Loading...
HomeMy WebLinkAbout07G Up North Plastics Environmental Assessment Worksheet July 2013 version Environmental Assessment Worksheet This Environmental Assessment Worksheet (EAW) form and EAW Guidelines are http://www.eqb.state.mn.us/EnvRevGuidanceDocuments.htm. The EAW form provides information about a project that may have the potential for significant environmental effects. The EAW Guidelines provide additional detail and resources for completing the EAW form. Cumulative potential effects can either be addressed under each applicable EAW Item, or can be addresses collectively under EAW Item 19. Note to reviewers: Comments must be submitted to the RGU during the 30-day comment period following notice of the EAW in the EQB Monitor. Comments should address the accuracy and completeness of information, potential impacts that warrant further investigation and the need for an EIS. 1. PROJECT TITLE Up North Plastics Cottage Grove Plastics Manufacturing Facility Expansion 2. PROPOSER Proposer: Up North Plastics Contact person: Mr. John Hill Title: Engineering Manager Address: 9480 Jamaica Ave City, State, ZIP: Cottage Grove, MN 55016 Phone: 651-734-6246 Fax: 651-734-5646 Email: johnh@upnplastics.com 3. RGU RGU: Contact person: Christine Costello Title: Economic Development Director Address: 12800 Ravine Parkway South City, State, ZIP: Cottage Grove, MN 55016 Phone: 651-458-2824 Fax: 651-458-2897 Email: ccostello@cottagegrovemn.gov 4. REASON FOR EAW PREPARATION: (check one) Required: Discretionary: Mandatory EAW page 1 If EAW or EIS is mandatory give EQB rule category subpart number(s) and name(s): Minnesota Rule 4410.4300 Subpart 14 B, 3: For construction, of a new or expansion of an existing industrial, commercial, or institutional facility, other than light warehousing or a light industrial facility, equal to or in excess of 300,000 square feet in a second-class city. The local government shall be the RGU. 5. PROJECT LOCATION County: Washington City/Township: Cottage Grove PLS Location (¼, ¼, Section, Township, Range): NW ¼ and SW ¼ of Section 21, Range 21, Township 27 Watershed (81 major watershed scale): Mississippi River Twin Cities GPS Coordinates: 44.811553 N and -92.939356 W Tax Parcel Number: 163-2102721230001 At a minimum attach each of the following to the EAW: County map showing the general location of the project; U.S. Geological Survey 7.5 minute, 1:24,000 scale map indicating project boundaries (photocopy acceptable); and Site plans showing all significant project and natural features. Pre-construction site plan and post-construction site plan. Figures: Figure 1: Site Location Map Figure 2: Site Aerial Photo Figure 3: Conceptual Site Plan for Proposed Expansion Project Figure 4: Pre and Post Project Land Cover Map Figure 5: Soils and Prime Farmland Figure 6: City of Cottage Grove Zoning Map Figure 7: County Well Index and Geologic Features Figure 8: Water Resources Map Figure 9: Architectural and Historic Resources Tables: Table 1: Comparison of Existing, Proposed, and Combined Facility Components Table 2: Project Magnitude Data Table 3: Existing and Proposed Land Cover Data Table 4: Required Permits and Approvals Table 5: Yard Requirements for the I-2 District Table 6: Soils Series on the Project Site Table 7: Total Daily Traffic Accessing the Up North Plastics Facility Table 8: Comparison of the Traffic Appendices: Appendix 1: Natural Heritage Information System Sensitive Species Review Appendix 2: State Historic Preservation Office Database Review Appendix 3: 2011 Facility Noise Assessment page 2 6.PROJECT DESCRIPTION a.Provide the brief project summary to be published in the EQB Monitor, (approximately 50 words). Up North Plastics (UNP) is proposing to expand their existing plastic manufacturing facility by approximately 428,353 sq ft in Cottage Grove, Minnesota. The proposed expansion would manufacture blown plastic film trash bags, which are new to the site, and plastic sheeting products. The expansion project will essentially double the size and production capacity of the existing facility. b.Give a complete description of the proposed project and related new construction, including infrastructure needs. If the project is an expansion include a description of the existing facility. Emphasize: 1) construction, operation methods and features that will cause physical manipulation of the environment or will produce wastes, 2) modifications to existing equipment or industrial processes, 3) significant demolition, removal or remodeling of existing structures, and 4) timing and duration of construction activities. UNP operates an existing plastic manufacturing facility located at 9480 Jamaica Avenue in Cottage Grove, Minnesota (Figure 1).UNP is a wholly owned subsidiary of the parent company Poly-America that is based in Grand Prairie, Texas.Poly-America owns two other plastics manufacturing facilities including Poly-West located in Henderson, Nevada and Carolina-Poly in Chester, South Carolina.They also own a plastics recycling facility near Houston, Texas. The existing facility in Cottage Grove is the only asset owned by Poly-America in Minnesota.The existing UNP facility was previously owned by a different private owner and moved to this current location in Cottage Grove in 1985. Poly-America purchased UNP in the Spring of 1990 and has been operating the facility since that time. There was a previous expansion of the facility completed in 2002 which added 165,000 sq ft of warehouse space to increase storage capacity at the facility. There was an additional 86,400 sq ft of warehouse space added in 2015. Existing Manufacturing Plant UNP manufactures blown film plastic products, including sheeting products that are used in the construction, agricultural and sheet wrap markets. The existing plastic manufacturing facility is 424,800 sqft in size and is located on an 86.6-acre site within an existing industrial area of Cottage Grove. The existing facility includes the manufacturing plant, office area, storage silos, warehouse, truck loading docks, rail spur, truck scales,trailer parking area, security entrance with guard shack, and employee parking area (Figure 2). There are currently 266employees at the facility. The plant operates 24 hours a day, with two shifts for the workers in the manufacturing plant. Approximately 140 employees access the facility each day. The raw materials used in the plastic manufacturing process are polyethylene-based materials including low density polyethylene (LDPE), linear low density polyethylene (LLDPE), and high density polyethylene (HDPE). Raw materials are transported to the facility primarily via the rail spur and kept in storage silos. The total raw material input is approximately 15,000,000 pounds per month. There are 24 storage silos page 3 with a capacity of 1,000,000 pounds and five storage silos with a capacity of 250,000 pounds at the facility. A pneumatic transfer system is used to move the polyethylene from the rail cars to the storage silos. The materials are moved from the storage silos into the manufacturing building where the blown film is created using fourteen extrusion lines. The sheeting is cooled within towers that range from 62 to 102 feet tall. After cooling, the finished product is packaged, placed on pallets, shrink wrapped, and stored within the warehouse. The material is loaded onto truck trailers and then transported off site to the marketplace. The total amount of plastic product produced at the existing facility is 15,000,000 pounds per month which is transported offsite via trucks, with a total of 400 truckloads each month (approximately 14 truckloads per day). Proposed Expansion Project The proposed expansion project would include the addition of a 428,353 sqft manufacturing area and warehouse which will also be a blown film process to produce trash bags and sheeting products. The expansion project will be constructed to the north of the existing manufacturing plant, converting some of the trailer parking and lawn areas to the new plant facilities (Figure 3). The raw materials used in the expansion project will be the same as those polyethylene products used in the existing facility. New rail spurs and 22 new storage silos will be added to the facility, including 16 silos with a 2,000,000 pound capacity and six silos with a 250,000 pound capacity. Six additional silos are projected to be needed due to product mix and new product development in the future. The expansion project will also include new cooling towers. The total production capacity of the new extrusion process for the proposed expansion is 20,000,000 pounds of product produced per month. A new warehousing area capable of storing 17,000,000 pounds of finished product will be added to the facility. The expansion project will include 240 additional employees and would add up to 500 truckloads per month (approximately 17 truckloads per day) to transport the finished product off site. The productionfacility will continue to operate 24 hours per day for plastic manufacturing. UNP will also modify the existing parking areas, storm water management facilities, landscaping, and screening areas on the project site to accommodate the expansion project. Acomparison of the facility components existing UNP manufacturing facility and the proposed expansion project is provided in Table 1. Table 1: Comparison of UNP facility components for the existing facility, proposed expansion, and total combined facility. Total Proposed Facility Component Existing Combined Expansion Facility Manufacturing and 424,800 sqft428,353sqft853,153sqft Warehouse Area Storage Silos2422 (+6 future)46 (+6 future) Employees266230496 Truck Shipments400/month500/month900/month Production Capacity15,000,000 20,000,000 35,000,000 lbs/monthlbs/monthlbs/month page 4 UNP is in the process of completing the balance of plant engineering design as well as the project site modifications and design. Anticipated completion of the engineering and design for the proposed facility expansion and site modifications is expected by February 2019. UNP anticipates construction for the expansion project to begin in approximately March 2019 after all permits and approvals are received. The construction process is estimated to take 18 to 24 months with a proposed initial operational date for the expansion facility of Q4 2020. After the initial startup, there would be ramp up period for the new facility, which is estimated to reach full production capacity inQ32022. c.Project magnitude: Table 2: Project Magnitude Data. Total Project Acreage86.6 acres Linear project lengthNa Number and type of residential unitsNa Commercial building area (in square Na feet) Industrial building area (in square Existing:424,800 sqft feet)Proposed:428,353sqft Total: 853,153 sq ft Institutional building area (in square Na feet) Other uses specify (in square feet)Parking Areas Lawn and Landscaping Structureheight(s)Existing Building:30 feet Storage Silos: 64-74feet Cooling Towers: 62-102 feet Proposed Building: 37 feet Storage Silos: 64-97 feet Cooling Towers: 67-98 feet d.Explain the project purpose; if the project will be carried out by a governmental unit, explain the need for the project and identify its beneficiaries. The purpose of the expansion project is to increase the production capacity of the Cottage Grove facility while also adding the manufacturing of new products including trash bags at this location. The expansion project will allow UNP to be more competitive and create increased market share in several of the sheet plastic markets. e.Are future stages of this development including development on any other property planned or likely to happen? Yes No If yes, briefly describe future stages, relationship to present project, timeline and plans for environmental review. page 5 f.Is this project a subsequent stage of an earlier project? Yes No If yes, briefly describe the past development, timeline and any past environmental review. 7. COVER TYPES Estimate the acreage of the site with each of the following cover types before and after development: Land cover analysis at the project site utilized the Minnesota Land Cover Classification System (MLCCS) to determine pre-development land cover. For the pre-development land cover analysis, the generalized land cover classification within MLCCS was used. Land cover categories are listed in Table 3 below. A preliminary site development plan was utilized to compare land cover between the before and after development conditions. The UNP facility is an existing industrial manufacturing site. The main land cover categories at the site include lawn/landscaping areas and impervious surfaces such as parking areas and buildings. There are no wetlands, forests, water bodies, grasslands, or agricultural areas at the project site. A comparison of pre and post development land cover for the proposed expansion project is displayed in Figure 4. The majority of the land cover changes at the site due to the proposed expansion project will be the reduction in lawn/landscaping areas and an increase in impervious surfaces for the new manufacturing plant, warehouse, and storage silos (Table 3). The post development land cover will also include new stormwater management features. Table 3: Land cover for the project site before and after the proposed development. Before After Before After Wetlands00Lawn/landscaping42.927.2 Deep water/streams00Impervious surface43.258.3 Wooded/forest00Stormwater Pond0.51.1 Brush/Grassland00Other (describe) Cropland00 TOTAL 86.6 86.6 8. PERMITS AND APPROVALS REQUIRED List all known local, state and federal permits, approvals, certifications and financial assistance for the project. Include modifications of any existing permits, governmental review of plans and all direct and indirect forms of public financial assistance including bond guarantees, Tax Increment Financing and infrastructure. All of these final decisions are prohibited until all appropriate environmental review has been completed. See Minnesota Rules, Chapter 4410.3100. page 6 Table 4: Required Project Permits and Approvals Unit of Government Types of Application Status State Minnesota Department of Water Appropriation PermitTo be applied for, if needed Natural Resources (MDNR) Very Small Quantity Hazardous To be amended Waste Generator License State General Industrial Storm To be amended WaterPermit Minnesota Pollution Control Agency (MPCA) NPDES Construction Storm To be applied for WaterPermit Underground Storage Tank To be applied for Notification (UST) Permit Local Solid Waste Generator LicenseTo be amended Washington CountyBuilding permitsTo be applied for, if needed Right-of-way Excavation PermitTo be applied for, if needed Zoning ApprovalTo be amended Conditional Use Permit (CUP)To be amended Building permitsTo be applied for City of Cottage Grove Right-of-way Excavation PermitTo be applied for, if needed Utility Connection PermitsTo be applied for, if needed Utility Repair PermitTo be applied for, if needed SWWD Project Review Erosion South Washington Control, StormWater To be applied for Watershed District (SWWD) Management, Wetlands Cumulative potential effects may be considered and addressed in response to individual EAW Item Nos. 9-18, or the RGU can address all cumulative potential effects in response to EAW Item No. 19. If addressing cumulative effect under individual items, make sure to include information requested in EAW Item No. 19 9. LAND USE a.Describe: i.Existing land use of the site as well as areas adjacent to and near the site, including parks, trails, prime or unique farmlands. The site is an existing industrial facility that manufactures plastic products. The project site primarily consists of existing industrial buildings, storage silos, and paved parking and drive areas for employees and transport trucks. Adjacent areas include industrial and commercial properties, with agricultural and residential property in the greater vicinity. Wag Farms Dog Park is located one quarter mile east of the facility. Hamlet Park and Woodridge Park are located within one mile of the project site and Grey Cloud Dunes Scientific and Natural page 7 Area is located over one mile southwest. There are no parks or trails within the project site. A portion of the site is considered prime farmland (Figure 5). Greater discussion of onsite soils is provided in Item 10. ii.Plans. Describe planned land use as identified in comprehensive plan (if available) and any other applicable plan for land use, water, or resources management by a local, regional, state, or federal agency. The City of Cottage Grove has identified planned land use for this area in the Cottage Grove 2030 Comprehensive Plan. The 2030 Comprehensive Plan was adopted March 2011. Comprehensive Plan is to continue to maintain and revitalize existing residential, industrial, and commercial areas. The 2030 Comprehensive Plan identified this area as planned future industrial land, including manufacturing and distribution of industrial goods. The 2040 Draft Comprehensive Plan, though currently under development, is anticipated to take effect December 2018. The 2040 Planned Land Use map also designates this area for industrial use. The project site is within the South Washington Watershed District (SWWD). The SWWD Watershed Management Plan aims to address local issues of flooding, natural resources, groundwater sustainability, water quality, and climate change. The SWWD is responsible for enforcing district rules to improve water quality and manage stormwater runoff within the watershed. The City of Cottage Grove 2040 Draft Comprehensive Plan contains a Local Surface Water Management Plan (LSWMP) that was enacted in 2008 and updated in 2018 as per Minnesota Statutes 103B. The LSWMP serves to meet the requirements of the SWWD. iii.Zoning, including special districts or overlays such as shoreland, floodplain, wild and scenic rivers, critical area, agricultural preserves, etc. The City of Cottage Grove administers the zoning ordinance for the project site, which is I-2 General Industry (Figure 6). The City of Cottage Grove Zoning Map shows adjacent properties are zoned as I-1 Limited Industrial, I-3 Heavy Industry, PB Planned Business and I- 5 Railroad Access. U.S. Highway 61creates a land use divide, with a mix of commercial (B-2 Retail Business and B-3 General Business) and residential (R-3, R-4, and R-5 Single Family, Low Density, and Medium Density) land use. Chapter 11 of the zoning ordinance addresses Industrial Districts. I-2 General ounding, processing, packaging or treatment of products which are of a more intense use than the I-1 district. Property zoned I-2 will be located within the metropolitan urban service area g and fabrication is considered a conditional use in an I-2 district. The existing facility currently operates under a conditional use permit (CUP). page 8 The I-2 district includes performance and development standards for all uses (i.e., permitted, conditional and accessory). Development standards in an I-2 district are summarized as follows: Table 5: Minimum Lot Area, Yard, and Bulk Requirements for I-2 District I-2 2 Lot area1 acre 3 Lot width175 feet Front yard setback 40 feet Side yard setback: 1 Interior 40 feet Abutting an R district 125 feet Adjacent to a street 80 feet Rear yard setback: 60 feet Abutting an R district 100 feet Building height 45 feet Maximum building coverage 45 percent Performance stand storage, vibration, glare and heat, waste material, noise, dust and odors, landscaping, manufacture of certain products, access drives, vehicle parking, utility lines, and loading docks. There are no special districts such as shore land, floodplain, or wild and scenic rivers within the project area. The Mississippi River (over one mile south of the project site) is not a designated wild and scenic river in this part of the state but is designated as Mississippi River Corridor Critical Area (MRCCA). The 1 , including an MRCCA Overlay District with specific zoning standards. The MRCCA boundary is located over one mile south of the project site and includes the Grey Cloud Dunes Scientific and Natural Area (SNA).The project site is located outside of the MRCCA Overlay District and will not affect the SNA. b.plans listed in Item 9a above, concentrating on implications for environmental effects. Since 1985, when UNP located to the current facility site, a number of CUP approvals have been obtained for construction and expansion activities at the project site. The following provides a summary of the CUPs obtained and amended over the years for the existing facility: 1985 construction of two 100-foot towers and one 60-foot tower. This CUP also allowed for six 60-foot storage silos that were never constructed. 1990 construction of 12 storage silos, approximately 85 feet tall. 1 City ordinance: Chapter 11, Section 11-1http://www.sterlingcodifiers.com/codebook/index.php?book_id=500 page 9 1996 construction of 12 storage silos and 8 blending tanks, approximately 85 feet tall. 1998 construction of a new tower on an existing roof, resulting height of 62 feet. 1999 construction of concrete pad for long-term storage of semi-trailers. 2001 construction of new 165,600 square foot building addition with loading docks along public street frontage. 2015 construction of new 86,640 square foot building addition with loading docks along public street frontage. All of the CUPs granted for the UNP facility have included specific conditions by the City for approval, such as standards for landscaping, outdoor lighting, exterior construction materials, and grading and erosion control plans. The proposed project will not affect the existing land use. However, the proposed project will require an amendment to the c.Identify measures incorporated into the proposed project to mitigate any potential incompatibility as discussed in Item 9b above. The proposed project is compatible with existing land use and City of Cottage Grove zoning ordinances. However, an amendment to the existing CUP will be required for construction and operation of the proposed project. Height variances will be necessary for some of the proposed project components including the cooling towers and storage silos. During the site plan review of the project, specific conditions and standards, including any potential mitigation measures, will be incorporated into the approval process for the amendment to the CUP. 10. GEOLOGY, SOILS AND TOPOGRAPHY/LAND FORMS a.Geology - Describe the geology underlying the project area and identify and map any susceptible geologic features such as sinkholes, shallow limestone formations, unconfined/shallow aquifers, or karst conditions. Discuss any limitations of these features for the project and any effects the project could have on these features. Identify any project designs or mitigation measures to address effects to geologic features. The project site overlays the Shakopee bedrock formation, which consists of primarily dolostone, sandstone, and shale (Steenberg and Retzler, 2016). Surficial geology includes gravelly sand deposited from glaciofluvial terraces of the glacial Rivers St. Croix and Warren (Stanley, 2016). Depth to bedrock is between 50-100 feet. Much of Washington County receives its water supply from the Paleozoic bedrock formations containing significant groundwater reserves. Most aquifers are dominated by coarse-grained sandstone within the Jordan Sandstone or Prairie Du Chien Group (Steenberg and Retzler, 2016). There are no karst features identified within the project site. However, eight features were identified within a one-mile buffer of the project site and several more are in the vicinity. The eight features identified within a one-mile buffer are all indicated to page 10 be sinkholes and are located approximately 3,200-4,500 feet northeast of the project site boundaries (see Figure 7). There are no anticipated impacts to karst features, aquifers, or site geology as a result of this project. b.Soils and topography - Describe the soils on the site, giving NRCS (SCS) classifications and descriptions, including limitations of soils. Describe topography, any special site conditions relating to erosion potential, soil stability or other soils limitations, such as steep slopes, highly permeable soils. Provide estimated volume and acreage of soil excavation and/or grading. Discuss impacts from project activities (distinguish between construction and operational activities) related to soils and topography. Identify measures during and after project construction to address soil limitations including stabilization, soil corrections or other measures. Erosion/sedimentation control related to stormwater runoff should be addressed in response to Item 11.b.ii. Site topography is gently sloping with areas of undulation, with elevations ranging from 782 to 814 feet. The project site does not contain significantly steep slopes and generally slopes upward from southeast to northwest. The Washington County Web Soil Survey indicated the follow soil map units present on the site: Table 6: Soil Series within the Project Site Map Farmland Percent of Unit Map Unit Name Classification AOI Symbol 151BBurkhardt sandy loam, 3 Farmland of statewide 56.30% to 9 percent slopesimportance 100BCopaston loam, 0 to 6 Farmland of statewide 12.70% percent slopesimportance 411Waukegan silt loam, 0 to All areas prime farmland9.60% 2 percent slopes 7CHubbard loamy sand, 6 to Not prime farmland7.70% 12 percent slopes 151Burkhardt sandy loam, 0 Farmland of statewide 5.60% to 3 percent slopesimportance 7DHubbard loamy sand, 12 Not prime farmland5.20% to 18 percent slopes 1029Pits, gravelNot prime farmland2.10% 8Sparta loamy sand, 0 to 2 Not prime farmland0.80% percent slopes 327Dickman sandy loam, 0 to Farmland of statewide 0.00% 2 percent slopesimportance The Burkhardt sandy loam and Copaston loam make up approximately 70% of the project site. The Burkhardt series consists of somewhat excessively drained sandy loams over gravelly coarse sand, originating from loamy glacial fluvium parent material. This soil series is considered farmland of statewide importance. The Copaston series consists of well drained loam and sandy loam over bedrock, originating from loamy sediment over bedrock parent material. This soil series is page 11 considered farmland of statewide importance (see Figure 5). The remaining series each occupy less than 10% of the project site. Soil map units within the project site are predominately sandy loam or silt loam with a 0 to 10% hydric rating (non-hydric) (see Figure 5). The Web Soil Survey indicates that site K factor (erosion factor) ranges between 0.02 and 0.37 for the map units contained within the project site, with an average of 0.19. K factor values may range from 0.02 to 0.69, indicating that site erodibility factors range from very low to moderate. Site soils are moderately disturbed as the project site is primarily developed for industrial use. Construction of the project is anticipated to cause impacts to soil through grading and excavation. Total anticipated disturbance to the 86-acre project site is estimated to be approximately 15 acres. The total volume of soil moved during site grading is estimated to be approximately 100,000 cubic yards per phase of development. NOTE: For silica sand projects, the EAW must include a hydrogeologic investigation assessing the potential groundwater and surface water effects and geologic conditions that could create an increased risk of potentially significant effects on groundwater and surface water. Descriptions of water resources and potential effects from the project in EAW Item 11 must be consistent with the geology, soils and topography/land forms and potential effects described in EAW Item 10. 11. WATER RESOURCES a.Describe surface water and groundwater features on or near the site in a.i. and a.ii. below. i. Surface water - lakes, streams, wetlands, intermittent channels, and county/judicial ditches. Include any special designations such as public waters, trout stream/lake, wildlife lakes, migratory waterfowl feeding/resting lake, and outstanding resource value water. Include water quality impairments or special designations listed on the current MPCA 303d Impaired Waters List that are within 1 mile of the project. Include DNR Public Waters Inventory number(s), if any. There are no surface waters present on the UNP project site. The National Wetlands Inventory (NWI), National Hydrography Dataset (NHD), and Minnesota DNR Public Waters Inventory (PWI) were reviewed. Review of all of these data sets indicated that there are no surface waters present within the site boundaries (see Figure 8). There are eight NWI wetlands are located within one quarter mile of the project site. The wetlands identified beyond the project site boundaries are primarily Type 1/PEMA/seasonally flooded basins or Type 3/PEMC/shallow marsh communities. The NHD identified a ditch running parallel to the southern boundary of the project site, approximately 600 feet south of 95th Street South. The MN DNR PWI indicated an unnamed stream (M-051.7) located approximately 1,600 feet east and an unnamed waterbody (#82008600) located approximately 700 feet east of the project site. There are no trout streams or lakes, wildlife lakes, migratory waterfowl feeding/resting lakes, or outstanding resource value page 12 waters within the project site or a one-mile buffer. There are no MPCA 303d Impaired Waters within the project site or a one-mile buffer (see Figure 8). ii. Groundwater aquifers, springs, seeps. Include: 1) depth to groundwater; 2) if project is within a MDH wellhead protection area; 3) identification of any onsite and/or nearby wells, including unique numbers and well logs if available. If there are no wells known on site or nearby, explain the methodology used to determine this. The project site is located over the Cambrian-Ordovician aquifer system, specifically the St. Peter-Prairie Du Chien-Jordan aquifer, which is comprised of St. Peter Sandstone, the Prairie Du Chien Group, and Jordan Sandstone. Geology ranges from fine- to medium-grained sandstone and dolomite. Depth to groundwater is approximately 100 feet, based on review of well boring logs from the County Public Well Index.The project site is partially within the Cottage Grove wellhead protection area. No wells are located on the project site; however,36 are located within a one-mile buffer of the project area, as determined by the Minnesota Well Index. The nearest well is approximately 930 feet east of the project site at the Acorn Mini Storage (Well ID #441943) (see Figure 7). The UNP facility utilizes water from the City of Cottage Grove and does not operate a private well at the property. No wells will be added to the facility as part of the proposed expansion project. b. Describe effects from project activities on water resources and measures to minimize or mitigate the effects in Item b.i. through Itemb.iv. below. i.Wastewater - For each of the following, describe the sources, quantities and composition of all sanitary, municipal/domestic and industrial wastewater produced or treated at the site. 1)If the wastewater discharge is to a publicly owned treatment facility, identify any pretreatment measures and the ability of the facility to handle the added water and waste loadings, including any effects on, or required expansion of, municipal wastewater infrastructure. There is limited wastewater produced at the UNP manufacturing facility. The facility utilizes approximately 500,000 gallons of water per month or 16,500 gallons per day. Most of this water is utilized as either irrigation water or make up water for the cooling towers to replace water lost to evaporative processes. These two sources of water consumption account for over 80% of the water used at the facility and do not result in wastewater discharges. The only wastewater discharges from the facility are limited amount of industrial process water discharge and the domestic use wastewater from restroom facilities. These two discharges account for less than 20% of the water consumed at the facility. Wastewater is discharged to the City of Cottage Grove wastewater sewer system where it is ultimately conveyed to the Metropolitan Council Metro Wastewater Treatment Plant (WWTP). page 13 The proposed expansion project will double the amount of water used and the site, thereby increasing the amount of wastewater discharged from the facility. All domestic and industrial wastewater discharges from the proposed combined facility will continue to be sent to the City of Cottage Grove wastewater sewer system and conveyed to the Metro WWTP. Both the existing City sewer system and Metro WWTP have the capacity to accommodate the increased wastewater flows from the proposed combined facility. No other measures are needed to accommodate the increased wastewater that will be produced by the proposed facility. 2)If the wastewater discharge is to a subsurface sewage treatment systems (SSTS), describe the system used, the design flow, and suitability of site conditions for such a system. The existing facility does not utilize an SSTS for wastewater discharges. There are no plans to utilize an SSTS at the facility as part of the expansion project. 3)If the wastewater discharge is to surface water, identify the wastewater treatment methods and identify discharge points and proposed effluent limitations to mitigate impacts. Discuss any effects to surface or groundwater from wastewater discharges. There are no wastewater discharges to surface water at the existing UNP facility. There will be no additions of wastewater discharges to the facility as part of the expansion project. ii.Stormwater - Describe the quantity and quality of stormwater runoff at the site prior to and post construction. Include the routes and receiving water bodies for runoff from the site (major downstream water bodies as well as the immediate receiving waters). Discuss any environmental effects from stormwater discharges. Describe stormwater pollution prevention plans including temporary and permanent runoff controls and potential BMP site locations to manage or treat stormwater runoff. Identify specific erosion control, sedimentation control or stabilization measures to address soil limitations during and after project construction. The project site is an industrial facility that is a mix of impervious surface and lawn/landscaping lands. Approximately 50% of the project site is impervious surface and the remaining 50% is mowed lawn and landscaping. The UNP facility operates under an existing industrial stormwater Multi-Sector General Permit MNR050000 from the MPCA and has an active Stormwater Pollution Prevention Plan (SWPPP). Currently, site stormwater is directed to two stormwater features in the southwest portion of the property. SWWD District Rules Chapter 7.3 states that sites must not exceed the pre-project runoff rates for the 2, 10, and 100-year, 24-hour Atlas 14 durations. This standard is applied to the entire site. The goal of stormwater management is to reduce and control stormwater, soil erosion, and sedimentation, while establishing standards and specifications page 14 for conservation practices and planning activities. Appropriate stormwater management practices will enhance water quality, minimize stormwater pollution, soil erosion, and sediment in waterways, and control the volume of water runoff to receiving streams and other water resources. A conceptual site design has been developed for the proposed expansion project (see Figure 3). As part of the expansion project there will be approximately 15 acres of additional impervious surfaces added to the site. The conceptual design shows two new stormwater retention ponds that will be added to the facility to control and treat stormwater runoff from the expansion areas. The final detailed design and engineering of the project site is currently underway by UNP. The final site design will be required to meet SWWD rules for stormwater management including water quality treatment and runoff rates. UNP will submit the stormwater plan for the expansion project to the SWWD for review and comment to ensure the requirements are met. The proposed expansion project will disturb more than one acre of land and therefore will trigger the need for a National Pollutant Discharge Elimination System (NPDES) stormwater permit. Construction best management practices (BMPs) for erosion prevention and sedimentation control, such as silt fences, will be implemented on site and will comply with the MPCA Stormwater Management Manual as well as NPDES requirements.The project will also implement a temporary construction SWPPP. Construction BMPs for erosion prevention and sedimentation control, such as storm drain inlet protection, silt fences, and temporary sediment basins (if required) will be implemented on site and will comply with the MPCA Stormwater Management Manual. Implementation of the SWPPP and identified stormwater BMPs will ensure stormwater runoff from proposed construction project will not impact downstream receiving waters. iii.Water appropriation - Describe if the project proposes to appropriate surface or groundwater (including dewatering). Describe the source, quantity, duration, use and purpose of the water use and if a DNR water appropriation permit is required. Describe any well abandonment. If connecting to an existing municipal water supply, identify the wells to be used as a water sourceand any effects on, or required expansion of, municipal water infrastructure. Discuss environmental effects from water appropriation, including an assessment of the water resources available for appropriation. Identify any measures to avoid, minimize, or mitigate environmental effects from the water appropriation. Current water useat the facility is approximately 500,000 gallons per month or 16,500 gallons per day. Water is provided by the City of Cottage Grove. Water use on site is divided between grounds and domestic use, including lawn and irrigation use and personnel use, and industrial processes, including the RO system for heat exchanger systems and process water. Industrial water use is approximately 40 percent of total site consumption. Domestic wastewater accounts for 10 percent of water consumption and the remaining water consumed at the site is utilized for lawn and landscaping irrigation. page 15 The proposed expansion project will result in more water consumption at the site, in the form of increased industrial water that is mainly consumed as make-up water in the cooling system to account for evaporative losses. The other increase in water consumption will be for domestic uses as the number of employees at the facility will increase substantially. UNP has stated that they will request an additional 500,000 gallons per month from the City of Cottage Grove. The existing City water supply system has adequate capacity to supply the requested increase in water that would be needed for the expansion project. There are no upgrades needed to the water plant or water supply system to convey the increased water volume to the facility. No additions to the City water system are needed to accommodate the increased water consumption by the proposed project. iv.Surface Waters a) Wetlands - Describe any anticipated physical effects or alterations to wetland features such as draining, filling, permanent inundation, dredging and vegetative removal. Discuss direct and indirect environmental effects from physical modification of wetlands, including the anticipated effects that any proposed wetland alterations may have to the host watershed. Identify measures to avoid (e.g., available alternatives that were considered), minimize, or mitigate environmental effects to wetlands. Discuss whether any required compensatory wetland mitigation for unavoidable wetland impacts will occur in the same minor or major watershed and identify those probable locations. There are no proposed impacts to wetlands as part of this project. There are no wetlands present on the project site. b) Other surface waters- Describe any anticipated physical effects or alterations to surface water features (lakes, streams, ponds, intermittent channels, county/judicial ditches) such as draining, filling, permanent inundation, dredging, diking, stream diversion, impoundment, aquatic plant removal and riparian alteration. Discuss direct and indirect environmental effects from physical modification of water features. Identify measures to avoid, minimize, or mitigate environmental effects to surface water features, including in-water Best Management Practices that are proposed to avoid or minimize turbidity/sedimentation while physically altering the water features. Discuss how the project will change the number or type of watercraft on any water body, including current and projected watercraft usage. There are no proposed impacts to other surface waters. There are no surface waters present on the project site. 12. CONTAMINATION/HAZARDOUS MATERIALS/WASTES a.Pre-project site conditions - Describe existing contamination or potential environmental hazards on or in close proximity to the project site such as soil or page 16 ground water contamination, abandoned dumps, closed landfills, existing or abandoned storage tanks, and hazardous liquid or gas pipelines. Discuss any potential environmental effects from pre-project site conditions that would be caused or exacerbated by project construction and operation. Identify measures to avoid, minimize or mitigate adverse effects from existing contamination or potential environmental hazards. Include development of a Contingency Plan or Response Action Plan. The UNP property is located in an industrial area within Cottage Grove and is ive website as having several permits including the General Industrial Stormwater Permit, Very Small Quantity Hazardous Waste Generator, an Above Ground Storage Tank, and an Underground Storage Tank. There are no clean up or investigation efforts listed for the UNP facility. There have been no spills of hazardous materials or wastes at the facility during the time it has been owned and operated by UNP. There is no know contamination at the existing facility. the other adjacent industrial properties also hold various permits from the MPCA including Industrial Stormwater Permits, Hazardous Waste Generator (various), Storage Tanks (various), and Air Emission Permits. There are no listed investigation and/or clean-up sites shown on the MPCA website for the properties adjacent to the UNP facility. b.Project related generation/storage of solid wastes - Describe solid wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from solid waste handling, storage and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of solid waste including source reduction and recycling. The existing facility generates some waste during the manufacturing process. Most of the plastic raw material that is used in the blown film manufacturing process is consumed while making the film and there is very little waste byproduct that is generated. There is a limited amount of scrap film or off-spec product that is generated, which cannot be reprocessed or recycled into other products, and becomes waste. Other wastes generated at the facility include oil-based wastes from cleaning or maintaining the equipment, ink-based wastes from ink used for printing on the manufactured plastic, domestic waste from employees and daily plant and office operations, used electronics, and scarp wood, metal, and cardboard generated from the packaging or shipping processes. All wastes generated by the facility are managed by licensed waste contractors. UNP uses different licensed waste haulers to collect and dispose the oil-based wastes, ink-based wastes, and domestic wastes. The scrap wood, metal, cardboard, and used electronics are also collected by a licensed hauler and recycled when possible. The proposed expansion project will produce some different plastic products compared to the existing facility such as trash bags, but the new facility will utilize the same blown film production process. As a result, the wastes generated as part of the expansion project will be of the same type and nature as is currently generated at the facility. As the total production capacity of the facility increases, the total amount of waste produced at the facility will also increase. UNP will continue to page 17 utilize the same licensed waste haulers for the various wastes generated by the facility to ensure property disposal and recycling of all waste materials as applicable. c.Project related use/storage of hazardous materials - Describe chemicals/hazardous materials used/stored during construction and/or operation of the project including method of storage. Indicate the number, location and size of any above or below ground tanks to store petroleum or other materials. Discuss potential environmental effects from accidental spill or release of hazardous materials. Identify measures to avoid, minimize or mitigate adverse effects from the use/storage of chemicals/hazardous materials including source reduction and recycling. Include development of a spill prevention plan. The existing UNP manufacturing plant utilizes LDPE, LLDPE and HDPE raw materials in ablown film process. The plastic raw materials that are shipped to the site do have some components that are potentially hazardous under certain conditions. However, in the form that the plastic pellets arrive and are utilized within the facility, these chemicals are encapsulated within the plastic and not an available hazard or source of exposure. The expansion project will utilize similar raw materials for plastic production and will not add a new source of hazardous materials to the blown film process. There are some hazardous materials stored and used at the existing plastics manufacturing facility.There is a 1,000 gallon above ground propane tank located at the facility; the propane is used to fuel the forklifts. There are also 2 diesel fuel tanks used for fueling tractors. Other hazardous materials include some of the inks used in the flexographic printing on the plastic products. There are also chemical solvents, paints, and lubricants used at the facility that have hazardous components. All hazardous materials, except for the propane and diesel tanks, are stored inside the facility and their use is controlled by appropriately trained staff. The proposed expansion project will generally use similar materials to those currently used at the existing facility and as a result of the increased facility production the total amount of these hazardous materials will increase proportionally. There will be some ink products or solvents used as part of the expansion facility that could be different from those currently onsite. These hazardous materials will be stored and handled in the same manner as is currently done for the existing facility. d.Project related generation/storage of hazardous wastes - Describe hazardous wastes generated/stored during construction and/or operation of the project. Indicate method of disposal. Discuss potential environmental effects from hazardous waste handling, storage, and disposal. Identify measures to avoid, minimize or mitigate adverse effects from the generation/storage of hazardous waste including source reduction and recycling. There is a small amount of hazardous waste generated at the existing manufacturing facility. The UNP facility is listed as a very small quantity hazardous waste generator and holds permits for this generator status from the MPCA and Washington County. Hazardous wastes generated at the facility include oil related wastes, as well as lubricants, solvents, mineral spirits, and waste ink. UNP uses licensed private waste hauling contractors to collect and dispose of all hazardous waste materials generated at the existing facility. The licensed waste disposal contractors are responsible for page 18 ensuring all hazardous waste materials are handled and disposed of by following State and Federal rules. The proposed expansion project will generally utilize the same oil products, lubricants, solvents, and ink used at the existing facility. The increased in plastic production at the facility will result in a corresponding increased amount of hazardous waste generated at the facility. UNP will continue to utilize licensed waste disposal contractors to ensure all hazardous wastes generated at the facility are handled and disposed as required by State and Federal rules. 13. FISH, WILDLIFE, PLANT COMMUNITIES, AND SENSITIVE ECOLOGICAL RESOURCES (RARE FEATURES) a.Describe fish and wildlife resources as well as habitats and vegetation on or in near the site. The project site is primarily industrial development with impervious surfaces and the remainder is open turf grass/maintained lawn. Some tree cover is present, though this is planted landscaping and does not provide significant woody cover or continuous habitat. The project site does not provide significant habitat or resources for fish and wildlife. South and east of the site boundaries are small undeveloped parcels with woody habitat and natural vegetation communities. The quality of these areas is unknown; however, due to their proximity to the site, may allow site use by small songbirds and mammals typical to lawns, grasses, shrubs and other habitats typical of urban environments. b.Describe rare features such as state-listed (endangered, threatened or special concern) species, native plant communities, Minnesota County Biological Survey Sites of Biodiversity Significance, and other sensitive ecological resources on or within close proximity to the site. Provide the license agreement number (LA-____) and/or correspondence number (ERDB _____________) from which the data were obtained and attach the Natural Heritage letter from the DNR. Indicate if any additional habitat or species survey work has been conducted within the site and describe the results. Under Limited License to Use Copyrighted Material (LA 917, 140076) related to Rare Features Data, the Minnesota Department of Natural Resources (DNR) Natural Heritage Information System (NHIS) was searched in July 2018 to identify sensitive or rare species, habitats or ecological communities within a 1-mile radius of the project site. The search results and an analysis of the potential impacts from the identified species in the search area were submitted to the DNR for concurrence in August 2018 (see Appendix 1). Concurrence and an associated ERDB number are pending. Results of the query indicate two state listed species of concern, two state listed endangered species, and one federally listed species may have been documented within the vicinity of the project site. The four state listed species include the Loggerhead shrike (Lanius ludovicianus), Western foxsnake (Patherophis ramspottiVireo belli), and Long-bearded hawkweed (Hieracium lonigipilum). The fifth species included in the query results was the rusty patched bumblebee (Bombus affinus), listed as federally endangered. page 19 The project site does not provide potential habitat for the rusty patched bumble bee, Western foxsnake, or long-bearded hawkweed. The project site is a mix of developed impervious surface for industrial manufacturing and maintained turf grass, with sparse trees. There is no native prairie or pollinator habitat within the project site. The presence of open grassy areas with sparse trees may support site use by several dense brush near water) are not present within the project site (NatureServe 2 Explorer, accessed 2018). According to the DNR website, the loggerhead shrike requires pastures and grasslands with sparse trees and fence lines for impaling food (MNDNR, 1996). There are no naturally vegetated or native grasslands on the project site. Green space within the project site is heavily managed as landscaping and the overall industrial use of the site makes it unlikely to provide habitat. The expansion will occur in the northern point of the parcel with additional parking in the northwest corner. Primary impacts will occur to previously developed impervious surfaces or maintained turf grass. c.Discuss how the identified fish, wildlife, plant communities, rare features and ecosystems may be affected by the project. Include a discussion on introduction and spread of invasive species from the project construction and operation. Separately discuss effects to known threatened and endangered species. There are no anticipated effects to fish, wildlife, plant communities, rare features, sensitive species or ecosystems because of this project. Areas proposed for impact consist of impervious surface or turfgrass and do not provide habitat for wildlife. d.Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to fish, wildlife, plant communities, and sensitive ecological resources. There are no anticipated effects to fish, wildlife, plant communities, or sensitive ecological features as a result of this project and therefore no mitigation measures are proposed. 14. HISTORIC PROPERTIES Describe any historic structures, archeological sites, and/or traditional cultural properties on or in close proximity to the site. Include: 1) historic designations, 2) known artifact areas, and 3) architectural features. Attach letter received from the State Historic Preservation Office (SHPO). Discuss any anticipated effects to historic properties during project construction and operation. Identify measures that will be taken to avoid, minimize, or mitigate adverse effects to historic properties. The Minnesota State Historic Preservation Office (SHPO) was consulted to determine if there are known archaeological and historic resources in the project area. A report generated by SHPO (Appendix 2) from a search conducted of the Minnesota Archaeological Inventory and Historic Structures Inventory did not identify any archaeological sites or historical structures on or immediately adjacent to the project site. Eleven previously identified 2 MNDNR, NatureServe Explorer, accessed 2018 http://files.dnr.state.mn.us/eco/rsg/shrikeflyer.pdf page 20 architectural/historical resources were identified within the vicinity, with the nearest property located approximately500 feet southeast of the project site across Jamaica Avenue (see Figure 9). The proposed expansion project will take place on the existing UNP property and will have a similar appearance and operations as the existing facility. The proposed expansion of the UNP manufacturing facility will not result in impacts to the architectural/historical properties located in the vicinity of the project site. 15. VISUAL Describe any scenic views or vistas on or near the project site. Describe any project related visual effects such as vapor plumes or glare from intense lights. Discuss the potential visual effects from the project. Identify any measures to avoid, minimize, or mitigate visual effects. There are no scenic views or vistas on the project site. Existing buildings range from 30 feet tall for the existing manufacturing facility up to heights of 102 feet tall for the cooling towers and storage silos (see Table 2).The expansion project will add new manufacturing space to the project site including a new manufacturing and warehouse with a building height of 37 feet. Proposed additions to the UNP facility will also include a new cooling tower with varying heights and 22 new silos, ranging from 64to 97 feet tall, with a potential of an additional 6 silos at 97 feet tall, to be installed in the future to account for product mix variability. This property already contains buildings of significant height and is used for industrial purposes, as are the surrounding properties. Additionally, a railroad line and Highway61 are located immediately north. The nearest residential property is located a quarter mile north of the facility on the north side of Highway 61. The items that would be added as part of the proposed expansion project will have a similar appearance and heights compared to the existing infrastructure at the facility. There are screening measures employed at the facility to obstruct the existing infrastructure including fencing, landscape vegetation, and berms. UNP has an existing CUP from the City of Cottage for the facility, that includes some variances for the heights of the existing site features. UNP will be required to update the CUP to include the new features of the proposed expansion project. The CUP will potentially include permit conditions that UNP will be required to meet in order to be granted the height variances for the proposed expansion project. UNP has had preliminary discussions with the City of Cottage Grove regarding CUP conditions that may be required, such as screening measures, that will need to be implemented as part of the expansion project to ensure there are not visual impacts in the areas adjacent to the project site. As part of the expansion project UNP will utilize the same screening techniques as the existing facility, including berms, vegetation, and fencing to provide a visual shield for the features that will be added to the facility. 16. AIR a.Stationary source emissions - Describe the type, sources, quantities and compositions of any emissions from stationary sources such as boilers or exhaust stacks. Include any hazardous air pollutants, criteria pollutants, and any greenhouse gases. Discuss effects to air quality including any sensitive receptors, human health or applicable regulatory criteria. Include a discussion of any methods used assess the Identify pollution page 21 control equipment and other measures that will be taken to avoid, minimize, or mitigate adverse effects from stationary source emissions. Air emissions in Minnesota are regulated by the MPCA. There are no air emission sources at the existing UNP facility that require an air permit and the existing facility does not operate under an air permit. The proposed expansion of the plastic manufacturing plant will not result in an increase of air emissions that would result in the need for air permitting. b.Vehicle emissions - -related emissions effect on air quality. Identify measures (e.g. traffic operational improvements, diesel idling minimization plan) that will be taken to minimize or mitigate vehicle-related emissions. There are vehicles that access the UNP facility each day including site employees and trucks to transport finished product to the market place. All parking and travel areas on the UNP site are paved and all vehicle travel at the facility is on paved surfaces which limits the amount of vehicle related dust produced at the facility. Trailers are loaded with finished product at the site and then hooked to trucks for transport offsite. The preloading of trailers reduces the amount of time trucks spend at the site with idling engines, which serves to reduce the amount of vehicle related emissions at the site. The proposed expansion project will increase the production capacity of the facility and will result in additional employee vehicles and trucks accessing the facility. Vehicles will continue to travel on paved surfaces while at the facility limiting dust potentially generated by vehicle traffic. Trucks accessing the site to deliver finished product will continue to be on site for short periods limiting the amount of exhaust emissions produced at the facility. c.Dust and odors - Describe sources, characteristics, duration, quantities, and intensity of dust and odors generated during project construction and operation. (Fugitive dust may be discussed under item 16a). Discuss the effect of dust and odors in the vicinity of the project including nearby sensitive receptors and quality of life. Identify measures that will be taken to minimize or mitigate the effects of dust and odors. There are some potential odor sources associated with the production of plastic, such as the extrusion of plastic. However, these industrial processes are contained within the manufacturing buildings which mitigates odors at the facility. There are no discernable odors on the facility grounds and there have been no odor complaints reported at the facility. The production of fragrance scented trash bags as part of the proposed expansion project will be a new potential source of odors at the facility. The new manufacturing processes proposed for the expansion project will also be located indoors reducing the potential for odors outside or on adjacent properties. UNP will take appropriate measures to control odors emitted from the manufacturing building or leaving the project site to ensure adjacent properties are not impacted. There is very limited dust generated at the facility. All surfaces for vehicle traffic at the facility are paved which limits the amount of dust produced by vehicles. The raw materials used in the manufacturing process are transported to the facility primarily page 22 via rail cars. These raw product pellets have very limited attached particulate dust. The pellets are transported from the rail cars to the storage silos and manufacturing plant via an enclosed conveyance system which produces only minimal dust. The plastic manufacturing process takes place indoors which limits the amount of particulate dust emitted from the facility. There are controls in place to manage dust, limiting the amount of dust that enters as well as leaves the building. It is important that the blowers used in the blown plastic film production process have clean air free of particulate matter. Therefore, UNP employs filters on the blower intakes to limit the amount of dust that is taken into the building. There are also air scrubbers used on the conveyance system to ensure the raw material plastic product is dust free when used in the blown film production process. There are also dust collectors on the conveyance exhaust systems to control dust emitted from the facility. UNP will continue to employ these same dust control processes as needed for the expansion project to minimize dust within the manufacturing facility as well as dust emitted from the plant. 17. NOISE Describe sources, characteristics, duration, quantities, and intensity of noise generated during project construction and operation. Discuss the effect of noise in the vicinity of the project including 1) existing noise levels/sources in the area, 2) nearby sensitive receptors, 3) conformance to state noise standards, and 4) quality of life. Identify measures that will be taken to minimize or mitigate the effects of noise. There are noise sources at the existing plastics manufacturing plant that produce noise from daily operations. Noise sources include vacuum pumps, electric motors, compressors, conveyance systems, blowers, grinders, and shredders. Most of the industrial processes used in the manufacturing of plastics are located indoors within one of the buildings at the facility and the conveyance systems are also enclosed. Vehicle, truck, and rail traffic also create noise at the facility. Noise levels in Minnesota are regulated by the MPCA under Minnesota Rules Chapter 7030, which establishes allowable noise levels within industrial, commercial, and residential areas. The noise rules also establish daytime and nighttime allowable noise levels. Allowable noise levels are higher during daytime periods compared to nighttime periods. Additionally, allowable noise levels are higher within industrial areas compared to commercial areas, and within commercial areas compared to residential areas. The project site is located within an industrial area of Cottage Grove and is adjacent to other industrial properties as well as US Highway 61. The nearest residential noise receptor is located north of US Highway 61, approximately one quarter mile from the facility. A noise survey was completed at the facility in 2011, which included noise measurements both inside the facility to evaluate occupational noise and measurements outside of the facility on UNP property to assess community noise (see Appendix 3). The community noise assessment measured noise levels at three locations at the edge of the UNP property. Noise level measurements were compared to both daytime and nighttime noise standards for residential areas, which have the lowest allowable noise levels. The measured noise levels on the UNP property were found to be below both daytime and nighttime levels for industrial and residential properties. page 23 There has been one noise compliant that was reported approximately five years ago from a residential property located north of US Highway 61. The noise complaint was associated with an isolated operational issue that was addressed by eliminating the source of noise. There have been no additional noise complaints reported to the facility since that time. UNP does administer noise mitigation measures within the facility. Most processes are contained within the plant which helps to mitigate noise impacts. Additionally, mufflers, baffles, and other noise control measures are used on pumps, exhaust vents, and conveyance systems to control noise produced at the plant. These measures help to ensure noise levels are not exceeded. The industrial process associated with the expansion project will operate in the same manner as the existing facility. Most of the industrial activities will be located within the new enclosed buildings and similar noise reduction practices (i.e. mufflers or baffles) will be utilized where appropriate on the new equipment. UNP will take these noise control measures to ensure the facility continues to comply with state noise standards. Construction of the expansion project will result in the addition of some temporary noise sources at the facility associated with the equipment used for construction (i.e. trucks, heavy equipment., cutting, welding). These noise sources will be temporary and limited to the time of construction. There have been past construction projects at the UNP facility such as the warehouse expansion completed in 2015. There have been no reported noise issues or complaints associated with past construction projects at the facility. The location of the facility and the expansion project within an industrial area combined with the continued implementation of noise control measures at the facility will ensure the UNP manufacturing plant does not exceed allowable noise levels. UNP continues to measure occupational noise within the manufacturing plant to protect workers and will monitor and address community noise level issues as needed to ensure noise produced at the facility are within allowable standards. 18. TRANSPORTATION a.Describe traffic-related aspects of project construction and operation. Include: 1) existing and proposed additional parking spaces, 2) estimated total average daily traffic generated, 3) estimated maximum peak hour traffic generated and time of occurrence, 4) indicate source of trip generation rates used in the estimates, and 5) availability of transit and/or other alternative transportation modes. th The existing UNP facility is located on 95 Street immediately west of the th intersection of 95 Street with Jamaica Avenue (see Figure 2). Traffic entering and exiting the facility includes employees, trucks transporting finished manufactured plastic products, and deliveries. There are currently 266 employees at the UNP facility. Approximately 140 employees access the facility each day. For the daily workers traveling to the facility, 116 of the employees are split between working in two sperate 12-hour shifts in the manufacturing plant from approximately 6:30 AM to 6:30 PM, and then from approximately 6:30 PM to 6:30 AM. Each shift has relatively equal number of employees within the plant. The remaining 24 employees work in the office and warehouse, generally following an 8:00 AM to 5:00 PM work day. The facility receives 10 to 15 deliveries each day that are evenly spaced throughout the day. Raw materials used in plastic production are transported to the page 24 facility primarily via rail, however finish products are transported from the facility primarily via trucks. There are approximately 14 truck shipments on average each day (400 per month) carrying finished plastic products to the market place. Due to the shifts worked by the employees within the manufacturing plant, the majority of traffic accessing the site does so outside of the normal AM Peak (7:00 AM to 9:00 AM) and PM Peak (4:00 AM to 6:00 PM) traffic periods. th Traffic that accesses the facility does so via two site access points off of 95 street, one for employees and one for trucks transporting finished products (see Figure 3). The vast majority of all traffic (employees and trucks) travel to and from the site via US Highway 61, either from the north or south, exiting at Jamaica Avenue and then th to 95 Street to the site access. There are currently 300 parking spaces for vehicles in the employee parking lot and an additional 70 parking spaces near the site office. There is space for between 400 and 500 truck trailers to be parked at the facility to be loaded with finished product (see Figure 3). All parking areas for the manufacturing plant, office, and trailer storage areas are paved. There are no gravel parking areas at the site. The proposed expansion project would add approximately 240 new employees total, with an additional 140 daily workers accessing the facility. On average, the expansion project will also add 10 to 15 daily deliveries and 17 daily product shipments via trucks to the existing facility. The additional cars and trucks accessing the UNP facility would use both the existing site access point, along with an additional entry point off of Ideal Ave, located west of the current 86 acre site.The entry area off of Ideal will be manicured in a way to allow for employee and truck traffic to access the new facility. The additional workers added to operate the expanded manufacturing facility would also work in shifts, matching the times listed above for the existing facility. 207 parking spaces will be added on the west side of the property to allow for employee parking. The proposed manufacturing plant expansion area, new warehouse space, and additional storage silos will be constructed on a portion of the area currently occupied with truck trailers. The new location for these displaced trailers will be determined in the future. A comparison of the total daily traffic accessing the site under the current and proposed expansion project conditions is provided in Table 7. Table 7: Total daily traffic accessing the Up North Plastics Facility for existing, proposed addition, and final combined facility conditions. Finished Daily Total Total Deliveries Product Truck Employees Vehicles Trips Shipments Existing Facility14010-1514169338 Expansion 14010-1517172344 Proposed Addition Total Combined 28020-3031341682 Facility page 25 b.Discuss the effect on traffic congestion on affected roads and describe any traffic regional transportation system. If the peak hour traffic generated exceeds 250 vehicles or the total daily trips exceeds 2,500, a traffic impact study must be prepared as part of the EAW. Use the Access Management Manual, Chapter 5 (available at: http://www.dot.state.mn.us/accessmanagement/resources.html) or a similar local guidance, The proposed expansion project will increase traffic accessing the site and on the surrounding roadway network. The Minnesota Department of Transportation (MnDOT) 2017 daily traffic volume maps were reviewed for the roadways in the project area. The existing facility currently has approximately 169 vehicles traveling to and from the project site each day, which results in approximately 338 daily traffic th trips. This represents approximately six percent of the traffic on 95 Street, three percent of the traffic on Jamaica Avenue south of Highway 61, one percent of the southbound traffic on Highway 61, and six percent of the northbound traffic on Highway 61. The proposed expansion project would essentially double the daily traffic accessing the site compare to the existing conditions. However, this additional traffic would still account for a relatively low percentage of traffic on the local roadway network. A comparison of the traffic trips from the existing and proposed expansion project compared to the daily traffic volumes on the local roadway network is shown in Table 8. Table 8: Comparison of the traffic from the existing, proposed addition, and final combined facility conditions at the UNP facility as a percentage of local roadway traffic. Existing Facility Proposed Facility 2017 Daily Traffic (338 Daily Traffic (872 AADT Trips) Percentage Trips) Percentage th 95Street5,7006.0%11.9% Jamaica Avenue12,0002.8%5.7% US Highway 61 40,0000.8%1.7% South US Highway 61 5,8005.8%11.8% North Employees will continue to access the site in shifts, as the staff operating the manufacturing plant would continue to work in two twelve-hour shifts. These shifts begin and end outside of the standard AM and PM traffic peaks which reduces the contribution that traffic from the UNP facility makes to traffic operations during peak times. The intersection of Highway 61 includes multi-lane roundabouts at the exit and entrance ramp intersections with Jamaica Avenue. The intersection of Jamaica th Avenue with 95 Street includes full turn lanes on Jamaica Avenue to accommodate th turning traffic. The Jamaica Avenue/95 Street intersection is controlled with stop signs on all approaches. page 26 Impacts to traffic operations from the proposed project are expected to be minimal due to the combination of peak trip generation for the facility occurring outside of standard weekday traffic peaks and the capacity available on the surrounding roadway network. No traffic improvements are anticipated to be needed to accommodate the proposed project. The existing site access points for employees and truck traffic can accommodate the traffic from the proposed expansion project without site improvements. c.Identify measures that will be taken to minimize or mitigate project related transportation effects. No traffic improvements are anticipated to be needed to accommodate the proposed th project. The current site access point along 95 Street will not require improvements or changes. Impacts to traffic operations from the proposed project are expected to be minimal due to the combination of peak trip generation for the facility occurring outside of standard weekday traffic peaks and the capacity available on the surrounding roadway network. The manufacturing plant operates in shifts which spreads out the employees arriving and leaving the facility across shift change times instead of concentrating this traffic during the AM and PM peaks of the standard 8:00 AM to 5:00 PM work day. No project specific traffic management or roadway improvement practices are needed to accommodate the proposed project. 19. CUMULATIVE POTENTIAL EFFECTS (Preparers can leave this item blank if cumulative potential effects are addressed under the applicable EAW Items) a.Describe the geographic scales and timeframes of the project related environmental effects that could combine with other environmental effects resulting in cumulative potential effects. The project will be located on an 86-acre site which is the location of the existing UNP plastic manufacturing facility in Cottage Grove, MN. The proposed expansion project is expected to begin construction during the first quarter 2019, in approximately March, and take 18 to 24 months. Initial start up of the expansion project is estimated to be fourth quarter 2020, with full production capacity of the project reached by third quarter 2022. The proposed project is an expansion of the existing UNP facility which has been operating at the project site in Cottage Grove since 1990. There have been previous expansion projects conducted at the project site that have not resulted in environmental impacts or concerns. As a result, there is limited potential for cumulative environmental effects to occur as a result of the proposed project. Several environmental effects are likely to occur form construction of the project. These effects primarily include changes in land use, stormwater runoff and traffic. The new expansion project will be constructed on the existing UNP site and will convert lawn/landscaping areas and parking areas over to the new manufacturing and warehousing facility. The project site is located in an existing industrial area within Cottage Grove and the site is zoned for industrial use. The proposed page 27 expansion project is consistent with the other uses at the existing facility and will have a similar appearance. UNP will be required to obtain an amended CUP from the City of Cottage Grove. As part of the CUP process UNP will be required to obtain a height variance for the cooling towers and storage silos. The project will increase impervious surfaces which will increase the amount of stormwater runoff generated at the site. There is existing stormwater infrastructure are the site to collect and manage runoff. New stormwater conveyance pipes and a new stormwater pond will be added to the project site to accommodate and treat the additional runoff and ensure cumulative impacts do not occur. The project will generate additional traffic from construction and operation of the project. A new site access point off of Ideal Avenue will be added so workers can access the expansion facility. The existing roadway network has adequate capacity to handle the existing and proposed traffic from the expansion project. The UNP facility will continue to operate in shifts and as a result the majority of traffic accessing the site will travel outside of the AM and PM peak traffic travel periods, minimizing the potential for cumulative effects. b.Describe any reasonably foreseeable future projects (for which a basis of expectation has been laid) that may interact with environmental effects of the proposed project within the geographic scales and timeframes identified above. The expansion proposed project will be located on existing UNP project site in a developed industrial portion of the Cottage Grove. There are no known reasonably foreseeable future projects that would potentially interact with the proposed project to create cumulative environmental impacts. 20. OTHER POTENTIAL ENVIRONMENTAL EFFECTS If the project may cause any additional environmental effects not addressed by items 1 to 19, describe the effects here, discuss the how the environment will be affected, and identify measures that will be taken to minimize and mitigate these effects. There are no other anticipated environmental effects from the proposed project that have not been addressed or described within the preceding sections of the EAW. page 28 RGU CERTIFICATION.(The Environmental Quality Board will only accept SIGNED Environmental Assessment Worksheets for public notice in the EQB Monitor.) I hereby certify that: The information contained in this document is accurate and complete to the best of my knowledge. The EAW describes the complete project; there are no other projects, stages or components other than those described in this document, which are related to the project as connected actions or phased actions, as defined at Minnesota Rules, parts 4410.0200, subparts 9c and 60, respectively. Copies of this EAW are being sent to the entire EQB distribution list. Signature _______________________________ Date __________________________ Title ________________________________ page 29 Appendix August 14, 2018 Lisa Joyal Endangered Species Review Coordinator Minnesota Department of Natural Resources 500 Lafayette Road, Box 25 St. Paul, MN 55155 RE:NHIS Query Concurrence Request Up North PlasticsEAW Wenck File # 7526-0001 Ms. Joyal: Up North Plastics, Inc.is preparing a mandatoryenvironmental assessment worksheet (EAW) for the proposed expansion of their plastics manufacturing facilityin the City of Cottage Grove, Minnesota (Figure 1 Site Location). The expansion will include a new 416,000 square foot facility within the existing property for the production of trash bag and plastic sheeting products. Accompanying structures include a warehouse, truck parking, silos for storing material, andnewrailroad spurs. Features Data, the Minnesota Department of Natural Resources (DNR) Natural Heritage Information System (NHIS) was searched in July2018 to identify any species within a 1-mile radius of the project site. The NHIS search indicated fivespecies and one ecological community that have been recorded within one mile of the project site. These include the federally endangered rusty-patched bumble bee (Bombus affinis), state endangered Loggerhead shrike (Lanius ludovicianus), Western foxsnake(Pantherophis ramspotti),state special concern vireo(Vireo belii), Long-bearded hawkweed(Hieracium longipilum), anda Dry Sand Gravel Prairie (Southern) Type ecological community.Please refer to the attached spreadsheet for a listing of species and data obtained from the NHIS for the 1-mile search area. The project site does not provide any potential habitat for the rusty patched bumble bee, Western foxsnake, or long-bearded hawkweed. The project site is a mix of developed impervious surface for industrial manufacturing and maintained turf grass, with sparse trees. There is no native prairie or pollinator habitat within the project site. The presence of open grassy areas with sparse trees may support site use by several different bird species, though within the project site (NatureServe Explorer, accessed 2018). According to the DNR website, the loggerhead shrikerequires pastures and grasslands with sparse trees and fencelines for impaling food(http://files.dnr.state.mn.us/eco/rsg/shrikeflyer.pdf). There are no naturally vegetated or native grasslands on the project site. Green space within the project site is heavily managed as landscaping and the overall industrial use of the site makes it unlikely to provide habitat. The expansion will occur in the northern point of the parcel with additional parking in Wenck | Colorado |Georgia|Minnesota| North Dakota |Wyoming Toll Free800-472-2232 Web wenck.com Lisa Joyal Review Coordinator Minnesota DNR August 14, 2018 the northwest corner. Primary impacts will occur to previously developed impervious surfaces or lawn. Due to the lack of suitable habitat and the existing industrial site use, there are no anticipated impacts to wildlife, fish, or vegetation. Per our license agreement and the requirements for assessment of the potential impacts from the project on known species in the NHIS. The specific NHIS data used to evaluate the potential element occurrence and potential impacts to species will not be distributed, mapped or used within the EAW document or publicly distributed. The EAW will provide general explanatory text similar to that contained in this letter to document the species occurrence and potential species impacts. We appreciate your timely review of our concurrence request. Please let us know if you have any questions. Sincerely, Meaghan Watson Environmental Scientist Wenck Associates, Inc. 2 N:\\Technical\\7526 Up North Plastics\\0001 EAW\\Agency Queries\\NHIS\\DNR Letter_2018-08-01.docx T27 R21 S10 T27 R21 S9 T27 R21 S8 T27 R21 S18 T27 R21 S15 T27 R21 S17 T27 R21 S16 Cottage Grove Project Site T27 R21 S19 T27 R21 S22 T27 R21 S20 T27 R21 S21 T27 R21 S30 T27 R21 S28 T27 R21 S27 T27 R21 S29 USGS The National Map: National Boundaries Dataset, National Elevation Dataset, Geographic Names Information System, National 1,00050001,000 Hydrography Dataset, National Land Cover Database, National T27 Structures Dataset, and National Transportation Dataset; U.S. Census Feet T27 R21 S32T27 R21 S33T27 R21 S34 R21 Path: L:\\7526 Up North Plastics\\0001\\MXD\\Site Map Working.mxd Bureau - TIGER/Line; HERE Road Data S31 Date: 7/17/2018Time: 9:10:08 AMUser: MadJC0259 ± UP NORTH PLASTICSJULY 2018 Site Location MapFigure 1 Project Site Usvdl!Usbjmfs!Qbsljoh Tupsbhf Tjmpt Qmbtujd!Nbovgbduvsjoh!QmbouPggjdf Tdbmf Fnqmpzff Qbsljoh 6113611611 Gffu Qbui;!M;\]8637!Vq!Opsui!Qmbtujdt\]1112\]NYE\]Tjuf!Efubjm!Nbq!Xpsljoh`kdn/nye Ebuf;!802803129Ujnf;!21;24;45!BNVtfs;!NbeKD136: ± UP NORTH PLASTICSJULY 2018 Site Detail MapFigure 2 Appendix S July 17, 2018 Data Requests Minnesota State Historic Preservation Office 345 Kellogg Boulevard West St. Paul, MN 55102 RE: Up North Plastics Industrial Expansion Wenck File #7526-0001 Department of Survey and Information Management: Up North Plasticsis proposing an expansion of their existing plastic manufacturingplant in Cottage Grove, Minnesota. The project site is 85acres and consists of the existing plastic manufacturing plant, storage silos for raw materials and finished products, truck and trailer parking areas, delivery areas, a scale, office building, and employee parking area. The existing facilityislocated at 9480 Jamaica Avenue South, Cottage Grove, MN 55016 as shown on the attached Figure 1. The proposed expansion will add approximately 410,000 square feet to the existing industrial facility as well as additional storage silos. The expansion will take place on the existing project site, mainly in the area where the existing truck parking is located on the north end of the site. A site detail map is included as Figure 2. We are requesting information about possible historical and/or other cultural resources located on or near the project site in Cottage Grove, in Washington County, Minnesota. Pleaseprovide any available information from the Minnesota Archaeological Inventory and Historic Structures Inventory regarding cultural resourcesnear the project site. Specifically, the project is located within theNW 1/4 of Section 21, Township 27, Range 21. The informationfrom this querywill be used as part of the EAWpreparationfor the proposed expansion project. Please feel free to contact me at (763)479-4263 if you have any questions. Thank you for your assistance. Sincerely, Wenck Associates, Inc. Jeff Madejczyk Principal jmadejczyk@wenck.com Enclosures: Project Location Map, Site Detail Map Wenck| 1800 Pioneer Creek Center|P.O. Box 249| Maple Plain, MN55359-0249 Toll Free800-472-2232 Main763-479-4200 Emailwenckmp@wenck.com Webwenck.com - T27 R21 S10 T27 R21 S9 T27 R21 S8 T27 R21 S18 T27 R21 S15 T27 R21 S17 T27 R21 S16 Dpuubhf!Hspwf Project Site T27 R21 S19 T27 R21 S22 T27 R21 S20 T27 R21 S21 T27 R21 S30 T27 R21 S28 T27 R21 S27 T27 R21 S29 !VTHT!Uif!Obujpobm!Nbq;!Obujpobm!Cpvoebsjft!Ebubtfu-!Obujpobm Fmfwbujpo!Ebubtfu-!Hfphsbqijd!Obnft!Jogpsnbujpo!Tztufn-!Obujpobm 2-11161112-111 Izesphsbqiz!Ebubtfu-!Obujpobm!Mboe!Dpwfs!Ebubcbtf-!Obujpobm T27 Tusvduvsft!Ebubtfu-!boe!Obujpobm!Usbotqpsubujpo!Ebubtfu<!V/T/!Dfotvt Gffu T27 R21 S32T27 R21 S33T27 R21 S34 R21 Qbui;!M;\]8637!Vq!Opsui!Qmbtujdt\]1112\]NYE\]Tjuf!Nbq!Xpsljoh/nye Cvsfbv!.!UJHFS0Mjof<!IFSF!Spbe!Ebub S31 Ebuf;!802803129Ujnf;!:;21;19!BNVtfs;!NbeKD136: ± UP NORTH PLASTICSJULY 2018 Site Location MapFigure 1 Project Site Usvdl!Usbjmfs!Qbsljoh Tupsbhf Tjmpt Qmbtujd!Nbovgbduvsjoh!QmbouPggjdf Tdbmf Fnqmpzff Qbsljoh 6113611611 Gffu Qbui;!M;\]8637!Vq!Opsui!Qmbtujdt\]1112\]NYE\]Tjuf!Efubjm!Nbq!Xpsljoh`kdn/nye Ebuf;!802803129Ujnf;!21;24;45!BNVtfs;!NbeKD136: ± UP NORTH PLASTICSJULY 2018 Site Detail MapFigure 2 Appendix 61 £ ¤ 61 £ ¤ Project Site 61 £ ¤ Ramsey Saint County Croix County Pierce Saint Paul Park 7.5 Minute Quadrangle (USGS: 1976) County Dakota County 2,0001,00002,000 Goodhue Feet Path: L:\\7526 Up North Plastics\\0001\\MXD\\EAW\\Figure_1_Site_Location_Map.mxd County Date: 9/19/2018Time: 12:23:31 PMUser: MueKJ0907 ± UP NORTH PLASTICSSEPT 2018 Site Location MapFigure 1 n g b e r g Tr S 90th St S S 61 £ ¤ Truck Trailer Parking Storage Silos Plastic Manufacturing Plant Office Scale Employee Parking Project Site 2016 Aerial Photograph (Source: MN GEO) 97th St S 5002500500 Feet Path: L:\\7526 Up North Plastics\\0001\\MXD\\EAW\\Figure_2_Site_Aerial_Photo.mxd Date: 9/19/2018Time: 12:25:24 PMUser: MueKJ0907 ± UP NORTH PLASTICSSEPT 2018 Site Aerial PhotoFigure 2 n g b e r g Tr S 90th St S S 61 Updated/Additional £ ¤ Railroad Spurs Proposed Parking Lot Existing Retaining Pond Proposed Plant Building Proposed Infiltration Basin Storage Proposed Truck Silos Trailer Parking Plastic Manufacturing Plant Office Scale Employee Parking Project Site Proposed Expansion Feature 2016 Aerial Photograph (Source: MN GEO) 97th St S 5002500500 Feet ± Path: L:\\7526 Up North Plastics\\0001\\MXD\\EAW\\Figure_3_Proposed_Expansion_Project_Updated.mxd Date: 9/19/2018Time: 3:06:59 PMUser: MueKJ0907 UP NORTH PLASTICSSEPT 2018 Conceptual Site Plan for Proposed Expansion Project Figure 3 Urban land-Zimmerman complex, 1 to 8 percent slopes 90th St S Sparta loamy sand, 0 to 2 percent slopes Sparta loamy sand, 2 to 6 percent slopes S Hubbard loamy sand, 1 to 6 percent slopes 61 £ ¤ Hubbard loamy sand, 6 to 12 Burkhardt sandy percent slopes loam, 3 to 9 percent slopes Sparta loamy Dickman sandy sand, 0 to 2 loam, 0 to 2 percent slopes percent slopes Waukegan silt loam, 0 to 2 percent slopes Burkhardt sandy loam, 0 to 3 percent slopes Sparta loamy Hubbard loamy sand, 0 to 2 sand, 12 to 18 Burkhardt sandy Burkhardt percent slopes percent slopes loam, 0 to 3 sandy loam, 3 to percent slopes 9 percent slopes Burkhardt sandy Pits, gravelOtter loam, 3 to 9 silt loam percent slopes Burkhardt sandy loam, 0 to 3 percent slopes Burkhardt sandy Project Site loam, 3 to 9 Burkhardt Copaston loam, 0 percent slopes sandy loam, 0 to Prime Farmland Classification to 6 percent slopes 3 percent slopes All areas are prime farmland Farmland of statewide importance Pits,quarry 9 7thSt Not prime farmland S Sparta loamy 2016 Aerial Photograph (Source: MN GEO) sand, 2 to 6 Sparta loamy percent slopes sand, 0 to 2 5002500500 percent slopes Feet Path: L:\\7526 Up North Plastics\\0001\\MXD\\EAW\\Figure_5_Soils_Prime_Farmland_Map.mxd Date: 9/19/2018Time: 12:28:57 PMUser: MueKJ0907 ± UP NORTH PLASTICSSEPT 2018 Soils and Prime Farmland MapFigure 5 St S 90th S 61 £ ¤ S Project SiteI3 - Heavy Industry Zoning I5 - Railroad Access 97 th St S B2 - Retail Buisiness PB - Planned Business ± B3 - General Business 5002500500 R3 - Single Family Residential Feet I1-Limited Industrial R6 - High Density Residential Source: Cottage Grove Zoning Map Path: L:\\7526 Up North Plastics\\0001\\MXD\\EAW\\Figure_6_Zoning_Map.mxd I2 - General Industry Date: 9/19/2018Time: 12:29:23 PMUser: MueKJ0907 UP NORTH PLASTICSSEPT 2018 City of Cottage Grove Zoning MapFigure 6 39 7 465 208805 208807 ! A 110464 ! A ! A ! A 208806 ! A 257868 201227 ! 257066 A ! A 61 £ ¤ !. !. !. !. !. !. !. 233510 441943 !. 257331 ! A! A 257332 257333 191904 ! 263111 A ! 194154 A ! A 257340 ! ! A 257344! ! A ! A A A ! ! 257341 A !A A ! 257334 ! A ! A 257339 A ! 426953 A 708071 ! 122028 257335 A 257338 257342 !! ! AA A 506667 257343 257609 ! A 608192 19A !7 465 A 151730 ! A Project SiteCounty Well Index Field Verified Wells Only 1 Mile Radius 2016 Aerial Photograph (Source: MN GEO) !Domestic Well A Karst Feature Inventory Point !. 2,0001,00002,000 Commercial Well ! A Feet Path: L:\\7526 Up North Plastics\\0001\\MXD\\EAW\\Figure_7_CWI_and_Geologic_Hazards.mxd !Public Supply Well A Date: 9/25/2018Time: 9:13:33 AMUser: MueKJ0907 ± UP NORTH PLASTICSSEPT 2018 County Well Index and Geologic Hazards MapFigure 7 39 7 465 Unnamed (82047200) Unnamed (82008500) Unnamed 61 £ ¤ (82008500) - 0 Unnamed (82008600) 19A 7 465 Project Site3 - Shallow Marsh 1 Mile Radius4 - Deep Marsh Public Water Watercourse5 - Shallow Open Water Public Waters Basins6 - Shrub Swamp 2016 Aerial Photograph (Source: MN GEO) MNDNR NWI Update8 - Bogs 2,0001,00002,000 1 - Seasonally Flooded Basin or Municipal and Industrial Activities Flat Feet Path: L:\\7526 Up North Plastics\\0001\\MXD\\EAW\\Figure_8_Water_Resources.mxd Riverine Systems Date: 9/19/2018Time: 12:31:25 PMUser: MueKJ0907 ± UP NORTH PLASTICSSEPT 2018 Water Resources MapFigure 8 eS ve JarvisA S e vA ore naJ einaJ S tS I S evA yals P E c J aedI evAl Hemingway Ave S e v A tS