"+k'�3d,'} � ;�� m �<.� �� , � �, � °'�F .. ; n.h �>n-� >�R '�° � : � ,y \g � w ♦?"-.
��u t"'�+ Y � { yj�C. ,9. � � .� ^��\ , ;da, , �
� , ,� � �
� e
a��, :� ., Q r , " � � � _���- � �� � � �` � �; � " "� �,�.�,
� �
.
r,'��1 � �„� i�i a �m. , y �'s:'� . , .
��� .
�
� 1 1 �� � y� 4
� ��. 1� � ♦. . . � . � 'A , i ��
F � * . .xY
rv. � � �
l� ✓'. ' '� '�
�tF � �
�' {� �
fy .�....� . . i �'��' '� R�
���� .4 . I � i.. � � �� .. � �'� .� .
� * � � 3 � �� � /
� � F '� �� 4 . ,j� ,,�1 . �� s ` . `�.y ^Y +R<�. Y
` r Y ; �
_.,. _
�
��,P� 'T� •. , . � _- �, � �.. �1 1�� t� � ' � � � ^ _ � � .
. � � * ' . . .. .. .___ .. nnnnnnn i�i .: �� �\' c e . \ . .
� � a
' � � ' ' ' _'• � � � ^ .�.
�., e
� x
� �
�. .. � . � _ m a , � , � a � ' °s � �.
•�� � �4� � - 'f x� t /� / ��� �� " � �� e�.
�
�� 1 � �a �� � , � �
; ,
\ .
!1F' :. �n F � '> _ � � � 5 a� �.e� s���� a
.e � ' , - i i inni ' a � � � �r
�'� � � ' �� ' - , �`�, �%
, ,�. � � � ��- � r� ,� • �;�- � , � ,
'/ w�� \� � ✓/i�� :c i � ./�§ . , ,. � ; . �'i � / ,. ../ y�� : i\
\ _ � .. � � �� �
D �
_� . '� � ��A�,' � '�-� � � _ �
� � ��. i.� � ,� � �� � �'��
i
� '. .: ,- .� � „
� o / �
� .. _ .
�
� -
r
. �
�
F�.. � .� �{ _ .
�^ � 'y $ly �- .
� I
6, �
{ � n
� +� � .. ��. � ���� �� \� �' �
�
LAYOUT LEGEND �'"� + ' � �� �� ' � � , � � _ � �
,y! : F� � ',
�
0 ,_ m � �.
coNCRETE PnvEMENr � r, � ' 9 � _ " � `
� BITUMINOUS PAVEMENT .. ._„ Y � �F�,�^ �v ����� �..� r . : , c.� �� R' �E6f 'I' �� � ^ ' �� � .� F .
i ' 'P
I�
� � " e � r �
RAISED MEDIAN, CURB & GUTTER Y ,� � � . � ��
* � -_. +
- LANOSCAPE -". ', ' �. .. fl _. _ � .
!I#? r�
� PRIVATE ORIVEWAY�GONGRETE WALK . � . ' I! ` � . - � A � _�{' t � .
� J a
EXISTING RIGHT OF WAY � �.�,`� j ' ' e . . m
- L ' � ";�p � ?
4. � � " _ ! x!� * .
PROPosEo RicHT oF wav � ; �d ' a - E �w. ,
' ^ `�rs � �
� �Do o���N��
�o � BOLTON e,v"�am'�", CITYOFCOTTAGEGROVE, MINNESOTA
��� �� & M E N K E o�em�kmm kmm
OQOBER�20ll FlGORE NO.
. ,� �, , � .i a .� ; , . � `
�...��� { � � � �.. ^4 s � � /5��� ` �n4� l � .Mfv � 4' .
� � �
Y �f.'� T� Y1 ./' .. I '� � ,`i. ' 11 �T \ . � � es
A
�y � n 115'6
� �^ �� �. �(,� � �� "��/' .( � '� n. S �� .��� � =✓
� � . . +w
.� . \ /�� �...� _ .....v � � ..y�:.._. � ..I. . +t � +..
'� , i. . . Y:� :-. .. x . �
,. . _ Sf2 .,�r . f . .. .\ .,... . . T.F��..�'r . a ' .
� � . .. . . e� :�. � , . . .. � �::
. . . . . .b ._..,. . . y�
il.� �� ��'U ���n '.� e �F i �� ''�.,- h h'� 4� ��✓
n � )
tr !t M \ /`. � � �, .�y
� .�,.-• 6 �y t .>'' �j, §' q�.' a � _� \ i � ��� , �� .� R ��� ?4�• ,'f /+�`:�
�-.{"�� � ` � �: �' » ,�� ... s� 6 ^ � ^`��� ���ro � \ .� %� / -�� i ��Q �` '�" , �..
�j � � � ��. ��. � �. �� � ♦ �„�� � ♦+*�
1P+X�" � � ���/h � .an � ��'. ° a%& � � � � '�r/
] � .e- .�. � � l � . . µ( . \ � � �
�� � � � `� � 1 - �9 � � � ��K � .✓� �� �� �rie����tA?; � �..
� .
. //
�v ��(y � � � � � � � . .a^y � � �
! �T � �
' �`� �.` '� � ' � . ^� A� � � � .: �� .
A �
� p �y` rv'A f � � �
� � �� .�� � � ^ ' I �� � Yar. �� 4. 4. 'p� '
_ S
r � y �
� � � fv b � . � F . � . �
�. '.� � ��� • � .. �p �
r � \��y
' J � � �✓ � �� • - - �
��A �
f � •� �� ;�� r �,
` _ __
, ''
� ` * � ,. - � � �,. �� _ ` .
, , ,' , - ������ , / � _
.
. , �_ °
-'. _ uir u \.._ �.. r 4 �.
_ _ O ,
a � �
E � � _ ' ♦ i � r�
� � � - � . / ` � � . � t.
�t °' a
�
��.��. � i�,yG ��" . � . - y t .� �� � V� � � � .
� N . A; !� ��. � _ , - � - �� �
• �
`X/
�
6 .. • nnn . _ . . �
�`. \ i 11 �i. nn m .. . �' / •a
YY� F ' __ ' " � � �
.. Y� s -� , - 1 . r"'` ' � � :. � �� � �� �� .
\ F �
� '
� . � ' _ ✓ � ` � � . .
� �
. � � � �.1� . �� .. . � � l� �
'�p� � 1� _ . �� - � 1 -
,
I � ^^/ � � �A `��� . 1 '`n/•:.`� `.
.�. �� �' � �.,
� � �
.. ,` � . _ � r
� ,�, ,� � _. ,� � �. +� ., , _ ^
, ,. � �... � ... ^ °�, . a F � ' . .
� 'I
� � � � �'� � �� �: �. ' �� � � � � � . . A .
. .—a �n v '� � M' ^.-_ _ a � L� � ��
�. , . � = - — — , � � � _ � �"
� _
. _($� �� � 6 � � , .
,,� , -$\ � . � � . F� � 1 2� � Fp �
LAYOUT LEGEND � � `�" �`�r _ - -
� � � .
. .. a r ;". ,..
� NEW LAND TO BE AC�UIRED = 42,200 SF . � - � A#E, � �� . �. .
r : A f = �
EXISTING RIGHT OF WAY I ,� �� ' � � r F � @9 A L
� � F
PROPOSED RIGHT OF WAY r' �� - � ' A ''�: '!� � �
a. ' � - . .. � " ,.
' . " '� r�.. .o�5 � � � w _ e — - .:
. : `� I' .pf` � '�-
�� BOL�N � � CITY OF COTTAGE GROVE, MINNESOTA
� & M E N K .,..� ,�-...,w.
ocroeere.mn rieureervo.