Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2018-02-26 PACKET 06.6.
STAFF REPORT CASE: PP2018-009 ITEM: 6.6 PUBLIC MEETING DATE: 2/26/18 TENTATIVE COUNCIL REVIEW DATE: 3/21/18 APPLICATION APPLICANT: Eternity Homes, LLC REQUEST: A preliminary plat to subdivide a 10.3525 -acre parcel of land into 24 single-family residential lots and 2 outlots. The subdivision plat name is Hamlet Heights. SITE DATA LOCATION: West of Pine Hill Elementary School, South of Thompson's Grove on the southerly extension of Hamlet Avenue, & North of Pinehill Acres ZONING: R-3, Single Family Residential GUIDED LAND USE: Low Density Residential LAND USE OF ADJACENT PROPERTIES: CURRENT GUIDED NORTH: Residential Low Density Residential EAST: Park Park & Priv. Open Space SOUTH: Residential Low Density Residential WEST: School Park & Priv. Open Space SIZE: 10.3525 acres DENSITY: 2.32 units per acre RECOMMENDATION Approval, subject to the conditions stipulated in this staff report. Cottage Grove COTTAGE GROVE PLANNING DIVISION � here Pride and Prosperity Meet Planning Staff Contact: John M. Burbank, Senior Planner; 651-458-2825; jburbank(d_)cottage-grove.org Application Accepted:. 2/26/18 60 -Day Review Deadline: 3/21/18 City of Cottage Grove Planning Division 9 12800 Ravine Parkway South 9 Cottage Grove, MN 55016 Planning Staff Report Hamlet Heights Residential Subdivision Planning Case No. PP2018-009 February 26, 2018 Proposal Eternity Homes, LLC has made application for a preliminary plat for a single family residential subdivision containing 24 lots and three outlots on a 10.35 -acre parcel of land, to be known as Hamlet Heights. n, - E N `7 LU 7 4 'a SITE 91 ST ST 6 - w z 92ND Sr 5LU �, F v _ A 0 n I Location Map Review Schedule Application Received- December 27, 2017 Acceptance of Completed Application- January 10, 2018 Planning Commission- February 26, 2018 Tentative City Council Date- March 7, 2018 60 -Day Review Deadline- March 11, 2018 120 -day review if exercised- May 10, 2018 Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 2 of 18 Background and Site Conditions The property is currently vacant and has remained in a natural vegetative state for many years. The site contains a temporary cul-de-sac, two temporary holding ponds, and an underground trunk sanitary sewer utility pipe. a ell qg 115, AL,:_ Neighborhood Meeting A neighborhood meeting was hosted by the Developer on February 14, 2018, at City Hall. Some of the comments and concerns that were voiced are listed below: Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 3 of 18 1. Bedrock blasting and damage to existing residents 2. Storm water management 3. Water tower drainage impacting new homes 4. Why develop now after 60 years 5. Vehicular traffic through existing neighborhoods 6. Construction traffic through existing neighborhoods 7. Damage to existing roadways 8. Setbacks to existing homes 9. Cul-de-sac length 10. Emergency access Planning Considerations Plan Review The dates of the plan sets utilized for this review were submitted by Pioneer Engineering and dated 01/10/18. Preliminary Plat The preliminary plat as proposed depicts a logical development of a viable property given the adopted performance standards of the zoning district. . .. ...... ., . Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 4 of 18 Land Use The property is currently guided for Low Density Residential. No changes in land use are pro- posed with the development. Existing Land Use Detail Zoning The property is currently zoned R-3, Single Family Residential. No changes in zoning are pro- posed with this development. Existing Zoning Map Detail 9* Legend ROW LINES ROW LINES 2030 land Use LAND USE Agricultural ' Rural Residential Low Density Residential Med Density Residential14 k f - High Density Residential SITE Mixed Use - Commercial - Industrial - Transition Planning Area - ParWPrivate Open Space Golf Course Mississippi River Existing Land Use Detail Zoning The property is currently zoned R-3, Single Family Residential. No changes in zoning are pro- posed with this development. Existing Zoning Map Detail Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 5 of 18 Zoning Development Standards The plat as proposed meets all required development performance standards for the established zoning district . Lc�t ares; 5�000 square feet Lot width 75 feet Front yard 30 feet Rear yard 35 feet Side yard 10 feet Side yard, garage 5 feet Maximum structure height 30 feet R3 Development Performance Standards The setback relationship of the new and existing homes adjacent to the project was one of the queries at the neighborhood meeting. The following detail identifies the distances from the pro- posed house pad areas to the existing homes and detached accessory structures (garages). s, 4 Density The density of the proposed development is 2.32 units per acre. The density range for the Low Density Residential Land Use District is one to four dwelling units per acre. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 6 of 18 Lot Sizes The average lot size in the development is 14,854 square feet. Public Utilities The property is currently located in the Metropolitan Urban Service Area (MUSA) and has public utilities available for service connection. The Engineering memo dated February 15, 2018, ad- dresses the utility comments for the project. A Sewer Availability Charge (SAC) will be required to be paid for each lot in the subdivision at the time of building permit. The current SAC rate is $2,485. Environmental Assessment Worksheet (EA W) The proposed project is below the lot count threshold that would trigger an environmental review prior to development. Transportation The project is located on the southern portion of Hamlet Avenue that is located within the Thompson's Grove 5th Addition subdivision. The road was originally platted as a through street in 1959 and has functioned as a pseudo cul-de-sac for the 14 residents along the stub street since the platting of the public right-of-way. Many long-term residents live on the existing Hamlet Avenue stub street. Traffic generation from the project is not any different from other new or ex- isting single family residential development, which is 9.57 trips per day or 230 trips for the new residents and 134 trips for the existing homes. The adjacent roadway network was designed to accommodate residential traffic of this quantity and scale and will not be negatively impacted. The proposed local roads are consistent with the existing roadway in the neighborhood with a road width of 32 feet face -of -curb to face -of -curb. The preliminary plat does not have platted landscaped islands in the cul-de-sac since the sur- rounding area does not have them. Surface Water Management A component of the project will be the removal of the temporary holding ponds from the site, and the incorporation of the management of the existing stormwater runoff into the design of the pro- ject. The stormwater design for the project includes offsite ponding on a portion of Hamlet Park on property owned by the City. The project is outside of the wellhead protection area. The Engi- neering memo dated February 15, 2018, addresses the stormwater comments for the project. An offsite ponding fee in the amount of $107,242 will be required at the time of recording of the plat. Landscaping, one City standard park bench, trash can, and cement pad serving as park amenities will be required in addition to the offsite ponding fee. These amenities should be placed near the junction of the new access trail and the Hamlet Park Trail. Additional stormwater review will be required upon submittal of the final grading and utility plans for the site. Grading The preliminary grading plan was reviewed by Engineering and included in the review com- ments from February 15. Additional grading review will be required upon submittal of final grad- ing and utility plans for the site. Based on concerns about blasting, the applicant will be required to obtain a grading permit, which will need to outline the means and methods for export/import of material and whether blasting is required. If blasting is identified, then a detailed monitoring Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 7 of 18 plan will be required. All monitoring and testing for blasting activities and any property damage documented through the monitoring process is the financial responsibility of the developer. Fire Department Access The combined length of the existing and new cul-de-sac length is 1,631 feet. City Code Title 10- 5-3D(1) permits cul-de-sacs greater in length than 600 feet where "by reason of unfavorable land form or the irregular shape of the land, a normal pattern cannot be established, or that land would be underutilized." Staff has identified that this exception is appropriate for this project. Based on the State Fire code, the 38 lots on the existing and new cul-de-sac require a second- ary access for emergency services. The planned trail connections from the development to the existing Hamlet Park Trail has been identified as an acceptable secondary emergency access by the Public Safety Department. The route identified in red below will need be maintained during the winter by the City. z. SIT MqW - MOM h N, - _ - -95th' Street ' i Trails and Sidewalks Based on the lack of sidewalks on the existing roadway, no side- walks will be required for this project. A recreational trail connecting the cul-de-sac with the existing Hamlet Park trailway will be required to be installed by the appli- cant. Based on the Comprehensive Plan, the City is working with the School District to plan a recreational trailway connection linking the new development with District property to the west. 103 RD ST Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 8 of 18 It is recommended that the developer shall be responsible for a 50 percent participation responsibility for the linking trail. Final design of the trail will include flexible trail design standards given the terrain deviation at the location. Park Dedication A park dedication fee in lieu of land dedication in the amount of $81,453 will be required at the time of plat recording. Area Charges The area charges for water, sanitary, and stormwater will be required at the time of the plat is recorded. Architecture The detail below identifies several elevation details of the anticipated home styles within the neighborhood. Summary 1) The property is guided for low density residential, and the requested preliminary plat design fits within the parameters of the required density. 2) The property is zoned for Single Family Residential (R-3), and the requested preliminary plat design fits within the parameters of the required development performance standards of the zoning district. 3) The property is within the MUSA and can be properly served by public utilities. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 9 of 18 4) The surface water management of existing and new streets and housing will be properly addressed with this development. 5) The traffic generated from the project will not have negative impacts on the adjacent road- ways. 6) The project is introducing additional builders to the City, thus expanding housing options for stakeholders in the community. Recommendation That the Planning Commission recommend that the City Council approve the preliminary plat for a single family residential subdivision containing 24 lots and thee outlots on a 10.35 -acre parcel of land to be known as Hamlet Heights, subject to the following conditions: General Development 1) The developer and builders must comply with all city ordinances and policies except as may be modified by agreement of the developer and City staff. 2) All grading, drainage, erosion control, and utilities must conform to the final plans approved by the City Engineer. 3) The applicant receive appropriate building permits from the City, and permits or approv- als from other regulatory agencies including, but not limited to: South Washington Water- shed District, Minnesota Department of Health, Minnesota Department of Natural Resources, and Minnesota Pollution Control Agency. 4) All monument signs must comply with the City's Sign Ordinance and only be placed on pri- vate property encompassed within an easement. 5) Construction traffic shall be prohibited from utilizing the 80th Street exit off of Highway 61. A load restriction permit is required from the Public Works Department. 6) The Developer shall incorporate the recommendations, requirements, and evaluations noted in the Bolton and Menk memorandum dated February 15, 2018, into the final plat, subject to modifications that are agreed to by the developer and City engineer. Platting, Land Dedication, and Easements 7) The future submittal of the final plat and the City's approval of the final plat are subject to additional conditions that will be listed in the City resolution approving the final plat and included in the development agreement. 8) The dimensions of each lot must be verified on the final plat, and a list containing the square footage for each lot must be provided to the City. 9) The final plat and declaration of private covenants must be recorded with the Washington County Recorder's Office before any building permit can be issued. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 10 of 18 10) The developer must enter into an agreement with the City of Cottage Grove for the com- pletion of the public improvements required by City ordinances. Once the development agreement is completely executed and all cash deposits and payments are paid to the City, the City will release the final plat to the developer for recording at the Washington County Recorder's Office. 11) The developer shall prepare a warranty deed to convey fee ownership of Outlots A, B, and C to the City of Cottage Grove and record the deed(s) once the City has inspected the required improvements proposed on any outlot. Once the City has accepted the im- provements and the developer has removed any silt fence, erosion control devices, and ground vegetation has matured within these outlots and is accepted by the City, the de- veloper shall prepare a record plan for each outlot. A copy of the recorded plan must be submitted to the City. The warranty deed for the outlots shall be recorded at Washington County Recorder's office once the outlots are accepted by the City. 12) In addition to one yard tree for each lot having street frontage, four yard trees and ten shrubs must be planted on each residential lot. One of the four trees must be a conifer tree. The developer or builder must post a letter of credit or escrow for the estimated cost of these trees and shrubs on each lot. 13) Common mail boxes meeting the approval of the local postmaster shall be required. Construction and Grading 14) A grading permit and financial guaranty is required for grading activity related to the project. 15) Prior to the submission of the final plat applications to the City, the developer must submit for staff review and approval a final construction management plan that includes erosion control measures, project phasing for grading work, areas designated for preservation, a crushed -rock construction entrance, and construction -related vehicle parking. All emer- gency overflow swales must be identified on the grading and erosion control plan. 16) The grading permit shall outline the means and methods for export/import of material and whether blasting is required. If blasting is identified, then a detailed monitoring plan will be required. All monitoring and testing for blasting activities and any property damage documented through the monitoring process is the financial responsibility of the developer. 17) An offsite ponding fee in the amount of $107,242 will be required at the time of recording of the plat. Payment of this fee is due to the City once the development agreement between the City and developer is fully executed. 18) In addition to the offsite ponding fee, landscaping, one City standard park bench, trash can, and cement pad serving as park amenities will be required to be installed by the ap- plicant near the junction of the new access trail and the Hamlet Park Trail. The landscap- ing plans shall be approved by the Community Development Department. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 11 of 18 19) A pre -construction meeting with City staff and the contractor must be held before site work begins. The contractor will provide the City with a project schedule for the various phases of construction. 20) Erosion control devices must be installed prior to commencement of any grading activity. Erosion control shall be performed in accordance with the recommended practices of the "Minnesota Construction Site Erosion and Sediment Control Planning Handbook" and the conditions stipulated in Title 10-5-8, Erosion Control During Construction of the City's Subdivision Ordinance. 21) Upon completing site grading, four copies of an "As -Built" survey for the site grade eleva- tions must be submitted to the City. An electronic file of the "As -Built" survey must be submitted to the City Engineer. 22) Outlot A shall be dedicated via warranty deed to the City for stormwater management purposes. Park Dedication 23) The park dedication requirements will be satisfied upon the final platting and dedication of Outlots B and C as identified on the preliminary plat and as incorporated in the required development agreement and payment of a park fee in lieu of land dedication in the amount of $81,453 will be required at the time of recording of the plat. 24) The developer is responsible for the cost and installation of 14 public land boundary markers at the corners of private properties abutting public property where a noted head- ing change in the property line directions occur. The boundary markers are $115 per marker and are to be picked up at the Cottage Grove Public Works facility. The boundary markers must be installed before a building permit is issued for the lot that abuts the recommended marker location. 25) Private fences, play equipment, swing sets, sand boxes, firewood, kennels, and/or any other materials, obstacles, or encroachments are prohibited from being placed on Outlots A, B, and C. Lot Performance Standards 26) All setbacks shall be consistent with those required in the R-3, Single Family Zoning District. 27) The architectural standards attached to the February 26, 2018 Planning Staff Report shall be recorded with Washington County and apply to all lots within the Subdivision. Prior to recording of the documents, the standards may be amended by agreement between the Applicant and Community Development staff. 28) The City accepts the design concepts of the homes shown in the application submittals and agrees that prior to final plat approval the developer and City staff shall agree on architectural standards for the subdivision that reflect these designs. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 12 of 18 Utilities 29) The Developer is responsible for providing the necessary easements and costs associ- ated with road and utility improvements serving the site. All drainage and utility ease- ments as recommended by the City Engineer must be shown on the final plat and dedicated to the City for public purposes. 30) The water utility plan shall conform to the City's water supply and distribution plan. 31) The sanitary sewer utility plan shall conform to the City's sanitary sewer comprehensive plan. 32) All stormwater designs shall meet the intent of the City's Surface Water Management Plan and the SWWD water management plan. 33) The developer must make all necessary adjustments to the curb stops, gate valves, and metal castings to bring them flush with the topsoil (after grading). Streets 34) Permanent or temporary access directly to Hamlet Park is prohibited for all lots in the subdivision. 35) The street name shall be Hamlet Avenue on the final plat. 36) The City's curb replacement policy must be complied with during home building. A bitu- minous wedge shall be maintained on the street until 90 percent of the homes are constructed in any phase or in 3 years. Tree Mitigation 37) A final tree preservation and mitigation plan shall be submitted with the final plat of the property. For any of the 188 required mitigation replacement trees not placed on site or within Hamlet Park shall require the payment of a tree mitigation fee of $350.00 per tree to the City's Public Landscaping Initiative Fund. Sidewalks and Trails 38) The Developer is required to pay for and construct a bituminous recreation trail as identi- fied in the project plan set dated 01/31/18. 39) The homeowners association or property owners abutting any bituminous trail corridor are required to mow the grass area between their property boundary line and edge of the bituminous trail. Landscaping and Irrigation 40) In addition to one yard tree for each lot having street frontage, four yard trees and ten shrubs must be planted on each residential lot. One of the four trees must be a conifer tree. The developer or builder must post a letter of credit or escrow for the estimated cost of these trees and shrubs on each lot. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 13 of 18 41) Irrigation systems installed within City right-of-way are solely the responsibility and risk of the developers, homeowners association, or individual. The City is not responsible or lia- ble for any damage or costs related to installation, damage, or replacement of lawn irriga- tion systems placed in the boulevard as a result of City use of or future changes in the right of way. 42) At the time of building permits for single family residential lots, a letter of credit amounting to 150 percent of the landscaping estimate, street sweeping, paving and curbing, and irri- gation systems shall be submitted to and approved by the City. Upon completion of the landscaping improvements, the owner shall, in writing, inform the City that said improve- ments have been completed. The City shall retain the financial guarantee covering the landscape improvements for a period of one year from the date of notice, to ensure sur- vival of the plants. No building permit shall be issued until the required financial guaran- tee has been received and accepted by the City. Surface Water Management 43) The lowest opening ground elevations of all structures shall be a minimum of two feet above the emergency overflow elevation, and three feet above adjacent pond high water levels. 44) All emergency overflow swales must be identified on the grading and erosion control plan. Each fall while home building is occurring, emergency overflow elevations shall be surveyed to ensure the emergency overflows are properly graded and maintained. Onsite Infrastructure Improvements 45) A street lighting plan must be submitted by the developer and approved by the City Engi- neer. 46) The developer must place iron monuments at all lot and block corners and at all other an- gle points on property lines. Iron monuments must be placed after all site and right-of- way grading has been completed in order to preserve the lot markers for future property owners. 47) The developer shall contact the electric, telephone, gas, and cable companies that are authorized to provide service to the property for the purpose of ascertaining whether any of those utility providers intend to install underground lines within the development. 48) The developer is responsible for all street maintenance; upkeep and repair of curbs, boulevards, and sod; and street sweeping until the project is complete. All streets must be maintained free of debris and soil until the subdivision is completed. Warning signs shall be placed when hazards develop in streets to prevent the public from traveling on said street(s) and directing them to detour routes. If and when the street becomes im- passible, such streets shall be barricaded and closed. In the event residences are occu- pied prior to completing streets, the developer must maintain a smooth driving surface and adequate drainage on all streets until they are completed and accepted by the City. The developer hereby agrees to indemnify and hold the City harmless from any and all claims for damages of any nature whatsoever arising out of developer's acts or omissions in performing the obligations imposed upon developer by this paragraph. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 14 of 18 49) The developer will provide to the City copies of bids, change orders, test results, suppli ers, subcontractors, etc., relating to the work to be performed by the developer. 50) The developer agrees to furnish to the City a list of contractors being considered for re- tention by the developer for the performance of the work described in the development agreement. 51) The developer is responsible for the control of grass and weeds in excess of eight inches on vacant lots or boulevards within their development. Failure to control grass and weeds will be considered a developer's default and the City may, at its option, perform the work and the developer shall promptly reimburse the City for any expense incurred by the City. 52) Developer is responsible to require each builder within the development to provide a Class 5 aggregate entrance for every house that is to be constructed in the development. This entrance is required to be installed upon initial construction of the home, but a paved driveway must be completed before the City will issue a certificate of occupancy for that property. See City Standard Plate ERO-12 for construction requirements. The water ser- vice line and shut-off valve shall not be located in the driveway. 53) Developer will be required to conduct all major activities to construct the public im- provements during the following hours of operation: Monday through Friday Saturday Sunday 7:00 A.M. to 7:00 P.M. 9:00 A.M. to 5:00 P.M. Not Allowed This does not apply to activities that are required on a 24-hour basis such as dewatering or bi pass pumping, etc. Any deviations from the above hours are subject to approval of the City Engineer. Violations of the working hours will result in a $500 fine per occur- rence. 54) The developer shall weekly, or more often if required by the City Engineer, clear from the public streets and property any soil, earth, or debris resulting from construction work by the developer or its agents or assigns. All debris, including brush, vegetation, trees, and demolition materials, shall be properly disposed of off-site; burying construction debris, trees, and other vegetation is prohibited. Burning of trees and structures is prohibited, except for fire training only. 55) The Developer grants the City, its agents, employees, officers, and contractors permis- sion to enter the site to perform all necessary work and/or inspections during grading and the installation of public improvements by the developer. 56) Upon acceptance of the public improvements by the City Council, all responsibility for the improvements must be assumed by the City, except that the developer is subject to a one-year warranty on the construction of the improvements from the time of acceptance by the City of all public improvements. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 15 of 18 57) The City will not have any responsibility with respect to any street or other public im- provements unless the street or other public improvements have been formally accepted by the City. Upon completion of the improvements, the Developer may request, in writing, their acceptance by the City. This request must be accompanied by proof that there are no outstanding judgments or liens against the land upon which the public improvements are located. Upon the City's receipt of a written request for acceptance from the Devel- oper, the City Engineer will conduct a final inspection of the public improvements and will furnish a written list of any deficiencies noted. The City Engineer will base the inspection on compliance with the approved construction plans, profiles and specifications, as re- quired by the city ordinance. Upon satisfactory completion of all construction in accord- ance with the approved plans, profiles, and specifications, as certified by a registered engineer in the State of Minnesota, and receipt of reproducible record drawings and satisfactory test results, the City Engineer will notify the developer in writing of the City's approval of the public improvements and schedule the request for acceptance for review by the City Council. 58) Upon completion of the work, the Developer shall provide the City with a full set of as - built plans for City records and transmitted to the City in a DWG Autocad format and pdf format. Developer must also furnish the City with a pdf format of the final plat and four prints of the recorded plat. If the Developer does not provide as-builts, the City will produce them at the developer's expense. 59) The developer is responsible for completing the final grade on all lots and ensuring all boulevards and yards have a minimum of four inches of organic topsoil or black dirt on them. Placement of organic topsoil or black dirt, sod, and shrubs must not be transferred to homeowners. 60) Notwithstanding any other provision of this resolution to the contrary, the City will issue building permits for up to two (2) model homes on lots acceptable to the City upon Devel- oper's compliance with the following requirements: a. Approval of a building plan and survey by the Chief Building Official. b. Presence of a paved road within three hundred feet (300') and presence of a fire hydrant within one thousand feet (1,000') of the model home(s). c. An unobstructed gravel surface road extension from a paved street surface to the proposed model home's driveway. d. No certificate of occupancy for such model homes shall be issued until all typical requirements for such issuance have been met. e. Final plat has been recorded. f. The Developer acknowledges in the development agreement that prior to the construction of the improvements, site conditions, access to paved roads, and fire hy- drants will be sub -standard and will not be optimized until the improvements are com- pleted. To the fullest extent permitted by law, Developer agrees to indemnify the City, Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 16 of 18 its officers, employees, agents and others acting on its behalf and to hold them harm- less and defend and protect them (with counsel of the City's choosing) from and against any and all loss, damage, liability, cost, and expense, specifically including attorneys' fees and other costs and expenses of defense, which result from, or other- wise arise in connection with any actions, claims or proceedings of any sort caused by or arising from the construction or use of the model homes by Developer or its con- tractors, employees, agents, or assigns, prior to the improvements being completed. Such claims shall include, but not be limited to, claims that the model homes could not be accessed properly or in a timely manner by fire equipment and/or police or emer- gency vehicles due to road or site conditions or claims based on lack of proximity to fire hydrants or lack of adequate fire protection. Although indemnification shall cease for claims arising after the improvements are completed and accepted, indemnifica- tion obligations for claims arising prior to the completion of the Improvements shall survive the termination of the agreement. 61) No additional building permits beyond the model permits will be issued until such time as adequate public utilities, including street lights, and streets have been installed and deter- mined to be available to use. The City will require that the utilities, lighting, and street sys- tem have been constructed and considered operational prior to issuance of any building permits in the development. Also, the City must have all the necessary right-of-way and/or easements needed for the property to be serviced. 62) Adequate dumpsters must be on site during construction of streets, utilities, and houses. When the dumpsters are full, they must be emptied immediately or replaced with an empty dumpster. The developer is responsible to require each builder to provide an on- site dumpster to contain all construction debris, thereby preventing it from being blown off-site. 63) Adequate portable toilets must be on-site at all times during construction of utilities, road- ways, and houses. At no time shall any house under construction be more than 250 feet away from any portable toilet. Toilets must be regularly emptied. 64) After the site is rough graded, but before any utility construction commences or building permits are issued, the erosion control plan shall be implemented by the developer and inspected and approved by the City. The City may impose additional erosion control re- quirements if it is determined that the methods implemented are insufficient to properly control erosion. 65) All areas disturbed by the excavation and back -filling operations shall be fertilized, mulched, and disc anchored as necessary for seed retention. Time is of the essence in controlling erosion. If the developer does not comply with the erosion control plan and schedule, or supplementary instructions received from the City, or in an emergency de- termined at the sole discretion of the City, the City may take such action as it deems ap- propriate to control erosion immediately. The City will notify the developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and the City's rights or obligations. If the developer does not reimburse the City for any costs of the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay such costs. Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 17 of 18 66) The Developer is responsible for erosion control inspection fees at the current rates. If the developer does not reimburse the City for the costs the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay such costs. 67) Dust control measures must be in place to prevent dust and erosion, including, but not limited to daily watering, silt fences, and seeding. The City Engineer may impose reason- able measures to reduce dust at the site. 68) The Developer shall comply with the 1991 Wetlands Conservation Act, as amended. 69) It is the Developer's responsibility to keep active and up to date the developer's contract and financial surety (e.g. Letter of Credit, etc.). These documents must remain active until the developer has been released from any further obligation by City Council motion received in writing from the City Engineer. 70) The Developer must provide to the City an irrevocable letter of credit for on-site improve- ments to ensure that the developer will construct or install and pay for the following: a. Paved streets b. Concrete curb and gutter c. Hard surface driveways d. Street lights e. Water system (trunk and lateral) and water house service stubs f. Sanitary sewer system (trunk and lateral) and sanitary house service stubs g. Storm sewer system h. Street and traffic control signs/signals i. Shaping and sodding drainage ways and emergency overflows in accordance with the drainage development plan approved by the City Engineer j. Adjust and repair new and existing utilities k. Trails I. Erosion control, site grading and ponding m. Surveying and staking n. Park and open space boundary markers Planning Staff Report — Case No. PP2018-009 Hamlet Heights Preliminary Plat February 26, 2018 Page 18 of 18 o. These improvements are all in conformance with City approved plans and specifica- tions and will be installed at the sole expense of the developer in conformance with City Code Title 10, Chapter 5. p. The bank and form of the security is subject to the reasonable approval of the City. The security shall be automatically renewing. The term of the security may be ex- tended from time to time if the extension is furnished to the City at least forty-five (45) days prior to the stated expiration date of the security. If the required public improve- ments are not completed, or terms of the Development Agreement are not satisfied, at least thirty (30) days prior to the expiration of a letter of credit, the City may draw down the letter of credit. The City may draw down the security without prior notice for any default of the development agreement. The minimum amount for this financial guarantee will be included in the development agreement. 71) The Developer must post a cash escrow with the City's Finance Director to cover engi- neering, legal, and administrative costs incurred by the City. If this non-interest bearing account balance becomes deficient, the Developer must deposit additional funds. This must be done before final bonding obligations are complete. This escrow amount will be included in the development agreement. 72) The Developer must post a cash escrow with the City's Finance Director to cover engi- neering costs and other City services, expenses, and materials provided in reviewing and processing of the final plat, including but not limited to staff time, legal expenses, office and field inspections, general inspections, and all other city staff services performed. This escrow amount will be included in the development agreement. 73) The Developer is responsible for establishing the final grades, topsoil, and seeding of all the residential lots and boulevards within the subdivision. The developer and/or builder is responsible for planting the one boulevard tree per lot and a second boulevard tree on the corner side lot for corner lots after homes are constructed. The City Forester will mark the location where the boulevard tree must be planted and approve the tree species to be planted. The final landscape plan must be coordinated with the City Forester. Prepared by: John M. Burbank, AICP Senior Planner Attachments Preliminary Plat Dated 02/21/2018 Preliminary Plans Dated 1/10/2018 Engineering Memorandum Dated 02/15/2018 II �� �o I AP E� I o� OUTLOT B - - 366 gs - 114 O % HPi APS UT -1 ' E AVA�AZ A ° ��1 5 z 10 oTLO��g - �- U—" 5 / Assn mss" o CD , _ E P U L 21E SER � s , , ML E C _ _ � , 8 iso , A- 22112 7 � �s36 � J � �, � � PG —12 IL 21 3 _ 2 �AAE 11 _ z°aaa n , m, �, �—___ ---�� ��� �� �, i AEY �a r 1 , „ „ „ , , , 76 LEGAL DESCR PT ON FOR PRELM NARY ng to tM1e recorded plot tM1ere ! WasM1'ingtan Co-, M'innesoi 1 PLAT PURPOSES ONLY DRAINAGE Outlot A, HAMLET PAR—, accord' o EASEMENTS ARE 9UTILITY �cno RGE SHOWN THUS: LOCATION MAP 21 PINE HILL ELEMENTARY TOTAL GROSS AREA 10.3szs ACRES TOTAL LOT AREA 21 No SCALE 7996 ACRES s� NUMBER OF LOTS L-5 1 / NUMBER OF OUTLOTS 3 ° 111— TOTAL 0 TOTAL RF WAS AREA AREA 0.8180 ACRfS-----I----J L-------- 1.5376 GROSS DENSITY2.32 LOTS/ACRE being 5 Teel in wtdtn. and adJotning col cines NEI tt (ENCLUEES OUTLETS & RIGHT OF WAY 3.00 LOTS/ACRE ss otM1erwise Indl °dlp1n ng lia sd, and 10 l le 1, widll 0 25 50 ]00 un essscree, a d rear 1 / otM1erwise ind'irnted 0n tM1e plot. Imes GRAPHIC SCALE ,N FEET PI$NEER, 777 u aBYld, ti,N„ u ,w """`°'"""°� -���= PRELIMINARY PLAT ETERNITY OMOES, LC HAMLET HEIGHTS °��� 4 "F 14 HAMLET HEIGHTS PRELIMINARY PLAT COTTAGE GROVE, MINNESOTA PI$NEERneeiing 12 LOQCI ION VI P o eo 0o zoo GRAPHIC SCALE IN FEET SHEETINDEX 1. COVER SHEET 2. LEGEND SHEET 3. EXISTING CONDITIONS 4. PRELIMINARY PLAT 5. PRELIMINARY SITE PLAN 6. PRELIMINARY GRADING PLAN 7. PRELIMINARY EROSION CONTROL PLAN 8-9. PRELIMINARY GRADING DETAILS 10. PRELIMINARY SANITARY & WATERMAIN PLAN 11. PRELIMINARY STORM PLAN 12. PRELIMINARY STREET PROFILES 13-14. CITY DETAILS L 1. PRELIMINARY LANDSCAPE PLAN TI -T2. PRELIMINARY TREE PRESERVATION PLAN TOPOGRAPHIC SYMBOLS ABBREVIATIONS A ALGEBRAIC DIFFERENCE ® B -B BUCK TO BACK A cn°N BAD BFE BASE FLOOD RIBIE ELEVATION —El CESKIE BMP BEST MANAGEMENT PRACTICE —El RELL CENTER LINE -8 AN HNI PC CB CATCHBASIN -�' a CBMH CAT CHBASIN MANHOLEIPE © METAL P BE AID O =1 HIL ET n v NO 17— CS CURB OUT STOP O OLE DIP DUCTILE IRON PIPE DT DRAIN TILE LA. SPINKLE1 H[eD ELILFV ELEVATIONEK EXIS71N FEF FACfETOEND FACfECTION ® FM. FOR CEMAIN AW METER GB GRADE BREAK T GND GROD ND p. K HYD HYGRANT NT ® TWIT HIGH WATER LEVEL ME T T INV INVERT • KPIPE L CURVE COEFFICIENT PND MPRK LENGTH LF LOWEST FLOOR ® LO LOOKOUT LO LOWEST OPENING RARE ® PATPairvT LP LICUID PETROLEUM OLE NOT YALE PC POINT OF CURVATURE ® PCC POINT OF COMPOUND CURVATURE 8 PI POINT OF INTERSECTION "LLR ARGPERTY LINE T c°NscavnnoN PLAIT PRC PONT OF REVERSE CURVATUREGE DERIN—S TREE RE cONIFEROUs TREE PVC POLYVINYL CHLORIDECPIPEA U PVI POINT OF VERTICAL INTERSECTION O SHRUB /BUSH R RADIUS FELLOW PAVEMENT R RA BLED POW R RCP CRETE PIPE SSWR SANITARY SEWER OF STA STATION STRM STORM SEWER SWPPP STORM WATER POLLUTION PROTECTION PLAN TVP TYPICAL BASIN HYDRANT WM WATER MAIN PROPOSED SP07 EROSION & SEDIMENT CONTROL wo WALKOUT STANDARD EROSION CONTROL .... .. I I I I HEAVY-DUTY EROSION CONTROL -o -o -o -o -o -o -o -o -o -o -o— SECONDARY EROSION CONTROL FENCE IT NE EROSION CDNTRGL AT BACK of CURB LOT INFORMATION (Topica SF��DN NET ,D s`oLEI REE FENCE %%%%%%%%} TEMPORARY DIVERSION DITCH TTFT " E. CATCH BASIN INLET PROTECTION ELEVATION UND T O CHAIN 2T BLOCKNO. v STRAW BIO ROLLS RICK BERM INc T LIT NO. —)) SUMPED RIP RAP PERMANENT Foul RIATER 'F �� DISEN CHARGE HGARGES LOCATION ELRAITIONEOR o-92 LO I OF UT OR sPu IN —VAMBLER GRAVEL CONSTRUCTION ENTRANCE - EB2D K OUT ALI SIDE LOOKOUT "AA" AD 0-+�� TEMPORARY OUTLET FLOATING SKIMMER a LOT CORNER N L SND — SIDE WPLKOUT BASIN ACCESS B9 SLOPE MA%. 34.5 STABILIZED EMERGENCY OVERFLOW STEEP'EST 11 GTE D ACCESS SLOPE 3:1 (H: V) -- - - - ST - - - - -- 1LIII (33.3%) OR STEEPER GRADE CURB LEGEND 08.15 = P F CURB LE CATION 4i gs.sT T9R SURMOUNTABLE CURB T, O. _ (TI EU MCP OF R6 ABLE CURB 08.32 = TOR OF C RB ELEVATION 08.62 T.0. = T P OF URB ELEVATOR CURB (TIP OUT GUTTER) �OTPS 5 == BITUMINOUS ELEVATION PIONEER >e�>,g 12 Il-,RHH,. �Fltj R xL- " S N.a.� M.,,,,P ETERNITY HOMES, LLC HAMLET HEIGHTS o 'm: a" LEGEND R,wuawciow n..D A—ETATsav caTTAac GROVE nnNuesoTA LEGEND UTILITY LINES E% ONG PRO SEO FU ®RE SANITARY MANHOLE SANITARY SEWER (SANITARY & WATERM AIN PLANS) -->--- > > > > SANITARY SEWER (STORM SEWER PLANS) FM —rte FM FORCE NM AIN FM $ C� N D4 GATE VALVE p � ® RUDU CSR RB OP -- — - —� �— IN (SANITARY & WATERMAIN PLANS) I I WATERMA WATERMAIN (STORM SEWER PLANS) � ® � CATCH BASIN ® ® ® BEEHIVE O 0 ® STORM MANN OLE C, ® ® FLARED END SECTION ® ® ® cONTR L srreucTURE -->r--> STORM SEWER (SANITARY & WATERMAIN PLANS) -->r-->Y —)) ))— » » STORM SEWER (STORM SEWER PLANS) CULVERT ---------------------- —PERP PERF— PFRF PFRF— PERFORATED DRAIN TILE --------------------- - °T SOL IS GRAIN TILE SERVICE CASING e e e e e e CTRIC LINE UNDERGROUND FIBER OPTIC LINE s s s s s s UNDERGROUND GAS PIPELINE PTI �� PTI To PeI To uNDERGRouND �ELEPHONE uNEs NE v v v v v v UNDERGROUND TELEN SON LINE an on an on OVERHEAD UTI LITV LINES SITE LINES EX ST NG PROPOSED FUTURE DESCR PT ON Bu SMYLE CURB &USIT IER UTTER RIBBON CDRB & CUTTER EDGE OF BITUMINOUS NG (SINGLE /DOD BLE) WHITE PAVEMENT STRIPING (SINGLE/DOUBLE) PHASE LINE - - - RUNE 2 CONTOUR LINE ----s 10 CONT OUR LINE _____________________ ou�iE�-sero ou�i��-sero BASIN OUTLET LINE -- --- --- --- BASN NIGN WATER LINE ELEVATION EMERGENCY OVERFLOW DRAINAGE FLOW ARROW — -- -- -- — — -- — — - -- — DELINEATED /PROPOSED WETLAND LINE �EEAND BUFFER FEMA FLOODPLAIN BOUNDARY FEMA EFMA """"""""""" RETAwwc WALL FENCE (BARBED WIRE) U U U U U U FENCE (WOOD) LN K) 1P T� coNSERvnnoN AREA SIGN � W TYPE III DB ARRICADEIGN LIG EE TOIG 4 + EDE STRIANN RAMP SURVEY LINES E%S NG PROPOSED FU DRE EIGHT HCDFDPRiVON — — _________- LOT LINE WAY ----------- ----------- ----------- EASEMENT _____________________________ SET BACK LINE ---- — SECTION LINE HATCH PATTERNS GRAVEL SURFACE � WETLAND DBITUMINOUS SURFACE � WILLING UPLAND BUFFER CONCRETE SURFACE � WETLAND MITIGATION RIP RAP O PERMANENT TURF RESTORATION DSELECT RAC FILL MATERIAL PERMANENT WET BASIN SEEDING EROSIEROSION CONTROL BLANKET III SII SII SII SII SII UPLAND/NATURAL AREA SEEDING ON CATEGORY PER PLAN TOPOGRAPHIC SYMBOLS ABBREVIATIONS A ALGEBRAIC DIFFERENCE ® B -B BUCK TO BACK A cn°N BAD BFE BASE FLOOD RIBIE ELEVATION —El CESKIE BMP BEST MANAGEMENT PRACTICE —El RELL CENTER LINE -8 AN HNI PC CB CATCHBASIN -�' a CBMH CAT CHBASIN MANHOLEIPE © METAL P BE AID O =1 HIL ET n v NO 17— CS CURB OUT STOP O OLE DIP DUCTILE IRON PIPE DT DRAIN TILE LA. SPINKLE1 H[eD ELILFV ELEVATIONEK EXIS71N FEF FACfETOEND FACfECTION ® FM. FOR CEMAIN AW METER GB GRADE BREAK T GND GROD ND p. K HYD HYGRANT NT ® TWIT HIGH WATER LEVEL ME T T INV INVERT • KPIPE L CURVE COEFFICIENT PND MPRK LENGTH LF LOWEST FLOOR ® LO LOOKOUT LO LOWEST OPENING RARE ® PATPairvT LP LICUID PETROLEUM OLE NOT YALE PC POINT OF CURVATURE ® PCC POINT OF COMPOUND CURVATURE 8 PI POINT OF INTERSECTION "LLR ARGPERTY LINE T c°NscavnnoN PLAIT PRC PONT OF REVERSE CURVATUREGE DERIN—S TREE RE cONIFEROUs TREE PVC POLYVINYL CHLORIDECPIPEA U PVI POINT OF VERTICAL INTERSECTION O SHRUB /BUSH R RADIUS FELLOW PAVEMENT R RA BLED POW R RCP CRETE PIPE SSWR SANITARY SEWER OF STA STATION STRM STORM SEWER SWPPP STORM WATER POLLUTION PROTECTION PLAN TVP TYPICAL BASIN HYDRANT WM WATER MAIN PROPOSED SP07 EROSION & SEDIMENT CONTROL wo WALKOUT STANDARD EROSION CONTROL .... .. I I I I HEAVY-DUTY EROSION CONTROL -o -o -o -o -o -o -o -o -o -o -o— SECONDARY EROSION CONTROL FENCE IT NE EROSION CDNTRGL AT BACK of CURB LOT INFORMATION (Topica SF��DN NET ,D s`oLEI REE FENCE %%%%%%%%} TEMPORARY DIVERSION DITCH TTFT " E. CATCH BASIN INLET PROTECTION ELEVATION UND T O CHAIN 2T BLOCKNO. v STRAW BIO ROLLS RICK BERM INc T LIT NO. —)) SUMPED RIP RAP PERMANENT Foul RIATER 'F �� DISEN CHARGE HGARGES LOCATION ELRAITIONEOR o-92 LO I OF UT OR sPu IN —VAMBLER GRAVEL CONSTRUCTION ENTRANCE - EB2D K OUT ALI SIDE LOOKOUT "AA" AD 0-+�� TEMPORARY OUTLET FLOATING SKIMMER a LOT CORNER N L SND — SIDE WPLKOUT BASIN ACCESS B9 SLOPE MA%. 34.5 STABILIZED EMERGENCY OVERFLOW STEEP'EST 11 GTE D ACCESS SLOPE 3:1 (H: V) -- - - - ST - - - - -- 1LIII (33.3%) OR STEEPER GRADE CURB LEGEND 08.15 = P F CURB LE CATION 4i gs.sT T9R SURMOUNTABLE CURB T, O. _ (TI EU MCP OF R6 ABLE CURB 08.32 = TOR OF C RB ELEVATION 08.62 T.0. = T P OF URB ELEVATOR CURB (TIP OUT GUTTER) �OTPS 5 == BITUMINOUS ELEVATION PIONEER >e�>,g 12 Il-,RHH,. �Fltj R xL- " S N.a.� M.,,,,P ETERNITY HOMES, LLC HAMLET HEIGHTS o 'm: a" LEGEND R,wuawciow n..D A—ETATsav caTTAac GROVE nnNuesoTA LEGEND UTILITY LINES E% ONG PRO SEO FU ®RE SANITARY MANHOLE SANITARY SEWER (SANITARY & WATERM AIN PLANS) -->--- > > > > SANITARY SEWER (STORM SEWER PLANS) FM —rte FM FORCE NM AIN FM $ C� N D4 GATE VALVE p � ® RUDU CSR RB OP -- — - —� �— IN (SANITARY & WATERMAIN PLANS) I I WATERMA WATERMAIN (STORM SEWER PLANS) � ® � CATCH BASIN ® ® ® BEEHIVE O 0 ® STORM MANN OLE C, ® ® FLARED END SECTION ® ® ® cONTR L srreucTURE -->r--> STORM SEWER (SANITARY & WATERMAIN PLANS) -->r-->Y —)) ))— » » STORM SEWER (STORM SEWER PLANS) CULVERT ---------------------- —PERP PERF— PFRF PFRF— PERFORATED DRAIN TILE --------------------- - °T SOL IS GRAIN TILE SERVICE CASING e e e e e e CTRIC LINE UNDERGROUND FIBER OPTIC LINE s s s s s s UNDERGROUND GAS PIPELINE PTI �� PTI To PeI To uNDERGRouND �ELEPHONE uNEs NE v v v v v v UNDERGROUND TELEN SON LINE an on an on OVERHEAD UTI LITV LINES SITE LINES EX ST NG PROPOSED FUTURE DESCR PT ON Bu SMYLE CURB &USIT IER UTTER RIBBON CDRB & CUTTER EDGE OF BITUMINOUS NG (SINGLE /DOD BLE) WHITE PAVEMENT STRIPING (SINGLE/DOUBLE) PHASE LINE - - - RUNE 2 CONTOUR LINE ----s 10 CONT OUR LINE _____________________ ou�iE�-sero ou�i��-sero BASIN OUTLET LINE -- --- --- --- BASN NIGN WATER LINE ELEVATION EMERGENCY OVERFLOW DRAINAGE FLOW ARROW — -- -- -- — — -- — — - -- — DELINEATED /PROPOSED WETLAND LINE �EEAND BUFFER FEMA FLOODPLAIN BOUNDARY FEMA EFMA """"""""""" RETAwwc WALL FENCE (BARBED WIRE) U U U U U U FENCE (WOOD) LN K) 1P T� coNSERvnnoN AREA SIGN � W TYPE III DB ARRICADEIGN LIG EE TOIG 4 + EDE STRIANN RAMP SURVEY LINES E%S NG PROPOSED FU DRE EIGHT HCDFDPRiVON — — _________- LOT LINE WAY ----------- ----------- ----------- EASEMENT _____________________________ SET BACK LINE ---- — SECTION LINE HATCH PATTERNS GRAVEL SURFACE � WETLAND DBITUMINOUS SURFACE � WILLING UPLAND BUFFER CONCRETE SURFACE � WETLAND MITIGATION RIP RAP O PERMANENT TURF RESTORATION DSELECT RAC FILL MATERIAL PERMANENT WET BASIN SEEDING EROSIEROSION CONTROL BLANKET III SII SII SII SII SII UPLAND/NATURAL AREA SEEDING ON �� tl [ t" r✓` Rt "�� B Y til � (j 1 a� L) v �>8 /i �f SN SCS N� ,✓ 9 f LEor���a2�— �-�-t� __�ir"'�K�--� RIMS 787.91 J� ^-� - 9p�_. INV. 774.55 3 \ c �— _� F `1� j J�' ry l ek O r��vi5 f a. JP ems' 4¢ A> IF x., P� i'rs C 7 ��i�r 711 r�R;AN ���%y���k✓J RE �>r _ - 7 _ _ � � � � ✓ f > Mo (� H wv-7sz6 off- �� _ _ �-,� / / �f a/ t y✓ —/ I I I 1 1 I RIM: 78&43 l _'—r—'~ 800 INV 775.26 X9,1 i-�-� /J f l i L�= Ex. 12" VCF / ✓ f �sl °� C'/ '', —yy ,> y'a/�. i� ✓� �� Ili o FL RM. 788,4 9a ` / / ✓ i_= / \� J. \ 1\ J NV -785.8 VAV��✓JJ ___ r < �l in �r it 5- �C L� -W ^� � w. L_ _# _ � (-�."-✓✓ -"fir _ � v' �J � L '19j 9 800._` � �� i� � � � J /' 8 q {./ � �6/ /� �n -_.-. Nv. ,ear -i �-��- ��i�- _ L'�-' ^ ' 'r —r aai�✓ / J S a 6CE��- T /19k�'�v����—�� i� INV=784.14 LEGAL DESCRIPTION FOR PRELM NARY PLAT PURPOSES ONLY ✓g8 i 'J '— _ / i�✓ /// //� _ /. t ° H11°1 nHAMLET aneR sou I m—. av plot W-11,'— c°�� n M' ...-to (ioLEGEND . " '-•�� _aoi� S C �'d"� Z —�-. ORe�ol�n .E _— —--� aaa���- ��r e ��� A� V 7"� C� a✓�� mes nP,aP� - ADti ly INVN8N'\ IN Y3�1` �/ // ( / A �/✓ o -L) l ( l / / �, A A '�V\�. SLS_ > g i�o� �es SECTION 2D, TWA, 27, RCE. 21 S)�l lh fi /1� S ���\� to 'vz�� `_�� <<n LOCATION MAP V "Et � � t. �� a � ��;a�< NO SCALE \A 1� 1 11 ° �na�e } I A �m.17 D110111 1 -11— D — —,i- no, o z5 w EGG Rea ti 7 I I \� IRk=811.36 Gj �J FI ER �� ? ��A�� \ ! iS 0 oe�mee leer nota GRAPHIC SCALE INu EEExwi n+rrvi 22 Ill-„„„, �R ETHRNITY HOMES, LLC HAMLET HEIGHTS 11-11111 H1111,1 tiI6.,,u ,.y ,� m •m: a - nn., a�, EXISTING COn DITIONS a,auaEvciow MN'iEsaa`rA �sma 3 oR 14 II �� �o I QP P� -------------------------------- ys D 114 0 QPM o' T ,s ,tT,1t t T 9 <c6 0 PI$NEERneeiing 601 PINE HILL ELEMENTARY OUTLOT B t t t\ 1 LEGAL SCRPTON FOR RED 11 NARY PLAT PURPOSES ONLY � 1 \ A.DE Outlot HAMLET PARK SOUTN, occord'ing io iM1e recorded plot tM1ereo! WasM1ingtan County, M'innemio. At DRAINAGE AND UTILITY EASEMENTS ARE SHOWN THUS: TOTAL GROSS AREA TOTAL LOT AREA 10.3525 ACRES 81783 ACRES s>I NUMBER OF LOTS NUMBER OF Ot1TLOTS 2 2 0 ---------J-------- TOTAL OUTLOT AREA 0.83fi5 ACRfs TOTAL RIGHT F WAY AREA GROSS DENSITY 1.5376 ACRES 232 LOTS/ACRE oetng 5 Teet in tdtM1. and odJo-q lot Itn NET Y (E% AL) 293 LOTS/ACRE le olM1erwlse lndlcated and 10 feet Ine9wldtM1 and 9adla�nfng street Imes and rear lot Itn unless at M1erwise 'od'i-- on th, plot. .Ls, A ,,; SECTION 20, TWA, 27, RCE, 21 LOCAo ION EMAP �o QP ENSTING BITUMINOUS 'RAIL ------------------------ OUTLOT B BITUMINOUS TRAIL -HAL 784.0___ -__ ---- --� _ - _ i INFILTRATION BASIN /: \ �� STORM WATER BASIN 13 A SGSnR RSTeA K \ ) 1. I 1, 9 2 �'� g REMO ExEl 2 I I TEMP. CUL-A�SAC Gip¢ /� \ o .'1 1 2 100cuR� ANST o ITI 1 TR � N �— 2J �— I11 1 1 1 ''1 (i 11 11 it 11 1 1 11 T PINE HILL ELEMENTARY / ZONING REQ REMENTS FOR R-3: 10,000 S PROPOSED NII REOUREM EN TS MINIMUM LOT AREA 10.000 SF TU / MINIMUM LOT METH 75 FEET F MINIMUM LOT AREA 75 FEET MINIMUM SIDE YARD SETBACK (NOOSE) 10 FEET MINIMUM SIDE VARA SETBACK (HOUSE) 7 FEET MINIMUM SIDE YARD SETBACK (GARAGE) 5 FEET MINIMUM SIDE VARA SETBACK (GARAGE) 7 FEET MINIMUM FRONT YARD SETBACK 30 FEET MINIMUM FRONT YARD SETBACK 30 FEET MINIMUM REAR YARD SETBACK 35 FEET MINIMUM REAR YARD SETBACK 35 FEET IIS MORiM UM SODEAVDARp SETBACK ON A 65 FEET MINIMUM SIDE -CARD SETBACK ON A 95 FEET L 0 2I5, 50 1R0 CORNER LOT 20 FEET CORNER LOT 20 FEET MARIMUM PRINCIPLE STRUCTURE HEIGHT 35 FEET MACIMUM PRINCIPLE STRUCTURE HEIGHT 35 FEET GRAPHIC SCALE IN FEET PIONEER>e�ng MINIMUM ATTACHED GARAGE SIZE 440 SFMINIMUM ATTACHED 22 5,.a.,_M= '°'°' IP ETERNITY HOMES, LLC HAMLET HEIGHTS IL "'m: „N., .�. PRELIMINARY SITE PLAN --,-En..iNnEsozA 'POP5 IF 14 �a carrAac GROVE nRSNESOTA 7 ,s\ --PINE- I4L:L-E EMEE TBRY AE i �,E, j ! ` j ��111i a' Qp ti211 r AT j 1 j PIONEERneen,ng �. 22 QL �i8a =TBs- 9 0Y 941 OUTLOT B e /e r A�o-�- j m > T90 s� No 7 ,s\ --PINE- I4L:L-E EMEE TBRY i �,E, A, ti211 r AT j PIONEERneen,ng �. 22 A. M �i8a =TBs- OUTLOT B �� 3- �r 73.00 NWL=T01 00 A~ \ AOTLET=TB,. So 3.00 _NNh_E 81. ` 0990 bry fat�do V�96 / J STET 1 WET , VOL -84 AA sTOR. wL.-e.erz Ac'fT _ 1 Al0876 0_�B8 ` ll 3 LF"�a8 Q� 1 1 96 e 1 1 1 "m 1 1 1 � 5882 1 1 1 1 1 _ 96 Er r- , 1111 �>aa9 11 LF- aK R 6 7 eo•F 1 1'� _ _ �-�. ter•, - 8838 A—A ✓�s /�� �-L- a�wo E �'- 1 / 1: I✓ i- g 6 f G F °E I �� a 1jl ) /•�'g Q>,._ S L i%s 93.81 � " '�,� e i / ✓ / / n /9 A J ✓ �� �� ( m �V �� S SINGLE CAM LY LOT REQU REMELTS ) m< _ i LOT wio1R: 75' G spa T�,r ou''-c9v"✓Sp� �A o A: �1 ERN _ t sRoeAc ✓ SIDERTAFC SETBACK: s �- l J e tR / BIILDNGREOIIREMENTS- r�r LOW OPENIN LO - SOL POND AOLECN LOTS EOE . �� LOCAL LOW OIN7S (TEMP. PALLING) Low OPENING: LO EOE + 1 - O 25 50 100 -� y GRADING IMPACT AREA. �_ ACRES GRAPHIC SCALE -� --PINE- I4L:L-E EMEE TBRY i �,E, PIONEERneen,ng �. 22 A. M PRELIn9INARY G g 6 f G F °E I �� a 1jl ) /•�'g Q>,._ S L i%s 93.81 � " '�,� e i / ✓ / / n /9 A J ✓ �� �� ( m �V �� S SINGLE CAM LY LOT REQU REMELTS ) m< _ i LOT wio1R: 75' G spa T�,r ou''-c9v"✓Sp� �A o A: �1 ERN _ t sRoeAc ✓ SIDERTAFC SETBACK: s �- l J e tR / BIILDNGREOIIREMENTS- r�r LOW OPENIN LO - SOL POND AOLECN LOTS EOE . �� LOCAL LOW OIN7S (TEMP. PALLING) Low OPENING: LO EOE + 1 - O 25 50 100 -� y GRADING IMPACT AREA. �_ ACRES GRAPHIC SCALE -� HAMLIS T-AWK Sg1JTN� .- - <.°� "f , 1,->°' a ^"s�(;; . G-,'-.,JBo����az-- --__.- _— �T84��T88�" l')L.—w,�__..� '� .......... m moi—. , y_0 I 6 �� V }V -7ee:.. OUTLOT B 0$' n ,?��� yon._• •_ •TA / -'^� - - - � , moi` --------- - - --- ��j `v -- �< T �, � r �"�' % i i 1 PI G �-.,�� /� mac, p A0 C 1 rl I 111 1 j. - -BOD WE - SYS— A� aoo� j��✓ PACB HE fjC:-��, SOD rf_ I i -FrNE LSI -E ME4:[A T✓�� rte/ �/f� �- / / ✓ '7° > T T{{ i%r1 /- IF I I I \\ � / l l I IF A 1 US A— _ �f s a r �' 1, a �� Cf L� � �� LEGFND E�.IUE� D A L A k 1 A r 11. 1 o�1 1 B:e o- ii ��'/ ��j `v -- �< T 1 PI G �-.,�� /� mac, p A0 C 1 rl I 111 1 j. - -BOD WE - SYS— A� aoo� j��✓ PACB / z SOD rf_ s's�� -FrNE LSI -E ME4:[A T✓�� A i -4 ��r�'L�� V �� iii '7° > ii --'i.•'/ �� � /��-��-_%/ rte--a�zti� //J r ) r� �� `v 1 PI G �-.,�� /� mac, p A0 C 1 rl I 111 1 j. - -BOD WE SYS— c / z SOD s's�� -FrNE LSI -E ME4:[A T✓�� A i -4 ��r�'L�� V �� iii FLIT FLE,\, T T{{ \ F� ` 1 1 IF I I I \\ � / l l I IF A 1 PI$NEERneeiing 22 Ilr— _ --'i.•'/ �� � /��-��-_%/ rte--a�zti� //J r ) r� �� `v WAS � "'S ��j�� /—� �� �-.,�� /� mac, V A, �\ SYS— c / z PC �^ a FLIT FLE,\, e 100 d _ �f s a r �' \ \1 Y/ �A, a/� �� Cf L� � �� LEGFND ll INSTALLeREFORE sIARTOF NASDOE PACING w 0 . ........ . PERIMETER EROSION CONTROL FENCE. INSTALL BEFORE START of GRADING . HEAVY DUTY EROSION CONTROL FENCE. lZr,i l'e INSTALL AFTER LOCAL GRADING COMPLETE SECONDARY EROSION CONTROL FENCE. ....... To BE INSTALLED 48 HOURS AFTER COMPLETION OF GRADING, 0 2 SOD OR ION CONTROL FENCE AT T TALLED AFTER COM PLBA K OETION OFSSDEWALKF CURB, TO BE SCONSTR CTIDN. >c. AA5IN ACCESS 89 SLOPE MAX. ej AFTAED RIP RAP PERMANENT ENERGY a DISSIPATER, INSTALL WITHIN 24 HOURS 6 AFTER coNNECTION To A SURFACE WATER. nl PHASE LINE H s -»»} TEMPORARY DRAINAGE DITCH O TO BE INSTALLEDEALER ECTI ST LIFT OF BITUMINOUS. ®A ,� TOBENSTIEFPROTECTION BINSTALLED C ASIN GRATE. STRAW BIO ROLLS. INSTALL WITHIN 7 DAYS OF GRADING COMPLETION OR BEFORE 1S7 RAINFALL EVENT WHICHEVER IS FIRST �O ROCK BERM. INSTALL WITHIN O RA NFALL FVEN I DAYS OF FE IST EST DIVERSION DITCH TE F O BEPLACEDAS NEEDED UNTIL STORM SEWER CONSTRUCTED DISCHARGE LOCATION W WETLAND CONSERVATION SIGN STABILIZED EMERGENCY OVERFLOW MIKE OT CAT 3 EROSION CONTROL BLANKET. INSTALL WITHIN 7 DAYS OF GRADING COMPLETION MIK® COMDPLETION AALL PAT 6NEROSION CONTROL BLANKETNST 7 DAYS OF GRADING. INFILTRATION AREA ill STEEP SLOPE. 3'.1 (H:V) 111! (33.37) OR STEEPER GRADE DMRv SEDIMENTATION BASIN WELAND Es (SILT FFNCFI oIMENT eASN. eASIry TO eE Teoo OCF%ncreE or A'EA n'I„EO. cF,,I TEM, SPIN IN Y OFF TO' Mp"M`NT`TON OF TO' 5"pp AND IF' NOTIRTZ P1011p"'IN I'l I IT' 111 01 111 OREN III FBI 111 "O'BLIBl"117 PLANNING IGNI.Oorc. Es (RMP'sl sH ooiT a ES ON 0 "ESN THE PLIN5 FIAT MIT POOR .III III ISH E LTE' "BELL. E PRENT R(DozE R1 u,sT Nc TRE E s. GRASS AND OTHER vE CETAT VE covER TO HELP 10 OPERATE HERID IM0 To, SLOPE IS I 'I "I, LIPPI A 1011M 111IOITI MINIMP, FISSION I ITKIB�PAF 1 211 11 PER 4111 11 P�IMIIIFGN THII IIIT0IIF01 10111 11 OINI 11 11COIBILICE ITO MIDST 1171 1 DAIS IMBRITINS TWE GFERnuzER' 22NDIG' wxw.I.I ® IID LRS PER ACRE. B11111 F INP, AIFFA F BLOING FLAT BICDMEV A IININCE HIE DINTIIITKI ITILL APPLY TEl FIKM A TOOK T1111 HE U SHALL HAVEREEN SEEDED 4ND MULCHIF To'ED 4ND 'LL FENCE 104LLPRO NA 0p"`TEN5 INSTo'TILLED OROIEIND DOLL PONDS. "vs1 ALL T"P I'D TO TY SIT DA AL ITE sTAe L IS ON s A10 EYED OR PETE' TnE T1 M,o'A'r ME..sU'Es III NO LON.11 UPIDID, IN To' MNM"T”` IF OFF COMPACT— MOST BE LISP ON ` "'ED' OF Ap'C`C COMP"TOR SHIA To' IFF NCLUDE ALL TOPSOIL PLACEMENT AID NFLTRAT " POINT TO IMILIOCT oBOIL BATON BASNs. 4 TO I 14L IN III E AREAS REauRNG LOOSS PI$NEERneeiing DTOR PIAIFIII FIAT (IN WOH FLPGS. SRPKESI SfGNS. SILT FENCE. III)NOI THE DEVELOPMENT INT of DISCHARGE TO ANv suC PMER, I. BEIFAE wATEFH(YNT2011 ON 24 HDURs TIFF IlM CONNECTING To A sU RFACE CAA DSJ'T TIMPA'v are PEIMINENT ENE'GV DISS,ATION MOUTIN 14 HOU'S of GR mHER rrPeovEO P=11 e/os ASEseo1NE ON CAE ERasGN CONTROL PLAN. Ms. cOMPas s,vAKes. DIED ACTITO 11 111 111 GO' 1 11 IIIALLID EIRS11 III BILL IIIIIIIHATION EVENT —1 11 111 SYSTEMS. 0 UTI OR DTCHEW'v (IN PERMANENT) sE ENs TILL TITIIN -NN 11RIE TEN ED MOVE C. OEWASEO'RREDANOO I'AN O 4NAOEMON L014TON IND/OR ASSHOWN ON THE EROSON CONTROL PL4N DEMOTERNI INI IN' TYPE AT WIIFIlE DIANISE THAI MIT HAVE 'FARE .1 SEDIMENT LIDEN DINIHISIE SAFE I GOAL BE D OCOIR RED To AN RppR"` SEDIMENT IRAN ON TOE PROTECT A HE GPENER�PMI TIES -0 HOE APPIOPIVE BMP S I— TORT TOE DINCORIGE DOES NEET ADREIIELl WHEAT TOE 2 ALL RVIE1 FIRM BE "HEI OF M"' BE "'04"ED 1 4 MANNED 'FIT SEE' I OF C40SE NO I VANCE I NNPEIHISNI AND MAINTENANCE DIHNI 4CLIE IONATFICTIN AND ITON 21 01111 ACTED 4 IANF EVENT IF IIEATEI LOAN B I REawREMEriTs (eo E �ocAL vu elsalCTION MAY REawRI A MORE FBEOUENT 'ETA NEDN=RRL OF wSPFCTION)wcHEs FINCHINIL AREA IF UNLENDEss ANTOEOTHERNE" TIME FRAME IS 'PEGFIED IPPERIED"IF DAY AFTER MPGA NPOEs PERMIT NDE 57 No IONS ALLow ACCESS E LOT BENCHING DETAIL NO SCALE OHLn 29,0 I ELEVAroN Nc BLOCK No ff,EAY —LOT NO E N IT (oE REauo RED) IAII��, IF IPLI ENTRY GO I WE fLf VAT ON O LOR D sWE wD sDf wAOLrcau?KOVT OR SPLT GARAGE PLEPATION REVIIIEND LISTED ELEVATIOY W LOT CORNER N ---------L - E STREET FINISHED GROUND3 PER n VARIE SPLA 1O O'/. FIN. P 6A GARAGE ELEVATION ON PER PLAN TI o w n VARIES s FINISI ADEPARIES VARIES CT 0 Q3 O 0 GRADING GRADE LOWEST OPENING EGRESS PIT -/SEE El BASEMENT - SU BGFAOEEl FLDBR > 11 TYPICAL STREET SEC TION RAMBLER (TYPICAL SECTION NOT TO SCALE) PaD VARIES 1O' 35' FINIS N GRADE GRADING GRADE LY 'y) OWE ST OPENINGCIE -25--15 ELEVATION PER PLA El TOPSOIL VARIES VARA— FINISH GRADE Zc.T o MIN. ..-.^ l _ SU BGFAOE l GFAO NG GRADE W... W -- LOWEST FLOOR PER PLAN BASEMENT FLOOR 5' SEE TYPICAL STREET SECTION FINISHED GF OUNO EL PER LOOKOUT TYPICAL SECTION NOT TO SCALE) 60 PAD 3 VARIES 10' 35 FINISH GRADE GRADING EFORE 25' GA AGE ELEVATION PER PLAN 15 VARIES VARIES FINISH GRADE VARIES LOWEST FLOOR/ ,yv TOPSOIL ... �. `\\ 0 m LOWEST OPENING PER PLAN v SU BGRADE A� > `GRADING GRADE O 2.0'/. 141N BASEMEN LOOK — I SEE TYPICAL - YPCALM1N. STREET SECTION I Y At.PY':' o 11 FINISHED GROUND ELEVATION PER PLAN WALKOUT (TYPICAL SECTION NOT TO SCALE) w FINISH GRADE rc L( HOLD DOWN TOPSOL TT i NON SELECT ON CoMPAC ED MA �EC BACXFILL�� SO GRADE ER ALS � "' "".j�A"j� / n'vp QC ACI \�£ G E%ISTING GR OUP �� BOTTOM OF UNSUITABLE MATERIAL 4TH � ,\�\�\�.��� �� /�A�/�/� \ NON -SELECT CLOMPACTED SE B KF MATER ALAC O /✓\\��j��//�/ / j / ~M° BACKFILL MATERIAL UNDISTURBED SOIL UNDISTURBED SOIL MIN SUBGRADE CORRECTION (TYPICAL SECTION NOT TO SCALE) (IN)FILTreAHON BASIN HwL+1.o' ELEV PER PLAN 20 ON—SITE CLAYEY MATERIAL THAT MEETS UNIFIED J OIL 'LASS'ATN. 0 T HAVE AT LEAST 309 PASSING THE 4200 SIEVEBASIN LINER TO END 0 . NCH ELEV PER PLAN STORM WATER BASIN SECTION (TYPICAL SECTION NOT TO SCALE) PI$NEERneeiing e� B EO. F. ELEVATION 1, EDGE OF BENCH FEE PLACE M,FOT CATEGORY fi EROSIONCONTL ROL POND ET FROM PON AB CONT STABILIZED EMERGENCY OVERFLOW DETAIL SECTION A -A FILTRATION MEDIA MIC • SELECT GRANULAR BACKFILL (MIGOT 3149 D.3): 85% • COMPOST (MIDOT GRADE 2): 15 PERCENT BLANKET LOCATION 1 A TOP OF BERM \ \�r'�`✓\� T IN TOO &E SIDES OF BLANKET 6MIN. 0' EMERGENCY STABILIZED EMERGENCY OVERFLOW DETAIL SECTION B -A PLANT MATERIAL TOLERANT OF INUNDATION DEPTH REQUIRED TO DRAIN SEE SE BUNG AN PLANTS RECOMMENDED HER IN 48 HOURS PL PRE-TREATMENTSTRIP LE 12" 41 SCARIFY BOTTOM 12'-18' BEFORE `UNDISTURBED. UNCOMPACTED PLACING AMENDED SOILS INSITU SOIL INFILTRATION BASIN CROSS SECTION (TYPICAL SECTION NOT TO SCALE) 1 INIT LL A xoue Na NNE/oR OTHER App" PIR ER PREVENT EIIENT EA GBA ERs PHONE. F.ER PFIl. ETC) PRIOR .ENIIIL -- I N 'HE EVENT THAT 1EEMENT A INTROPHIED INTO THE POP PIANO OR AM ' HE L OTH FOI CRIT DN DIP HLfcLcvn I HTAs1DNL SE -----1' -784.0-- ----------- -� - - - - - QP I ��E oUZ Nw/=1EE V - Ex EN 'R' — — — _ E 9 — _ _ PROPOSED �M_ OE 82 , 1 IEV'EE$.E6 I ° MN -EX -20i 1 1 11 1 1 1 1 1 6 7 \ ESD 12 4oR RiM_E88 4 1 I I I I INV 776,33 3 � 1 1 3 1 1 1 1 1 1 1 1 J L�- I�� II 337 - CT4 0 167. EX. 99'' 12' VCP @ 6.2D9 1 11 11 11 o, I r -EN 33 1 IE CL4 1 7 1 1 / s 1 ' 11 11 1 1 11 11 Z 1 1 11 1 1 1 E%. 263 8' PVC SDR 26 O 3.389 - 1 1 2 111 1 1 1 1\ 1 1 1 / 1 1 1 11 1 \1 11 ll 1 til 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 111 - 11 11 11 11 1 1 11 1 1 1 1 1 1 1 E%8' PVC SDR 619 1 ^ ---111' - 6 D 2 ®. \ I 11 11 1 PINE HILL ELEMENTARY PI$NEERne�ng 22 ,� .IMI "'°"' PRELIM INARY SANITARY & WATERMAIN PLAN ------ -vv 1 y C EX. 493'- 18" RCPPCL4 0149 / 10 \ L - - - - --PRSPIE SED IRI7 41P1 /\ \ BLD' / NV. E/575 2.26 EXISTING 2 RIM: 815 17 PROPOSED RIM: 816.40 L \ 0 25 50 100 L.� GRAPHIC ECAEE ]N FEET 'E�7 Rl 365 - 33' RCP CL3 E 0.'. I I I I C 78N 111788. II INBLD:B I I I RIM LF 8895 I INV :783.00 EX. 31' - 30' RCP CIL3 ®0 259 a - RIM�I88 _V N1Co�1 IN1783.66 I\"' V I I IM MMW 05 RLP 5 N- 7,82 04 of 5 QP Fe5-201 V: 8.00 RIMN-202 R Mnes 7a za' - 1s' RP cls 0.00 cD1n 167 OUTLOT B INV 7781 CBMN-161 111:786.07 j RIM: 86.28 NV'78257 CDMN-163 /� �� 15 POP CL5 M 0.5 %-OCs-100 -FES-100CBLD. 4.34 RIM 791,71 � RIM: 783.68 INV 78 94-� IN VD B57 ^ \ 3-438 INV =7B_ _t -INV: 0 784.0__-��\- -16� RCP CLS ®250% �� \ \ \\ r-- -- -- 0 - -� 1W1 INV:781 �00 511 RDLD: 4IM '.50 L'l\\ 34 - 15 RCP CL5 O -2.989 INV 781,54 L85 P I I/,qLl� / \ \ BOTTOM=773.0 10 P CBMN-152 ' G II // \ \ NSf-El ��// RIM'.78fi.01jg1 0 1 \. \ \ OUTLET=781.50 BLD: 4.90 /� ^�'p \ II \ L 6' NWL=783.85 -INV 781 ii y N WET VOL. -4.74 AC'FT 23-0 284.0��� 0 /13 7 0 30' - 27' RCP CLI @ 0.25% F �_Hu✓L= (� \\� I R. VOL 8 C _ CP / 0 82 A INV 7El 2I" RCP CL4 @ Q309 030%-� INV I I �� - CL4 \ 09��� �j R CL5 0.3, � 7 / 9 - 7 FMM78 50� - - _NWL=78L�0'1. 1 1 \ J \ \\ �N� s°o7 -=-�� 8 T 12 S n'5 CL3 .40 e113' -15" RCP CL5 @ 0.35% 2 RCP 9 1 11 1 LI _ __J _ 9 1 1 2 3 '��- -_ 10 - _ _ ET -� 1 1 .790051 -�� Y='-1 / RIM 792,' �� - -11 1 BLD. 3.78 - - INV 789,6 9 54 _ CB -155 RIM :792.94 15 RCP CL5 l� l ----- - / 8 � BL0:739507 15 CNV78777 1 �, 5 aRP CL5 1 e3 4 1 CBM N92O 32-24"IRPLGI3@050%, 1 11 111:79200111, 1 , 1 BLD'. 5.46 4 1 1 _ J L « 111:794.74 1 III I� NV. 786.5 L _ _ _, 1 1 / TTI , 'NV:- 5.24 \ RCBMHIM 7810fi5 1 1 _ J - (< 1 1, Ii P C (I1 f _ f- , , , 1 150' - 15" RP CL5 @ 1 lv NV Saz7v-�4c 23C I 1X8 RCP , 1 1 1 1 1 11 C)31DNL�2 1 1 BLD:3 265 1 1 1\ 1 1 , 1 3 1 BLD:3.71 1 \ 1 1 1 l 1 1 1 s 1 NV:78894 11 11 150-28 PC ®2609 11 1 11 1 111 RC L5 nl 1111 \1 O U 11 �11 1 Iu \ \ PI �-------J 1------'t------LIL------� 1 11 \ VIII I / N5V: 809.90 -r IN V: B"I1F08 RIM LID 815 3,97 \ BLD :3.97 N V. 812.00 PINE HILL ELEMENTARY EX. 27 - 12" RCP CL5 O 3.939 EX. 25' - 12" RCP CL5 C 3.93 ` INV:813.13 III \ I \ I \' li C 216 60 100 GRAPHIC SCALE IN FEET Hamlet Avenue DNG DCT,, TIACM FABRIC MAxIMDMBPACING ,=o.MrE�=a�3PnaPon 3eab.i iMA LEREsT1Eo% DIST N111"11 FROM FABRIC s�r+iPws s Fu,PI rn EDI ME��rCOMPACTED DPxloa roDw IRE�°W POBTEMBEDM �GTwe�e DD MACHINE SLICED SITE FENCE ® Stantec COTTAGE GROVE, MINNESOTA ERo-1 Ea'o. PDG G, R FLAP ATDNBDTTDM DF BoxeB1 n l FAIRIC MIP BUSY UNDER ICAL TO PREAR THPIRIASIRNIS .a �lIWIDENSEPD AREJNHE THE INLET 1TRN=C— R?' TC DTM M.rv.MuNG STANDARD DETAILS l�(a Gm wLEr PaoTECTION saT eox Sams.°+"^`m1"' FOR BEEHNE CASTING ® Stantec CO TACE GROVE, MINNESOTA ERo-lo PI$NEERneen,ng STEEL MEN osT IT --1). [LAMENT GENNLATDTExn 6 MAx.MUM sPAaNc. 3ss6`i iMA MINS sl,'Eoi. ATT"I�RiTOT MINIMUMOF FABRIC. EEaIPoiT IN TOP e POST 11%H so , FILL ARC ATT IRUM A.. 11 FABRICTHE w `M 11CLETEE Q THI OSIFEES DIRECTION IF 21' MINIMUM PIET u - EMREDMEN �T�Np aoDDETAIa SILT FENc ® Stantec COTTAGE GROVE, MINNESOTA ERO-2 IIITFENCETNIATA'N ETHDRE INSTALL III 2 —111 THE STATS EDINTIN6I'11AT II= _ 'EEN11 S STA1 ECH CI DARDDDENA DID' GEwe ® Stantec COTTAGE GROVE, MINNESOTA ERo-11 �a�DNDT�B�ow,E° "" �ER�PEND.3INTERNq�. �o BE APED M�' SIAID''GAN Mw.MDMDFER1A_rVAS DIRECTED .E -I PLAN'CT LE HALL AAEL WRNODrANANCHOR TRENCH ED.DD //��l1� Cottage STANDARD DETAILS ERDS.ON CANTRDL BLANKET ® Stantec COTTAGE GROVE, MINNESOTA ERD-5 / 00°0080 ,C �C`oC� GTy by 6 IN `MI0 0 ocG w000wlPSLa MIN.MUMD OHO oOo°`�S sPEGIMCATIarvs"I CUT OFT I RM J/ o S1. TN M¢E RUNDFF MITI WAN 1. FILTER IAIRI' IN ALL BE PLACED ' TO AFTER MLIN S HOTI°Eeula oRNDa HP RLv,o 1. ENMNTC�EEMTST STANDARD DETAILS GT wege corvsTRurnON NmArvcE ® Stantec CO AGE GROVE, MINNESOTA �= E��ING EDF CG sVE mEo�NoDNc on �s;6Nc nP� AND COTTER MOD GIT. APPRDvHIGH FLOW INUET PROTECTION ao UQHAL. L�...E .".AEI TTBEv MT1No �mzr INTETPR TCATCHLDHP e ET BASIN INSE °^Mmx=nan.vmrrm B WSERTOTECTICT CAT ® Stantec COTTAGE GROVE, MINNESOTA ERD-9 eC ✓` f t ; , T'_' EPEATE "COVED 11111N1IC111 TI -11 DE EQUAL TO OR STEEPER THAN 3:. REQU SLOPES TRAAcrENG. SLC'Es WITH A GRAZE MORE G DUAL THAN n.. RECIFE SLOPE TRACK.NC IF THE STANDARD DETAILS GT wed SLOPE TPAIXING ® Stantec COTTAGE GROVE, MINNESOTA ERo-13 Rrvv , - —1IOR wE CURB &CITTER =CRI15HE01 11 a o(3. C, (3P, A w97NG �E �Pw�3o�s.3 7HICKNEES`REQ ;)owEER of "EGEBBAR.12 MSN. F/+n m.M...= °CG^mOlta e STANDARD DEL T'LPICALL PUBLITDRISECTIGNBLT%TSGN - ® StantecCOTTAGGEEGR"ROVET'l'E"' E -E1 , MINNESOTA ,� STR�2 RIBER rt TRE..Rl—E0 ON Ln. ON RLAN ON SE_ NNECIONO F) — �, ERVICE RISE DEQ 1. i! 1 CO.IfO. 36'RCa..RAOR, S6 PIPE El IN LPIATE TOa DRESER (1 BE.CUBIC YARE) /]lam 0� �e S STANDARDCDETAILS �.U. \k® ERVICE CONNE ON TO RCP U ® Stantec COTTAGE GROVE, MINNESOTA SERA PI$NEERneeiing BBBLE NBN)ARD i STANDARD OIL DE D PT aDAR I.NE � „ BOULEVARD UMINUMR DRB BII CINIRIE (30 BIC) D T. PDANTINcs REQUIRE Cm APPROVAL A. ISLAND 1111 11E I AND IB (B/C) ISIAND CORN AND CO B u.ERT 56IB(. RT) WISLAND CUL-DE— ID Cottage TYPICAL CUUL DD—C BE Gm e REBOENTUL UNIT ® Stantec COTTAGE GROVE, MINNESOTA STR�S SIE R-1 NO, STO 15 DOR RLACEMENT A.IU.1 Cl fy. x N TIE — 3 RIE LOUUSE 2 TIE ROUT LASTENIJIS DPORSDTTaM ANCHORBBHEIDEB �ARI 0M3wx3HAEAe cPen ISOMETRICGuSDUNI �tH/BARS 1(975 11 la "m 12 y�'J1l1DARED END 5STANDARO 71GNIAN l�fAa E E D "^.nue.+nv.+✓ TRASH CAURD ® Stantec COTTAGE GROVE, MINNESOTA 570719 R-1 r �` mAl RL-1 11.11EMONTI 1111 IT11— \i PIAN OTE'FILTER—NICT 21 UO33 36 TC 48 14 1211 ILL 3, REWIRED UNDER RIP R P. c (ONENUER RE UNDER RES.\ D1 rEL RMATERAL M o073EDI.IN1 SECTION AGEO 4 ENIET TIRE IR IlElNATERUL �(MNDOT 36B "' SECTION E I��COI1Rge AILS RPRADP ATOTARD TLSTS I .aenrn a. ® Stantec COTTAGE GROVE, MINNESOTA oI eunnir_ crucnl u r KEY COMMON NAME SCIENTIFIC NAME OVERSTORY TREES ROOT QUANTITY AUTUMN BLAZE MAPLE/AGER X EREEMANII 2.5" B&B 7 0 HACKBERRY/CELTIS OCCIDENTALIS 2.5" B&B 5 SENTRY LINDEN/TILIA AMERICANA'SENTRY 2.5" B&8 4— RED DAK/QUERCUS RUBRA 2.5" B&B 9 ® THORNLESS HONEYLOCUST/GLEDITSIA TRIACANTHOS VAR INEMIS 2.5" E. 4 RIVER BIRCH/BETULA NIGRA 'HERITAGE' (CLUMP) 4" BAR 31 SWAMP WHITE OAK/QUERCUS BICOLOR 4" B. 30 EVERGREEN TREES j BLACK HILLS SPRUCE/PICEA GLAUCA DENSATA D' E. 37 V RED PINE/PINUS RESINOSA 6' E. 21 ORNAMENTAL TREES y ALLEGHENY SERVICEBERRY/AMELANCHIER LAEAS TS" E. 10 J, PRAIREFIRE CRAB/MALUS'PRARIEFIRE 15" B&B ® SUGAR TYME CRAB/MALUS'SUGAR TWE' 1.5" B&B oI eunnir_ crucnl u r KEY COMMON NAME SCIENTIFIC NAME OVERSTORY TREES ROOT QUANTITY AUTUMN BLAZE MAPLE/AGER X EREEMANII 2.5" B&B 7 0 HACKBERRY/CELTIS OCCIDENTALIS 2.5" B&B 5 SENTRY LINDEN/TILIA AMERICANA'SENTRY 2.5" B&8 RED DAK/QUERCUS RUBRA 2.5" B&B 9 ® THORNLESS HONEYLOCUST/GLEDITSIA TRIACANTHOS VAR INEMIS 2.5" E. 4 RIVER BIRCH/BETULA NIGRA 'HERITAGE' (CLUMP) 4" BAR 31 SWAMP WHITE OAK/QUERCUS BICOLOR 4" B. 30 EVERGREEN TREES j BLACK HILLS SPRUCE/PICEA GLAUCA DENSATA D' E. 37 V RED PINE/PINUS RESINOSA 6' E. 21 ORNAMENTAL TREES y ALLEGHENY SERVICEBERRY/AMELANCHIER LAEAS TS" E. 10 PRAIREFIRE CRAB/MALUS'PRARIEFIRE 15" B&B ® SUGAR TYME CRAB/MALUS'SUGAR TWE' 1.5" B&B 7 PI$NEERneeiing b 1 LANDSCAPE REQUIREMENT SINGLE FAMILY: 24 LOTS 2 TREES PER LOT = 48 TREES �,es �oU,TLOT B �G f _� )) LANDSCAPE NOTES _ ��a.A. Pxxx,°,xxxnxx.xa Y F q jG✓/r- o� �`\ . suu xmrvmc Faros s�or avoaos<o arr:scu sono e" o D-,�� �' . !' �> � or Zxxxs�s,x�x_ �x�.w,�nff�,o».x,xErox,nx�x.�xxx�x��x ��,xx�Px�,nPx°xx j �� �kxx,x°,xE rxx�xa, ff xr=Poxra� ,nx °xxP,,,xx �,x ar oPa,�a �� x�xr.,,�x� xx Pwxn� DECIDUOUS TREE PLANTING DETAIL F �-zJ� } LE � f � I,O �`�-� L nr� ��Jf " ��� ] CONIFEROUS TREE,( PLANTING DETAIL II f I � _'.-�BiB✓ J _ J) r� / \ � \ /� �' c rwns rxo G \"1 k� Pr.x,w�xorE. Loxo �`Y i'`s. uuxn,xuxrc or sa • IIuTEI WWi, TREE MITIGATION REQUIREMENT ,Z`a0'""° TOTAL TREE REQUIRED FOR MITIGATION = 186 CATEGORY B TREES (OR EQUIVALENT) Px,oxro -= i'i W- II w11I PROPOSED MITIGATION: CATEGORY A TREES = 61 TREES (122 CATEGORY B TREES) CATEGORY B TREES = 66 TREES TOTAL PROPOSED TREES = 175 TREES TREE PROTECTION DETAIL STAKES AT THE DRIP LINE. OR AS DIRECTED 31 THE —ER S ra wNCRETE Woof 1T IINT MND LE11 OR 11H—EALA A- CF / �E� -R,aF a6 gai _ R � r� J W� '2J oar -� moi' —��--'� sl<--� i-���) °�ZJ" ia'I i < G G "P1NE��Y a� ( w ,7P a Tree Invnentory 6 = TREE TO BE SAVED s6 TREE TD BE REIADVED Total Trees located on site = 152 Trees31 TREE LOCATED OFF SITE Allowed to removed 40% of trees on site 61 Trees SEE SHEET T2 FOR A DETAILED TREE Total Trees to be removed that are not damaged=108Trees LIST Total trees removed overthreshold=47Trees Replace the Iargest47Tree first Must mitigate 188 Category B trees (94 Category A Trees) PI$NEERneeiing �o GRAPHIC SCALE IN FEET - - ;m: 77 M�.,,,,P '"'°'°"" n '.�P TREE PRESERVATION PLAN ETERNITY HOMES, LLC azs rma�sraFFz HAMLET AVENUE TI 1), FARTES czo L mNnEsozA 1-4 ` I lIV5 15gSlbeCadn Elm Black IIIIIlsS ru ss l,uc,yrdenm 20'inhoi ht 1— cetlargg 1168 12 Ob-- Elm Ulmusrpumil,n ovc SibeElin not gh, gg y IIJ2P—m --p-1.l, �moovc undo pr --dens, 20'In Fel g1t Elder undo trobus ght W, g g ry 1— 12Elder undo 5 .coon Elm Ulmuspumil, Black Hills Spruce sgl,"' denm 20'in height, JJ3 snadesup nodus Slberlan Elm SSSslillbbbbeeeerrarlilaaaannnn nEEEEllllEmmmmlm UUUlllmmmuuussppuummlJlo, IR 1155 11 [„bil 1— 1251 1—nhoght 1260 G 'p M1119111 gry nhoi ght,whal4sh.desp ovc pp yt I_I M1tc l ght RI -1 ngt vetch Pine rylestris E5in neignt g 6 Y aweImdet nnb�et nnp1ignt 4uaki ng Aspen vuluttremuloidex g g y Quaki ng Aspen polus ncmuloides pp qua 12 quake ng aspen in hoight 4uaking aspen older g g y tltler undopp ,bees FelgM1t, to Elder —g—do 4WM1 a lobus n noigM1t 1276 7 6C g me ovc Slbernodus pp ,r --dense t5'In h,.ghl in noignt g g Y 91cum v 1201 1 Black Isglouw vvi. d -un 15'in M1eigM1t in height White Pino Imlbus� in holight W10hcitke HPIIilnsoSpruce P -nusg[larumuear denso l5'Iinn M1neoiiggM1M1[t ova wrr}i Pln e 'In P Mt,,- c[egg s9l,ucpvdnm 15nM1eghl ny5o emve 10 B eRne Pus 0F1a W0egM1Me g 4C g ory BTmreet,bs s Remove 1207 4 ovc 1211 4Elderpundo u10n " hl Red Rne ng o nnoRlht M 14 RI -1 6 Off-Sre p nheight g 1111, -11 45 hl� 911 5— nobus worth Pinc tvhesn. in hclight siber�mn Elm Slberlan Elm Ulmuspumllo Red Pinene bus he Off -Sete g White R-ticbus� in hoight Off S[c ,r --dense U'In M1eIgM1[ Red Nne pr pp P -111111 -op I-- R—Ol 1301 6 N-11 11-1 uo obles Fel ghl RedCedarIn e In neignt c , ,.les In ht 35 g gry Spmce yl,,l Inno gll wtd�Pignt ,r- dens, es'm hefgM1!, er 211 -1,t,pretted Nn.in noignt R g Y v 1 7 mld�Pinep spl,ucp yO,,t 35h hl g 4-,,- p eraamage wtenPino tvroeem;t mhoight a Pme tzm B not,�gbt gate ee: Remove z5t2 B v ne v' alte got cat move Rea Plne _ -g g g ry - bpt wtchPina tyroemit in noignt g ¢e g v me auc pi_ Abeaan elm 13 4vetch Plne P1111 11, mhelgM1tM119111—try Slberlan elm torch Pina ssyIesnis In hei got 1— 13Siberian Elm Ulmurpumil, Off-Sreelgkertlamage sy I". FM1t,z r tlamage g wtcM1 Plano sylesms 130in hoight,s psudordamaga � �� p Red cedar p g g �0 GRAPHIC SCALE IN FEET PI$NEER ,,,i,g 22 11,111,11, 11,11, HIChl, III N� '"'"'°"" '.�R ETERNITY HOMES. LLC �,,� TREE PRESERVATION PLAN HAMLET HEIGHTS T? „ BOLTON M & MENK Real People. Real Solutions. MEMORANDUM Date: 02/15/2018 To: Ryan Burfeind, PE From: Mike Boex, PE Subject: Hamlet Heights Preliminary Plan Review City of Cottage Grove, MN Project No.: N14.115577 2035 County Road D East Maplewood, MN 55109-5314 Ph: (651) 704-9970 Fax: (651) 704-9971 Bolton-Menk.com This memo summarizes the review of documents submitted by Pioneer Engineering., dated 01/10/18. General: 1. Easement widths to be confirmed during final design. Minimum easement width should be twice as wide as pipe depth. 2. A street lighting plan will be required with the final plans. a. Residential lights should be approximately 200-250 feet apart located on lot lines. b. Feed point cabinet locations should be identified on the plan. c. Identify wire sizes on the plan. Wire to be placed in conduit. Handholes are to be placed adjacent to each light pole. City details LGT-3, LGT-25, and LGT-27 will be required. 3. Final plans will require plan and profiles of utilities to understand utility cover across the length of pipe, crossings, and clearances between crossings. Sheet 3: 4. Please clarify the source of the existing contours (surveyed, Lidar, etc.). C1-- 5. A 200' transition from the existing 36' (b -b) to new 32'(f -f) street is requested. 6. The existing water tower south of Lot 8 Block 2 should be depicted for clarity. 7. For plowing and maneuverability, construct a 10' radius where bituminous trails intersect. 8. Public Safety is requesting a secondary access to the development. It's requested that a trail be added between lot 1 block 1 and the existing home at 8991 Hamlet Avenue. This trail should be covered by a 20' Outlot and connect to the existing trail in the park. C1 - C. — 9. Lots 1-8, Block 2 rear yard drainage: Bolton & Menk is an equal opportunity employer. Hamlet Heights Preliminary Plan Review Page: 2 a. As depicted the pipe would be difficult for the City to jet and clean (over 500 If) and access is difficult. It is preferred to minimize rear yard storm pipe since access can be difficult in this location. Evaluate the possibility of extending the outlet pipe from the Pine Hill Elementary school basin to Hamlet Ave between lots 5 & 6. In order to reduce pipe in the back yard, evaluate other possible options: i. Extend storm between lots 3 & 4 block 2 to pick up rear structure if needed. Can drainage in rear yards be split up to minimize pipe, while allowing overland drainage across 3-4 lots maximum? For example, can drainage behind lots 4-5 be graded back to CBMH-122 and lots 1-3 go to CBMH-106? 10. Removals don't appear to be depicted clearly, a separate removal plan should be created. For example, it appears that existing trees/brush on the south side of the existing homes appear to be impacted by the proposed grading. 11. The EOF next to lot 1 block 1 of 798.5 should be better defined as it relates to the existing home to the north (8991 Hamlet Ave.). Based on the submitted contours, it appears drainage will encroach on the existing driveway. In order to avoid drainage encroaching on the adjacent property, it may require the low point in the road to be shifted further south. In addition, low openings and finished floor elevations of the existing home should be confirmed as it relates to the proposed drainage. 12. It appears the 793.9 elevation between lots 8 & 9 block 1 is an EOF and should be labeled as such. 13. Label the EOF of the proposed basins to Hamlet Park. 14. Evaluate options to construct the trail off the cul-de-sac at a 5% grade or less. 15. Provide access to all structures adjacent to the proposed ponds with a 10' maintenance bench. It appears a maintenance bench would not be required on the west (home) side of the pond. This should be coordinated with the detail on Sheet 9 as well. 16. Access will be required to the rear yard storm behind lots 7-11 block 1. Consider placing CBMH- 152 and CBMH-162 in the Outlot. CBMH-161 could likely be eliminated. 17. The berm between basins should also be a minimum 10' wide to allow the City access for maintenance. This should be coordinated with the detail on Sheet 9 as well. 18. Provide details as to if site balances or if there is fill intended to be hauled in to grade the site. Sheet 9: 19. Incorporate notes about providing a clay liner in the west basin; see details in comment #45. 20. Please propose and submit a more permanent product for the pond EOF, such as rip rap. Sheet 10: 21. Provide provisions to restrict fencing around the sanitary manhole in the backyard of lot 8 block 2. 22. The proposed watermain should be looped to the 18" main near the water tower. A wet -tap connection will be acceptable. The proposed watermain should be 8" DIP within the site and will be reduced to 6" to make the connection at the northern plat boundary. Bolton & Menk is an equal opportunity employer. Hamlet Heights Preliminary Plan Review Page: 3 23. Move the proposed hydrant from between Block 2 -Lot 7 and Block 2 -Lot 8 to between Block 2 - Lot 8 and Block 2 -Lot 9. Add an additional hydrant between Block 2 -Lot 4 and Block 2 -Lot 5. 24. Maintain 10' separation from hydrant and CBMH 163. 25. The existing trunk sewer structures are lined and when adjusted they will require the same lining product (Zebron 300 series liner) to be installed. 26. Since the sanitary structures are being adjusted, provide 27" cones and castings. 27. Provide access to the existing trunk sewer during construction. Cka + 11 28. Extend the FES -201 to the Hamlet Pond normal water level of 777.5 in an effort to minimize erosion. See attached plan sheet for pond details. 29. FES -107 should be changed to a catch basin structure per STO-9 or STO-10 and not a flared end. 30. Evaluate options to straighten FES -107 to CB -104 and eliminating the bend at structures 105 & 106. 31. Try to achieve 3' minimum cover over storm pipe in street. It appears 2' min cover in greenspace is achieved. 32. On the removal plan, confirm the FES from the Pine Hill basin will be removed. 33. Provide a detail for OCS-100. 34. Move CBMH-111 and CB -112 to lot lines. Sheet 13-14: 35. Include pond benching detail City Plate STO-18. 36. Note that the sidewalk is not to be constructed on detail STR-2. 37. Add the concrete hydrant pad detail (City Plate WAT-9). 38. Include City Plate STR-10 for bituminous trail construction. 39. Please note that the existing trunk sanitary pipe has been lined with a CIPP. A new connection detail is provided at the end of this memo. Sheet L1: 40. Boulevard trees should be located 10' behind curb. 41. Maple boulevard trees should not be provided. Consult with the City forester for acceptable replacement species. 42. Trees should not be planted over utility pipes (storm sewer) or hinder access routes around the ponds or to drainage structures. Stormwater: 43. There is a regional pond immediately to the east of this site, pond TG -P4. The HWL of this pond, 786.14, needs to be accounted for as it relates to tailwater and freeboard requirements. a. Freeboard standards: For stormwater facilities with emergency overflows, the low entry elevation for all new structures must be a minimum of 3 feet above both the peak surface water elevation for the 100 -year precipitation event and 2 feet above the Bolton & Menk is an equal opportunity employer. Hamlet Heights Preliminary Plan Review Page: 4 emergency overflow elevation of any immediately adjacent new stormwater basin. The submitted grading plan for this basin must identify the direction of overflow and provide adequate flowage easements for the overflow. For backyard and side -yard conveyance and temporary ponding areas, there must be at least 1 foot between the overland overflow elevation and the low entry of the adjacent structure. b. It appears Lots 3-11 block 1 and lots 1-2 block 2 do not meet the low opening requirement. 44. The Stormwater Management Plan narrative states: "The discharge from the existing stormwater basin located on the Pine Hill Elementary School property will be contained in a pipe and routed to the site's storm water treatment facilities." Please provide additional information or a drawing of the existing and proposed Pine Hill basin outlet structures. 45. A 3 -foot minimum vertical separation is required from the bottom of both the pond and infiltration system to top of bedrock, should it be encountered. Place a 1 foot minimum liner along pond bottom up to pond NWL. Liner shall have a maximum permeability of 1X10-6 CM/S with a minimum 15% passing the #200 sieve. If encountered, bedrock should be over -excavated a minimum depth of 1' below finished grade in areas above the NWL. 46. Provide a sump for pretreatment in STMH-203, CBMH-103, CBMH-154, & C13-163. 47. NPDES Construction Stormwater Permit: As this project disturbs more than 1 acre, an NPDES Construction Stormwater Permit will be required. The preliminary plans include erosion control features. A SWPPP will also be required along with the NPDES Permit. 48. On-site storm sewer should be sized to a 5 -year rational method design. Submit design calculations for the storm sewer system. a. Please submit a drainage area map for each catchment. b. Include individual pipe segment velocities with calculations for review. c. Design pipes from basins to carry both the 100 -yr pond discharge and 5 -yr design flow for directly connected areas 49. Update modeling to reflect the attached outlet on the Pine Hill site 50. Water Quality: The City requires that new development projects include BMPs that at a minimum achieve post -development reductions in TP and TSS by 50% and 80%, respectively. Since the project site drains to the Mississippi River, Watershed rules call for TP loading rate of 0.22 lbs./acre/year or existing loading rates, whichever is less. c. MIDS Summary: The applicant submitted a MIDS summary for the proposed condition of 16.37 acres draining to Pond 100 (this area does not include the Pine Hill Elementary School area which is treated on the school site). Due to the use of both a stormwater pond and an infiltration basin, it seems likely that water quality requirements will be satisfied, but the applicant will need to submit a MIDS analysis of the existing conditions within the P100 drainage area to demonstrate compliance with the watershed TP loading rule. In addition the applicant needs to include in the analysis the existing and proposed conditions within the 3.03 acres of drainage areas 2005 and 200. These areas include backyards and a drainage swale discharging offsite. Bolton & Mark is an equal opportunity employer. INSTALLATION DETAIL FOR TAPPING LINED RIGID PIPE USING INSERTA TEE FATBOY® CONCRETE ENCASE CUT AWAY SECTION WHERE REQUIRED BY LINER MANUFACTURER DETERIORATED RIGID PIPE PIPE LINER A RUBBER SLEEVE CONCRETE ENCASE INSERTA TEE FATBOY CUT AWAY SECTION HUB ADAPTER FOR 4" AND 6" SDR 26, WHERE REQUIRED 28, AND 35 LATERALS BY LINER MANUFACTURER a a ,• a a 41. ) aQ a r a s PIPE I INSTALLATION INSTRUCTIONS: 1. MARK AREA TO BE TAPPED ON SURFACE OF RIGID PIPE. WORKING AREA SHOULD BE 2 -INCHES WIDER THAN DIAMETER OF INSERTA TEE. 2. BREAK AWAY RIGID PIPE SECTION TO BE TAPPED AND EXPOSE NEW LINER SECTION. 3. BRUSH AND CLEAN PIPE LINER SURFACE AND REMOVE DAMAGED SECTIONS OF RIGID PIPE. 4. CORE HOLE INTO LINER WITH APPROPRIATE INSERTA TEE HOLE SAW. 5. INSTALL INSERTA TEE FATBOY® TAP CONNECTION PER PROVIDED INSTALLATION INSTRUCTIONS. 6. ENCASE CUT OUT SECTION OF RIGID PIPE WITH CONCRETE WHERE REQUIRED BY LINING MANUFACTURER. DETERIORATED RIGID PIPE ©2010 1REV. DESCRIPTION BY I MM/DD/YY I CHK'D ADVANCED DRAINAGE SYSTEMS, INC. ("ADS") HAS PREPARED THIS DETAIL BASED ON INFORMATION PROVIDED TO ADS. THIS AWM DRAWING IS INTENDED TO DEPICT THE COMPONENTS AS REQUESTED. ADS HAS NOT PERFORMED ANY ENGINEERING OR DESIGN PH, 503/357-2110 SERVICES FOR THIS PROJECT, NOR HAS ADS INDEPENDENTLY VERIFIED THE INFORMATION SUPPLIED. THE INSTALLATION DETAILS TAPPING LINED RIGID PIPE FX 503/359-5417 PROVIDED HEREIN ARE GENERAL RECOMMENDATIONS AND ARE NOT SPECIFIC FOR THIS PROJECT. THE DESIGN ENGINEER SHALL I WITH INSERTA TEE low, 0 ". REVIEW THESE DETAILS PRIOR TO CONSTRUCTION. IT IS THE DESIGN ENGINEERS RESPONSIBILITY TO ENSURE THE DETAILS PROVIDED HEREIN MEETS OR EXCEEDS THE APPLICABLE NATIONAL, STATE, OR LOCAL REQUIREMENTS AND TO ENSURE THAT THE NTS DETAILS PROVIDED HEREIN ARE ACCEPTABLE FOR THIS PROJECT. DRAWING NUMBER Enaili soles@insertatee.coro OF o W I -- —_ --- ------- -—- — -- --- --- --- --- i— --- FX SS 17--------------------------------- ------------------- ------------------ 95TH ST _ 6_ 118 119 120 121 122 1. z 14 LANE + EX -- 95TH ST ------- m m - ----- -7T ---------------------------------------------- --------- ------------------ --- +---------- Ln N--- ---- --- -_- - --------------------------------------------------------------------------------------------------------------- -- --- --------Er�slf----------------------- - w jRnv � ` NOTES: FOR DR, INAGE PROFILES SEE SHEETS 121 - 123. FOR DRAINAGE ULATIONS SEE SHEEP 124 - 126 O 4' PVC PIPE DRAIN. PIPE SHALL BE PLACED 20' IN EACH RECTION UNDER THE BACK F CURB AT THE LOW POINTS. © fIlE PIPE DRAIN. PIPE SHALL BE PLACED 20' 1N T OIRECLION OF CONSTRURION E LOW POINTS. NDER THEGACK OF CURB AT 52' N 4) WEIR REHABILITATION WEIR REHABILITATION o zs' 'D' 830 PROFILE VIEW 830 TOPOF14' 10' �� 14' 14' � -r 11 PLAN VIEW � ELEVATION ON-816' 4 RCP BOTTOM OF POND INV 813.00' ELEVATION 810' j TOP OF BERM = / / 5135 820 - z 82O WEIR REHABILITATION / SECTION VIEW (NOT TO SCALE) i j 0 5134 j 810 —f --- 810 1 j `6 TONT OF POND 50 12. RCP. 4.Ou% E STING GROUND 5110 � T/E &CONSTRUCTION LlMlTS Boo Soo 1+18 1+DO O+DO Cottage ®Stantec Grove «n<aEv n«e DRAINAGE PLAN 95TH STREET SOUTH CITY OF COTTAGE GROVE, MN HADLEY AVENUE IMPROVEMENTS SAP 180-107-004 &SAP 180-111-003 l l 9 - 217 Yfainlet ifeights Cottage ijrove, A(JY ARCHITECTURAL GUIDELINES: All Builders/Lot Owners understand that a full set of plans, blueprints, elevations of all buildings, lot survey and exterior colors are submitted to the Eternity Homes, LLC (the "Developer") for approval prior to construction. All Builders/Lot Owners shall adhere to the following guidelines: Building Area. The size of any dwelling, exclusive of one-story open porches, decks, basements, garages, fireplaces and three season porches, shall be: Splint Entry Minimum of 1,100 square feet of finished living area above grade. Rambler or Single Floor Minimum of 1,400 square feet of finished living area on the main floor. Multi-level Minimum of 1,400 square feet of finished living area above grade. Modified Two Story Minimum of 1,600 square feet of total finished living area above grade. Two Story Minimum of 1,900 square feet of finished living area above grade. Other Style Homes Must receive specific case-by-case written approval by the Developer. 2. Roof Pitch. A minimum roof pitch (slope) of eight (6) feet on rise in twelve (12) feet of run (6/12 pitch) is required on all dwellings including attached garages, except that Developer may approve a lesser roof pitch if presented as an element of a plan proposing a recognized architectural style (e.g. "Prairie Style" dwellings). Porch areas are excluded from the 6/12 pitch requirement. 3. Minimum Brick or Stone. The garage piers and columns on any front porch or stoop must have a minimum of forty-two (42) inches of brick or stone. 4. Garage. Minimum Two car garage with a minimum of 440 square feet. 5. Front Porches. Porches on the front of the dwelling must extend a minimum of six (6) feet from the front of the principal dwelling. 6. Garage Doors. All residential garage doors must have raised panels or similar design features. 7. Trim and Wraps. The Developer encourages the use of window wraps, window grids, shutters, etc. and all windows, doors and garage doors must have a low or no maintenance trim or wrap on all four sides of the dwelling. 8. Exterior Materials. All exterior dwelling surfaces shall be of approved materials including, but not limited to brick, stone, stucco, shakes, cedar, vinyl siding, cementious board, or aluminum or steel siding. Siding shall have a reveal of no more than eight (8) inches, and where used shall be the same on all sides of the Dwelling. 9. Neutral Color Control. No two colors or elevations alike next to each other on the same side of the street. Natural colors utilizing earth tones, greens, grays, or natural wood tones are encouraged. 10. Zoning. Lot Owners are responsible for all City of Cottage Grove ordinance requirements and all setbacks shall be consistent with the R3 Single Family Zoning District. 11. Landscape Escrow. Lot Owner agrees the complete yard will be sodded within forty-five (45) days of the issuance of the certificate of occupancy permit by the City of Cottage Grove, weather permitting, or in the case of winter construction by July 30 following that winter. The Lot Owner shall accept responsibility for site maintenance and for controlling storm water runoff. The Lot Owner shall correct all site maintenance or drainage problems within fifteen (15) days of receiving written notice from the City of Cottage Grove or the Developer. After said fifteen (15) day notice period, the Developer and/or the City of Cottage Grove shall have the right to enter the property, correct the site problem and bill the Lot Owner for the work needed to fix the problem. To guarantee the landscaping, trees and sod is installed, the Lot Owner shall place a $ escrow with the Developer that will be returned to the Lot Owner when the landscaping is complete. 12. Trees. Lot Owner agrees to plant front yard trees per lot after construction of the home according to the approved landscape plan dated 12018. BUYER: DEVELOPER: Eternity Homes, LLC DATE: BY: Pat Flynn BUYER: ITS: President DATE: DATE: BUYER'S AGENT: DATE: