HomeMy WebLinkAbout2018-02-26 PACKET 06.2.STAFF REPORT CASE: CP2018-001 & PP2018-002
ITEM: 6.2
PUBLIC MEETING DATE: 2/26/18 TENTATIVE COUNCIL REVIEW DATE: 3/21/18
APPLICATION
APPLICANT: Cottage Grove Economic Development Authority
REQUEST: A comprehensive plan amendment to change the land use from Parks
and Private Open Space to Low Density Residential, and a preliminary
plat to subdivide a 1.36 -acre parcel of land into three single-family
residential lots. The subdivision name is Thompson Grove Country Club
and will be located at the site of the former Cottage Grove municipal pool
building.
SITE DATA
LOCATION: 6541 85th Street South
ZONING: R-3, Single Family Residential
GUIDED LAND USE: Parks and Private Open Space
LAND USE OF ADJACENT PROPERTIES:
CURRENT
GUIDED
NORTH:
Residential
Low Density Residential
EAST:
Residential
Low Density Residential
SOUTH:
Residential
Low Density Residential
WEST:
Industrial
Industrial
1.36 acres
DENSITY:
RECOMMENDATION
Approval, subject to the conditions stipulated in this staff report.
Cottage
� Grove COTTAGE GROVE PLANNING DIVISION
""ere pride aid "'e'ity Meet
Planning Staff Contact: John M. Burbank, Senior Planner; 651-458-2825; jburbankCa�cottage-grove. org
Application Accepted:. 1/31/18 60 -Day Review Deadline: 4/1/18
City of Cottage Grove Planning Division • 12800 Ravine Parkway South • Cottage Grove, MN 55016
Planning Staff Report
Thompson Grove Country Club
Planning Case No. CP018-001 & PP018-002
February 26, 2018
Proposal
The Cottage Grove Economic Development Authority has requested the following actions for the
property at 6541 85th Street South:
• A comprehensive plan amendment to change the land use from Parks and Private Open
Space to Low Density Residential
• A preliminary plat to subdivide a 1.36 -acre parcel of land into three single-family residential
lots
The subdivision name is proposed to be Thompson Grove Country Club, and it will be located at
the site of the former Cottage Grove municipal pool building.
Granada Park eLA
L' v
Q
D Y T
85TH STS 85TH STs ..
_
. 0
Location Map
Thompson Grove Country Club
Planning Staff Report — Cases PP2018-001 and CP2018-002
February 26, 2018
Page 2 of 8
THOl PSON GROVE COUNTRY CLUB
I
_?. LF THE LE
z r�F
_. . -
--....STH Lh+E cF THE _E d CF E, '.3. TV` '. ee.E 2
E..i�a� T, --,E
2t
�,.
N 89' 37 56' E PLAT
S 89'2935" W MEAS. 295.19—
" c9
W
tUc.I9 95.OG95.11
-
r------__
t9
I � 1
� I
I
I ? I
I
I
I t
B LI C K iI
I E
I
G
g
10
I
::<
�. E I'TI �- -1 ,E •'i, N1LTr
-`
`a'E-1 -LIT GF
•
0 1
1 I
I I
I o
•Y
� I
I �vl
1 213
I I
1
2 I
I
1
I
I
I
i l l
j l
I I
I I
I
i t
I cn
1
I
I
I
,, I
I
I
------------------------------------.:
I I I
1 1
I I
I
I
00
-
tUfl.t9 95.or
35.96
•_
_ MEAS. 295.19
N HT s? 56' E`'L-T
Preliminary Plat
Review Schedule
The application was received on January 31, 2018.
The application was deemed complete on January 31, 2018.
The 60 -day application review expires on April 1, 2018.
The 120 -day review extension date is May 30, 2018.
Background
The structure on the property was originally constructed in 1959 as an amenity for the early
Thompson Grove neighborhood. It was operated by the homeowners association until it was
acquired by the City in 1968. The site was operated as a municipal pool until it was decommis-
sioned in 2014.
Thompson Grove Country Club
Planning Staff Report — Cases PP2018-001 and CP2018-002
February 26, 2018
Page 3 of 8
Planning Considerations
Comprehensive Plan — Future Land Use Designation
The future land use map in the City's Future Vision 2030 Comprehensive Plan identifies this
property as park and private open space. The proposed use will require an amendment to the
Comprehensive Plan to change the land use to Low Density Residential. One of the applications
for this property is a comprehensive plan amendment, and the modification is required as the
site will no longer be utilized as park or open space.
Zoning
This parcel is currently zoned Single -Family Residential (R-3). The proposed use is consistent
with that zoning designation.
Existing Site Conditions
The site is 1.36 acres and currently has a vacant public building, which was formerly used as a
community recreation center and municipal pool since the City's acquisition in 1968. The pool
feature was removed and backfilled for safety reasons in 2014. The building is constructed of
concrete masonry units with a gabled asphalt shingled roof. There is a picnic shelter, a parking
lot, and an existing curb cut on Granada Avenue.
Thompson Grove Country Club
Planning Staff Report — Cases PP2018-001 and CP2018-002
February 26, 2018
Page 4 of 8
Existing Site Detail
Minimum Development Standards
The application submittal included a site development sketch plan of the houses proposed to be
constructed on the new lots. As proposed, the required setbacks and other performance stand-
ards for the zoning district would be in compliance.
R-3 Development Standards
Leat area
10,000 square feet
Let width
75 feet
Frant yard
30 feet
Rear yard
35 feet
Side yard
10 feet
Sideyard, garage
5 feet
Maximum structure height
30 feet
R-3 Development Standards
Thompson Grove Country Club
Planning Staff Report — Cases PP2018-001 and CP2018-002
February 26, 2018
Page 5 of 8
85TH 6T. S.
.ox+.io
f
I b
�1 I b I I
t wwee®wwe I a[� .1 mcle••w.ee I
C
E
0
I
rlono•IDI j I I y 1
S
C
I aa..a i I i I I
S I I I I I
T
I � I
I ,
I � I
1 - r
- -
C 1
�! .°� I �
�
i i O7 i i LOf '}
Lmrara,
LOrI i I I meas s:. � � i acrs�asm aF
I I
U'
I cors. area s=. i I i
I I I I 1 I i
1 I 1 I t
S i j
1 I
i i
I
✓ I i I j
I I
I 1 AAA'AG �
1
I
`----------------4 mss.. `------------------------'
I I
AEMMW��
�ea/e�s
♦
� y� I
1
y� I
Site Development Sketch Plan
Impervious Surface
There are no maximum impervious requirements in the R-3 zoning district.
Driveways
The driveways would all be located at new curb cuts off of 85th Street and would meet the mini-
mum standards. Hard surfacing of the drives is required, and the drive aprons shall meet the
City's standard detail plate STR-19.
Driveway Location Detail
C
E
1 - r
- -
�! .°� I �
�
1 I 1 I t
� 1
I
•
I 1 AAA'AG �
1
I
4
AEMMW��
�ea/e�s
♦
� y� I
1
y� I
C
$
i 1 ►moo' y1Dl{{�
yi /
:! 1
II &A-0
'
1
Driveway Location Detail
Thompson Grove Country Club
Planning Staff Report — Cases PP2018-001 and CP2018-002
February 26, 2018
Page 6 of 8
Architecture
The new structures have been designed to blend into the existing neighborhood.
Utilities
The subject property is located inside of the Metropolitan Urban Service Area (MUSA) and is
adequately served by City public utilities.
Parking
The new lots will all have garages meeting the minimum requirement of 440 square feet and
would provide the required off-street parking requirements.
Traffic/Access
The relocation of the site's access from Granada Avenue to 85th Street will not negatively im-
pact the roadways. These adjacent roadways were designed to accommodate existing and
forecasted traffic, which would include the projected average of 10 trips per day per new lot.
Pedestrian Access
Not applicable with this application.
Surface Water Management
In order to meet the SWWD phosphorus loading requirements for this area, a 200 -foot drainage
swale will need to be constructed. This can be achieved through the typical side yard and rear
yard drainage swales that are graded during home construction. Grant opportunities are avail-
able through the SWWD for residents seeking to voluntarily improve water surface management
practices on their sites above and beyond the minimum requirements.
Thompson Grove Country Club
Planning Staff Report — Cases PP2018-001 and CP2018-002
February 26, 2018
Page 7 of 8
Tree Preservation
Trees to be removed beyond the ordinance threshold will be required to be replaced on site in
addition to any trees required through the subdivision process.
Landscaping
As a result of the subdivision process, a boulevard tree is required to be planted on each lot
along a public street (four trees total) as well as four additional trees and ten shrubs. Two of the
four additional trees must be coniferous.
Area Charges
The area charges were addressed in the purchase agreement for the property.
Park Dedication
The Park Dedication requirements were addressed in the purchase agreement for the property.
Public Hearing Notices
The public hearing notice was published in the South Washington County Bulletin on February
14, 2018, and mailed to the 82 property owners who are within 500 feet of the property on
February 15, 2018.
Builders Escrow
At the time of building permit, a builder's escrow shall be submitted to the City for each lot.
Builder Escrow
Per Lot
Yard & Boulevard Sod
$3,943
Boulevard Trees — Interior *
$428
Sidewalk Replacement - Interior Lot
$778
Property As -built Survey & Corner Pin Placement
$1000
Sod and Blvd. Tree Inspection Fee
$150
Curb Stop Inspection Fee
$150
Grading As -built Review Fee
$30
Right-of-way Permit Fee
$50
TOTAL
$6,529
* Adjustments needed for corner lots
Summary
A. The City worked for many years to find an adaptive reuse for the site.
B. The site is properly zoned for the creation of the proposed single family residential lots.
C. The land use amendment is proper given the change in land use of the site from park and
open space purposes to a new single family residential use.
D. The land use amendment does not have any negative impacts on local or regional systems.
Thompson Grove Country Club
Planning Staff Report — Cases PP2018-001 and CP2018-002
February 26, 2018
Page 8 of 8
E. There will be no negative impacts to city roadways or infrastructure resulting from the subdi-
vision.
F. The new residential structures were purposely designed to be harmonious with the existing
neighborhood.
Recommendation
The Planning Commission should recommend that the City Council approve the following
applications subject to the conditions listed below:
• A comprehensive plan amendment to change the land use from Parks and Private Open
Space to Low Density Residential
• A preliminary plat to subdivide a 1.36 -acre parcel of land into three single-family residential
lots.
Conditions of Approval:
1. The comprehensive plan amendment must be accepted and acknowledged by the Met-
ropolitan Council prior to the issuance of any building permit.
2. All applicable permits (i.e.; building, electrical, grading, right-of-way, mechanical, etc.)
must be completed, submitted, and approved by the City prior to the commencement of
any construction activities.
3. A boulevard tree shall be planted along 85th Street on each lot, and an additional one
along Granada Avenue on Lot 1, Block 1.
4. In addition to the required boulevard trees, each lot shall have four trees and ten shrubs
planted prior to the issuance of the certificate of occupancy.
5. A builder's escrow of $6,529 shall be posted at the time of building permit in order to en-
sure completion of all inspections and requirements related to the new construction.
Prepared by:
John M. Burbank, Senior Planner
Attachments:
Preliminary Plat
LFGIEND
11uo CB
THOMPSON GROVE COUNTRY CLUB
PRELIMINARYPLAT
85TH ST STH
-- --- -- ------- ---
UTILITY AND SITE DATA
iE 1111 '111 i1qII11111ITsq g
III IG I
A,; I'll I,
— 1su c1 3 SURVEYOR/ENGINEER/DESIGNER
F-7
SURVEYORS NOTES
xl
SURVEYORS CERTIFICATION
--N- A - - — — — -
�111X d"Al
....... ..
AREA TAB U LATI 0 IN
771" 212A:"I
VICINITY MAP
B L 0 C K
I.IYANI'
2
R '
l 3
L�".
IN B E.
"'SEll
OWNER/SUBDIVIDER
— 1su c1 3 SURVEYOR/ENGINEER/DESIGNER
F-7
SURVEYORS NOTES
xl
SURVEYORS CERTIFICATION
--N- A - - — — — -
�111X d"Al
....... ..
AREA TAB U LATI 0 IN
771" 212A:"I